PART AND TOOL FLOW MANAGEMENT IN MULTI-CELL FLEXIBLE MANUFACTURING SYSTEM
|
|
|
- Corey Fitzgerald
- 9 years ago
- Views:
Transcription
1 PART AND TOOL FLOW MANAGEMENT IN MULTI-CELL FLEXIBLE MANUFACTURING SYSTEM Mustafa Özbayrak Department of Industrial Engineering Marmara University Goztepe - Istanbul, TURKEY A. Kursad Turker Melek Pisman Department of Industrial Engineering Sakarya University Esentepe - Adapazari, TURKEY ABSTRACT Simulation techniques have been proven as reliable and powerful tools in the design, development, evaluation and operation of manufacturing systems. The following paper presents a simulation-based work done for the part and tool flow management modeling in a multi-cell flexible manufacturing system (FMS). The objective of this research was to develop a simulation model which could analyze the system in detail, and provide a basis for analyzing the effects of part and tooling strategies on major cell performance measures. An overview of the system is given and an example application is presented to illustrate how the part and tool flow management simulation design system operates. 1 INTRODUCTION Over the last two decades, there has been a steady increase in the number of installations in flexible machining systems. However, the trends in the design and management of such facilities have changed significantly since flexible manufacturing was introduced, from large scale systems to multiple machining cells which are integrated via an automated factory-level transport network. Although this has increased the flexibility and provided system users with a significant competitive edge, many systems have failed to take advantage because of increasing complexity in operation and control of machining cells. Part and tool flows, two major dynamic entities, are the key factors for managing successful manufacturing. Stecke (1983) formulated the tool allocation problem as a non-linear programming model. Positioning of tools in the magazine and the magazine capacity were considered as primary constraints. Balancing the assigned machine processing times and maximizing the tool density of each magazine with the tool allocation are the objectives of the formulation. Coleman et al. (1996a) have studied tool management and job allocation in flexible machining cells using workoriented strategies. This spreadsheet-based model presents and investigates strategies for tool management and job allocations in a demand-driven system. The paper s major concern is to measure tool management strategy`s effects on machining cells under the influence of job allocation rules. Coleman et al. (1996b) have developed a similar model of tool management and job allocation in machining cells using tool-oriented strategies. This paper presents a tooloriented approach to provide further tooling economy. The model employs a cluster algorithm which identifies part and tool groups. These clustered groups are allocated to a particular machining cell configuration with respect to the additional constraints of balancing the overall work load per machine and managing tool kit exchange under limited tool magazine capacity. Amoaka-Gyampah et al. (1992) have compared tool management strategies and part selection rules. They described four tool management strategies and three part selection rules of which two concentrated on tooling and the other on earliest due date (EDD). They developed a simulation model and used five performance measures. Although the paper primarily deals with tool management in FMS, all of the performance measures focus on the part and general system spectrum. Major tool management performance criteria such as tool requirements and tool inventory level have been omitted. In this paper, we provide a simulation model considering several hardware configurations to investigate the effects of part and tooling strategies as well as of alternative cell hardware on the major system performance criteria. Some of the alternative cell operating strategies such as machine grouping, alternative part routing and tooling strategies have not been considered in this research and these issues have been left out for future research. 2 PART AND TOOL FLOW IN FMS Part scheduling is one of the most important factors that affects cell performance. Since all the jobs use the same finite (limited) resources such as machines, materials, tools, time, etc., the competition for the same resources make the part flow a vital function for successful
2 810 Ozbayrak, Turker, and Pisman manufacturing and requiring a particular attention (Unal and Kiran, 1992). Part flow function has been considered with an aim to examine the effects of part flow on tool flow in FMS. No attempt is made to develop optimal rules but part flow has been incorporated to maximize the efficiency of the modeling facility designed. As pointed out by Ghosh et al. (1992), Amoako- Gyampah et al. (1992), and Graver and McGinnis (1989), tooling and tool magazine capacity have a significant impact and are the major constraints for part batching and scheduling. 2.1 Part Scheduling Under a Tooling Constraint As indicated by several researchers (Carrie and Perera 1986, Ventura and Chen 1990, and Amoaka-Gyampah et al., 1992) the part allocation, machine balancing, production ratio, and tool allocation problems are closely related and unless they are considered simultaneously, the solution proposed would be insufficient. Part scheduling should satisfy timely assignment of manufacturing operations as well as determine what set of orders should be ready for processing at a particular station at a particular time, deciding on the sequence in which they will be run, and calculating the resulting start and finish times for each operation. On the other hand, the tool management aims at allocating the right tools for the right job at the right place, at the right time, and at the right quantity. Since manufacturing operations require a large number of tools on different work centers, it is vital to allocate the limited number of tools to the work centers with limited capacity magazines. Sometimes some of the criteria considered by the different scheduling programs may conflict and may cause substantial manufacturing chaos. It is thus necessary to consider solution procedures for the part scheduling and tool allocation problems simultaneously. However, it is often very difficult to determine the best part and tool schedule combination relative to all these criteria. In this study, four scheduling rules, which are shortest processing time (SPT), longest processing time (LPT), earliest due date (EDD), and first come first served (FCFS), are used to schedule the parts to a multi-cell flexible manufacturing system, and four different partoriented tooling strategies, which are full kitting, differential kitting, single tools kitting, and resident kitting strategies, are used to allocate the tools to the limited capacity-work centers. Tool magazine capacity (in this study 20 and 40 pockets), pallet capacity (10 each, 20 each and 40 each), and the automated guided vehicle (AGV) (1 and 2-vehicle system) are the finite resources in the system. The major research focus of this study is on investigating the parts scheduling effects on tool requirements and on major cell performance criteria. In addressing the part and tool flow problem in multicell FMS, the paper reports the results of an experiment based on a computer simulation model by considering different combinations of cell operating rules. 