AKA Which Is? Used When? Who s Responsible?
|
|
|
- Opal Tyler
- 9 years ago
- Views:
Transcription
1 Open Proprietary Descriptive Performance Reference Cash Allowance Closed Prescriptive Base Bid Specifications AKA Which Is? Used When? Who s Responsible? Several (3-5) appropriate material/product/systems are given and the contractor can use any of them, or suggest his own if he can prove the performance and quality is equal. Product/materials/systems are specifically listed by name and # and there s no substitutions allowed. All components of products, their arrangement and methods of assembly, physical and chemical properties, arrangement and relationship of parts, and numerous other details and requirements are described. Like an open spec, but instead of listing manufactures, the required expectations/criteria and results for the intended system are given. Like an open spec, but items have to meet specific testing authority requirements (UL, ASTM, ANSI) A dollar amount decided upon by the architect/owner, and to be set aside for a product/system that hasn t been totally designed or figured out yet. This portion of the bid will be equal for all bidders. You have a public job and/or want competitive bidding. You or the owner want to see something specific, because you want it, or know it will work best for the application (eg: Owner wants the same window to match the rest on the existing house) The most detailed of all specifications to be used when the architect is certain the assembled product will function properly. You don t have a manufacture preference and the contractor can competitively bid You want or need things to conform to requirements. You don t know exactly what you want to use, but know about how much you want to spend on it (eg: casework) The contractor for performance. They can submit substitution requests for approval during bidding, or risk it getting rejected during shop drawings/ inspection. The architect assumes total responsibility for the function and performance of a product. /Owner. The specific product/system is chosen should be the allowance price. Issue a CO for any amount +/- the bid amount as required
2 Easy as Parts of a Spec Section: 1. General What s covered/the scope, related sections (ie: door section would reference door hardware section), quality control, required submittals (if applicable), guarantees, warranties. 2. Materials The materials, products, and equipment to be used (can list multiple options if an open spec) 3. Execution Instruction how to install the products and perform the work. Spectacular Spec Facts: - Specs take precedence over drawings if there is an inconsistency. - Unit Prices (cost per cubic foot of concrete, lineal foot of pvc pipe, etc) is often bid for quantities that might be hard to exactly measure, or that might change in the project. It s a base price when the contractor says hey the pipe actually runs like this and we re adding 20ft+, you know at $3/ft you ve got a $60 material CO. - Once the general gets the spec, he give the sections to whichever sub he wants. But it s ultimately his responsibility to make sure there are no gaps, and that everything is coordinated and covered. - General Requirements (Division 01-administrative rules, work-related provisions, general info) are not to be confused with General Conditions (AIA B201-general parts of owner/contractor agreement) - Project Manual Include this Stuff Contract Documents Include this Stuff - Cover Sheet - The Owner/ Agreement (A101) - Table of Contents - General/Supplementary Conditions - Bid Form - Specifications (CSI Masterformat) - Instruction To Bidders - Working Drawings - Contract Forms - Addenda Owner Agreements - Modifications (Change Orders) Performance Bond Payment Bond Certificate of Insurance - General / Supplementary Conditions - Contents/Index for Specifications - Specifications organized by division
3 Insurance AKA What does it protect? Who has it & How much? How long does it last? Professional Liability Errors/Omissions Liability due to negligence or not meeting the standard of care expected of them. (eg: not designing ADA compliant restrooms in a public building) Property Builder s Risk Covers any damages, loss of Loss of Use Workers Comp work on site/off site/in transit Any financial loss due to delay in construction because of damage, accidents, fire, other hazards needed to be dealt with. Liability to employees for injury or sickness as a result of their employment. Contractual Indemnification Liability assumed by contract where contractors agree to hold owners/architects harmless from damages that are the result of specific events Product & Completed Operations Liability for damages caused by installed goods after the construction phase and transfer of title. Architects and Design Professionals Owner For the Cost of the Project Owner Architects, s, Most Employers actually! Usually renewed each year, but want to make sure the firm is covered for the length of the statue of limitations (10 years) Interesting Insurance Facts: - More than the required minimum insurance may be needed for a job. Anything extra is noted in the supplemental conditions - The owner can require the contractor to submit a certificate of insurance with a bid to prove what insurance he carries and what his limits are. - NO SUBROGATION. Owner/ should keep this provision in the AIA 201 document, so the insurance company, after paying out, can put themselves in the shoes of their client and go after whoever might be responsible for the damage that s otherwise No-Fault. You don t want the owner s insurance company going after the contractor if there s some sort of freak fire in the middle of the night that could somehow be tied back to him.
