1 Technical collection Capacitor Bank Switching with Vacuum Circuit Breakers Conferences publications H. Schellekens

2 2008 China International Conference on Electricity Distribution (CICED 2008) 1 Capacitor Bank Switching with Vacuum Circuit Breakers Hans Schellekens Schneider Electric, Power SBU, Medium Voltage Development, Usine 38V, ZAC Champ Saint-Ange, Varces, France Abstract: After interruption of a capacitive current sometimes Non Sustained Disruptive Discharges (NSDDs) are observed when using vacuum circuit breakers. According to network calculations, NSDDs generate significant over-voltage on the terminal of the capacitor bank to ground and across the circuit breaker (CB) terminals. In a full scale experiment at 12kV on an 8Mvar capacitor bank artificial NSDDs are produced using a Triggered Vacuum Gap. The over-voltage depends on the momentary voltage difference across the breaker and, hence, varies with the phase angle. The over-voltage on the terminal of the capacitor bank to ground varies from 1.5 to 4.2 pu, and to maximum 5.2 pu. across the CB terminals. The effectiveness of surge arrestors on the limitation of the over-voltages is measured. The over-voltages are limited to 2.2 pu. on the terminals of the capacitor bank to ground and 3.2 pu. across the CB terminals. A single surge arrestor on the neutral point of the capacitor bank yields the same level of protection and, therefore, is a cost effective alternative. An application guide for switchgear and arrestors is presented. 1. INTRODUCTION The capacitive current switching duty is characterised by frequent, day to day or hour by hour, switching of low to moderate currents in industrial or public networks, and by a low rate of rise of recovery voltage. Modern circuit breakers (CB s) which claim a long mechanical but also electrical life without maintenance seem to be best adapted to this switching duty [1,2,3]. Yet the behaviour of vacuum CB s is rather different from that of gas CB s. Today, the circuit breaker envisioned for capacitor bank switching is either a vacuum or SF6 circuit breaker or a vacuum or SF6 contactor. All these devices are known for their long service life. The circuit breaker offers a protection against short circuit currents with an electrical life between and operations at nominal current. Contactors offer an electrical life up to 1 million operations depending on load conditions. SF6 CB s, in the past referred to as restrike free breakers, are according to the new IEC class C2 breakers with proven very low restrike probability [4]. Field experience indicates that the restrike probability even for the electrically very stressed 36 kv networks is lower than 1/ For vacuum CB s, the physical processes during the capacitive switching duty have been studied by [5]. They found that the pre-ignition at contact closing and the subsequent inrush current heavily eroded the contacts leading to detached particles. These particles cause late breakdowns which appear as NSDDs 1. Breakdown frequencies of typically 3/1000 where found under the experimental conditions studied. The probability of breakdown depends on the dielectric conception or contact stroke of the vacuum interrupter. So for the same voltage rating different designs lead to different probabilities of occurrence of NSDD. Fig. 1 shows the experimentally found relation between dielectric conception, based on contact gap, and the probability of a NSDD during an operation. It shows that a minimum contact distance of 16 mm is necessary to reduce this probability below 1/500. The overvoltage produced by a NSDD differs notably from the overvoltage produced by a restrike. A restrike can generate an overvoltage of 3 pu. between the terminals of the capacitor bank, whereas a NSDD causes a sudden voltage shift of the neutral capacitor bank voltage, which leaves the voltage across the capacitor unchanged, but creates an overvoltage between 1.5 and 5 pu. on the terminal of capacitor bank to ground and between 2.5 and 6 pu. across the CB terminals. Due to this high overvoltage a second NSDD in the adjacent phases becomes more likely. When two NSDDs occur simultaneously, the phenomenon turns into a restrike. Typically, a vacuum CB with a contact gap of about 16 mm has a probability of about 1 NSDD or non-sustained disruptive discharge [7] is a disruptive discharge associated with current interruption that does not result in the resumption of power frequency current or, in the case of capacitive current interruption does not result in current in the main load circuit.

3 China International Conference on Electricity Distribution (CICED 2008)) 1/500 for producing a NSDD and belongs to the class C2 with proven very low restrike probability. Fig.1 : Experimentally found dependence between probability of a NSDD and nominal contact stroke of vacuum interrupter. Due to the rare occurrence and the random nature of the phenomenon, the relation between NSDD and overvoltage is not evident. Therefore in this paper this question is addressed in section II using a numerical network simulation. By this the worst case overvoltage for different voltage levels is determined. Then in section III an experiment designed to verify the simulation results is shown. Here the NSDD is created artificially, which permits to measure the influence of phase angle and network parameters. A good understanding of the origin of the overvoltage enables the definition of protective measures adapted to the switchgear and capacitor bank. In section IV protection schemes based on surge arrestors are tested and compared on their effectiveness. Finally in section V the results are discussed and an application guideline is presented for the choice of switchgear and arrestor. 2. ORIGIN OF OVERVOLTAGES The source side of the network is represented by: - a generator with a driving voltage of U - a short circuit impedance of value Ls - a TRV network as defined by IEC for short circuit conditions - a capacitor Cp to account for parallel feeders The load side of the network is represented by: - a 8Mvar capacitor bank with floating neutral - single phase cables between CB and the bank. The load and the source side of the network are connected to each other by the CB. The CB is treated as an ideal breaker with a NSDD some time after current interruption. The moment of NSDD has been chosen in order to create the worst possible case. The CB is allowed to recover immediately at the first occurring current zero. At a NSDD, on the R phase for the case illustrated by Fig. 2, the voltage across the breaker moves as a travelling wave through the line impedance towards the capacitor bank. The capacitor bank being a high frequency short circuit allows the wave to pass on to the neutral point of the bank. At the neutral point the wave splits itself and continues its propagation in the neighbouring phases towards the healthy CB poles. These healthy poles are in fact open terminals for the incoming wave causing it to reflect by doubling the voltage. After reflection the wave travels back to the failing CB pole. Here it creates a current zero passage on which the breaker can interrupt. The frequency of this current is typically of the order of 100 khz for cable connected capacitor banks. Fig. 3 shows the voltage swing on the bank terminals with respect to ground. Note that 2.1 Numerical simulation The simplified electrical circuit, Fig. 2, will be used here to simulate the phenomena associated with a NSDD; the NSDD is simulated as a temporary loss of dielectric strength in the vacuum interrupter of a vacuum CB. Fig. 3 : The voltage on all 3 capacitor bank terminals during current interruption (at 0.1s) followed by a NSDD (at 0.13s) in R phase in a 12kV network. Fig. 2 : Electric circuit used to calculate overvoltage on capacitor bank during a NSDD. TVG see section III. - For each of the three bank terminals the voltage jumps to a new value, which means that the neutral point of the bank attains also a different value. - The voltage difference between terminals remains

4 2008 China International Conference on Electricity Distribution (CICED 2008) 3 unchanged. The capacitors themselves are not stressed by the breakdown. - The maximum terminal voltage to earth attains a high value (see table I). This is a dc voltage, so all parts of the installation are stressed during a long period. - The CB is stressed by the composed voltage of network voltage and capacitor bank terminal voltage. - The capacity of the bank itself is of no significance for the phenomenon. Table 1: Compilation of voltages associated with capacitor bank switching for nominal network voltages U m U S U C-bank U VCB BIL Power frequency kvrms kvrms kv kv kv kvrms Identification of zones at risk In table I the maximum possible overvoltage produced by a NSDD is shown for three commonly used classes of network voltages. For each voltage class column 2 gives Us the nominal network voltage. Column 3 gives the maximum overvoltage on the capacitor bank terminal to ground and column 4 the maximum overvoltage across the CB terminals. For reference the BIL and power frequency withstand voltages of the equipment are given. For all three voltage classes both overvoltages exceed the peak value of the power frequency withstand voltage. For the CB the overvoltage comes very close to the rated BIL voltage for 36 kv class networks. 2. EXPERIMENTAL VERIFICATION 3.1 Test procedure The objective was to create in a reproducible way NSDD type breakdowns in a capacitive current interruption test. This allowed to minimize the number of tests to obtain the desired NSDD. NSDDs do not occur frequently and are therefore difficult to reproduce. A triggered vacuum gap (TVG) parallel to the R-phase of the VCB is used to create an artificial NSDD in a controllable way. A separate experiment confirmed that the TVG was able to interrupt high frequency currents of, for instance, 300A at 100kHz and 10 A at 900 khz at the first current zero. Hence, the duration of the artificial NSDD is determined by the circuit topology and only one half cycle of high frequency current will pass through the TVG. Numerical modelling showed that this will lead to the highest possible overvoltage. Using the TVG provided a measurement window with high frequency sampling centred at the time of breakdown allowing precise measurements to be made. Full scale tests are performed in a direct test circuit fed by a generator 2000 MVA at 12 kv with short circuit current limited at 14 ka. The capacitive load was a 8 Mvar capacitor bank; nominal current of 430 A. The detailed characteristics of the test circuit are given in Fig. 4 and table II. Fig. 4 : 3-phase test circuit with generator and 8 Mvar capacitor bank. 3.2 Test results Fig. 5a shows an oscillogram of a normal interruption with NSDD. The first phase to interrupt, R, creates a dc voltage on the capacitor bank terminal of 1.5 pu. Then 30 milliseconds after current interruption a NSDD is generated in phase R at a maximum voltage difference across the CB. At this moment the voltages on all C-bank terminals change suddenly and settle to a new constant value. The highest overvoltage is found in phase T. The instant of occurrence of the NSDD was varied by firing the TVG at a predetermined