2.2 Tool Management - An Overview The essential role of tool management is the timely scheduling of tools to satisfy a short to medium term manufacturing task. The heart of a typical tool management system is the tool list which is derived from the machining schedule, the starting point and controlling factor of all the cells' activities and events. The machining schedule or list, at the highest level, consists of order numbers, due dates, priorities and required quantities. The machining list may be subdivided into partial orders (individual workpieces) and stored in the form of order waiting queues or work schedules. These schedules exist for every machine in the cell, and specify the sequence of operations for a particular workpiece, and the required tool sequence (the tool list). The tool lists not only determine the schedules for tool transfer and tool changing but also the gross tool requirement. A net tool requirement is established by examining tool store contents for the appropriate tools which have adequate residual tool life; and introducing new tools where necessary, to service the machining schedule. The generated tooling requirement is placed in the tool room, which is responsible for supplying the required tools. The organization of the tool room to manage these required tools depends upon the facilities supplied and the manpower used. As orders are being processed, the currently completed number of workpieces is recorded and updated. The consequences of these completed workpieces on the lists is an indication of which tools are no longer required or can no longer be used due to reaching their life limit. This in turn activates the tool transfer schedule and new tools may be introduced into the system. A tool management system thus typically concentrates on maintaining a dynamic inventory of all tools in the cell, their size, type, number and location; and on improving tool forecasts and warnings of tool changes, reducing delays in the system and improving the reliability of tool information. The number of captive tools at cell level particularly within the cell secondary tool store (STS) is the major factor in determining the total tool inventory and the cost of the solution. The pattern of supply and return of tools is of particular importance. A number of solutions exist resulting in either irregular, periodic or regular patterns of supply. The solutions adopted range from kitting through to the issue of single tools under the workpieceoriented strategy and from the issue of tool cluster sets to tool packages under the tool-oriented strategy. The selection of a tool flow solution bears a direct
3 Part and Tool Flow Management in Multi-Cell Flexible Manufacturing System 811 relationship to the pattern of supply and return of tools within a cell and thus on the selection of a strategy within either of the two tool management categories Workpiece-Oriented Tool Management The workpiece-oriented tool management categorizes those cases where the machines are supported with tools related to the actual orders, i.e. the manufacturing system is said to be demand-driven. A tool rationalization algorithm is applied to reduce duplication of the tools not only within the primary or machine-based store, but also within the overall manufacturing system. Tool disposition using this approach requires greater planning to determine tool demands, but guarantees maximum availability and flexibility of tools in the system Full Kitting Strategy Basically, a kit of tools is allocated with every job to be processed at a machine. The kit is usually returned to the secondary tool stores when the particular job to which it is assigned has been finished. The strategy is highly flexible and ensures tool availability. However, a large number of basic and sister tools are unavoidably required. Since there is no life sharing across the production period there is no need to trace the available tool life. Therefore, it is easy to operate and control Differential Tool Kitting Strategy The differential kitting strategy is an improved form of the kitting strategy and its basic principle is that it allows tool life sharing. The rule for issuing tools according to the differential kitting strategy is: If any tools used by the existing job are common with tools required by the new job and if the common tools have enough life to carry on the operations required for the new job, then keep these common tools on the machine. Then remove the remainder of the existing tool kit and assign the new tools which are required by the new job to the machine. Repeat for successive jobs. Since the strategy allows for tool life sharing across kits, tool life may be used more effectively and tool inventory may be reduced Single Tools Strategy The single tools strategy is more progressive in the sharing of available tool life across batches in comparison with the differential kitting strategy. The logic is based on group technology principles. At the beginning of the manufacturing period, a rationalized set of all tools required are loaded into the magazine of the each machine, according to the job list to be processed. New tools are required when they are not already available on a machine or when the available tools become worn. Tools are unloaded when a magazine is full and they are no longer required or worn Resident Kitting Strategy The strategy uses an external scheduling system to assign jobs and then assigns the tool kits. However, in contrast to the differential kitting strategy it does not remove the tools from the magazine as long as there is sufficient space in the magazine. The magazine is gradually filled to capacity loading only unavailable tools in the magazine. The strategy only exchanges tools if they become worn and they are still needed for the current operation. Since the strategy keeps the previously assigned tools in the magazine, there is always a good possibility to meet the requirement with one of the tools which is already in the magazine Tool-Oriented Tool Management The tool-oriented strategies are targeted to respond to the need for workpiece processing and routing flexibility and in situations where there are many diverse workpieces produced, unlike the workpiece-oriented strategies, where the number and type of tools is determined from the machining requirements of a workpiece spectrum introduced over a given scheduling period. This is in contrast to the workpiece-oriented strategy where there is an assumption that a set of workpiece types will visit particular machines with a high degree of certainty. In this paper, only workpiece-oriented tool management strategies have been considered and tool oriented tool management strategies are subjects of a separate paper. 3 THE SIMULATION MODEL In this study, an FMS with six cells which contains 14 machines altogether, is considered. Every machine has one-component input and output buffer and each cell has a queue holding a maximum of 6 components, an inspection station, an automated storage and retrieval system (AS/RS), up to two-vehicle automated transporter systems (AGV) to move parts to and from machines, and a robotic material handling system that loads and unloads parts from the machine tool. The layout of the system is shown in Fig. 1. At the beginning of the planning horizon, the system is assumed to be empty. It is also assumed that operation times, transportation times and the part routes are known either with certainly or by calculation. Moreover, basic tool requirements for each job are known beforehand, but the tool kit size is calculated by the tool issue strategy adopted. Parts are sequenced and scheduled according to
