Rules for Classification and Construction Ship Technology

Size: px
Start display at page:

Download "Rules for Classification and Construction Ship Technology"

Transcription

1 I Rules for Classification and Construction Ship Technology 5 Underwater Technology 3 Unmanned Submersibles (ROV, AUV) and Underwater Working Machines Amended : Section 1, D of these rules is not applicable for Unmanned Submersibles (ROV, AUV) and Underwater Working Machines transferred to the common DNV GL production system from the date of transfer. For such Unmanned Submersibles (ROV, AUV) and Underwater Working Machines, see DNV GL rules for classification: Underwater technology, Pt.7. Edition 009

2 The following Rules come into force on 1 November 009. Germanischer Lloyd Aktiengesellschaft Head Office Vorsetzen 35, 0459 Hamburg, Germany Phone: Fax: [email protected] "General Terms and Conditions" of the respective latest edition will be applicable (see Rules for Classification and Construction, I - Ship Technology, Part 0 - Classification and Surveys). Reproduction by printing or photostatic means is only permissible with the consent of Germanischer Lloyd Aktiengesellschaft. Published by: Germanischer Lloyd Aktiengesellschaft, Hamburg

3 I - Part 5 Table of Contents Chapter 3 Page 3 Table of Contents Section 1 Certification and Classification of Unmanned Submersibles A. Scope B. Certification C. Classification and Characters of Classification D. Surveys for Maintenance of Class E. Workmanship Section Principles for the Construction of Unmanned Submersibles A. General Principles B. Rules and Regulations to be Considered C. Definitions D. Environmental Conditions E. Documents for Approval F. Failure Modes and Effects Analysis (FMEA) G. Tests and Trials H. Marking I. Spare Parts Section 3 Design and Construction of Unmanned, Remotely Operated Submersibles (ROV) A. General Principles B. Materials C. Design Loads D. Vessels and Apparatus under Pressure E. Supporting Structure and Exostructure, Equipment F. Launcher G. Piping Systems and Umbilicals H. Arrangements for Control resp. Adjustment of Depth, Trim, Positive and Negative Buoyancy I. Propulsion and Manoeuvring Equipment J. Positioning System K. Working Devices L. Electrical Equipment M. Control, Automation, Data Transfer, Navigation and Locating Equipment N. Fire and Explosion Protection O. Operational Media P. Corrosion Protection Section 4 Additional Requirements for Unmanned, Autonomous Submersibles (AUV) A. General Principles B. Principles of Design and Construction C. Documents for Approval D. Tests and Trials

4 Chapter 3 Page 4 Table of Contents I - Part 5 Section 5 Principles for the Construction of Underwater Working Devices and Underwater Working Machines A. Scope B. Certification C. Rules and Regulations to be Considered D. Definitions E. Environmental Conditions F. Principles for Design and Construction G. Documents for Approval H. Tests and Trials I. Marking J. Spare Parts K. Operational Media L. Corrosion Protection Section 6 Supporting Systems aboard the Support Ship A. General B. Classification and Certification C. Systems for Control D. Supply Systems E. Launch and Recovery System F. Stowage and Deck Transport Annex A Calculation of the Pressure Hull A. General... A- 1 B. Fatigue Strength... A- 1 C. Stresses at Nominal Diving Pressure... A- D. Stresses at Test Diving Pressure... A- E. Proof of Ultimate Strength at Collapse Diving Pressure... A- F. Calculation... A- G. Literature... A- 17 Annex B Manufacturing Tolerances for the Pressure Hull A. General... B- 1 B. Dimensions of the Pressure Hull... B- 1 C. Pressure Hull Frames... B- D. Out-of Roundness of the Cylindrical resp. Conical Pressure Hull... B- 3 E. Spherical Shells and Dished Ends... B- 6 F. Literature... B- 8 Annex C Acrylic Windows A. General... C- 1 B. Materials... C- 1 C. Manufacture of Windows... C- D. Window Shapes and Sizes... C- E. Installation of Windows... C- 3

5 I - Part 5 Table of Contents Chapter 3 Page 5 Annex D Manufacture and Treatment of Fibre Reinforced Plastics (FRP) A. General... D- 1 B. Requirements for the Materials and their Processing... D- 1 C. Requirements for the Design... D- Annex E Basic Requirements for Umbilicals A. General... E- 1 B. Principles for Layout and Design... E- 1 C. Documents for Approval... E- 4 D. Tests and Trials... E- 5 E. Marking... E- 6

6

7 I - Part 5 Index Chapter 3 Page 7 Index A Accessibility Acrylic windows , 3-3, C-1 limits of application... C-1 mechanical and optical properties... C-3 standard dimensions... C-4 Actuators Annual survey Antennas Asymmetric interstiffener buckling of the shell... A-5 Automation , 4- Automation, navigation and locating systems , 4- AUV Certificate B Ballast system , 3-8 Bottom of the sea , 5-5 Buoyancy material , 3-5, 3-8 C Cables... E-3, E-6 Calculation of the pressure hull... A-1 Cells Certification according to GL Rules , 5-1, 6-1 according to other rules , 5- Character of Classification Circuitry Class Certificate Class Register Class Renewal Survey Classification... 1-, 6-1 Cleaning devices Climate... -4, 5-4 Coil-up/coil-off mechanism for umbilicals Collapse diving depth CDD... -3, 3-, 5- Collapse diving pressure CDP... 3-, 5-, A-1

8 Chapter 3 Page 8 Index I - Part 5 Communication systems Component thickness... B-1 Compressed air supply Compressed air systems Compressors Computer-aided operational control systems , 3-11 Conical part of pressure hull, dimensions... B-1 Control station , 5-, 5-5, 6-1 Control systems , 6-5 Corrosion protection Cylindrical part of pressure hull, dimensions... B-1 D Data connection Data transfer systems , 6- Deck transport Design loads... 3-, 6-4 Design service life for acrylic windows... C-1 Discontinuities... A-14 Dished ends... A-1, B-6 dimensions... B-1 torispherical resp. semi-elliptical shape... B-6 Divers Diving, compensation and trimming systems... -5, 3-8 Documents for approval... -4, 4-3, 5-6, 6-6, 6-8 Dynamic positioning E Edge offset... B-1 Elastic-plastic range of the material... A-1 Electrical connecting elements... E-4 Electrical equipment... -6, -9, 3-10, 4- Electrical supply , 6-3 Emergency power supply , 4- Emergency recovery system Emergency shut-off , 5-5, 6-5 Emergency surfacing , 4-, 5-5 Energy distribution Environmental conditions... -3, 5-4, 6-1 Equipment , 6-5

9 I - Part 5 Index Chapter 3 Page 9 Exostructure... -5, 3-5 Explosion protection... -6, 5-4 F Fatigue strength , A-1 Fibre reinforced plastics... D-1 manufacturing... D-1 repair of components... D- requirements for the Design... D- requirements for the materials and their processing... D-1 scope of application... D-1 Fibre ropes Fire and explosion protection... -6, 3-13, 6-7 Fixing systems , 5-5 Frames... A-8, A-11 arranged outside... A-1 imperfections... A-9 of pressure hull... B- tolerances... B-3 tripping... A-9 G Garage Gas cylinders Gas systems H Hose assemblies... -9, 3-7, E-, E-6 Hydraulic system , 6-3 I Inclined positions... -4, 5-4 J Jettisoning of equipment L Launch and recovery cranes Launch and recovery system Launcher... -6, 3-5, 4-1 Lifting cables , 3-6, 3-8 Lifting points... -9, 3-5, 5-7

10 Chapter 3 Page 10 Index I - Part 5 Literature... A-17 Load cases for pressure vessels Locating equipment M Main dimensions and main parameters... - Maintenance manual Manipulators , 5-3 Manoeuvring equipment Manual for operation and maintenance... -5, 5-6 Manufacturing documents Manufacturing tolerances for the pressure hull... B-1 Marking , 5-7, 6-7, C-1, C-, E-6 Materials , 6-5, C-1 N Navigation , 4-3 Nominal diving depth NDD... -3, 3-, 5-3, 5-6, 5-7 Nominal diving pressure NDP... 3-, 5-3 O Operational media Operational records... 1-, -5, 5-6 Out-of roundness of the cylindrical resp. conical pressure hull... B-3 Out-of-roundness Measuring method 1 direct measuring of radii... B-4 non-uniformly distributed measuring points... B-5 Measuring method indirect measurement of the deviation from the average arc height... B-5 P Payload NL... -, 4-3, 4-4, 5-7, 6-4 Penetrations in the cylindrical or conical part of the pressure hull area comparison principle... A-14 big penetrations interrupting frames... A-16 sectional area substitution principle... A-15 small penetrations which do not interrupt frames... A-15 Penetrations of spherical shells... A-17 Piping systems... -5, -9, 3-7 Positioning system... -5, -10, 3-9, 6-

11 I - Part 5 Index Chapter 3 Page 11 Power supply , 3-1, 4-3 Pressure hull conical part, dimensions... B-1 cylindrical part, dimensions... B-1 frames... B- Pressure vessel , A-1 Pressures Propeller , 3-8, 4- Propulsion and manoeuvring equipment... -5, 3-8, 4- Protective conductors Protective measures Pumps... -5, -9, 3-7 Q Quality control R Ram frames Reduction factor "k" for different kinds of steel treatment... A-14 ROV Certificate Rudders , 3-9, 4- S Safe working load SWL , 6-4, 6-6, 6-7 Safety factor Search lights Seaways... -4, 5-4 Sensors Shaking... -4, 5-4 Spare parts... -9, 5-7 Spherical form, permissible... B-6 Spherical shells... A-1, B-6 dimensions... B-1 failure pressure with a deviating out-of-roundness... B-7 measurement of the local flattening... B-7 of ferritic steel... A-13 of other materials... A-13 Standard dimensions for flat disk windows... C-4 for spherical shell windows... C-5 Steel wire ropes

12 Chapter 3 Page 1 Index I - Part 5 Stowage Stresses at nominal diving pressure NDP... A- at test diving pressure TDP... A- for a conical pressure hull... A-5 in a uniformly stiffened cylinder... A- Stress-strain behaviour... A-7 Supply systems Supporting structure... -5, -9, 3-5, 4-1 Supporting systems aboard the support ship... 1-, 5-1, 6-1 Surveys annual Class renewal intermediate maintenance of Class Swell compensators Symmetric interstiffener buckling of the shell... A-6 T Test diving depth TDD... -3, 3-, 5-3 Test diving pressure TDP... 3-, 5-3 Tether Management System (TMS)... -, 6-6 Tide and currents... -4, 5-4 Tools Total system... -4, -7, 5-6 Towing point Trial program... -5, 5-6 Trimming systems... -5, 3-8 U Ultimate strength... A- Umbilical winch Umbilicals... -5, -9, 3-5, 3-6, 3-7 coil-up/coil-off mechanism... E-4 documents for approval... E-4 energy supply lines... E-3 jettisoning... E-4 marking... E-6 principles for layout and design... E-1 tests... E-5

13 I - Part 5 Index Chapter 3 Page 13 Unmanned submersibles autonomous , 4- remotely operated , 3-1 V Vessels and apparatus under pressure , -5, 3-3 Vibrations... -4, 5-4 Video cameras W Web frames... A-7, A-8, A-1 Weld sinkage... B-1 Welding seams, evaluation... B- Window installation... C-3 manufacturing... C- shapes... C- Working devices , 3-8, 5-3 Working functions Working machines Workmanship

14 I - Part 5 Section 1 B Certification and Classification of Unmanned Submersibles Chapter 3 Page 1 1 Section 1 Certification and Classification of Unmanned Submersibles A. Scope 1. These Rules are valid for the construction of unmanned submersibles (UUV) which shall be certified or classified by Germanischer Lloyd (GL), including their operating and monitoring systems. The requirements for the necessary supply systems and the systems for launch and recovery of submersibles on the support ship are summarized in Section 6. Unmanned submersibles may be Remotely Operated Vehicles (ROV) or Autonomous Underwater Vehicles (AUV).. Remotely operated submersibles (ROV) For the purpose of these Rules unmanned submersibles, which are during the mission physically connected with an umbilical to the relevant support ship and which are controlled from there, are regarded as remotely operated submersibles. As an exception also wireless remote control is possible. 3. Autonomous submersibles (AUV) For the purpose of these Rules unmanned submersibles, which are during the mission not physically connected with the relevant support ship (e.g. with an umbilical), are regarded as autonomous submersibles (AUV). These vehicles may perform pre-defined missions with the assistance of EDP-programming and active and/or passive sensors respectively single missions under remote control. 4. For further definitions, see Section, C. B. Certification 1. General 1.1 The application for Certification of a submersible is to be made in writing to GL by the manufacturer or operator. 1. Documents for the submersible are generally to be submitted to GL in triplicate respectively in case of electronic transmission as single issue for approval. The scope of the documents to be submitted depends on the type and equipment of the submersible and follows from Section, E. 1.3 Surveys which have to be performed by GL are to be notified to GL in due time.. Certification according to GL Rules.1 Opportunity for Certification Unmanned submersibles, which are constructed and tested according to the rules and under survey of GL may receive a ROV respectively an AUV Certificate from GL.. Scope of Certification The Certification comprises the complete submersible including its machinery, shipbuilding and electric installations. An overview which additional system elements are to be certified shows Table ROV/AUV Certificate.3.1 After completion and successful testing of the submersible a ROV Certificate will be issued for remotely operated vehicles respectively an AUV Certificate will be issued for autonomous vehicles by GL..3. The Certificate certifies the technical condition of the submersible at the time of the tests and approvals by GL. In addition it will be confirmed that no safety reservations are opposing the operation of the submersible..3.3 The validity of the ROV respectively AUV Certificate is 5 years at maximum and can be prolonged after renewed tests. For maintaining the Certificate the submersible is in general to be subjected to an Annual Survey. The scope has to be agreed with GL in each single case. The ROV respectively AUV Certificate looses its validity if substantial changes have been performed at the submersible respectively if the submersible has been severely damaged and the change or the repair has not been agreed and approved by GL. 3. Certification according to other rules 3.1 For unmanned submersibles, which are not built according to the Rules of GL, the applied rules have to be defined in a binding way in the application for Certification. 3. After successful examination a Certificate may be issued by GL.

15 Chapter 3 Page 1 Section 1 C Certification and Classification of Unmanned Submersibles I - Part 5 Table 1.1 Certification and Classification of unmanned submersibles System elements Submersibles: (Sections 1 4) Submersible as such, including umbilical/lifting cable, if applicable Control stand, data transfer to submersible Launcher, if applicable Types of unmanned submersibles ROV Classification ROV Certification Classification ROV Certification Classification ROV Certification AUV Classification AUV Certification Classification AUV Certification Classification AUV Certification Supporting systems aboard the support ship: (Abschnitt 6) Supply systems and their control Certification 1 Certification 1 Launch and recovery equipment, umbilical winch, if applicable Certification Certification Stowage and deck transport Proof of suitability 3 Proof of suitability 3 1 GL Certificate oder Certificate of a recognized institution, as far not content of the Classification of the support ship GL Certificate oder Certificate of a recognized institution 3 e.g. test stamp, test mark for lashing devices, etc.; proof for winches, deck fastening, etc. C. Classification and Characters of Classification 1. Classification 1.1 Opportunity for Classification Unmanned submersibles (UUV) may be classified and have then to be subjected to repeated surveys by GL according to the duration of Class. 1. Basis for Classification These Rules for Classification and Construction constitute the basis for the Classification and Construction of unmanned submersibles. For requirements not defined in these Rules, the other Rules for Classification and Construction of GL have to be applied, if not otherwise agreed. The term "Rules for Construction" includes Rules for Materials and Welding as well as other Rules for Construction issued by GL, compare Section, B. 1.3 Scope of Classification Classification comprises the entire unmanned submersible including its machinery, structural elements and electrical equipment. An overview which additional system elements of the total system are generally to be classified shows Table Class Certificate The Certificate of Classification for unmanned submersibles is issued by the GL Head Office. It is to be kept on board of the support ship. 1.5 Class Register Unmanned submersibles classified by GL are entered in the Register Book with a note of the Character of Classification and of the most important technical data and are included in the list of submersibles. 1.6 Operational records Unmanned submersibles are required to carry an operational record in which details of operations (diving depth, mission time, damages, maintenance, repairs, etc.) are to be entered. The record is to be presented to the GL Surveyor on request.. Characters of Classification.1 The Character of Classification is: 100 A 5 ROV for remotely operated submersibles 100 A 5 AUV for autonomous operating submersibles The figure 5 denotes the duration of Class in years.. Where unmanned submersibles are built under the survey and in accordance with the Rules of GL using materials and components tested by GL in conformity with its Rules the Character of Classification is amended by the preceding Character..3 Where unmanned submersibles are built under the survey and in accordance with the rules of another recognized classification society on being awarded GL Classification, the Character of Classification is amended by the preceding Character.

16 I - Part 5 Section 1 D Certification and Classification of Unmanned Submersibles Chapter 3 Page For submersibles and their equipment which are non-standard design, GL reserve the right to impose additional tests, to order a special survey schedule and to make special entries in the Certificate of the submersible and the Register Book. 3. Further class relevant requirements Further requirements for Classification and maintenance of Class are contained in the GL Rules for Manned Submersibles (I-5-), Section 1 and Classification and Surveys (I-0) and are to be applied as far as possible analogously for unmanned submersibles. 4. Type approval for series vehicles Unmanned submersibles which are manufactured in series may be subjected to a type test and certified or classified in a relevant way. Kind and scope of the type tests as well as of the additional construction supervision of the series are to be agreed with GL in each single case. D. Surveys for Maintenance of Class 1. General 1.1 Surveys to be performed in the course of the constructional tests and acceptance tests on the unmanned submersible are performed by GL in accordance with these Rules in agreement with the manufacturer or operator. For this scope see Section, F. 1. Surveys required under official regulations, international conventions or other arrangements are performed by GL on application or commission as required by the relevant provisions. 1.3 If the submersible has suffered substantial damage which impairs or nullifies the validity of the Certificate, GL will on application carry out damage and repair surveys and confirm the Certificate after the necessary repair measures have been performed. 1.4 Extraordinary surveys have to be carried out if modification is made in respect of design, mode of operation or equipment. 1.5 If it is an excessive effort to prepare units and components for survey on board, the surveys may also, on application, be performed at the manufacturer's works or another authorized workshop.. Class surveys The surveys are to be performed according to the following criteria. If the operational systems of a submersible should be different from the standard case, the scope of the surveys may be adjusted accordingly in agreement with GL..1 Annual Survey The Annual Survey of the unmanned submersible includes at least the following tests and checks:.1.1 Examination of the documents relating to the submersible and scrutiny of the operational records..1. The exostructure including the load bearing structure, all fixtures, doors and covers, lifting points, claddings, fixed buoyancy aids, etc. are to be inspected for visible damage, cracks, deformation, corrosion attacks and fouling, etc..1.3 Check of the measures for corrosion protection (e.g. anodes)..1.4 All vessels and apparatus under external or internal overpressure, penetrations, viewports, valves, fittings and relevant safety equipment are to be subjected to external inspection..1.5 The entire machinery installation including electrical equipment and eventual redundancy systems are to be subjected to external inspection..1.6 Check that insulation measurements have been performed on the electrical equipment..1.7 Review of safety systems and of the set points of the safety devices..1.8 Function test of all alarm systems..1.9 Switching from the main to the emergency electricity supply of the submersible, if existing, is to be tested The accuracy of all essential instrument readings is to be checked (e.g. depth gauge, etc.) All emergency systems (e.g. release mechanism, emergency signals) are to undergo a functional test - as far as applicable..1.1 Check of the ballast system Hose assemblies are to be checked for visible damages The umbilical and lifting cable - if applicable - is to be checked for visible damages, cracks, deformations and corrosion The function of the equipment for data transfer is to be checked The functional efficiency of the total system is to be checked by means of a trial dive.. Intermediate Survey The Intermediate Survey falls due nominally,5 years after commissioning and each Class Renewal and may be carried out on the occasion of the second or third Annual Survey.

17 Chapter 3 Page 1 4 Section 1 E Certification and Classification of Unmanned Submersibles I - Part 5 An Intermediate Survey is an Annual Survey according to.1 extended by the following scope:..1 Performance of a tightness test on vessels under external pressure by application of a vacuum of at least 0, bar below atmospheric pressure or other suitable test procedures, as far as applicable... Tightness test of ballast water system, if existing...3 Tightness test of hose assemblies...4 External visual check and eventual functional test, if applicable, of the extension elements/working devices belonging to the submersible..3 Class Renewal Survey Every five years a Class Renewal Survey will be carried out. In addition to the surveys defined in. the following tests and examinations are to be carried out for Class Renewal Surveys:.3.1 Check of the shell cladding and buoyancy aids (pressure resistant foam) from all sides. If necessary the cladding has to be removed..3. Check of the areas of the load bearing structure which are not easily accessible with the aid of non-destructive test procedures..3.3 For vessels and apparatus under pressure, which cannot be satisfactorily inspected internally or their satisfactory condition cannot be fully verified by internal inspection, another non-destructive test method is to be used or a hydraulic pressure test is to be performed additionally. As far as necessary buoyancy materials, cladding or heat insulation layers are to be removed..3.4 Acrylic windows are to be dismantled, if necessary, and are to be checked for cracks. The window seatings are to be checked for corrosion and damages..3.5 Check of systems for emergency surfacing and the resulting floating condition at the water surface..3.6 Check that accessories, especially hose assemblies and compensators have been changed according to the maintenance plan. E. Workmanship 1. General 1.1 Requirements to be complied with by the manufacturer and supplier Each workshop of a manufacturer/supplier has to be provided with suitable equipment and facilities to enable proper handling of the respective materials, manufacturing processes, structural components, etc. GL reserve the right to inspect the workshops accordingly and ask for related requirements or to restrict the scope of manufacture to the potential available at the plant. For safety relevant components and elements it is to be defined by GL if the manufacturer/supplier needs an approval by GL. Components and elements are regarded as safety relevant, if a direct danger for persons or the submersible may be created by them The manufacturing plants are to have at their disposal sufficiently qualified personnel. The supervisory and control personnel is to be named to GL, the areas of responsibility are to be defined. GL reserve the right to require proof of qualification. 1. Quality control 1..1 The manufacturer/supplier has to apply a quality management system, like e.g. ISO 9001 or equivalent. 1.. As far as required and expedient, all components both during manufacture and on completion are to be checked for completeness, correct dimensions and faultless workmanship according to the standard of good engineering practice Upon inspection and eventual corrections by the manufacturing plant, the structural components are to be presented to the GL Surveyor for inspection, in suitable construction sections, normally in uncoated condition and enabling proper access for inspection The GL Surveyor may reject components that have not been adequately pre-checked and may demand their resubmission upon successful checks by the manufacturer and, if necessary, corrective actions.. Details in manufacturing documents.1 All significant details concerning quality and functional ability of the component concerned shall be entered in the manufacturing documents (workshop drawings, etc.). This includes besides scantlings - where relevant - such items as surface conditions (e.g. finishing of flame cut edges and weld seams), special methods of manufacture involved as well as inspection and acceptance requirements and where relevant permissible tolerances. As far as a standard (works standard, national standard, etc.) shall be used it has to be harmonized with GL.. If, due to missing or insufficient details in the manufacturing documents, the quality or functional ability of the component cannot be guaranteed or is doubtful, GL may require appropriate improvements. This is valid analogously for supplementary or additional parts (e.g. reinforcements), even if these were not required at the time of plan approval or if - as a result of insufficient detailing - could not be required.

18 I - Part 5 Section C Principles for the Construction of Unmanned Submersibles Chapter 3 Page 1 Section Principles for the Construction of Unmanned Submersibles A. General Principles 1. Wherever expedient and feasible, submersibles are to be designed and constructed in such a way that failure of any single component cannot give rise to a dangerous situation.. Submersibles and their components are to be designed to meet the service conditions stated in the specification. 3. Submersibles are to be designed and built to ensure safe operation and facilitate proper maintenance and the necessary surveys. 4. Submersibles are to be designed and constructed in such a way that sufficient possibilities for monitoring during dived travels are given. This can be achieved e.g. by video systems and acoustic instruments. B. Rules and Regulations to be Considered 1. Rules of GL 1.1 The following Rules are valid as additional requirements for the Certification/Classification and construction of submersibles in addition to the GL Rules for Classification and Construction of these vehicles: Part 0 Classification and Surveys Part 1 Seagoing Ships, Chapter 1-4, if applicable II Materials and Welding, Part For supporting systems aboard the support ship see Section Designs differing from the Rules of Construction may be permitted provided that they have been recognized by GL as equivalent. 1.4 Submersibles or parts thereof whose development is based on new principles and which have not yet been sufficiently tested in practical operation require special approval by GL. 1.5 In the cases mentioned in 1.3 and 1.4, GL is entitled to require the submission of additional documentation and the performance of special tests. 1.6 GL reserve the right to impose demands additional to those contained in the Rules in respect of all types of submersibles when such action is necessitated by new knowledge or practical experience, or to sanction deviations from the Rules in specially justified cases.. National regulations National regulations existing alongside GL's Rules are unaffected. 3. International Conventions and Codes Where reference is made to international Conventions and Codes examples are listed in the following: 3.1 MARPOL 73/78 International Convention for the Prevention of Pollution from Ships, 1973 including the 1978 Protocol as amended. 3. SOLAS 74 International Convention for the Safety of Life at Sea, 1974, as amended. 3.3 COLREGS 197 International Regulations of 197 to prevent collisions at sea. C. Definitions 1. General Autonomous submersible (AUV) Submersible which is not physically connected to the support ship during operation (e.g. by an umbilical) and which is able to perform pre-defined missions with the aid of EDP-programming and active and/or passive sensors. Further on they are recovered by a support ship, supplied, maintained and transferred to the location of the next mission. Control stand Desk or console at which all essential indicators, controls, regulating devices, monitoring devices for the remote operation of the submersible are arranged. Diving pressure The pressure, corresponding to the relevant diving depth, to which a submersible or diver is exposed during underwater operations.

19 Chapter 3 Page Section C Principles for the Construction of Unmanned Submersibles I - Part 5 Exostructure External fairing, supporting structures and fixtures outside of pressure vessels which are normally not designed to withstand the diving pressure. Fixing system Device for short time fixing of a submersible e.g. on a structure. Garage Cage into which the submersible can be launched and recovered in a protected way. The garage will in general be part of a launcher. Gas cylinders Bottles for the storage and transport of gases under pressure. Launcher Device for launching and recovering of the submersible from the support ship and from which the submersible can start under water to the location of the mission. For remotely operated submersibles (ROV) the launcher is connected by lifting cable and relatively long supply lines with the support ship and contains normally the drum (e.g. TMS Tether Management System) for the umbilical from the launcher to the submersible. Launching and recovering system The plant and equipment necessary for launching and recovering a submersible. Lifting cable Cable for launching and recovering of submersibles and also for lifting and lowering of a remotely operated submersible. Payload NL of the submersible Maximum additional load for devices, equipment, materials, which are not necessary for the direct operation of the submersible, but are serving for work to be performed, investigation of the sea and scientific research. Positioning system System for keeping a pre-defined position (breadth, length, depth) Pressure vessel A container capable of withstanding an internal or external overpressure. Remotely operated submersible (ROV) Submersible which is during the mission physically connected to the related support ship by an umbilical and is controlled from there. As an exception also wireless remote control is possible. Safe working load SWL of the launching and recovery system The safe working load SWL is the load which may be loaded directly to the launching and recovery system. The dead load of the load transmitting device which are not fixed to the launch and recovery system, but are used as connection between load and lifting appliance, are part of the safe working load SWL. Supporting structure Frame or rack in which the single components of the submersible are arranged together. Supporting systems Systems on the support ship, which are supporting especially remotely operated, but also autonomous submersibles with supplies necessary for the operation, like e.g. electrical energy, hydraulic liquid, as well as control and monitoring data. Support ship A surface vessel for support and supply of remotely operated and autonomous submersibles. Within these Rules the support ship may also be a stationary supply station (e.g. on the coast or on a stationary offshore plant). Total system The submersible including its control, launching, recovery, storage, transport and supply systems. Umbilical Connection between support ship and remotely operated submersible, which might contain control, monitoring, data transfer and energy supply lines and, if applicable, also a lifting cable. This supply line can also be used between a launcher and the submersible or between the submersible and a diver. Working device (underwater) Device, e.g. manipulator, sample container and tools, which are fixed to the submersible and which are designated to the performance of underwater tasks and the reception of e.g. samples. Working machine (underwater) Machines, e.g. grab, driver, drill and their combination, which are normally used from a support ship to perform underwater tasks.. Main dimensions and main parameters All dimensions are related to fix installed equipment in drawn-in/turned-in condition..1 Co-ordinate system In relation to the submersible a fixed, right-handed coordinate system x, y, z according to Fig..1 is intro-

20 I - Part 5 Section D Principles for the Construction of Unmanned Submersibles Chapter 3 Page 3 duced. The origin of the system is defined by the aft perpendicular, the centre line and the basis line of the submersible. The x-axis points in longitudinal direction of the vehicle positive forward, the y-axis positive to port and the z-axis positive upwards. Angular motions are considered positive in a clockwise direction about the three axes.. Length over all LOA The length LOA is the length between the most forward and most aft point of the submersible including fixed installed components of equipment, measured parallel to the x-axis [m]..3 Total breadth (width) B The total breadth (width) B is the maximum breadth of the submersible including all fixed installed parts of equipment, measured parallel to the y-axis [m]..4 Radius of the pressure tight vessel R m The radius R m of a pressure tight vessel is the radius of the cylinder or the sphere related to the middle of the wall thickness [m]..5 Total height H The total height H is the total height from baseline to upper edge of the vehicle including all fixed installed parts of equipment, measured parallel to the z-axis [m]..6 Draught T The draught T in surfaced condition is the maximum vertical distance between the baseline and the water surface [m]..7 Displacement The displacement of the surfaced submersible is Δ, the displacement of the dived vehicle is Δ [t]. z z.8 Pay load NL The maximum additional load for devices, equipment, materials, which are not necessary for the direct operation of the submersible, but are serving for work to be performed, investigation of the sea and scientific research is NL [kg]..9 Diving depths All diving depths are related to the baseline..9.1 Nominal diving depth NDD The nominal diving depth NDD is the diving depth for the unrestricted operation of the submersible [m]..9. Test diving depth TDD The test diving depth TDD is the diving depth which is related to an external overpressure, to which the submersible is subjected after the new construction or after essential repairs [m]..9.3 Collapse diving depth CDD The collapse diving depth CDD is the diving depth of the submersible, which is adequate to the calculated external overpressure, where the collapse of a pressure-proof component is to be expected [m]..10 Velocities.10.1 Velocity v 0 The velocity v 0 is the maximum operational speed of the surfaced submersible [kn] at a number of revolutions of the propeller according to the maximum continuous propulsion power surfaced (MCR 1 )..10. Velocity v 0 The velocity v 0 is the maximum operational speed of the dived submersible [kn] at a number of revolutions of the propeller according to the maximum continuous propulsion power dived (MCR 1 ). z x LOA LOA Fig..1 Fixed co-ordinate system and main dimensions for remotely operated (above) and autonomous (below) unmanned submersibles x y y B B z H H D. Environmental Conditions 1. General As a minimum requirement, the design, selection and arrangement of all machinery, instruments and equipment located on board submersibles are required to conform to the environmental conditions stated below. Environmental conditions other than those stated may be approved for submersibles for service only in particular areas. For special missions, like diving under ice or in caves the environmental conditions experienced there are to be considered and the special measures to be agreed with GL. 1 MCR = maximum continuous rating

21 Chapter 3 Page 4 Section E Principles for the Construction of Unmanned Submersibles I - Part 5. Inclined positions If not specified otherwise satisfactory functioning shall be ensured at (static and dynamic) inclinations of up to,5 in any direction measured in relation to the as-installed datum. Transient inclinations of up to 45 shall not adversely affect operation and shall not cause damage, particularly to machine mountings. For greater operational inclinations these have to be considered adequately for design and testing. 3. Water For the design of submersibles and components the temperature range of the water as well as the range of salt content and therefore of the density is to be defined. If not agreed otherwise, seawater with a temperature range from C to +3 C, with a salt content of 3,5 % and a density of 108 kg/m 3 may be used as a basis. A value of 0,101 bar/m is to be applied when converting diving depth to pressure. 4. Seaways The seaways up to which the submersible shall be operated in surfaced condition are to be agreed with GL. If not agreed otherwise, submersibles are to be designed for sea states with a significant wave height of at least m, allowance being made for accelerations of g downwards and 1 g upwards in the vertical and 1 g each in the longitudinal and transverse directions (g = 9,81 m/s ). 5. Tide and currents For the design of the propulsion and manoeuvring arrangement the different influences of currents according to the operation area and their possible combinations are to be considered. As basis for the design the maximum as well as the minimum tide at the relevant operation area shall be included. In addition currents created by wind or geographic specialities (e.g. narrow channels) are to be considered. 6. Climate For transport, maintenance, inspection and trials out of water on board of support ships as well as for launch and recovery systems for the submersible salt impregnated air ranging in temperature from 10 C to +55 C at an relative atmospheric humidity of 100 % is to be considered. In specially protected control rooms for remotely operated submersibles on board of support ships, a relative atmospheric humidity of 80 % at a reference temperature of 45 C is to be considered. 7. Vibrations and shaking Machinery shall not cause any vibration or shaking which imposes unacceptable stresses on other machines, equipment or the hull of the submersible. The amplitudes and accelerations defined in the GL Rules for Machinery Installations (I-1-), Section 1, C. are to be complied with. 8. Explosion protection Submersibles which are used in respectively from explosion endangered areas (e.g. of oil and gas delivering platforms) are to be designed for the relevant explosion zones. This is also valid for control stands. 9. Further environmental conditions For the design of the submersible also the environmental conditions occurring during an eventual air transport (e.g. underpressure/temperature) are to be considered. E. Documents for Approval 1. General 1.1 Before the start of manufacture, plans of the total system and drawings of all components and systems subject to compulsory inspection, wherever applicable and to the extent specified below, are to be submitted to in triplicate respectively in case of electronic transmission as single issue. 1. The documents shall contain all the data necessary to check the design and loading of the equipment. Wherever necessary, calculations relating to components and descriptions of the system are to be submitted. 1.3 Once the documents submitted have been approved by GL, they become binding for the execution. Any subsequent modifications require GL's consent before they are implemented.. Total system The following documents are to be submitted:.1 A description of the submersible with details of its mode of operation, the proposed application and the essential design data including e.g.: nominal diving depth maximum operating time and maximum function time of identification signals maximum range of a mission (radius) diving procedure operating limits for launching and recovery (seaway) other operating limits in relation to environmental conditions (e.g. salt water / fresh water or geographical peculiarities due to currents)

22 I - Part 5 Section E Principles for the Construction of Unmanned Submersibles Chapter 3 Page 5 speed below and eventually above water as well as maximum towing speed type of propulsion and manoeuvring equipment type and extent of working devices and equipment weight of vehicle, payload and ballast, displacement (submerged). General arrangement drawing and plans showing design details of the submersible, including specifications for materials, manufacture and testing..3 Drawings (block diagrams) of the total system..4 Failure Modes and Effects Analysis (FMEA), if necessary..5 A comprehensive presentation of the measures taken to prevent corrosion..6 Stability documentation (according to aim of mission and design).7 Manual for operation and maintenance The manual for the operation shall include in detail the steps necessary for normal operation as well as for emergency operation in a clear and conceptual form and in the necessary sequence (e.g. as checklist). In addition the measures for the loading of the operating systems (e.g. batteries) are to be defined. In addition the planned lifetime as well as the permissible load and mission cycles of parts of the equipment (e.g. acrylic windows, batteries) is to be defined herein. The maintenance manual shall include all procedures for preventive maintenance as well as for periodic inspections..8 Operational records All conditions relevant for operation (diving depth, mission time, damages, etc.) are to be documented herein..9 Trial program. 3. Supporting structure and exostructure Drawings of the supporting and exostructure of the submersible are to be submitted with data concerning extensions like trimming weights, diving cells, pressure vessels, buoyancy elements, stabilizing fins, drives, umbilical connection, control box, search lights, ram protection, fairing, manipulators, fixing systems, instrument racks, etc. 4. Vessels and apparatus under pressure Drawings of the vessels and apparatus under external and internal pressure are to be submitted with all essential particulars and details necessary for appraising the safety of the equipment and including the specifications for materials, manufacture and testing. 5. Piping systems, umbilicals, and pumps The following are to be submitted: 5.1 Schematic diagrams of all piping systems including details of: materials maximum allowable working pressure maximum allowable working temperature dimensions (diameter, wall thickness) media carried type of valves and connections used and their operational parameters type of hose assemblies 5. Description of pumps and their drives together with all important design and operating data. 5.3 Description of the design of the umbilical and its single elements as well as the requirements for lifting cables according to Annex E, C. 5.4 Listing of the components filled with liquids with definition of the type of liquid (e.g. oil, water). 6. Diving, compensation and trimming systems 6.1 Submission of arrangement of diving, regulating and trimming systems with mathematical proof of the static diving capability 6. For open and closed loop control are to be submitted: description of the systems for depth, positive and negative buoyancy and trim including the necessary diagrams and component drawings data concerning scope, type and design of buoyancy and ballast elements and their fixing on the supporting structure 7. Propulsion and manoeuvring equipment Drawings and descriptions of the propulsion and manoeuvring equipment are to be submitted with data about: mode of operation and control of the systems power demand (type and quantity) method of power transmission to propulsion unit safety systems 8. Positioning system The type and control of the positioning system is to be explained.