5 China International Conference on Electricity Distribution (CICED 2008)) moment to see the influence of the phase angle on the nature and the value of the over-voltage. The waveform of the overvoltage is a dc voltage and is the same for all tested phase angles. the most severe one, the experiment was repeated by keeping the first phase to clear in phase R and generating the NSDD in phase T. The highest overvoltage is now found in phase R. The instant of occurrence of the NSDD was varied by firing the TVG at a predetermined moment to see the influence of the phase angle on the nature and the value of the over-voltage. The waveform of the overvoltage is a dc voltage and is the same for all tested phase angles. Fig. 6b shows the measured voltage on the capacitor bank terminal in phase R to ground after the NSDD in phase T. Before the NSDD the voltage is about 1.5 pu. The voltage jump is between 0 and 2.5 pu. resulting into an over-voltage of maximum 4.0 pu. The height of the overvoltage varies harmonically with the phase angle. Fig.5a: Normal interruption of capacitive current followed by NSDD in R phase after 30 ms. Fig.5b: As Fig. 5a Surge arrestor in phase T limits the overvoltage. For each phase (R, S, T). Red : Source side voltage on CB. Green : Load side voltage on CB and capacitor bank terminal. Blue : Current through CB. Time scale: 1ms/div. Fig. 6a shows the measured voltage on the capacitor bank terminal in phase T to ground after the NSDD in phase R. Before the NSDD the voltage is about 0.89 pu. The voltage jump is between 0.6 and 3.2 pu. leading to an over-voltage of maximum 4.1 pu. The height of the overvoltage varies harmonically with the phase angle. Fig. 6a : Variation of over-voltage in phase T expressed in pu due to instant of occurrence (phase angle) of the NSDD in 1 st phase R to interrupt. In order to investigate whether the above condition is Fig. 6b : Variation of over-voltage in phase R expressed in pu due to instant of occurrence (phase angle) of the NSDD in 2 nd phase T to interrupt. Note that the over-voltage is the addition of the original capacitor bank voltage after current interruption and a voltage jump due to the NSDD. The amplitude of the voltage jump depends on two factors : the voltage across the breaker at the instant of breakdown, which varies with time or phase angle, and which is maximum 2.5 pu. (see Fig. 5a). an amplitude multiplication K-factor (section IIIC) The voltage difference at breakdown is transmitted integrally to the neighbouring phases as predicted by the numerical simulation. Except for a reduced amplitude factor the behaviour found is identical to the simulation. Moreover, the most severe overvoltage is produced by a NSDD in the first phase to interrupt at the moment of the largest voltage difference across the CB. 3.3 Influence of TRV circuit The influence of the TRV circuit on the high frequency behaviour of the breakdown has been studied with the following circuits:

6 2008 China International Conference on Electricity Distribution (CICED 2008) 5 TRV-1 : The standard TRV circuit composed of 2 branches see Fig. 2. TRV-2 : No TRV circuit; only stray capacitance between Generator and CB. TABLE III : Influence TRV circuit on peak value of overvoltage TRV-1 TRV-2 Voltage jump K-theoretical 2 2 K-Immediate K-Late Damping time 16.5µs 13.5µs Frequency NSDD current 150 khz 28 khz Current 28 A 6 A Results are shown in table III. The voltage jump after breakdown can be characterised by : A peak voltage immediately after the NSDD: with K factor : K-immediate. A dc voltage after a transition period: K-late. The transition is characterised by a time constant here called damping time. The frequency of the NSDD current. Fig. 7 shows an oscillogram of the voltage on both sides of the CB during the NSDD for TRV-2 circuit. During the NSDD, between 12 and 30 µsec, both voltages are identical as an arc in the CB allows for current to pass from the source side to the load side. Due to the small TRV capacitance, the source side voltage collapses at 12 µsec and joins the load side voltage. During the current flow the voltage makes an oscillation around the driving voltage (the source voltage before the NSDD). When this reaches a new maximum at 30 µsec the current passes through zero and interruption takes place. After interruption, the source voltage is subject to the Fig. 7 Zoom at voltage behaviour at NSDD in R phase with TRV-2. Green (1) : Load side voltage on CB and capacitor bank terminal. Red (2) : Source side voltage on CB. Time scale 10µs/div. TRV generated by the driving voltage of the generator and the TRV circuit. The load side voltage settles to a new dc voltage level. Numerical simulation suggests voltage doubling with a K-factor equal to 2. Therefore the reduced value of K-immediate is attributed to damping of the high frequency current at NSDD. 4. PROTECTION BY SURGE ARRESTORS Arrestors are commonly proposed as means to protect the capacitor bank against excessive overvoltages due to restrikes [6]. In such a case the overvoltage rise-time is of the order of milliseconds. Yet in case of an NSDD the overvoltage rise-time is only several microseconds. In order to verify the effectiveness of the surge arrestor the following two cases are investigated. 4.1 Surge arrestors on all three phases to ground Test conditions are similar as under section IIIA but with surge arrestors on the load side of the CB to ground. On initiation of a NSDD in phase R, the highest overvoltage of 2.2 pu. was in phase T due to immediate limitation of the overvoltage by the surge arrestor in phase T; the associated oscillogram is shown in Fig. 5b. A significant current flows through the surge arrestor: 890 A during 1 ms; representing an energy of about 8 kjoule. This current is determined by : 1. The series impedance of two branches R and T of the capacitor bank and the series inductance of phase R and the resistance to ground of the generator. 2. The voltage difference across the capacitor prior to breakdown minus the voltage of the arrestor. Notice, that during the limitation of an overvoltage due to a NSDD only one surge arrestor is conductive and dissipates the energy. Due to the random nature of current interruption the maximum overvoltage can be in any of the three phases. Therefore, surge arrestors have to be installed on all three phases. 4.2 Surge arrestor on neutral to ground Test conditions are similar as under section IIIA but with a single surge arrestor on the neutral point of the capacitor bank. If a NSDD was initiated in phase R, the highest overvoltage of 2.1 pu. was in phase T due to immediate limitation of the overvoltage by the surge arrestor. A significant current flows through the surge arrestor: 575 A during 2.5 ms; representing an energy of about 13 kjoule. This current is determined by 1. The series impedance of one branch of the capacitor bank, the inductance of one phase of the circuit and the resistance to ground of the generator.

