1 Ministry of Electricity and Renewable Energy Egyptian Electricity Holding Company Egyptian Electricity Transmission Company QUALIFICATIONS REQUIREMENTS FOR INVESTORS TO PARTICIPATE IN FEED-IN TARIFF SCHEME Nov. 4 th, 2014

2 REQUIREMENTS FOR QUALIFICATIONS REQUESTED FROM INVESTORS FOR ELEGIBILITY TO PARTICIPATE IN FEED-IN TARIFF SCHEME I. INTRODUCTION: The Government of Egypt (GoE) represented by the Ministry of Electricity and Renewable Energy (MoERE) has adopted a Feed-in Tariff (FiT) scheme for both solar and wind energy as an effective investment that supports deployment of Renewable Energy (RE) in Egypt. According to this scheme, the electricity transmission company (EETC) and distribution companies (DCs) are committed to purchase the produced electricity from RE power plants at the prices announced by the Cabinet of Ministers. Based on this scheme the GoE will not subsidize the purchased energy from renewable energy producers. The cost bared by the government will be transferred to consumers. The Egyptian Electricity Regulatory Agency (EgyptERA) has set the required regulations and procedures for executing the Renewable Energy Feed- in Tariff (RE FiT) projects. The MoERE aims to support investment in RE through FiT by setting a target of 4300 MW in the first regulatory period. This includes 300 MW of PV projects below 500 kw, 2000 MW for projects starting from 500 kw up to 50 MW, 2000 MW from wind energy with project capacities ranging from 20 MW up to 50 MW per project. The new tariff will be only applied to the projects that will be contracted after the issuance of the new tariff. The first regulatory period ends when either achieving the set targets or after two (2) years, which is first. Moreover, GoE shall set the regulations for the allocation of state owned lands through a usufruct agreement that lasts for period equals to the life time of the project according to FiT regulation in this respect. All RE projects shall have priority of dispatch and the EETC & DCs shall sign a (take or pay) Power Purchase Agreement (PPA) with the investors for a period of twenty (20) years in case of wind projects and twenty-five (25) years in case of PV projects. In this context, EgyptERA has developed RE regulations for RE FiT projects, including the procedures of projects execution using a one-stop-shop technique. The one-stop-shop, presented by the Central Unit for RE FiT s located at MOERE premises, 12 th floor at Abbasia, Cairo, aims to facilitate the procedural steps for starting a project. This unit shall be responsible for qualifying investors according to their previous experience, organizational and financial structures as a pre-requisite before going on with the other procedures. II. PURPOSE: This document aims to set the criteria for qualifying investors applying for the RE FiT projects with capacities from 500 kw and above. The investor can apply for qualification for one (1) time regardless the number of projects he wants to establish such that each project should not be more than 50 MW. Investors shall be qualified according to the criteria mentioned in Attachment (1). The investor is considered to be qualified if he receives 650 points or more, by that he will be eligible to continue with the other procedures. Otherwise, he will be informed by the reasons for being unqualified and he can re-apply afterwards. Page 2

3 III. NOTES TO INVESTORS 1. Date and Address of Submitting the Required Documents Investors shall submit their required documents in three(3) original hard copies to the address of the Central Unit for Feed-in Tariff and one (1) soft copy to the following address. Address: Central Unit of Feed-in Tariff, 12th floor, EETC premises, Abbasia, Cairo Tel: Fax: address: 2. Language The qualification documents shall be written in Arabic or English. Any documents submitted in other languages shall include an official translation to Arabic or English. 3. Required Documents Investors shall submit documents according to the following order: a. Title Page: The title page shall be titled as follows: QUALIFYING INVESTORS FOR FEED-IN TARIFF PROJECTS IN EGYPT The title page should include the following data: For the Investor and for each of the Consortium Members (if any) Name of Company: Type of Company:(shareholding/special purpose/joint venture ) Company`s Main Activity: Issued Capital: Paid Capital: Commercial Registration Number : Address: Company s official Website: Telephone: Fax: Contact Person Name: Title: Telephone: Fax: Page 3

4 If the investor is a Consortium, then: a) The Consortium s name should be stated on the title page and all the attachments, b) The title page must be signed by an authorized representative from each of the consortium members, and c) All the documents required for the purpose of this qualification process are requested from each of the consortium members b. Introduction: The investor shall provide: Description of the company/consortium including a description of the leading company and the other member companies, the particular area of the anticipated responsibility of each member as well as the proposed RE FiT projects Feed-In tariff program projects, In case of committed Consortium, as well as each of the consortium s members, shall submit Letters of Intent, In case of uncommitted Consortium, the consortium shall identify their potential subcontractors and their specified jobs, and Brief description of the RE FiT projects, the Consortium intend to have within the first regulatory period. The description includes, but not limited to, the following information: Technology: Installed Capacity: Number of Units: Net Energy Generated: Expected Commercial Operation Date: Any other information: c. Approach and Understanding: The investor shall provide: Detailed description and approach for the development of each project the investor intend to have in the FiT program (site measurements/development plan / project time schedule /organisation chart / team profile /work plan/profile of participating organisations,.etc), Description for the investor s understanding for the necessary steps/approvals / requirements/land acquisition/mitigation of associated risks and other procedures and regulations that are needed to develop RE FiT projects, Method of financing the RE FiT projects; and Plan for the construction, operation and maintenance of the intended projects. d. Qualifications and Experience The investor should provide their last five (5) year accomplished projects (not limited to the RE projects), by filling in the forms in Exhibits A.1, A.2, A.3, and A.4, using its own letterhead and signed by the authorized representatives. Those projects that have been accomplished in Egypt, in particular for the electricity sector either RE or not shall be presented in a separate form. Page 4

5 Information related to the company s history, type of business, profile, organisation, manpower, major achievements, and future business plans and objectives must be included in Exhibit A.1. Experience related to projects completed during the last five years must be included in Exhibit A.2 Experience related to projects in progress must be included in Exhibit A.3. Experience related to IPP projects which have been completed, on-going or cancelled may be included in Exhibit A.4. e. Organizational Framework, Human Resources and Financial Resources The investor shall describe in details, the organizational structure, the available human resources and financial resources. Human Resources The investor shall provide an overall description of the available human resources, including the size of the company, the breakdown by personnel discipline, the additional resources; they may have the organizational chart and the applied governance. Financial Resources The investor shall submit the following: The audited financial statements over the last three (3) years, which should demonstrate their financial capability to secure the necessary finance for the project. For projects more than 20 MW, the credit rating for long-term unsecured debt by an international credit agency (S&P, Moody`s, DBRS), if available, will be a value added. f. Additional Information Any additional relevant information which further demonstrates the capabilities of the responding investor may be submitted under this section. Extensive information which is judged to be unappreciable and not related may be counterproductive. IV. EVALUATION CRITERIA The evaluation will be based on a 1000 points scoring system for the requested information. A minimum score of 650 points is mandatory to be qualified. The general points and the points assigned to each section of this document are shown Attachment (1). Page 5