23 Chapter 3 Page 6 Section E Principles for the Construction of Unmanned Submersibles I - Part 5 9. Working devices (compare also Section 5, G.) 9.1 For extension elements and working devices the effects on the total system are to be defined. 9. Plans and descriptions of the working devices provided are to be submitted with data concerning: task of the devices/mission parameter type of operation and energy supply control and monitoring safety arrangements location and fixing at the supporting structure applied materials type of release system, if applicable 9.3 Plans and descriptions of the fixing system are to be submitted with information for type and control of the fixing system size of holding power behaviour at energy failure type of release system 10. Electrical equipment The following are to be submitted: 10.1 A general arrangement drawing of the electrical equipment containing at least the following information: voltage rating of the systems power resp. current ratings of electrical consumers switchgear and safety systems (e.g. overload protection) with indicating settings for overload and overload protection cable types and cross-sections 10. The energy balance of power supply Plans and descriptions of the electrical energy supply system Drawings of switchgear and distribution equipment with parts list Complete documentation for electric motor drives with details of control, measuring and monitoring systems Battery installation drawing with details of battery types Details of electrical penetrations through pressure vessel walls Calculation of short-circuit conditions of all electrical components and distribution systems (e.g. power switches, power protection switches and fuses with data about the current ratings and breaking capacity) For the operation in explosive endangered areas the required explosion classes are to be proven Description of the electrical design of the umbilical as well as the connection to the submersible. 11. Automation, navigation and locating systems The following are to be submitted: 11.1 Description of the complete layout of the instruments at the control stand of remotely operated submersibles. 11. Description of the control and operating elements for the submersible and its equipment Description of the nautical and diving instrumentation, including speed and position indicators A description of the safety and alarm systems Arrangement drawings/block diagrams of monitoring systems including lists of measuring points Documentation for electronic components such as instrument amplifiers, computers and peripheral units General diagrams and equipment lists for the data transmission systems and signalling equipment General diagram and description of the Video system Descriptions, general diagrams and equipment lists for the locating equipment. 1. Fire and explosion protection The following are to be submitted: Description of preventive fire and explosion protection measures for the submersibles which shall be used in or from explosion endangered areas. 13. Launcher The following are to be submitted: 13.1 Plans and descriptions of the launcher with data about operating conditions, task and equipment.

24 I - Part 5 Section F Principles for the Construction of Unmanned Submersibles Chapter 3 Page Plans and descriptions of the garage system, if applicable, and equipment of the garage Description of the connections between the support ship and the launcher as well as between the launcher and the submersible. F. Failure Modes and Effects Analysis (FMEA) 1. General 1.1 The Failure Modes and Effects Analysis (FMEA) has the purpose to identify possible failures in the total system, in subsystems and in components of unmanned submersibles/vehicles and to describe the effects on the total system and its subsystems resp. components. 1. For unmanned submersibles an analysis concerning the function and availability of the submersible after occurrence of a single failure has to be submitted if requested by GL. 1.3 The FMEA shall be executed in an early stadium accompanying the design to be able to realize system modification at due time. A tabular form, e.g. according to IEC 6081 is to be used.. Description of the subsystems relevant for the analysis.1 The FMEA shall represent an independent document and be understandable without consulting further documentation. This means that all relevant subsystems are to be described concerning the structure of their basic functions, the installed redundancies and especially the interfaces of the subsystems to each other.. The description shall provide the operating personnel with a good overview of the vehicle structure and the functionalities of the relevant subsystems. For all subsystems typical failure modes and their effects on the overall function of the vehicle shall be indicated. Further on the corrective actions to manage these failures and their effects are to be provided..3 For unmanned submersibles the following subsystems are relevant for maintaining the overall function: exo-supporting structure and equipment pressure hull penetrations and equipment systems for control of depth, trimming, positive and negative buoyancy vessels and apparatus under pressure piping systems, fittings, pumps and compressors, mainly for remotely operated vehicles (ROV) Umbilicals, for ROVs propulsion and manoeuvring equipment electrical installations emergency power supply control, automation, data transfer, navigation and locating equipment fire and explosion protection launch and recovery system/launcher coil up/coil off mechanism for umbilicals, for ROVs mating equipment systems for control aboard the support ship supply systems aboard the support ship stowage and deck transport rescue systems The system descriptions are to be completed by block diagrams according to Block diagrams of the relevant subsystems For each relevant subsystem a block diagram is to be established. This block diagram shall contain the essential information of the system required for the failure analysis, which is normally: definition of the subsystems all essential components of the subsystems interfaces between the components of the subsystems interfaces to or from other subsystems (typical for hydraulic drives and controls, etc.) arrangements for control of the total system submersible supplies from outside the total system vehicle, if applicable further aspects depending on the actual design of the submersible 4. Analysis of the different relevant subsystems Each relevant subsystem is to be analyzed with regard to the following essential aspects, in course of which further aspects may occur during the execution of the analysis, compare work sheet (Table.1): failure of subsystems malfunctions of subsystems failure of components in a subsystem malfunctions of components

25 Chapter 3 Page 8 Section G Principles for the Construction of Unmanned Submersibles I - Part 5 Table.1 Tabular work sheet ID Number 1 Subsystem component Type of failure Failure cause Failure detection Consequences for total system Consequences for subsystem/ component Failure correction Remarks 3 interface failures between the subsystems, a subsystem and its components as well as between components themselves Interface analysis is very important, as according to experience many failures are created due to lack of knowledge of which data, medium and power are transferred or how failures are spread via the interfaces to other subsystems/components. hidden failures check for hidden failures and the practicality of alarms arrangement of periodic testing where alarms are not practical failures because of external influences which may lead to simultaneous failure of redundant subsystems, e.g. changed environmental conditions and their control, voltage and amperage fluctuations in power supply, contamination of supply media, etc. faulty operation of subsystems or components, only with certain probability 5. Tabular work sheet The analysis shall be carried out in tabular form with a work sheet acc. to Table.1 or e.g. acc. to IEC The analysis has to consider all operational modes. 6. Assumptions and defined limits for the analysis During the analysis the assumptions are to be defined which influence the result of the analysis. Typical assumptions are e.g.: the operating personnel is qualified and trained to safely operate the unmanned vehicle the supply of energy and as far as necessary with other consumables from outside the unmanned submersible is secured in redundant way (for remotely operated vehicles - ROV) the settings and switching operations prescribed in the operation manual are followed by the operating personnel, etc. 7. Treatment of changes In case of changes at the vehicle respectively at the supporting systems aboard the support ship the FMEA is to be adjusted. 8. Conclusions The FMEA shall contain a summary of the results of the analysis for the relevant unmanned submersible. In addition it should contain a listing of the main failures which may occur for the operation of the vehicle and especially for keeping the manoeuvrability and ability for surfacing as well as the desired atmosphere in the pressure hull. For the operating personnel aboard the support ship training measures for incontestable handling of the vehicle and the supporting systems in the event of such failures are to be proposed. A periodic check of the FMEA including practical trials is recommended. 9. FMEA test program 9.1 According to the FMEA a test program is to be established. The purpose of this program is to verify the assumptions and the expected operational behaviour of the submersible as defined in the analysis. 9. The program has to consider typical failure modes in the relevant systems and components including the worst case failure. All operational modes of the vehicle are to be reflected. 9.3 The test program is to be agreed with GL and needs to specify in detail how the test shall be carried out respectively how simulation is done. G. Tests and Trials 1. General 1.1 Unmanned submersibles are subject to constructional and acceptance testing at the manufacturer s works. As a minimum requirement, this shall include verification of compliance with the approved documents, inspection of workmanship, proofs for materials and observance of dimensional tolerances. Wherever applicable all the tests prescribed in the following are to be performed and documented. About the presence of GL Surveyors at these tests and trials GL will decide case by case. 1. For series-manufactured parts, test procedures other than those prescribed may be agreed with GL provided that they are recognized as equivalent by GL.

26 I - Part 5 Section G Principles for the Construction of Unmanned Submersibles Chapter 3 Page GL reserve the right to extend the scope of the tests where necessary and also to subject to test those parts for which testing is not expressly prescribed in the Rules. 1.4 Approved parts subject to replacement are to be replaced with tested parts. The same also applies to spare parts. 1.5 A summary of the test pressures, as well as of the design and lay-out pressures is contained in Section 3, C., Table 3... Total system On completion, the submersible is to be subjected to a constructional, functional and acceptance test. This shall include at least the following individual tests: inspection of assembly (where not already performed during checking of manufacture) measurement of weight, buoyancy and stability testing of all safety devices functional testing of diving and trimming equipment functional testing of mechanical, electrical and optical equipment functional testing of working devices including the fixing system with regard to influence on the submersible trial trip submerged testing of launch and recovery procedures including functional test of the launcher verification of all essential measuring instruments insulation test and if necessary high voltage test and on the electrical equipment test of the control stand on the support ship trials and functional tests under water with diving depths up to the nominal diving depth NDD 3. Supporting structure 3.1 It has to be checked, if the not pressure-proof parts of the supporting structure (hollow bodies, pipes, etc.) are pressure equalized. Pressure-proof components are to be tested according to The lifting points at the submersible are to be tested statically with, times the safe working load SWL (= weight and payload NL of the submersible). 3.3 The fixing point of the umbilical at the submersible is to be tested statically with, times the maximum permissible tension load of the umbilical. 4. Vessels and apparatus under pressure 4.1 Pressure vessels are to undergo a hydraulic pressure test before being insulated or painted. The test may result in no leakage or permanent deformation of the vessel walls. 4. The test pressure applied to vessels and apparatus with stress from internal pressure shall generally be equivalent to 1,5 times the maximum allowable working pressure PB. 4.3 Vessels and apparatus which may be subjected to external overpressure according to the maximum allowable diving depth of the submersible have to undergo an external pressure test. The test pressure TDP shall be at least a multiple of the nominal diving pressure NDP according to Table 3.1 in Section 3, C. 4.4 If the strength against pressure of vessels and apparatus cannot be sufficiently proven by calculation, an alternative verification has to be agreed with GL. 4.5 All windows in pressure vessels are to be subjected to a hydraulic pressure test. The test may be performed after installation together with the pressure vessel or stand alone in a test device. The test pressure is to be determined according to 4.3. For the pressure test it has to be observed that that the test pressure is not higher than 1,5 times the calculation pressure of the window. 5. Piping systems, umbilicals and pumps 5.1 Piping systems On completion but before being insulated or painted, all piping systems are to undergo a hydraulic pressure test at 1,5 times the maximum allowable working pressure After installation, all piping systems are to undergo a tightness test at the maximum allowable working pressure. Pipes under diving pressure are to be checked in addition with test diving pressure TDP (inside or outside according to the actual load case) The safety systems are to be checked. 5. Pumps On completion, pumps are to be subjected by the manufacturer to a pressure test at the maximum allowable working pressure, a tightness test as well as a performance test. 5.3 Umbilicals/supply lines Umbilicals of remotely operated unmanned submersibles (ROV) have to meet special requirements. The required tests are divided in a type test of the prototype and a routine test of the final product. All aspects for the tests and trials of umbilicals are defined in Appendix E, D. 5.4 As far as the requirements in 5.3 are applicable for hose assemblies they shall be used.

27 Chapter 3 Page 10 Section H Principles for the Construction of Unmanned Submersibles I - Part 5 6. Trimming, compensating and diving systems The trimming, compensating and diving systems are to be subjected to a functional test. 7. Propulsion and manoeuvring equipment The function of the propulsion and manoeuvring plant is to be proven at the occasion of trial travel under water. 8. Positioning system The automatic keeping of a pre-defined position in breadth, length and depth is to be checked. 9. Working devices (See also Section 5, H.) 9.1 The influence of the working devices on the total system is to be tested. 9. The working devices have to be checked at least with reference to: control and monitoring functioning of safety devices avoiding dangers for divers and the submersible 9.3 The fixing systems are to be subjected to a function test where at least the following individual tests are to be performed with respect to: specified holding power of the fixing system limitations of power and distance travelled of the fixing systems as well as the directing of the vehicle simulation of an energy failure 10. Electrical equipment 10.1 Electrical machines and automation, alarm and safety systems including steering and control stands are to be tested in the manufacturer's works. The electrical systems are to be approved by GL, preferably type approved components are to be used. Kind and scope of type tests are to be defined by GL case by case on the basis of the GL Test Requirements for Electrical/Electronic Equipment and Systems (VI-7-). 10. All electrical systems and equipment are to be inspected and tested before the submersible is put into service The set points and response thresholds of electrical protective devices are to be checked. Depending on the type of device the electrical equipment of the vehicle, if possible, is to be subjected to a high voltage test and an insulation test with a test voltage 500 V Electrical cables under external pressure are to be checked according to the electrical requirements for umbilicals defined in Electrical penetrations into vessels and apparatus under pressure and underwater plug connections are to be subjected to a type and routine test according to GL Rules for Manned Submersibles (I-5-), Section 11, D All electrical equipment which is exposed to diving pressure shall be checked additionally for isolation after the first diving. 11. Automation, navigation and locating equipment 11.1 Indicating and monitoring systems are to be checked for the accuracy of their readings, their limit value settings and ergonomic arrangement according to the GL Rules for Automation (I-1-4). 11. Automation systems are to be checked for satisfactory performance under service conditions. 1. Launcher 1.1 The launching and recovery of the launcher including the submersible is to be checked in a functional test. 1. The lifting point of the launcher is to be tested with, times the safe working load. The device for harbouring the submersible to the launcher is also statically tested with, times the weight including payload NL of the submersible. 1.3 The entrance and the exit of the submersible to or from the launcher respectively the garage, if existing, is to be tested in dived condition and a functional test of all elements of the total system is to be performed. H. Marking 1. Fittings, indicators and warning devices All essential valves, fittings, control elements, indicator and warning devices are to be provided with permanent and seawater resistant markings.. Pressure vessels and gas cylinders.1 All pressure vessels and gas cylinders are to be permanently marked at an easily visible position with the following details: name or company designation of manufacturer year of construction and serial number (pressure vessels) serial number (gas cylinders)

28 I - Part 5 Section I Principles for the Construction of Unmanned Submersibles Chapter 3 Page 11 type of gas maximum allowable working pressure [bar] maximum allowable working temperature (for > 50 C and < 10 C) capacity [ ] test pressure [bar] empty weight (of gas cylinders) [kg] date of test test stamp. Permanently installed gas cylinders, gas containers and gas piping systems are, if existing, to be marked with a permanent colour code in accordance with Table. and with the chemical symbol designating the type of gas concerned. The marking of pressure vessels and gas cylinders has to be visible from the valve side. Systems for other media are also to be marked in suitable way. The distance of the markings is to be chosen for pipe systems according to function and safety. Table. Type of gas Marking of gas systems Chemical symbol Colour code Oxygen O white Nitrogen N black Air white and black The marking of gases for special duties is to be agreed with GL. I. Spare Parts 1. In order to restore the operation of the submersible in the event of damage at sea, spare parts for the main propulsion plant and the essential equipment together with the necessary tools shall be kept on board of the support ship.. The scope of spare parts is to be documented and a relevant listing has to be kept on board of the support ship.

29

30 I - Part 5 Section 3 B Design and Construction of Unmanned, Remotely Operated Submersibles (ROV) Chapter 3 Page 3 1 Section 3 Design and Construction of Unmanned, Remotely Operated Submersibles (ROV) A. General Principles 1. Unmanned, remotely operated submersibles (ROVs) are during the mission physically connected to the relevant support ship (e.g. by an umbilical) and are controlled from board of the support ship. As an exception also wireless remote control is possible. The documents to be submitted to GL for approval are defined in Section, E. The required tests and markings are defined in Section, F. and G. If a launcher for the submersible is provided, it is to be considered as part of the total system of the submersible and to be classified/certified together with it.. Submersibles are to be so equipped that the operator can be informed about the position and the operating condition of the vehicle. 3. Submersibles which operate with diver support are to be equipped with a TV unit for monitoring the work site and with special protection arrangements, which can be actuated from the control stand for the submersible. 4. Due care is to be taken to ensure that inadvertent movements cannot cause the remotely operated submersible to destroy itself or equipment located at the work site or to become separated from its control and supply lines (e.g. by cable protector). 5. Submersibles are to be so designed and constructed, that they achieve also a definite condition (e.g. positive buoyancy) even if the control and the energy supply fail. 6. Measures are to be taken to avoid that the submersible gets caught as far as possible. Propellers are to be provided with adequate protection arrangements. 7. All possible stability cases of the submersible with minimum and maximum payload NL including all extension components are to be considered in surfaced and submerged condition. The centre of gravity is to be located below the centre of buoyancy. 8. Submersibles are to so designed, that their operation causes no inadmissible environmental loads and endangering of the environment will be avoided as far as possible. B. Materials 1. Materials for unmanned remotely controlled submersibles and their equipment are to be so selected, that the vehicle can be safely operated under the defined conditions of the environment and of the missions during the planned life time.. Materials are to be suitable for the purpose intended and approved by GL. Concerning special materials for pressure-proof components reference is made to GL Rules for Manned Submersibles (I-5-), Section 5, B. 3. The production, processing and testing of materials has to follow recognized standards respectively according to specifications of the producer which are proven and approved by GL. 4. The quality of the material of components subject to approval is to be demonstrated in a suitable way, see GL Rules for Manned Submersibles (I-5-), Section 5, Table Materials for rigid buoyancy material bodies are to be suitable for the proposed pressure and temperature ranges and shall have a low water absorption factor. 6. Lifting cables are to be manufactured and tested according to a recognized standard or according to the GL Rules for Equipment (II-1-4). 7. Materials shall be resistant against influences of the surrounding media as far it is required for the function of the vehicle and another sufficient protection is not possible. In addition materials have to be compatible to each other.

31 Chapter 3 Page 3 Section 3 C Design and Construction of Unmanned, Remotely Operated Submersibles (ROV) I - Part 5 C. Design Loads 1. Pressure-proof parts of the construction Reference points for the pressure heads are the water surface and the lower edge of pressure vessels respectively of constructional elements. The following pressure heads are to be considered. 1.1 Pressure for nominal diving depth The nominal diving depth NDD [m] is the diving depth for unrestricted operation of the submersible. The nominal diving pressure NDP [bar] for this depth follows by multiplying the NDD value by 0,101 [bar/m], if not otherwise agreed with GL for special operations. 1. Pressure for test diving depth The test diving depth TDD [m] is the diving depth at which the vessels and apparatus under pressure resp. the equipment are subjected under test conditions after completion or after main repairs and changes. The test diving pressure TDP for the pressure hull is defined in Table Pressure for collapse diving depth The collapse diving depth CDD [m] is the decisive depth for the design of the vessels and apparatus under external pressure and at which by computation a collapse of components can be expected. In general the collapse diving pressure CDP is chosen according to Table 3.1. Deviating factors for the collapse diving pressure may be agreed with GL case by case. 1.4 Safety factors The safety factor S 1 of the pressure-proof parts of the construction is the relation test diving pressure TDP according to 1. to nominal diving pressure NDP according to The safety factor S of Table 3.1 is the relation collapse diving pressure CDP to nominal diving pressure NDP. The factor S shall cover the following uncertainties: influences which cannot be covered by the calculation procedure influences as consequence of manufacturing mistakes (material failures, manufacturing inaccuracies, welding mistakes, residual stresses from manufacturing), compare also Annex B. negative influences caused by operation (corrosion deficiencies, unobserved buckling, alternating stressing) 1.5 Time dependent strength characteristics of the material For the fatigue strength it has to be defined how often the nominal diving depth NDD can be reached. (see ) 1.6 Pressure vessels and apparatus under pressure Load cases for pressure vessels The following three load cases are to be investigated for pressure vessels and apparatus under pressure, which represent an essential part of the submersible Load case I The load case I is determined by operational loads: nominal diving pressure NDP according to 1.1 internal pressure flow resistance wash of the sea ice accretion loads at emerging accelerations from vehicle movements and seaway wind loads accelerations from collision loads from towing, etc. loads from propeller shafts loads by rudders, fins and propulsion drives loads on tanks without additional internal pressure local additional loads because of lifting points and supports Table 3.1 Test diving pressure and collapse diving pressure depending from nominal diving pressure for unmanned submersibles Nominal diving pressure NDP [bar] NDP < Test diving pressure / nominal diving pressure S 1 = TDP/NDP Collapse diving pressure / nominal diving pressure S = CDP/NDP 1 Minimum nominal diving pressure 5 bar Intermediate values can be interpolated linearly. 1,50 1,30 1,0 1,0 1,0 1,0 1,0 1,10,0 1,90 1,80 1,75 1,70 1,65 1,60 1,50

32 I - Part 5 Section 3 D Design and Construction of Unmanned, Remotely Operated Submersibles (ROV) Chapter 3 Page 3 3 For determination of the above defined operational loads besides others the Rules for Manned Submersibles (I-5-), Section 4, C. may be used. The fatigue strength for at least 5000 operation cycles with rectangular spectrum has to be proven analogously to the GL Rules for Hull Structures (I-1-1), Section Load case II The load case II is determined by the loads at collapse diving depth: collapse diving pressure CDP according to 1.3 Other loads are not to be considered Load case III The load case III is determined by the test loads: test diving pressure TDP according to 1. loads from strength, tightness and functional tests of different areas or of the vehicle as a whole pressure loads on the different elements additionally loads from load case I, which may occur at the tests (e.g. flow resistance, propeller thrust, rudder forces, etc.) are to be superposed 1.6. Other pressure vessels and apparatus The design of pressure vessels and apparatus which are exposed to diving pressure and which are not representing an essential part of the submersible has to be based on the collapse diving pressure CDP.. Additional loads If further external and/or internal loads become effective, the GL Rules for Manned Submersibles (I-5-), Section 4, C. and D. are to be applied analogously. 3. Summary of pressures Table 3. presents a summary of the pressures decisive for the different elements of the submersible. The following pressures are defined: Design pressure PR: Pressure as input in a calculation procedure, which includes certain safety requirements according to the respective professional field Lay out pressure PA: Limit value of the pressure equal to or in relation to the collapse diving pressure CDP, which can be barely endured without consideration of the creeping behaviour and the creep rupture strength of the material. Test pressure PP: pressure to be used for practical tests Pressure PB: maximum allowable internal working pressure, usually limited by safety equipment Nominal pressure of components P N : the nominal pressure defined by the manufacturer Test pressure for tightness TTP: pressure to be applied for tightness tests D. Vessels and Apparatus under Pressure 1. Pressure vessels and apparatus under outside pressure The calculation procedure of Annex A or an internationally recognized standard has to be applied.. Pressure vessels and apparatus under internal pressure For pressure vessels, gas cylinders and apparatus under internal pressure the requirements defined in the GL Rules for Machinery Installations (I-1-), Section 8 or other recognized regulations according to state of the art (e.g. AD published rules) are valid. 3. Design The principles for manufacturing and design as well as design details are defined in the GL Rules for Manned Submersibles (I-5-), Section 5. Other rules and regulations may be applied with agreement of GL. 4. Acrylic windows If openings with acrylic windows are required in pressure-proof parts of the construction, e.g. for the application of search lights and cameras, the design and dimensioning of these windows are to be performed according to Annex C. In justified cases the minimum wall thickness can be reduced in agreement with GL. Viewing windows of other materials as acryl glass may be approved by GL according to separate testing.

33 Chapter 3 Page 3 4 Section 3 D Design and Construction of Unmanned, Remotely Operated Submersibles (ROV) I - Part 5 Table 3. Summary of pressures Element group Element Vessels and apparatus: Exposed to diving pressure Exposed to diving pressure/ fatigue strength Exposed to internal pressure Windows in pressure vessels Tanks: Diving tanks Compensating and diving tanks/ pumps Compensating and diving tanks/ compressed air Reference: Chapter/ Section No. or Annex A E Ch. 3/ 3/C /F.4.3 Ch. 3/ 3/C Ch. 3/ 3/C /F.4. Ch. 3/ 3/C.1.8 Annex C Ch. 3/ 3/G.. Ch. 3/ 3/G.. Ch. 3/ 3/G.. Piping systems and pumps: Systems exposed to diving pressure Further systems Ch. 3/ /F.5. Ch. 3/ /F.5. Hoselines and umbilicals / cables: Type test for liquids Type test for gases Type tests for electrical lines Routine test for electrical lines Routine test for metallic hoses Routine test for nonmetallic hoses Routine test umbilical completely installed E/B..4 E/D..1 Lay out/design External pressure PA = CDP Internal pressure Test pressure for tightness TTP 0, bar underpressure Test pressure PP TDP PA = NDP TDP Further requirements + further loads acc. 3/C PR = PB 1,5 PB PR = NDP Wash of the sea Static pressure TDP PP 1,5 PR PR 1380 bar 0, bar PA = CDP TDP PA = CDP PR = PB TDP 1,5 PB Before PA = CDP painting: TDP PR = PB 1,5 PB After installation: 1,5 PB 1,0 PB PA = CDP PR = PB PB E/B.3.3 PA = CDP E/B PB 5 PB P N (cyclic) 1,5 P N (cyclic) For external pressure: PP = 1,5 Δp E/D.3.1 1,5 PB E/D.3.1 PB E/D.3.1 PB with original media TDP

34 I - Part 5 Section 3 E Design and Construction of Unmanned, Remotely Operated Submersibles (ROV) Chapter 3 Page 3 5 Table 3. Summary of pressures (continued) Element group Element Reference: Chapter/ Section No. or Annex A E Drives and electrical equipment: Cases exposed to diving pressure Electric penetrations/ Type test Electric penetrations/ Routine test Ch. 3/ 3/K.5.1 Ch. / 11/D.8. Ch. 3/ 3/K.5. Lay out / Design External pressure Internal pressure Test pressure for tightness TTP Test pressure PP Further requirements PA = CDP TDP PA = CDP With air: P N With He: 1,5 P N P N (cyclic) 1,5 P N (cyclic) E. Supporting Structure and Exostructure, Equipment 1. Supporting structure 1.1 Frames and supporting structures of submersibles are to be designed and constructed according to state-of-the-art technology. 1. Approved methods of calculation are to be applied to the design of the supporting structure. The structure is to be dimensioned in such a way that at the anticipated loads the effective stress does not exceed 60 % of the yield strength. 1.3 The supporting structure of the submersible is to be designed to avoid unintentional trapping of the structure. 1.4 The lifting points on the submersible is to be so designed and located that the launching and recovering is possible for the maximum permissible seaway conditions and the maximum weight. The lifting points shall have a safety against rupture of 8 times the working load and are to be clearly signed and marked with their working load. 1.5 The umbilicals connection of the submersible has to be designed to transfer the maximum permissible tension load of the umbilical to the supporting structure. 1.6 If in case of failure a recovery of the submersible is not possible, elements for fastening towing lines are to be installed on the submersible. This towing point is to be so designed and located that the submersible can be towed surfaced even under most unfavourable operating conditions with the maximum planned towing speed.. Exostructure.1 If the submersible shall achieve a considerable speed worth mentioning, the exostructure is to be provided with streamlined and smooth surface. Stepwise connections of structural elements shall be equalized if the flow will be influenced in a negative way.. The exostructure at the underside of the submersible is to be designed to ensure sufficient protection against interference of the sea bottom in case of impact of the vehicle. As far as necessary, submersibles are to be equipped with ram frames or similar to protect components and working devices. If a combination of the submersible with a launcher and/or a garage is provided, the exostructure is to be so designed that a safe guidance into and out of the launcher/garage as well as a safe protection against canting and getting caught is guaranteed..3 All free floodable areas of the exostructure are to be designed in a way and provided with openings that complete flooding/exhausting resp. ventilating/ emptying of the spaces is guaranteed and it is also to be considered, that no impermissible loads are caused by eventual pressure differences..4 Buoyancy material appliances mounted externally on the vehicle are to be properly secured and protected..5 All flaps in the exostructure have to be flush, safely closable and secured against vibrations. 3. Equipment According to the area of operation and the purpose of the mission of the submersible, the required elements of the hull equipment are to be provided:

35 Chapter 3 Page 3 6 Section 3 F Design and Construction of Unmanned, Remotely Operated Submersibles (ROV) I - Part Accessibility In the case the vehicle is accessible in the surfaced condition, adequate handles, guard rail elements, etc. are to be provided at the upper part of the vehicle. If these disturb during underwater journeys, they have to be arranged for turning in or retracting. The area for standing shall be equipped with a nonslip covering. 3. Antennas Antennas are normally retracted or turned down into the exostructure during diving journeys and are to be lifted/ turned up for use on the water surface. The required height and the scope of the devices to be installed are to be agreed with GL according to purpose of the mission. For the material used the limitation of the distortion is in general the decisive criteria to guarantee a correct and precise function of the devices. 3.3 Lifting cables and umbilicals The lifting cable between support ship and the launcher respectively the submersible is a separate component and may be, as in most cases, integrated in the umbilical. The relevant requirements are defined in Annex E. 3.4 Working devices Working devices which are not directly part of the basic function of the submersible, but can be installed at it, are treated in Section Jettisoning of equipment Working devices, like manipulators, fixing devices or other parts of the equipment, which keep eventually the submersible under water in position, are, as far as required by the mission, to be so designed that can be released or jettisoned in an emergency. Jettisoning gear is to be designed to preclude accidental release or jettisoning. Jettisoning shall not cause any inadmissible heeling or trim conditions. F. Launcher 1. General 1.1 Launcher shall serve to bring the submersible from the deck of the support ship with assistance of the launch and recovery system in a water depth where no essential influence of surface waves occurs anymore. By this the actual mission of the submersible can be started from this position and can also be finished in this position again. Compare also Fig For a submersible for greater depths the local mobility and manoeuvrability of the submersible shall be increased by lowering the launcher to greater depths and to connect it with a primary umbilical. From the launcher to the submersible only a relative short secondary umbilical need then to be installed. 1.3 Special protection of the submersible can be provided especially during launch and recovery if the launcher is equipped with a garage for the submersible. 1.4 Measures to reduce or even avoid the transformation of the movements of the support ship in the seaway to the coupling respectively the garage part of the launcher are recommendable. They are to be agreed in advance with GL and it will be to decide, if and how relevant practical trials are proven or are still to be performed. Coil-up/coil-off mechanism Braking unit Storage for primary umbilical with lifting cable Winches for lifting cable and umbilical Primary umbilical with lifting cable Sekundary umbilical Lifting cable Primary umbilical Launcher with garage Remotely operated submersible Launcher with coupling Fig. 3.1 Possibilities for the application of a launcher for non-autonomous submersibles (ROV)

36 I - Part 5 Section 3 G Design and Construction of Unmanned, Remotely Operated Submersibles (ROV) Chapter 3 Page 3 7. Basic requirements.1 The suspension of the launcher is to be so designed that a turning of the launcher and, if existing, also of the garage will be reduced as this would render the recovery of the submersible more difficult.. If the launcher is suspended on the launch and recovery device suitable measures are to be taken against excessive swinging caused by ship movements..3 If no garage for the submersible is provided, the submersible is to be suspended with a suitable coupling device under the construction of the launcher. Adequate guidance devices to the coupling points are to be installed on the launcher. Concerning the successful coupling and decoupling procedures including locking a feedback signal is required to the control stand on the support ship..4 For the umbilical winch on the launcher the same requirements as defined for the winches on the support ship are valid analogously..5 To facilitate the control and monitoring of the procedures for start and recovery of the submersible and also to be able to overlook and check the surrounding area of the launcher an illumination system and adequate video cameras are to be installed. This can also be safeguarded by other suitable measures..6 For the equipment for acoustic position finding the same requirements as defined for devices on submersibles are valid..7 For the equipment like hydraulic systems and electrical installations the same requirements as for submersibles are valid. 3. Garage If the launcher is equipped with a garage, the following requirements are to be met: The supporting structure of the cage shall be adequately robust to be able to endure impacts and is to be equipped with fenders if need be. For the requirements on statics the definitions in D.1. and D.. are valid in analogous form. Adequate guidance devices or other aids for parking (e.g. sensors) are to be provided to facilitate the parking of the submersible in the garage. After the complete entrance in the garage the submersible is to be interlocked/before the exit it is to be unlocked. About these procedures a feedback signal to the control stand on the support ship is required. G. Piping Systems and Umbilicals Piping systems include pipe lines, fittings, hoses, pumps and compressors. 1. General 1.1 Piping systems are to be designed and installed according to internationally recognized standards. For the selection of the material, manufacturing and computation the GL Rules for Machinery Installations (I-1-), Section 11 can be applied, as far as applicable. 1. Piping systems are to be dimensioned for a design pressure PR equal to the maximum allowable working pressure PB. All piping systems which may be loaded with the diving pressure are to be designed additionally for 1,0 times the collapse diving pressure CDP (according to the load case from outside or inside).. Piping systems.1 Piping systems which may be exposed to pressures above the design pressure are to be provided with an overpressure protection which guarantees a safe blowing-off.. Piping systems for gases and electric cables are to be installed separately. Piping systems which are endangered to mechanical damage are to be protected. 3. Fittings 3.1 Shut-off devices shall conform to a recognized standard. Fittings with screw-down covers and spindles are to be safeguarded against accidental unscrewing of the cover or of the spindle. 3. Manual shut-off devices are to be closed by turning in the clockwise direction. The open and closed positions of essential shut-off valves are to be clearly recognizable. If they have to be operated by a diver under water they are to be so designed that the handling is possible while wearing mittens. 3.3 Fittings for hoses are to be made of corrosion resistant material and are to be so designed that unintentional loosing can be excluded. 4. Hose assemblies As far as the requirements of 6. are relevant for hose assemblies, they shall be applied. 5. Pumps and compressors The casing of pumps and compressors are to be provided pressure proof. The proof of strength shall be

37 Chapter 3 Page 3 8 Section 3 I Design and Construction of Unmanned, Remotely Operated Submersibles (ROV) I - Part 5 done by computation. If this is only possible in an insufficient way, these casings are to be tested according to the requirement of GL. 6. Umbilicals Umbilicals as connecting element between support ship/launcher and launcher/submersible may contain hydraulic and pneumatic pipes within a joint encasing. All aspects for the design of umbilicals are treated in Annex E. 7. Compressed air systems 7.1 Compressed air systems which come in contact with seawater are to be designed adequately and to be separated from other systems. In addition measures are to be taken to exclude the entrance of seawater in the compressed air system as far as possible. 7. Compressed air systems are to be equipped with pressure indicators. Maximum working pressures are to be marked. 8. Hydraulic systems 8.1 The pressure creating and distribution components of the hydraulic systems have to have adequate performance if the manoeuvring systems are hydraulically driven. In addition it has to be defined if and how much additional capacity for working devices to be connected (compare Section 5) is to be made available. 8. If the hydraulic aggregate is located on the launcher, an adequate electrical feeding via the umbilical is to be provided. A supply with higher voltage and subsequent voltage transformation to a lower voltage is permissible. 8.3 Concerning selection of materials, manufacturing and computation the GL Rules for Machinery Installations (I-1-), Section 14 are valid. H. Arrangements for Control resp. Adjustment of Depth, Trim, Positive and Negative Buoyancy 1. Unmanned, remotely operated submersibles are to be provided with arrangements for control respectively adjustment of depth, positive and negative buoyancy. It has to be secured that these arrangements are effective under all specified conditions of heel and trim.. Depending on the type of submersible the following systems may be regarded as arrangements for control and support of depth, trim, positive and negative buoyancy: lifting cable if the submersible is connected tight with it releasable weights (for quick diving to a wanted depth resp. for emerging) fixed resp. adjustable ballast and trimming weights rigid buoyancy appliances, e.g. of pressure resistant foam floodable ballast and trim tanks propeller drives depth rudders with dynamic effects (e.g. for towed submersibles) 3. The control devices are to be capable of compensating the expected differences in water density and of ensuring that the submersible attains a defined diving state. The submersible has to be stabile in each operational phase and be in the position to return to the water surface. 4. The arrangements for control of depth, trim, positive and negative buoyancy are to be controlled from the control stand of the submersible on the support ship. In addition the depth of the submersible has to be indicated continuously on the console. I. Propulsion and Manoeuvring Equipment 1. Propulsion equipment 1.1 With regard to their type, number, size and arrangement, propulsion devices shall be designed to meet the requirements arising from the planned purpose and location of the mission. 1. Propulsion units shall be designed for the collapse diving pressure CDP or shall be pressurebalanced. 1.3 Propulsion plants for submersibles are to be designed for intermittent and continuous operation. 1.4 Electric propulsion motors are to be designed in accordance with the requirements of L. 1.5 Shaft penetrations and other penetrations through the wall of pressure vessels are to be provided with a proven seal designed for the collapse diving pressure CDP. 1.6 Propellers are to be so arranged that an unintentional trapping of the submersible or getting caught of the umbilical or lifting cable can be largely excluded. For a joint mission with divers the propellers are to be protected against unintentional approach, e.g. by ducting and grids or nets before and aft.