7 China International Conference on Electricity Distribution (CICED 2008)) 2. The voltage difference across the capacitor prior to breakdown minus the voltage of the arrestor. The energy dissipated in the arrestor is higher than under IV-A due to the lower COV of the arrestor. Yet here the arrestor will function regardless the phase in which the maximum overvoltage will occur. This limits the number of surge arrestors to install to one. Table IV : Choice of continuous operating voltage of the arrestor and the resulting overvoltage protection level depends on network operation conditions and arrestor location. networks with highohmic insulated neutral system and automatic earth fault clearing networks with earth fault compensation or with a high-ohmic insulated neutral system Arrestor location CB terminals Neutral point CB terminals Neutral point Continuous Operating Voltage Overvoltage protection level [pu] or Un (2/3) Un/ *Un/ *Un/ *Un/ Choice of the surge arrestor The surge arrestor limits effectively the overvoltage by suppressing the high frequency (150 khz) peak overvoltage. The absolute value of the remaining overvoltage depends though on the choice of the surge arrestor. The voltage limitation is effective at a level of 3.1 times the rated continuous operating voltage of the surge arrestor. The choice of the rated voltage of the surge arrestor must take into account abnormal circuit conditions as well. In table IV two common situations are compared. For networks with high-ohmic insulated neutral system and automatic earth fault clearing the nominal voltage of each phase is fixed at Un/ 3 and the neutral point of the capacitor bank has 0 (zero) voltage. The continuous operating voltage of the surge arrestor can be chosen accordingly. The surge arrestor with associated continuous operating voltage (COV) gives a protection of 2.2 pu. During a normal breaking operation the neutral point attains a peak voltage of 0.5*Un (2/3), which lasts until discharging of the capacitor bank; this corresponds to a COV of 0.5*Un/ 3; the resulting level of protection is 2.1 pu. For networks with earth fault compensation or with a high-ohmic insulated neutral system a possible persistent single phase earth failure increases the nominal voltage of the healthy phases a factor 3, and the voltage on the neutral point of the capacitor bank increases to 1 pu. These more severe conditions determine the continuous operating voltage of the surge arrestor. For arrestors on the circuit-breaker terminals the nominal voltage can reach 1.5*Un/ 3; the resulting level of protection is 3.3 pu. For a single arrestor on the neutral of the bank the continuous voltage can reach Un/ 3; the resulting level of protection is 3.2 pu. During interruption of the capacitive current the voltage of the neutral can increase slightly more. Yet, the surge arrestor is capable of dealing with this temporary overvoltage under this rare abnormal network condition. 5. DISCUSSION The main results of this study are summarized in table V. An important difference is found between the numerically and experimentally obtained overvoltage values. The measured overvoltage on the bank terminal to ground is significantly lower than calculated. This is due to natural damping of the high frequency phenomena by dissipative elements in the circuit and by the very small capacitance on the source side due to the absence of parallel feeders. The peak over-voltage has a limited duration of about 10µs. Surge arrestors effectively limit these overvoltages to values as low as 2.2 pu between terminal and ground. The capacitors themselves are stressed neither by the NSDD nor by the action of the surge arrestors during limitation, as the discharge current is a single phase current flowing towards ground. TABLE V : Over-voltages in capacitor bank switching Situation Capacitor Across CB bank terminal 1 Normal Interruption 1.5 pu 2.5 pu 2 NSDD : Predicted 6.0 pu 7.0 pu 3a NSDD (K-Late = 1.3) 4.2 pu 5.2 pu 3b NSDD (K-Immediate = 1.7) 5.2 pu 6.2 pu 4 Surge arrestors on all terminals 2.2 pu 3.2 pu 5 Surge arrestor on C-bank neutral 2.2 pu 3.2 pu In the introduction it was outlined that NSDDs are a common phenomenon in vacuum interrupters and that the simultaneous occurrence of NSDDs in 2 phases give rise to a restrike. The frequency of occurrence of a NSDD is related to design parameters like the contact opening stroke. Hence it is possible to design a vacuum CB according to the requirements of either low restrike probability class C1 or very low restrike probability class C2 of [7]. For 24 kv Class C2 vacuum CBs with very low restriking probability this leads to a nominal contact gap of 16 mm, see Fig. 1. For voltages of 36 kv and above [8] proposes to use two vacuum

8 2008 China International Conference on Electricity Distribution (CICED 2008) 7 interrupters in series. Although these measures are effective from a normative point of view, they do not contribute to an economically conclusive and reliable solution as shown by the following numerical example. For instance, contactors which allow for frequent operations have a small contact opening stroke. Even with a NSDD frequency of only 1/500 they will produce over 2000 NSDDs in their entire lifespan. Therefore, only the application of surge arrestors is an effective solution to suppress overvoltages and eliminate any risk for equipment: capacitor bank, circuit breaker and switch board. The application guide in table VI summarises this recommendation relating the choice of switchgear to the application duty. If the CB is used only occasionally for energizing and de-energizing the capacitor bank a vacuum CB with class C1 or C2 can be used. Yet for daily operation of the capacitor bank a protection by surge arrestor is recommended, and in this case a class C1 rating is sufficient, as the suppression of overvoltage during a NSDD reduces significantly the probability of a second simultaneous NSDD, and hence the risk of a restrike. For more than daily operation a vacuum contactor with surge arrestor is an economical viable solution in series with a vacuum CB for protection. Table VI : Vacuum-C B Vacuum-C ontactors Application guide Capacitive switching duty Protection and Daily operation Occasional operation Class C1 + Class C1 or C2 Surge arrestors Surge arrestors Frequent operation Surge arrestors When applying surge arrestors, special attention must be given to the energy dissipation in the arrestor. It is proposed to dimension the arrestor to be capable to carry out 3 consecutive protective actions without cooling down. Furthermore the dimensioning is related to the reactive power of the capacitor bank, Sk. Guidelines are given by [6, 9] in the case of restriking CBs, in which case the arrestor has to be dimensioned for an energy of 6*Sk/ω, where ω : angular frequency of the network. Transposing this approach to a protection against NSDD the guidelines as presented in table VII dimension the energy dissipation capability of the arrestor. Hence, for the protection against NSDDs the arrestor can be designed 3 to 6 times smaller. Table VII : the requested energy dissipation capability of the arrestor Protection against NSDD Arrestor on CB terminals to ground 1 * Sk/ω Arrestor on C-bank neutral to ground 2 * Sk/ω I. CONCLUSION This study focussed on the interaction of the vacuum circuit breaker with a capacitor bank during switching operation. The occurrence of a NSDD leads to a shift of the voltage of the neutral point of the bank. Although the phenomenon in itself is rare, the over-voltages produced are deterministic and depend on the recovery voltage of the phase in which the NSDD occurs and on the moment of breakdown. The experimental study shows that the overvoltage after NSDD is limited to about 4.2 pu. on the capacitor bank terminals. Surge arrestors are shown to be an effective means to limit this overvoltage. As cost efficient solution it is proposed to use a single surge arrestor on the neutral point of the capacitor bank. Guidelines are presented to dimension these arrestors. REFERENCES [1] T. Yokoyama, Y. Matsui, K. Ikemoto and M. Inoyama Technique on Overvoltage Phenomenon Analysis for Vacuum Switching Equipment by, Meiden Review Series No. 78,1986 [2] Y. Sunada,N.Ito, S. Yanabu, H. Awaji, H. Okumura and Y. Kanai, Research and Development on 13.8kV 100kA Vacuum CB with Huge capacity and Frequent Operation, CIGRE, Paris, 1982 [3] P. Huhse and E. Zielke, 3AF Vacuum CBs for Switching in Capacitor Banks, Siemens Power ENGENEERING III (1981) No 8-9 [4] D. Koch, Control equipment for MV capacitor banks, ECT142, Schneider-Electric, Grenoble, 1992 [5] T. Kamakawaji, T. Shioiri, T. Funahashi, Y. Satoh, E. Kaneko and I. Oshima, An Investigation into Major Factors in Shunt Capacitor switching Performances By Vacuum CBs With Copper Chromium Contacts, IEEE Power Engeneering 1993 winter meeting Columbus OHIO [6] L. Gebhardt, B. Richter, Surge arrestor application of MV-capacitor banks to mitigate problems of switching restrikes, paper 0639, 19 th CIRED, 2007, Vienna. [7] International Standard IEC , 2008, High Voltage

9 China International Conference on Electricity Distribution (CICED 2008)) Switchgear and Controlgear Part 1: Common specifications [8] E. Dullni, W. Shang, D. Gentsch,I. Kleberg and K. Niayesh, Switching of Capacitive Currents and the Correlation of Restrike and Pre-ignition Behavior, IEEE trans. on dielectrics and electrical insulation, vol. 13, n 1, pp , 2006 [9] R. Rudolph and B. Richter, Dimensioning, testing and application of metal oxide surge arrestors in medium voltage networks, open document ABB, Wettingen, 1999 About the author Hans Schellekens (54) received the Ph.D. degree in technical engineering from the Technical University of Eindhoven, The Netherlands, in 1983, with a specialization in plasma physics. He worked at the HOLEC Research Laboratory from 1978 to 1982 and at KEMA testing laboratories from 1983 to From 1986 to 1993, he was responsible for the development of vacuum interrupters and vacuum circuit breakers at HOLEC. Since 1994, he is involved in the development of vacuum interrupters for Schneider Electric Medium Voltage SBU (formerly Merlin-Gerin) at Grenoble in France. He has been active in the Dutch Brazing Soc. as well as in the CIGRE Working Group from 1985 to Dr. Schellekens is a member of the Current Zero Club. of author: hans.schellekens@schneider-electric.com