6 ATTACHEMENT (1) EVALUATION CRITERIA This evaluation will be based on a 1000 point scoring system for the requested information. The general points and the points assigned to each section of the Requirements For Qualification (RFQ) are as follows: a. General Format and Completeness 50 Points Points will be awarded to documents that follow item 3 Notes to Investors. b. Title Page 0 Points No points will be awarded directly to the title page. However, the completeness of the title page will be assessed in awarding points for General Format and Completeness. c. Introduction 50 Points Points for the introduction will be awarded based on the clarity of the investor s description of the consortium, the responsibilities of each consortium member, and clarity of the investor s description of the role of the intended subcontracting companies. The combined responsibility of the investor and subcontracting companies must cover the major tasks and jobs of RE projects developments. Points will also be awarded if the investor provides clear and defined description of the projects he intends to establish. d. Understanding 200 Points Points will be awarded based on to what extent the investor understands the procedure of executing RE FiT project, in particular the RE projects in Egypt. e. Qualifications and Experience 300 Points Points will be awarded based on the following: The previous experience of the Developer (consortium members and major subcontractors) in projects management, development, financing, procurement, construction and commercial and local condition (not limited to RE projects). Completing projects with the same or more capital cost and the knowledge of local environment as the projects he intends to participate with in the Feed-In Tariff scheme (not limited to RE projects). All references will be checked, experience of each member of the investor's consortium shall be submitted using the forms in Exhibits A1, A2, A3 and A4. In case of not including a contact person details, who can authoritatively discuss the status of stated projects and the performance of the companies, in the submitted documents, these projects will be excluded from the company/consortium experience. f. Resources Human Resources 150 Points Points will be awarded according to the completeness of the company s organization charts provided by the investor (each consortium member and major subcontractor), and on assessment of the investor s capability to provide the necessary human resources to successfully complete the company`s responsibilities to complete the RE FiT projects intended to, as well as projects that the investor (consortium members) may obtain. Page 6

7 This assessment will be based on the organization chart, number of relevant employees in each part of the company, the general experience and qualifications of the company, the ability of contracting, managing these contracts and managing projects of the same investment size for the intended RE FiT projects. Financial Resources 250 Points Points will be awarded based on the ability of the investor (consortium members) to make the financial closure for the intended RE FiT projects, as follows: The participation share of the investor in the RE FiT projects completed in the previous five (5) years and on-going (not limited to RE projects). The analysis of the last three (3) years financial statements (financial ratios). Those companies that have negative working capital (more current liabilities than current assets) will be unqualified. The creditability rating form any international entity (e.g..s&p, Moody`s, DBRS). Letters from banks and financial institutions confirming the capability of the company to finance the proposed RE FiT projects and the intent of these institutions to finance these projects. g. Additional Information 0 Points No points are directly awarded to the additional information section. Any information provided in this section will be considered as a supplementary information for other sections. Page 7

8 EXHIBIT A.1 Name: Name of Consortium: Legal Name of Company: Address: Phone Number: Fax: Company s Description and History: Company`s Major Accomplishments Company s Business Plan: Use as many sheets as needed. Signature Page 8

9 s Completed EXHIBIT A2 Consortium s Name: Firm s Name: NO Name Location Brief Description Name of client & contact person; Address, Phone Number & . Total Value in US$/EGP Description of Firm`s Scope of Work value of Firm`s in US$/EGP Sources of finance of Firm`s Date of firm`s Start Date of Completion and Acceptance of Work Use as many sheets as needed. Signature 9

10 EXHIBIT A.3 s in Progress Consortium s Name: Firm s Name: NO Name Location Brief Description Name of client & contact person; Address, Phone Number & . Total / Value in US$/EGP Description of Firm`s Scope of Work value of firm`s in US$/EGP Sources of finance of Firm`s Date of firm`s Start Expected Date of Completion Use as many sheets as needed. Signature 10

11 EXHIBIT A.4 IPP s (Investors Intend to Participate in the Equity Only) Consortium s Name: Firm s Name: NO Name Location Brief Description Name of client & contact person; Address, Phone Number & . Total / Cost in US$/EGP Description of Firm`s Scope of Work Sources Of Funds for (Equity& Debt) State Value and source Firm`s Share In Equity Start Date Status Reasons for cancelling or delaying the project Use as many sheets as needed. Signature 11

QUALIFICATIONS REQUIREMENTS FOR INVESTORS TO PARTICIPATE IN FEED-IN TARIFF SCHEME

QUALIFICATIONS REQUIREMENTS FOR INVESTORS TO PARTICIPATE IN FEED-IN TARIFF SCHEME Ministry of Electricity and Renewable Energy Egyptian Electricity Holding Company Egyptian Electricity Transmission Company QUALIFICATIONS REQUIREMENTS FOR INVESTORS TO PARTICIPATE IN FEED-IN TARIFF SCHEME

More information

Renewable Energy Feed-in Tariff Projects Regulations

Renewable Energy Feed-in Tariff Projects Regulations for Consumer Protection and Renewable Energy Feed-in Tariff Projects Regulations Oct. 2014 EgyptERA s crew has prepared this document so as to answer all the questions related to the renewbales supporting

More information

Feed-in Tariff for Wind and Solar Energy in Egypt

Feed-in Tariff for Wind and Solar Energy in Egypt 2 ND JOINT ECRB MEDREG ROUNDTABLE THE ROLE OF REGULATORS IN PROMOTING INVESTMENTS Feed-in Tariff for Wind and Solar Energy in Egypt Eng. Marwa Mostafa Athens Sep. 2015 Contents Overview of the RE Mechanisms

More information

Egypt Renewable energy Projects. Eng. Lamya Youssef Head Of FIT Unit Central Unit Egyptian Electricity Transmission Company EETC

Egypt Renewable energy Projects. Eng. Lamya Youssef Head Of FIT Unit Central Unit Egyptian Electricity Transmission Company EETC Egypt Renewable energy Projects Eng. Lamya Youssef Head Of FIT Unit Central Unit Egyptian Electricity Transmission Company EETC Strategy Private Sector is our partner towards achieving our goal increasing