38 I - Part 5 Section 3 K Design and Construction of Unmanned, Remotely Operated Submersibles (ROV) Chapter 3 Page Devices for controlling the speed and/or the direction of the rotation are to be so designed that the propulsion motor can be stopped even in the event of their failure. 1.8 The operating condition of the propulsion units (direction of thrust and rotation) has to be displayed at the control stand on the support ship.. Manoeuvring equipment.1 Remotely operated submersibles are to be equipped with suitable devices which provide the vehicle with the required manoeuvrability under consideration of the most unfavourable operating conditions. Especially also a propeller thrust for going backwards is to be provided which enables an effective braking of the vehicle.. Depth and side rudder devices are to be designed for the greatest loads which result at underwater journeys from the steering forces resp. at planned longer surface journeys from pitching movements and wash of the sea. The equivalent stress in the rudder shaft shall not exceed 0,5 yield strength..3 Depth rudders are to be so designed that the wanted depth can be kept in the assigned speed range and under all load conditions..4 For the swivelling devices of the propulsion units, which serve at the same time as manoeuvring device, the same requirements are valid as for rudders. 3. Mission on the bottom of the sea 3.1 If the movement happens on wheels or crawlers, their foot print area is to be adjusted to the practically possible bottom pressure in the planned mission area. Design and drive are to be agreed with GL case by case. 3. At sandy or muddy bottom of the sea propulsion units which are used for the advance shall not be positioned too low or shall be totally avoided as the visibility around the vehicle can be strongly limited because of the whirled up bottom material. 3.3 Systems for locating of obstacles, like rocks, wrecks, pipelines, offshore structures, etc. are to be provided to avoid collisions safely. J. Positioning System Dynamic positioning may be required for certain purposes of operation, especially for remote controlled submersibles a cooperation with the support ship may be required, compare also Section 6, C General 1.1 Dynamic positioning means that a vehicle keeps automatically its position at the water surface or in the underwater space (within accuracy of the system defined for the duty of the mission) or that it moves on a predefined track, using solely the effect of propulsors. 1. Systems for dynamic positioning have to include the following subsystems: as far as required for safe operation redundant source of energy with switchgear and energy distribution a number of drives/propulsors with motor and, if necessary, gear as well as propeller, eventually slewing gear; the control of the positioning system has to be adequate to the purpose of the mission of the submersible suitable sensors for determination of location/position control system including computer system with software, monitoring display at the control stand and reference system for the position Further details concerning the requirements for such systems are defined in the GL Rules for Dynamic Positioning (I-1-15).. Submersible For submersibles the use of dynamic positioning and the required equipment for this has to be agreed with GL case by case. K. Working Devices 1. Only working devices are to be applied to submersibles if the influence on the total system is investigated and approved by GL.. Working devices are to be so arranged on the submersible that it can get largely excluded to trap the vehicle or that the umbilical or the lifting cable become entangled. 3. Fixing systems are to be designed and constructed that a defined holding power can be adjusted. In addition devices should to be provided with which the holding claw or similar can be opened in case of energy failure. 4. Concerning all further requirements for working devices respectively for their separate Certification see Section 5.

39 Chapter 3 Page 3 10 Section 3 L Design and Construction of Unmanned, Remotely Operated Submersibles (ROV) I - Part 5 L. Electrical Equipment 1. Principles 1.1 All electrical equipment is to be so designed and installed that it is operational and serviceable under the design conditions specified for the remotely operated submersible. 1. Systems for which even a brief failure cannot be tolerated are to be provided with battery support or are to be supplied by an uninterruptible power. 1.3 Where batteries are used, eventually the special operating conditions are to be observed. Battery chargers shall have a characteristic conforming to the battery manufacturer's recommendations.. Power supply.1 Principles.1.1 Devices are to be provided enabling the submersible to be voltage-absent during launching and recovery..1. Approved supply systems are: direct current and single-phase alternating current, with both conductors insulated from the hull of the submersible three-phase alternating current with the three conductors insulated from the hull of the submersible, networks with an earthed neutral are not permitted..1.3 The permissible voltage and frequency deviations stated in the Rules for Classification and Construction for Electrical Installations (I-1-3), Section 1 shall not be exceeded.. Main power supply..1 A power balance shall be prepared to prove that the rating of the main power supply is sufficient... Appropriate diversity factors may be assumed for consumers which are intermittently connected...3 A power margin is to be provided for transient peak loads (e.g. on motor start-up)...4 A subordinate mistake shall not hinder the distribution of sufficient power for the drive of the vehicle or other essential systems, like search lights and video cameras..3 Emergency power supply.3.1 An emergency energy supply is necessary in those cases where the endangerment of the submersible, its environment or its function due to a failure of the main power supply is inadmissible..3. The emergency power supply is to be so designed that, if the main power supply fails, the submersible can be brought in a stationary operating condition which at no time presents a danger. From this condition it shall be possible either to recover the vehicle safely or to continue its mission after the main power supply has been restored. 3. Power distribution 3.1 Electrical distribution systems are to be so designed that a fault or failure in one circuit does not impair the operation of other circuits. 3. During normal operation the emergency power distribution system may be fed via an interconnector feeder from the main power distribution system. 3.3 The lengths of cables from storage batteries to the switchboard/switching devices and end consumers are to be kept as short as possible. These cables are to be laid separately to the corresponding circuit-breaker and are to be specially protected against mechanical damage. 3.4 In switchgears, measures are to be taken for the prevention of parasitic voltages. Voltage circuits for safety extra low voltage shall not be run in the same conductor bundle or in the same cable duct as higher-voltage circuits. Terminals for different voltage levels are to be arranged separately and marked accordingly. 4. Protective measures 4.1 Each circuit is to be protected against short circuit and overload. 4. All consumer circuits are to be designed for all-pole switching. 4.3 If remotely operated submersibles operate with diver support, electrical systems whose failure could endanger the divers are to be designed for high availability, e.g. with battery back-up. 4.4 Where remotely operated submersibles operate with diver support, a continuous insulationmonitoring system is to be provided which actuates a visual and audible alarm at the ROV control station when the value drops below a minimum level. Where the possibility of danger to humans cannot be ruled out, provision is to be made for the automatic disconnection of the circuit concerned. An emergency stop device for the submersible is to be installed at the control stand. It shall be designed to exclude unintentional actuation, compare Section 6.

40 I - Part 5 Section 3 M Design and Construction of Unmanned, Remotely Operated Submersibles (ROV) Chapter 3 Page Remotely operated submersibles with electrical equipment are to be provided with an earthing and equipotential system. All non-current-carrying metal parts are to be connected to this. Where earthing is not provided via the fastenings, protective conductors are to be fitted. Where protective conductors are used, the following is to be observed: a) The protective conductor has to take the form of an additional cable or additional line or an additional core in the power cable. The use of armouring as protective conductors is to be checked case by case and to be approved by GL. b) A conductor which carries current in normal operation shall not simultaneously be used as a protective conductor and shall not be connected jointly with the latter to the hull of the vehicle. c) The cross-section of the protective conductor shall be equivalent to at least half the crosssection of the phase conductors. However, with cross-sections of up to 16 mm² the cross-section shall be the same as that of the phase conductor. With separately laid protective conductors the minimum cross-section is 4 mm. d) The connections of the protective conductors shall be installed at locations which can be easily checked. e) In an easily accessible position on the hull of the submersible a connection point in the form of a connecting plate with preferably M 1 stud bolts is to be provided to which, a protective conductor can be connected without the use of tools. This connection serves for the compensation of the potential between the recovered submersible and the support ship. f) Depending of the endangering potential of the electrical plant of the submersible a device for compensation of the potential is to be provided which is already effective during recovery out of the water. 5. Electrical equipment 5.1 The housings of non-pressure-compensated electrical equipment for underwater use are to be designed for the collapse diving pressure CDP as a minimum. 5. Penetrations in vessels and plug-and-socket connections are to be designed and tested in accordance with the GL Rules for Manned Submersibles (I- 5-), Section 11, D.8. under consideration of For electrical equipment a minimum type of protection IP 44 is required. 5.4 Insulation class F is to be provided for the windings of electrical machines. 5.5 Underwater cables and lines shall be impervious to transverse water penetration (i.e. no water shall penetrate the sheath) and are to be designed for an overpressure which is equivalent to the collapse diving pressure CDP. For further requirements concerning design and testing see Annex E. 5.6 Drum cables are to be so designed that mechanical forces are not transmitted via electrical components. 5.7 For monitoring of the manoeuvres and activities of the ROV under water suitable searchlights and video cameras are to be provided. M. Control, Automation, Data Transfer, Navigation and Locating Equipment 1. Design principles 1.1 General principles All devices for automatically monitoring and controlling the operating parameters of a submersible are to be so designed and constructed that they function properly under the design and ambient conditions laid down for the vehicle Computer-aided operational control systems for the submersible are permissible. Details of the scope and redundancy of the equipment are to be agreed with GL. The systems are to be approved by GL and type approved components should be used. The check contains the applied devices (hardware) as also the effectiveness of software programs belonging to them. Kind and scope of the check is to be agreed with GL Computer-aided operational control systems are to be capable of being switched to manual operation at any time. Exceptions to this rule are to be agreed with GL No fault or failure whatsoever in the automation system shall lead to an uncontrollable operating condition Automation equipment shall be as far as possible protected against incorrect operation Automation equipment shall be capable of maintaining the pre-defined operating parameters of the submersible All inadmissible deviations from the operating parameters shall automatically actuate a visual and audible alarm at the control station, this applies additionally to automatic changeovers in the power supply system and to faults in the control and monitoring system.

41 Chapter 3 Page 3 1 Section 3 M Design and Construction of Unmanned, Remotely Operated Submersibles (ROV) I - Part In addition to electronic control and monitoring devices, independent safety devices are to be provided which prevent a fault in a system from creating an unsafe or undesirable operating condition The response settings of automation devices are to be co-ordinated in such a way that, when a limit value is reached, an indicating signal is actuated followed by the response of the safety devices on the expiry of a specific warning period or on the further variation of the process variable at a preset speed The overall behaviour of the automation equipment has to be compatible with the time constants of the devices and components in the system As criterion for the noise immunity of electronic systems the IEC standard (Electromagnetic compatibility of electronic installation in ships) is to be applied. 1. Construction 1..1 Electronic automation equipment shall comprise easily interchangeable modules using the plug-in system wherever possible. The modules should be largely standardized, and the number of module types should be kept small to reduce the spares inventory. 1.. Plug-in cards shall be clearly marked or coded as a safeguard against accidental confusion Measures are to be taken to prevent condensation inside electronic equipment even when it is switched off. A stand-by heating is recommended Wherever possible, automation equipment shall be preferably operable without forced ventilation. The functioning of any cooling system is to be monitored Components are to be effectively fastened. The mechanical loading of wires and soldered connections by vibrations and shaking is to be minimized The construction of systems and equipment shall be simple and straightforward. Easy accessibility for measurements and repairs is desirable. 1.3 Circuitry Signalling, monitoring and control devices for safety-related functions are to be constructed on the fail-safe principle, i.e. defects such as shortcircuits, earth faults and breaks cannot produce conditions endangering humans or equipment. This is to be based on the assumption of single faults. The failure of one module, e.g. due to short-circuit, shall not result in damage to other modules In programmable controllers the electrical values of the sensors shall meet the safety requirements for control devices. This means primarily: H-level start-up, i.e. by powering via NO contacts L-level shutdown, i.e. by de-powering via NC contacts The requirements stated in are unaffected Command and control devices for safety functions, e.g. emergency-stop sensors, are to be independent of a programmable controller and are to act directly on the output device, e.g. stop solenoid valve. They are to be safeguarded against unintentional operation Programmable controllers shall be noninteracting and in case of fault shall not cause disturbances in program-independent safety interlocks and safety switching sequences for fixed subroutines Freely accessible potentiometers and other components provided for adjustment or working-point setting are to be capable of being locked in the operating position Switchgear interfaces are to be so designed that contact chatter has no adverse effects on the operation of the equipment Printed conductors forming part of circuits extending outside the enclosure containing the printed circuit boards are to be conditionally short-circuit proof, i.e. in the event of an external short-circuit only the protective devices provided may respond without destroying the printed conductors The equipment shall not be damaged by brief voltage surges in the vehicle's power supply which may be caused by switching operations. If not more detailed otherwise at the feeding of the remotely operated submersible wiring-bound interference voltages and quick transient interference factors according to IEC , severity level 3 are to be considered. Where equipment is supplied from static converters, allowance is to be made for periodic voltage pulses. The amplitude depends on the type of converter and is to be investigated in each case. An overvoltage protection adjusted to the equipment is recommended. 1.4 Power supply For the supply of control, monitoring and safety systems - in general by the support ship - the requirements according to the GL Rules for Electrical Installations (I-1-3), Section 9 are to be observed, compare also Section The power supply is to be monitored and a failure is to be alarmed and registered.

42 I - Part 5 Section 3 O Design and Construction of Unmanned, Remotely Operated Submersibles (ROV) Chapter 3 Page Power supply units for automation equipment shall at least have short-circuit and overload protection as far no unsafe operating condition of the vehicle can be created by these Automation equipment is to be capable of reliable operation with the voltage and frequency deviations mentioned in the GL Rules for Electrical Installations (I-1-3), Section 1.. Control station.1 For monitoring and controlling the submersible a control station or console is to be provided aboard of the support ship (in a mobile container or permanently installed in the support ship) at which all the important data relating to the vehicle are displayed and all the controls and monitors, including TV and communications facilities, are located which are needed for the operation of the submersible.. The instruments for supervising, open and closed loop control and operating of the submersible are to be grouped and arranged on ergonomic principles at the control stand..3 All monitoring and control devices are to be unambiguously labelled and marked..4 Limit values are to be marked for analogous measuring instruments. In case of reaching limit values on digital indicating instruments an alarm is to be provided..5 As far as feasible and rational, initiated control functions are to be indicated optically at the control station..6 In the area of the control station no plants or systems are to be installed which are impairing the supervision and operation of the submersible..7 The prerequisites which are to be made available for the control station by the support ship are defined in Section In case of a failure of the data transfer the submersible has to reach a defined and safe operating condition. 4.3 If secondary "data for payloads" shall be transferred with data lines, these are to be transmitted independently from the data lines for the operation of the submersible. 5. Navigation and locating equipment Principally also the regulations of the flag state respectively of the competent authorities are to be considered. 5.1 All the electronically operated navigation and locating equipment necessary to the safety of the submersible is to be connected to the submersible's emergency power supply. Its operational or stand-by status is to be clearly indicated at the control station. 5. As far as it is feasible and rational, remotely operated submersibles should be equipped with an automatic emergency locating device (pinger). If a launcher is provided, it can be favourable to equip it also with an emergency locating device (pinger). These locating devices are to be harmonized with those on the support ship. 5.3 Submersibles are to be equipped with suitable signal systems (e.g. flashing light), which enable a quick detection of the surfaced submersible. 5.4 For better visibility of the submersible at the water surface, submersibles should be provided with contrast colour painting or reflection material, applying preferably the colours orange, yellow or red. N. Fire and Explosion Protection Especially if the submersible is on board of a support ship where there are explosion endangered areas, adequate explosion protection measures are to be provided for the equipment and the control stations of the submersible; if need be the equipment is to be checked specially and marked for this type of mission. 3. Sensors and actuators All devices for registering the operating conditions of remotely operated submersibles as well as the belonging actuators are to be approved by GL and should be type tested. 4. Data transfer systems 4.1 For the use of data cables it has to be guaranteed that the specified data volume per time unit will be transmitted without disturbances under all operating conditions. O. Operational Media 1. Operational media such as hydraulic fluids, lubricants, etc. are to be selected in accordance with the proposed ambient conditions. They shall not tend to congeal or evaporate over the whole temperature range.. Operational media are to be so selected that water penetration resp. mixing with seawater does not essentially impair the functionality of the submersible.

43 Chapter 3 Page 3 14 Section 3 P Design and Construction of Unmanned, Remotely Operated Submersibles (ROV) I - Part 5 3. Operational media shall not contain toxic ingredients which are liable to be hazardous to health through skin contact or when given off in fumes. 4. Operational media should not be corrosive or attack other operating equipment (e.g. seals, hose lines, etc.). P. Corrosion Protection Submersibles and all adjacent components are to be protected effectively against corrosion. Further information can be gained from the GL Guidelines for Corrosion Protection and Coating Systems (VI- 10-).

44 I - Part 5 Section 4 B Additional Requirements for Unmanned, Autonomous Submersibles (AUV) Chapter 3 Page 4 1 Section 4 Additional Requirements for Unmanned, Autonomous Submersibles (AUV) A. General Principles 1. In principle the requirements of the Sections 1 3 are besides this Section also valid for the design and construction of autonomous submersibles (AUV) as far as applicable. Unmanned autonomous submersibles (AUV) are to be equipped with own power supply and own open and closed loop control including eventual control by active and/or passive sensors and computer hard- and software, to fulfil predefined missions in autonomous way for a certain time period. Afterwards they are recovered by a support ship and are supplied, maintained and transferred to the location of the next mission.. The tasks of the AUV serve mainly for the execution of missions for surveillance, observation, measurements, making films, cartographic records, etc. Other tasks are possible as far as the power demand can be covered by the AUV. 3. For a simultaneous mission of several AUVs from one support ship, the additional requirements will be defined by GL case by case. 4. AUVs which are connecting at the working place to a supply line and are then operated as ROV are designated as Hybrid-ROV (HROV). The special conditions for such a case of application will be defined by GL case by case. 5. As far as applicable, the requirements of this Section may be applied also for measuring devices and measuring sensors, which are used stationary or mobile without own propulsion. B. Principles of Design and Construction 1. Design principles For autonomous submersibles in general the following design principles are to be realized: power supply of sufficient capacity for the defined scope of tasks sensor system which allows a three dimensional positioning in the underwater space computer equipment for programming of missions emergency program to abandon the mission if failures occur and to enable the recovering of the vehicle A deviation from single requirements may be agreed with GL.. Supporting structure The supporting structure may be provided e.g. as pressure hull with adequate watertight closable openings or as basic structure with pressure vessels arranged in between. Other types of structure may be agreed with GL. 3. Launcher For autonomous submersibles the application of launchers without and with garage for the safe launch and recovery should be possible, compare Fig The requirements for the launcher are equivalent to those defined in Section 3, F., as far as applicable. 4. Equipment for control respectively adjustment of depth, trim, positive and negative buoyancy 4.1 Weights For solely application of weights which can be released adequately, the following functions have to be clearly separated: equipping with oversized weights for quick diving to the required depth partial release of weights to achieve floating in the water (smaller density differences of the water, etc. can be equalized dynamically) further release of weights for emerging at the end of mission 4. Cells If diving tanks, compensating tanks and trimming tanks are provided for bigger AUVs, systems analogous to manned submersibles are to be provided, but simpler measures with reduced redundancy may be applied. 4.3 Dynamic arrangements Arrangements are to be provided for: keeping a certain diving depth on the one hand, or achieving on the other hand a certain distance from the sea bottom, even it is uneven or rugged. The tolerances for these characteristics are to be defined by the manufacturer and are to be checked at the trials according to D.

45 Chapter 3 Page 4 Section 4 B Additional Requirements for Unmanned, Autonomous Submersibles (AUV) I - Part 5 Coil-up/coil-off mechanism Braking unit Storage for umbilical with lifting cable Winches for lifting cable and umbilical Umbilical with lifting cable Lifting cable Umbilical Launcher with garage autonomous submersible Launcher with coupling Fig. 4.1 Application of launchers for autonomous submersibles (AUV) 4.4 Automatic depth limitation For missions of an AUV in waters, which are deeper than nominal diving depth NDD, an automatic depth limitation is required. 4.5 Emergency surfacing systems To avoid the total loss of the submersible, e.g. in case of total power failure, an energy independent emergency surfacing system is recommended. As emergency surfacing systems e.g. weights with corrosion fastening or gas operated surfacing systems may be applied. 5. Propulsion and manoeuvring equipment The propulsion and manoeuvring equipment may include: propeller main propulsion with single propeller or contra-propeller with reverse direction of rotation resp. water jet propulsion steering propeller, especially for assistance of changes of diving depth horizontal and vertical effective fins and rudders 6. Electrical equipment 6.1 Principles The time of functioning of the electrical equipment is to be specified according to the maximum duration of the missions of the AUV. 6. Power supply 6..1 A main power supply has to be provided, which will be in general a battery. 6.. In addition an emergency power supply has to be provided which shall supply the following systems for a period of time to be specified, but at least for 4 hours: emergency processor for activation of the emergency measures performing of the emergency measures (e.g. controlled emerging, release of a signal shape) dispatch of wireless signals flash light or other lights if required and possibly acoustic signals 6..3 Depending on the potential of danger for the electrical equipment of the AUV a device to equalize the potential is to be provided which is already effective during recovery from the water. 7. Automation, navigation and location systems 7.1 Automation Pre-programmed missions are to be entered and stored. The execution has to begin after a starting order During the execution of the mission, its performance according to program has to be checked by suitable routines and if necessary be corrected. The essential mission parameters are to be recorded A series of parameters which are concerning the operation of the AUV directly and which are essential for it are to be monitored and eventually a failure report is to be sent to the support ship. If the transmission is not possible for some time, all reports are to be stored for reconstruction of the function of the AUV at the end of the mission. Such parameters can inter alia be: specific status reports, e.g. position, speed, diving depth, etc. ground fault of the electric equipment

46 I - Part 5 Section 4 C Additional Requirements for Unmanned, Autonomous Submersibles (AUV) Chapter 3 Page 4 3 voltage drop over temperature of monitored components entrance of water in a monitored space overpressure in a monitored space failure of the main computer If the detected failures according to cannot be corrected and if the following problems arrive: exceeding of the nominal diving depth, leaving of the area defined for the mission, exceeding of the period of time for the mission, the mission has to be broken-off and the provided emergency program is to be started. If emerging is planned in this case, the propulsion of the AUV has to be stopped, eventually the emerging weight is to be released, emergency signals are to be transmitted and the flashlight is to be switched on If required, the AUV has to be provided with a system which allows breaking-off the mission after receiving an acoustic emergency signal from the support ship. It is to be distinguished, if immediate emerging or resting in the position reached recently under water will become necessary (e.g. if bad weather does not allow the recovery by the support ship) or if eventually the returning to the start position shall be initiated. 7. Data connection 7..1 Under water the data exchange between the support ship and the AUV can be established by e.g. acoustic methods. In case of background noise in the water independent from the AUV, e.g. from waves, breakers, etc., filtering out of such disturbances by adequate measures is to be aspired. 7.. Above water the data exchange between the support ship and the AUV is to be established by wireless communication. A one channel transmitter is sufficient in general. In addition it is recommended for not planned surfacing, e.g. in case of failure, to provide a data connection via satellite to a defined receiver The AUV shall be able to report its status (position, propulsion, remaining energy, payload in action, detected failures, etc.) to the support ship within regular time intervals, which can be adjusted according to the executed mission. 7.3 Navigation The accuracy of navigation for submerged and surfaced condition is to be agreed with GL Submerged Under water different measures and their combination may be possible for navigation. These are e.g.: acoustic positioning in relation to the support ship and/or to transponders located in advance in the working area orientation on underwater structures or on the relief of the sea bottom inertial navigation 7.3. Surfaced At the water surface an active determination of the position shall be made by the Global Positioning System (GPS) or an equivalent system. During the mission the actual position shall be transmitted by wireless to the support ship within defined time intervals. If an active system for determination of the position is not suitable for the mission, e.g. radar transponders or an automatic identification system (AIS) are to be provided. To facilitate the detection in the range of the water surface during the emerging procedure a flash light is to be switched on already from 10 m depth onwards. The supporting structure of the AUV shall in general be provided with adequate conspicuous colour (e.g. yellow or red-orange) to improve visibility. In addition further measures for collision prevention according to 6.. and to flag state and international regulations may be requested. 7.4 Sensors All sensors including navigation systems shall be time synchronized. The sensors shall not disturb each other and shall also not influence the payload sensors. 8. Payload The sensors of the payload NL shall be independent from the operational and navigational sensors and shall not disturb the operation and navigation of the AUV. C. Documents for Approval 1. As far as possible documents analogous to those defined in Section, E. are to be submitted.. Special importance have: proof by computation of the performance and duration of operation of the power supply proof by computation concerning ability of diving and emerging description of type and kind as well as scope of missions block diagrams and further details concerning open and closed loop control of navigation within a defined mission

47 Chapter 3 Page 4 4 Section 4 D Additional Requirements for Unmanned, Autonomous Submersibles (AUV) I - Part 5 description of a computer-aided mission simulation for the total system description of the possible payload NL and its influence on the total system description of the emergency program D. Tests and Trials 1. General 1.1 Unmanned autonomous submersibles are subject to constructional and acceptance testing at the manufacturer s works. All the tests prescribed in the following paragraphs are to be performed and documented, wherever applicable. About the presence of GL Surveyors at these tests and trials GL will decide case by case. 1. For series-manufactured parts, test procedures other than those prescribed may be agreed with GL provided that they are recognized as equivalent by GL.. Scope of tests After completion the submersible with the required auxiliary systems, as e.g. arrangements for programming and input of the mission parameters, the power charging between the missions, etc. is to be subjected to function and approval testing, performing at least the following single tests:.1 As far as necessary, tests according to Section, F. are to be performed.. Special importance have: functional test at the manufacturer's including mission simulation All mission dependent functions are to be checked within a trial parcours. functional test of emergency program/breakingoff of mission test of all safety systems under consideration of the autonomous mission launch and recovery of the AUV including starting and final phase of the mission The tests under water are to be performed with diving depths up to nominal diving depth NDD, see Section 3, C. 3. Payload NL It is to be checked that the operation of the devices representing the payload does not influence the operation of the AUV in a negative way.

48 I - Part 5 Section 5 B Principles for the Construction of Underwater Working Devices and Underwater Working Machines Chapter 3 Page 5 1 Section 5 Principles for the Construction of Underwater Working Devices and Underwater Working Machines A. Scope 1. The following Rules are valid for the construction of underwater working devices and working machines which shall be certified by GL, including their control and monitoring systems. Underwater working devices and working machines are defined in D.1.. Further system elements of the total system, like stowage and deck transport on the support ship, the supply systems and their control on the support ship as well as the required systems for launching and recovery of the underwater working machines may also be judged and certified, compare Table 5.1 and Section The requirements defined in the following are to be observed according to type, size and mission duty of the devices and machines in each actual case. B. Certification 1. General 1.1 The application for Certification of an underwater working device or a working machine is to be directed to GL by the manufacturer or operator in written form. 1. Documents for working devices and working machines are to be submitted to GL generally in triplicate respectively in case of electronic transmission as single issue for approval. The scope of the documents to be submitted depends on the type and equipment of the working device or working machine and follows from the requirements defined in the following. 1.3 Surveys which have to be performed by GL are to be noticed to GL in due time.. Certification according to GL Rules Underwater working devices and working machines, which are constructed and tested according to the rules and surveys of Germanischer Lloyd may receive a Certificate from GL. An overview which system elements of the total system may be certified in general shows Table Certificate 3.1 After completion and successful testing of the working device or the working machine according to H. an Underwater Working Device Certificate or an Underwater Working Machine Certificate will be issued by GL. Table 5.1 Certification of working devices and working machines System elements Working device Working machine Working machines / working devices: (Section 5) Working device / working machine as such, including umbilical, if applicable Control stand Data transfer to working device / working machine Supporting systems aboard the support ship: (Section 6) Underwater Working Device Certification Underwater Working Device Certification Underwater Working Machine Certification Underwater Working Machine Certification Supply systems and their control on the support ship Certification 1 Certification 1 Launch and recovery equipment, including umbilical winch, if applicable Certification Stowage and deck transport on the support ship Proof of Suitability 3 Proof of Suitability 3 1 GL Certificate or Certificate of a recognized institution, as far not content of the Classification of the support ship GL Certificate or Certificate of a recognized institution 3 e.g. test stamp, test mark for lashing devices, etc.; proof for winches, deck fastening, etc.

49 Chapter 3 Page 5 Section 5 D Principles for the Construction of Underwater Working Devices and Underwater Working Machines I - Part 5 3. The Certificate certifies the technical condition of the working device resp. the working machine by GL at the time of the tests and approvals. In addition it will be confirmed that no safety reservations are opposing the operation. 3.3 The validity of the Certificate is 5 years at maximum and can be prolonged after renewed tests. For maintaining the Certificate the system is in general to be subjected to an annual survey. After longer times of standstill a test is to be performed before putting into operation again. The Certificate looses its validity if substantial changes (influencing the safety of the system) are performed at the device or machine respectively if the system has been severely damaged and the change resp. the repair has not been agreed and approved by GL. 4. Certification according to other rules 4.1 For working devices and working machines, which are not built according to the Rules of GL, the applied rules have to be defined in a binding way in the application for Certification. 4. After successful examination a Certificate may be issued by GL. C. Rules and Regulations to be Considered 1. Rules of GL 1.1 The following Rules are valid as additional requirements for the Certification and construction of underwater working devices and working machines in addition to the Rules for Classification and Construction of GL, e.g.: Part 1 Seagoing Ships, Chapter 4, as far as applicable II Materials and Welding, Part 1 3 IV Industrial Services, Part 6 Offshore Technology, as far as applicable 1. For underwater working machines also the plants and systems for control and safe operating have to comply with the relevant Rules of GL. 1.3 Designs differing from the Rules of Construction may be approved provided that they have been recognized by GL as equivalent. 1.4 Underwater working devices and working machines or parts thereof whose development is based on new principles and which have not yet been sufficiently tested in practical operation require special approval by GL. 1.5 In the cases mentioned in 1.3 and 1.4, GL is entitled to require the submission of additional documentation and the performance of special tests. 1.6 GL reserve the right to impose demands additional to those contained in the Rules in respect of all types of underwater working devices and working machines when such action is necessitated by new knowledge or practical experience, or to sanction deviations from the Rules in specially justified cases.. National regulations National regulations existing alongside GL's Rules are unaffected. 3. International Conventions and Codes International Conventions and Codes may also be valid, e.g.: 3.1 MARPOL 73/78 International Convention for the Prevention of Pollution from Ships, 1973 including the 1978 Protocol as amended. D. Definitions 1. General Collapse diving pressure CDP The collapse diving pressure CDP is related to the collapse diving depth CDD of the working device or the working machine, which is decisive for the design and for which a collapse of components can be expected [bar]. Control stand Desk, console or mobile control unit at which all essential indicators, controls, regulating devices and monitoring devices for remote control of the working devices resp. of the working machines are arranged. For the operation of working devices the control stand may be arranged in the manned submersible or on the support ship. For the operation of working machines it is situated in general on the support ship. Diving pressure The pressure, corresponding to the relevant diving depth, to which a working device or a working machine is exposed during underwater operations. The diving depth is related to the lower edge of the working machine or for working devices to the baseline of the submersible. Launching and recovering system The plant and equipment necessary for launching and recovering working machines.