EMTP STUDIES PERFORMED TO INSERT LONG AC CABLES IN THE FRENCH GRID

EMTP STUDIES PERFORMED TO INSERT LONG AC CABLES IN THE FRENCH GRID Tension (kv) Impedance (Ohms) EMTP STUDIES PERFORMED TO INSERT LONG AC CABLES IN THE FRENCH GRID frequency (Hz) Simon DESCHANVRES Yannick VERNAY RTE, CNER, Substations Department t (ms) EMTP-RV Users Group

More information

IEC and IEEE Standards for High-Voltage Switchgear and Controlgear Present Situation and Future Evolution

IEC and IEEE Standards for High-Voltage Switchgear and Controlgear Present Situation and Future Evolution IEC and IEEE Standards for High-Voltage Switchgear and Controlgear Present Situation and Future Evolution Denis Dufournet Chairman IEC TC 17 & SC17A Fellow IEEE Senior Expert Areva T&D Mumbai, January,

More information

Measurement, Modeling and Simulation of Capacitor Bank Switching Transients

Measurement, Modeling and Simulation of Capacitor Bank Switching Transients Measurement, Modeling and Simulation of Capacitor Bank Switching Transients Mirza Softić*, Amir Tokić**, Ivo Uglešić*** *Kreka - Dubrave e, Dubrave, Bosnia and Herzegovina (e-mail: softic_mirza@yahoo.com).

More information

A3-301 CURRENT INTERRUPTION WITH HIGH VOLTAGE AIR-BREAK DISCONNECTORS. J.H. SAWADA BC HYDRO (Canada) J.G. KRONE HAPAM B.V.

A3-301 CURRENT INTERRUPTION WITH HIGH VOLTAGE AIR-BREAK DISCONNECTORS. J.H. SAWADA BC HYDRO (Canada) J.G. KRONE HAPAM B.V. 21, rue d'artois, F-75008 Paris http://www.cigre.org A3-301 Session 2004 CIGRÉ CURRENT INTERRUPTION WITH HIGH VOLTAGE AIR-BREAK DISCONNECTORS D.F. PEELO* DF PEELO & ASSOCIATES R.P.P. SMEETS KEMA HIGH-POWER

More information

Cahier technique no. 193

Cahier technique no. 193 Collection Technique... Cahier technique no. 193 MV breaking techniques S. Théoleyre "Cahiers Techniques" is a collection of documents intended for engineers and technicians, people in the industry who

More information

Assessment of the Technical Issues relating to Significant Amounts of EHV Underground Cable in the All-island Electricity Transmission System

Assessment of the Technical Issues relating to Significant Amounts of EHV Underground Cable in the All-island Electricity Transmission System Assessment of the Technical Issues relating to Significant Amounts of EHV Underground Cable in the All-island Electricity Transmission System Summary Report November 2009 Technical Report on using EHV

More information

ALTERNATIVE METHODS FOR INTERNAL ARC TESTS ON 12 KV AND 24 KV METAL-ENCLOSED SWITCHGEARS WITH COMPACT RMU

ALTERNATIVE METHODS FOR INTERNAL ARC TESTS ON 12 KV AND 24 KV METAL-ENCLOSED SWITCHGEARS WITH COMPACT RMU ALTERNATIVE METHODS FOR INTERNAL ARC TESTS ON 12 KV AND 24 KV METAL-ENCLOSED SWITCHGEARS WITH COMPACT RMU George CURCANU, Constantin ILINCA, Ilie SBORA ICMET Craiova, Romania, Calea Bucuresti 144, phone:

More information

TWENTIES WORKSHOP, EWEA 2012 Unveiling the future energy system: full scale demonstrations to reach 2020 targets. 17th April 2012

TWENTIES WORKSHOP, EWEA 2012 Unveiling the future energy system: full scale demonstrations to reach 2020 targets. 17th April 2012 TWENTIES WORKSHOP, EWEA 2012 Unveiling the future energy system: full scale demonstrations to reach 2020 targets 17th April 2012 Session 2 Technological challenges to cope with in TWENTIES field tests

More information

Joslyn Clark Controls, Inc.

Joslyn Clark Controls, Inc. Joslyn Clark Controls, Inc. CAPACITOR SWITCHING VACUUM CONTACTORS vs. AIR BREAK CONTACTORS APPLICATION PRECAUTIONS & CALCULATIONS TO LIMIT HIGH FREQUENCY & HIGH CURRENT 2 QUESTION: WHY IS A VACUUM CONTACTOR

More information

LIMITING SHORT-CIRCUIT CURRENTS IN MEDIUM-VOLTAGE APPLICATIONS

LIMITING SHORT-CIRCUIT CURRENTS IN MEDIUM-VOLTAGE APPLICATIONS LIMITING SHORT-CIRCUIT CURRENTS IN MEDIUM-VOLTAGE APPLICATIONS Terence Hazel Senior Member IEEE Schneider Electric 38050 Grenoble France Abstract The power requirements for large industrial sites is increasing.

More information

Charged cable event. 1 Goal of the ongoing investigation. 2 Energy sources for the CDE. Content

Charged cable event. 1 Goal of the ongoing investigation. 2 Energy sources for the CDE. Content Charged cable event David Pommerenke, david_pommerenke@hp.com, 916 785 4550 Last update: Feb.23, 2001 Content Goal Energy sources, which may lead to CDE. Complexity of the different discharge modes. Possible

More information

7. Reactive energy compensation

7. Reactive energy compensation 593 7. Reactive energy compensation 594 7. REACTIVE ENERGY COMPENSATION Reactive energy compensation is an important element for reducing the electricity bill and improving the quality of the electrical

More information

PROTECTION TECHNIQUE FOR TRANSIENT OVERVOLTAGE DUE TO CAPACITOR BANK SWITCHING IN DISTRIBUTION SYSTEMS USING HIGH PASS FILTER

PROTECTION TECHNIQUE FOR TRANSIENT OVERVOLTAGE DUE TO CAPACITOR BANK SWITCHING IN DISTRIBUTION SYSTEMS USING HIGH PASS FILTER VO. 1, NO., DEEMBER 15 SSN 1819-668 6-15 Asian Research Publishing Network (ARPN). All rights reserved. PROTETON TEHNQUE FOR TRANSENT OVERVOTAGE DUE TO APATOR BANK SWTHNG N DSTRBUTON SYSTEMS USNG HGH PASS

More information

Transformers. Special transformers Reactors products

Transformers. Special transformers Reactors products Transformers Special transformers Reactors products Reactors Custom designed, custom built ABB Oy Transformers has extensive experience and numerous references from different reactor applications, having

More information

Typical Data Requirements Data Required for Power System Evaluation

Typical Data Requirements Data Required for Power System Evaluation Summary 66 Carey Road Queensbury, NY 12804 Ph: (518) 792-4776 Fax: (518) 792-5767 www.nepsi.com sales@nepsi.com Harmonic Filter & Power Capacitor Bank Application Studies This document describes NEPSI

More information

Equipment Performance Due to Voltage Sags Test Results for Contactor and Induction Motor

Equipment Performance Due to Voltage Sags Test Results for Contactor and Induction Motor DOI 10.7603/s40707-013-0008-5 Equipment Performance Due to Voltage Sags Test Results for Contactor and Induction Motor Surya Hardi, Muhd. Hafizi, Muzamir Isa, Rohana Ismail Abstract This paper presents

More information

Power Quality Paper #3

Power Quality Paper #3 The Effect of Voltage Dips On Induction Motors by: M D McCulloch 1. INTRODUCTION Voltage depressions caused by faults on the system affect the performance of induction motors, in terms of the production