More information

Electricity in Egypt

Electricity in Egypt T: (+20) 2 3760 4592 F: (+20) 2 3760 4593 A: 16 Hussein Wassef Street, Messaha Square Dokki, Giza, Egypt 12311 www.ide.com.eg Electricity in Egypt Policy and Regulatory Reform November 2015 Electricity

More information

Current and expected contribution of RES-E in NA countries

Current and expected contribution of RES-E in NA countries Arab Republic of Egypt Ministry of Electricity & Energy New & Renewable Energy Authority (NREA) Current and expected contribution of RES-E in NA countries Ehab Ismail Ameen General Manager of Planning

More information

The Status of the Wind Power Market in Egypt. Dr. Walid El-Khattam Ain Shams University (Cairo, Egypt) The Egyptian Electricity Regulator (EgyptERA)

The Status of the Wind Power Market in Egypt. Dr. Walid El-Khattam Ain Shams University (Cairo, Egypt) The Egyptian Electricity Regulator (EgyptERA) The Status of the Wind Power Market in Egypt Dr. Walid El-Khattam Ain Shams University (Cairo, Egypt) The Egyptian Electricity Regulator (EgyptERA) Berlin, June 11 th, 2013 1 Contents Key Challenges for

More information

Full Scale Program for Renewable Energy in Egypt

Full Scale Program for Renewable Energy in Egypt Full Scale Program for Renewable Energy in Egypt Contents Evolution of Egypt Needs of Electricity and its supply mix Renewable Energy Policy and Targets Renewable Energy Program Components Conclusions

More information

Future of Renewable Energy in Egypt

Future of Renewable Energy in Egypt Future of Renewable Energy in Egypt Mohamed Salah ElSobki (Jr) Executive Chairman New and Renewable Energy Authority (NREA) Ministry of Electricity and Renewable Energy (MoE&RE) Energy market motivations,

More information

Renewable Energy in Egypt

Renewable Energy in Egypt Renewable Energy in Egypt Mohammed Mostafa El-Khayat New and Renewable Energy Authority mohamed.elkhayat@yahoo.com Renewable Energy in Egypt, June 8, 2015, Abu Dhabi, UAE Contents Electricity Sources in

More information

Wind Energy in Egypt

Wind Energy in Egypt Wind Energy in Egypt Mohamed Salah Elsobki (Jr.) Energy Efficiency and Renewable Energies Manager Industrial Modernization Programme Adjunct Professor Faculty of Engineering Cairo University Egypt Wind

More information

Renewable Energy in the manufacturing and tourism industry in Egypt. Regulatory Framework and market potential

Renewable Energy in the manufacturing and tourism industry in Egypt. Regulatory Framework and market potential Renewable Energy in the manufacturing and tourism industry in Egypt Regulatory Framework and market potential Part 1 Electricity Self-consumption 2 Egypt s Electricity Sector Figures 2013 27 GW Peak Load

More information

ORGANIZATION CHART OF MINISTRY OF ELECTRICITY & RENEWABLE ENERGY MoERE

ORGANIZATION CHART OF MINISTRY OF ELECTRICITY & RENEWABLE ENERGY MoERE ORGANIZATION CHART OF MINISTRY OF ELECTRICITY & RENEWABLE ENERGY MoERE Egyptian Electricity Holding Company EEHC Egyptian Electricity Transmission Company EETC Egyptian Electricity Distribution Company

More information

Solar in Egypt: New feed-in-tariff scheme to develop PV

Solar in Egypt: New feed-in-tariff scheme to develop PV Solar in Egypt: New feed-in-tariff scheme to develop PV Researched & produced by: SolarReserve www.pv-insider.com/menasol/egypt In association with: MENASOL 2015 7th Middle East & North Africa Conference

More information

Overview of the Electricity Sector in Egypt

Overview of the Electricity Sector in Egypt Overview of the Electricity Sector in Egypt Milan 22-23 October - 2 nd Capacity building Reporting methodologies: how to collect data and monitor regulated entities Salma Hussien Osman Egypt ERA www.egyptera.org

More information

Eng.Mostafa. Ibrahim Khamis. Dr. Shaher Anis Mahmoud. Eng.Ehab. Ehab Ismaeel Amin. Acc. Hazem Ahmed Abdelhalim

Eng.Mostafa. Ibrahim Khamis. Dr. Shaher Anis Mahmoud. Eng.Ehab. Ehab Ismaeel Amin. Acc. Hazem Ahmed Abdelhalim Eng.Mostafa Ibrahim Khamis Dr. Fouad Mohammed Mansour Dr. Shaher Anis Mahmoud Eng.Ehab Ehab Ismaeel Amin Acc. Hazem Ahmed Abdelhalim 2 Providing continuous and safe supply of electricity to all consumers

More information

Arab Republic of Egypt Ministry of Electricity & Energy New & Renewable Energy Authority (NREA)

Arab Republic of Egypt Ministry of Electricity & Energy New & Renewable Energy Authority (NREA) Arab Republic of Egypt Ministry of Electricity & Energy New & Renewable Energy Authority (NREA) Oct. 2012 Institutional framework: Establishing NREA (1986) The national focal point to develop and introduce

More information

Current Status and Future Prospects for the Power Market in Egypt

Current Status and Future Prospects for the Power Market in Egypt Current Status and Future Prospects for the Power Market in Egypt Dr. Walid El-Khattam Ain Shams University (Cairo, Egypt) The Egyptian Electricity Regulator (EgyptERA) Berlin, June 11 th, 2013 1 Contents

More information

Renewable Energy Strategy for 2020 and Regulatory Framework. Eng. Hatem Amer Egyptian Electric Regulatory and Consumer Protection Agency

Renewable Energy Strategy for 2020 and Regulatory Framework. Eng. Hatem Amer Egyptian Electric Regulatory and Consumer Protection Agency Renewable Energy Strategy for 2020 and Regulatory Framework Eng. Hatem Amer Egyptian Electric Regulatory and Consumer Protection Agency Objectives of the Agency Regulate, supervise, and control all matters

More information

OKLAHOMA GAS AND ELECTRIC COMPANY REQUEST FOR INFORMATION. Solar Energy Purchase Power Agreement Information

OKLAHOMA GAS AND ELECTRIC COMPANY REQUEST FOR INFORMATION. Solar Energy Purchase Power Agreement Information OKLAHOMA GAS AND ELECTRIC COMPANY REQUEST FOR INFORMATION Solar Energy Purchase Power Agreement Information RFI Issue Date May 18, 2015 Responses Due June 15, 2015 1. RFI Purpose and Scope 1.1 Purpose

More information

Energy Finance in the Middle East: Uncertainties and Opportunities Maamari Auditorium, OSB AUB, 22 January 2016