50 I - Part 5 Section 5 D Principles for the Construction of Underwater Working Devices and Underwater Working Machines Chapter 3 Page 5 3 Lifting cable Cable for launching and recovering, and also for lifting and lowering of a working machine. Nominal diving pressure NDP The nominal diving pressure is related to the diving depth NDD for the unrestricted operation of the working device or working machine [bar]. Payload NL of the working machine Maximum additional load which the working machine is able to carry for the jobs to be performed, e.g. investigation of the sea and scientific research. Gas cylinders Bottles for the storage and transport of gases under pressure Pressure vessels Container capable of withstanding an internal or external maximum allowable working pressure of 1 bar or above. Support ship A surface vessel for support and supply of working machines. Within these Rules the support ship may also be a stationary supply station (e.g. on the coast or on a stationary offshore plant). Test diving pressure TDP The test diving pressure TDP is related to the test diving depth TDD which is adequate to an external overpressure to which the working device or the working machine is subjected after completion or after essential repairs and conversions under testing conditions [bar]. Total system Underwater working machine or submersible with working device or including its control, launching, recovery, stowing, transport and supply systems. Umbilical Connection between support ship and working machine, which might contain control, monitoring, data transfer and power supply lines as well as the lifting cable. Working device (underwater) Device, e.g. manipulator or tool, which is fixed to a submersible resp. to an underwater working machine and which is designated to the performance of underwater tasks. Working machine (underwater) Machines, e.g. grab, driver, drill and their combination, which are normally used from a support ship to perform underwater tasks.. Types of underwater working devices Underwater working devices are e.g.:.1 Video cameras Cameras can be mounted on either a pan and tilt assembly, held by a manipulator arm or may be arranged in a fixed position. With movable cameras pictures of areas which are not easy to be looked at or under special visual angle can be made. To improve visibility search lights are to be provided.. Devices for non-destructive material testing These devices serve to verify the intactness of offshore structures and include thickness measurement devices, flooded member detectors and current density devices, etc..3 Devices for acoustic measurements and position determination These devices include measuring systems and systems for determination of position and all types of active/passive sonar systems, like sonar or echo sounders to detect hindrances, sea bottom survey, tracking of pipelines, etc..4 Cleaning devices These devices serve to clean ships or offshore structures with e.g. rotating wire or nylon brushes and water-jetting systems with or without abrasives..5 Fixing systems These systems are serving for temporary fixing of a submersible with working devices resp. of a working machine e.g. on an underwater structure. Fixing systems may be mechanical or hydraulic systems..6 Search lights Search lights including their pressure-proof housing with penetrations, which are applied for illumination of an underwater range, are considered as working device in the sense of these rules.7 Manipulators Manipulators are used for fixing, for handling tools and for the execution of working missions..8 Further working devices Further working devices may be devices for taking samplings, transport containers, special measuring devices or devices for special tasks. 3. Types of working machines Working machines with the capability to perform e.g. the following activities under water:

51 Chapter 3 Page 5 4 Section 5 F Principles for the Construction of Underwater Working Devices and Underwater Working Machines I - Part 5 welding cutting/separating drilling doweling, anchoring pumping milling excavating/filling up flushing ramming/vibrating installing mounting connect/disconnect geological mining mission related special tasks E. Environmental Conditions 1. General For the design of working devices and working machines environmental conditions defined in the following are to be considered. For working devices and working machines which are used only in certain areas, different environmental conditions may be approved.. Inclined positions As far as not specified otherwise, satisfactory operation shall be ensured at (static and dynamic) inclinations of up to,5 in any direction measured in relation to the as-installed datum. Transient inclinations of up to 45 shall not adversely affect operation and shall not cause damage, particularly to machine mountings. For greater operational inclinations these have to be considered adequately for design and testing. 3. Water For the design of working devices and working machines the temperature range of the water as well as the range of salt content and therefore of the density is to be defined. If not agreed otherwise, seawater with a temperature range from C to +3 C, with a salt content of 3,5 % and a density of 108 kg/m 3 may be used as a basis. A value of 0,101 bar/m is to be applied when converting diving depth to pressure. 4. Seaways The seaways up to which the mission is to be performed, are to be agreed with GL. If not agreed otherwise, it is to be designed for sea states with a significant wave height of at least m. Allowance is being made for accelerations of g downwards and 1 g upwards in the vertical and 1 g each in the longitudinal and transverse directions (g = 9,81 m/s ). 5. Tide and currents Current conditions are to be considered for the design according to the operation area. As basis for the design the maximum as well as the minimum tide at the relevant operation area shall be included. In addition currents created by storms or geographic specialities (e.g. narrow channels) are to be considered, as far as necessary. 6. Climate For transport, storage, maintenance, inspection and trials out of water of working devices and working machines on board of the support ship as well as for the launch and recovery system of the working machine salt impregnated air ranging in temperature from 10 C to +55 C at a relative atmospheric humidity of 100 % has to be assumed. In the protected control rooms for working machines installed on board of the support ship, a relative atmospheric humidity of 80 % at a reference temperature of 45 C is to be assumed. 7. Vibrations and shaking Working devices and working machines shall not cause any vibration or shaking which imposes unacceptable stresses on other machines, equipment or the hull of the submersible. The amplitudes and accelerations defined in the GL Rules for Machinery Installations (I-1-), Section 1, C. are to be complied with. 8. Explosion protection Working devices and working machines which are used in respectively from explosion endangered areas (e.g. platforms for extraction of oil and gas) are to be designed for the relevant explosion zones. This is also valid for control stands. 9. Further environmental conditions For the design of working devices and working machines eventual the environmental conditions occurring during an air transport (e.g. underpressure / temperature) are to be considered. F. Principles for Design and Construction 1. Working devices 1.1 Total system Working devices are to be coordinated with the submersible in relation to size and effect and shall not lead to any impairment of the function of the submersible. The working device shall meet at least the applicable design parameters for the manned or unmanned submersible.

52 I - Part 5 Section 5 F Principles for the Construction of Underwater Working Devices and Underwater Working Machines Chapter 3 Page Power supply For greater power demand the power supply for the working device shall be separated from the supply of the submersible itself. Fixing system shall be designed according to the fail safe principle, i.e. in case of power failure the fixing device opens, if this creates no additional danger. If the mission requires an emergency operation because of failure of the main power supply, e.g. to finish already started works, this is adequately to be considered. 1.3 Tools Tools which can be changed by remote control, are to be provided with measures to avoid the leakage of operation media or the ingress of sea water in the supply system. Tilting and slewing tools are to be designed in a way that existing power, supply or control connections will not be twisted off or damaged.. Working machines.1 Layout.1.1 Working machines are to be designed for all planned operation conditions. As a basis the requirements defined in Section 3 are to be considered as far as applicable..1. Components of working machines which are subjected to external pressure are to be designed at least for 1,0 collapse diving pressure CDP..1.3 For the layout the safety factors CDP/NDP and TDP/NDP according to Section 3, Table 3.1 are to be applied..1.4 The lifting points at the working machine shall have a safety against rupture of 8 times the safe working load SWL and are to be clearly signed and marked with their safe working load SWL..1.5 For the safety of working machines it may be required (e.g. according to a Failure Modes and Effects Analysis FMEA, compare Section, F.) to provide redundant systems or components..1.6 In addition it can be required, that e.g. open and closed loop control, monitoring devices or tools are redundantly designed to increase the availability of working machines, especially for deep sea missions.. Power supply In the case of a main power supply failure or interruption of the remote control the working machine has to reach a defined and safe operating condition..3 Control and monitoring For this especially is to be observed: Systems are to be provided that are able to monitor the position of the working machine at the working location at any time. These may not be part of the working machine. The actual status of the working machine and the working function in execution has to be indicated at the control stand on the support ship. The operating parameters required for the safe operation of the working machine are to be indicated at the control stand and are to be provided with acoustic and/or optical alarms according to the priorities. For immediate finishing of the works in case of emergency an emergency stop device is to be provided. In case the execution of several working functions is arranged automatically one after the other, manual interruption of this sequence has to be possible at any time. If visual monitoring is required for underwater missions, measures are to be provided which enable an adequate illumination of the working area and the use of video cameras. To protect the working machine and also sensible objects to be treated from damages, overload protections are to be provided for the different working functions. If a twisting of the machine shall be hindered during the mission, an anti-twist unit is to be provided..4 Emergency surfacing system If required an emergency surfacing system with defined actuation is to be provided to avoid e.g. a total loss of the working machine if the lifting cable is destroyed..5 Missions with divers If a joint mission with divers is planned, suitable safety measures, like e.g. protection grids for shielding of dangerous areas or similar are to be provided. In addition an easily visible and easily accessible emergency stop device at a suitable location (at the working machine, at the nd diver) has to be available. Further the electrical installations according to Section 3, L.4. are to be protected for a mission with persons..6 Missions at the sea bottom Working machines for missions on the sea bottom are to be designed that a minimum possible influence on the sea bottom and its flora and fauna is guaranteed..7 Further requirements Further requirements are - as far as applicable - to be accomplished in analogous form to the unmanned submersibles respectively are to be agreed with GL case by case.

53 Chapter 3 Page 5 6 Section 5 H Principles for the Construction of Underwater Working Devices and Underwater Working Machines I - Part 5 G. Documents for Approval 1. General The general requirements defined in Section, E.1. are also valid here.. Total system The following documents are to be submitted:.1 Description of the working device and its interface to the submersible resp. of the working machine with data about type of operation, planned mission duty and the essential layout parameters, like e.g.: nominal diving depth NDD limits of mission in relation to launch and recovery (seaway) other limits of mission in relation to environmental conditions, e.g. salt water/fresh water or similar type and extent of working devices resp. of the working machine for working devices: arrangement and fixing at the supporting structure materials used maximum power demand and power supply type and quantity of the used operational media control and monitoring safety systems if existing, type of emergency emerging system weight of working device resp. of working machine, payload and ballast volume. General arrangement drawing of the working device resp. of the working machine..3 Schematic drawings (block diagrams) of the total system, in addition details about systems provided for supply and support of the working device resp. of the working machine (e.g. control stand, launching and recovery system, umbilical for power supply, etc.)..4 A comprehensive presentation of the measures taken to prevent corrosion especially for functionally essential components..5 Stability documentation (according to mission duty and construction) for the submersible with working device resp. for the working machine, if applicable..6 Manual for operation and maintenance The manual for the operation shall include in detail the steps necessary for normal operation as well as for emergency operation in a clear and conceptual form and in the necessary sequence (e.g. as checklists). In addition the measures for the charging of the operating systems (e.g. batteries, gas/fuel containers) are to be defined. In addition the planned lifetime as well as the permissible load and operation cycles of parts of the equipment (e.g. acrylic windows, batteries) is to be defined herein. The maintenance manual shall include all procedures for the preventive maintenance as well as for periodic inspections..7 Operational records All conditions relevant for the mission (diving depth, mission time, damages, etc.) are to be documented..8 Trial program..9 Documents required further are to be taken from Section, E. H. Tests and Trials 1. Constructional and acceptance test 1.1 General Remotely operated working devices and working machines are subject to constructional and acceptance testing at the manufacturer's workshop as far as possible. In addition, all the tests and trials prescribed in the following are to be performed and documented, wherever applicable. About the presence of GL Surveyors at these tests and trials GL will decide case by case For series-manufactured parts, test procedures other than those prescribed may be agreed with GL provided that they are recognized as equivalent by GL. 1. Total system On completion, the working device including the envisaged submersible resp. the working machine with the necessary ancillary equipment, like e.g. control stand, energy supply, etc., is to be subjected to a functional and acceptance test. In general the following individual tests are to be performed: inspection of assembly (where not already performed during supervision of manufacture) measurement of weight and buoyancy, eventually stability

54 I - Part 5 Section 5 J Principles for the Construction of Underwater Working Devices and Underwater Working Machines Chapter 3 Page 5 7 static test of the lifting points at the working machine with, times the safe working load SWL (weight + payload NL of the working machine) static test of the connecting points for the umbilical at the working machine with, times the maximum permissible tensioning load of the umbilical check of control and monitoring check of all safety systems. Repeated tests Check of documents for the working machine resp. the working device and inspection of the operational records. The complete system is to be checked for visible damages, cracks, deformations and corrosion attacks. The complete system is to be subjected to a functional test. Further tests specific to the machine are defined by GL case by case. check of redundant systems and components functional testing of mechanical, electrical and optical equipment including fixing systems and working devices check of all essential measuring instruments high voltage test and insulation test on the electrical equipment before and after the trials under water check of arrangements to avoid dangers for the divers check of eventual affects on the submersible by working devices including functional test and change of working device, if applicable pressure testing of the working machine resp. of its components subjected to external pressure (vessels, apparatus, electrical penetrations, etc.) or of the working device with test diving pressure TDP trials and functional tests under water without the specified performance proof for the working function for diving depth up to nominal diving depth NDD Before the trials at nominal diving depth NDD normally functional tests are to be performed on land and in shallow water. Further required tests are defined according to the equipment in Section, F. 1.3 Check of working functions The proof for the specified performance parameters of working devices and working machines may be performed with simulated working conditions, e.g. in a pressure tank, or by a deep water trial with nominal diving depth NDD. The scope of the proof of performance has to consider the parameters specified for nominal diving depth NDD and is to be agreed with GL. Only after the successful proof of performance, the relevant performance data of the underwater working device resp. of the working machine can be included into the Certificate. I. Marking 1. All working devices and working machines are to be provided with permanent and seawater resistant markings.. The marking shall contain: name or company designation of manufacturer year of construction serial number nominal diving pressure NDP [bar] maximum allowable working pressure [bar] of the systems under pressure performance parameters according to type of working device respectively of working machine if necessary, further characteristic parameters according to type of device /machine electrical data (voltage, amperage, etc.) weight [kg] if necessary, permissible payload NL [kg] and belonging load radius [m] date of test test stamp J. Spare Parts 1. In order to restore operation capability of the working device or the working machine in the event of damage at sea, spare parts for the essential equipment shall be available together with the necessary tools on board of the support ship resp. in the surrounding area to the mission location.. The scope of spare parts is to be documented and a relevant listing has to be on board of the support ship. 3. For change or repair of essential or safety relevant components B.3.3 is to be observed.

55 Chapter 3 Page 5 8 Section 5 L Principles for the Construction of Underwater Working Devices and Underwater Working Machines I - Part 5 K. Operational Media 1. Operational media such as hydraulic fluids, lubricants, etc. are to be selected in accordance with the proposed ambient conditions. They shall not tend to congeal or evaporate over the whole temperature range.. Operational media are to be so selected that water penetration resp. mixing with seawater does not essentially impair the functionality of the submersible. 3. Operational media shall not contain toxic ingredients which are liable to be hazardous to health through skin contact or when given off in fumes. 4. Operational media should not be corrosive or attack other operating equipment (e.g. seals, hose assemblies, etc.). L. Corrosion Protection Underwater working devices and underwater working machines and all adjacent components are to be protected effectively against corrosion. Further information can be gained from the GL Guidelines for Corrosion Protection and Coating Systems (VI- 10-).

56 I - Part 5 Section 6 C Supporting Systems aboard the Support Ship Chapter 3 Page 6 1 Section 6 Supporting Systems aboard the Support Ship A. General 1. Scope The following Rules are valid for plants and systems which are located aboard the support ship for submersibles and which are necessary for the support of the operation according to type and purpose of the mission of the submersible respectively of the underwater working machine. 3. For the ROV- or AUV-Certification of a submersible the systems according to C.. and C.3. are belonging to the submersible. The procedure to be applied is defined in Section 1, B. 4. For the Certification of further systems by GL a Certificate will be issued. The procedure to be applied is defined in Section 5, B.. Definitions For the definitions see Section, C. (ROV, AUV) and Section 5, D. (working devices and working machines). 3. Rules to be considered For the Rules to be considered see Section, B. (ROV, AUV) and Section 5, C. (working devices and working machines) 4. Environmental conditions The environmental conditions according to Section, D. (ROV, AUV) and Section 5, E. (working devices and working machines) are to be applied analogously for the supporting systems on the support ship. 5. Communication systems As far as several areas not situated nearby are required aboard of the support ship for the safe operation of the submersible resp. working machine, these are to be connected to each other by a suitable communication system. B. Classification and Certification 1. To guarantee an undisturbed and safe operation of the submersible resp. of a working machine, the supporting systems are to be either classified or certified (see Section 1, Table 1.1 and Section 5, Table 5.1).. For the Classification of a submersible with Class Notation ROV or AUV the systems according to C.. and C.3. are belonging to the submersible. The procedure to be applied is defined in Section 1, C. C. Systems for Control 1. General 1.1 As systems for control the control station, the data transfer systems to the submersible resp. to the working machine and the dynamic positioning system of the support ship are summarized. 1. The proof of the suitability of control station and data transfer has to be given by GL Classification or an ROV-Certificate (compare Section 1, Table 1.1) resp. an Underwater Working Machine Certificate for the working machine (compare Section 5, Table 5.1) of GL. In both cases the following requirements are to be considered. 1.3 If systems for control/data transfer are used for AUVs, 1. has to be applied analogously.. Control station.1 As far as applicable, the requirements defined in Section 3, M.. are valid for a control station aboard the supply ship in analogous way.. The following requirements are to be considered additionally: The power demand defined by the manufacturer of the submersible resp. working machine has to be made available. The power supply of the control station for remotely controlled submersibles/working machines shall be established by two power circuits independent from each other which can be switched over. Alternatively a direct feeding from the emergency switchboard of the support ship may be provided.

57 Chapter 3 Page 6 Section 6 C Supporting Systems aboard the Support Ship I - Part 5 The permissible deviations of voltage and frequency according to GL Rules for Electrical Installations (I-1-3), Section 1 shall not be exceeded. For the power supply of control, monitoring and safety systems the requirements according to the GL Rules for Electrical Installations (I-1-3), Section 9 are to be met. The minimum degrees of protection for the control station are to be provided according to the GL Rules for Electrical Installations (I-1-3), Section 1. An emergency stopping device for the submersible resp. the working machine is to be installed at the control station. This is to be provided in a way that unintentional actuation is excluded. If the control station is not located directly at the bridge, a communication system between them is to be provided. Between the control station and the control stand for the supply systems according to D. a communication system is to be established. In the vicinity of the control station no systems or plants are to be installed which impair the monitoring and control of the submersible resp. of the working machine..3.1 and. are only to be applied to the control station of an AUV, if the control station is required for the save operation of the AUV..4 Plans and descriptions of the control station and its power supply are to be submitted for the areas relevant here. 3. Data transfer systems 3.1 As far as applicable, the requirements for data transfer systems defined in Section 3, M.4. are valid on board of the support ship in the same way. 3. The energy supply for the data transfer to the submersible resp. to the working machine is to be provided in analogous way to is only to be applied to the data transfer system of an AUV, if the data transfer is required for the save operation of the AUV. 3.4 Plans and descriptions of the data transfer systems of the support ship are to be submitted for the relevant areas. 4. Dynamic positioning of the support ship 4.1 A ship with dynamic positioning is a vessel which automatically keeps its position (fixed location or pre-determined track) exclusively with the aid of propeller/jet drives. Especially for remotely controlled submersibles (ROV) and working machines it may become necessary to provide a dynamic positioning of the support ship as the ROV resp. the working machine is connected to the support ship via an umbilical and/or lifting cable. 4. As far as applicable, the requirements for positioning systems defined in Section 3, J. are valid for the support ship in analogous way. 4.3 All requirements for Classification of a positioning system are included in the GL Rules for Dynamic Positioning Systems (I-1-15). According to the degree of redundancy GL may assign the Class Notations DP1, DP and DP3. The support ship has also to meet the regulations of IMO: "Guidelines for Vessels with Dynamic Positioning Systems" (MSC/Circ. 645). 4.4 Documents to be submitted The following documents are to be submitted: description of the main characteristics of the system block schematic diagrams of the control system and applied logics information about possibilities for the position balance between the involved units 5. Tests and trials 5.1 Within the Classification together with the submersible an acceptance test after completion, an annual survey, an intermediate survey and a class renewal survey after 5 years is to be performed. 5. If control station and data transfer systems are to be surveyed for issuance of a ROV-/AUV Certificate resp. an Underwater Working Machine Certificate, an acceptance test after manufacturing and normally an annual survey is required. 5.3 Within the acceptance test the compliance of the documentation with the system as well as the safe functioning during normal and emergency operation has to be proven. 5.4 Within the repeated surveys the complete system is to be checked for visual damages and corrosion and is to be subjected to a functional test for normal and emergency operation.

58 I - Part 5 Section 6 D Supporting Systems aboard the Support Ship Chapter 3 Page 6 3 D. Supply Systems 1. General 1.1 Systems of the support ship, which provide energy in form of electrical power, hydraulic oil and compressed air at the interface to the umbilical are supply systems. For remotely operated submersibles (ROV) and working machines normally the supply is necessary during the preparation of the mission as well as continuously during the mission, for autonomous submersibles (AUV) between the missions. 1. The proof of the suitability of these systems can be provided by a Class Certificate of the supply ship or by a separate Certificate of a recognized institution (compare Section 1, Table 1.1). If no Certificate is existing and the establishment of such a proof is ordered from GL by the manufacturer or operator, the following requirements are to be considered.. Electrical supply.1 As far as applicable, the requirements defined in Section 3, L. are valid for the support ship in analogous form as well as state-of the-art-technology.. The following requirements are to be considered additionally: The power demand defined by the manufacturer of the submersible resp. working machine has to be made available at any time. The additional demand for eventual working devices (compare Section 5) is to be considered. If a dangerous condition for the consumer may arrive if the main supply fails, special measures are to be provided in accordance with GL. The emergency power supply on the support ship shall be able to provide the power demand until a safe condition of the underwater mission is reached. The permissible deviations of voltage and frequency according to GL Rules for Electrical Installations (I-1-3), Section 1 shall not be exceeded..3 Plans and descriptions of the electrical power supply system of the support ship are to be submitted within the GL Certification for the areas relevant here. 3. Hydraulic supply 3.1 As far as applicable, the requirements defined in GL Rules for Machinery Installations (I-1-), Section 14 are valid for the support ship as well as stateof-the-art-technology. 3. The following requirements are to be considered additionally: The demand of hydraulic oil (volume, pressure range) defined by the manufacturer of the submersible resp. the working machine has to be made available at any time. The additional demand for eventual working devices (compare Section 5) is to be considered. If a dangerous condition for the consumer may arrive if the main supply fails, special measures are to be provided and to be agreed with GL. If necessary, the emergency supply at missions of submersibles/working machines shall be able to provide the defined oil demand until a safe condition of the underwater mission is reached. The permissible deviations of volume and pressure are to be in accordance with the data of the manufacturer of the ROV/working machine and shall not be exceeded resp. shall not fall short of. The hydraulic fluid is to be suitable for the operational conditions and especially for the environmental conditions above and under water (see Section, D.). 3.3 Plans and descriptions of the hydraulic system of the support ship are to be submitted within the GL Certification for the areas relevant here. 4. Supply of compressed air 4.1 For the calculation, choice of materials and manufacturing of the compressed air system on the support ship the GL Rules for Machinery Installations (I-1-), Section 11 as well as state-of-the-art-technology are to be recognized. 4. The following requirements are to be considered additionally: The demand of compressed air (volume, pressure range) defined by the manufacturer of the submersible resp. the working machine has to be made available at any time. The additional demand for eventual working devices (compare Section 5) is to be considered. If a dangerous condition for the consumer may arrive if the main supply fails, special measures are to be provided in accordance with GL. If necessary, the emergency supply at missions of ROVs/working machines shall be able to provide the defined demand of compressed air until a safe condition of the underwater mission is reached. The permissible deviations of volume and pressure are to be in accordance with the data of the manufacturer of the ROV/working machine and shall not be exceeded resp. shall not fall short of.

59 Chapter 3 Page 6 4 Section 6 E Supporting Systems aboard the Support Ship I - Part 5 Between the supply system for underwater missions and the compressed air system for the operation of the support ship a safe separation is to be provided. 4.3 Plans and descriptions of the compressed air system of the support ship are to be submitted within the GL Certification for the areas relevant here. 5. Tests and trials 5.1 For the issue of a Certificate for the different supply systems an acceptance test after manufacturing and for maintaining of the Certificate normally an annual survey is to be performed. 5. Within the acceptance test the compliance of the documentation with the system as well as the safe functioning during normal and emergency operation has to be proven. 5.3 Within the repeated surveys the complete system is to be checked for visual damages, cracks, deformations and corrosion and is to be subjected to a functional test for normal and emergency operation. E. Launch and Recovery System 1. General 1.1 The following requirements are valid for all systems and plants for launch and recovery as well as for coil-up/coil-off mechanism for umbilicals of unmanned submersibles resp. of working machines to be certified by GL, compare Section 1, Table 1.1 resp. Section 5, Table The proof of the suitability of these systems is to be provided by a separate Certificate of a recognized institution (compare Section 1, Table 1.1). If no Certificate is existing and GL is appointed with the issue of such a proof by the manufacturer or operator, the following requirements are to be recognized. 1.3 If the systems are constructed and tested under GL surveillance considering the following requirements, a Certificate for the system can be issued and a Register of launching appliances can be opened. The latter has the purpose to provide information about the actual situation with regard to general data plus the test, examination and maintenance status. Details are defined in the GL Guidelines for the Construction and Survey of Lifting Appliances (VI--). 1.4 Besides of the launch and recovery system an emergency recovery system is to be provided that allows the submersible resp. the working machine to be lifted to the surface in an emergency. Other measures may be provided in accordance with GL. An adequate emergency recovery plan is to be submitted. 1.5 Between the launch and recovery system and the umbilical winch, if separately arranged, a communication facility with the control station of the submersible resp. the working machine and the bridge of the support ship is to be established.. Principles for design, computation and equipment.1 Design.1.1 Design loads The "safe working load SWL" of the launch and recovery system summarizes as follows: weight of the submersible, including its equipment, ballast weights, etc. payload NL of the submersible total weight of the lifting cable weight of the load transmitting devices which are not connected in a fixed way with the launch and recovery system resulting loads of the umbilical according to 3. if this is transferred via the launch and recovery system For the launch and recovery systems of working machines the safe working load SWL is to be evaluated in analogous form Calculations are to be based on the assumption that the angle of engagement of the lifting cable may be 1 off perpendicular in any direction For the calculation also further possible external loads, which may occur during operation (e.g. dynamics, wind loads, ice accretion, etc.) are to be considered. A proof of strength is to be submitted under consideration of the seaway and wind conditions according to Section, D Finally also the forces from maximum ship motions and green seas, wind, ice, etc. have to be checked for the launch and recovery system in resting position and stowed on the supply ship In addition the minimum heaving speed is to be specified by the manufacturer and to be agreed with GL The driving machine of the winch has to be designed in a way, that a maximum torque according to a maximum pull of 1,5 times the nominal pull of the winch can be developed at reduced speed for at least 5 minutes. In analogy the hydraulic cylinders are to be laid out for 1,5 times the nominal cylinder force. For both a calculation proof is to be provided.

60 I - Part 5 Section 6 E Supporting Systems aboard the Support Ship Chapter 3 Page The launch and recovery system shall be capable to safely launch and recover the submersible resp. the working machine at the seaway conditions defined in Section, D..1. Power supply, mechanical drives.1..1 The launch and recovery system shall have an energy source which is able to deliver the full energy demand required for the launch and recovery of the submersible..1.. The launch and recovery system is to be equipped with auxiliary drives enabling a launch or recovery manoeuvre which has already been started to be safely concluded should the winches or hydraulic pumps fail Launch and recovery systems using an "A" frame are to be equipped with two hydraulic cylinders which are to be so designed and arranged that each is fully capable of safely performing the launch and recovery operation under load. In addition, they are to be connected to the hydraulic system in such a way that a single fault in the hydraulic system cannot lead to the failure of both hydraulic cylinders..1.3 Control equipment Launch and recovery systems are to be fitted with control equipment enabling the system to be operated intermittently with smooth accelerations. In addition, the controls are to be designed and arranged in such a way that the operator has the submersible resp. the working machine in his visual field throughout complete launch and recovery and is fully able to perform all the necessary actions The controls are to be fitted with blocking devices which ensure that only those commands can be performed simultaneously which do not produce a dangerous or unintended condition Control systems are to be provided with emergency shut-off buttons Wherever possible, control units are to operate on the fail-safe principle Control units with remote control are to be additionally equipped with a direct control override. In the event of failure or malfunction of the remote control, all operating sequences which have been initiated shall be automatically stopped All control units are to be clearly and permanently marked and shall be adequately illuminated.. Materials..1 For the manufacture, processing and testing of materials the GL Rules II Materials and Welding, Part 1 Metallic Materials and Part Non-metallic Materials are valid... Other materials as defined in..1 are to be manufactured and processed according to recognized standards resp. according to specifications of the material manufacturer checked and approved by GL..3 Calculation.3.1 The calculation of the launch and recovery system as well as of the coil-up/coil-off mechanism for umbilicals is to be performed according to the principles of GL Guidelines for the Construction and Survey of Lifting Appliances (VI--). For this computation the system is to be considered as offshore lifting gear. If the system is equipped with shock absorbers or swell compensators approved by GL, a reduction of the working load may be dispensed with totally or partially if agreed by GL..3. Deviating from the design of offshore lifting gears, for the dimensioning of launch and recovery systems a hoist load coefficient of,7 and a dead load coefficient of 1,5 are to be considered independently of type and size of their safe working load. In this connection it is assumed that an employment in a seaway is restricted to significant wave heights up to m. Where it is proposed that launch or recovery operations should be performed in even more unfavourable conditions, previous agreement with GL is necessary..4 Equipment.4.1 Where cranes are used for launch and recovery, measures are to be taken to prevent the uncontrolled turning or slewing of the crane in a seaway. The turning or slewing gear has to be capable of holding the crane in any position. The gear is also to be designed to ensure that all movements are started and braked smoothly..4. Launch and recovery systems are to be equipped with measures which prevent excessive turning or swinging of the submersible resp. the working machine during recovery (e.g. by the use of nonspin ropes and additional pendants)..4.3 Measures are to be provided to prevent the submersible resp. the working machine from striking against the ship's hull or against the launch and recovery gear..4.4 Winches are to be equipped with two independent brakes. One of the brakes is to be energy independent and shall be activated in case of voltage failure..4.5 The capacity of the brakes has to be sufficient to safely hold the dynamic test loads specified in The final positions of the launch and recovery system, like upper and lower hook and jib position as

61 Chapter 3 Page 6 6 Section 6 E Supporting Systems aboard the Support Ship I - Part 5 well as the slewing range, are to be monitored. The starting and breaking velocities are to be controlled..4.7 In the case the submersible resp. the working machine is not hanging on the lifting cable, a coupling system is to be provided to enable the submersible to be safely and efficiently coupled to and uncoupled from the launch and recovery system..4.8 All interchangeable single components such as blocks, hooks, shackles, etc. are to conform to recognized standards, shall have a safety of 8 against fracture related to the safe working load SWL and are to be marked with their safe working load..4.9 The maximum static tensile stress imposed on steel wire ropes by the safe working load may not exceed 1/8 of the proven breaking load The use of ropes made of fibres is only permissible with special consent of GL. For the use of natural or synthetic fibres the maximum static tensile stress imposed by the safe working load may not exceed 1/10 of the proven breaking load. 3. Coil-up/coil-off mechanism for umbilicals 3.1 Coil-up and coil-off mechanism for umbilicals describe the complete equipment for handling of the umbilical on the support ship. They may be of different types, but often an umbilical winch is an integrated part of this system. 3. An adequate coil-up and coil-off mechanism is to be provided for the umbilical, which is tracking the umbilical without restriction of the freedom to move and without additional mechanical loads to the element under water. If a control system for following up umbilicals (TMS - Tether Management System) is provided for the mechanism, the requirements of Annex E, B.. are to be considered. 3.3 The following requirements are to be considered for the design of coil-up and coil-off mechanism for umbilicals: specified operating conditions, e.g. wave height and type of support ship safe working load SWL of the coil-up and coiloff mechanism for umbilicals considering the weight of the umbilical, its buoyancy in water (filled and empty) as well as the friction in water and dynamic effects, e.g. by the seaway The radius of the umbilical in the coil-up and coil-off mechanism is not to be less than the specified bending radius of the umbilical. most unfavourable arrangement of the umbilical in relation to the coil-up and coil-off mechanism (e.g. coil-up angle, position of the winch drum, application of guide pulleys, etc.) The material Certificates have to be in accordance to the GL Guidelines for the Construction and Survey of Lifting Appliances (VI--). The coil-up and coil-off mechanism have to have a power source which has the ability to safely coil-up and coil-off the umbilical under the specified conditions. The coil-up and coil-off mechanism is to be equipped with auxiliary drives to be able to finish an already started coil-up and coil-off procedure in a safe way if the main drive respectively the hydraulic pump are failing. To avoid overstressing of umbilical and the coilup and coil-off mechanism measuring of the tension force is to be provided at a suitable position of the system, which triggers an alarm at the control stand in case of exceeding the safe working load SWL. 4. Documents for approval Within the GL Certification the following documents are to be submitted: 4.1 Description of the system with definition of the mission conditions and technical data including recovery and launching speed. 4. Data about installation and connection conditions including control stand. 4.3 Design drawings of: launch and recovery systems coil-up and coil-off mechanism for umbilicals substructure for gears and winches 4.4 Detailed drawings of exchangeable single parts and fittings or definition of the standards where they are based on. 4.5 Drawings of the machinery equipment like e.g. winches, drives, etc. 4.6 Connection diagram of the hydraulic and pneumatic systems. 4.7 Control scheme and description of the safety systems. 4.8 Information about nominal data and type of protection of the electrical installation 4.9 Data for lifting cables/umbilicals.