More information

The Importance of the X/R Ratio in Low-Voltage Short Circuit Studies

The Importance of the X/R Ratio in Low-Voltage Short Circuit Studies The Importance of the X/R Ratio in Low-Voltage Short Circuit Studies DATE: November 17, 1999 REVISION: AUTHOR: John Merrell Introduction In some short circuit studies, the X/R ratio is ignored when comparing

More information

Line Reactors and AC Drives

Line Reactors and AC Drives Line Reactors and AC Drives Rockwell Automation Mequon Wisconsin Quite often, line and load reactors are installed on AC drives without a solid understanding of why or what the positive and negative consequences

More information

Lightning current simulation in the laboratory - parameters, procedures and test equipment -

Lightning current simulation in the laboratory - parameters, procedures and test equipment - Lightning current simulation in the laboratory - parameters, procedures and test equipment - Dipl.-Ing. J. Schönau, Dr.-Ing. M. Naß, CE-LAB GmbH Prof. Dr.-Ing. F. Berger, Ilmenau University of Technology

More information

New Distribution Class Arrester Ground Lead Disconnector Design Enhances Detonation Reliability and Improves Arrester Performance

New Distribution Class Arrester Ground Lead Disconnector Design Enhances Detonation Reliability and Improves Arrester Performance New Distribution Class Arrester Ground Lead Disconnector Design Enhances Detonation Reliability and Improves Arrester Performance Dennis W. Lenk, Fellow, IEEE Abstract-- This paper examines performance

More information

IEC 1000-4-2 ESD Immunity and Transient Current Capability for the SP72X Series Protection Arrays

IEC 1000-4-2 ESD Immunity and Transient Current Capability for the SP72X Series Protection Arrays IEC 00-4-2 ESD Immunity and Transient Current Capability for the SP72X Series Protection Arrays Application Note July 1999 AN9612.2 Author: Wayne Austin The SP720, SP721, SP723, and SP724 are protection

More information

Protection from Short-circuit

Protection from Short-circuit Protection from Short-circuit Back-up Fuse-Link with ÜLA (controlled power dissipation) Test device for tripping device Special version with threat High-voltage Fuse-Link for voltage transformers (HSW)

More information

CAN Bus Transceivers Operate from 3.3V or 5V and Withstand ±60V Faults

CAN Bus Transceivers Operate from 3.3V or 5V and Withstand ±60V Faults CAN Bus Transceivers Operate from 3.3V or 5V and Withstand ±6 Faults Ciaran Brennan design features The LTC2875 is a robust CAN bus transceiver that features ±6 overvoltage and ±25kV ESD tolerance to reduce

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 60071-2 Third edition 1996-12 Insulation co-ordination Part 2: Application guide This English-language version is derived from the original bilingual publication by leaving out

More information

RC NETWORKS SALES GUIDE

RC NETWORKS SALES GUIDE SALES GUIDE INTRODUCTION TO Recent developments in electronic equipment have shown the following trends: Increasing demands for numerical control machines, robotics and technically advanced appliances

More information

ANCILLARY EQUIPMENT AND ELECTRICAL EQUIPMENT Power Supply Systems and Electrical Equipment for Desalination Plants - Y.M. Hamud and A.H.

ANCILLARY EQUIPMENT AND ELECTRICAL EQUIPMENT Power Supply Systems and Electrical Equipment for Desalination Plants - Y.M. Hamud and A.H. POWER SUPPLY SYSTEMS AND ELECTRICAL EQUIPMENT FOR DESALINATION PLANTS Y.M. Hamud and A.H. Anwar Abu Dhabi Water and Electricity Authority, Abu Dhabi, UAE Keywords : Electrical System, Network for Desalination,

More information

SUITABILITY OF DIFFERENT TEST VOLTAGES FOR ON-SITE TESTING OF XLPE CABLE SYSTEMS

SUITABILITY OF DIFFERENT TEST VOLTAGES FOR ON-SITE TESTING OF XLPE CABLE SYSTEMS SUITABILITY OF DIFFERENT TEST VOLTAGES FOR ON-SITE TESTING OF XLPE CABLE SYSTEMS Michael Hensel HIGHVOLT Prüftechnik Dresden GmbH 2 3 Content 1 Introduction Test parameters and their significance Differences

More information

MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING

MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING Training Title MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING Training Duration 5 days Training Date MV, HV and EHV Switchgear Testing & Commissioning 5 20 24 Apr $3,750 Dubai, UAE In any of the 5 star

More information

The design and performance of Static Var Compensators for particle accelerators

The design and performance of Static Var Compensators for particle accelerators CERN-ACC-2015-0104 Karsten.Kahle@cern.ch The design and performance of Static Var Compensators for particle accelerators Karsten Kahle, Francisco R. Blánquez, Charles-Mathieu Genton CERN, Geneva, Switzerland,

More information

Advantages of Fixed Circuit Breaker Switchgear

Advantages of Fixed Circuit Breaker Switchgear Advantages of Fixed Circuit Breaker Switchgear by Lionel Mackay, EDF Energy, and Mike Adams, Schneider Electric Ltd Introduction The purpose of this paper is to review the advantages of fixed circuit breaker

More information

Inrush Current. Although the concepts stated are universal, this application note was written specifically for Interpoint products.

Inrush Current. Although the concepts stated are universal, this application note was written specifically for Interpoint products. INTERPOINT Although the concepts stated are universal, this application note was written specifically for Interpoint products. In today s applications, high surge currents coming from the dc bus are a

More information

Arc Terminator Active Arc-Resistant Switchgear

Arc Terminator Active Arc-Resistant Switchgear Arc Terminator Active Arc-Resistant Switchgear Increasing safety and productivity by extinguishing internal arcing faults within the switchgear. The Square D Arc Terminator from Schneider Electric offers

More information

ABB s Disconnecting Circuit Breakers Higher substation availability and lower environmental impact

ABB s Disconnecting Circuit Breakers Higher substation availability and lower environmental impact ABB s Disconnecting Circuit Breakers Higher substation availability and lower environmental impact Authors Carl Ejnar Sölver, ABB High Voltage Products Rasmus Larsson, ABB High Voltage Products 2 ABB ABB

More information

CEF 9 CEF-S 23 CEF-VT 27 CMF 31 WBP 39 WBT 47 BPS 61

CEF 9 CEF-S 23 CEF-VT 27 CMF 31 WBP 39 WBT 47 BPS 61 FUSES Catalogue CEF 9 CEF-S 23 CEF-VT 27 CMF 31 WBP 39 WBT 47 BPS 61 INTRODUCTION The main function of current limiting fuses is to protect electrical apparatus, such as distribution transformers, motors

More information

EDEXCEL NATIONAL CERTIFICATE/DIPLOMA UNIT 5 - ELECTRICAL AND ELECTRONIC PRINCIPLES NQF LEVEL 3 OUTCOME 4 - ALTERNATING CURRENT

EDEXCEL NATIONAL CERTIFICATE/DIPLOMA UNIT 5 - ELECTRICAL AND ELECTRONIC PRINCIPLES NQF LEVEL 3 OUTCOME 4 - ALTERNATING CURRENT EDEXCEL NATIONAL CERTIFICATE/DIPLOMA UNIT 5 - ELECTRICAL AND ELECTRONIC PRINCIPLES NQF LEVEL 3 OUTCOME 4 - ALTERNATING CURRENT 4 Understand single-phase alternating current (ac) theory Single phase AC

More information

ECE 586b Course Project Report. Auto-Reclosing

ECE 586b Course Project Report. Auto-Reclosing ECE 586b Course Project Report Auto-Reclosing Srichand Injeti May 5, 2008 Department Of Electrical and computer Engineering University Of Western Ontario, London Ontario Table of contents 1. Introduction...1

More information

SWITCHGEAR PROTECTION

SWITCHGEAR PROTECTION LECTURE NOTES ON SWITCHGEAR PROTECTION IV B. Tech I semester (JNTUH-R09) Mr. P SHIVAKUMAR Assistant Professor ELECTRICAL AND ELECTRONICS ENGINEERING INSTITUTE OF AERONAUTICAL ENGINEERING DUNDIGAL, HYDERABAD

More information

Power Quality Issues, Impacts, and Mitigation for Industrial Customers

Power Quality Issues, Impacts, and Mitigation for Industrial Customers Power Quality Issues, Impacts, and Mitigation for Industrial Customers By Kevin Olikara, Power and Energy Management Products Rockwell Automation, Inc. Now, more than ever, electronic equipment and computing

More information

Our brand POWER DYNAMIC PASSION COMMITMENT CREATIVITY. A strong brand for strong products: 8PU Premium. MV Energy

Our brand POWER DYNAMIC PASSION COMMITMENT CREATIVITY. A strong brand for strong products: 8PU Premium. MV Energy Our brand A strong brand for strong products: The ENERGOLINE brand represents our product portfolio of INDUSTRIAL SWITCHGEAR SYSTEMS. Our products are characterized by a high degree of safety, flexibility

More information

NATUS NES / NES-H Draw-out Type Medium Voltage Switchgear Systems. Safe energy distribution that meets the highest industrial requirements

NATUS NES / NES-H Draw-out Type Medium Voltage Switchgear Systems. Safe energy distribution that meets the highest industrial requirements NATUS NES / NES-H Draw-out Type Medium Voltage Switchgear Systems Safe energy distribution that meets the highest industrial requirements NATUS switchgear systems your advantages minimal use of insulant

More information

TAN δ (DELTA) CABLE TESTING OVERVIEW AND ANSWERS TO FREQUENTLY ASKED QUESTIONS. What Is Tan δ, Or Tan Delta?

