1 MULTI ECHELON SPARE PARTS INVENTORY OPTIMISATION: A SIMULATIVE STUDY Simone Zanoni, Ivan Ferretti and Lucio Zavanella Dipartimento di Ingegneria Meccanica Università degli Studi di Brescia Via Branze 38, Brescia, Italy [email protected] KEYWORDS Inventory, Simulation, Spare parts, Multi Echelon. ABSTRACT The research in this paper is motivated by a real life spare parts networks for complex technical systems in oil refining sector. At the customers the availability of the installed technical systems often is essential for the primary process. Hence, they require a high availability. For improve the management of the spare parts inventory the main company (the customer) has developed a new strategies for pushing down to the supply echelon some inventory so as to increase availability of finished parts or components while the properties is still kept by the supplier until its usage, so as sharing in such a way the inventory costs. In this paper after reviewing the literature on spare parts management the industrial case is discussed and based on it a model with closed queuing network approach will be shown. Due to its analytically difficultness the optimality of the parameters will be addressed via simulative way. INTRODUCTION The importance of service parts management has increased in the past decades. One reason is the fact that system availability and high quality after sales service have become important criteria when selecting suppliers of technically advanced systems. A second reason is the increasing value of service part inventory investment. A survey by Cohen et al. (1997) reports that service parts inventories equal 8.75% of the value of product sales in their sample, being over $23 mln. inventory investment on average. The spare parts are needed to maintain an installed base of technical systems. Examples are aircrafts, locomotives, frigates and computer systems. Service parts are often supplied via a multi-echelon distribution network, i.e. a hierarchical network of stocking locations through which service parts are supplied to the installed base at customer s sites. A reason to have a multi-echelon structure is the need for both local stocks close to the customer s sites in order to achieve fast supply and the need for stock centralisation to reduce holding costs. Cohen et al. (1997) report that three-echelon networks are prevalent in their sample followed by two-echelon systems. Four-echelon networks occur in practice as well. There is a trend however to reduce the number of echelons and the number of locations per echelon in order to reduce fixed warehousing costs and service parts obsolescence costs. All these characteristics cause that service parts management is an increasingly important, yet complex task. A key challenge is to attain high availability of the installed base at low service costs. These service costs include costs for stock holding, warehousing, transportation, service engineers, repair shops and overhead. Literature review In the literature, various ways to deal with finite capacity in service part networks have been discussed. One of these methods is to model the network as a closed queuing network (Jackson network, cf. Gross et al., 1978, 1983). This method provides very good estimations of the steady state probabilities in a closed network with fixed parameters, but the numerical algorithms involved make it difficult to find optimal stock levels for each location and each part type. Another approach is based on Markov processes; see Albright and Soni (1988), Gupta and Albright (1992) and Albright and Gupta (1993). A drawback of this approach is the fact that the number of states may become very large and that existing methods to reduce the model size to acceptable dimensions are rather rough. A similar approach is developed by Avsar and Zijm (2000). They construct an excellent approximation for a two-echelon inventory model, where repair shops can be modelled as open Jackson queuing networks. However, their model considers only item-dedicated repair shops and is difficult to extend to multi-echelon model or model with different types of repair shops, as we consider. Another possibility is to extend the VARI-METRIC method to deal with finite capacity by replacing the M/G/ queuing model for the repair shop by some finite capacity system, cf. Aboud (1996), Diaz and Fu (1997), Kim et al. (2000) and Perlman et al. (2001). They use their method to analyse the impact of finite capacity. Diaz and Fu (1997) show that finite capacity has a serious impact on system performance for a single
2 indenture, two-echelon system with only one central repair shop. They model the repair shop as a GI/G/k multi-class queuing system, where the part flow of one item type is modelled as one class in the queuing system. Although they discuss formulas for multi-server queues, their numerical results refer to single server queues only. In addition, they discuss an alternative method to plug in throughput times as observed in practice in the M/G/ model, so that waiting times are included. This approach is also used in the case study for the Caracas Metro subway system that Diaz and Fu (1997) present. Then the impact of finite capacity is less, but still significant, and as we mentioned already this procedure is not suitable for what-if analyses. From the literature review it is quite clear how the more convenient way to model such spare parts inventory situation, considering also finite capacity repair shops, is the queuing network approach. There is an extensive literature on queuing analysis, see e.g. Kleinrock (1975) and Gross and Harris (1998). Applications are particularly in computer and telecommunication system analysis and the analysis of manufacturing systems, cf. Hall (1991), Papadopolous (1993) and Buzacott and Shanthikumar (1993). PROBLEM DEFINITION The context from which we have taken inspiration for the development of the present research is real practice observed in Italy. In brief the situation concerns the field of the oil refining, and involve three different companies: - Co1: industry of oil refining and distribution, situated in the gulf of Cagliari (Sardegna, Italy); - Co2: supplier of special power plant installations; - Co3: manufacturer of mechanical components, i.e. as particular pump equipment. Recently the company Co1 promote some challenging objective, that in some cases involves also its suppliers. One of this programme is cantered on inventory management optimisation. The company Co1 started to study the possibility of establish a new warehouse for stocking the spare parts that need with certain regularity or with short lead time: the warehouse could be conveniently located in the company Co2, so as it could optimize its production/assembly process located. In the same way company Co2 tried to react with company Co3, establishing there its components warehouse. This is the problem that we will face in the following part of the paper. Problem Formulation A rough representation of the problem described is following reported: MANUFACTURER SUPPLIER CUSTOMER Figures 1: Scheme of the case study We have reduced the system to three actors: customer (Co1), supplier (Co2) and producer (Co3). The productive structure of the customer is subject to breakdowns that happen at a given failure rate. Such breakdowns are repaired with spare parts supplied from a warehouse managed through a particular agreement with the supplier. The latter guarantees to the customer a given service level. The management of the inventory is entrusted to the supplier who controls the levels of supply and avoids the overcoming of specific limits (defined with contract). The components remains of property of the supplier until when it is used, and paid subsequently. Therefore the cost of maintenance to supply is subdivided in the following way: - the financial cost is paid by the supplier; - the physical storage cost is paid by the customer. Such a situation may be also interpreted as a variant of the Consignment Stock inventory management practice. It is obvious that this practice may facilitate remarkably the customer, pull down the inventories with less costs. However it is not difficult to understand that this type of agreement assure in such a way the supplier that benefit of an exclusive contract supply. Moreover also the supplier has the component inventory whose level is guaranteed by a similar relationship to that customersupplier with the manufacturer.