62 I - Part 5 Section 6 F Supporting Systems aboard the Support Ship Chapter 3 Page Tests and trials 5.1 Acceptance test Before putting into operation of the launch and recovery system as well as the coil-up/coil-off mechanism for umbilicals an acceptance test with the following single tests is to be performed: check that proofs are available for all exchangeable single parts The breaking load of the used ropes is to be proven by a total rupture test and to be certified. static test of the system at the manufacturer with a test load equal to, times the safe working load SWL dynamic test (brake test) aboard with 1,5 times the safe working load SWL For an A-frame operated by two hydraulic cylinders an additional test with SWL and use of only one cylinder is to be performed. check of the minimum heaving speed test that the procedure of launch and recovery of the submersible/the working machine respectively the coil-up and coil-off of the umbilical is performed in normal and emergency operation safely and without jerk check of lifting cable coupling system, if applicable test of function including safety and alarm systems. 5. Repeated tests For maintaining the Certificate the launching and recovery system is to be subjected to an annual survey. For this the complete system including all lifting tackles is to be checked for visible damages, cracks, deformations and corrosion and is to be subjected to a functional test including a brake test (power failure). Every 5 years a dynamic test with 1,5 times SWL including a brake test (power failure) is to be performed. 6. Marking The launch and recovery systems as well as the coilup/coil-off mechanism for umbilicals are to be marked with a fixed type plate at a good visible position which contains in easily readable writing the following data: manufacturer serial number and year of construction safe working load SWL [t] load radius [m] date of test and test stamp, for cranes at the bottom end of the right-hand jib member and next to the point where the member joints to the crane housing F. Stowage and Deck Transport 1. General 1.1 As stowage and deck transport the transfer of the submersible resp. working machine recovered by the launch and recovery system to a deposit location is to be understood. The deposit location is normally to be protected against environmental influences, especially if maintenance and repair work has to be done. The submersible/the working machine is to be safely stowed and lashed for all thinkable ship movements. 1. If no adequate proof of suitability by e.g. test stamps, test marks, etc. for this equipment is existing (compare Section 1, Table 1.1 resp. Section 5, Table 5.1), and GL is appointed to establish such a proof by the manufacturer or operator, the following requirements are to be recognized.. Principles for design and equipment The requirements of the IMO Code A.714(17): "Code of the Safe Practice for Cargo Stowage and Securing" are to be considered..1 Mechanical requirements Aboard the support ship and under consideration of maximum ship movements, sufficiently dimensioned measures, like cargo securing elements are to be provided from ship side for: complete transport way storage of the submersible resp. the working machine lashing on deck or within the containers/hatches lashing of containers with equipment. Electrical requirements..1 At the superstructures of the support ship a connecting possibility in form of a connecting plate with stay bolt preferably M1 is to be provided at an easily accessible position, on which the protective conductor of the submersible resp. the working machine can be connected without using tools... For the stay of the submersible resp. the working machine on deck of the support ship the measures defined in..1 are to be so arranged, that an uninterrupted equalization of the potential is possible...3 Areas for transport and stowage are to sufficiently illuminated..3 Fire and explosion protection The stowage location for the submersible resp. the working machine on the support ship is to be equipped with suitable fire extinguishing systems. This system may be a part of the fire extinguishing system of the support ship.

63 Chapter 3 Page 6 8 Section 6 F Supporting Systems aboard the Support Ship I - Part 5 Explosion protection measures for areas with explosion danger, from where the submersible resp. the working machine shall undergo missions, are to be provided. 3. Documents for approval Within the GL Certification the following documents are to be submitted: plans with description of the transport, the stowage and the lashing measures including piece lists with the lashing material used description with the electrical measures description of the fire protection measures description of the explosion protection measures 4. Tests and trials 4.1 Acceptance test Before use of the stowage and transport system an acceptance test with the following single test is to be performed: check that proofs are available for all exchangeable single parts check, that proofs are available for the breaking load of the used ropes check that the transport of the submersible resp. the working machine in normal and emergency operation is safe and without jerk functional test including check of the safety devices 4. Repeated tests For maintaining the Certificate the systems are to be subjected to an annual survey. For this the complete system including all lashing and transport devices is to be checked for cracks, deformations and corrosion and is to be subjected to a functional test.

64 I - Part 5 Annex A B Calculation of the Pressure Hull Chapter 3 Page A 1 Annex A Calculation of the Pressure Hull A. General 1. Introduction 1.1 In the following a calculation method is described which investigates the stress and stability situation in the pressure hull for the load cases I, II and III with the pressures: nominal diving pressure NDP (load case I according to GL Rules for Manned Submersibles (I-5-), Section 4, E.) collapse diving pressure CDP (load case II) test diving pressure TDP (load case III) In the following the method of calculation for stiffened cylindrical shells is presented. For unstiffened cylindrical shells with dished ends the calculations are analogously performed for the sectional area of the stiffening ring A eff = A F = 0, whereas the buckling length is limited by the dished ends. If the buckling length is limited by dished ends, 40 % of the curve depth is to be added for each dished end to the cylindrical length. The method of calculation presented takes account of manufacturing related deviations from the ideal form of the shell (e.g. out-off-roundness). The manufacturing tolerances defined in Annex B have to be applied for the calculation. 1. Conical shells are calculated in sections, each of which is treated like cylindrical shells. 1.3 The overall collapse of the construction is regarded as buckling of the pressure hull between bulkheads, web frames and dished ends. For the states of stability described, proof is required of sufficient safety in respect to the particular form of damage concerned. 1.4 When using the method of calculation it is to observe, that both elastic and elastic-plastic behaviour can occur in the materials of the shell structure and the frames. It is generally the case that: at nominal diving pressure, the stress is within the purely elastic range of the material at test diving pressure, the stress may lie at the commencement of the elastic-plastic range of the material but for calculation against exceeding of the permissible stress elastic material behaviour of the material can be assumed at collapse diving pressure, the stress may lie in the elastic or the elastic-plastic range of the material 1.5 When calculating a pressure hull the calculation data are to be introduced according to the planned operating conditions under consideration of GL Rules for Manned Submersibles (I-5-), Section 5, D. 1.6 Pressure hulls subjected to internal overpressure are to be calculated in addition according to the GL Rules for Machinery Installations (I-1-), Section 8.. Longitudinal strength For the longitudinal strength of the pressure hull the longitudinal bending moments and shear forces are to be considered. It is to be checked only on request of GL. 3. Vessels similar to the pressure hull For vessels which are partly or totally arranged like the pressure hull and from which the safety of the submersible depends in the same way, like e.g. entrance trunk, containers for rescue equipment, etc., the same proofs have to be carried out as for the pressure hull. 4. Acrylic windows The requirements for design and manufacturing of acrylic windows are defined in Annex C. B. Fatigue Strength 1. Proof of fatigue strength has to be carried out for load case I determined by nominal diving pressure NDP according to the GL Rules for Manned Submersibles (I-5-), Section 4, B..1. resp. Unmanned Submersibles (ROV, AUV) and Underwater Working Machines (I-5-3), Section 3, C The proof of stresses is to be based on the nominal geometry.

65 Chapter 3 Page A Annex A F Calculation of the Pressure Hull I - Part 5 3. For the calculation of the stresses in the pressure hull, the following influences have to be considered with sufficient accuracy: increase of stress at frames, web frames, bulkheads and tripping/transition rings increase of stress at penetrations disturbances of the state of stress because of connection with pressure-proof extensions C. Stresses at Nominal Diving Pressure 1. Proof of stress has to be carried out for load case I characterized by nominal diving pressure NDP according to the Rules for Manned Submersibles (I-5- ), Section 4, B..1 respectively Unmanned Submersibles (ROV, AUV) and Underwater Working Machines (I-5-3), Section 3, C For the calculation of the stresses in the pressure hull the stress limits are defined in the Rules for Manned Submersibles (I-5-), Section 5, D The proof of stress has to be performed using the methods in F.1., F.6., F.4.4 (formula A59), F.7. and F.7.4. Manned Submersibles (I-5-), Section 4, B..3 respectively Unmanned Submersibles (ROV, AUV) and Underwater Working Machines (I-5-3), Section 3, C as proof of stability and stress. For the following types of failure it has to be proven that the pressures for a failure are greater or equal to the collapse diving procedure: symmetric buckling between the frames asymmetric buckling between the frames general instability under consideration of the partial effect of the web frames tilting of the frames buckling of the dished ends and spheres local yielding in the area of discontinuities. For the calculation of the stresses in the pressure hull the stress limits are defined in the Rules for Manned Submersibles (I-5-), Section 5, D The proof of stress has to be performed using the methods in F.1., F.6., F.4.4, F.5.3, F.7. and F.7.4. F. Calculation D. Stresses at Test Diving Pressure 1. Proof of stresses has to be carried out for load case III characterized by test diving pressure TDP according to GL Rules for Manned Submersibles (I-5- ), Section 4, B.. respectively Unmanned Submersibles (ROV, AUV) and Underwater Working Machines (I-5-3), Section 3, C For the calculation of the stresses in the pressure hull the stress limits are defined in the GL Rules for Manned Submersibles (I-5-), Section 5, D For nominal diving pressures of at least 10 bar proof of strength for load case III can be omitted. 4. The proof of stress has to be performed using the methods in F.1., F.6., F.4.4 (formula A59), F.7. and F.7.4. E. Proof of Ultimate Strength at Collapse Diving Pressure 1. The proof of ultimate strength has to be carried out for load case II characterized by the collapse diving pressure CDP according to the GL Rules for 1. Calculation of stresses in a uniformly stiffened cylinder or cone as a basis for the calculation of the collapse pressure 1.1 The geometrical situation is defined in Fig. A.1 and a summary of the stresses is given in Table A.1. Designations in Fig. A.1: R m R s h w s w b f s f L F A F R C R f = mean radius of the cylindrical shell = internal radius of the cylindrical shell = nominal wall thickness of the cylindrical shell after deduction of corrosion allowance c = web height of the frame = web thickness of the frame = flange width = flange thickness = frame spacing = cross sectional area of the frame = radius to the centre of gravity of the frame cross section = inner radius to the flange of frame

66 I - Part 5 Annex A F Calculation of the Pressure Hull Chapter 3 Page A 3 L F s s W h W A F R m R sf b f R f R C Fig. A.1 Geometrical situation of frames stiffening the pressure hull Table A.1 Summary of stresses in a stiffened cylindrical shell Types of Stresses in the cylindrical shell At the frame In the middle of the field stresses Circumferential Equivalent Axial Circumferential Equivalent Axial Membrane stress m σ ϕ,f (A19) m σ x,f (A17) m σ ϕ,m (A18) m σ x,m (A17) Membrane equivalent stress σ m v,f (A14) m σ v,m (A14) Bending stresses b σ ϕ,f (A3) b σ x,f (A1) b σ ϕ,m (A) b σ x,m (A0) Normal stress outside Equivalent normal stress outside m b ϕ,f ϕ,f σ +σ (A19) + (A3) σ m+ b v,f,o (A14) m x,f b x,f σ +σ (A17) + (A1) m b ϕ,m ϕ,m σ +σ (A18) + (A) σ m+ b v,m,o (A14) m x,m σ +σ b x,m (A17) + (A0) Normal stress inside Equivalent normal stress inside m b ϕ,f ϕ,f σ σ (A19) - (A3) m+ b v,f,i σ (A14) m x,f b x,f σ σ (A17) - (A1) m b ϕ,m ϕ,m σ σ (A18) - (A) m+ b v,m,i σ (A14) m x,m σ σ b x,m (A17) - (A0) Remark The numbers in brackets represent the numbers of the formulas to be applied. 1. Calculation of factors and basic formulas 4 cos h ηθ 1 cos ηθ F1 = cos h 1 sinh 1 cos sin (A1) θ ηθ ηθ η θ ηθ + η1 η cosh ηθ 1 sin ηθ sinh ηθ 1 cos ηθ + η η1 F = cosh ηθ 1 sinh ηθ 1 cos ηθ sin ηθ + η η 1 (A) 3 cosh η1θ sinh η1θ cos ηθ sin ηθ + η η (A3) 1 3 = 1 cosh 1 sinh 1 cos sin ν η θ η θ η θ ηθ F 3 η + η 1 cosh η1θ sin ηθ sinh η1θ cos ηθ η η (A4) 1 4 = 1 cosh 1 sinh 1 cos sin ν η θ η θ η θ ηθ F η + η 1 E s p = R 3(1 ) m ν (A5)

67 Chapter 3 Page A 4 Annex A F Calculation of the Pressure Hull I - Part 5 E ν ν p p = modulus of elasticity =, N/mm for ferritic steel = adequate values for other materials to be agreed = Poisson ratio in elastic range = 0,3 for steel = Poisson ratio in elastic-plastic range p γ= (A6) p = calculation pressure = alternatively NDP, TDP and CDP 1 η 1 = 1 γ (A7) 1 η = 1 +γ (A8) L = L s (A9) F w Leff = Rm s 4 3(1 ν ) m Aeff AF R C (A10) R = (A11) L θ= (A1) L eff The reference stress is the circumferential stress in the unstiffened cylindrical pressure hull: p R m σ o = (A13) s The equivalent stresses are composed of the single stresses in longitudinal and circumferential direction: v x ϕ x σ = σ +σ σ σ (A14) The radial displacement in the middle between the frames w M : m p R ν A F wm = 1 1 (A15) Es A + s s+ LsF ϕ eff eff w 1 The radial displacement at the frames w F : p Rm ν A F wf = 1 1 E s A + s s+ L s F eff (A16) eff w 1 1 ν F 4 +γ 3 F cosh 1 cos sinh 1 sin 4 η 1 η η θ η θ+ η θ η θ Average membrane stress in longitudinal direction (independent of the longitudinal coordinate x): For the stress designations the following indices are valid: 0 reference value m membrane stress b bending stress v equivalent stress x longitudinal direction φ circumferential direction r radial direction t tangential direction o outer side i inner side F at the frame D at the web frame F/D at the frame/ at the web frame M in the middle of the field f in the flange of the frame w in the web of the frame C at the centre of gravity of the frame cross section c in the crown of the dished ends σ m x p R = s m (A17) Membrane stress in circumferential direction in the middle between the frames: w σ = +ν σ (A18) m M m ϕ,m E x R m and at the frames: m wf m σ ϕ, F = E +ν σ x (A19) R m Bending stresses in longitudinal direction in the middle between the frames: b ν Aeff σ x,m = ±σo 1 F4 A + s s+ L s F and at the frames: m ( ϕ ) b x,f o,f F3 eff w 1 (A0) σ = ± σ σ (A1) The positive sign is valid for the outside of the cylindrical shell, the negative preceding sign for the inner side.

68 I - Part 5 Annex A F Calculation of the Pressure Hull Chapter 3 Page A 5 Bending stresses in circumferential direction in the middle between the frames: b b ϕ,m x,m σ =ν σ (A) and at the frames: b b ϕ,f x,f σ =ν σ (A3) The circumferential stress follows from the radial displacement to: m wf σ ϕ,fw = E (A4) R in the frame foot, respectively. Calculation of the collapse pressure for the asymmetric interstiffener buckling of the shell in uniformly stiffened sections of the pressure hull.1 For conical pressure hulls the same values as defined for the stress calculation above are to be used. For calculation of the minimum buckling pressure which depends on the number of circumferential lobes, the following approximation may be used:. Elastic buckling pressure p m el π E f s L cr = ( ) Rm 3 Φ ( 1 f) 3 Φ 1 ν Theoretical elastic-plastic pressure: R s (A8) m wf σ ϕ,ff = E (A5) R f i el Et Es cr cr 1 νp 1 ν 3Φ 3Φ p = p 1 + E 4 E 4 (A9) in the frame flange. The equivalent stresses as well as the circumferential stresses in the frame summarized in Table A.1 are to be limited with the value of the permissible stresses σ zul,ndp, σ zul,tdp resp. σ zul,cdp belonging to each load case according to GL Rules for Manned Submersibles (I-5-), Section 5, D.3. with: Rm s Φ= 1, 3 (A30) L f m x m ϕ,m σ = (A31) σ 1.3 Calculation of the stresses for a conical pressure hull The formulas given above are also applicable to stiffened conical shells. The relevant formulas have to be modified using the half apex angle α. For this, the mean radius yields to: ( ϕ ) ( ) m m m m v,m x ϕ,m x σ = σ + σ σ σ (A3) For secant module: E s σv = (A33) ε v R = R /cosα (A6) m,eqv m and the equivalent frame spacing turns to: For tangential module: E t dσv = dε v (A34) R m L F,eqv eqv = L /cos α, resp. F L = L/cos α. (A7) = radius midway between the frames of the area under consideration The calculation has to be carried out for both frames of the bay under evaluation. The dimensions of the frames have to be multiplied by the radius ratio R m /R m,f. For the following calculation of the collapse pressures the (absolutely) greatest value is decisive. For elastic-plastic Poisson's ratio: Es ν p = 0,5 (0,5 ν ) (A35) E f, σ v, E s, E t are functions of the elastic-plastic buckling pressure p cr i to be determined. For the iterative evaluation of p cr i the value f can be computed for the calculation pressure CDP and be assumed as constant in the following calculation. σ v can be determined by linear extrapolation starting from the value of the calculation pressure CDP.

69 Chapter 3 Page A 6 Annex A F Calculation of the Pressure Hull I - Part 5.3 Secant module and tangential module of steels For various types of steel is valid: z = σ e σ σ e 0, = limit of proportional extension (A36) σ 0, = 0, % yield strength, R eh z = 0,8 for ferritic steel = 0,6 for austenitic steel If σ v > σ e the formulas defined in.3.1 and.3. are valid. For σ v σ e is valid: E s = E t = E.3.1 Modules for z 0,8 v z σ σ0, Et = E 1 (1 z) σ0, E s σv = E σ z σ σ 0, z + (1 z)arctanh (1 z) σ.3. Modules for z < 0,8 σ z σ = v 0, Et E 1 k (1 z) σ0, v 0, σv Es = E 1 σ z σ z σ0, (1 z) σ0, ln 1 k k (1 z) σ 0, v 0, k has to be calculated from the condition: 0, (A37) (A38) (A39) (A40) (A41) 1 σ 0, + 0,00 E = z σ0, (1 z) σ0, ln (1 k) (A4) k at least with the accuracy of two decimals..4 Secant modules and tangent modules for other metallic materials For other metallic materials z is to be agreed..5 It has to be proven, that the collapse pressure, which is the theoretical elastic-plastic buckling pressure p i cr multiplied by the reduction factor r, is at least equal to the calculation pressure CDP of the pressure hull. With the reduction factor: 1 p el cr 1 pcr i r = 1 0,5 e (A43) 3. Calculation of the collapse pressure for the symmetric interstiffener buckling of the shell in uniformly stiffened sections of the pressure hull 3.1 For conical pressure hulls the equivalent values as defined for the stress calculation above have to be used. 3. Elastic buckling pressure: el s L 1 π Leff cr = E + 3(1 ν ) R L m π eff 4 L p Theoretical elastic-plastic buckling pressure: (A44) i s α L 1 π pcr = Es C 3(1 ) R + (A45) ν π 4 α L m with: α= C = A A1 3 ν p 4 A 1 A 1 Rm s 1 νp 1 1 νp A A A 1 Es 1 ν p = E ν t s 1 = ν p νp 4(1 νp )K H (A46) (A47) (A48) 1 E /E A 1 ( ) (1 )k (A49) 1 E /E A 1 (1 ) ( )k (A50) t s = ν p νp 4(1 νp )K H 1 E t /Es A1 = 1 + ( ν p ) (1 νp )k 4 νp(1 νp)k H (A51) (1 νp) ( νp) k ( νp ) ( νp )} { 1 E t /Es H = 1+ ( νp) ( 1 νp) k 41 K k 31 m σ ϕ,m m x (A5) = σ (A53) K = 1 k + k (A54) The procedure for the evaluation of the theoretical elastic-plastic buckling pressure is analogous to that described for asymmetric buckling.

70 I - Part 5 Annex A F Calculation of the Pressure Hull Chapter 3 Page A It has to be proven, that the collapse pressure, which is the theoretical elastic-plastic buckling pressure p cr multiplied by the reduction factor r, is at least i equal to the calculation pressure CDP of the pressure hull. With the reduction factor: 1 p el cr 1 pcr i r = 1 0,5e (A55) 4. Proof of the collapse pressure for the general instability under consideration of the web frames 4.1 The proof of the general instability has to be done on the basis of a stress calculation which meets the equilibrium criteria in a deformed state. As predeformation, the out-of-roundness of the frames has to be considered. It has to be proven, that the out-ofroundness permissible according to Annex B can not lead to a global collapse. 4. Consideration of the stress-strain behaviour For austenitic steels and other materials, for which σ 0,01 < 0,8. σ 0, is valid, the actual stress-strain behaviour has to be considered by adequate calculation. The pressure hull, pre-deformed to the permissible out-ofroundness and inclinations of the frames, has to be incrementally pressure loaded. For the calculation of the increasing elastic displacement and stresses, the deformations in equilibrium condition and the actual, local material behaviour have to be considered. For materials with σ 0,01 > 0,8. σ 0, a linear elastic behaviour can be assumed for a stress calculation according to a theory of nd order. In this case the following stress limits (without consideration of local weaknesses) have to be met: The sum of basic stress and stress due to out-ofroundness in the frame flange shall not exceed σ 0,. The sum of basic stress and stress due to out-ofroundness in the web frame flange shall not exceed 80 % of σ 0,. R m,f/d = mean radius of the pressure hull at particular frame or web frame e = distance from the centroid of the frame or web frame plus the effective length of shell to the furthest surface of the flange (see Fig. A.). For conical shells e' =e/cosα is valid. R C = radius to the centroid of the frame or web frame cross section L D = length of the generating shell line at the considered area of the web frame L D,r, L D,l = length of the generating shell line of the left hand or the right hand adjacent field, depending on the field boundary for which the proof is made (see Fig. A.3) = distance between bulkheads L B π Rm π Rm β D = ; β B = (A56) (A57) L L D α = half apex angle (see Fig. A.) Generally the apex angle is not constant, neither in the actual web frame field nor in the adjacent field. Which angle is decisive will be described in the following for each particular case. I, I D = area moment of inertia of frame respectively web frame including effective length of pressure hull shell, to be assumed always parallel to the axis of the pressure hull The effective length is: Leff = Rm,F s/cosα 4 31 ( ν ) B (A58) but not greater than the average value of both adjacent frame distances. α Dl, α Dr = the local half apex angle at the adjacent web frame, right or left 4.3 The calculation procedure is described in the following: s a Definitions: p = collapse diving pressure of the pressure hull CDP n = number of circumferential lobes of out-ofroundness w 0 = maximum permissible out-of-roundness of the pressure hull according to Annex B R m = mean radius of the pressure hull in the considered field e' Fig. A. e R C R m,f or R m,d Situation at a frame or web frame

71 Chapter 3 Page A 8 Annex A F Calculation of the Pressure Hull I - Part 5 L D L D,r L D,l a D a D,r a D,l R f R m,d R m L D L D,r L D,l a D,l a D a D,r R m R f R m,d Fig. A.3 General stability - both calculation cases for a conical pressure hull The area moment of inertia has to be converted to the radius R m of the actual field by multiplying them by the ratio (R m /R m,f ) 4. The proof has to be done for each section of the pressure hull, bounded by web frames, bulkheads or dished ends. Dished ends are to be considered as bulkheads. A pressure hull section relevant for general instability may be limited by two web frames, followed by two adjacent web frame (or bulkhead) fields at each end, compare Fig. A.3. The calculation has to be performed for both relevant, adjacent fields in question. The most unfavourable case is decisive. 4.4 Basic stress in the frames and in the web frames The basic stress in a frame flange has to be calculated according to 1., equation (A5) for R = R f. The effect of the half apex angle α is explicitly considered in the following formulas. The basic stress in a deep frame can be conservatively evaluated according to the following formulas: R f R ( ) m pr m Leff 1 ν/ R f 1 R m cos AD + Leff s RD σ ϕ,d = α (A59) = radius of the flange Leff = Rm s/cosα 4 3(1 ν ) (A60) It has to be observed that A D is the sole section area of the web frame and R D the corresponding radius. For the thickness of the shell s the locally reinforced shell thickness at the web frame has to be used, if applicable. The bending stress in the frame respectively web frame is: n 1 σ ϕ,d = ± w E e (A61) R R C = see Fig. A. el C

72 I - Part 5 Annex A F Calculation of the Pressure Hull Chapter 3 Page A 9 The elastic deflection w el for the frames reads: p w = w p p el 0 n g and for web frames: w = w el 0 n pg p p With the membrane part: pm p + p 4 Es 3 β pm = cos α R m (n 1 +β /)(n + β ) m D (A6) (A63) (A64) α is the average half apex angle and s the average cylinder shell thickness in the considered field. And with the web frame part p D : p 3 (n 1)E ID cos α D = C,D m m C,D D + D,l/r R [R 4(R R )](L L ) n 1 n 1 / +βb (A65) α is the maximum half apex angle along the pressure hull section starting at the middle of the field under consideration and ending at the middle of the adjacent field: α max = max(α; α Dl ) resp. α max = max(α; α Dr ) see Fig. A.3 R C,D applies to web frames. The total instability pressure follows: p p p p p n m D g = F + + B pm + pd n p g has to be evaluated as (A66) using p m and p D as described above, and the frame part p F as well as the bulkhead part p B as follows: (n 1)E IF 4 n 1 F = cos α 3 RC,F LF 1 pd n 1+β pd + pm p R C,F applies to frames. p 4 Es 3 βb B = cos α R m (n 1 +β B / ) (n +βb ) (A67) (A68) α is here to be understood as the average half apex angle in the field considered. The frame part has to be calculated with the dimensions of an equivalent frame including equivalent frame spacing. Generally these are the dimensions of the frame closest to the midway point of the field under evaluation, which have to be converted to the average field radius in a manner described in 1.3. The following condition has to be met: For each frame of the considered field the permissible out-of-roundness has to be calculated for n = 5, assuming for p g 5 an infinitive field length (β D = 0). The arithmetic average of the out-of-roundness values evaluated in this way for three adjacent frames divided by the related frame radius shall not be less than the out-of-roundness for the equivalent frame evaluated in analogous way. 5. Proof of the collapse pressure for tripping of frames 5.1 Stability against tripping The proof of the tripping stability has to be done for frames and web frames on the basis of a stress calculation, which fulfils the status of equilibrium in deformed condition. As pre-deformations the tolerances of the frames as defined in Annex B may be considered. Concerning the consideration of the stress-strain behaviour the rules defined in 4. are valid. For materials with σ 0,01 0,8 σ 0, linear elastic behaviour can be assumed for a stress calculation according to nd order theory. The following stress limits have to be observed (disregarding local material weakening): The equivalent stress in frame web shall not exceed σ 0,. The circumferential stress in frame flange shall not exceed σ 0,. The effects to be considered in this procedure are defined further on. 5. Additional stresses caused by frame imperfections The additional stresses caused by imperfections of the frame cross section have to be evaluated for internal frames according to the following formulas. See also Figure A.4. The imperfections "inclination of web to plane of frame Θ", "eccentricity of flange to web u ex " and "misalignment of frame heel to frame plane d" are defined in Annex B, C..5 to C..7. h s f w = hw + (A69)

73 Chapter 3 Page A 10 Annex A F Calculation of the Pressure Hull I - Part 5 h β= w (A70a) R R ' f sf = Rf + (A70b) h w β f = (A71) R A I J f f f s s f w f = bf sf (A7) 3 f b sf = (A73) 1 3 f bf s = 6(1 +ν) w w w (A74) A = h s (A75) D L 0 3 w Es = 1 (1 ν ) (A76) σ0 AF = (A77) R Ff = σ0 A f (A78) σ 0 = basic stress in flange according to 5.3 / 5.4. n A w λ = (A79) A F = number of circumferential lobes of imperfections; the calculation has to be performed for n = 3. e ' w L0 h = n β (A80) D s w A' w ' w L0 h ε = λ (A81) D ' hw L 0 3 g = n β λ n β D (A8) 13 k11 = 1 1, e+ 0,6 ε g (A83) k1 = 6 0,1 e g + ν n β (A84) 10 g k = 4 e + 0,1 ε (A85) k31 = 6 0,1 e + 0,1 ε + g (A86) 40 e ε g k3 = + + (A87) ( ) n E D Ff 11 4 f f '3 11 Rf hw Rf A = n I + J + k n (A88) n E D 1 ( f f ) 3 ' 1 Rf hw A = I + J k (A89) ( ) E D A = I + n J + k (A90) f f ' Rf hw Amplitudes of the elastic displacement u and twist ω of the connection web-flange: with 1 u = ( B1 A B A1) (A91) Det 1 ω = ( B A11 B1 A1) (A9) Det 11 1 Det = A A A (A93) h'w A' f sf b f hw R ( ) F B 1 n L k u f f 1 =θ + βf 0 λ 1, θ + ex R ' f Rf hw L0 n βf R f ( ) ' 1,d h R w f n β + d 1 λ λ k F (A94) Fig. A.4 R' f Local situation at the frame F B = θ L λ h k + u d L λ n β k (A95) ' f 0 w, θ ex 0 f,d Rf

74 I - Part 5 Annex A F Calculation of the Pressure Hull Chapter 3 Page A 11 where: 5.3 Frames 1 ε k1, θ = 1 + 0,013 g + 0,015 e 40 0,05 e ε 0,7 n β ) (A96) For the stress σ 0 always σ 0, of the frame material has to be used. The bending rigidity of the flange has to be neglected, i.e. set to zero (I f = 0). 1 ε k1,d = 1 + 0,013 g+ 0,015 e 0,05 e ε 40 (A97) 1 e ε g k, θ = 1 0,008 e (A98) 19 e 5 ε + 0,013 e ε+ 0,6 n β The equivalent stress at the web toe has to be evaluated with the calculation pressure for both signs of the b bending stress σ r,fw according to formula (A10). Circumferential stress: e σ =σ + σ ±ν σ (A105) m+ b m b ϕ,f ϕ,fw O/R r,fw e1 1 e ε g k,d = 1 0,008 e 0,013 e ε (A99) m with σ ϕ,fw according to 1., equation (A4), compare Fig. A.5 and Stresses in the flange are as follows: b f r,f/df R f ( n u Rf ) Eb σ = ± + ω Bending stress around radial axis, and nes f τ t,f/df = + f ω 1 R ( +ν) f ( u R ) (A100) (A101) with m O/R 0, ϕ,ff σ =σ +σ (A106) m σ ϕ,ff according to 1., equation (A5) Radial stress: L0 b σ r = ± σ r,fw (A107) s w Torsion around the tangential axis, which is phaseshifted against σ r,f/df by a quarter b period. The bending stress at the toe of the web is: with and b 6 D ' σ r,f/dw = ± ' ( k 31 u k 3 h w ω) sw hw (A10) ' ( θ ) +λl0 k3, hw θ+ k3,d n β d 1 e ε k3, θ = 1 0,4 n β (A103) + ε ( 1 0,019 e 0,009 ) The equivalent stress: v ϕ r ϕ r σ = σ +σ σ σ (A108) shall not exceed σ 0,. e e 1 R R f or R Df 1 e ε k3,d = (A104) The stresses resulting from imperfections of the frames are to be checked for frames and web frames, using different procedures. Fig. A.5 Situation of the frame in relation to the axis of the pressure hull

75 Chapter 3 Page A 1 Annex A F Calculation of the Pressure Hull I - Part Web frames For the basic stress in the flange σ 0 the absolute value of the circumferential stress σ ϕ,d according to formula (A59) has to be taken, as obtained for the half value of the permissible out-of-roundness resulting from the general instability proof performed for n = circumferential lobes according to 4. It has to be proven that: a) b) b σ 0 + σr,df σ 0, (A109) 0 3 t,df 0, σ + τ σ (A110) b with σ r,df according to formula (A100) and τ t, Df according to formula (A101) considering the relevant dimensions of the web frames and the equivalent stress at the web toe v ϕ r ϕ r 0, σ = σ +σ σ σ σ (A111) The circumferential stress σ φ is the sum of the basic stress σ φ,d obtained with the formula (A59) in 4.4 and ν-times the web bending stress σ b r,dw according to formula (A10): b σ ϕ =σ ϕ,d +ν σ r,dw (A11) The radial stress is: Af σ 0 + Aw σd σ r = ±σ R s D w b r,dw (A113) For calculation of σ 0 the following simplified formula can be used: 1 σ 0 = σ ϕ,d + 0, 4 σ 0, (A114) 5.5 Modifications for frames arranged outside For frames arranged outside all radii (R, R f, R Df ) have to be applied as negative values. 6. Spherical shells and dished ends 6.1 General Spherical shells and dished ends are to be investigated for the load cases defined in GL Rules for Manned Submersibles (I-5-), Section 4, E. respectively Unmanned Submersibles (ROV, AUV) and Underwater Working Machines (I-5-3), Section 3, C.1.6. against exceeding stresses and buckling. For dished ends the stresses in the crown and the knuckle are to be investigated. Spheres are to be treated like the crown area of dished ends. 6. Stresses For the crown area the stress results from formula (A118). For the knuckle area the stress can be evaluated by formula (A119). The coefficients β are to be determined according to the GL Rules for Machinery Installations (I-1-), Section 7a, D They can also be evaluated directly with assistance of the following formulas: For torispherical ends: β = 0,6148 1,6589 x 0,506 x 0,0571 x 3 (A115) And for semi-ellipsoidal ends: β = 1,38 0,3637 x 0,193 x 0,0171 x 3 (A116) D a s with x = ln D a s for range of validity 0, 001 0,1 D = outside diameter of the dished end a (A117) In the range 0,5 s R besides the transition to the cylinder the coefficient β = 1,1 for hemispherical ends. Under the assumption that deviations in the form of dished ends stay within the permissible tolerances, the stresses can be calculated with the following formulas. If the tolerances are exceeded, a separate proof of stress is to be performed. c,o,l R p σ= (A118) R s c,m,l R c,o,l = local outside radius of sphere crown of the dished end R c,m,l = local radius of the sphere crown of the dished end at half thickness of the shell p Da 1, β σ= 4s (A119) For p NDP, TDP and CDP are to be introduced respectively. The proof has been made if the permissible stresses according to the Rules for Manned Submersibles (I-5- ), Section 5, D.3. are not exceeded. 6.3 Calculation of the collapse pressure The calculations are based on the local thickness and curvature of the shell and they are considering an outof-roundness of the shell in the sense of a local flattening up to maximum u = 0,18 s l / R o. This is valid for pressed spherical shells and is adequate to a local outside curvature radius of R o,l = 1,3 R o of the outer nominal radius.