TAN δ (DELTA) CABLE TESTING OVERVIEW AND ANSWERS TO FREQUENTLY ASKED QUESTIONS. What Is Tan δ, Or Tan Delta? TAN δ (DELTA) CABLE TESTING OVERVIEW AND ANSWERS TO FREQUENTLY ASKED QUESTIONS What Is Tan δ, Or Tan Delta? Tan Delta, also called Loss Angle or Dissipation Factor testing, is a diagnostic method of testing

More information

ELECTRICAL INSULATION TESTING OF HV EQUIPMENT UP TO 33kV

ELECTRICAL INSULATION TESTING OF HV EQUIPMENT UP TO 33kV 1. SCOPE This document details PowerSystems requirements for electrical testing of HV Equipment up to and including 33kV. 2. ISSUE RECORD This is a Reference document. The current version of Controlled

More information

DS1 Diode-based transient-free capacitor switch

DS1 Diode-based transient-free capacitor switch Medium voltage products DS1 Diode-based transient-free capacitor switch Power and productivity for a better world TM Compensation of reactive power DS1 the future of switches Compensation of reactive power

More information

www.siemens.com/energy High Voltage Circuit Breakers 3AP Type 72.5 kv to 800 kv Answers for energy.

www.siemens.com/energy High Voltage Circuit Breakers 3AP Type 72.5 kv to 800 kv Answers for energy. s www.siemens.com/energy High Voltage Circuit Breakers AP Type 7.5 kv to 800 kv Answers for energy. The AP High Voltage Circuit Breakers Available up to 800 kv Decades of our experience in high voltage

More information

For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690 V - 1000 V (at 50 Hz)

For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690 V - 1000 V (at 50 Hz) 24 1. NETWORK CONFIGURATIONS definition Standard IEC 38 defines voltage ratings as follows: - Low voltage () For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690

More information

The Intelligent AX1 Switchgear for Medium Voltage

The Intelligent AX1 Switchgear for Medium Voltage The Intelligent AX1 Switchgear for Medium Voltage Leif Lundin, Manager of Research and Development, Division Medium Voltage and Compact Substations, ABB Distribution, Sweden Abstract The newly launched

More information

2012 San Francisco Colloquium

2012 San Francisco Colloquium 2012 San Francisco Colloquium http : //www.cigre.org HVDC and Power Electronic Systems for Overhead Line and Insulated Cable Applications B4-8 Trans Bay Cable A Breakthrough of VSC Multilevel Converters

More information

MINISTERIE VAN ECONOMISCHE ZAKEN GENERAL COST COMPARISON BETWEEN UNDERGROUND CABLES AND O.H. LINE SYSTEMS FOR H.V. TRANSMISSION

MINISTERIE VAN ECONOMISCHE ZAKEN GENERAL COST COMPARISON BETWEEN UNDERGROUND CABLES AND O.H. LINE SYSTEMS FOR H.V. TRANSMISSION MINISTERIE VAN ECONOMISCHE ZAKEN GENERAL COST COMPARISON BETWEEN UNDERGROUND CABLES AND O.H. LINE SYSTEMS FOR H.V. TRANSMISSION REPORT ON NETWORK RELIABILITY ASPECTS OF THE CHOICE LINE VERSUS CABLE FOR

More information

Discussion on Class I & II Terminology. IEEE PES Transformers Committee Fall Meeting 2011 Boston, MA

Discussion on Class I & II Terminology. IEEE PES Transformers Committee Fall Meeting 2011 Boston, MA Discussion on Class I & II Terminology IEEE PES Transformers Committee Fall Meeting 2011 Boston, MA What is Class I & II? C57.12.00 2010 is the only document we have that defined these terms. 5.10 Insulation

More information

DDX 7000 & 8003. Digital Partial Discharge Detectors FEATURES APPLICATIONS

DDX 7000 & 8003. Digital Partial Discharge Detectors FEATURES APPLICATIONS DDX 7000 & 8003 Digital Partial Discharge Detectors The HAEFELY HIPOTRONICS DDX Digital Partial Discharge Detector offers the high accuracy and flexibility of digital technology, plus the real-time display

More information

F05D Meeting on Damped AC Voltage Testing

F05D Meeting on Damped AC Voltage Testing October 28 th, 2008 from 03.30-5.30 pm in San Antonio, TX Agenda F05D Damped AC Voltage Testing 1 Agenda F05D Damped AC Voltage Testing Welcome: Introduction On-site testing voltages e.g. IEC 60060-3 High

More information

Power surges can also be generated by equipment in your facility such as:

Power surges can also be generated by equipment in your facility such as: Power Quality Surge Suppressors What is Surge Protection A surge suppressor can be the first and best defense against the instant or gradual destruction of electrical equipment. Compared to the replacement

More information

MEDIUM AND HIGH VOLTAGE CAPACITORS, CAPACITOR BANKS AND SYSTEMS

MEDIUM AND HIGH VOLTAGE CAPACITORS, CAPACITOR BANKS AND SYSTEMS MEDIUM AND HIGH VOLTAGE CAPACITORS, CAPACITOR BANKS AND SYSTEMS Meher Capacitors offers reliable and innovative products and solutions in the fields of Reactive Power Compensation, Power Quality and Energy

More information

Step Voltage Regulators

Step Voltage Regulators Step Voltage Regulators Don Wareham Field Application Engineer Today s Agenda Introduction Voltage Regulator theory Voltage Regulator application considerations Installation and proper bypassing Wrap-up/questions

More information

EirGrid INVESTIGATION INTO MITIGATION TECHNIQUES FOR 400/220KV CABLE ISSUES FINAL REPORT EIRGRID PSP022. 30 January 2015

EirGrid INVESTIGATION INTO MITIGATION TECHNIQUES FOR 400/220KV CABLE ISSUES FINAL REPORT EIRGRID PSP022. 30 January 2015 LONDON POWER ASSOCIATES LTD EirGrid INVESTIGATION INTO MITIGATION TECHNIQUES FOR 400/220KV CABLE ISSUES FINAL REPORT London Power Associates Ltd. Project Number 10348 Elizabeth House, 56-60 London Road,

More information

Siemens AG Power Transmission and Distribution Medium Voltage Division Mozartstr. 31c 91052 Erlangen Germany. www.siemens.