3 Consigment Stock The CS (Consignment Stock) policy is an industrial approach to stock management in the Supply Chain, firstly observed in the automotive field. Its principles and modelling are discussed in Abdel-Malek et al. (2002), Valentini and Zavanella (2003) and Braglia and Zavanella (2003), with reference to deterministic demand and to its extension to a stochastic environment. Let s see more in detail the cost structure under the consignment stock policy. The inventory cost per unit h is driven by two main components: a financial one (h fin ) and storage one (h stock ). Under a typical supply agreement, these costs are borne as indicated in Table 1. Table 1: Inventory costs in traditional agreements Position of Raw Material Supplier Company Relevant Supplier h s,fin + h s,stock 0 costs Company 0 h c,fin + h c,stock It should be noted that h c,fin + h c,stock is generally greater than h s,fin + h s,stock, mainly because of the financial component, which increases as it goes down the supply chain. The different situation brought about by CS is outlined in table 2. Table 2: Inventory costs under CS policy Position of Raw Material Supplier Company Relevant Supplier h s,fin + hs,stock h s,fin costs Company 0 h c,stock As can clearly be seen, the main difference is found in the case where the material has already been delivered to the company. In fact, the company incurs the storage cost, given that the material is located in its warehouse, but it does not yet sustain the financial cost. In fact, given that a good is formally purchased only after its consumption, the supplier is still bearing the financial opportunity cost. Thus, while calculating the total cost for the system, we may reasonably assume that the storage component h stock of the total inventory cost may be considered as more or less identical for the supplier and the company, i.e. h c,stock = h s,stock. As a consequence, referring to the same average stock level, the total storage cost of the system is lower in the CS case (as we assume h c,fin > h s,fin ), even if a part of the cost is shifted onto the supplier. However, the supplier perceives some advantages as counterpart: the average quantity of the material stored in his own inventories decreases and, consequently, space is available to allocate other items; finally, the supplier may manage his production plan more flexibly, as it is not constrained by closed-orders. On the other hand, the company sees a lower inventory cost per unit, that is, only h c,stock instead of the entire (h c,fin + h c,stock ). MODEL DESCRITPION In this section we introduce our model. Firstly, we present the assumptions and notations used in the model. Secondly, we describe the model for the evaluation of a stocking policy and lastly, we formulate the optimization problem. Assumptions and notations We model the situation of the three independent companies. In particular we take into account the situation in which both the supplier and the customer keep spare parts on stock for the customer technical systems. We will consider a single type of spare parts type. These systems installed in the customer facility in number N are subject to failures. Failures occur according to Poisson processes with constant rates f. Each time that a failure occur to one of the systems the customer maintenance staff is devoted to completely replace the system with a new one: if the system is available in the customer MRO inventory it could be replaced with a small lead time ( m) otherwise it should be ordered to the supplier and it additionally requires a certain transportation lead times ( t1). Moreover if the system is not available at the supplier finished product inventory an additionally assembly lead time is needed ( p). It has to be noticed that with a stochastic probability the system may be repaired, but this operation it has been performed only by the supplier. So as some percentage of the fault system are sent back to the supplier for its supplier (after that they have been replaced with new one) with a certain lead time ( t2). Repair operation are always cheaper than new system assembly, so when it is possible all the repairable system are repaired. Parameters name used in the model, as well theirs symbol, are reported in the following table: Table 3: Relevant parameters of the model Parameter Symbol Failure rate [day] f Average repair time [day] m Average shipment lead time (supplier-customer) [day] t1 Average supplier assembly time [day/system] p Average shipment lead time (manufacturer-supplier) t2 [day] Average remanufacturing time [day/system] r Holding cost for systems at the customer stocking point hpc (physical component) [ /system day] Holding cost for systems at the customer stocking point hfc (financial component) [ /system day] Holding cost for systems at the supplier stocking point hs 1 (financial and physical component) [ /system day] Holding cost for components at the supplier stocking point (financial and physical components) [ /system day] hs 2 Fixed cost for the maintenance operation [ /repair] cfm Set-up cost incurred by the supplier [ /Set-up] scs Cost for plant unavailability [ /hour of downtime] cvm Transport cost from customer to supplier and from supplier to manufacturer [ /system] ct