4 Bonding AKA What does it guarantee? Who has it & How much? How long does it last? Surety Bond Bond The Surety/Bonding Company will make good to the owner the debt, default, or failure of the contractor to perform the work. Completion Bond The project will be complete free of liens. Bid Bond Forfeiture bond The bidder, if awarded a contract, will enter into the contract within a specified time, and in accordance with the bidding documents. Performance Bond To protect the interest of the owner, and ensure that the work will be completed in accordance Labor/Materials Payment Bond with the contract documents. The contractor and the contractor s surety will pay their subcontractors and to purchase materials for the construction in accordance with the CDs. or Owner for 5-10% of the bid amount Submitted with the bid, and activated if the selected bidder refuses to sign the contract Brilliant Bonding Facts: - Suretys are written promises by a person/entity who guarantees the performance of an obligation of another party. It protects the owner s interest by ensuring that the contractor will do the work. - Leins are claims against an owner s property for outstanding payment due to a sub/vendor/etc. The owner can t release the title until the claim is settled...and they might have to sell the property to pay the claim. It doesn t matter if the general contractor has been paid, either!
5 Fixed Fee Cost Plus Fee (to GMP) Percentage of Construction Cost Contract Sum Stipulated Sum Agreement Fees AKA Which is? Who gets it? Use it when? A lump sum for a particular Owner/s Services are easily and scope of service. Contingencies Owner/Architect accurately defined. are included (5-10%) to cover the risk that the costs exceed the budget on which the fee is based. Reimbursable are extra. Reimbursement for actual expense to perform the work (includes salaries, employee benefits, office overhead) plus a negotiated fee for profit. Usually includes a guaranteed maximum price. Based on a percentage of the total cost of construction Total amount payable for the performance of the work done under the requirements of the contract documents Owner/ or Owner/Architect Owner/Architect Owner/ Fantastic Fee Facts: - Suretys are written promises by a person/entity who guarantees the performance of an obligation of another party. It protects the owner s interest by ensuring that the contractor will do the work. -
Construction Documents and Services Study Notes By Caroline Joseph
CJL / CDs Study Notes / Page 1 of 60 Construction Documents and Services Study Notes By Caroline Joseph Notes and References based on: Kaplan 2011 Study Guide ARE Review Manual Second Edition AIA Sample
CONSTRUCTION & DESIGN AGREEMENTS FOR OWNERS. Presented by ALEXANDER F. FERRINI, III
CONSTRUCTION & DESIGN AGREEMENTS FOR OWNERS Basics for Projects of All Sizes Presented by ALEXANDER F. FERRINI, III Why do I need an agreement? Why do I need an agreement? Why do I need an agreement? Design
The BASICS of CONSTRUCTION ACCOUNTING Workshop GLOSSARY
The BASICS of CONSTRUCTION ACCOUNTING Workshop GLOSSARY From Financial Management & Accounting for the Construction Industry, CFMA. 2014 Matthew Bender and Company, Inc., a member of the LexisNexis Group.
SECTION 3 AWARD AND EXECUTION OF CONTRACT
SECTION 3 AWARD AND EXECUTION OF CONTRACT 3.01 CONSIDERATION OF BIDS: After the Proposals are opened and read, the approximate estimated quantity of each item multiplied by the unit price bid for that
CONSTRUCTION DOCUMENTS TECHNOLOGY PROGRAM CDT STUDY GUIDE
CONSTRUCTION DOCUMENTS TECHNOLOGY PROGRAM CDT STUDY GUIDE THE CONSTRUCTION SPECIFICATIONS INSTITUTE 99 CANAL CENTER PLAZA, SUITE 300 ALEXANDRIA, VA 22314 (P) 800-689-2900; (F) 703-684-0465 (E) [email protected];
AIA Document A107 TM 2007
AIA Document A107 TM 2007 Standard Form of Agreement Between Owner and Contractor for a Project of Limited Scope AGREEMENT made as of the day of in the year (In words, indicate day, month and year.) BETWEEN
Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum
Document A101 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the in the year (In words, indicate day, month and year.)