Siemens AG Power Transmission and Distribution Medium Voltage Division Mozartstr. 31c 91052 Erlangen Germany. www.siemens. Siemens AG Power Transmission and Distribution Medium Voltage Division Mozartstr. 31c 91052 Erlangen Germany www.siemens.com/energy For questions on power transmission and distribution, please contact

More information

Voltage Stability Improvement using Static Var Compensator in Power Systems

Voltage Stability Improvement using Static Var Compensator in Power Systems Leonardo Journal of Sciences ISSN 1583-0233 Issue 14, January-June 2009 p. 167-172 Voltage Stability Improvement using Static Var Compensator in Power Systems Department of Electrical/Computer Engineering,

More information

ANN Based Fault Classifier and Fault Locator for Double Circuit Transmission Line

ANN Based Fault Classifier and Fault Locator for Double Circuit Transmission Line International Journal of Computer Sciences and Engineering Open Access Research Paper Volume-4, Special Issue-2, April 2016 E-ISSN: 2347-2693 ANN Based Fault Classifier and Fault Locator for Double Circuit

More information

Transformerless UPS systems and the 9900 By: John Steele, EIT Engineering Manager

Transformerless UPS systems and the 9900 By: John Steele, EIT Engineering Manager Transformerless UPS systems and the 9900 By: John Steele, EIT Engineering Manager Introduction There is a growing trend in the UPS industry to create a highly efficient, more lightweight and smaller UPS

More information

Bourns Resistive Products

Bourns Resistive Products Bourns Resistive Products Diverse Requirements Drive Innovations to Pulse Resistors Introduction Countless circuits depend on the protection provided by one of the most fundamental types of passive components:

More information

AMSC s Superconductor Cable Technologies for Electric Utilities

AMSC s Superconductor Cable Technologies for Electric Utilities International Workshop 2014 AMSC s Superconductor Cable Technologies for Electric Utilities Michael Ross, P.E. Managing Director of Superconductor Power Systems AMSC Corporate Facts Headquartered in MA,

More information

Generator Stator Protection, under/over voltage, under /over frequency and unbalanced loading. Ramandeep Kaur Aujla S.NO 250447392

Generator Stator Protection, under/over voltage, under /over frequency and unbalanced loading. Ramandeep Kaur Aujla S.NO 250447392 1 Generator Stator Protection, under/over voltage, under /over frequency and unbalanced loading By Ramandeep Kaur Aujla S.NO 250447392 ES 586b: Theory and applications of protective relays Department of

More information

49 Series - Relay interface modules 8-10 - 16 A. Features

49 Series - Relay interface modules 8-10 - 16 A. Features Features 1 & 2 Pole relay interface modules 5 µm Gold plate contacts for low level switching capability 49.31-50x0-1 Pole 10 A (screw terminal) 49.52-50x0-2 Pole 8 A (screw terminal) 49.72-50x0-2 Pole

More information

FAQs-Main switchboard design criteria

FAQs-Main switchboard design criteria FAQs-Main switchboard design criteria Q: What is the Australian standard for main switchboards? Current Australian standard is AS/NZS 3439.1: 2002 originating from IEC 60439. The new series of standard

More information

AN96-07. Surging Ideas TVS Diode Application Note PROTECTION PRODUCTS. TRANSIENT IMMUNITY STANDARDS: IEC 61000-4-x

AN96-07. Surging Ideas TVS Diode Application Note PROTECTION PRODUCTS. TRANSIENT IMMUNITY STANDARDS: IEC 61000-4-x TRANSIENT IMMUNITY STANDARDS: IEC 61000-4-x On January 1, 1996, exports into Europe began facing some tough transient immunity standards. The International Electrotechnical Commission (IEC), a worldwide

More information

Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components

Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components Course No: E02-010 Credit: 2 PDH Boris Shvartsberg, Ph.D., P.E., P.M.P. Continuing Education

More information

Reyrolle Protection Devices. 7PG17 - XR Intertripping, Interposing, Supervision and Special Purpose Relays. Answers for energy

Reyrolle Protection Devices. 7PG17 - XR Intertripping, Interposing, Supervision and Special Purpose Relays. Answers for energy Reyrolle Protection Devices 7PG17 - XR Intertripping, Interposing, Supervision and Special Purpose Relays. Answers for energy Siemens Protection Devices Limited 2 7PG17 XR101 & XR102 Intertripping Relay

More information

HOW TO SELECT VARISTORS

HOW TO SELECT VARISTORS HOW TO SELECT VARISTORS We have three alternatives: - selection of the varistors suitable for the operating voltage of the application - calculating the surge current, energy absorption and average power

More information

Session Eleven: Development of Standards for MV Switchgear Rated for Arc Protection

Session Eleven: Development of Standards for MV Switchgear Rated for Arc Protection Session Eleven: Development of Standards for MV Switchgear Rated for Arc Protection Bryan Johnson Product Group Manager, MV Switchgear ABB South Africa Contents Introduction... 3 What is an internal arc

More information

Circulating Current Relay. Type IRXm

Circulating Current Relay. Type IRXm Circulating Current Relay Type IRXm ABB a global technology leader ABB is a global leader in Power and Automation technologies that enable utility and industry customers to improve performance while lowering

More information

Harmonics and Noise in Photovoltaic (PV) Inverter and the Mitigation Strategies

Harmonics and Noise in Photovoltaic (PV) Inverter and the Mitigation Strategies Soonwook Hong, Ph. D. Michael Zuercher Martinson Harmonics and Noise in Photovoltaic (PV) Inverter and the Mitigation Strategies 1. Introduction PV inverters use semiconductor devices to transform the

More information

Medium Voltage Products. ZN1 12 kv arc-proof air-insulated switchgear for primary distribution

Medium Voltage Products. ZN1 12 kv arc-proof air-insulated switchgear for primary distribution Medium Voltage Products ZN1 12 kv arc-proof air-insulated switchgear for primary distribution ZN1 an innovative switchgear for power distribution requirements ABB ZN1 primary distribution switchgear is

More information

APPLICATION NOTE ULTRASONIC CERAMIC TRANSDUCERS

APPLICATION NOTE ULTRASONIC CERAMIC TRANSDUCERS APPLICATION NOTE ULTRASONIC CERAMIC TRANSDUCERS Selection and use of Ultrasonic Ceramic Transducers The purpose of this application note is to aid the user in the selection and application of the Ultrasonic

More information

This is a preview - click here to buy the full publication TECHNICAL REPORT

This is a preview - click here to buy the full publication TECHNICAL REPORT TECHNICAL REPORT IEC TR 62066 First edition 2002-06 Surge overvoltages and surge protection in low-voltage a.c. power systems General basic information Surtensions de choc et protection contre la foudre

More information

Improvements of Reliability of Micro Hydro Power Plants in Sri Lanka

Improvements of Reliability of Micro Hydro Power Plants in Sri Lanka Improvements of Reliability of Micro Hydro Power Plants in Sri Lanka S S B Udugampala, V Vijayarajah, N T L W Vithanawasam, W M S C Weerasinghe, Supervised by: Eng J Karunanayake, Dr. K T M U Hemapala

More information

INTRODUCTION TO HARMONIC ASSESSMENT IN POWER SYSTEMS

INTRODUCTION TO HARMONIC ASSESSMENT IN POWER SYSTEMS INTRODUCTION TO HARMONIC ASSESSMENT IN POWER SYSTEMS LIST OF CONTENT 1. INTRODUCTION... 1 2. HARMONIC VOLTAGE ASSESSMENT REQUIREMENT IN THE UK... 2 3. THE ASSESSMENT... 2 3.1. SYSTEM MODELLING...3 3.2.

More information

300 MW Variable Speed Drives for Pump-Storage Plant Application Goldisthal

300 MW Variable Speed Drives for Pump-Storage Plant Application Goldisthal May 24 MW Variable Speed Drives for Aurélie Bocquel APCG / 4BOC4 (MW-Goldisthal 1-5-24).PPT MW Variable Speed Drives for Content Major benefits of the cyclo-converter driven doubly-fed induction machines

More information

DESCRIPTION DWG DESCRIPTION DWG

DESCRIPTION DWG DESCRIPTION DWG DESCRIPTION DWG DESCRIPTION DWG Ferroresonance 3451/1 3451/2 3451/3 Electro-magnetic Fields (EMF) 3462/1 HV & LV Insulators (Links) 3463/1 A ORIGINAL ISSUE B 14.07.09 APPROVED DATE J. Brooks 25.02.03 INDEX

More information

13. Electrical network design methodology and application example

13. Electrical network design methodology and application example 873 13. Electrical network design methodology and application example 874 13. ELECTRICAL NETWORK DESIGN METHODOLOGY AND APPLICATION EXAMPLE The profitability of an industrial installation is directly linked

More information

SURVEY OF HARMONIC DISTORTION IN LV AND MV NETWORKS: RESULTS AND CORRECTIVE STRATEGIES

SURVEY OF HARMONIC DISTORTION IN LV AND MV NETWORKS: RESULTS AND CORRECTIVE STRATEGIES SURVEY OF HARMONIC DISTORTION IN LV AND MV NETWORKS: RESULTS AND CORRECTIVE STRATEGIES E Bompard*, E Carpaneto*, R Napoli*, P Ribaldone**, C Vercellino** * Dipartimento di Ingegneria Elettrica Industriale,

More information

48.12. 2 pole, 8 A Safety relay. Screw terminal. 35 mm rail (EN 60715) mounting. 2 CO (DPDT) 8/15 250/400 2,000 500 0.37 8/0.65/0.