4 Objective function With all the above defined assumptions and notations, we can now formulate our optimization problem as follows: Minimize (TC) With: 7 i 1 TC C i Where: C1 = average opportunity loss for the downtime of the system (evaluated on the hypothesis that the part of the plant served by the system fell down couldn t work and the customer face the contribution margin of the production lost) C2 = average costs of maintenance operations (payed by the customer) C3 = average holding costs for the systems stocked in the customer warehouse (in the standard case fully paid by the customer and in the CS case the financial component paid by the supplier and physical one by the customer) C4= average holding costs for the systems stocked in the supplier finished products warehouse (paid by the supplier) C5 = average holding costs for the components stocked in the supplier raw material warehouse (paid by the supplier) C6 = average transportation costs of the systems from the supplier to the customer (paid by the supplier) C7 = average set-up costs for the systems assembly in the supplier facility (paid by the supplier) The objective is to find a stocking policy under which the average total cost (for the whole supply chain system) is minimized. In such a way two different approach may be pursued: - traditional supply agreement - CS supply agreement Moreover we will take into account the whole supply chain as well as its different components that pertain to the different actors (i.e. supplier and customer). We will consider for the three different stocking point the same control policy, i.e an (s,s) one (for additional detail Silver et al., 1998). Therefore we optimize 6 parameters: - (s1, S1) for the customer; - (s2, S2) for the supplier; - (s3, S3) for the manufacturer. SIMULATION STUDY As discussed in previous paragraph the inventory management of multi-echelon inventory items structures has been studied largely. However, some restrictions still exist on its applications to real case problems. To surpass some of these limitations a simulation model is developed in this work. In particular in this study, we use Arena to build our simulation model. The embedded OptQuest is applied to search the optimal decision variables. OptQuest includes sampling techniques and advanced error control to find better answers faster, and incorporates algorithms based on Tabu search, scatter search, integer programming, and neural networks (Kelton et al, 2002). Preliminary experiments have been conducted to validate our simulation model as well as to evaluate the solution quality of OptQuest. It shows that the results between analytical and the simulation models are comparable. However, the disadvantage of using OptQuest is that it still takes long time to find the (near) optimal solutions. To create uncertainty we use a fixed seed stream in Arena. Each source of uncertainty in this model has its own seed for generating random numbers. More precisely, in our simulation experiments, we model as stochastic processes the failure process, the production/assembly process and lead times and In this way the different models are comparable with each other and possible differences due to the use of different random seeds can be excluded. Simulation results With the real data provided by the company (here reported slightly changed due to the confidentiality required) it has been possible to perform a complete simulative optimisation for all the parameters and for each of that perform a sensitive analysis. In particular we have taken into account the failure rate ( f) as the main parameters for investigate the response of the system. We will consider the plant of the company consisting of 50 equal pumping groups variously located in the refinery plant. Detailed data for each parameter is reported in Table 4. Table 4: Parameters value used for the case study Symbol Traditional CS f POIS(15 120) POIS(15 120) m UNIF(2;4) UNIF(2;4) t1 NORM(4,3) NORM(4,3) p NORM(2,1) NORM(2,1) t2 NORM(5,4) NORM(5,4) r UNIF(10;5) UNIF(10;5) hpc 5 9 hfc 2 hs hs cfm 2 2 scs cvm ct 3 3 In the following figures it is possible to compare results of the optimised configuration for the two cases under analysis, while varying the failure rate. The simulation length as been set to 3650 period, i.e. considering a planning period of 10 years.
5 Average total Costs [ /day] f f Average Total Cost [ /day] % 98.0% 98.5% 99.0% 99.5% 100.0% Traditional agreement Consignment Stock Service Level C1 C2 C3 C4 C5 C6 C7 Figure 2: Average costs distribution while varying the failure rate within the two agreement option With the CS agreement the average total cost is always lower than in the traditional agreement case. In the following table it is reported the percentage improvement in the objective function. Table 5: Average cost improvement associated with the CS policy adoption f Average cost improvement -9.5% -4.4% -8.4% -15.4% -7.2% It is also interesting to investigate how the system responds in terms of service level, measured as the effective available time of the plant on the requested time of its availability, while varying the failure rate with the two different policy. Service level 100.0% 99.5% 99.0% 98.5% 98.0% 97.5% 97.0% 96.5% Failure rate ( f) traditional Figure 3: Service level while varying the failure rate Moreover with the simulation optimisation performed it has been possible to design a trade-off curve between the service level and supply chain costs: curve is reported in figure 4. CS traditional Figure 4: Trade-off curve between average total costs and service level Also in this case the CS policy agreement perform better than the traditional one. CONCLUSIONS Various process and manufacturing plants using complex machines often require large quantities of spare parts to guarantee high system availability which in turn results in excessive holding cost. On the one hand, companies can find themselves carrying an excessive number of spare parts. On the other hand, if they were not available when needed, companies will face severe downtime consequences. As many parts are very expensive, critically important and their failure rates are so low that they are difficult to forecast, spare parts inventory management within these industries is one of the hardest problems to deal with. In this paper we have presented a simulative approach for planning the spare parts inventory in a refinery plant, where a large amount of components have a failure rate that significantly affect the availability of the system. Moreover we have also shown how under a particular supply agreement, named Consignment Stock, the whole system perform better, both in terms of total costs and service level with a given failure rate. The same approach and methodology may be applied to other supply-chain cases, thus offering the proper information to undertake the best course of action in the multi echelon spare parts inventory management. REFERENCES Abdel-Malek; L., Valentini G. and L.E.; Zavanella, 2002, Managing stocks in Supply Chains: modelling and issues, in Seuring S.; Goldbach M., Cost Management in Supply Chains, Heildeberg: Physica Verlag, pp Aboud, N.E., 1996, "The Markovian two-echelon repairable item provisioning problem", Journal of the Operational Research Society 47, Albright, S.C. and A. Gupta, 1993, Steady-state approximation of a multi-echelon multiindentured CS