Energy Finance in the Middle East: Uncertainties and Opportunities Maamari Auditorium, OSB AUB, 22 January 2016 American University of Beirut (AUB) The Munib and Angela Masri Institute of Energy and Natural Resources Energy Finance in the Middle East: Uncertainties and Opportunities Maamari Auditorium, OSB AUB,

More information

Renewable Energy Certificate Mechanism for India. ABPS Infrastructure Advisory. Background

Renewable Energy Certificate Mechanism for India. ABPS Infrastructure Advisory. Background Renewable Energy Certificate Mechanism for India Background ABPS Infrastructure Advisory India is abundantly gifted with a variety of renewable energy (RE) sources. However, not all states are endowed

More information

Renewable Energy in Egypt. October 2013

Renewable Energy in Egypt. October 2013 Renewable Energy in Egypt October 2013 Contents National Bank of Egypt NBE Vision & Strategy Finance Incentives Wind Farm Energy Solar Energy Potential role of NBE 2 NBE stands on very solid pillars Oldest

More information

HOULDER INSURANCE SERVICES

HOULDER INSURANCE SERVICES HOULDER INSURANCE SERVICES PROFESSIONAL INDEMNITY PROPOSAL FORM ENGINEERS PLEASE READ THE FOLLOWING BEFORE COMPLETING THIS PROPOSAL FORM: ALL QUESTIONS SHOULD BE COMPLETED IN INK. WHERE A QUESTION IS NOT

More information

GENERAL CONTRACTOR / CONSTRUCTION MANAGER SERVICES

GENERAL CONTRACTOR / CONSTRUCTION MANAGER SERVICES REQUEST FOR QUALIFICATIONS GENERAL CONTRACTOR / CONSTRUCTION MANAGER SERVICES NEW DINING HALL MONTANA STATE UNIVERSITY Bozeman, Montana PPA NO. 15-0103 Campus Planning, Design & Construction Plew Building

More information

RES in Egypt: state of the art and future developments

RES in Egypt: state of the art and future developments RES in Egypt: state of the art and future developments Mohamed Salah ElSobki (Jr) Executive Chairman New and Renewable Energy Authority (NREA) Ministry of Electricity and Renewable Energy (MoE&RE) 1 EE

More information

The Importance of Feed In Tariffs to Attract Financial Resources Asset & Capital Structuring Corporate & Investment Banking

The Importance of Feed In Tariffs to Attract Financial Resources Asset & Capital Structuring Corporate & Investment Banking The Importance of Feed In Tariffs to Attract Financial Resources Asset & Capital Structuring Corporate & Investment Banking Madrid, November 2008 Index 1. Asset & Capital Structuring 2. Capital Structuring

More information

Development in Egypt. Egyptian Electricity Holding Company - EEHC

Development in Egypt. Egyptian Electricity Holding Company - EEHC Wind Power Development in Egypt Introduction In Egypt, the high reliance on increasingly scarce of the availability of conventional energy resources (crude oil & natural gas) is becoming a cause for concern,

More information

Consultation on changes to Feed-in Tariff accreditation

Consultation on changes to Feed-in Tariff accreditation Consultation on changes to Feed-in Tariff accreditation Removing preliminary accreditation from the Feedin Tariff 21 July 2015 Department of Energy and Climate Change 3 Whitehall Place London SW1A 2AW

More information

Frequently Asked Questions About. Japan s Feed-in- Tariff System

Frequently Asked Questions About. Japan s Feed-in- Tariff System Frequently Asked Questions About Japan s Feed-in- Tariff System Spring 2013 JAPAN S FEED-IN-TARIFF SYSTEM SPRING 2013 Naoki Watanabe 1. What are the Key Steps in the Process of Getting FIT Approval of

More information

Prospects and Incentives for Use of Alternative Energy Technologies in the Arab Electric Power Generation Sector

Prospects and Incentives for Use of Alternative Energy Technologies in the Arab Electric Power Generation Sector Prospects and Incentives for Use of Alternative Energy Technologies in the Arab Electric Power Generation Sector Samir AlKotob Arab Fund for Economic and Social Development Objectives To overview the Arab

More information

Prospects of the Renewable Energy in Egypt

Prospects of the Renewable Energy in Egypt Prospects of the Renewable Energy in Egypt AbdelRahman Shawky Elsadawy Project Manager at OnaSolar S.A.E October 9, 2014 Tunis, Tunisia OnaSolar S.A.E OnaSolar is a solar integrator that provides a turnkey

More information

e-factsheet Feed-in Tariffs what we have to offer

e-factsheet Feed-in Tariffs what we have to offer e-factsheet Feed-in Tariffs what we have to offer 2 of 12 Feed-in Tariffs (FITs) make renewable generation more financially rewarding for smaller installations and help reduce the UK s carbon emissions.

More information

Jonathan Walters Sector Manager, Energy and Transport Middle East and North Africa World Bank

Jonathan Walters Sector Manager, Energy and Transport Middle East and North Africa World Bank Jonathan Walters Sector Manager, Energy and Transport Middle East and North Africa World Bank Why CSP Scale-up in MENA has global impacts? MENA and South Western USA/Mexico offer best solar resources;

More information

NARUC International Relations Committee Meeting February 5, 2012 Washington, D.C. Jay Godfrey Jfgodfrey@aep.com Managing Director, Renewable Energy

NARUC International Relations Committee Meeting February 5, 2012 Washington, D.C. Jay Godfrey Jfgodfrey@aep.com Managing Director, Renewable Energy NARUC International Relations Committee Meeting February 5, 2012 Washington, D.C. Jay Godfrey Jfgodfrey@aep.com Managing Director, Renewable Energy American Electric Power Company U.S. electric generation

More information

Financing Energy Efficiency and Renewable Energy through the India Renewable Energy Development Agency

Financing Energy Efficiency and Renewable Energy through the India Renewable Energy Development Agency RENEWABLE ENERGY INDUSTRIAL ENERGY EFFICIENCY BUILDING ENERGY EFFICIENCY Financing Energy Efficiency and Renewable Energy through the India Renewable Energy Development Agency A RANGE OF FINANCIAL SUPPORT

More information

HOULDER INSURANCE SERVICES

HOULDER INSURANCE SERVICES HOULDER INSURANCE SERVICES PROFESSIONAL INDEMNITY PROPOSAL FORM ARCHITECTS PLEASE READ THE FOLLOWING BEFORE COMPLETING THIS PROPOSAL FORM: ALL QUESTIONS SHOULD BE COMPLETED IN INK. WHERE A QUESTION IS

More information

TABLE OF CONTENTS. I. Introduction 3. II. Contractor Pre-Qualification Criteria 4. III. Procedure for Application of Contractor Pre-Qualification 6

TABLE OF CONTENTS. I. Introduction 3. II. Contractor Pre-Qualification Criteria 4. III. Procedure for Application of Contractor Pre-Qualification 6 Related To FEWA Electricity Network (Transmission & Distribution) Version 1.0 December 2014 TABLE OF CONTENTS Page I. Introduction 3 II. Contractor Pre-Qualification Criteria 4 III. Procedure for Application

More information

Presentation by BSI on the main changes to the IATF ISO/TS 16949 certification scheme

Presentation by BSI on the main changes to the IATF ISO/TS 16949 certification scheme Presentation by BSI on the main changes to the IATF ISO/TS 16949 certification scheme ISO/TS 16949 IATF Scheme rules 4 th edition areas that impact BSI Clients Copyright 2014 BSI. All rights reserved.