76 I - Part 5 Annex A F Calculation of the Pressure Hull Chapter 3 Page A 13 The out-of-roundness and herewith the local radius is to be evaluated with a bridge gauge as described in Annex B, E. There a measuring length L cr,l according to formula (A10) has to be used. The out-ofroundness defined in this way is to be understood as local flattening from the theoretical form of the sphere within the diameter L cr,l. For the lay out a local radius of 1,3 times the nominal radius and a nominal thickness of the shell (eventually reduced by the corrosion addition) is to be assumed. The corrosion addition shall be considered by keeping the outside radius. If other tolerances are provided or another out-ofroundness is resulting from the measurement checks according to Annex B, E.3. or E.4., then a recalculation of the permissible pressure according Annex B, E.5. is required. For mechanically machined spherical shells local radii less than 1,05 R o are reachable from point of manufacturing. The more favourable geometrical condition of the shell can be introduced in the calculation with at minimum R o,l = 1,05 R o under the assumption that the measurement procedure, as described in Annex B, has proven a maximum permissible local flattening of u = 0,035 s 1 / R o with an accuracy of at least 0,001 s. 6.4 Definitions The following definitions are valid: R m,l = maximum local mean radius of curvature of the sphere at shell half thickness R 0,1 = maximum local outside radius of curvature of the sphere s = nominal thickness of the shell = local average shell thickness s 1 Critical arc length or diameter of the measuring circle to be used for measuring the deviations from the perfect form of the sphere according to Annex B, E.3. and E.4.:, L = R s 3 (1 ν ) 4 cr,l o,l l 4 Elastic buckling pressure of the sphere: 1, 4 s = 3(1 ν ) el l pcr E R o,l (A10) (A11) Theoretical elastic-plastic buckling pressure of the sphere: p p i cr el Et Es = pcr (A1) E σ s R = (A13) 0, l m,l 0, Ro,l 6.5 Spherical ends made of ferritic steel For spherical ends made of ferritic steel grade GL- M550 or similar material p cr can be calculated as follows: For spherical ends which are not stress relieved the following is valid: p cr el cr = p if p p el cr 0, el pcr pcr = p0, 0,38 + 0,195 p 0, p = p if cr 0, 0, 47 (A14) el pcr if 0, 47 < 3,18 p p p el cr 0, 0, (A15) > 3,18 (A16) 6.5. For stress relieved spherical ends (tempered and stress relieved) the following is valid: p cr el cr = p if p p el cr 0, el pcr pcr = p0, 0, ,195 p 0, p = p if cr 0, 0,595 (A17) el pcr if 0,595 <,7 p p p el cr 0, 0, (A18) >,7 (A19) The fabrication of ends by welding of stress relieved segments and the welding of the penetrations into the shell after stress relieving is permitted. The calculated collapse pressure p cr shall be at least equal to the collapse diving pressure CDP of the pressure hull. 6.6 Spherical shells of other materials For spherical ends made of other steel materials the elastic-plastic buckling pressure p i cr which has been evaluated according to the formulas described above has to be multiplied by the reduction factor k defined in Fig. A.6. The reduction factor k is also summarized in tabular form in Table A.. Intermediate values can be defined by linear interpolation. For the application of non-iron metal materials the reduction factors are to be evaluated in accordance with GL by model tests.

77 Chapter 3 Page A 14 Annex A F Calculation of the Pressure Hull I - Part 5 Reduction factor k 1,00 0,95 0,90 0,85 0,80 0,75 0,70 as fabricated stress relieved 0,65 0,60 0,4 0,6 0,8 1,0 1, 1,4 1,6 1,8,0,,4,6,8 3,0 3, p el / p 0, Fig. A.6 Reduction factor "k" for different kinds of steel treatment Table A. Reduction factor "k" for different kinds of steel treatment 7. Penetrations of the pressure hull and discontinuities Pressure relation Reduction factor k p el/p 0, As fabricated Stress relieved 0,470 1,000 1,000 0,495 0,963 1,000 0,595 0,834 1,000 0,700 0,738 0,874 0,800 0,670 0,789 0,900 0,647 0,757 1,000 0,646 0,753 1,100 0,653 0,758 1,00 0,664 0,766 1,300 0,677 0,778 1,400 0,691 0,79 1,500 0,706 0,806 1,600 0,73 0,8 1,700 0,739 0,838 1,800 0,757 0,855 1,900 0,775 0,873,000 0,79 0,890,100 0,810 0,907,00 0,88 0,95,300 0,846 0,943,400 0,865 0,96,500 0,883 0,980,600 0,90 0,999,700 0,91 1,000,800 0,940 1,000,900 0,958 1,000 3,000 0,978 1,000 3,100 0,997 1,000 3,00 1,000 1, Discontinuities Discontinuities like connections of cylinders and conical segments transition rings (tripping rings) flanges for the attachment of dome shaped windows are to be subjected for the load cases nominal diving pressure and test diving pressure to an analysis of the stress and elongation behaviour similar to [10] 1 and [11]. 1 The equivalent stress follows from formula (A14). Sufficient safety is given, if the permissible stresses according to GL Rules for Manned Submersibles (I-5-), Section 5, D.3. are not exceeded. If stiffeners are interrupted by penetrations, suitable reinforcements are to be provided. 7. Penetrations in the cylindrical or conical part of the pressure hull - area comparison principle Penetrations in cylinders are to be preferably evaluated according to the GL Rules for Machinery Installations (I-1-), Section 7a, D..3.4 with a design pressure p c for which NDP, TDP resp. CDP are to be inserted alternatively. There is: D i and s A = R = necessary wall thickness at the penetration boundary according to GL Rules for Machinery Installations (I-1-), Section 7a, D.. which is to be evaluated by iteration. 1 See data about literature in G.

78 I - Part 5 Annex A F Calculation of the Pressure Hull Chapter 3 Page A 15 The following rules for dimensioning are valid under the assumption that the material strength is the same for the shell of the pressure hull and for the reinforcement of the penetration boundary. For different material characteristics the rules have to be modified in an analogous way. 7.3 Penetrations in the cylindrical or conical part of the pressure hull cross sectional area substitution principle After approval by GL the required reinforcement of the penetration boundary can be evaluated also with the cross sectional area substitution principle. These rules for dimensioning are valid under the assumption that the material strength is the same for the shell of the pressure hull and for the reinforcement of the penetration boundary. For different material strength the rules have to be modified in an analogous way Small penetrations which do not interrupt frames Circular penetrations in radial direction The situation is characterised by Fig. A.7 where for the calculation one half of the nozzle is considered. Designations in Fig. A.7: s = thickness of the shell of the pressure hull after deduction of corrosion allowance s v = thickness of the shell of the pressure hull in the reinforcement vicinity R = internal radius of the pressure hull = external diameter of the nozzle d a s, s = excess lengths of the nozzle min = min ( s, s ) = smaller excess length of the nozzle max = max ( s, s ) = bigger excess length of the nozzle s s = wall thickness of nozzle A = cross sectional area to be substituted A eff = effective substitutive cross sectional area = effective length of the nozzle l eff * 0,5(da s s) ss = (A130) 4 3(1 ν ) rm = 0,5 (da s s) (A131) It has to be proven that the effective substitutive cross sectional area of the boundary reinforcement A eff of the penetration is at least equal to the cross sectional area A cut out of the shell which is to be substituted. The area to be substituted is A = 0,5 d a s (A13) For penetrations, which are designed in the form shown in Fig. A.7 the effective substituted cross sectional area can be calculated according to the following formula: Aeff = b min (sv s) + ss eff (A133) b min = 0, 78 R sv Effective length of the nozzle: Case 1: Case : = * + s for (A134) eff s ' s v *; * (A135) eff = min + sv (A136) * min * (A137)

79 Chapter 3 Page A 16 Annex A F Calculation of the Pressure Hull I - Part 5 b min s v l s s l' s Nozzle R s s da Fig. A.7 Penetration through the enforced shell Case 3: m σ x * da = max L x,l eff = min + min (a, ) + sv (A138) ϕ m σ ϕ * * min < ; max > (A139) min max max a = (0,4+ 0,6 ) Flush form of circular penetrations in radial direction (A140) Penetrations in flush form of the pressure hull ( s = 0), may have in the penetration area a cut out to include a zinc ring, see Fig. A.8. In this case eff can be evaluated with the formulas given above. In addition the strength of the cross section A-A has to be proven. In the case that the wall of the pressure hull is not reinforced, the following condition has to be met: s sd a g cg c > 4 + c d c sd a cg cτ = 3 d c a a τ (A141) (A14) Non-circular penetrations or penetrations not in radial direction to the shell If the penetration is not circular or does not cut the shell of the pressure hull in radial direction the diameter d a has to be replaced by: L x L ϕ (A143) = width of the penetration line in longitudinal direction = width of the penetration line in circumferential direction m σ x = membrane stress in the pressure hull in longitudinal direction m σ ϕ = membrane stress in the pressure hull in circumferential direction In special cases, if the Rules can only be utilized in limited way, the strength has to be proven by numerical computation Big penetrations interrupting frames For preliminary dimensioning the following procedure is can be used: The effective border reinforcement for the penetration has, in a similar way as for the small penetrations, to substitute the area cut out. The cross sections of the interrupted frame webs are to be considered additionally. The effective substitutive cross sectional area has to be evaluated in analogous way as for small penetrations. Compact reinforcement rings are fully load carrying if they are located directly in the penetration line. The construction in the flange plane of the frame has to be designed in such a way that the maximal permissible forces in the flange (A f σ zul ) can be transmitted further. For σ zul the value of the permissible stress belonging to the individual load case acc. to GL Rules for Manned Submersibles (I-5-), Section 5, D.3. is to be inserted. Big penetrations have to be proven by numerical computation.

80 I - Part 5 Annex A G Calculation of the Pressure Hull Chapter 3 Page A 17 c Zinc ring A g A s Shell of the pressure hull d a Fig. A.8 Penetration of flush form 7.4 Penetrations of spherical shells Penetrations in spherical shells are to be evaluated according to the GL Rules for Machinery Installations (I-1-), Section 7a, D with a design pressure p c for which 1, NDP, 1, TDP resp. 1, CDP are to be inserted alternatively. There is: D i and s A A s0 = R = necessary wall thickness at the penetration boundary according to GL Rules for Machinery Installations (I-1-), Section 7a, D.. which is to be evaluated by iteration. A s1 s b Fig. A.9 A p d ' s A p s S - c A s1 s D i b A s0 Penetrations of spherical shells s A - c After approval by GL the cross sectional area substitution principle as described in 7.3 may be applied analogously. For this R is the internal radius of the sphere. In cases, where area comparison respectively cross sectional area substitution principle are not fulfilled, a numerical proof has to be done. For this the local radius of the spherical shell according to 6.3 is to be chosen adequately in the vicinity of the penetration. The achieved failure pressure is then to be reduced like the elastic-plastic buckling pressure, which has been evaluated for undisturbed dished ends, see Fig. A.6. G. Literature [1] Germanischer Lloyd, Klassifikations- und Bauvorschriften, Teil 1 Seeschiffe, Kapitel Maschinenanlagen [] AD 000 Regelwerk, Merkblätter Reihe B, Berechnung von Druckbehältern, Herausgeber: Arbeitsgemeinschaft Druckbehälter [3] The Stress Analysis of Pressure Vessels and Pressure Vessel Compartments, Herausgeber: S.S. Gill, Pergamon Press, 1970 [4] John C. Pulos und Vito L. Salerno: Axisymmetric Elastic Deformations and Stresses in a Ring-Stiffened, Perfectly Circular Cylindrical Shell under External Hydrostatic Pressure, DTMB-Report No [5] Development in Pressure Vessel Technology, Herausgeber: R. W. Nichols, Applied Science Publishers, 1983 [6] European Recommendations for Steel Construction: Buckling of Shells, Herausgeber: ECCS-CECM-EKS, Brüssel, 1984

81 Chapter 3 Page A 18 Annex A G Calculation of the Pressure Hull I - Part 5 [7] DIN 4114, Blatt : Stabilitätsfälle (Knickung, Kippung, Beulung), Ausgabe.53 [8] Myron E. Lunchick: Plastic Axisymmetric Buckling of Ring-Stiffened Cylindrical Shells Fabricated from Strainhardening Materials and Subjected to External Hydrostatic Pressure, DTMB-Report No [9] Krenske, Martin A. und Kierman, Thomas J.: The Effect of Initial Imperfections on the Collapse Strength of Sherical Shells, DTMB- Report No [10] ASME Boiler and Pressure Vessel Code, Section VIII, Division [11] Raymond J. Roark and Warren C. Young: Formulars for Stress and Strain, Mc Graw - Hill Book Company [1] William F. Blumenberg: The Effect of Intermediate Heavy Frames on the Elastic General-Instability Strength of Ring-Stiffened Cylinders Under External Hydrostatic Pressure, DTMB-Report No [13] Thomas E. Reynolds: Inelastic Lobar Buckling of Cylindrical Shells Under External Hydrostatic Pressure, DTMB-Report No. 139.

82 I - Part 5 Annex B B Manufacturing Tolerances for the Pressure Hull Chapter 3 Page B 1 Annex B Manufacturing Tolerances for the Pressure Hull A. General 1. This Annex describes the permissible manufacturing tolerances for the pressure hull as prerequisite for the application of the strength calculations defined in Annex A.. All tests are to be performed by the manufacturer in presence of a GL Surveyor and a measurement report has to be sent by the manufacturer to GL. 3. The required checks defined in the following are only to be performed, if no following changes of the measurement values are to be expected. Areas with welding seams which have been worked over in the mean time because of impermissible defects have to be measured again. The component to be investigated shall be cooled down to ambient temperature and is so to be relieved from any tensions by means of installation aids in order to prevent falsification of the measurement results. B. Dimensions of the Pressure Hull 1. General 1.1 As far as not defined otherwise in these Rules the following tolerances are valid. 1. All longitudinal and circumferential seams in the pressure hull plating shall be inspected for edge offset, weld sinkage, undercuts and hollow grinding. This shall also be valid for the welding connection of the plating with the tripping/transition ring. The inner and outer surface of the plates is to be inspected for damage.. Dimensions of the cylindrical and conical parts.1 Diameter The actual mean outside diameter of cylindrical respectively conical pressure hulls shall, calculated from the circumference, deviate not more than ± 0,5 % from the outside diameter on which the calculation is based. The measurements are to be performed in distances of maximum 3Rs over the complete length of the component. s = nominal shell thickness [mm] R = internal radius of the shell [mm]. Generating line The deviation of the theoretical generating line from the straight line shall not exceed ± 0, % of the length of the straight forward part of a cylinder resp. cone over three adjacent measuring points, which are given by web frames, bulkheads and connections of cones and dished ends. If web frames, cones and bulkheads are not provided, only between dished ends is to be measured. The deviation is to be measured at minimum 8 positions equally distributed over the circumference..3 Length The length of the pressure hull rings in manufacturing is to be measured at minimum 4 positions equally distributed over the circumference and to be averaged. The allowable tolerance of the length of the pressure hull ring shall not be bigger than the sum of the existing deviations of the frame distances within this ring. If no frames are provided, the tolerance is ± 1 % of the nominal length, but not more than 15 mm. 3. Dimensions of spherical shells and dished ends 3.1 Radius of spherical shells and crown of dished ends For determination of the spherical form of the spherical shell the outside radius is to be evaluated according to E.3. The spherical form of the spherical shell has to remain within a tolerance of ± 1 % of the nominal outside radius. 3. Course of theoretical geometry lines of dished ends (knuckle/crown radius) The tolerances are to be defined by the manufacturer according to recognized regulations and deviations from it are to be approved by GL, compare E.. 4. Component thickness Tolerances for components of the pressure hull: 0/+t Tolerance value t according to material delivery specifications (if the material delivery standard allows minus tolerances, these are to be considered for the calculations) 5. Edge offset and weld sinkage 5.1 The radial deviations x 1 and x are the basis for the determination of weld sinkage and edge offset

83 Chapter 3 Page B Annex B C Manufacturing Tolerances for the Pressure Hull I - Part 5 of sheet metal surfaces with regard to their nominal positions next to a welding seam, compare Fig. B.1. They are measured at a distance v = s max + 0 mm on both sides centred over the welding seam. 5. The tolerances for the gradient of the theoretical line of the middle plane at the tripping/transition ring are to be documented in the manufacturing protocols and to be checked. 5.3 Edge offset for cylindrical and conical parts The edge offset of both plates which is determined by the difference of the measuring values x x 1, compare Fig. B.1. For circumferential seams the edge offset shall not exceed 15 % of the nominal thickness of the thinner plate, but maximum 4 mm. For longitudinal seams the edge offset shall not exceed 10 % of the nominal thickness of the thinner plate, but maximum 3 mm. 6. Damages to the component surface Damage to the surface, such as scores, scratches, arc strikes, indentation pits, etc. shall be thoroughly smoothed and inspected for surface cracks. The flaws treated in this way are permissible without proof of strength, if the following requirements are met: The depth shall at maximum 0,05 s or 3 mm, the smaller value is decisive. The area of the undercut of the thickness shall be within a circular area with s as diameter or 60 mm, the smaller value is decisive. The distance between two areas of thickness undercut and the distance from points of disturbance, like e.g. penetrations, shall be at least Rs. Deeper flaws are to be treated specially in agreement with GL. 7. Evaluation of the welding seams x 1 x The evaluation of other imperfections on welding seams as defined under 5. shall be performed according to the GL Rules for Design, Fabrication and Inspection of Welding Joints (II-3-), Annex A, quality level B. y = s max + 0 mm Fig. B.1 Radial deviation of the sheet metal surface of the pressure hull 5.4 Edge offset for spherical shells and dished ends For butt joints within these shells and dished ends the edge offset shall not exceed 10 % of the nominal thickness of the thinner plate, but maximum 3 mm. 5.5 Weld sinkage for cylindrical and conical parts The mean value of the deviations h = (x 1 + x ) / is defined as weld sinkage. If not otherwise agreed with GL, the following tolerances are valid: For circumferential seams the weld sinkage shall not exceed h = ¼ s, but maximum 5 mm. For longitudinal seams the weld sinkage shall not exceed h 1/6 s, but not more than 3 mm. 5.6 Weld sinkage for spherical shells and dished ends For butt joints within these shells and dished ends the weld sinkage shall not exceed h = 1/6 s, but maximum 3 mm. C. Pressure Hull Frames 1. Measurements The following measurements shall be carried out on every frame of the pressure hull at eight measuring points uniformly distributed around the circumference: flange width flange thickness web thickness frame spacing (measured at frame heel) frame height at frame moulding edge eccentricity flange to web web tilt to plane of frame The spacing k of the frame heel from a reference plane shall be determined by direct measurement, see Fig. B.. The location of the frame heel is shown as detail "A" in this Figure. For cylindrical pressure hull parts this measurement shall be carried out on a minimum of one frame per ring (with a ring length of up to a maximum of 8 pressure hull frames) and for conical pressure hull parts on every frame at 16 points uniformly distributed around the circumference.

84 I - Part 5 Annex B D Manufacturing Tolerances for the Pressure Hull Chapter 3 Page B 3 M.S. Detail A k A k Reference plane A k Fig. B. Definition of the reference plane of a frame. Tolerances.1 The following tolerances are maximum values and shall not be exceeded. The tolerances calculated from percentages may be rounded up to half of a millimetre.. Flange width: 0 % to + 4,5 % Flange thickness: 0 mm to + 3 mm Web thickness: 0 mm to + 3 mm With regard to the flange width resp. flange thickness the nominal cross sectional area of the flange is considered to be a permissible acceptance criteria. Height tolerances of 0, + 0,04 s 1 mm (s = material thickness in mm) due to flat grinding of nicks may be exceeded locally, however, the nominal cross section of the flange or web shall not be reduced to more than 90 %..3 Frame spacing: generally ± 1 % At circumferential seams +1 % to 3 %.4 Frame height at frame moulding edge: 0 % to + 5 % Tolerances up to % are allowed locally if the mean value of the 8 measuring points reaches nominal value..5 Eccentricity of flange to web: % of frame height.6 Inclination of web to reference plane of frame: ±.7 Misalignment of frame heel to reference plane: + 4 mm for frames ± 6 mm for web frames If the maximum difference of determined spacings (k max k min ) is larger than 8 mm for frames and 1 mm for web frames, the real deviations of h shall be determined by evaluation according to the following formula: h i = k i k 0 Δk x sin ϕ i Δk y cos ϕ i (B1) k 0 = 1/J (k 1 + k + k 3 + k J ) (B) Δk x = /J (k 1 sin ϕ 1 + k sin ϕ + k 3 sin ϕ k J sin ϕ J ) (B3) Δk y = /J (k 1 cos ϕ 1 + k cos ϕ + k 3 cos ϕ k J cos ϕ J ) (B4) ϕ i = 360 i /J h i = deviation of the frame heel from the actual plane of frame at measuring point i k i = measured distance of frame heel from the reference plane of measuring point i J = number of measuring points 3. Transition rings and strengthening of pressure hull Transition rings, strengthenings of cut-outs and other strengthenings of the pressure hull are not to be applied with tolerances which weaken the components. D. Out-of Roundness of the Cylindrical resp. Conical Pressure Hull 1. The out-of-roundness shall be measured at each frame and also at each transition ring. The measurements are to be conducted with a maximum distance according to 3Rs over the complete length of the component. For frame spacings above 3Rs the out-of-roundness is to be determined also at the shell between the frames considering this measuring distance. Moreover the course of the theoretical geometry lines at the transition ring is to be determined.. The following requirements shall be met prior to conducting out-of-roundness measurements:

85 Chapter 3 Page B 4 Annex B D Manufacturing Tolerances for the Pressure Hull I - Part 5 The required tests shall only be carried out when no subsequent changes of measured values are to be expected. The section is to be cooled down to ambient temperature and relieved from any tension by means of appropriate aids in order to prevent falsification of measurement results. 3. The measurement of the pressure hull can be carried out from outside or from inside. In principle the measurement of out-of-roundness shall be carried out at 4 points distributed as uniformly as possible around the circumference. It can be conducted with the help of a circular template, callipers, a two point bridge gage (see Fig. B.4), photogrammetry or theodolite methods, in which case access has to be provided by appropriate means. If the measuring of individual values is not possible due to constructional reasons (e.g. in the area of larger openings), it shall be supplemented as far as practically possible (in general by linear interpolation). The measurement shall not be impaired by welding seams (e.g. weld reinforcement) or local imperfections on the surface. 4. The results of the evaluation shall be presented to GL as tables and graphs. 5. The maximum permissible out-of-roundness is ± 0,5 % of the nominal pressure hull diameter unless otherwise agreed by GL. 6. Measuring method 1: direct measurement of the radii and their deviation from constant radius; from inside or from outside The measurement can be performed from inside - measurement of the radii, and from outside - measurement of the deviations from the constant, mean radius by rotating the pressure hull around an assumed axis (centre). The assumed centre shall be as near to the true centre as possible, compare Fig. B.3. The following formulas apply to J = 4 measuring points distributed uniformly around the circumference: u i = R i R Δx sin ϕ i - Δy cos ϕ i (B5) R = 1/J (R 1 + R + R R J ) (B6) Δx = /J (R 1 sin ϕ 1 + R sin ϕ + R 3 sin ϕ R J sin ϕ J ) (B7) Δy = /J (R 1 cos ϕ 1 + R cos ϕ i R i R Δx Δy u i ϕ i + R 3 cos ϕ R J cos ϕ J ) (B8) = measuring points 1 to J (for above formula J = 4) = radial measuring value at the curve shape at measuring point i; measured from assumed centre = average calculated radius = deviation of measurement, horizontal = deviation of measurement, vertical = calculated out-of-roundness of the pressure hull at the measuring point i = angle of the measuring point, see C..7 The calculation procedure shall be documented according to Table B Dx R1 f R R3 30 True centre of average radius 3 R4 45 R5 4 5 Dy Centre of measurements R (average radius) Fig. B.3 Measurement of the out-of-roundness at the cylinder; measuring method 1, explanation of symbols

86 I - Part 5 Annex B D Manufacturing Tolerances for the Pressure Hull Chapter 3 Page B 5 Table B.1 Protocol and calculation table for evaluation of the out-of-roundness according to method 1 (1) () (3) (4) (5) (6) (7) (8) (9) (10) (11) Δ i R i [mm] ϕ i [ ] sinϕ i cosϕ i R i sinϕ i R i cosϕ x Δ y i (7)+(8) (9)+ R u i=(1) sinϕ i cosϕ i (10) ,588 0, ,5000 0, ,7071 0, ,8660 0, ,9659 0, ,0000 0, ,9659 0, ,8660 0, ,7071 0, ,5000 0, ,588 0, ,0000 1, ,588 0, ,5000 0, ,7071 0, ,8660 0, ,9659 0, ,0000 0, ,9659 0, ,8660 0, ,7071 0, ,5000 0, ,588 0, ,0000 1, Measuring method 1: non-uniformly distributed measuring points In case of non-uniformly distributed measuring points and angular separation of measuring points 18 the following formulas apply: u i = R i R Δx sin ϕ i Δy cos ϕ i (B9) R = [1/( π D)] [R 1 x + R (x 3 x 1 ) + R 3 ( x 4 x ) + + R J (x 1 x J-1 + π D)] (B10) Δx = [1/(π D)] [R 1 sin ϕ 1 x + R sin ϕ (x 3 x 1 ) + R 3 sin ϕ 3 (x 4 - x ) + + R J sin φ J (x 1 x J-1 + π D)] (B11) Δy = [1/(π D)] [R 1 cos ϕ 1 x + R cos ϕ (x 3 x 1 ) + R 3 cos ϕ 3 (x 4 - x ) + + R J cos ϕ J (x 1 x J-1 + π D)] (B1) i = measuring points 1 to J (for above formula J = 4) J = actual number of measuring points R i = see definition in 6. R = average calculated radius Δx = deviation of measurement, horizontal Δy = deviation of measurement, vertical u i = see definition in 6. D = diameter of the measuring circuit x i = circumferential coordinate at measuring point i (measuring distance from starting point x J = x 0 = 0) ϕ i = angle at measuring point = 360 x i / (π D) 8. Measuring method : indirect measurement of the deviation from the average arc height of the measuring bridge; from outside The number of planes used for measuring the out-ofroundness of cylindrical pressure vessels is to be agreed with GL. For each measuring plane, at least J = 4 measuring points shall be provided and evenly

87 Chapter 3 Page B 6 Annex B E Manufacturing Tolerances for the Pressure Hull I - Part 5 distributed round the circumference. The height of arc x (j) is measured with a bridge extending over a string length L s = 4 π R 0 /J (see Fig. B.4). From the values x (j) and the influence coefficients C, the out-ofroundness values can be calculated by applying formula (B13). Table B. gives the influence coefficients C where J = 4. The values of the out-of-roundness U (j) measured in this way shall not exceed the maximum permissible values defined in 5. R 0 means here the outer radius of the cylindrical shell. E. Spherical Shells and Dished Ends 1. The following measurements are to be performed for spherical shells and dished ends: course of the theoretical geometry lines at the transition ring (tripping ring) out of roundness, circumference and inclined position of the cylindrical attachment of dished ends out of roundness of the spherical shell (local flattening) spherical form of the shell Fig. B.4 j = 0 j = 1 g j = L S R o x Measuring the out-of-roundness of a cylindrical shell, measuring method J 1 j = i i j i= 0 U Σ x C (B13). For dished ends with torispherical resp. semielliptical shape the tolerances according to recognized standards, e.g. DIN 8011 resp. DIN 8013 are to be kept. But for the deviations in shape: local flattening out of roundness of the cylindrical attachment the tolerances defined in this Annex are valid, compare 4. bzw. D A permissible spherical form is a shell which keeps a defined radius with a defined tolerance. For evaluation of the spherical form of the shell the outside radii are to be measured in 6 equally distributed (i.e. displaced by 30 ) planes cutting a joint axis (Fig. B.5). For spherical segments an analogous procedure is to be established. Example for out-of roundness U at the point j = for J = 4: U = x0 C+ x1 C1+ x C0 + x3 C x1 C19 + x C0 + x3 C1 (B14) Table B. Influence factors C i for j = 4 R i i = j C i-j i = j C i-j , , ,1834 0, , , , , , , , , ,6014 0, , , , , , , , , ,1834 0,85587 Fig. B.5 Measurement planes of a spherical shell - measuring method 1 The values for the out-of-roundness measured in this way shall not exceed 1 % of the nominal outer radius. If smaller local radii as 1,3 times the nominal outer radius are agreed for local flattenings, a less permissible out-of-roundness of the spherical shell is of advantage. The permissible value of the out-of-roundness is to be agreed with GL.

88 I - Part 5 Annex B E Manufacturing Tolerances for the Pressure Hull Chapter 3 Page B 7 L c,l 4. Measurement of the local flattening at spherical shells The measurement shall not be impaired by welding seams (e.g. seam reinforcement) or local imperfections of the surface. U x' R o,l s 1 s R o x The height of arch x' is measured with a 3 point bridge gauge (see Fig. B.6), where the measuring diameter L c,l is to be calculated with formula (B15). The out-ofroundness of the spherical shell follows from the local flattening U according to formula (B17). The maximum permissible value of the local flattening, on the basis of a local radius R o,l = 1,3 R o is u = 0,18 s l / R o. Consequently the maximum permissible local flattening U of the spherical shell from the theoretical spherical form is 1,8 % of the plate thickness s l (average value of the measured thickness in the measuring area). If a deviating local radius for the layout of the pressure hull is agreed, a corrected collapsing pressure p cr ' and a corrected permissible local flattening is to be evaluated according to 5., L = R s 3 (1- ν ) 4 c,l o,l l 4 (B15) c,l L x=ro - Ro - 4 (B16) U=x-x'=u R o (B17) L c,l = critical arch length (diameter of measuring circle) s l = local average shell thickness L c,l Fig. B.6 Measuring the out-of-roundness of a sphere R' x = arch height at nominal shell radius R o x = measured arch height ν = Poisson's ratio in elastic range = 0,3 for steel U = local flattening of the spherical shell within diameter L c,l u = local flattening, related to the nominal radius R o The distribution of the measuring points is defined in Fig. B.7. In each measuring point two measurements are to be made: once in a plane through the middle axis and once vertical to it. Fig. B.7 Measuring point Distribution of the measuring points over a hemisphere 5. Calculation of the failure pressure for spherical shells with a deviating out-ofroundness (u 0,18 s/r o ) The corrected maximum permissible out-of roundness can be evaluated with the aid of Table B.3. i The corrected elastic-plastic buckling pressure p ' cr is to be evaluated with formula (B18) using the correc-

89 Chapter 3 Page B 8 Annex B F Manufacturing Tolerances for the Pressure Hull I - Part 5 tion factor c p under consideration of the actually existing local curvature radius R o,l (relation ). The Ro,l R o local curvature radius is to be calculated with formula (B19). The thus evaluated elastic-plastic buckling i pressure p ' cr is to be multiplied with the reduction factor k according to Annex A, F.6.6. Local radii larger than two times the nominal radius are to be avoided. For radii less than 1,3 times the nominal radius the definitions in Annex A, F.6.3 are to be observed. p i cr ' i cr p = (B18) c p R o,l c,l x' L = + (B19) 8 x' The corrected failure pressure p cr ' which is evaluated in this way shall at least be equal to the collapse diving pressure CDP of the pressure hull: i p cr' p cr'= k CDP (B0) c F. Literature p Concerning literature reference is made to Annex A, G. Table B.3 Maximum permissible local flattening for deviating local radius Relation R R o,l o Maximum local flattening c,l L 1 1 U= - 8 Ro R o,l Corrected diameter of the measuring circle *, L = R s 3 (1- ν ) 4 c,l o,l l 4 Correction factor for the elastic-plastic buckling i ' pressure p c p Ro,l = 1,3 R o cr 1,07 1,3 0,18 s 1,759 Ro,l sl 1,000 1,4 0,90 s 1,863 Ro,l sl 1,083 1,5 0,363 s 1,964 Ro,l sl 1,165 1,6 0,435 s 1 3,061 Ro,l sl 1,49 1,7 0,508 s 1 3,155 Ro,l sl 1,33 1,8 0,580 s 1 3,47 Ro,l sl 1,417 1,9 0,653 s 1 3,336 Ro,l sl 1,501,0 0,75 s 1 3,4 Ro,l sl 1,586, * o,l L c,l = Ro sl 4 Ro 3 (1- ν ) 4 Table B.3 is valid for a wall thickness ratio R s 0,0 R and for materials with yield strength σ 0, 550 MPa. 0

90 I - Part 5 Annex C B Acrylic Windows Chapter 3 Page C 1 Annex C Acrylic Windows A. General 1. Scope In the sense of these Rules, acrylic windows are flat or curved windows for the view ports of pressure hulls which are made of cast, unlaminated polymethyl methacrylate plastic.. Limits of application For acrylic windows following limits for application apply: designed service life 10 resp. 0 years (see explanatory notes below) temperature range 18 C to +66 C rate of pressurization max. 10 bar/s pressure cycles at design pressure max period under pressure at design pressure max h maximum allowable working pressure max bar The design service life for acrylic windows depends on numerous factors, in particular on the kind of loading. The maximum design service life to be assumed for spherical or cylindrical windows subjected to external overpressure, which are exclusively exposed to compressive stresses or minor bending stresses only, is generally 0 years, while for flat windows with flat seat it is 10 years. The design service life starts with the date of manufacturing regardless of the use in the submersible. Depending on the previous actual loads acting on the windows and testing to be agreed with GL in detail, extension of the service life of acrylic windows may be approved. 3. Permissions/Approvals For the design and manufacturing of acrylic windows the following permissions/approvals are required: approval of drawings and of the design for each type of window and each form of application by GL approval as material manufacturer by GL Manufacturer Inspection Certificate for the material, compare B.3. approval by GL as manufacturer of acrylic windows GL Certificate which certifies the manufacturing inspections and the pressure tests according to C.6. B. Materials 1. Materials for acrylic windows are to be manufactured in accordance with a recognized standard (e.g. ANSI/ASME PVHO 1, Section ). The producer is required to certify this before manufacture commences.. Acrylic windows have to meet the minimum physical requirements stated in Table C For each batch of acrylic plastic processed to windows the manufacturer has to issue a Manufacturer Inspection Certificate containing at least the following details: number and date of Certificate manufacturer's name and address designation and application of casting type batch number, quantity, shape and size of castings marking of castings results of tests applied in accordance with Table C.1 stamp and signature 4. Where a Manufacturer Inspection Certificate of the kind required is not available for the acrylic plastic or where the conditions for recognition of the Inspection Certificate are not satisfied, the tests are to be extended in a manner to be agreed with GL in each individual case. 5. Each casting is to be provided at one point at least with a marking which identifies the type of casting, the batch number, the date of manufacture and the name of the manufacturer.