6 repairable-item inventory system with a single repair facility, Naval Research Logistics 40(4), Albright, S.C. and A. Soni, 1988, Markovian multiechelon repairable inventory system, Naval Research Logistics Quarterly 35, Avsar Z.M. and W.H.M. Zijm, 2000, Resourceconstrained two-echelon inventory models for repairable item systems, working paper, University of Twente, Enschede, The Netherlands. Axsäter, S Modelling emergency lateral transhipments in inventory systems. Management Science, Vol. 36, Braglia, M. and L:E. Zavanella, 2003, An industrial strategy for stock management in Supply Chains: modelling and performance evaluation, International Journal of Production research, vol. 41, no. 16, Buzacott, J.A. and J.G. Shanthikumar, 1993, Stochastic models of manufacturing systems, Prentice Hall, Englewood Cliffs, NJ Cohen, M.A., Y-S. Zheng and V. Agrawal, 1997, Service parts logistics: a benchmark analysis, IIE Transactions 29, Diaz, A. and M.C. Fu, 1997, Models for multi-echelon repairable item inventory systems with limited repair capacity, European Journal of Operational Research 97, Gross, D. and C.M. Harris, 1998, Fundamentals of queuing theory, Wiley, New York Gross, D. and J.F. Ince, 1978, Spares provisioning for repairable items: Cyclic queues in light traffic, AIIE Transactions 10(3), 1978, Gross, D., D.R. Miller and R.M. Soland, 1983, A closed queueing network model for multi-echelon repairable item provisioning, IIE Transactions 15(4), Gupta, A. and S.C. Albright, 1992, Steady-state approximations for multi-echelon multi indentured repairable-item inventory system, European Journal of Operational Research 97(3), Hall, R.W., 1991, Queueing methods for services and manufacturing, Prentice Hall, Englewood Cliffs, NJ Kelton, W. D., Sadowski, R. P. and Sadowski, D. A. (2002), Simulation with Arena, McGraw-Hill, Boston. Kim, J-S, K-C Shin and S-K Park, 2000, An optimal algorithm for repairable-item inventory systems with depot spares, Journal of the Operational Research Society 51, Kleinrock, L., 1975, Queuing systems, Wiley, New York Papadopolous H.T., C. Heavey and J. Browne, 1993, Queuing theory in manufacturing systems analysis and design, Chapman & Hall, London Perlman, Y., A. Mehrez and M. Kaspi, 2001, Setting expediting repair policy in a multiechelon repairable-item inventory system with limited repair capacity, Journal of the Operational Research Society 52, Silver, E.A., Pyke, D.F. and R. Peterson, 1998, Inventory Management and Production Planning and Scheduling 3 rd Ed., John Wiley & Sons, New York. Valentini, G. and L.E. Zavanella, 2003, The Consignment Stock of Inventories: Industrial Case and Performance Analysis, International Journal of Productions Economics, Vol , pp AUTHORS BIOGRAPHIES SIMONE ZANONI, Ph.D is currently an assistant professor in the Mechanical Engineering Department at the University of Brescia (Italy). He graduated (with distinction) in 2001 in Mechanical Engineering and took his a Ph.D at the University of Brescia (Italy) in His main research interests are focused on Layout Design, Inventory Management and Closed-loop Supply Chain. His address is : [email protected]. IVAN FERRETTI, graduated in 2003 in Industrial Engineering at the University of Brescia (Italy). Since 2004, he is a Ph.D student at the same university. His main research interests are focused on Simulation, e-business, Supply Chain Management and Reverse Logistics. His address is : [email protected]. LUCIO ZAVANELLA graduated in 1982 in mechanical engineering at the Politecnico di Milano. Since 1986, he has been a researcher in the field of production systems at the Università degli Studi di Brescia. Presently, he is associate professor of Industrial Plants. His research activities mainly concern manufacturing systems, also with reference to environmental and safety aspects. His address is: [email protected].
A QUEUEING-INVENTORY SYSTEM WITH DEFECTIVE ITEMS AND POISSON DEMAND. [email protected]
A QUEUEING-INVENTORY SYSTEM WITH DEFECTIVE ITEMS AND POISSON DEMAND Rasoul Hai 1, Babak Hai 1 Industrial Engineering Department, Sharif University of Technology, +98-1-66165708, [email protected] Industrial
Modeling Multi-Echelon Multi-Supplier Repairable Inventory Systems with Backorders
J. Service Science & Management, 2010, 3, 440-448 doi:10.4236/jssm.2010.34050 Published Online December 2010 (http://www.scirp.org/journal/jssm) Modeling Multi-Echelon Multi-Supplier Repairable Inventory
How To Find The Optimal Base Stock Level In A Supply Chain
Optimizing Stochastic Supply Chains via Simulation: What is an Appropriate Simulation Run Length? Arreola-Risa A 1, Fortuny-Santos J 2, Vintró-Sánchez C 3 Abstract The most common solution strategy for
Managing the After Sales Logistic Network A Simulation Study of a Spare Parts Supply Chain
Managing the After Sales Logistic Network A Simulation Study of a Spare Parts Supply Chain Fredrik Persson 1 and Nicola Saccani 2 1 Linkoping University, Department of Management and Engineering, Linköping,
Optimal base-stock policy for the inventory system with periodic review, backorders and sequential lead times
44 Int. J. Inventory Research, Vol. 1, No. 1, 2008 Optimal base-stock policy for the inventory system with periodic review, backorders and sequential lead times Søren Glud Johansen Department of Operations