More information

ANNOUNCEMENT. Bidders pre-qualification for Event Management Services. Procurement & Contracts Management Division Bidders pre-qualification

ANNOUNCEMENT. Bidders pre-qualification for Event Management Services. Procurement & Contracts Management Division Bidders pre-qualification ANNOUNCEMENT Bidders pre-qualification for Event Management Services Procurement & Contracts Management Division Bidders pre-qualification The Abu Dhabi Education Council ADEC is pleased to invite all specialized

More information

PG&E and Renewable Energy. Chuck Hornbrook Senior Manager Solar and Customer Generation

PG&E and Renewable Energy. Chuck Hornbrook Senior Manager Solar and Customer Generation PG&E and Renewable Energy Chuck Hornbrook Senior Manager Solar and Customer Generation PG&E and our Business What we do: Deliver safe, reliable, and environmentally responsible gas and electricity to approximately

More information

New Energy Investment Forum

New Energy Investment Forum & THE 2ND EGYPT 29 & 30 April 2015 Cairo, Egypt Power Infrastructure New Energy Investment Forum Main topics include: Egypt`s New Energy market - Milestones, opportunities & risk reward Electricity and

More information

HOULDER INSURANCE SERVICES PROFESSIONAL INDEMNITY PROPOSAL FORM DESIGN & CONSTRUCTION INDUSTRY

HOULDER INSURANCE SERVICES PROFESSIONAL INDEMNITY PROPOSAL FORM DESIGN & CONSTRUCTION INDUSTRY HOULDER INSURANCE SERVICES PROFESSIONAL INDEMNITY PROPOSAL FORM DESIGN & CONSTRUCTION INDUSTRY PLEASE READ THE FOLLOWING BEFORE COMPLETING THIS PROPOSAL FORM: ALL QUESTIONS SHOULD BE COMPLETED IN INK.

More information

The information given herein is correct as at: 06/01/2016 13:38 and has been completed by [ ] Published by. Project: - 1 -

The information given herein is correct as at: 06/01/2016 13:38 and has been completed by [ ] Published by. Project: - 1 - The information given herein is correct as at: 06/01/2016 13:38 and has been completed by [ ] ILLUSTRATIVE QUESTIONNAIRE FOR DUE DILIGENCE OF RENEWABLE ENERGY ASSETS (Equity) Published by Project: - 1

More information

Renewable Energy market in Egypt

Renewable Energy market in Egypt Renewable Energy market in Egypt By : Hesham Enan June 10 th 2015 1 Agenda Energy Mix in Egypt Electricity Authority and Electricity Tariffs RE Strategy & Policies Hydro Power Solar Energy & Wind Energy

More information

Success in Renewables. Glossary of Terms Investment and Renewables

Success in Renewables. Glossary of Terms Investment and Renewables Success in Renewables Glossary of Terms Investment and Renewables If you re new to renewable energy or investment, then it can be a minefield of new language and terminology. What seems totally normal

More information

PacifiCorp. Request for Proposal. Natural Gas Asset Management and Supply. ISSUED: April 6, 2016. DUE DATE: April 18, 2016

PacifiCorp. Request for Proposal. Natural Gas Asset Management and Supply. ISSUED: April 6, 2016. DUE DATE: April 18, 2016 PacifiCorp Request for Proposal Natural Gas Asset Management and Supply ISSUED: April 6, 2016 DUE DATE: April 18, 2016 2016 RFP for Natural Gas Asset Management and Supply Responses: RFP-Gas@pacificorp.com

More information

Appendix A. Glossary. For. 2016 Request For Proposals For Long-Term Renewable Generation Resources for Entergy Louisiana, LLC

Appendix A. Glossary. For. 2016 Request For Proposals For Long-Term Renewable Generation Resources for Entergy Louisiana, LLC Appendix A Glossary For 2016 Request For Proposals For Long-Term Renewable Generation Resources for Entergy Louisiana, LLC Entergy Services, Inc. June 8, 2016 Website means the internet website https://spofossil.entergy.com/entrfp/send/2016ellrenewablerfp/index.htm.

More information

Guidelines for Setting Up of Private Power Projects Under Short Term Capacity Addition Initiative AUGUST 2010 Private Power and Infrastructure Board Ministry of Water & Power Government of Pakistan PART

More information

Paving the way for MSP Activity 1.1.1: Benchmarking of existing practice against EU norms

Paving the way for MSP Activity 1.1.1: Benchmarking of existing practice against EU norms Paving the way for MSP Activity 1.1.1: Benchmarking of existing practice against EU norms - Country Report Egypt - The Contents of this publication are the sole responsibility of the Consortium MVVdecon/ENEA/RTE-I/Sonelgaz/Terna

More information

International Peace Support Training Centre Westwood Park P O Box 24232-00502 Karen, Kenya

International Peace Support Training Centre Westwood Park P O Box 24232-00502 Karen, Kenya International Peace Support Training Centre Westwood Park P O Box 24232-00502 Karen, Kenya PRE-QUALIFICATION TENDER NO. IPSTC/PREQ/2014/2015/043 FOR PROVISION OF PLUMBING SERVICES FOR 2014/2015 July, 2014

More information

Renewable Energy Promotion Policies in Taiwan. Bureau of Energy Ministry of Economic Affairs

Renewable Energy Promotion Policies in Taiwan. Bureau of Energy Ministry of Economic Affairs Renewable Energy Promotion Policies in Taiwan Bureau of Energy Ministry of Economic Affairs October 2015 1 Outline Current Development of Renewables in Taiwan Taiwan s New Renewable Energy Policy 2 Current

More information

DRAFT KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE. No. 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015