48.12. 2 pole, 8 A Safety relay. Screw terminal. 35 mm rail (EN 60715) mounting. 2 CO (DPDT) 8/15 250/400 2,000 500 0.37 8/0.65/0. 48 Series - Relay interface modules 8 A Features 48.12 2 Pole Safety relay interface modules, 15.8 mm wide 48.12-2 Pole 8 A (screw terminal) DC sensitive coils Relay with forcibly guided contacts according

More information

UFES Active protection for switchgear

UFES Active protection for switchgear Active protection for switchgear ABB AG Oberhausener Strasse 4047 Ratingen, Germany Phone: +49 0-0 Fax: +49 0-7 77 Note: We reserve the right to make technical changes or modify the contents of this document

More information

CAPACITOR BANK TESTING SWP

CAPACITOR BANK TESTING SWP 1. PURPOSE AND SCOPE The purpose of this Standard Work Practice (SWP) is to standardise and prescribe the method for testing Capacitor Banks including capacitors, tuning reactors and inrush limiting reactors.

More information

MOBILE SYSTEM FOR DIAGNOSIS OF HIGH VOLTAGE CABLES (132KV/220KV) VLF-200 HVCD

MOBILE SYSTEM FOR DIAGNOSIS OF HIGH VOLTAGE CABLES (132KV/220KV) VLF-200 HVCD MOBILE SYSTEM FOR DIAGNOSIS OF HIGH VOLTAGE CABLES (132KV/220KV) VLF-200 HVCD VERY LOW FREQUENCY (VLF) - PARTIAL DISCHARGES AND TANGENT DELTA HV/EHV POWER CABLES DIAGNOSTIC AND ON-SITE FIELD TESTING WITH

More information

Unified requirements for systems with voltages above 1 kv up to 15 kv

Unified requirements for systems with voltages above 1 kv up to 15 kv (1991) (Rev.1 May 2001) (Rev.2 July 2003) (Rev.3 Feb 2015) Unified requirements for systems with voltages above 1 kv up to 15 kv 1. General 1.1 Field of application The following requirements apply to

More information

TYPE TEST CERTIFICATE OF SHORT-CIRCUIT PERFORMANCE. A three-phase outdoor oil-immersed distribution transformer

TYPE TEST CERTIFICATE OF SHORT-CIRCUIT PERFORMANCE. A three-phase outdoor oil-immersed distribution transformer 168-08 TYPE TEST CERTIFICATE OF SHORT-CIRCUIT PERFORMANCE APPARATUS A three-phase outdoor oil-immersed distribution transformer DESIGNATION 1000 kva SERIAL No. 1-08-112-01-0001 Rated power Rated voltage

More information

Telecommunication Line Protectors

Telecommunication Line Protectors TN CR 0025 Telecommunication Line s 1.1 The nature of telecom surges The telecom services considered in this report are transported on twisted pair. Each service has two wires, or lines, sometimes called

More information

High Frequency Modeling for Cable and Induction Motor Over-voltage Studies in Long Cable Drives

High Frequency Modeling for Cable and Induction Motor Over-voltage Studies in Long Cable Drives IEEE Industrial Application Society 36th Annual Meeting Page of 8 Chicago, Illinois, USA, September 3 October 5, High Frequency Modeling for Cable and Induction Motor Over-voltage Studies in Long Cable

More information

48 SERIES Relay interface modules 10 A

48 SERIES Relay interface modules 10 A 48 Relay interface modules 10 A 1 CO relay interface modules, mm wide Ideal interface for PLC and electronic systems Type 48.P3 1 CO 10 A s Type 48.31 1 CO 10 A s AC coils or DC sensitive coils Supply

More information

UniGear ZS1. Medium voltage, arc proof, air insulated switchgear for primary distribution

UniGear ZS1. Medium voltage, arc proof, air insulated switchgear for primary distribution UniGear ZS1 Medium voltage, arc proof, air insulated switchgear for primary distribution UniGear ZS1: an innovative solution for all installation requirements ABB UniGear is medium voltage metal-clad,

More information

COMPARISON OF THE FACTS EQUIPMENT OPERATION IN TRANSMISSION AND DISTRIBUTION SYSTEMS

COMPARISON OF THE FACTS EQUIPMENT OPERATION IN TRANSMISSION AND DISTRIBUTION SYSTEMS COMPARISON OF THE FACTS EQUIPMENT OPERATION IN TRANSMISSION AND DISTRIBUTION SYSTEMS Afshin LASHKAR ARA Azad University of Dezfoul - Iran A_lashkarara@hotmail.com Seyed Ali NABAVI NIAKI University of Mazandaran

More information

Calculation of Voltage Sag Indices for Distribution Networks

Calculation of Voltage Sag Indices for Distribution Networks Calculation of Voltage Sag Indices for Distribution Networks Juan A. Martinez-Velasco, Member, IEEE, Jacinto Martin-Arnedo, Nonmember Abstract This paper is presenting the main results of a work aimed

More information

Application-oriented testing of line differential protection end to end in the field using the corresponding RelaySimTest template

Application-oriented testing of line differential protection end to end in the field using the corresponding RelaySimTest template Application Note Application-oriented testing of line differential protection end to end in the field using the corresponding RelaySimTest template Author Jens Baumeister jens.baumeister@omicron.at Date

More information

Product Safety Considerations for Insulation Coordination of Low- Voltage Equipment. Scott Aldous, Compliance Engineer

Product Safety Considerations for Insulation Coordination of Low- Voltage Equipment. Scott Aldous, Compliance Engineer Product Safety Considerations for Insulation Coordination of Low- Voltage Equipment Scott Aldous, Compliance Engineer What is Insulation Coordination? From IEC 60664-1, Edition 1.2: So what does that mean

More information

EVALUATION OF CURRENTS AND CHARGE IN SURGE PROTECTIVE DEVICES IN LOW-VOLTAGE DISTRIBUTION NETWORKS DUE TO DIRECT LIGHTNING STRIKES

EVALUATION OF CURRENTS AND CHARGE IN SURGE PROTECTIVE DEVICES IN LOW-VOLTAGE DISTRIBUTION NETWORKS DUE TO DIRECT LIGHTNING STRIKES EVALUATION OF CURRENTS AND CHARGE IN SURGE PROTECTIVE DEVICES IN LOW-VOLTAGE DISTRIBUTION NETWORKS DUE TO DIRECT LIGHTNING STRIKES W. Bassi A. Piantini N.M. Matsuo University of São Paulo, Brazil This

More information

A Design of DC/DC Converter of Photovoltaic Generation System for Streetcars

A Design of DC/DC Converter of Photovoltaic Generation System for Streetcars Journal of International Council on Electrical Engineering Vol. 3, No. 2, pp.164~168, 2013 http://dx.doi.org/10.5370/jicee.2013.3.2.164 A Design of DC/DC Converter of Photovoltaic Generation System for

More information

The following table shows approximate percentage wise the

The following table shows approximate percentage wise the SHORT-CIRCUIT CALCULATION INTRODUCTION Designing an electrical system is easy and simple, if only the normal operation of the network is taken into consideration. However, abnormal conditions which are

More information

AC-Synchronous Generator

AC-Synchronous Generator Design Description AC Generators come in two basic types synchronous and non-synchronous. Synchronous generators lock in with the fundamental line frequency and rotate at a synchronous speed related to

More information

SHORT CIRCUIT CURRENT CALCULATION AND PREVENTION IN HIGH VOLTAGE POWER NETS

SHORT CIRCUIT CURRENT CALCULATION AND PREVENTION IN HIGH VOLTAGE POWER NETS Bachelor's Thesis Electrical Engineering June 2014 SHORT CIRCUIT CURRENT CALCULATION AND PREVENTION IN HIGH VOLTAGE POWER NETS MD FARUQUL ALAM SALMAN SAIF HAMID ALI School of Engineering Blekinge Tekniska

More information