SPARE PARTS INVENTORY SYSTEMS UNDER AN INCREASING FAILURE RATE DEMAND INTERVAL DISTRIBUTION
SPARE PARS INVENORY SYSEMS UNDER AN INCREASING FAILURE RAE DEMAND INERVAL DISRIBUION Safa Saidane 1, M. Zied Babai 2, M. Salah Aguir 3, Ouajdi Korbaa 4 1 National School of Computer Sciences (unisia),
Simulation-Based Optimization of Inventory Control Systems (Rn, Q) Multi Echelon - Multi Item
J. Appl. Environ. Biol. Sci., 5(9S)710-719, 2015 2015, TextRoad Publication ISSN: 2090-4274 Journal of Applied Environmental and Biological Sciences www.textroad.com Simulation-Based Optimization of Inventory
Issues in inventory control models with demand and supply uncertainty Thesis proposal
Issues in inventory control models with demand and supply uncertainty Thesis proposal Abhijit B. Bendre August 8, 2008 CORAL Centre for Operations Research Applications in Logistics Dept. of Business Studies,
Integer Programming Model for Inventory Optimization for a Multi Echelon System
Journal of Advanced Management Science Vol, No, January 06 Integer Programming Model for Inventory Optimization for a Multi Echelon System Bassem H Roushdy Basic and Applied Science, Arab Academy for Science
Primary Logistics Activities
1 TOPIC 1: OVERVIEW OF BUSINESS LOGISTICS AND PLANNING Topic Outcomes: You should be able: 1. Define logistics 2. Define activity mix in logistics business 3. Determine the importance of business logistics
Analysis of a Production/Inventory System with Multiple Retailers
Analysis of a Production/Inventory System with Multiple Retailers Ann M. Noblesse 1, Robert N. Boute 1,2, Marc R. Lambrecht 1, Benny Van Houdt 3 1 Research Center for Operations Management, University
Mathematical Modeling of Inventory Control Systems with Lateral Transshipments
Mathematical Modeling of Inventory Control Systems with Lateral Transshipments Lina Johansson Master Thesis Department of Industrial Management and Logistics Division of Production Management Lund university,
Spreadsheet Heuristic for Stochastic Demand Environments to Solve the Joint Replenishment Problem
, July 3-5, 2013, London, U.K. Spreadsheet Heuristic for Stochastic Demand Environments to Solve the Joint Replenishment Problem Buket Türkay, S. Emre Alptekin Abstract In this paper, a new adaptation
INTEGRATED OPTIMIZATION OF SAFETY STOCK
INTEGRATED OPTIMIZATION OF SAFETY STOCK AND TRANSPORTATION CAPACITY Horst Tempelmeier Department of Production Management University of Cologne Albertus-Magnus-Platz D-50932 Koeln, Germany http://www.spw.uni-koeln.de/
SIMULATION-BASED ANALYSIS OF THE BULLWHIP EFFECT UNDER DIFFERENT INFORMATION SHARING STRATEGIES
SIMULATION-BASED ANALYSIS OF THE BULLWHIP EFFECT UNDER DIFFERENT INFORMATION SHARING STRATEGIES Yuri A. Merkuryev and Julija J. Petuhova Rik Van Landeghem and Steven Vansteenkiste Department of Modelling
ERP Course: Production and Materials Management Reading: Chapter 6 from Mary Sumner
ERP Course: Production and Materials Management Reading: Chapter 6 from Mary Sumner Peter Dolog dolog [at] cs [dot] aau [dot] dk 5.2.03 Information Systems September 16, 2008 2 Sales Finished and packaged
THE CONTROL OF AN INTEGRATED PRODUCTION-INVENTORY SYSTEM WITH JOB SHOP ROUTINGS AND STOCHASTIC ARRIVAL AND PROCESSING TIMES
THE ONTROL OF AN INTEGRATED RODUTION-INVENTORY SYSTEM WITH JOB SHO ROUTINGS AND STOHASTI ARRIVAL AND ROESSING TIMES LM Van Nyen 1 * JWM Bertrand 1 HG Van Ooijen 1 NJ Vandaele 2 1 2 Technische Universiteit
TOOLS OF MONTE CARLO SIMULATION IN INVENTORY MANAGEMENT PROBLEMS
TOOLS OF MONTE CARLO SIMULATION IN INVENTORY MANAGEMENT PROBLEMS Jacek Zabawa and Bożena Mielczarek Institute of Industrial Engineering and Management Wrocław University of Technology 50-370, Wrocław,
Determining Inventory Levels in a CONWIP Controlled Job Shop
Determining Inventory Levels in a CONWIP Controlled Job Shop Sarah M. Ryan* Senior Member, IIE Department of Industrial and Management Systems Engineering University of Nebraska-Lincoln Lincoln, NE 68588-0518
LOGISTICS & SUPPLY CHAIN MANAGEMENT
LOGISTICS & SUPPLY CHAIN MANAGEMENT Section 1 Understanding the Supply Chain and its logistics activities C O R R A D O C E R R U T I What is Logistics? Logistics takes care of the activities and the decisions
Single item inventory control under periodic review and a minimum order quantity
Single item inventory control under periodic review and a minimum order quantity G. P. Kiesmüller, A.G. de Kok, S. Dabia Faculty of Technology Management, Technische Universiteit Eindhoven, P.O. Box 513,
A LOT-SIZING PROBLEM WITH TIME VARIATION IMPACT IN CLOSED-LOOP SUPPLY CHAINS
A LOT-SIZING PROBLEM WITH TIME VARIATION IMPACT IN CLOSED-LOOP SUPPLY CHAINS Aya Ishigaki*, [email protected]; Tokyo University of Science, Japan Tetsuo Yamada, [email protected]; The University
STOCHASTIC PERISHABLE INVENTORY CONTROL SYSTEMS IN SUPPLY CHAIN WITH PARTIAL BACKORDERS
Int. J. of Mathematical Sciences and Applications, Vol. 2, No. 2, May 212 Copyright Mind Reader Publications www.journalshub.com STOCHASTIC PERISHABLE INVENTORY CONTROL SYSTEMS IN SUPPLY CHAIN WITH PARTIAL
APPLICATION OF SIMULATION IN INVENTORY MANAGEMENT OF EOL PRODUCTS IN A DISASSEMBLY LINE
APPLICATION OF SIMULATION IN INVENTORY MANAGEMENT OF EOL PRODUCTS IN A DISASSEMBLY LINE Badr O. Johar, Northeastern University, (617) 3737635, [email protected] Surendra M. Gupta, Northeastern University,
Evaluation of Supply Chain Management Systems Regarding Discrete Manufacturing Applications
Evaluation of Supply Chain Management Systems Regarding Discrete Manufacturing Applications Prof. Dr.-Ing. Klaus Thaler FHTW Berlin, Treskowallee 8, D-10318 Berlin, Germany e-mail: [email protected]
SUPPLY CHAIN MODELING USING SIMULATION
SUPPLY CHAIN MODELING USING SIMULATION 1 YOON CHANG AND 2 HARRIS MAKATSORIS 1 Institute for Manufacturing, University of Cambridge, Cambridge, CB2 1RX, UK 1 To whom correspondence should be addressed.