91 Chapter 3 Page C Annex C D Acrylic Windows I - Part 5 C. Manufacture of Windows 1. The manufacture of acrylic windows covered by these Rules may only take place in specialized workshops which have been approved by GL for that purpose. Such approval can be granted only to those companies which employ properly trained specialists and which have available the necessary technical facilities enabling them to undertake the expert forming, machining, heat treatment and quality control of acrylic windows. Application for approval is to be made to GL before the manufacture of windows commences.. The acrylic plastic to be used has to meet the requirements stated in B. After machining and any necessary forming operations, each window is to be subjected to heat treatment (tempering) in accordance with the acrylic plastic manufacturer's specification. After tempering no further mechanical polishing may be carried out on the window. Flat disk windows for diving chambers where only the surrounding area is professionally machined need not to undergo a heat treatment after manufacturing. 3. Window surfaces are to be polished in such a way as to meet the optical clarity requirement stated in Table C For each window or series of windows the window manufacturer has to issue a component Certificate specifying all the stages of manufacture such as cutting, sticking, polishing, forming and tempering. In addition the tests carried out, the test results, the marking of the windows and the date of manufacture are to be indicated. 5. Each window is to be permanently marked with at least the following details: design pressure PR = NDP [bar] design temperature [ C] GL approval stamp manufacturer's name or identifying mark serial number and year of manufacture. direction of pressure, if it is not clear Wherever possible, the marking is to be engraved in the non-load-bearing portion of the window edge. The use of punches is not allowed. 6. Acrylic windows are to be presented to GL for an inspection of manufacture. In addition, each window is to be subjected, in the presence of a GL Surveyor, to a pressure test in accordance with GL Rules for Manned Submersibles (I-5-), Section, F.3.3. At the pressure test the direction of pressure has to be observed. If the windows are subjected to pressure from both sides, this is to be considered for the testing. D. Window Shapes and Sizes 1. The standard shapes and sizes shown in Table C., C.3 and C.4 are to be selected for the acrylic windows. For design pressure PR in general the nominal diving pressure NDP is to be used, see also the Rules for Manned Submersibles (I-5-), Table 4. resp. Unmanned Submersibles (ROV, AUV) and Underwater Working Machines (I-5-3), Table 3... Acrylic windows of other shapes and sizes or for other ranges of pressure may be used on application if approved by GL or if they are designed and manufactured to a standard recognized by GL. Acrylic windows may be performed e.g. according to ASME PVHO-1, Section. 3. The design temperature to be assumed for acrylic windows shall be the mean value of the maximum external and internal temperatures to be expected under design pressure conditions. 4. Windows subjected to pressure from both sides are to be designed for the maximum pressure applied, regardless of whether this pressure is external or internal. 5. Pressure may only be applied to the convex side of spherical shell windows. 6. The thickness of the window has to be everywhere equal to, or greater than, the minimum value determined by reference to Tables C., C.3 and C.4. For intermediate temperatures linear interpolation may be applied. 7. With flat windows having right-angled edge and an O-ring seal, the outside diameter of the disk shall be within + 0,00/ 0,5 mm of the nominal value, or within + 0,00/ 0,75 mm where flat gasket seals are used. 8. Because of stress increasing effects grooves for seals shall not be located in the acrylic window bearing surface and also not in the window itself. 9. The greater diameter of the conical bearing surface of an acrylic window shall be within +0,000/ 0,00 D o of the nominal value. The included conical angle of the window shall be within + 0,5/ 0,00 degrees of the nominal value. 10. The concave or convex surface of the window shall not differ from an ideal spherical sector by more than ± 0,5 % of the nominal external spherical radius. 11. The surface roughness R a of the window bearing surface shall be 0,75 μm or better.

92 I - Part 5 Annex C E Acrylic Windows Chapter 3 Page C 3 E. Installation of Windows 1. If the window seat is not made of corrosion resistant material, it is to be sufficiently preserved with a suitable agent. In addition window and window seat are to be carefully cleaned using only cleaning material which is compatible with acrylic glass.. Conical window seats are to be treated with silicone or a suitable grease before the installation. 3. During installation of the window care is to be taken that the bolts of the fastening ring are to be tightened with the prescribed and all the same torque. Table C.1 Mechanical and optical properties of acrylic plastics Properties Specified values Test method ASTM Ultimate tensile strength Elongation at break (in relation to necking zone) Modulus of elasticity measured by tensile test 6 N/mm % 760 N/mm DIN specimen type 3 test velocity II standard climate 3/50 DIN D Compressive yield strength Modulus of elasticity measured by compression test 103 N/mm 760 N/mm DIN standard climate 3/50 size of test specimen: 5 1,5 1,5 mm DIN D Compressive deformation 1 % Ulltraviolet transmittance 5 % Constant compressive stress 1 of 7,5 N/mm for 4 h at 50 C test cube: 1,5 mm edge length UV-spectrophotometer wave length range: nm thickness of specimen: 1,5 mm D 61 1 E 308 Visual clarity Legibility A 5 x 5 mm standard type set comprising 7 lines of 16 letters each is to be clearly legible through the acrylic plastic pane at a distance of 500 mm. D 70 Residual monomers methyl methacrylate aethyl acrylate 1,6 % Gas chromatograph 1 The mechanical properties are to be verified on at least specimens.

93 Chapter 3 Page C 4 Annex C E Acrylic Windows I - Part 5 Table C. Standard dimensions for flat disk windows Range of application: Minimum wall thickness : s 1,5 mm Slenderness ratio : s/d o 0,15 Edge radius : 1 mm R 1 mm Window seating : 1,5 D o /D f 1,5 mm Max. allowable working pressure : p 170 bar R 1 D o s D i = D f Design pressure PR [bar] Minimum wall thickness / inside diameter of seat s/d i at 10 C 4 C 38 C 5 C 66 C 5 0,134 0,146 0,154 0,164 0, ,154 0,173 0,188 0,01 0,6 15 0,173 0,195 0,10 0,3 0,53 0 0,188 0,10 0,6 0,40 0,81 5 0,01 0,3 0,40 0,57 0, ,10 0,33 0,53 0,74 0, ,19 0,43 0,67 0,9 0, ,6 0,53 0,81 0,305 0, ,33 0,64 0,95 0,317 0, ,40 0,74 0,305 0,39 0, ,53 0,95 0,34 0,354 0, ,67 0,310 0,344 0,378 0, ,81 0,34 0,363 0,40 0, ,95 0,339 0,383 0,47 0, ,305 0,354 0,40 0,451 0, ,315 0,368 0,4 0,476 0, ,34 0,383 0,441 0,500 0, ,334 0,398 0,461 0,54 0, ,344 0,41 0,480 0,549 0, ,354 0,47 0,500 0,573 0, ,363 0,441 0,50 0,598 0, ,373 0,456 0,539 0,6 0,871

94 I - Part 5 Annex C E Acrylic Windows Chapter 3 Page C 5 Table C.3 Standard dimensions for spherical shell windows with conical seat (opening angle 60 / 90 ) Range of application: Opening angle : α 60 Minimum wall thickness : s 1,5 mm Minimum values for s/r i : α 60 α < α < 10 s/r i 0,09 0,06 Window seating : D i /D f 1,0 Max. allowable working pressure : p 170 bar Design Minimum wall thickness / pressure inside diameter of seat s/d i PR for 60 α < 90 at [bar] 10 C 4 C 38 C 5 C 66 C s R i a D f D i Design Minimum wall thickness / pressure inside diameter of seat s/d i PR for 90 α < 10 at [bar] 10 C 4 C 38 C 5 C 66 C 5 0,090 0,090 0,090 0,090 0, ,04 0,04 0,04 0,04 0, ,090 0, ,090 0, ,04 0,043 0,049 0,054 0, ,090 0,090 0,097 0,108 0, ,043 0,05 0,060 0,067 0, ,090 0,097 0,11 0,16 0, ,049 0,060 0,070 0,080 0, ,090 0,108 0,16 0,143 0, ,054 0,067 0,080 0,091 0, ,097 0,119 0,140 0,160 0, ,060 0,075 0,089 0,10 0, ,104 0,19 0,153 0,176 0, ,065 0,08 0,098 0,113 0, ,11 0,140 0,166 0,191 0, ,070 0,089 0,107 0,14 0, ,119 0,150 0,179 0,06 0, ,075 0,095 0,116 0,135 0, ,16 0,160 0,191 0,1 0, ,080 0,10 0,14 0,146 0, ,140 0,179 0,15 0,48 0, ,089 0,116 0,14 0,168 0,4 70 0,153 0,197 0,38 0,74 0, ,098 0,18 0,160 0,190 0,7 80 0,166 0,15 0,59 0,98 0, ,107 0,14 0,177 0,10 0, ,179 0,3 0,79 0,30 0, ,116 0,155 0,194 0,30 0, ,191 0,48 0,98 0,340 0, ,14 0,168 0,10 0,50 0, ,03 0,64 0,315 0,359 0, ,133 0,181 0,6 0,69 0, ,15 0,79 0,33 0,377 0, ,14 0,194 0,4 0,87 0, ,7 0,93 0,348 0, ,151 0,06 0,57 0,304 0, ,38 0,307 0,363 0, ,160 0,18 0,7 0, ,48 0,30 0,377 0, ,168 0,30 0,87 0, ,59 0,33 0,391 0, ,177 0,4 0,300 0, ,69 0,344 0,404 0, ,185 0,54 0,314 0,365

95 Chapter 3 Page C 6 Annex C E Acrylic Windows I - Part 5 Table C.4 Standard dimensions for spherical shell windows with conical seat (opening angle 10 / 180 ) Range of application: Opening angle : 180 α 10 Minimum wall thickness : s 1,5 mm Minimum values for s/r i : α 10 α < 180 α = 180 s/r i 0,06 0,03 Window seating : D i /D f 1,0 Max. allowable working pressure : p 170 bar Design Minimum wall thickness / pressure Inside diameter of seat s/d i PR for 10 α < 180 at [bar] 10 C 4 C 38 C 5 C 66 C s R i a D f D i Design Minimum wall thickness / pressure Inside diameter of seat s/d i PR for α = 180 at [bar] 10 C 4 C 38 C 5 C 66 C 5 0,01 0,03 0,05 0,08 0, ,018 0,018 0,019 0,01 0, ,05 0,030 0,034 0,038 0, ,019 0,03 0,06 0,030 0, ,030 0,036 0,04 0,048 0, ,03 0,08 0,034 0,039 0, ,034 0,04 0,050 0,059 0, ,06 0,034 0,041 0,049 0, ,038 0,048 0,059 0,069 0, ,030 0,039 0,049 0,058 0, ,04 0,054 0,067 0,079 0, ,034 0,045 0,056 0,068 0, ,046 0,061 0,075 0,090 0, ,038 0,051 0,064 0,077 0, ,050 0,067 0,083 0,100 0, ,041 0,056 0,071 0,086 0, ,054 0,073 0,09 0,110 0, ,045 0,06 0,079 0,096 0, ,059 0,079 0,100 0,119 0, ,049 0,068 0,086 0,105 0, ,067 0,09 0,117 0,138 0, ,056 0,079 0,101 0,1 0, ,075 0,104 0,131 0,157 0,3 70 0,064 0,090 0,115 0,139 0, ,083 0,117 0,146 0,175 0, ,071 0,101 0,19 0,155 0,3 90 0,09 0,17 0,161 0,193 0, ,079 0,11 0,14 0,17 0, ,100 0,138 0,175 0,11 0, ,086 0,1 0,155 0,188 0, ,108 0,149 0,190 0,8 0, ,094 0,13 0,168 0,04 0, ,117 0,161 0,04 0,45 0, ,101 0,14 0,18 0,0 0, ,13 0,171 0,18 0,6 0, ,108 0,15 0,194 0,35 0, ,131 0,18 0,3 0,78 0, ,115 0,16 0,07 0,50 0, ,138 0,193 0,45 0, ,1 0,17 0,0 0,64 0, ,146 0,04 0,59 0, ,19 0,18 0,3 0, ,153 0,14 0,7 0, ,135 0,191 0,44 0,9

96 I - Part 5 Annex D B Manufacture and Treatment of Fibre Reinforced Plastics (FRP) Chapter 3 Page D 1 Annex D Manufacture and Treatment of Fibre Reinforced Plastics (FRP) A. General 1. Definition Fibre reinforced plastics are heterogeneous materials, consisting of a thermosetting resin as the matrix and an embedded fibrous reinforcing material.. Scope of application For submersibles plastics are mainly used for the following components: exostructure rudder and propeller pressure vessels B. Requirements for the Materials and their Processing 1. Materials 1.1 Approval The materials used for the manufacturing of components from FRP shall be assessed and approved by GL The approval refers only to the approved material. The applicability of this material in connection with other materials shall be demonstrated independently by the manufacturer or the user in a suitable manner. 1. Quality assurance 1..1 A constant material quality shall be secured by the manufacturer through constant quality assurance measures. 1.. GL reserve the right to demand resp. carry out spot tests of the material properties during the duration of the material approval. 1.3 Types of materials For the construction of submersibles in general the following materials are to be considered: laminated resins, e.g. cold-setting or hot-setting unsaturated polyester (UP) resins and cold setting epoxy (EP) resins reinforcing materials, e.g. fibre reinforcements made of glass and carbon prepregs as reinforcing materials, which are preimpregnated with a thermosetting resin and which can be processed without any further addition of resin or hardener core materials, e.g. rigid foams with adequate compressive strength adhesives, e.g. cold- and hot-setting thermosetting adhesives and hot-melt adhesives flame retardant laminates produced by additives to the resin system, whereby the viscosity of the resin or the mechanical properties of the manufactured laminates not be changed essentially Other materials may be approved in agreement with GL Head Office.. Manufacturing.1 Approval.1.1 Manufacture of FRP-components shall only be performed by workshops which are approved by GL for the manufacture of components made from fibre-reinforced thermosetting resins..1. The manufacture of FRP-components shall only be carried out by persons with professional knowledge. This professional knowledge shall in general be verified by certificates of the corresponding training courses..1.3 All manufacturing facilities, store-rooms and their operational equipment shall fulfil the requirements of the responsible authorities. The manufacturer is alone responsible for compliance with these requirements.. Store rooms and laminating workshops The danger of contamination of laminating materials is to be minimized through separation of production facilities from store rooms..3 Guidelines for processing.3.1 As a matter of principle, only materials approved by GL shall be used. In addition to the choice of suitable and approved materials, special care shall be taken when working with them because of the great influence on the properties of the product.

97 Chapter 3 Page D Annex D C Manufacture and Treatment of Fibre Reinforced Plastics (FRP) I - Part 5.3. For the preparation and processing of the resin compounds and reinforcing material, beside the GL Rules, the instructions issued by the material manufacturers and the regulations of the competent authorities are to be observed..4 Manufacturing surveillance For components made of FRP, manufacturing surveillance has to consist of the quality control of the basic materials, production surveillance and the quality inspection of the finished components..5 Repair of components.5.1 Repairs of structural FRP-components shall only be performed by workshops which are approved by GL..5. For the approval of a repair, all design and repair drawings needed to assess the repair of the relevant components are to be submitted to GL. The repair plan is to be examined by GL Head Office and approved..5.3 A report is to be established for each repair which has to be signed by the head of the repair team..5.4 If the materials and laminates used for the repair are not identical to those employed when the component was manufactured, equivalence of the combination of materials shall be verified with respect to their properties. 3. Detailed requirements The detailed requirements for the areas pointed out are defined in the GL Rules for Fibre Reinforced Plastics and Bonding (II--1). C. Requirements for the Design 1. Design data The mechanical properties and the nominal thickness of the laminate as well as weight, type and portion of the reinforcement layers, which can be individually used, are to be defined on the design drawings.. Design measures For the design of components the following measures are to be considered:.1 Changes in the laminate thickness are to be established with a smooth transition of 5 mm per 600 g/m². In the transition area from a sandwich design to massive laminate the core material is to be gradually tapered (at least 3 : 1).. In general frame and stiffening sections are to be built up by layer and layer on the laminate, as far as the last layer is not yet cured. Where internal structural members are crossing each other, special care is to be taken that the load-bearing capacity remains unchanged..3 Closed hollow spaces in the structure which may be subjected to external pressure are to be avoided..4 If core materials are used in areas which may be subjected to external pressure, pressure-proof materials like e.g. rigid foams are to be used..5 Stress concentrations, peaks in stiffness and discontinuities are to be avoided. It has to be ensured, that because of cut-outs, openings in load carrying elements and the connection of fittings the strength of the component is not impaired..6 If various components which have been produced in different moulds are to be connected with each other, then the connecting laminates have to be finished before curing of the components. If components of FRP are bolted which each other or with components of other materials, the connecting elements (bolts, nuts, washers) are to be of seawater resistant material. Bolted connections are to be dimensioned according to the occurring forces..7 In areas with local force introduction (e.g. connecting elements of the exostructure, bitts, cleats) sole pieces and/or shims of adequate strength are to be situated. The strength, e.g. bearing strength is to be proven in a suitable way. The connecting area of these sole pieces is to be prepared in a suitable way and shall be free of contamination..8 Metallic materials used in the design, like e.g. steel or aluminium alloys have to be suitable for the intended purpose and shall not impair the curing of the laminating resins. Local reinforcements of metallic materials are to be cleaned and degreased carefully and, if possible, are to be shot blasted or roughened up to achieve a toothing effect..9 For sandwich laminates in way of bolted connections and fittings, inserts of a material, which can withstand the compression and the design loads, are to be provided. The inserts are to be connected with the core material and the laminate layers in the best way..10 Laminate edges and holes are to be sealed..11 Further design measures which are recommendable for different shipbuilding components made of plastics are contained in the GL Rules for Yachts 4 m (I-3-), Section, E. and Yachts and Boats up to 4 m (I-3-3), Section 1, B. and C.

98 I - Part 5 Annex E B Basic Requirements for Umbilicals Chapter 3 Page E 1 Annex E Basic Requirements for Umbilicals A. General 1. Definition The umbilical is regarded as the connecting link between support ship and an element under water, which may include hose assemblies for liquid and gas transport and monitoring, communication, data transfer and energy supply cables as well eventually a lifting cable. This bundled or integrated supply line may also be used between elements under water. As elements under water in the sense of this Annex are to be regarded e.g.: diving chambers non-autonomous (manned) and remotely controlled (unmanned) submersibles launchers underwater working machines diving equipment The integrated or also independent lifting cable serves for launching and recovery, as well as for lifting and lowering of an element under water as well as for absorption of tension loads during operation. The lifting cable may also be designed as bearing element, e.g. as netting within the sheathing of the umbilical.. Scope This Annex is valid for the technical requirements and the testing of umbilicals including connecting pieces as well as shut-off devices at the ends and the load transfer points. The load transfer points of the support ship/element are not subject of this Annex. Furtheron this Annex is valid for cables and hose assemblies which may be subjected to external overpressure and integrated lifting cables. The penetration into the pressure hull or a vessel under pressure is part of the element. Some basic requirements for the coil-up/coil-off mechanism are defined. The supply systems for the materials, data and energies transferred by the umbilical form part of the support ship or element and are not treated in this Annex. Umbilical systems for production duties, as e.g. used in the oil and gas industry, are primarily not subject of this Annex. 3. Quality Management System The manufacturer of umbilicals has to apply a recognized quality management system, like e.g. ISO 9001 or equivalent. This system has to cover design, manufacture and testing. 4. Equivalence Umbilicals deviating from this Annex in their type, structure and the compliance with some detailed requirements may be accepted by GL, provided that they are found to be equivalent to the principle requirements defined in this Annex. B. Principles for Layout and Design 1. General 1.1 The requirements defined in the following are minimum requirements for the majority of the prospective applications. For special use the selection of the requirements is to be agreed with GL. 1. Generally the following requirements are to be considered for the design: environmental influences, see the GL Rules for Manned Submersibles (I-5-), Section, D. influence of weight (deadweight, empty, full) buoyancy behaviour (positive and negative buoyancy, neutral buoyancy) dynamic influences because of ship movements and increasing and lowering the pressure inside thermal influences on expansion and shrinking because of possible temperature changes inside and outside thermal influences because of power cables partly on drum pressure differences in hoses between upper and lower end of umbilical chemical and electrochemical influences 1.3 The control of the coil-up/coil-off mechanism for the umbilical and the monitoring of the supply flow through the umbilical including the production of materials to be supplied are to be concentrated at a central position.

99 Chapter 3 Page E Annex E B Basic Requirements for Umbilicals I - Part 5 For manned, non-autonomous submersibles the control and monitoring is to be integrated into the control stand which maintains the connection with the submersible. For unmanned, remotely controlled submersibles and other elements these are to be integrated into the control station. 1.4 Umbilicals shall be produced in one piece for the complete required length and shall not be divided into different parts. 1.5 Requirements and tests of umbilicals for hose supplied diving equipment are to be taken from standard EN Mechanical requirements.1 Materials Only materials according to generally recognized standards are to be used and their application has to be clearly recorded and traced. The materials are to be suitable for the use in salt water. If a mission in other media than water is planned, these are to be adequately considered. The material of hose assemblies is to be suitable for the media to be transported. The materials are to be suitable for permanent and varying bending stress. If hoses are used for breathing gases their suitability is to be proven (e.g. off-gassing test). Umbilicals, hose assemblies and cables are to be protected against abrasion and damages. For the protection cover of umbilicals attention is to be given that no internal pressure can be built up if little leakages occur in the hose. Metal inserts in the protection cover are to be avoided.. Tensile load..1 For umbilicals with integrated lifting cable the mechanical characteristics are to be judged according to the submitted documentation. Hereby the maximum permissible tension load and the minimum breaking load of the umbilical are to be defined by the manufacturer. For the use of lifting cables made of steel the maximum static tension load created by the safe working load shall not exceed 1/8 of the proven breaking load of the cable. For the use of lifting cables made of chemical fibre the maximum static tension load created by the safe working load shall not exceed 1/10 of the proven breaking load of the cable. For the use of lifting cables for simple scientific devices a reduced breaking load of the cable may be approved in agreement with GL under consideration of risk potential and intended use. Further on the functionality of the elements contained in the umbilical at maximum possible longitudinal extension of the umbilical is to be considered. The umbilical is to be constructed to reach neutrality to tension for the whole range of tensional stresses... If there is no lifting cable included, the integrated cables and hose lines are to be protected from longitudinal stress by a strain relief. The minimum tension load is to be defined considering the duty of the mission, is to be agreed with GL and to be proven...3 If buoyancy elements or weights are used to change the buoyancy behaviour, these are to be securely fastened without damaging the umbilical. Over the complete appearing tension range no additional torsional effects shall be created. For hoses with non corrosion-resistant wire mesh inlets the mesh is to be protected against the surrounding media..3 Bending and buckling Umbilicals shall be buckling safe and bending resistant respectively being adequately arranged to avoid buckling safely. According to the structure of the umbilical the minimum bending radius is to be agreed with GL. The minimum bending radius of a single component (e.g. lifting cable, cable, hose assembly, etc.) shall not be bigger than the minimum bending radius of the complete umbilical. 1 If special elements are used for avoidance of bending and buckling, these have to be securely fastened without damaging the umbilical..4 Hose lines.4.1 Lay out For the layout is to be considered: Each hose line is to be designed for an internal burst pressure, which shall at least be for liquids 4 times, for gases 5 times of the maximum allowable working pressure. Hose assemblies to be subjected to external pressure, are to be designed for at least 1,1 times (manned submersibles) and 1,0 times (unmanned submersibles and other elements) the collapse diving pressure CDP. Moreover the maximum possible pressure difference Δp between inside and outside pressure has to be considered..4. Type test Burst pressure test: Each hose is to be subjected to internal pressure until bursting. The minimum burst pressure is to 1 For bending radius and bending number compare also CIGRE Recommendation 68 under consideration of the mechanical requirements according to.1 and additional influences of temperature, load, salt water, if necessary diesel fuel.

100 I - Part 5 Annex E B Basic Requirements for Umbilicals Chapter 3 Page E 3 be for liquids 4 times, for gases 5 times the allowable maximum working pressure. External pressure test: Hose assemblies which are additionally subjected to external overpressure have to undergo a hydraulic pressure test with 1,5 times the maximum possible pressure difference between inside and outside (but at least 10 bar)..4.3 Routine test Within the series production the routine test contains the following test steps: Pressure test: Before integration into an umbilical, each hose is to be tested with an internal pressure according to 1,5 times (metallic hose assemblies) respectively times (non-metallic hose lines) maximum allowable working pressure. External pressure test: Hoses which are additionally subjected to external overpressure have to undergo a hydraulic pressure test with 1,5 times the maximum possible pressure difference between inside and outside..5 Fittings Connecting elements and fittings have to meet the same inside and outside design pressures as the umbilical, shall not unintentionally disconnect, shall be corrosion resistant and suitable for the planned media. 3. Electrical requirements 3.1 Umbilicals may contain monitoring and communication/data transfer cables and also energy supply lines. 3. Lay out For the lay out has to be considered: Flexible cables resp. highly flexible cables e.g. of class 5 acc. to IEC have to be used, whereby for energy supply cables a minimum sectional area of the single copper conductor of,5 mm is to be provided. Empty spaces are to be filled with suitable filler material like petroleum jelly, to maintain form stability. Electrical cables and optical conductors are to be designed according to their specification. The maximum length is to be considered hereby. For special duties it may be necessary to construct cables with longitudinal water tightness. For different cables with several levels of voltage negative influences between them have to be avoided. For cables mechanical forces shall not be transferred by the conductors or their insulation. Cables have to provided at least cross water tight. Each cable is to be designed for an external pressure which is at least for manned submersibles 1,1 times and for unmanned submersibles and other elements 1,0 times the collapse diving pressure CDP. Extended stowage of cables in water shall not lead to a remarkable reduction of the insulation resistance. 3.3 Type test Fundamentally the electric and electronic characteristics specified for the project have to be proven, e.g. by a type test according to IEC /351. The type test contains the following test steps: visual check check of dimensions, structure and marking The cross - watertightness of electrical cables / single conductors is in general to be tested with P N (cyclic). If the cables are integrated in a cross-watertight umbilical, the test may be cancelled in agreement with GL. evaluation of voltage insulation strength according to Table E.1 Measurement of the insulation of energy supply lines with at least 500 V (guiding value: > 500 MΩ km) For cables with a nominal voltage up to 1 kv a check of the insulation values is to be performed with a test voltage equal to times the nominal voltage, but at least 500 V. For energy supply lines with a nominal voltage above 1 kv a check of the insulation values is to be performed with a test voltage of at least the nominal voltage. The test comprises the evaluation of the insulation value of all conductors against each other as well as of each single conductor against the external insulation layer. The measurement of the insulation is to be performed before and after the test of cross water tightness and after the test for voltage insulation strength. resistance measurement of all single conductors measurement of partial discharging according to IEC at voltages above 3,6/6 kv (U 0 /U) for all single conductors of the cable impedance and capacity test depending on voltage and duty of mission in agreement with GL check of compliance with the specifications for insulation, capacity and eventually impedance

101 Chapter 3 Page E 4 Annex E C Basic Requirements for Umbilicals I - Part 5 Table E.1 Test voltages for cables U m kv 1, 3,6 7, 1 U 0 /U kv / kv 0,6 / 1,0 1,8 / 3,0 3,6 / 6,0 6,0 / 10 AC test voltage kv 3,5 6, DC test voltage kv U 1,5 U 1,3 U 1 1,5 U 1 Remarks: U 0 : nominal main voltage between conductor and earth or metallic screen U : nominal main voltage between the conductors for which the cable is designed U m : maximum permissible voltage for equipment 1 test voltage case by case according to agreement with GL The test period is in case of using AC as test voltage 15 minutes. The test period is in case of using DC as test voltage 1 minute. 3.4 Routine test Within the series production the routine test contains the following test steps: visual check check of dimensions, structure and marking covering failure test, if applicable evaluation of voltage insulation strength according to Table E.1 The cross - watertightness of electrical cables / single conductor is in general to be tested with 1,5 P N (cyclic) according to GL Rules for Manned Submersibles (I-5-), Section 11, Fig. 11. If the cable is integrated in an umbilical which is cross - watertight, this test may be avoided in agreement with GL. The insulation measurement according to 3.3 is to be performed before and after the test of cross water tightness and after the test for voltage insulation strength. 3.5 Electrical connecting elements Connecting elements are to be designed for the same external pressure as the cables, shall not unintentionally disconnect and shall be corrosion-resistant. Electrically they shall follow the layout of the adjacent cables and are to be watertight in longitudinal direction in addition. The electrical and mechanical characteristics are not to be influenced in a negative way by the connecting elements. 4. Coil-up/coil-off mechanism for umbilicals Concerning technical requirements for coil-up/coil-off mechanism for umbilicals on the support ship see the GL Rules for Unmanned Submersibles (ROV, AUV) and Underwater Working Machines (I-5-3), Section 6, E.3. resp. Manned Submersibles (I-5-), Section 17, E Jettisoning of the umbilical 5.1 In case the umbilical is caught at an underwater obstacle and this hindrance cannot be removed by relevant manoeuvring, it may be necessary to separate the umbilical from the element under water and to initiate an independent surfacing procedure. 5. For manned submersibles it has to be possible to drop respectively to cut-off the umbilical by the crew from inside the submersible. The jettisoning system is to be so designed that two operational actions which are independent from each other and which need no electric energy are required to activate the separation. 5.3 For unmanned elements, for which jettisoning is required, the umbilical has to be dropped respectively cut-off at the connecting point with the submersible from the control station. The jettisoning system is to be designed that an unintentional jettisoning is avoided. 5.4 For other elements under water the possibility for jettisoning is to be agreed with GL according to type and mission duty. C. Documents for Approval It is to be submitted: general description of the mission duty description of the structure and the applied materials of the single components definition of main parameter, compare E. drawing of the cross section data concerning connecting elements and fittings, eventually drawings, if existing

102 I - Part 5 Annex E D Basic Requirements for Umbilicals Chapter 3 Page E 5 data concerning pressure and flow conditions and capacity for gas and liquid transport data concerning the energy, communication and data transfer, e.g. voltage, amperage, transfer rates specification of impedance, capacity and resistance values data concerning tests with Certificates already performed data concerning installation, maintenance, operation and repair description of marking D. Tests and Trials 1. General 1.1 The required tests are to be divided into a type test for the prototype and a routine test within the manufacturing for the effective use. 1. A trial and test program is to be established by the manufacturer of the umbilical according to the specification of the requirements profile defined by the end client (element producer or operator) and to be submitted to GL for approval. Generally this program shall contain at least the test steps defined in the following. 1.3 About the scope of the presence of GL Surveyors at these tests and trials GL will decide in each individual case.. Type test.1 Mechanical requirements The type test contains the following test steps: visual check check of dimensions, structure and markings weight evaluation: The effective weight for missions of the umbilical [t/1000 m] is to be determined in air, water (if not specified otherwise: seawater with 108 kg/m 3 ) empty and filled and under defined dynamic load (with friction in water) with the aim to determine the safe working load SWL at the upper end of the umbilical. Test of tensile strength: The minimum tensile strength of the elements provided for the tension load of the umbilical is to be determined. Buckling test: The umbilical is to buckle 5000 times with the defined bending radius at one location and in one direction. Subsequently insulation and resistance measurement of the single conductors are to be performed. Torsion test: A part of at least 1 m length is to be loaded vertically with 0,3 SWL and to be twisted by 90 for 5 minutes. After the test no remarkable lengthening or twist shall be noticeable. Subsequently electrical lines are subjected to a resistance measurement, hose lines to a tightness test under working pressure. Stretch loading test: A part of at least 1,5 m length is to be fixed at the ends and a pretension in longitudinal direction will be brought up. The size of the pretension is to be agreed with GL. For 5 cycles the size of the pretension will be increased by 5 times and lowered again. Subsequently electrical lines are subjected to a resistance measurement, hose lines to a tightness test under working pressure. External pressure test: In general the umbilical is to be subjected to a cyclic hydraulic pressure test with times the nominal pressure of the umbilical P N. For big water depths the test pressure is to be agreed with GL. Attention is to be paid to the fact, that for the use of hose lines the internal pressure is not below the diving pressure, as far as possible. Tightness test of the complete umbilical type: All hose assemblies are to be subjected at the same time to the maximum allowable working pressure and an eventual loss of pressure because of leakage is to be checked. A maximum allowable leakage rate of 1 % pressure loss within 4 hours is acceptable for the different hose lines. If gases with a content by volume greater 5 % oxygen shall be transported, all materials coming into contact with oxygen are to be checked for their oxygen suitability (e.g. according to EN 559). For allowable working pressures of more than 5 bar an oxygen pressure surge test is to be performed (e.g. according to EN ). In an actual case of application, depending on mission duty and operational conditions it will be decided by GL if all defined tests are to be performed. If required, the specified liquid and gas volume which can be put through is to be checked (if need be with projection to the effective length of the umbilical).

103 Chapter 3 Page E 6 Annex E E Basic Requirements for Umbilicals I - Part 5. Electrical/electronic requirements Principally the electric and electronic characteristics specified for the project are to be proven e.g. by a type test according to IEC The type test contains the following steps: Each single cable has to meet the requirements according to B.3.3. The cross - watertightness of the umbilical is to be proven within the external pressure test according to.1. The measurements of the insulation according to B.3.3 are to be performed before or after the test of cross - watertightness. Impedance and/or capacity tests are to be performed depending on voltage and duty of mission in agreement with GL. evaluation of voltage insulation strength according to Table E.1 check of compliance with the specifications for insulation, capacity and eventually impedance check of transfer of the specified data volume/time unit (If data cables are tracked together with cables for voltage supply within the umbilical, the check of data transfer is to be done with active nominal voltage. Voltage peaks by e.g. switching actions are to be considered.) 3. Routine test 3.1 Mechanical requirements Within the series production the routine test contains the following test steps: visual check check of dimensions external pressure test: In general the umbilical is to be subjected to a hydraulic pressure test with 1,5 times the nominal pressure of the umbilical P N (cyclic according to the GL Rules for Manned Submersibles (I-5-), Section 11, Fig. 11.). Attention is to be paid to the fact, that for the use of hose assemblies the internal pressure is not below the diving pressure. pressure and tightness test of the complete finally assembled umbilical including end fittings: All hose lines are to be subjected to 1,5 times (metallic hose lines) resp. times (non-metallic hose lines) the maximum allowable working pressure at the same time using the original media (as far as possible) and an eventual pressure decrease because of leakage is to be checked. The cleanliness of the hose lines is to be checked. 3. Electric/electronic requirements Within the series production the routine test contains the following test steps: Each single cable has to meet the requirements according to B.3.4. covering failure test, if applicable Measurements of the insulation according to B.3.4 are to be performed before and after the test of cross water tightness within the external pressure test according to 3.1. evaluation of voltage insulation strength according to Table E.1 in agreement with GL check of faultless transfer of the specified data volume/time unit by the data cables E. Marking 1. Marking of umbilicals A durable marking fixed at the upper end of the umbilical shall contain the following data: name of manufacturer year of construction and serial number safe working load of the umbilical SWL [t] total length [m] overall diameter [mm] minimum bending radius [m] maximum allowable internal working pressure of hose lines [bar] allowable external pressure of the umbilical P N [bar] data about cables for transmission of electric power (maximum voltage and amperage) data concerning communication/data transfer Further on the umbilical is to be marked with a longitudinal marking for torsion control as well as with longitudinal markings every 100 m and at the first and last 100 m every 10 m. Placed markings shall not contain elements which may create corrosion damages.. Marking of hose assemblies The marking on hose assemblies shall contain the following data: name of manufacturer year of construction and serial number outside and internal diameter [mm] maximum allowable working pressure of the hose line [bar] media of the different hose lines

104 I - Part 5 Annex E E Basic Requirements for Umbilicals Chapter 3 Page E 7 The different hose assemblies of the umbilical are to be repeatedly marked at suitable distance to easily recognize duty and medium. 3. Marking of cables name of manufacturer year of construction and serial number maximum voltage [V] maximum amperage [A] cross section of the single conductors [mm ] It is recommended to mark the different electrical wires with different colours. The cables are to be repeatedly marked at suitable distance.