DRAFT KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE. No. 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015 DRAFT 31.3.2015 KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015 The Kerala State Electricity Regulatory Commission hereby publishes

More information

Contracts for Difference - the new support regime for low carbon generation

Contracts for Difference - the new support regime for low carbon generation Contracts for Difference - the new support regime for low carbon generation James Taylor Raj Bavishi 11 November 2014 UK Incentive Regimes Small scale Feed in Tariffs and the Renewables Obligations have

More information

BANK OF UGANDA REPUBLIC OF UGANDA

BANK OF UGANDA REPUBLIC OF UGANDA BANK OF UGANDA REPUBLIC OF UGANDA 37/45 KAMPALA ROAD, P.O. BOX 7120, KAMPALA; Telephone: 256-414-258441/6 or 258061, Telex: 61069/61344; Fax: 256-414-233818 Web site: www.bou.or.ug; E-mail address: info@bou.or.ug

More information

Sustainable and Renewable Energy Development Authority (SREDA) of Bangladesh Role and Responsibility

Sustainable and Renewable Energy Development Authority (SREDA) of Bangladesh Role and Responsibility Sustainable and Renewable Energy Development Authority (SREDA) of Bangladesh Role and Responsibility Welcome to SREDA Siddique Zobair Member (EE & C) Sustainable & Renewable Energy Development Authority

More information

Draft law on Renewable Energy Sources - Update January 2014

Draft law on Renewable Energy Sources - Update January 2014 Draft law on Renewable Energy Sources - Update January 2014 On 3 January 2014 another draft of new law on Renewable Energy Sources ( RES ) was published by the Polish Ministry of Economy ( MoE ). Additionally,

More information

Solar PV For Surrey Schools - Information Pack

Solar PV For Surrey Schools - Information Pack Solar PV For Surrey Schools - Information Pack Solar PV for Surrey Schools: Summary of options and key considerations School interested in solar PV OPTION 1 Own investment: School is responsible for the

More information

Process for a Hotel to Become Green-Star Hotel-Certified

Process for a Hotel to Become Green-Star Hotel-Certified Process for a Hotel to Become Green-Star Hotel-Certified Introduction The Green Star Hotel (GSH) Certificate for tourist accommodation businesses is awarded to tourist accommodations in Egypt for their

More information

FEED-IN OF EXCESS ENERGY AND SELF CONSUMPTION: NEW REGULATIONS IN GHANA S ENERGY SECTOR JULIUS NKANSAH-NYARKO ENERGY COMMISSION

FEED-IN OF EXCESS ENERGY AND SELF CONSUMPTION: NEW REGULATIONS IN GHANA S ENERGY SECTOR JULIUS NKANSAH-NYARKO ENERGY COMMISSION FEED-IN OF EXCESS ENERGY AND SELF CONSUMPTION: NEW REGULATIONS IN GHANA S ENERGY SECTOR JULIUS NKANSAH-NYARKO ENERGY COMMISSION NOVEMBER 20, 2014 PRESENTATION OUTLINE Overview of Ghana s Energy Situation

More information

Renewable Energy Promotion Policies in Chinese Taipei

Renewable Energy Promotion Policies in Chinese Taipei Renewable Energy Promotion Policies in Chinese Taipei Bureau of Energy, Ministry of Economic Affairs Chinese Taipei November 12, 2014 RE for CT - 1 Current Development of Renewables in Chinese Taipei RE

More information

MINISTRY OF ENERGY FEED-IN-TARIFFS POLICY ON WIND, BIOMASS, SMALL-HYDRO, GEOTHERMAL, BIOGAS AND SOLAR RESOURCE GENERATED ELECTRICITY

MINISTRY OF ENERGY FEED-IN-TARIFFS POLICY ON WIND, BIOMASS, SMALL-HYDRO, GEOTHERMAL, BIOGAS AND SOLAR RESOURCE GENERATED ELECTRICITY MINISTRY OF ENERGY FEED-IN-TARIFFS POLICY ON WIND, BIOMASS, SMALL-HYDRO, GEOTHERMAL, BIOGAS AND SOLAR RESOURCE GENERATED ELECTRICITY Initial Issue: March 2008 1 st Revision: January 2010 2 nd Revision:

More information

Results Presentation Jan-Sep 2014. November 25 th, 2014

Results Presentation Jan-Sep 2014. November 25 th, 2014 Results Presentation Jan-Sep 2014 November 25 th, 2014 Disclaimer This document has been prepared by Grupo Isolux Corsán, S.A.; therefore no part of it may be published, disclosed or distributed in any

More information

New and Renewable Energy Policy in Republic of Korea

New and Renewable Energy Policy in Republic of Korea New and Renewable Energy Policy in Republic of Korea April 26th, 2010 Sanghoon Lee Research Fellow Climate Change Research Center Sejong University, Korea UTLINE Ⅰ. Energy Situation and NRE Status in Korea

More information

-Translation- 2. Related Parties Vintage Engineering Public Company Limited ( Company or VTE ) Green Earth Power (Thailand) Company Limited ( GEP )

-Translation- 2. Related Parties Vintage Engineering Public Company Limited ( Company or VTE ) Green Earth Power (Thailand) Company Limited ( GEP ) Information Memorandum of Vintage Engineering Public Limited Company Regarding Related Transaction on the Rendering of Construction Service for The 220MW Solar Power Plant Project located in Minbu, Myanmar

More information

RAJASTHAN ELECTRICITY REGULATORY COMMISSION JAIPUR

RAJASTHAN ELECTRICITY REGULATORY COMMISSION JAIPUR RAJASTHAN ELECTRICITY REGULATORY COMMISSION JAIPUR NOTIFICATION 23 rd December, 2010 No.RERC/Secy/Reg. 82 : In exercise of powers conferred under sections 61, 66, 86(1)(e) and 181 of the Electricity Act,

More information

ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION

ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION RENEWABLE POWER PURCHASE OBLIGATION (COMPLIANCE BY PURCHASE OF RENEWABLE ENERGY / RENEWABLE ENERGY CERTIFICATES) REGULATIONS, 2012 Regulation No. 1 of 2012

More information

Financial Mechanisms and Policies Oriented towards the development of Renewable Energy Markets. Mexico City, 28 November 2007

Financial Mechanisms and Policies Oriented towards the development of Renewable Energy Markets. Mexico City, 28 November 2007 Financial Mechanisms and Policies Oriented towards the development of Renewable Energy Markets Mexico City, 28 November 2007 Index I. Santander I Financing Drivers I Market Drivers IV. Example: Refit V.