4 812 Ozbayrak, Turker, and Pisman one of the four scheduling rules adopted and are transferred on pallets of variable sizes which forms the transferred batches. Since the lot sizes are variable, a variable quantity of parts is introduced into the system every day. In total, 30 different parts-types are processed using 80 different tool types in FMS. Also five different pallet types are used to transfer parts. The setup time for each batch is deterministic and known previously. The simulation was coded in SIMAN IV (Pedgen et al., 1990). Simulation has been run for three shifts in a day and 30 days, altogether minutes. The performance criteria were first classified into two groups as performance measures for cell performance consisting of the mean flow time, mean tardiness of parts, production rate, machine utilization, robot utilization, and AGV utilization, and for tool management system performance consisting of tool requirement planning and worn tool quantity. Load/Unload Robot A G V B in Inspection Cell 1 Cell 2 Cell 3 B in B out B in B out B in B out B out B in B out B in B out B in B out Cell 6 Cell 5 Cell 4 Figure 1: The Layout of the System AS/RS 4 EXPERIMENTAL RESULTS AND DISCUSSION The scenarios designed and run are as follows: Scenario 1: 14 Machines, 30 Part Types, 79 Tool Types, 1 AGV, 40-Magazine Capacity, 5 Pallet Types each has 40 pallets, Scenario 2: 14 Machines, 30 Part Types, 79 Tool Types, 2 AGV, 40-Magazine Capacity, 5 Pallet Types each has 40 pallets, Scenario 3: 14 Machines, 30 Part Types, 79 Tool Types, 2 AGV, 20-Magazine Capacity, 5 Pallet Types each has 40 pallets, Scenario 4: 14 Machines, 30 Part Types, 79 Tool Types, 2 AGV, 40-Magazine Capacity, 5 Pallet Types each has 10 pallets, Scenario 5: 14 Machines, 30 Part Types, 79 Tool Types, 2 AGV, 40-Magazine Capacity, 5 Pallet Types each has 20 pallets, Each of the results will now be discussed in turn according to the performance criteria listed above. 4.1 Mean Flowtime A graphical comparison of the four tooling strategies with four scheduling rules for 5 scenarios for the mean flowtime measure is shown in Fig. 2. As shown in the figure, there is no exact best solution for a specific tooling strategy. However, while the single tools and the resident kitting strategies with the EDD scheduling rule for scenario 1 has given the best result, the single tools and the resident kitting strategies, this time with SPT for scenarios 2, 3, 4, and 5, have given the best result. Since there is less tool changing in the single tools and the resident kitting strategies, operation times have decreased considerably and this has affected the mean flow time of the parts. On the other hand, since the full kitting strategy requires a great number of tools and tool changes which causes frequent machine downtime, it increases the part flow time. Also, the system that works with a single AGV has given the worst flow time performance. The only reason for this result is that long part queues were created by the insufficient material handling system. The most remarkable conclusion is that the single tools and the resident kitting strategies have given almost the same results for all part scheduling rules and for all scenarios. The only explanation for this result is that both strategies working logic becomes almost the same after a while. The only difference is that the single tools strategy starts manufacturing with a full magazine, and the resident kitting strategy starts with an empty magazine. Therefore, in the long term, both strategies give very similar performance. 4.2 Mean Tardiness The graphical comparison of the four tooling strategies for each part scheduling rule for 5 scenarios is shown in Fig. 3. Similar results to the mean flow time results are also obtained for the mean tardiness. As it happened for the mean tardiness, there is no exact emerging best result for all strategies and rules for all scenarios. However, for Scenario 1, the single tools and the resident kitting strategies with EDD have given the best result. For scenarios 2, 3 and 5, the single tools and the resident kitting strategies with LPT have given better results in comparison with other scheduling rules. However, for scenario 4, again the single tools and the resident kitting strategies this time with EDD have given better results in comparison with other scheduling rules. The LPT and EDD rules have emerged as the better working rules with the single tools and the resident kitting strategies in terms of mean tardiness.
5 Part and Tool Flow Management in Multi-Cell Flexible Manufacturing System Scenario 1-Mean Flow Time FK DK STK RK Scenario 1-Mean Tardiness FK DK STK RK Figure 2: Mean Flow Time for Scenario 1 The LPT rule should not be a surprising rule since when jobs with longer operation times are released first, the average job numbers available in the system will be less than for the other scheduling rules, which decreases the average waiting times in the queues. This can also be seen from the production rate, in Fig. 7, which is relatively less than for the other three rules. However, this does not mean that the LPT rule is a superior scheduling rule to the other scheduling rules and this situation could be different for different FMS simulations (Amoaka-Gyampah, 1992). 4.3 Average Machine Utilization The graphical comparison of the four tooling strategies under four scheduling rules for five scenarios is shown in Fig. 4. There is no outperforming strategy and scheduling rule combination for any scenario and almost all the scenarios with different tooling strategy and part scheduling rule pair have given very close performance. The full kitting strategy has given poorer performance in comparison with the other tooling strategies because of frequent tool exchange and machine down time. 4.4 Average AGV Utilization As it happened in machine utilization performance, there is no single outperforming tooling strategy- scheduling rule combination for the better AGV utilization, see Fig. 5a and 5b. Almost all the strategieshave given similar results to each other. The only difference is that, since there is one AGV car in scenario 1, the material handling system is busier than in the other scenarios. Again, parallel to jobs produced in the system, the AGV utilization is either increased or decreased. Figure 3: Mean Tardiness for Scenario Robot Utilization Robot is used for part loading, unloading and tool exchanging activities. Fig. 6a and 6b show the graphical comparison of robot utilization for all scenarios. The figures clearly show that the full kitting and the differential kitting strategies keep the robot busier than the other strategies for all part scheduling rules because of relatively more tool exchanging activities Scenario 1-Machine Utilization FK DK STK RK Figure 4: Average Machine Utilization for Scenario Production Rate Figure 7 shows the graphical comparison of the production rate for the tooling strategies and part scheduling rules for scenarios 1. The graph shows that there is no significant production rate difference between tooling strategies-part scheduling rules pairs. For scenario 1, since there is one AGV, relatively less material is transferred than the material transferred in the other scenarios. Therefore the production rate is less in comparison to the other scenarios. Also, for scenario 4, since the pallet number is smaller than the pallet numbers in scenarios 2, 3 and 5, the part transfer and therefore production rate is less when they are compared with the other three scenarios. For pallet number 20, scenario 5 and pallet number 40, scenarios 2 and 3, the production rate is almost the same. This means that 20 and more pallets are enough to run the system smoothly. Therefore, there is almost no