Implications for Service Parts Management in the Rapidly Changing Aviation MRO Market
Implications for Service Parts Management in the Rapidly Changing Aviation MRO Market Morris A. Cohen Panasonic Professor of Manufacturing and Logistics The Wharton School & Chair, MCA Solutions Inc. Philadelphia,
INVENTORY CONTROL BY TOYOTA PRODUCTION SYSTEM KANBAN METHODOLOGY A CASE STUDY
Int. J. Mech. Eng. & Rob. Res. 2013 V M Nistane and Srinivas Viswanath V, 2013 Research Paper ISSN 2278 0149 www.ijmerr.com Vol. 2, No. 1, January 2013 2013 IJMERR. All Rights Reserved INVENTORY CONTROL
THE IMPLEMENTATION OF VENDOR MANAGED INVENTORY IN THE SUPPLY CHAIN WITH SIMPLE PROBABILISTIC INVENTORY MODEL
THE IMPLEMENTATION OF VENDOR MANAGED INVENTORY IN THE SUPPLY CHAIN WITH SIMPLE PROBABILISTIC INVENTORY MODEL Ika Deefi Anna Departement of Industrial Engineering, Faculty of Engineering, University of
Increasing operational efficiency through improved customer service a case from the process maintenance business
Increasing operational efficiency through improved customer service a case from the process maintenance business Jaana Auramo, Kari Tanskanen and Johanna Småros Department of Industrial Engineering and
Inventory Control Strategy Study For Airlines
Inventory Control Strategy Study For Airlines Supanee Arthasartsri and He Ren, School of Aerospace, Mechanical Manufacturing Engineering RMIT University (Australia) The airline industry, as a whole, sits
BSCM Sample TEST. CPIM(Certified In Production & Inventory Management) - 1 -
BSCM Sample TEST. 1. Which of the following demand fulfillment approaches typically provides the longest delivery time? A) Engineer-to-order. B) Make-to-order. C) Assemble-to-order. D) Make-to-stock. 2.
A Synchronized Supply Chain for Reducing Decoupling Stock
A Synchronized Supply Chain for Reducing Decoupling Stock Jian Wang Shanghai University, China, [email protected] Hiroaki Matsukawa Keio University, Japan, [email protected] Shane J. Schvaneveldt
STRATEGIC CAPACITY PLANNING USING STOCK CONTROL MODEL
Session 6. Applications of Mathematical Methods to Logistics and Business Proceedings of the 9th International Conference Reliability and Statistics in Transportation and Communication (RelStat 09), 21
Job Shop Lean Production Implementation Using Program Evaluation and Review Technique (Pert)
Proceedings of the 2014 International Conference on Industrial Engineering and Operations Management Bali, Indonesia, January 7 9, 2014 Job Shop Lean Production Implementation Using Program Evaluation
Using Queueing Network Models to Set Lot-sizing Policies. for Printed Circuit Board Assembly Operations. Maged M. Dessouky
Using Queueing Network Models to Set Lot-sizing Policies for Printed Circuit Board Assembly Operations Maged M. Dessouky Department of Industrial and Systems Engineering, University of Southern California,
Oracle Value Chain Planning Inventory Optimization
Oracle Value Chain Planning Inventory Optimization Do you know what the most profitable balance is among customer service levels, budgets, and inventory cost? Do you know how much inventory to hold where
QUEUING THEORY. 1. Introduction
QUEUING THEORY RYAN BERRY Abstract. This paper defines the building blocks of and derives basic queuing systems. It begins with a review of some probability theory and then defines processes used to analyze
Chapter 11. MRP and JIT
Chapter 11 MRP and JIT (Material Resources Planning and Just In Time) 11.1. MRP Even if MRP can be applied among several production environments, it has been chosen here as a preferential tool for the
EVERYTHING YOU NEED TO KNOW ABOUT INVENTORY
EVERYTHING YOU NEED TO KNOW ABOUT INVENTORY Introduction Inventory is considered the necessary evil of the supply chain. In fact, there has been a whole movement; lean manufacturing that has tried to reduce
An Interactive Web Based Virtual Factory Model for Teaching Production Concepts
An Interactive Web Based Virtual Factory Model for Teaching Production Concepts Ramanan Tiruvannamalai, Lawrence Whitman, Hossein Cheraghi, and Ashok Ramachandran Department of Industrial and Manufacturing
SIMULATION BASED APPROACH TO STUDY THE INTERACTION OF SCHEDULING AND ROUTING ON A LOGISTIC NETWORK
SIMULATION BASED APPROACH TO STUDY THE INTERACTION OF SCHEDULING AND ROUTING ON A LOGISTIC NETWORK Alex J. Ruiz-Torres Department of Decision Sciences Florida Gulf Coast University 17595 S. Tamiami Trail,
COORDINATION IN THE SUPPLY CHAIN: VENDOR MANAGED INVENTORY IS THE WAY TO GO
www.sjm.tf.bor.ac.yu Serbian Journal of Management 1 (1) (2006) 41-47 Serbian Journal of Management COORDINATION IN THE SUPPLY CHAIN: VENDOR MANAGED INVENTORY IS THE WAY TO GO R. Piplani * Center for Supply
Buffering against lumpy demand in MRP environments: a theoretical approach and a case study
Buffering against lumpy demand in MRP environments: a theoretical approach and a case study Maria Caridi 1 and Roberto Cigolini Dipartimento di Economia e Produzione, Politecnico di Milano Piazza Leonardo
Modeling Stochastic Inventory Policy with Simulation
Modeling Stochastic Inventory Policy with Simulation 1 Modeling Stochastic Inventory Policy with Simulation János BENKŐ Department of Material Handling and Logistics, Institute of Engineering Management
Web based Multi Product Inventory Optimization using Genetic Algorithm
Web based Multi Product Inventory Optimization using Genetic Algorithm Priya P Research Scholar, Dept of computer science, Bharathiar University, Coimbatore Dr.K.Iyakutti Senior Professor, Madurai Kamarajar
High tech spare parts management
High tech spare parts management André van Goch Logistics Manager ASML Center of Excellence / Slide 1 20071112 ASML spare parts management Version 1 André van Goch Contents ASML business Supply chain model
Ch.1 Purchasing & Supply Chain Management
Module 1 : Purchasing Process. Ch.1 Purchasing & Supply Chain Management Edited by Dr. Seung Hyun Lee (Ph.D., CPM) IEMS Research Center, E-mail : [email protected] Definition of Supply Chain. Definition
Material Requirements Planning. Lecturer: Stanley B. Gershwin
Material Requirements Planning Lecturer: Stanley B. Gershwin MRP Overview Primary source: Factory Physics by Hopp and Spearman. Basic idea: Once the final due date for a product is known, and the time
Web Server Software Architectures
Web Server Software Architectures Author: Daniel A. Menascé Presenter: Noshaba Bakht Web Site performance and scalability 1.workload characteristics. 2.security mechanisms. 3. Web cluster architectures.