More information

OFF-GRID SOLAR CASE STUDY AND OPPORTUNITIES IN KENYA J.M.P. MBITHI Deputy Director, Renewable Energy MINISTRY OF ENERGY AND PETROLEUM

OFF-GRID SOLAR CASE STUDY AND OPPORTUNITIES IN KENYA J.M.P. MBITHI Deputy Director, Renewable Energy MINISTRY OF ENERGY AND PETROLEUM OFF-GRID SOLAR CASE STUDY AND OPPORTUNITIES IN KENYA J.M.P. MBITHI Deputy Director, Renewable Energy MINISTRY OF ENERGY AND PETROLEUM PRESENTATION SUMMARY Introduction-Power situation in Kenya Off-grid

More information

Memorandum of Understanding. First Solar, Inc.

Memorandum of Understanding. First Solar, Inc. 9/9/2009 Memorandum of Understanding between First Solar, Inc. and Ordos City Government (China) Solar Power & Environmental News from the American Southwest www.thephoenixsun.com contact@thephoenixsun.com

More information

VIVINT SOLAR ANNOUNCES FIRST QUARTER 2015 FINANCIAL RESULTS

VIVINT SOLAR ANNOUNCES FIRST QUARTER 2015 FINANCIAL RESULTS VIVINT SOLAR ANNOUNCES FIRST QUARTER 2015 FINANCIAL RESULTS Megawatts Installed Increased 131% Year-over-Year Retained Value Increased 138% Year-over-Year Revenue Increased 172% Year-over-Year LEHI, Utah,

More information

Republic of Turkey. Date of acceptance: 9 November 2007 PART 1. Goal, scope, definitions and abbreviations. Goal and scope.

Republic of Turkey. Date of acceptance: 9 November 2007 PART 1. Goal, scope, definitions and abbreviations. Goal and scope. Republic of Turkey Unofficial Translation 1 of the Turkish Law No. 5710 2 Concerning the Construction and Operation of Nuclear Power Plants and the Sale of Energy Generated from Those Plants Date of acceptance:

More information

INDONESIA S COUNTRY REPORT ENCOURAGING CLEAN ENERGY INITIATIVE

INDONESIA S COUNTRY REPORT ENCOURAGING CLEAN ENERGY INITIATIVE DEWAN PERWAKILAN RAKYAT REPUBLIK INDONESIA INDONESIA S COUNTRY REPORT ENCOURAGING CLEAN ENERGY INITIATIVE As part of the international community, Indonesia shares its concern on the environment and development

More information

Renewable Energy Guidance & Application Form

Renewable Energy Guidance & Application Form RESOURCES Portfolio Renewable Energy & Application Form July 2013 Revision 0 Contents Section Page 1 Purpose 3 2 Scope 3 3 Background 3 4 4 Application Form 6 2 1 Purpose 1.1 This guidance note and application

More information

Reflections on the Spanish Regulation Framework. Dr. Luis Crespo Secretary General of Protermosolar President of ESTELA

Reflections on the Spanish Regulation Framework. Dr. Luis Crespo Secretary General of Protermosolar President of ESTELA Reflections on the Spanish Regulation Framework Dr. Luis Crespo Secretary General of Protermosolar President of ESTELA Recent History of STE regulation and deployment in Spain The Electrical Sector Law

More information

REQUEST FOR PROPOSALS For. Kelowna and Vernon Hospitals Project

REQUEST FOR PROPOSALS For. Kelowna and Vernon Hospitals Project REQUEST FOR PROPOSALS For The Kelowna and Vernon Hospitals Project VOLUME 2 of 4 Instructions to Proponents Closing Time: Delivery Address: 3:00 pm (local time) Thursday, March 6,2008 Kelowna and Vernon

More information

Newton-Mosharafa PhD Programme

Newton-Mosharafa PhD Programme Newton-Mosharafa PhD Programme Call for Applications 1. The UK Department of Business, Innovation and Skills (BIS), the British Council, British Embassy Cairo and Egyptian Ministry of Higher Education

More information

Appendix C-2. Entergy Services, Inc. June 8, 2016

Appendix C-2. Entergy Services, Inc. June 8, 2016 Appendix C-2 Preliminary Due Diligence List (Existing Resources) For 2016 Request For Proposals For Long-Term Renewable Generation Resources For Entergy Louisiana, LLC Entergy Services, Inc. June 8, 2016

More information

International Workshop on Renewable Energy Policies in Developing Countries, November 22-23, 2010 Washington, DC

International Workshop on Renewable Energy Policies in Developing Countries, November 22-23, 2010 Washington, DC RENEWABLE ENERGY in MENA Region: Assets and Challenges Mustapha Taoumi, Project Officer, MENA Region Contents 1. Worldwide situation 2. Potential in MENA countries 3. Actual situation 4. Assets 5. Challenges

More information

Japan. Nagahide Sato and Sadayuki Matsudaira Nishimura & Asahi

Japan. Nagahide Sato and Sadayuki Matsudaira Nishimura & Asahi Nagahide Sato and Sadayuki Matsudaira Nishimura & Asahi 1 Policy and law What is the government policy and legislative framework for the electricity sector? The electricity sector in is governed by the

More information

RENEWABLE ENERGY DEVELOPMENT IN LITHUANIA ACHIEVEMENTS AND DRAWBACKS

RENEWABLE ENERGY DEVELOPMENT IN LITHUANIA ACHIEVEMENTS AND DRAWBACKS RENEWABLE ENERGY DEVELOPMENT IN LITHUANIA ACHIEVEMENTS AND DRAWBACKS Ieva Kuodė Ministry of Energy of the Republic of Lithuania SOLINVEST 2015-06-02 RES TARGETS BY 2020 23% the share of energy from renewable

More information

Law of the Republic of Kazakhstan «ABOUT SUPPORT OF USE OF RENEWABLE SOURCES OF ENERGY»

Law of the Republic of Kazakhstan «ABOUT SUPPORT OF USE OF RENEWABLE SOURCES OF ENERGY» Law of the Republic of Kazakhstan «ABOUT SUPPORT OF USE OF RENEWABLE SOURCES OF ENERGY» Draft The present Law regulates public relations in the area of the usage of Renewable Energy Sources, establishes

More information

RENEWABLE ENERGY WORKSHOP

RENEWABLE ENERGY WORKSHOP RENEWABLE ENERGY WORKSHOP Development of Bankable PPAs and Opportunities for Cooperation with ECG GIZ House, Reichpietschufer, Berlin January 18, 2016 OUTLINE OF PRESENTATION Introduction and Overview

More information

Renewable Electricity and Liberalised Markets REALM. JOULE-III Project JOR3-CT98-0290 GREECE ACTION PLAN. By ICCS / NTUA K. Delkis