6 814 Ozbayrak, Turker, and Pisman difference between 20 and 40-pallet systems in terms of production rate. Scenario 1-Average AGV Utilization Figure 5a: Average AGV Utilization for Scenario 1 Scenario 1-Average AGV Utilization Figure 5b: Average AGV Utilization for Scenarios 2 and Tool Requirements Planning As shown in Table 1, due to the nature of the full kitting strategy, which involves a complete tool exchange for each job, a large number of tools are required. This creates extensive tool traffic between cell based secondary tool stores (STS) and the machine based primary tool stores (PTS) unnecessarily with too many sister tools involved in the tool traffic the majority of which are used very lightly, see Fig. 8. Since a tool kit is assigned to each job, the part scheduling rule has no effect on the tool requirements at all. As indicated in Table 1, the differential kitting strategy s primary characteristic, tool sharing between successive jobs, leads to substantial savings in tool requirements. The strategy largely depends on part scheduling rules. If a scheduling rule assigns a very diverse list of jobs to the same machine in terms of tool commonality, then the differential kitting strategy may perform poorly. A scheduling rule involving part-tool clustering can lead to substantial tool savings when it is coupled with differential kitting strategy Production Rate as Process Batches- Scenario 1 FK DK STK RK Robot Utilization - Scenario Figure 7: Production Rate for Scenario Figure 6a: Robot Utilization for Scenario 1 Robot Utilization -Scenarios 2, Figure 6b: Robot Utilization for Scenarios 2 and 3 The single tools kitting strategy concerns the assignment of all tool types at the beginning of the manufacturing period, therefore, the strategy guarantees tool availability. The strategy uses tool life effectively and works very efficiently, especially with a large magazine capacity. As seen in Table 1, with a smaller magazine capacity, Scenario 3, because of relatively frequent tool exchange which results in inefficient tool life utilization, the tool requirement has increased in comparison to other single tools kitting strategy applications with the larger magazine capacity, Scenarios 2, 4, and 5. Since the strategy aims to guarantee the tool availability at each machine, the part scheduling rules have no significant effect on the strategy s tool requirement. The resident kitting strategy gives a similar performance to the single tools strategy, see Table 1 and Fig. 8. Especially in long term manufacturing, which has happened here, the strategy turns to be a single tools kitting strategy and works in a similar way. Therefore, the strategy s performance follows almost the same
7 Part and Tool Flow Management in Multi-Cell Flexible Manufacturing System 815 pattern with the single tools strategy. However, the strategy works better with lean magazine capacity, Scenario 3. The reason for this, is that the strategy does not require whole tool types at the beginning and only requires succeeding tool kit difference. Therefore the tool life is used in a more efficient way which pulls gross tool requirement down. 4.8 Worn Tool Quantity The worn tool quantity is a result of efficient tool life utilization. As shown in Fig. 9 and Table 1, the strategies which are more effective in tool life utilization have produced more worn tools. Since the worn tool quantity is a derivation of tooling strategies, the same comment can be made for the tooling strategies in terms of worn tools. The part scheduling rules have almost no effect on the worn tool quantity. Tool Requirement for Scenario Figure 8: Tool Requirement for Scenario 1 5 CONCLUSION Part and tool flow management play important roles in the operation of a flexible manufacturing system. Most of the researches done in this field consider part and tool flow as separate issues and often, the effects of one of the pair on the other is neglected. In this paper, dual flow of parts and tools have been considered, taking into account four popular part scheduling and four tool assignment strategies. A simulation model has been designed for different cell configurations which has led to a study of the different aspects of the system. The effects of the different part scheduling rules on the tooling requirements are not very significant and there is no part scheduling-tool assignment strategy pair available that is consistently superior. However, the full kitting strategy, because of a great number of tool exchanges, always gives the worst performance and the single tools kitting and the resident kitting strategies, because of extensive tool life sharing, have given relatively better performance in terms of tool requirements, worn tools, mean tardiness, mean flow time, and average machine utilization for almost all cases. Our future research will focus on tool re-cycling for the low tool life sharing strategies and building a tool refurbishment facility in the cell for the resharpenable tools for further tooling economy. Worn Tools Quantity for Scenario Figure 9: Worn Tools Quantity for Scenario 1 REFERENCES Amoaka-Gyampah, K.A., J.R. Meredith, and A. Raturi A comparison of tool management strategies and part selection rules for a flexible manufacturing systems. International Journal of Production Research 30 (4): Carrie, A.S., and D.T.S. Perera Work scheduling in FMS under tool availability constraints. International Journal of Production Research 24 (6): Coleman, P., M. Özbayrak, and R. Bell. 1996a. Tool management and job allocation in flexible machining cells, Part 1: Work oriented strategies. Proceeding of IMechE Part B: Journal of Engineering Manufacture 210 (5B): Coleman, P., M. Özbayrak, and R. Bell. 1996b. Tool management and job allocation in flexible machining cells, Part 2: Tool oriented strategies. Proceedings of IMechE Part B: Journal of Engineering Manufacture 210 (5B): Ghosh, S., S. A. Melynk, and G. L. Ragatz Tooling constraints and shop floor scheduling: evaluating the impact of a sequence dependency. International Journal of Production Research 30 (6): Graver, T. W. and L. F. McGinnis A Tool provisioning problem in FMS. The International Journal of Flexible Manufacturing Systems 1: Melnyk, S.A., S. Ghosh, and G.L. Ragatz Tooling constrains and shop floor scheduling: a simulation study. Journal of Operation Management 8 (2): Pedgen, D. C, Shannon, R. E., R. P. Sadowski Introduction to Simulation Using SIMAN. New York: MCGraw-Hill.
8 816 Ozbayrak, Turker, and Pisman Stecke, K. E. and I. Kim Formulation and solution of nonlinear integer production planning problems for flexible manufacturing systems. Management Science 29: Unal, A. T., and A. S. Kiran Batch Sequencing. IIE Transactions 24 (4): Ventura, J.A., F. F. Chen Grouping parts and tools in flexible manufacturing systems production planning. International Journal of Production Research 28 (6): AUTHOR BIOGRAPHIES MUSTAFA ÖZBAYRAK is an assistant professor in the Department of Industrial Engineering at Marmara University. He received a B.S.I.E from Cukurova University and an M.S.I.E from Anadolu University. He also holds an M.Phil. and a Ph.D. in manufacturing engineering, both from Loughborough University of Technology. His research interests include modeling and analysis of manufacturing systems, production planning, and control in advanced manufacturing systems. A. KURSAD TURKER is a Ph.D. candidate in the Department of Industrial Engineering at the Sakarya University. He received a B.S.I.E from Istanbul Technical University, and he received an M.S.I.E from Yildiz University. His research interests include simulation modeling and analysis of production as well as service systems. MELEK PISMAN is a Ph.D. student in the Department of Production/Operations Management at the Sakarya University. She received a B.S. in business administration and an MBA both from Uludag University. Her research interests include the planning and control of advanced manufacturing systems, system dynamics and economic aspects of operating production systems. Table 1: Tool Requirement and Worn Tools Quantity for all Scenarios Tool Requirement Planning Worn Tools Quantity FK Scenario DK STK RK FK Scenario DK STK RK FK Scenario DK STK RK FK Scenario DK STK RK FK Scenario DK STK RK