How To Get Construction Procurement Services
Construction Procurement William C. Charvat, AIA, CSI Excerpt from The Architect s Handbook of Professional Practice, 13th edition 2000 The procurement of construction services brings together the team
STANDARD SUBCONTRACT AGREEMENT FOR BUILDING CONSTRUCTION
STANDARD SUBCONTRACT AGREEMENT FOR BUILDING CONSTRUCTION THIS AGREEMENT made at Columbus, Ohio on by and between Lincoln Construction, Inc., hereinafter referred to as the Contractor, and, hereinafter
REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT AND GENERAL CONTRACTOR SERVICES SPRINGVILLE CITY NEW AQUATICS AND ACTIVITIES CENTER
RFP #2016-02 REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT AND GENERAL CONTRACTOR SERVICES FOR SPRINGVILLE CITY NEW AQUATICS AND ACTIVITIES CENTER RELEASE DATE: January 29, 2016 DUE DATE: February
Document Comparison. AIA Documents A134 2009 and A131CMc 2003
Document Comparison AIA Documents A134 2009 and A131CMc 2003 AIA Document A134 2009 is in the right-hand column. Corresponding sections of AIA Document A131 CMc 2003 are in the left-hand column. Sections
Memorandum Potentially Affected AIA Contract Documents AIA Document A105 2007 AIA Document B105 2007 Important Information
Memorandum Important information related to requirements of state or local laws to include additional provisions in residential construction contracts Potentially Affected AIA Contract Documents AIA Document
ON-TIME AND ON-BUDGET: KEY ISSUES IN NEGOTIATING CONSTRUCTION CONTRACTS
ON-TIME AND ON-BUDGET: KEY ISSUES IN NEGOTIATING CONSTRUCTION CONTRACTS ACC REAL ESTATE COMMITTEE PRESENTATION SEPTEMBER 17, 2009 SEAN T. BOULGER, ESQ. WILMER CUTLER PICKERING HALE AND DORR LLP I. Introduction
CSA CONSTRUCTION, INC. 2314 McAllister Road Houston, Texas 77092 SUBCONTRACTOR AGREEMENT
CSA CONSTRUCTION, INC. 2314 McAllister Road Houston, Texas 77092 SUBCONTRACTOR AGREEMENT THIS AGREEMENT made this day of Month, Year, by and between CSA CONSTRUCTION, INC., a Texas corporation whose principal
Document A312" 2010. of business) OWNER'S REPRESENTATIVE: (Architect, Engineer or other party:) 500 North Main Street Monroe, North Carolina 28112
Document A312" 2010 Payment Bond CONTRACTOR: (Name, legal status and address) OWNER: (Name, legal status and address) Union County 500 North Main Street Monroe, North Carolina 28112 CONSTRUCTION CONTRACT
Document Comparative
Document Comparative AIA Documents A401 2007 and A401 2007 SP AIA Document A401 2007 SP, Standard Form of Agreement Between Contractor and Subcontractor, for use on a Sustainable Project, establishes the
Evaluating Project Delivery Options
Evaluating Project Delivery Options Scot A. Bini Vice President, URS August 24, 2004 Design-Bid-Build Overview Design Build Construction Management at Risk Owner Representation Terminology Project Manager
Bonding for Contractors. Barrie Construction Association September 17, 2015
Bonding for Contractors Barrie Construction Association September 17, 2015 1 Topics What do bonds do? How does a bond benefit you? How do you get a bond? What are the information requirements? What is
IMPORTANT! - Please use the attached Application for Payment. All payment requests must be submitted on our form. Thank you!
` SUBCONTRACTOR: PHONE PROJECT: LOCATION: Page 1 of 6 SUBCONTRACT (SHORT FORM) JOB NO.: COST CODE: PRICE: This agreement is made and effective, by and between SUN CONSTRUCTION & FACILITY SERVICES, INC.
Construction Surety Bonds
Construction Surety Bonds September 17, 2014 Presented by: Walt Caldwell [email protected] What is a Surety Bond An instrument where one party (Surety) guarantees the obligations of a second party
You & Your Architect A GUIDE FOR A SUCCESSFUL PARTNERSHIP.