ELA Standards of Competence on the Supervisory/Operational Management Level
ELA Standards of Competence on the Supervisory/Operational Management Level 2.0 Basic Supply Chain Concepts 2.0.01 Explain the scope and role of component activities within the supply chain 2.0.02 Map
Budgetary Planning. Managerial Accounting Fifth Edition Weygandt Kimmel Kieso. Page 9-2
9-1 Budgetary Planning Managerial Accounting Fifth Edition Weygandt Kimmel Kieso 9-2 study objectives 1. Indicate the benefits of budgeting. 2. State the essentials of effective budgeting. 3. Identify
High-Mix Low-Volume Flow Shop Manufacturing System Scheduling
Proceedings of the 14th IAC Symposium on Information Control Problems in Manufacturing, May 23-25, 2012 High-Mix Low-Volume low Shop Manufacturing System Scheduling Juraj Svancara, Zdenka Kralova Institute
FIXED CHARGE UNBALANCED TRANSPORTATION PROBLEM IN INVENTORY POOLING WITH MULTIPLE RETAILERS
FIXED CHARGE UNBALANCED TRANSPORTATION PROBLEM IN INVENTORY POOLING WITH MULTIPLE RETAILERS Ramidayu Yousuk Faculty of Engineering, Kasetsart University, Bangkok, Thailand [email protected] Huynh Trung
PROCESS FLOW IMPROVEMENT PROPOSAL OF A BATCH MANUFACTURING SYSTEM USING ARENA SIMULATION MODELING
PROCESS FLOW IMPROVEMENT PROPOSAL OF A BATCH MANUFACTURING SYSTEM USING ARENA SIMULATION MODELING Chowdury M. L. RAHMAN 1 Shafayet Ullah SABUJ 2 Abstract: Simulation is frequently the technique of choice
A Programme Implementation of Several Inventory Control Algorithms
BULGARIAN ACADEMY OF SCIENCES CYBERNETICS AND INFORMATION TECHNOLOGIES Volume, No Sofia 20 A Programme Implementation of Several Inventory Control Algorithms Vladimir Monov, Tasho Tashev Institute of Information
Spare Parts Inventory Model for Auto Mobile Sector Using Genetic Algorithm
Parts Inventory Model for Auto Mobile Sector Using Genetic Algorithm S. Godwin Barnabas, I. Ambrose Edward, and S.Thandeeswaran Abstract In this paper the objective is to determine the optimal allocation
Full-time MSc in Logistics and Supply Chain Management
Full-time MSc in Logistics and Supply Chain Management Course structure and content 2016-2017 The course has been developed to produce expert logistics and supply chain professionals who can take the skills
Paper F5. Performance Management. Monday 2 December 2013. Fundamentals Level Skills Module. The Association of Chartered Certified Accountants
Fundamentals Level Skills Module Performance Management Monday 2 December 2013 Time allowed Reading and planning: Writing: 15 minutes 3 hours ALL FIVE questions are compulsory and MUST be attempted. Formulae
Analysis of Various Forecasting Approaches for Linear Supply Chains based on Different Demand Data Transformations
Institute of Information Systems University of Bern Working Paper No 196 source: https://doi.org/10.7892/boris.58047 downloaded: 16.11.2015 Analysis of Various Forecasting Approaches for Linear Supply
ACCA Certified Accounting Technician Examination Paper T7. Section A. 2 C ($200,000 ($200,000 0 2 x 0 15)) = $50,000
Answers ACCA Certified Accounting Technician Examination Paper T7 Planning, Control and Financial Management December 2009 Answers Section A 1 A 2 C ($200,000 ($200,000 0 2 x 0 15)) = $50,000 3 D 4 B $3,600
DEPARTMENT OF LEADERSHIP AND GOVERNANCE
THE OPEN UNIVERSITY OF TANZANIA FACULTY OF BUINESS MANAGEMENT DEPARTMENT OF LEADERSHIP AND GOVERNANCE MASTER OF PROJECT MANAGEMENT (MPM) PROGRAMME OLG 629: Management of Strategic Operations COURSE OUTLINE
PART AND TOOL FLOW MANAGEMENT IN MULTI-CELL FLEXIBLE MANUFACTURING SYSTEM
PART AND TOOL FLOW MANAGEMENT IN MULTI-CELL FLEXIBLE MANUFACTURING SYSTEM Mustafa Özbayrak Department of Industrial Engineering Marmara University 81040 Goztepe - Istanbul, TURKEY A. Kursad Turker Melek
ISyE 2030 Test 2 Solutions
1 NAME ISyE 2030 Test 2 Solutions Fall 2004 This test is open notes, open books. Do precisely 5 of the following problems your choice. You have exactly 55 minutes. 1. Suppose that we are simulating the
Cumulative Diagrams: An Example
Cumulative Diagrams: An Example Consider Figure 1 in which the functions (t) and (t) denote, respectively, the demand rate and the service rate (or capacity ) over time at the runway system of an airport
Interpreting the Numbers: From Data to Design. William Elenbark, Consultant Gross & Associates 732-636-2666; belenbark@grossassociates.
Interpreting the Numbers: From Data to Design William Elenbark, Consultant Gross & Associates 732-636-2666; [email protected] Robert Muller, Industrial Engineer Gross & Associates 732-636-2666;
Chapter 1. Introduction
Chapter 1 Introduction 1.1. Motivation Network performance analysis, and the underlying queueing theory, was born at the beginning of the 20th Century when two Scandinavian engineers, Erlang 1 and Engset
Scheduling Policies, Batch Sizes, and Manufacturing Lead Times
To appear in IIE Transactions Scheduling Policies, Batch Sizes, and Manufacturing Lead Times Saifallah Benjaafar and Mehdi Sheikhzadeh Department of Mechanical Engineering University of Minnesota Minneapolis,
Manufacturing. Manufacturing challenges of today and how. Navision Axapta solves them- In the current explosive economy, many
Manufacturing challenges of today and how Navision Axapta solves them- the solution for change; controlled by you. Manufacturing In the current explosive economy, many manufacturers are struggling to keep
Management Information Systems
Faculty of Foundry Engineering Virtotechnology Management Information Systems Classification, elements, and evolution Agenda Information Systems (IS) IS introduction Classification Integrated IS 2 Information
Logistics Management SC Performance, SC Drivers and Metrics. Özgür Kabak, Ph.D.