Scheduling of a computer integrated manufacturing system: A simulation study
JIEM, 011 4(4):577-609 Online ISSN: 01-095 Print ISSN: 01-84 http://dx.doi.org/10.96/jiem.1 Scheduling of a computer integrated manufacturing system: A simulation study Nadia Bhuiyan 1, Gerard Gouw 1,
Factors to Describe Job Shop Scheduling Problem
Job Shop Scheduling Job Shop A work location in which a number of general purpose work stations exist and are used to perform a variety of jobs Example: Car repair each operator (mechanic) evaluates plus
Computer Integrated Manufacturing CIM A T I L I M U N I V E R S I T Y
MFGE 404 Computer Integrated Manufacturing CIM A T I L I M U N I V E R S I T Y Manufacturing Engineering Department Lecture 1 - Introduction Dr. Saleh AMAITIK Fall 2005/2006 Production Systems Production
Flexible Manufacturing System
Flexible Manufacturing System Introduction to FMS Features of FMS Operational problems in FMS Layout considerations Sequencing of Robot Moves FMS Scheduling and control Examples Deadlocking Flow system
- 1 - intelligence. showing the layout, and products moving around on the screen during simulation
- 1 - LIST OF SYMBOLS, TERMS AND EXPRESSIONS This list of symbols, terms and expressions gives an explanation or definition of how they are used in this thesis. Most of them are defined in the references
Determining Inventory Levels in a CONWIP Controlled Job Shop
Determining Inventory Levels in a CONWIP Controlled Job Shop Sarah M. Ryan* Senior Member, IIE Department of Industrial and Management Systems Engineering University of Nebraska-Lincoln Lincoln, NE 68588-0518
SIMULATION BASED APPROACH TO STUDY THE INTERACTION OF SCHEDULING AND ROUTING ON A LOGISTIC NETWORK
SIMULATION BASED APPROACH TO STUDY THE INTERACTION OF SCHEDULING AND ROUTING ON A LOGISTIC NETWORK Alex J. Ruiz-Torres Department of Decision Sciences Florida Gulf Coast University 17595 S. Tamiami Trail,
Design Simulations Deliver Measurable Performance
Design Simulation for TransCar Automated Guided Vehicle System (AGVS) Forecast the ability of an automated material transport system design to perform the defined workload within the available space and
1 st year / 2014-2015/ Principles of Industrial Eng. Chapter -3 -/ Dr. May G. Kassir. Chapter Three
Chapter Three Scheduling, Sequencing and Dispatching 3-1- SCHEDULING Scheduling can be defined as prescribing of when and where each operation necessary to manufacture the product is to be performed. It
Automated Scheduling Methods. Advanced Planning and Scheduling Techniques
Advanced Planning and Scheduling Techniques Table of Contents Introduction 3 The Basic Theories 3 Constrained and Unconstrained Planning 4 Forward, Backward, and other methods 5 Rules for Sequencing Tasks
jobs that obey the norms must ensure the load balancing qualities. Load balancing should be interpreted as releasing a balanced mix of jobs to the
Summary The term job shops is used to indicate companies that produce customer-specific components in small batches. Jobs (production orders) in a job shop are characterised by a large variety of routings
Priori ty ... ... ...
.Maintenance Scheduling Maintenance scheduling is the process by which jobs are matched with resources (crafts) and sequenced to be executed at certain points in time. The maintenance schedule can be prepared
A Robustness Simulation Method of Project Schedule based on the Monte Carlo Method
Send Orders for Reprints to [email protected] 254 The Open Cybernetics & Systemics Journal, 2014, 8, 254-258 Open Access A Robustness Simulation Method of Project Schedule based on the Monte Carlo
An investigation into production scheduling systems
Computer Science Kjell Olofsson An investigation into production scheduling systems D-dissertation (10 p) 2004:06 This report is submitted in partial fulfillment of the requirements for the Master s degree
Modeling Agile Manufacturing Cell using Object-Oriented Timed Petri net
Modeling Agile Manufacturing Cell using Object-Oriented Timed Petri net Peigen Li, Ke Shi, Jie Zhang Intelligent Manufacturing Lab School of Mechanical Science and Engineering Huazhong University of Science
High-Mix Low-Volume Flow Shop Manufacturing System Scheduling
Proceedings of the 14th IAC Symposium on Information Control Problems in Manufacturing, May 23-25, 2012 High-Mix Low-Volume low Shop Manufacturing System Scheduling Juraj Svancara, Zdenka Kralova Institute
DEVELOPING A PHYSICAL EMULATOR FOR A FLEXIBLE MANUFACTURING SYSTEM
DEVELOPING A PHYSICAL EMULATOR FOR A FLEXIBLE MANUFACTURING SYSTEM Fernando G. Gonzalez Department of Electrical and Computer Engineering University of Central Florida Orlando, Florida 32816 USA (407)823-3987
Resource grouping selection to minimize the maximum over capacity planning
2012 International Conference on Industrial and Intelligent Information (ICIII 2012) IPCSIT vol.31 (2012) (2012) IACSIT Press, Singapore Resource grouping selection to minimize the maximum over capacity
R u t c o r Research R e p o r t. A Method to Schedule Both Transportation and Production at the Same Time in a Special FMS.
R u t c o r Research R e p o r t A Method to Schedule Both Transportation and Production at the Same Time in a Special FMS Navid Hashemian a Béla Vizvári b RRR 3-2011, February 21, 2011 RUTCOR Rutgers
QUEST The Systems Integration, Process Flow Design and Visualization Solution
Resource Modeling & Simulation DELMIA QUEST The Systems Integration, Process Flow Design and Visualization Solution DELMIA QUEST The Systems Integration, Process Flow Design and Visualization Solution
A SIMULATION STUDY FOR DYNAMIC FLEXIBLE JOB SHOP SCHEDULING WITH SEQUENCE-DEPENDENT SETUP TIMES
A SIMULATION STUDY FOR DYNAMIC FLEXIBLE JOB SHOP SCHEDULING WITH SEQUENCE-DEPENDENT SETUP TIMES by Zakaria Yahia Abdelrasol Abdelgawad A Thesis Submitted to the Faculty of Engineering at Cairo University
NEW MODELS FOR PRODUCTION SIMULATION AND VALIDATION USING ARENA SOFTWARE
NEW MODELS FOR PRODUCTION SIMULATION AND VALIDATION USING ARENA SOFTWARE Marinela INŢĂ 1 and Achim MUNTEAN 1 ABSTRACT: Currently, Lean Manufacturing is a recognized topic in many research fields, which
Integrated support system for planning and scheduling... 2003/4/24 page 75 #101. Chapter 5 Sequencing and assignment Strategies
Integrated support system for planning and scheduling... 2003/4/24 page 75 #101 Chapter 5 Sequencing and assignment Strategies 5.1 Overview This chapter is dedicated to the methodologies used in this work
AN INDUSTRIAL APPLICATION OF THE SMED METHODOLOGY AND OTHER LEAN PRODUCTION TOOLS
Integrity, Reliability and Failure of Mechanical Systems Paper Ref: 3927 AN INDUSTRIAL APPLICATION OF THE SMED METHODOLOGY AND OTHER LEAN PRODUCTION TOOLS Eric Costa 1(*), Rui Sousa 1, Sara Bragança 1,
Chapter 11. MRP and JIT
Chapter 11 MRP and JIT (Material Resources Planning and Just In Time) 11.1. MRP Even if MRP can be applied among several production environments, it has been chosen here as a preferential tool for the
Implementing Automation after Making Lean Improvements
Implementing Automation after Making Lean Improvements Frank C. Garcia, P.E., Director Business Solutions & Engineering Services Tom Lawton, President Advent Design Corporation Bristol, PA, USA December
A Comparison Study of Qos Using Different Routing Algorithms In Mobile Ad Hoc Networks
A Comparison Study of Qos Using Different Routing Algorithms In Mobile Ad Hoc Networks T.Chandrasekhar 1, J.S.Chakravarthi 2, K.Sravya 3 Professor, Dept. of Electronics and Communication Engg., GIET Engg.