Renewable Electricity and Liberalised Markets REALM. JOULE-III Project JOR3-CT98-0290 GREECE ACTION PLAN. By ICCS / NTUA K. Delkis Renewable Electricity and Liberalised Markets REALM JOULE-III Project JOR3-CT98-0290 GREECE ACTION PLAN By ICCS / NTUA K. Delkis October 1999 INTRODUCTION AND BACKGROUND Background to Renewable Energy

More information

Policy and regulatory barriers to renewable energy deployment in South East Europe

Policy and regulatory barriers to renewable energy deployment in South East Europe Policy and regulatory barriers to renewable energy deployment in South East Europe Andreas Tuerk Dorian Frieden, Mislav Kirac, Mak Dukan, Leo Jerkic 3. March 2016 www.joanneum.at/life Method applied Interviews

More information

Comments of the Edison Electric Institute Net Benefits and Costs of Distributed Solar Energy and Innovative Solar Deployment Models, DOE-EERE

Comments of the Edison Electric Institute Net Benefits and Costs of Distributed Solar Energy and Innovative Solar Deployment Models, DOE-EERE Comments of the Edison Electric Institute Net Benefits and Costs of Distributed Solar Energy and Innovative Solar Deployment Models, DOE-EERE Category 2 - Innovative Solar Deployment Models Edward H. Comer,

More information

INVESTMENT IN WIND ENERGY IN VIETNAM: THE RIGHT TIME HAS COME?

INVESTMENT IN WIND ENERGY IN VIETNAM: THE RIGHT TIME HAS COME? INVESTMENT IN WIND ENERGY IN VIETNAM: THE RIGHT TIME HAS COME? OLIVER MASSMANN MANAGING PARTNER DUANE MORRIS VIETNAM LLC 2010 Duane Morris LLP. All Rights Reserved. Duane Morris is a registered service

More information

Investment Brief for the Electricity Sector in Ghana

Investment Brief for the Electricity Sector in Ghana Investment Brief for the Electricity Sector in Ghana Overview Ghana s economy growth decelerated sharply to an estimated 4.2% in 2014, down from 7.4 % in 2013. Manufacturing and oil production from the

More information

Purchase Price Allocations for Solar Energy Systems for Financial Reporting Purposes

Purchase Price Allocations for Solar Energy Systems for Financial Reporting Purposes Purchase Price Allocations for Solar Energy Systems for Financial Reporting Purposes July 2015 505 9th Street NW Suite 800 Washington DC 20004 202.862.0556 www.seia.org Solar Energy Industries Association

More information

Northeast Utilities Creditworthiness Policy for Transmission Service

Northeast Utilities Creditworthiness Policy for Transmission Service Northeast Utilities Creditworthiness Policy for Transmission Service 1. General Information: All customers taking (i) any service under Schedule 21, the Local Service Schedules ( LSS ) schedules and associated

More information

DBSA RENEWABLE ENERGY FINANCING

DBSA RENEWABLE ENERGY FINANCING DBSA RENEWABLE ENERGY FINANCING Development Bank of Southern Africa Presented by Madalo Minofu Project Preparation Specialist: DBSA Project Preparation Funds Division 2 June 2014 1 DBSA s Product Offering

More information

BANK OF UGANDA REPUBLIC OF UGANDA

BANK OF UGANDA REPUBLIC OF UGANDA BANK OF UGANDA REPUBLIC OF UGANDA 37/45 KAMPALA ROAD, P.O. BOX 7120, KAMPALA; Telephone: 256-414-258441/6 or 258061, Telex: 61069/61344; Fax: 256-414-233818 Web site: www.bou.or.ug; E-mail address: info@bou.or.ug

More information

Solar Power Cost Effects on Customers

Solar Power Cost Effects on Customers Austin s Solar Tool Box Value of Solar, Community Solar and Solar Leasing Kaiba White kaibawhite@gmail.com Value of Solar Tariff Value of solar (VoS) is available to residential customers for solar installations

More information

NOTICE OF PUBLIC CALL FOR INVESTORS ANEEL Auction 004/2014 LOTS A and E

NOTICE OF PUBLIC CALL FOR INVESTORS ANEEL Auction 004/2014 LOTS A and E NOTICE OF ANEEL Auction 004/2014 LOTS A and E 1. PURPOSE The purpose of this Public Call is the selection of companies that may be interested in establishing a partnership with ELETROSUL for the implementation

More information

The Narragansett Electric Company d/b/a National Grid

The Narragansett Electric Company d/b/a National Grid The Narragansett Electric Company d/b/a National Grid Rhode Island Renewable Energy Growth Program Solicitation and Enrollment Process Rules for Small-Scale Solar Projects Effective Date: April 1, 2015

More information

TOWN OF SILVERTHORNE, COLORADO RFP for Independent Professional Auditing Services

TOWN OF SILVERTHORNE, COLORADO RFP for Independent Professional Auditing Services Nature of Services Required A. General The Town is soliciting the services of qualified firms of certified public accountants to audit its financial statements for the fiscal year ending December 31, 2011,

More information

SOLAR ENERGY DEVELOPMENT IN THAILAND

SOLAR ENERGY DEVELOPMENT IN THAILAND 26 October 2015 SOLAR ENERGY DEVELOPMENT IN THAILAND OVERVIEW As of 26 October 2015: Number of Solar Projects The current number of solar projects which have achieved COD in Thailand is 295 projects, with

More information

CHAPTER 69-05.2-12 PERFORMANCE BONDS - LIABILITY INSURANCE

CHAPTER 69-05.2-12 PERFORMANCE BONDS - LIABILITY INSURANCE CHAPTER 69-05.2-12 PERFORMANCE BONDS - LIABILITY INSURANCE Section 69-05.2-12-01 Performance Bond - General Requirements 69-05.2-12-02 Performance Bond - Form of the Performance Bond 69-05.2-12-03 Performance

More information

Regulatory Governance and Policy Risk - Renewable Energy

Regulatory Governance and Policy Risk - Renewable Energy Regulatory Governance and Policy Risk: Attracting Private Investment in (Renewable) Energy Guy L. F. Associate Professor, Ivey School of Business Director, Energy @ Ivey June 4, 2010 Copyright 2010 Intense

More information

The Real Cost of Electrical Energy. Outline of Presentation

The Real Cost of Electrical Energy. Outline of Presentation 2 Outline of Presentation Data Sources Electricity Demand and Supply Cost to Meet Demand Profile Electricity Pricing Cost Impact of Dispatching Generation (Load Following) Simplifying Assumptions Electricity

More information