Logistics Management SC Performance, SC Drivers and Metrics Özgür Kabak, Ph.D. Outline Supply Chain Performance: Achieving Strategic Fit and Scope Competitive and supply chain strategies Achieving strategic
Basic Queuing Relationships
Queueing Theory Basic Queuing Relationships Resident items Waiting items Residence time Single server Utilisation System Utilisation Little s formulae are the most important equation in queuing theory
Developing a framework model of Supply Chain Management : A case study on a Mega construction project in Myanmar.
Proposal for PhD Research Yadanar Soe ID: 1140937 Course Title: PhD Research (Construction Management) [email protected], [email protected] Lead Supervisor: Dr M An Co Supervisor: Dr J Yang Title Developing
Inventory Cycle Counting A Review
Inventory Cycle Counting A Review Manuel D. Rossetti, Terry Collins, Ravi Kurgund Department of Industrial Engineering University of Arkansas Fayetteville, AR 72703, USA Abstract Accurate inventory records
TEACHING SIMULATION WITH SPREADSHEETS
TEACHING SIMULATION WITH SPREADSHEETS Jelena Pecherska and Yuri Merkuryev Deptartment of Modelling and Simulation Riga Technical University 1, Kalku Street, LV-1658 Riga, Latvia E-mail: [email protected],
Agile Manufacturing for ALUMINIUM SMELTERS
Agile Manufacturing for ALUMINIUM SMELTERS White Paper This White Paper describes how Advanced Information Management and Planning & Scheduling solutions for Aluminium Smelters can transform production
PERFORMANCE ANALYSIS OF AN AUTOMATED PRODUCTION SYSTEM WITH QUEUE LENGTH DEPENDENT SERVICE RATES
ISSN 1726-4529 Int j simul model 9 (2010) 4, 184-194 Original scientific paper PERFORMANCE ANALYSIS OF AN AUTOMATED PRODUCTION SYSTEM WITH QUEUE LENGTH DEPENDENT SERVICE RATES Al-Hawari, T. * ; Aqlan,
The problem with waiting time
The problem with waiting time Why the only way to real optimization of any process requires discrete event simulation Bill Nordgren, MS CIM, FlexSim Software Products Over the years there have been many
Agenda. Real System, Transactional IT, Analytic IT. What s the Supply Chain. Levels of Decision Making. Supply Chain Optimization
Agenda Supply Chain Optimization KUBO Mikio Definition of the Supply Chain (SC) and Logistics Decision Levels of the SC Classification of Basic Models in the SC Logistics Network Design Production Planning
APICS Certified in Production and Inventory Management [CPIM] Exam Content Manual. Preview
APICS Certified in Production and Inventory Management [CPIM] Exam Content Manual Preview 2013 APICS CPIM Overview of Exam Content Manual Basics of Supply Chain Management January 1, 2013 through December
Moving Parts Planning Forward
2013 Moving Parts Planning Forward In less than six months, we ve reduced our inventory by more than $75,000 and expect to reduce it by $150,000 by the end of the first year. Valogix e-report Series www.valogixinventoryplanning.com
Time Series and Forecasting
Chapter 22 Page 1 Time Series and Forecasting A time series is a sequence of observations of a random variable. Hence, it is a stochastic process. Examples include the monthly demand for a product, the
Telephone Traffic Queues in a Customer Call Center. A Thesis. Presented for the. Master of Science Degree. The University of Tennessee at Chattanooga
Telephone Traffic Queues in a Customer Call Center A Thesis Presented for the Master of Science Degree The University of Tennessee at Chattanooga Patrick Todd April 2009 Copyright 2009 by Patrick Todd
Exact Fill Rates for the (R, S) Inventory Control with Discrete Distributed Demands for the Backordering Case
Informatica Economică vol. 6, no. 3/22 9 Exact Fill ates for the (, S) Inventory Control with Discrete Distributed Demands for the Backordering Case Eugenia BABILONI, Ester GUIJAO, Manuel CADÓS, Sofía
Inventory Management. Topics on inventory management
Inventory Management ISyE 3104 Fall 2013 Topics on inventory management Objective An introduction to the fundamental concepts, tradeoffs and methods in inventory management Topics Deterministic inventory
PERFORMANCE ANALYSIS OF A CONTRACT MANUFACTURING SYSTEM
PERFORMANCE ANALYSIS OF A CONTRACT MANUFACTURING SYSTEM Viswanadham.N 1, Vaidyanathan.G 2 The Logistics Institute- Asia Pacific National University of Singapore Singapore 11926 [email protected] 1 [email protected]
Fundamentals Level Skills Module, Paper F5. Section A
Answers Fundamentals Level Skills Module, Paper F5 Performance Management December 2014 Answers Section A 1 A Division A: Profit = $14 4m x 30% = $4 32m Imputed interest charge = $32 6m x 10% = $3 26m
Supply Chain Analytics - OR in Action
Supply Chain Analytics - OR in Action Jan van Doremalen January 14th, 2016 Lunteren from x to u A Practitioners View on Supply Chain Analytics This talk is about applying existing operations research techniques
RELATIONSHIP BETWEEN INVENTORY MANAGEMENT AND INDUSTRIES BECOMING SICK, ESPECIALLY IN THIRD WORLD COUNTRIES
Relationship between inventory management and industries becoming sick, especially in third world countries 7 RELATIONSHIP BETWEEN INVENTORY MANAGEMENT AND INDUSTRIES BECOMING SICK, ESPECIALLY IN THIRD