105

Rules for Classification and Construction Additional Rules and Guidelines 3 Machinery Installations

Rules for Classification and Construction Additional Rules and Guidelines 3 Machinery Installations VI Rules for Classification and Construction Additional Rules and Guidelines 3 Machinery Installations 5 Guidelines for Design, Equipment and Testing of Gas Welding Installations on Seagoing Ships Edition

More information

Part 0 - Classification and Surveys Classification and Surveys I-0 2016-01

Part 0 - Classification and Surveys Classification and Surveys I-0 2016-01 Code Edition I - Ship Technology Part 0 - Classification and Surveys Classification and Surveys I-0 2016-01 Part 1 - Seagoing Ships Chapter 1 - Hull Structures I-1-1 2016-01 Chapter 1 - Hull Structures

More information

Rules for Classification and Construction Ship Technology

Rules for Classification and Construction Ship Technology I Rules for Classification and Construction Ship Technology 1 Seagoing Ships 19 Guidelines for the Carriage of Refrigerated Containers on Board Ships Edition 2003 The following Guidelines come into force

More information

Rules for Classification and Construction Additional Rules and Guidelines

Rules for Classification and Construction Additional Rules and Guidelines VI Rules for Classification and Construction Additional Rules and Guidelines 5 Pumps 1 Guidelines for the Design, Construction and Testing of Pumps Edition 2007 The following Guidelines come into force

More information

CLASSIFICATION NOTES

CLASSIFICATION NOTES CLASSIFICATION NOTES Type Approval, Installation and Testing of Water Level Detectors on Bulk Carriers and Single Hold Cargo Ships other than Bulk Carriers General Information This edition of the classification

More information

Rules for Classification and Construction Additional Rules and Guidelines

Rules for Classification and Construction Additional Rules and Guidelines VI Rules for Classification and Construction Additional Rules and Guidelines 7 Guidelines for the Performance of Type Approvals 6 Test Requirements for Electrical Machinery Edition 1999 The following Guidelines

More information

2.22 - Lifting Appliances

2.22 - Lifting Appliances Standards d for Certification 2.22 - Lifting Appliances Ole-Henrik Andressen and Åge Mikkelsen 29th of April 2009 Rules for Certification of Lifting Appliances 1994 Standard dadfor Certification Cet cato

More information

VdS 2100-09en. VdS Guidelines for water extinguishing systems. Non-return valves. Requirements and test methods. VdS 2100-09en : 2011-05 (01)

VdS 2100-09en. VdS Guidelines for water extinguishing systems. Non-return valves. Requirements and test methods. VdS 2100-09en : 2011-05 (01) VdS Guidelines for water extinguishing systems VdS 2100-09en Requirements and test methods VdS 2100-09en : 2011-05 (01) Publishing house: VdS Schadenverhütung GmbH Amsterdamer Str. 172-174 50735 Köln,

More information

A.1 Obligations and reporting of the gaining Society. Plans to be Submitted by the Owner to the Gaining Society

A.1 Obligations and reporting of the gaining Society. Plans to be Submitted by the Owner to the Gaining Society (Rev.0 July 2009) (Rev.1 June 2012) (Rev.2 Oct 2013) (Rev.3 Jan 2015) (Rev.4 July 2015) (Rev.5 Jan 2016) Procedure for Transfer of Class TABLE OF CONTENTS Procedure for Transfer of Class Application Definitions

More information

Rules for Classification and Construction Ship Technology

Rules for Classification and Construction Ship Technology I Rules for Classification and Construction Ship Technology 1 Seagoing Ships 15 Dynamic Positioning Systems Edition 2013 The following Rules come into force on 1 August 2013. Alterations to the preceding

More information

INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES. Interpretations of the FTP

INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES. Interpretations of the FTP INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES Interpretations of the FTP CONTENTS FTP1 Adhesives used in A or B class divisions (FTP Code 3.1, Res A.754 para. 3.2.3) June 2000 FTP2 Pipe and duct

More information

TYPE APPROVAL CERTIFICATION SCHEME MASS PRODUCED DIESEL ENGINES

TYPE APPROVAL CERTIFICATION SCHEME MASS PRODUCED DIESEL ENGINES 1. Introduction TYPE APPROVAL CERTIFICATION SCHEME MASS PRODUCED DIESEL ENGINES 1.1 This scheme details the tests and inspection of diesel engines manufactured by mass production system for use in marine

More information

GUIDELINES FOR FLOODING DETECTION SYSTEMS ON PASSENGER SHIPS

GUIDELINES FOR FLOODING DETECTION SYSTEMS ON PASSENGER SHIPS INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7735 7611 Fax: 020 7587 3210 IMO E Ref. T1/2.04 MSC.1/Circ.1291 9 December 2008 GUIDELINES FOR FLOODING DETECTION SYSTEMS

More information

Unified requirements for systems with voltages above 1 kv up to 15 kv

Unified requirements for systems with voltages above 1 kv up to 15 kv (1991) (Rev.1 May 2001) (Rev.2 July 2003) (Rev.3 Feb 2015) Unified requirements for systems with voltages above 1 kv up to 15 kv 1. General 1.1 Field of application The following requirements apply to

More information

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION Fire Pump Plan Review 2009 International Fire Code and NFPA 20 Date of Review / / BLD201 - Project Address: Project Name: Contractor s Business

More information

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional

More information

METHOD OF STATEMENT FOR STATIC LOADING TEST

METHOD OF STATEMENT FOR STATIC LOADING TEST Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents

More information

REVISED GUIDELINES FOR THE PREPARATION OF THE CARGO SECURING MANUAL

REVISED GUIDELINES FOR THE PREPARATION OF THE CARGO SECURING MANUAL E 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: +44 (0)20 7735 7611 Fax: +44 (0)20 7587 3210 REVISED GUIDELINES FOR THE PREPARATION OF THE CARGO SECURING MANUAL MSC.1/Circ.1353/Rev.1 15 December 2014 1

More information

Rules for Classification and Construction Ship Technology

Rules for Classification and Construction Ship Technology I Rules for Classification and Construction Ship Technology 1 Seagoing Ships 17 Guidelines for Machinery Condition Monitoring Edition 2008 The following Guidelines come into force on February 15 th, 2008

More information

Rules for Classification and Construction Additional Rules and Guidelines

Rules for Classification and Construction Additional Rules and Guidelines VI Rules for Classification and Construction Additional Rules and Guidelines 7 Guidelines for the Performance of Type Approvals 4 Test Requirements for Sealing Systems of Bulkhead and Deck Penetrations

More information

Wire Damage on Ships Cranes

Wire Damage on Ships Cranes 13.12.2005 Wire Damage on Ships Cranes (Capt. Dipl.-Ing. U. Kreitz,) On board sea-going vessels, rotation-resistant wire ropes with compacted strands are preferable for use in respect to ships cranes with

More information

TECHNICAL SPECIFICATION FOR PROJECTION WELDING MACHINE (Qty. 2 Nos.)

TECHNICAL SPECIFICATION FOR PROJECTION WELDING MACHINE (Qty. 2 Nos.) TECHNICAL SPECIFICATION FOR PROJECTION WELDING MACHINE (Qty. 2 Nos.) 1. Requirement: Two (02) Nos. DC Type, 3 phase, 3 wire Projection Welding Machine is required for welding of ventilation M.S. / Stainless

More information

ENGLISH FORK GUIDE 2013

ENGLISH FORK GUIDE 2013 FORK GUIDE 2013 ENGLISH 1 With a brand which is synonymous with specialists in forest products handling attachments, BOLZONI AURAMO offers its expertise and market leading attachments for all requirements,

More information

TECHNICAL INFORMATION

TECHNICAL INFORMATION Page: 1/6 This checklist recognizes the major accident hazards found by experience of previous HAZID studies. It is not intended to be totally exhaustive and feedback from users should be incorporated

More information

MEASURES TO PREVENT ACCIDENTS WITH LIFEBOATS

MEASURES TO PREVENT ACCIDENTS WITH LIFEBOATS INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7587 3152 Fax: 020 7587 3210 IMO E Ref. T4/4.01 MSC.1/Circ.1206 26 May 2006 MEASURES TO PREVENT ACCIDENTS WITH LIFEBOATS

More information

Trends in the Development of Container Vessels

Trends in the Development of Container Vessels Trends in the Development of Container Vessels Presentation at NTU Athens 2005-05-25 Contents Technological Development of Container Vessels The current size limits and future prospects The 9200TEU Post-Panamax

More information

Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone: 0041 22 77 66 051 [email protected]

Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone: 0041 22 77 66 051 info@cardok.com CARDOK CARLIFT Fast access to underground garages Fast, Silent, Discreet, Design, High-Tech Installation to replace an access ramp on private property Dimensions: (Built to measure, all dimensions can

More information

Rules for Classification and Construction Materials and Welding

Rules for Classification and Construction Materials and Welding II Rules for Classification and Construction Materials and Welding 3 Welding 1 General Requirements, Proof of Qualifications, Approvals Edition 2000 The following Rules come into force on July 1 st, 2000

More information

ATLAS SeaFox Mk II ROV for Identification and Mine Disposal

ATLAS SeaFox Mk II ROV for Identification and Mine Disposal ATLAS SeaFox Mk II ROV for Identification and Mine Disposal SeaFox Mine Warfare System ATLAS ELEKTRONIK A joint company of ThyssenKrupp and EADS SeaFox Mine Disposal System Short mission time (typ. < 15

More information

1x90 TONS TENSIONERS TECHNICAL PROPOSAL. 1 X 90 Tons 30 m/min Tensioners TECHNICAL PROPOSAL JOB 08/059. 0 19/02/2008 Basic proposal PP GM SB

1x90 TONS TENSIONERS TECHNICAL PROPOSAL. 1 X 90 Tons 30 m/min Tensioners TECHNICAL PROPOSAL JOB 08/059. 0 19/02/2008 Basic proposal PP GM SB Pagina N.: 1 of 19 1 X 90 Tons 30 m/min Tensioners JOB 08/059 0 19/02/2008 Basic proposal PP GM SB Rev N Date Issue Description Prepared by Checked by Approved by Pagina N.: 2 of 19 TABLE OF CONTENTS:

More information

TARIFF CODE and updates standard

TARIFF CODE and updates standard TARIFF CODE and updates standard No HS CODE AHTN CODE PRODUCT DESCRIPTION PRODUCT TYPE STANDARDS IDENTIFIED 7207 Semi finished products of iron or non alloy steel Containing by weight less than 0.25% of

More information

EXPANDED POLYSTYRENE (EPS) INSULATION BOARD SPECIFICATIONS

EXPANDED POLYSTYRENE (EPS) INSULATION BOARD SPECIFICATIONS EXPANDED POLYSTYRENE (EPS) INSULATION BOARD SPECIFICATIONS 1. SCOPE 1.1 This specification covers the type, physical properties and dimensions of Expanded Polystyrene Insulation Board intended for use

More information

REQUIREMENTS FOR REGISTRATION AS A PROFESSIONAL ENGINEER WITH THE PROFESSIONAL ENGINEERS BOARD SINGAPORE

REQUIREMENTS FOR REGISTRATION AS A PROFESSIONAL ENGINEER WITH THE PROFESSIONAL ENGINEERS BOARD SINGAPORE ATTACHMENT 9 REQUIREMENTS FOR REGISTRATION AS A PROFESSIONAL ENGINEER WITH THE PROFESSIONAL ENGINEERS BOARD SINGAPORE Requirements 1 The Professional Engineers Board will register a candidate as a professional

More information

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS Page 1 of 9 SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS 1. GENERAL REQUIREMENTS 1. Description of Work: This work consists of furnishing all materials, equipment and

More information

TYPE TESTING PROCEDURE FOR CRANKCASE EXPLOSION RELIEF VALVES

TYPE TESTING PROCEDURE FOR CRANKCASE EXPLOSION RELIEF VALVES TYPE TESTING PROCEDURE FOR CRANKCASE EXPLOSION RELIEF VALVES 2015 This latest edition incorporates all rule changes. The latest revisions are shown with a vertical line. The section title is framed if

More information

Dry-type transformers. Dry-type transformers from ABB The ideal solution for the oil and gas industry

Dry-type transformers. Dry-type transformers from ABB The ideal solution for the oil and gas industry Dry-type transformers Dry-type transformers from ABB The ideal solution for the oil and gas industry 2 Dry-type transformers for the oil and gas industry ABB s products and solutions for the oil and gas

More information

GAS FLAWLESS - FORM C

GAS FLAWLESS - FORM C DESCRIPTION OF THE VESSEL 1. GENERAL 1.1 Builder and Yard HIGAKI S/Y Hull No. H/N 595 1.2 Year built 2007 1.3 Flag MALTA 1.4 Signal Letters and Normal Station Watched 9HVB8 1.5 Classification Lloyds 1.6

More information

10 TON HYDRAULIC PRESS

10 TON HYDRAULIC PRESS 10 TON HYDRAULIC PRESS Model Nos. CSA10F and CSA10B OPERATING & MAINTENANCE INSTRUCTIONS 0200 SPARE PARTS and SERVICING Please contact your nearest dealer, or CLARKE International, on one of the following

More information

Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since.

Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since. Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since. Liftech is the structural review engineer of record for most

More information

TRANSPORT OF DANGEROUS GOODS

TRANSPORT OF DANGEROUS GOODS Recommendations on the TRANSPORT OF DANGEROUS GOODS Manual of Tests and Criteria Fifth revised edition Amendment 1 UNITED NATIONS SECTION 38 38.3 Amend to read as follows: "38.3 Lithium metal and lithium

More information

Why a torque measuring system?

Why a torque measuring system? T-Sense P R O D U C T B U L L E T I N 660 Optical Torque Measuring Systems Introduction The use of a T-Sense torque measuring system means efficiency improvement, overload protection and prevention of

More information

Electrical Shore Connections / Cold Ironing

Electrical Shore Connections / Cold Ironing STANDARD FOR CERTIFICATION No. 2.25 Electrical Shore Connections / Cold Ironing JULY 2014 The electronic pdf version of this document found through http://www.dnv.com is the officially binding version

More information

ALTERNATIVE METHODS FOR INTERNAL ARC TESTS ON 12 KV AND 24 KV METAL-ENCLOSED SWITCHGEARS WITH COMPACT RMU

ALTERNATIVE METHODS FOR INTERNAL ARC TESTS ON 12 KV AND 24 KV METAL-ENCLOSED SWITCHGEARS WITH COMPACT RMU ALTERNATIVE METHODS FOR INTERNAL ARC TESTS ON 12 KV AND 24 KV METAL-ENCLOSED SWITCHGEARS WITH COMPACT RMU George CURCANU, Constantin ILINCA, Ilie SBORA ICMET Craiova, Romania, Calea Bucuresti 144, phone:

More information

Fire Pump Plan Review March 2010

Fire Pump Plan Review March 2010 Fire Pump Plan Review March 2010 Date of Review: / / Permit Number: Business/Building Name: Address of Project: Designer Name: Designer s Phone: Contractor: Contractor s Phone: Occupancy Classification:

More information

SUSPENSION AND STEERING OVERVIEW

SUSPENSION AND STEERING OVERVIEW SUSPENSION SUSPENSION AND STEERING OVERVIEW The S40/V50 has a wide track and a long wheelbase for its relative size and weight. This gives the car stable and predictable driving characteristics. It also

More information

FIRE ALARM AND DETECTION SYSTEMS SECTION 16721

FIRE ALARM AND DETECTION SYSTEMS SECTION 16721 PART 1 - GENERAL 1.01 WORK INCLUDED FIRE ALARM AND DETECTION SYSTEMS SECTION 16721 A. Provide a complete fully addressable, power limited, fire detection and evacuation system. The system shall be connected

More information

2001/069. Decks, stairways,gangways and their associated handrails OFFSHORE TECHNOLOGY REPORT HSE

2001/069. Decks, stairways,gangways and their associated handrails OFFSHORE TECHNOLOGY REPORT HSE HSE Health & Safety Executive Decks, stairways,gangways and their associated handrails Prepared by Bomel Ltd for the Health and Safety Executive OFFSHORE TECHNOLOGY REPORT 2001/069 HSE Health & Safety

More information

Automatic Fire Fighting Monitors

Automatic Fire Fighting Monitors Automatic Fire Fighting Monitors Fire Protection Solutions Automatic Fire Fighting Monitors Foreword Automatic monitors are devices used to deliver large amounts of water or water/foam solution to remote

More information

SEISMIC VELOCITY TRANSDUCER T1-40

SEISMIC VELOCITY TRANSDUCER T1-40 SEISMIC VELOCITY TRANSDUCER T1-40 Measurement of Omnidirectional Absolute Vibrations Certified according to ATEX 94/9/CE directive OPERATION Transducer T1-40 serves for seismic measurement of the absolute

More information

Precision Miniature Load Cell. Models 8431, 8432 with Overload Protection

Precision Miniature Load Cell. Models 8431, 8432 with Overload Protection w Technical Product Information Precision Miniature Load Cell with Overload Protection 1. Introduction The load cells in the model 8431 and 8432 series are primarily designed for the measurement of force

More information

HIGHLY SOPHISTICATED MONITORING

HIGHLY SOPHISTICATED MONITORING PERFECTLY PROTECTED HIGHLY SOPHISTICATED MONITORING Yachts are masterpieces of design and technology with thousands of functions providing the highest level of comfort. Besecke s automation and circuitry

More information

SECTION 16720 - FIRE AND SMOKE ALARM SYSTEM. City of San Diego, CWP Guidelines

SECTION 16720 - FIRE AND SMOKE ALARM SYSTEM. City of San Diego, CWP Guidelines PART 1 -- GENERAL 1.1 WORK OF THIS SECTION SECTION 16720 - City of San Diego, CWP Guidelines A. The WORK of this Section includes providing manual and automatic fire alarm and smoke detection systems meeting

More information

North American Stainless

North American Stainless North American Stainless Long Products Stainless Steel Grade Sheet 2205 UNS S2205 EN 1.4462 2304 UNS S2304 EN 1.4362 INTRODUCTION Types 2205 and 2304 are duplex stainless steel grades with a microstructure,

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD IEC 61892-7 INTERNATIONAL STANDARD Edition 2.0 2007-11 Mobile and fixed offshore units Electrical installations Part 7: Hazardous areas INTERNATIONAL ELECTROTECHNICAL COMMISSION PRICE CODE XA ICS 47.020.60

More information

3.1.1 Full Type Tests & Routine Tests according to Clause 8 2 & 8 3. 4.0 Instructions For Installation, Operation & Maintenance

3.1.1 Full Type Tests & Routine Tests according to Clause 8 2 & 8 3. 4.0 Instructions For Installation, Operation & Maintenance SPECIFICATION FOR LOW VOLTAGE SWITCHBOARD SEN I N D E X Description 10 STANDARD TECHNICAL REQUIREMENTS 11 Standards 12 General Operating Conditions 13 General Description Of Switchboard 131 Structure 132

More information

Specification Guide. for RVAC. Direct Replacement. AC Medium Voltage. Circuit Breakers

Specification Guide. for RVAC. Direct Replacement. AC Medium Voltage. Circuit Breakers Specification Guide for RVAC Direct Replacement AC Medium Voltage Circuit Breakers Table of Contents 1.0 General Work Scope...3 2.0 Standards...3 3.0 Supplier Qualifications...4 4.0 Circuit Breaker Element

More information

Subminiature Load Cell Model 8417

Subminiature Load Cell Model 8417 w Technical Product Information Subminiature Load Cell 1. Introduction... 2 2. Preparing for use... 2 2.1 Unpacking... 2 2.2 Using the instrument for the first time... 2 2.3 Grounding and potential connection...

More information

Low Voltage Switchboards The Best Technical Solution for Your Ship

Low Voltage Switchboards The Best Technical Solution for Your Ship The Best Technical Solution for Your Ship Wärtsilä SAM Electronics Optimal Power Distribution The uninterrupted supply of power to systems and consumers onboard modern ships is an extremly important matter.

More information

Basic Hydraulics and Pneumatics

Basic Hydraulics and Pneumatics Basic Hydraulics and Pneumatics Module 1: Introduction to Pneumatics PREPARED BY IAT Curriculum Unit March 2011 Institute of Applied Technology, 2011 ATM 1122 Basic Hydraulics and Pneumatics Module 1:

More information

CFD Modelling and Real-time testing of the Wave Surface Glider (WSG) Robot

CFD Modelling and Real-time testing of the Wave Surface Glider (WSG) Robot 21st International Congress on Modelling and Simulation, Gold Coast, Australia, 29 Nov to 4 Dec 2015 www.mssanz.org.au/modsim2015 CFD Modelling and Real-time testing of the Wave Surface Glider (WSG) Robot

More information

Canadian Technology Accreditation Criteria (CTAC) INDUSTRIAL ENGINEERING TECHNOLOGY - TECHNOLOGIST Technology Accreditation Canada (TAC)

Canadian Technology Accreditation Criteria (CTAC) INDUSTRIAL ENGINEERING TECHNOLOGY - TECHNOLOGIST Technology Accreditation Canada (TAC) Canadian Technology Accreditation Criteria (CTAC) INDUSTRIAL ENGINEERING TECHNOLOGY - TECHNOLOGIST Technology Accreditation Canada (TAC) Preamble These CTAC are applicable to programs having titles involving

More information

Regulation of 15 September 1992 No. 704 concerning operating arrangements on Norwegian ships

Regulation of 15 September 1992 No. 704 concerning operating arrangements on Norwegian ships Regulation of 5 September 992 No. 704 concerning operating arrangements on Norwegian ships Laid down by the Norwegian Maritime Directorate on 5 September 992 pursuant to the Act of 9 June 903 no. 7 relating

More information

ROLLED STAINLESS STEEL PLATES, SECTIONS AND BARS

ROLLED STAINLESS STEEL PLATES, SECTIONS AND BARS STANDARD FOR CERTIFICATION No. 2.9 ROLLED STAINLESS STEEL PLATES, SECTIONS AND BARS OCTOBER 2008 Veritasveien 1, NO-1322 Høvik, Norway Tel.: +47 67 57 99 00 Fax: +47 67 57 99 11 FOREWORD (DNV) is an autonomous

More information

Rules for Classification and Construction Ship Technology

Rules for Classification and Construction Ship Technology I Rules for Classification and Construction Ship Technology 2 Inland Navigation Vessels 1 Classification and Surveys Amended 2016-01: Section 3 of these rules is not applicable for Inland Navigation Vessels

More information

SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)

SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC) APPLICATIONS Process Industry Weak Acids Alkalies Compressed Air Pulp & Paper MODELS ASM - Flanged Connection OPTIONS Control Rods Oil & Gas Water & Waste Pump suction & discharge Sea water Chemical lines

More information

FVSU-33201301 REPAIR & UPGRADE FIBER OPTIC 280000-1 SECTION 280000 FIRE ALARM SYSTEM CONNECTIVITY

FVSU-33201301 REPAIR & UPGRADE FIBER OPTIC 280000-1 SECTION 280000 FIRE ALARM SYSTEM CONNECTIVITY FVSU-33201301 REPAIR & UPGRADE FIBER OPTIC 280000-1 SECTION 280000 FIRE ALARM SYSTEM CONNECTIVITY PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Fire-alarm control unit. 2. Addressable interface

More information

Fuel Treatment and Conditioning Systems

Fuel Treatment and Conditioning Systems RULES FOR CLASSIFICATION OF Ships PART 6 CHAPTER 14 NEWBUILDINGS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS Fuel Treatment and Conditioning Systems JULY 2006 This chapter has been amended since the

More information

ATS Overhead Table Shelf System INSTRUCTION MANUAL

ATS Overhead Table Shelf System INSTRUCTION MANUAL ATS Overhead Table Shelf System INSTRUCTION MANUAL ATS Overhead Table Shelf System Instruction Manual Warranty Newport Corporation warrants this product to be free of defects in material and workmanship

More information

Competency Framework for Marine Engineer Class 6. Competency Framework for Marine Engineer Class 6

Competency Framework for Marine Engineer Class 6. Competency Framework for Marine Engineer Class 6 Table of Contents (MEC 6)... 1 Function: Operate Vessel Machinery and Systems... 1 Diesel engines.... 1 Operational procedures.... 3 Operate and monitor a vessel s engines and auxiliary equipment.... 4

More information

LS1024B / LS2024B/ LS3024B. Solar Charge Controller USER MANUAL

LS1024B / LS2024B/ LS3024B. Solar Charge Controller USER MANUAL EPSOLAR LS1024B / LS2024B/ LS3024B Solar Charge Controller USER MANUAL Thank you very much for selecting our product! This manual offers important information and suggestions with respect to installation,

More information

CONTRACT SPECIFICATIONS - SEISMIC ISOLATION BEARINGS

CONTRACT SPECIFICATIONS - SEISMIC ISOLATION BEARINGS CONTRACT SPECIFICATIONS - SEISMIC ISOLATION BEARINGS 1.0 DESIGN 1.1 Scope of Work 1.1.1 This work shall consist of furnishing Isolation Bearings and installing Isolation Bearing Assemblies at the locations

More information

SITEMA PowerStroke. Technical Information TI-P11. 1 Function. 2 Applications. Mould Closing Devices series FSK. Contents

SITEMA PowerStroke. Technical Information TI-P11. 1 Function. 2 Applications. Mould Closing Devices series FSK. Contents English translation of German original Technical Information TI-P11 SITEMA PowerStroke Mould Closing Devices series FS drive system for powerful forces on a short stroke hydraulic actuation closing force

More information

39HQ Airovision Air Handling Units

39HQ Airovision Air Handling Units 39HQ Airovision Air Handling Units Mounting instructions CONTENTS 1 - TRANSPORT AND LIFTING INSTRUCTIONS... 3 1.1 - General... 3 1.2 - Transport and storage... 3 1.3 - Roof edge protection during transport

More information

UN Manual of Tests and Criteria, Sub-section 38.3, Amendments to the 5 th edition, effective 2014 January 1 st

UN Manual of Tests and Criteria, Sub-section 38.3, Amendments to the 5 th edition, effective 2014 January 1 st 1 UN Manual of Tests and Criteria, Sub-section 38.3, Amendments to the 5 th edition, effective 2014 January 1 st 38.3 Lithium metal and lithium ion batteries 38.3.1 Purpose This section presents the procedures

More information

Why and How we Use Capacity Control

Why and How we Use Capacity Control Why and How we Use Capacity Control On refrigeration and air conditioning applications where the load may vary over a wide range, due to lighting, occupancy, product loading, ambient weather variations,

More information

ANNEX 5 RESOLUTION MEPC.127(53) Adopted on 22 July 2005 GUIDELINES FOR BALLAST WATER MANAGEMENT AND DEVELOPMENT OF BALLAST WATER MANAGEMENT PLANS (G4)

ANNEX 5 RESOLUTION MEPC.127(53) Adopted on 22 July 2005 GUIDELINES FOR BALLAST WATER MANAGEMENT AND DEVELOPMENT OF BALLAST WATER MANAGEMENT PLANS (G4) RESOLUTION MEPC.127(53) Adopted on 22 July 2005 GUIDELINES FOR BALLAST WATER MANAGEMENT AND DEVELOPMENT OF BALLAST WATER MANAGEMENT PLANS (G4) THE MARINE ENVIRONMENT PROTECTION COMMITTEE, RECALLING Article

More information

Mechanical Installation

Mechanical Installation Page -1-1. INTRODUCTION AND PURPOSE 1.1. This specification covers the installation, testing and precommissioning of mechanical equipment. Work is to be performed in conjunction with the manufacturer s

More information

SPREFIX SPRAY INSULATION _ in the marine market.

SPREFIX SPRAY INSULATION _ in the marine market. SPREFIX SPRAY INSULATION _ in the marine market. A self-adhesive glass or stone wool, sprayed directly onto surface.. Easily applied to wood, steel, plastic or other surfaces without any mechanical fasteners

More information

Embedded Parts Introduction - Anchors

Embedded Parts Introduction - Anchors In the plant construction or process plants such as chemical, petrochemical, gas or power plants various disciplines are brought into contact and built on each other. Civil, mechanical, electro technical

More information

PHYS 101-4M, Fall 2005 Exam #3. MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question.

PHYS 101-4M, Fall 2005 Exam #3. MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question. PHYS 101-4M, Fall 2005 Exam #3 Name MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question. 1) A bicycle wheel rotates uniformly through 2.0 revolutions in

More information

NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE

NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE GENERAL a. These specifications may be used in whole or in part by any party without

More information

THEME Competence Matrix - Electrical Engineering/Electronics with Partial competences/ Learning outcomes

THEME Competence Matrix - Electrical Engineering/Electronics with Partial competences/ Learning outcomes COMPETENCE AREAS STEPS OF COMPETENCE DEVELOPMENT 1. Preparing, planning, mounting and installing electrical for buildings and industrial applications He/She is able to prepare and carry out simple electrical

More information

USNS Maury (T-AGS 66) Moon Pool Launch & Recovery System (MLARS)

USNS Maury (T-AGS 66) Moon Pool Launch & Recovery System (MLARS) USNS Maury (T-AGS 66) Moon Pool Launch & Recovery System (MLARS) Mr. Willis Proper Assistant Program Manager PEO Ships (PMS325) 17 May 2016 Mr. Scott CR Henry Concept Design Manager CSRA, LLC Operating

More information

GK Packing System Welding Instructions

GK Packing System Welding Instructions GK Packing System Welding Instructions Roxtec GmbH Neuer Höltigbaum 1-3, 22143 Hamburg GERMANY Tel +49 (040) 657398-0, Fax +49 (040) 657398-50 EMAIL [email protected], www.roxtec.de Welding instructions

More information

Safety of Life at Sea, 1974 (SOLAS)

Safety of Life at Sea, 1974 (SOLAS) Safety of Life at Sea, 1974 (SOLAS) Prof. Manuel Ventura Ship Design I MSc in Marine Engineering and Naval Architecture Chap. III. Lifesaving Appliances and Arrangements 1 Cargo Ships Cargo Ships - Case

More information

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 CERTIFICATE NAME OF PRODUCT No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 H-CONTROL REFLEX+ reflective insulating vapour control layer for roof and wall applications MANUFACTURER ACTIS

More information

SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word

More information

Ergo-Pro Single Line Solar Station Installation and Operating Instructions

Ergo-Pro Single Line Solar Station Installation and Operating Instructions Rp 3/4 Ergo-Pro Single Line Solar Station Installation and Operating Instructions Item No Pump type 677.21.70 WILO ST 15/6 13 2 4 11 Technical Specifications Max. operating pressure: 6 bar Max. operating

More information

Rotary vane steering gear for smaller vessels

Rotary vane steering gear for smaller vessels Steering gear Rotary vane steering gear for smaller vessels The SR series is designed with integrated frequency controlled pumps. General description Rolls-Royce supplies a complete range of steering gear,

More information

COMDTPUB P16721 NVIC 20-14 August 25, 2014. Subj: GUIDELINES FOR QUALIFICATION FOR HIGH-SPEED CRAFT TYPE-RATING ENDORSEMENTS

COMDTPUB P16721 NVIC 20-14 August 25, 2014. Subj: GUIDELINES FOR QUALIFICATION FOR HIGH-SPEED CRAFT TYPE-RATING ENDORSEMENTS Commandant United States Coast Guard 2703 Martin Luther King Jr. Ave. SE Washington, DC 20593-7501 Staff Symbol: CG-CVC-4 Phone: (202) 372-2357 E-Mail: [email protected] NAVIGATION AND VESSEL INSPECTION

More information

Lithium Ion Battery Specifications

Lithium Ion Battery Specifications Lithium Ion Battery Specifications Type: Cylindrical Lithium Iron Phosphate Battery Mode: LFP-26650-3300 AA Portable Power Corp. Prepared by Checked by Approved by 1 . Product Specifications Type ------------

More information

SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM

SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Packaged rooftop air conditioning unit (5 tons and smaller). 2. Roof curb. 1.2

More information

Specification for Pipe Coating Repairs Offshore

Specification for Pipe Coating Repairs Offshore Specification for Pipe Coating Repairs Offshore Specification for Pipe Coating Repairs Offshore 1 of 6 Table of Contents 1.0 SCOPE... 3 2.0 REFERENCE DOCUMENTS... 3 3.0 MATERIALS... 3 4.0 EQUIPMENT AND

More information

ABB i-bus EIB / KNX Analogue Input AE/S 4.2

ABB i-bus EIB / KNX Analogue Input AE/S 4.2 Product Manual ABB i-bus EIB / KNX Analogue Input AE/S 4.2 Intelligent Installation Systems This manual describes the functionality of Analogue Input AE/S 4.2. Subject to changes and errors excepted. Exclusion

More information

Guidelines for the Acceptance of Manufacturer's Quality Assurance Systems for Welding Consumables

Guidelines for the Acceptance of Manufacturer's Quality Assurance Systems for Welding Consumables (1987) Guidelines for the Acceptance of Manufacturer's Quality Assurance Systems for Welding Consumables 1. General 1.1 Introduction 1.1.1 The present guidelines are to serve as a supplement to the IACS

More information

ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT

ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT Description: This work shall consist of furnishing all materials, equipment and labor necessary for conducting an Osterberg Cell (O-Cell) Load

More information

Specification. Safelift Overhead Travelling Cranes

Specification. Safelift Overhead Travelling Cranes Specification Safelift Overhead Travelling Cranes Safelift overhead travelling cranes are Safelift products, produced by the Rossendale Group, backed by the Safelift Guarantee. GENERAL PRODUCT DESCRIPTION

More information

Jobson THE RIGHT CONTACT

Jobson THE RIGHT CONTACT THE RIGHT CONTACT Jobson Italia srl was set up in 1990. The following services are rendered 365 days a year, 24 hours a day: Stocking and trading of spare parts: Main Engines, auxiliary engines, pumps,

More information

CNG & Hydrogen Tank Safety, R&D, and Testing

CNG & Hydrogen Tank Safety, R&D, and Testing > Powertech Labs Inc. CNG & Hydrogen Tank Safety, R&D, and Testing 012.10.2009 Presented by Joe Wong, P.Eng. PRESENTATION OBJECTIVES Present experience from CNG in-service tank performance. The process

More information