15. Flexible Manufacturing Systems
15. Flexible Manufacturing Systems 15.1 Unit Introduction 15.2 Unit Objectives 15.3 Flexible Manufacturing Systems 15.4 FMS Components 15.5 FMS Applications and Benefits 15.6 FMS Planning and Implementation
Analysis Of Shoe Manufacturing Factory By Simulation Of Production Processes
Analysis Of Shoe Manufacturing Factory By Simulation Of Production Processes Muhammed Selman ERYILMAZ a Ali Osman KUŞAKCI b Haris GAVRANOVIC c Fehim FINDIK d a Graduate of Department of Industrial Engineering,
SUPPLY CHAIN MODELING USING SIMULATION
SUPPLY CHAIN MODELING USING SIMULATION 1 YOON CHANG AND 2 HARRIS MAKATSORIS 1 Institute for Manufacturing, University of Cambridge, Cambridge, CB2 1RX, UK 1 To whom correspondence should be addressed.
Production Management for the Pulp and Paper Industry. Industrial IT Tools for Production Data Management
Production Management for the Pulp and Paper Industry Industrial IT Tools for Production Data Management Towards Optimum Mill Performance with Managing the production process Industrial IT Production Management
Operations Management
Operations Management Short-Term Scheduling Chapter 15 15-1 Outline GLOAL COMPANY PROFILE: DELTA AIRLINES THE STRATEGIC IMPORTANCE OF SHORT- TERM SCHEDULING SCHEDULING ISSUES Forward and ackward Scheduling
AS-D1 SIMULATION: A KEY TO CALL CENTER MANAGEMENT. Rupesh Chokshi Project Manager
AS-D1 SIMULATION: A KEY TO CALL CENTER MANAGEMENT Rupesh Chokshi Project Manager AT&T Laboratories Room 3J-325 101 Crawfords Corner Road Holmdel, NJ 07733, U.S.A. Phone: 732-332-5118 Fax: 732-949-9112
Warehouse Management in
Warehouse Management in Microsoft Dynamics NAV 2013 Technical White Paper Warehouse Management... 1 Warehouse Overview... 2 Basic or Advanced Warehousing... 3 Warehouse Setup... 4 Bin and Bin Content...
Dave Sly, PhD, MBA, PE Iowa State University
Dave Sly, PhD, MBA, PE Iowa State University Tuggers deliver to multiple locations on one trip, where Unit Load deliveries involve only one location per trip. Tugger deliveries are more complex since the
CHAPTER 1. Basic Concepts on Planning and Scheduling
CHAPTER 1 Basic Concepts on Planning and Scheduling Scheduling, FEUP/PRODEI /MIEIC 1 Planning and Scheduling: Processes of Decision Making regarding the selection and ordering of activities as well as
Operations Management OPM-301-TE
Operations Management OPM-301-TE This TECEP focuses on the process of transforming inputs through a value-added process to produce goods and services. Topics covered include value chains, performance measurement,
Elevator Simulation and Scheduling: Automated Guided Vehicles in a Hospital
Elevator Simulation and Scheduling: Automated Guided Vehicles in a Hospital Johan M. M. van Rooij Guest Lecture Utrecht University, 31-03-2015 from x to u The speaker 2 Johan van Rooij - 2011 current:
BEYOND THE BASICS OF MRP: IS YOUR SYSTEM DRIVING EXCESSIVE ORDER QUANTITITES? Michael D. Ford, CFPIM, CSCP, CQA, CRE Principal, TQM Works Consulting
BEYOND THE BASICS OF MRP: IS YOUR SYSTEM DRIVING EXCESSIVE ORDER QUANTITITES? Michael D. Ford, CFPIM, CSCP, CQA, CRE Principal, TQM Works Consulting INTRODUCTION MRP (Material Requirements Planning) has
Short-Term Scheduling
Strategic Implications of By scheduling effectively, companies use assets more effectively and create greater capacity per dollar invested, which, in turn, lowers cost This added capacity and related flexibility
A simple analysis of the TV game WHO WANTS TO BE A MILLIONAIRE? R
A simple analysis of the TV game WHO WANTS TO BE A MILLIONAIRE? R Federico Perea Justo Puerto MaMaEuSch Management Mathematics for European Schools 94342 - CP - 1-2001 - DE - COMENIUS - C21 University
Wait-Time Analysis Method: New Best Practice for Performance Management
WHITE PAPER Wait-Time Analysis Method: New Best Practice for Performance Management September 2006 Confio Software www.confio.com +1-303-938-8282 SUMMARY: Wait-Time analysis allows IT to ALWAYS find the
DISCRETE EVENT SIMULATION IN THE DESIGN, LAYOUT AND SCHEDULING OF PIPELESS BATCH PLANTS
DISCRETE EVENT SIMULATION IN THE DESIGN, LAYOUT AND SCHEDULING OF PIPELESS BATCH PLANTS F. Mushtaq and P.W.H. Chung Department of Chemical Engineering, Loughborough University, Loughborough, Leicestershire,
PERFORMANCE ANALYSIS OF AN AUTOMATED PRODUCTION SYSTEM WITH QUEUE LENGTH DEPENDENT SERVICE RATES
ISSN 1726-4529 Int j simul model 9 (2010) 4, 184-194 Original scientific paper PERFORMANCE ANALYSIS OF AN AUTOMATED PRODUCTION SYSTEM WITH QUEUE LENGTH DEPENDENT SERVICE RATES Al-Hawari, T. * ; Aqlan,
MIP-Based Approaches for Solving Scheduling Problems with Batch Processing Machines
The Eighth International Symposium on Operations Research and Its Applications (ISORA 09) Zhangjiajie, China, September 20 22, 2009 Copyright 2009 ORSC & APORC, pp. 132 139 MIP-Based Approaches for Solving
Agile Manufacturing for ALUMINIUM SMELTERS
Agile Manufacturing for ALUMINIUM SMELTERS White Paper This White Paper describes how Advanced Information Management and Planning & Scheduling solutions for Aluminium Smelters can transform production
Smart Shopping Cart. Group 5. March 11, 2008. Advisor: Professor Haibo He
Smart Shopping Cart Group 5 March 11, 2008 Advisor: Professor Haibo He ------------------------------ Group Members: Norasyikin Fadilah Siti Fatimah Ahmad Anirudh Argawal Rajwinder Singh Katherine Casella
A Genetic Algorithm Approach for Solving a Flexible Job Shop Scheduling Problem
A Genetic Algorithm Approach for Solving a Flexible Job Shop Scheduling Problem Sayedmohammadreza Vaghefinezhad 1, Kuan Yew Wong 2 1 Department of Manufacturing & Industrial Engineering, Faculty of Mechanical
Sequencing in Process Manufacturing The Product Wheel Approach
Sequencing in Process Manufacturing The Product Wheel Approach Shellyanne Wilson ([email protected]) The University of Trinidad and Tobago Abstract Sequencing is perhaps the single most important
INTRODUCTION TO MANUFACTURING EXECUTION SYSTEMS MES CONFERENCE & EXPOSITION. Baltimore, Maryland
INTRODUCTION TO MANUFACTURING EXECUTION SYSTEMS MES CONFERENCE & EXPOSITION JUNE 4-6, 2001 Baltimore, Maryland Michael McClellan President MES Solutions Incorporated Terrebonne, Oregon 97760 541 548 6690
KNOWLEDGE-BASED MODELING OF DISCRETE-EVENT SIMULATION SYSTEMS. Henk de Swaan Arons
KNOWLEDGE-BASED MODELING OF DISCRETE-EVENT SIMULATION SYSTEMS Henk de Swaan Arons Erasmus University Rotterdam Faculty of Economics, ment of Computer Science P.O. Box 1738, H9-28 3000 DR Rotterdam, The
Improving Operational Efficiencies through Analytic Software for Manufacturing Companies
ceocfointerviews.com All rights reserved! Issue: July 13, 2015 The Most Powerful Name in Corporate News Improving Operational Efficiencies through Analytic Software for Manufacturing Companies Pablo Asiron
Humanitarian Supply Chain Management An Overview
Humanitarian Supply Chain Management An Overview Ozlem Ergun, Gonca Karakus, Pinar Keskinocak, Julie Swann, Monica Villarreal H. Milton Stewart School of Industrial and Systems Engineering, Georgia Institute
AUTOMATIC CREATION OF SIMULATION MODELS FOR FLOW ASSEMBLY LINES
AUTOMATIC CREATION OF SIMULATION MODELS FOR FLOW ASSEMBLY LINES João Weinholtz, Rui Loureiro, Carlos Cardeira, João M. Sousa Instituto Superior Técnico, Technical University of Lisbon Dept. of Mechanical
Understanding Manufacturing Execution Systems (MES)
Understanding Manufacturing Execution Systems (MES) Presented by: Shirley Schmidt Freedom Technologies 10370 Citation Dr., Suite 200 Brighton, MI 48116 Phone: 810-227-3737 www.freedomcorp.com What is a
PROCESS FLOW IMPROVEMENT PROPOSAL OF A BATCH MANUFACTURING SYSTEM USING ARENA SIMULATION MODELING
PROCESS FLOW IMPROVEMENT PROPOSAL OF A BATCH MANUFACTURING SYSTEM USING ARENA SIMULATION MODELING Chowdury M. L. RAHMAN 1 Shafayet Ullah SABUJ 2 Abstract: Simulation is frequently the technique of choice
A SIMULATION MODEL FOR RESOURCE CONSTRAINED SCHEDULING OF MULTIPLE PROJECTS
A SIMULATION MODEL FOR RESOURCE CONSTRAINED SCHEDULING OF MULTIPLE PROJECTS B. Kanagasabapathi 1 and K. Ananthanarayanan 2 Building Technology and Construction Management Division, Department of Civil
Basic Queuing Relationships
Queueing Theory Basic Queuing Relationships Resident items Waiting items Residence time Single server Utilisation System Utilisation Little s formulae are the most important equation in queuing theory
COMPANY... 3 SYSTEM...
Wisetime Ltd is a Finnish software company that has longterm experience in developing industrial Enterprise Resource Planning (ERP) systems. Our comprehensive system is used by thousands of users in 14
Shareability and Locality Aware Scheduling Algorithm in Hadoop for Mobile Cloud Computing
Shareability and Locality Aware Scheduling Algorithm in Hadoop for Mobile Cloud Computing Hsin-Wen Wei 1,2, Che-Wei Hsu 2, Tin-Yu Wu 3, Wei-Tsong Lee 1 1 Department of Electrical Engineering, Tamkang University
4.1. Chapter 4. Process design 4.1
4.1 Chapter 4 Process design 4.1 4.2 Key operations questions In Chapter 4 Process design Slack et al. identify the following key questions: What is process design? What objectives should process design
Chapter 6. Inventory Control Models
Chapter 6 Inventory Control Models Learning Objectives After completing this chapter, students will be able to: 1. Understand the importance of inventory control and ABC analysis. 2. Use the economic order
The World Bank. 1 System choice
Selecting road management systems (Source: Robinson, R, 1995. Rethinking policy, strategy and information under severe budget constraints: management information and tools to prioritise works. In: World
Interactive Dynamic Modeling for the Passenger Flow Bottleneck and Security Checkpoint Management at an Airport
Interactive Dynamic Modeling for the Passenger Flow Bottleneck and Security Checkpoint Management at an Airport Yaman BARLAS M. Serdar ÇAKACIASLAN Tolga SAĞLIK Pınar SEKE Mustafa UĞUR Boğaziçi University
/ Department of Mechanical Engineering. Manufacturing Networks. Warehouse storage: cases or layers? J.J.P. van Heur. Where innovation starts
/ Department of Mechanical Engineering Manufacturing Networks Warehouse storage: cases or layers? J.J.P. van Heur Where innovation starts Systems Engineering Group Department of Mechanical Engineering
PART III. OPS-based wide area networks
PART III OPS-based wide area networks Chapter 7 Introduction to the OPS-based wide area network 7.1 State-of-the-art In this thesis, we consider the general switch architecture with full connectivity
Push and Pull Production Systems
Push and Pull Production Systems You say yes. I say no. You say stop. and I say go, go, go! The Beatles 1 The Key Difference Between Push and Pull Push Systems: schedule work releases based on demand.
Final Year Projects at itm. Topics 2010/2011
Final Year Projects at itm Topics 2010/2011 Chair of Information Technology in Mechanical Engineering Prof. Dr.-Ing. B. Vogel-Heuser Prof. Dr.-Ing. Frank Schiller Prof. Dr.-Ing. Klaus Bender Technische
Linear Programming. Solving LP Models Using MS Excel, 18
SUPPLEMENT TO CHAPTER SIX Linear Programming SUPPLEMENT OUTLINE Introduction, 2 Linear Programming Models, 2 Model Formulation, 4 Graphical Linear Programming, 5 Outline of Graphical Procedure, 5 Plotting
Graphical Scheduler. Get on time All the time. For Production
Graphical Scheduler Get on time All the time For Production Summary JobPack Graphical Scheduler provides REAL DELIVERY DATES, Instantly and in real time. At a glance late jobs are known, bottlenecks identified,
IMPACT OF PROCESS VARIABILITY ON LEAN MANUFACTURING SYSTEMS
IMPACT OF PROCESS VARIABILITY ON LEAN MANUFACTURING SYSTEMS Mel Adams and Bernard J. Schroer Center for Automation & Robotics University of Alabama in Huntsville Huntsville, AL 35899 [email protected]
INVENTORY MANAGEMENT, SERVICE LEVEL AND SAFETY STOCK
INVENTORY MANAGEMENT, SERVICE LEVEL AND SAFETY STOCK Alin Constantin RĂDĂŞANU Alexandru Ioan Cuza University, Iaşi, Romania, [email protected] Abstract: There are many studies that emphasize as
HARDWARE ACCELERATION IN FINANCIAL MARKETS. A step change in speed
HARDWARE ACCELERATION IN FINANCIAL MARKETS A step change in speed NAME OF REPORT SECTION 3 HARDWARE ACCELERATION IN FINANCIAL MARKETS A step change in speed Faster is more profitable in the front office
SC21 Manufacturing Excellence. Process Overview
SC21 Manufacturing Excellence Process Overview Prepared by:- The SC21 Performance, Development and Quality (PDQ) Special Interest Group (SIG) Acknowledgement The scoring methodology used in the Management
CRITICAL PATH ANALYSIS AND GANTT CHARTS
CRITICAL PATH ANALYSIS AND GANTT CHARTS 1. An engineering project is modelled by the activity network shown in the figure above. The activities are represented by the arcs. The number in brackets on each
GANTRY ROBOTIC CELL FOR AUTOMATIC STORAGE AND RETREIVAL SYSTEM
Advances in Production Engineering & Management 4 (2009) 4, 255-262 ISSN 1854-6250 Technical paper GANTRY ROBOTIC CELL FOR AUTOMATIC STORAGE AND RETREIVAL SYSTEM Ata, A., A.*; Elaryan, M.**; Gemaee, M.**;
Material Requirements Planning (MRP)
Material Requirements Planning (MRP) Unlike many other approaches and techniques, material requirements planning works which is its best recommendation. Joseph Orlicky, 1974 1 History Begun around 1960
Kellogg Graduate School of Management Northwestern University
Kellogg Graduate School of Management Northwestern University Operations MORE SAMPLE EXAM QUESTIONS: SOLUTIONS [1] Consider the life cycle of a product from introduction to maturity to decline. What kind
SOLIDWORKS SOFTWARE OPTIMIZATION
W H I T E P A P E R SOLIDWORKS SOFTWARE OPTIMIZATION Overview Optimization is the calculation of weight, stress, cost, deflection, natural frequencies, and temperature factors, which are dependent on variables
LECTURE 1 SERVICE INVENTORY MANAGEMENT
LECTURE 1 SERVICE INVENTORY MANAGEMENT Learning objective To discuss the role of service inventory and types of inventories in service sector 10.1 Service Inventory A Service product can be viewed as a
Material Requirements Planning. Lecturer: Stanley B. Gershwin
Material Requirements Planning Lecturer: Stanley B. Gershwin MRP Overview Primary source: Factory Physics by Hopp and Spearman. Basic idea: Once the final due date for a product is known, and the time
COMPUTER INTEGRATED MANUFACTURING
CHAPTER COMPUTER INTEGRATED MANUFACTURING 1 An overview of CIM is presented in this chapter. A brief account of the evolution of CIM is included. The major functions carried out in a manufacturing plant
ISSN: 2319-5967 ISO 9001:2008 Certified International Journal of Engineering Science and Innovative Technology (IJESIT) Volume 2, Issue 4, July 2013
Study of Kanban and Conwip Analysis on Inventory and Production Control System in an Industry Kailash Kumar Lahadotiya, Ravindra pathak, Asutosh K Pandey Rishiraj Institute of Technology, Indore-India,
16 Learning Curve Theory
16 Learning Curve Theory LEARNING OBJECTIVES : After studying this unit, you will be able to : Understanding, of learning curve phenomenon. Understand how the percentage learning rate applies to the doubling
American Journal Of Business Education July/August 2012 Volume 5, Number 4
The Impact Of The Principles Of Accounting Experience On Student Preparation For Intermediate Accounting Linda G. Carrington, Ph.D., Sam Houston State University, USA ABSTRACT Both students and instructors
Visual Planning and Scheduling Systems. A White Paper. Gregory Quinn President Quinn & Associates Inc September 2006 Updated October 2006
Visual Planning and Scheduling Systems A White Paper By Gregory Quinn President Quinn & Associates Inc September 2006 Updated October 2006 Visual Planning and Visual Scheduling Systems Introduction The
Technology Trends in MRO Inventory Management
June 2012 Technology Trends in MRO Inventory Management Technological Advances Technological advances are changing the dynamics in level of MRO inventory management and data management has a distinct focus
TEACHING AGGREGATE PLANNING IN AN OPERATIONS MANAGEMENT COURSE
TEACHING AGGREGATE PLANNING IN AN OPERATIONS MANAGEMENT COURSE Johnny C. Ho, Turner College of Business, Columbus State University, Columbus, GA 31907 David Ang, School of Business, Auburn University Montgomery,
The Ultimate WISP Customer Experience. A White Paper by Leon Hubby Co-Founder, Mesh Networks
The Ultimate WISP Customer Experience A White Paper by Leon Hubby Co-Founder, Mesh Networks Contents Introduction... 3 At Issue The Problem... 3 Current Protocol- Not a Solution... 3 Exceeding Expectations-