A GUIDE FOR A SUCCESSFUL PARTNERSHIP. YOU AND YOUR ARCHITECT Architecture isn t only for museums, corporations, and the very wealthy. Whether you are remodeling a kitchen, creating your dream home, or
CITY OF CHARLOTTETOWN. REQUEST FOR QUOTATIONS SUPPLY AND INSTALL LIGHTING Municipal Parking Garages
CITY OF CHARLOTTETOWN REQUEST FOR QUOTATIONS SUPPLY AND INSTALL LIGHTING Municipal Parking Garages May 2016 PAGE 2 CITY OF CHARLOTTETOWN REQUEST FOR QUOTATIONS SUPPLY AND INSTALL LIGHTING Municipal Parking
SECTION 00900 PERFORMANCE BOND., hereinafter called PRINCIPAL, and
SECTION 00900 PERFORMANCE BOND KNOW ALL PERSONS BY THESE PRESENTS: THAT (Name or Contractor) a (Address of Contractor) (Corporation, Partnership, or Individual), hereinafter called PRINCIPAL, and (Name
Home Renovations and Repair
Home Renovations and Repair June 2005 This tipsheet is intended to provide general information and is not a substitute for legal advice. This tipsheet has two parts: general information about hiring any
Surety Bond Tutorial by Lori Kieswetter
Contract Surety Bonds Defined Surety Bond Tutorial by Lori Kieswetter A bond issued by a surety bond company on behalf of a contractor, guaranteeing that the contractor will complete a contract as per
Request For Proposal. Furnish Schneider Business Park Signs Design Build Services. For the Cibolo Economic Development Corporation Cibolo, Texas
Request For Proposal Furnish Schneider Business Park Signs Design Build Services For the Cibolo Economic Development Corporation Cibolo, Texas The City of Cibolo, Texas Economic Development Corporation
Rebuilding Ohio s Public Construction Law: Construction Reform in House Bill 153
Rebuilding Ohio s Public Construction Law: Construction Reform in House Bill 153 October 2011 E. Rod Davisson, Esq., Schottenstein Zox & Dunn Co., LPA 250 West Street Columbus, Ohio 43215 614.462.2700
Standard Form of Agreement Between Owner and Contractor where the basis of payment is a STIPULATED SUM
INSTRUCTIONS Standard Form of Agreement Between Owner and Contractor where the basis of payment is a STIPULATED SUM GENERAL INFORMATION PURPOSE. AIA Document A101-1997 is intended for use on construction
ENGINEERING AGREEMENT
ENGINEERING AGREEMENT STATE OF LOUISIANA PARISH OF JEFFERSON This Agreement is made and entered into on this day of, 200 by and between the Parish of Jefferson, State of Louisiana, acting herein by and
CITY OF BEVERLY HILLS REQUEST FOR PROPOSAL. for RISK MANAGEMENT PLAN (RMP) FOR THE HANDLING AND STORAGE OF AMMONIA HYDROXIDE
CITY OF BEVERLY HILLS REQUEST FOR PROPOSAL for RISK MANAGEMENT PLAN (RMP) FOR THE HANDLING AND STORAGE OF AMMONIA HYDROXIDE Please Respond no later than July 11, 2013, by 2:00 P.M. to the City Clerk s
HAWAII STANDARD GENERAL CONDITIONS FOR FORM OF AGREEMENT BETWEEN CONTRACTOR AND SUBCONTRACTOR
HAWAII STANDARD GENERAL CONDITIONS FOR FORM OF AGREEMENT BETWEEN CONTRACTOR AND SUBCONTRACTOR TABLE OF ARTICLES 1 AGREEMENT 2. SCOPE OF WORK 3. SUBCONTRACTOR S RESPONSIBILTIES 4. CONTRACTOR'S RESPONSIBILITIES
Document B101 TM. Standard Form of Agreement Between Owner and Architect
Document B101 TM 2007 Standard Form of Agreement Between Owner and Architect AGREEMENT made as of the day of in the year 2014 (In words, indicate day, month and year.) BETWEEN the Architect s client identified
Guide, Instructions and Commentary to the 2013 AIA Digital Practice Documents
Guide, Instructions and Commentary to the 2013 AIA Digital Practice Documents AIA Document E203 2013, Building Information Modeling and Digital Data Exhibit AIA Document G201 2013, Project Digital Data
Document Commentary. A201 2007 General Conditions of the Contract for Construction
Document Commentary A201 2007 General Conditions of the Contract for Construction INTRODUCTION An integral part of the prime owner-contractor agreement, the general conditions of the contract sets forth
AIA Document A141 TM - 2004 Standard From of Agreement Between Owner and Design- Builder
AIA Document A141 TM - 2004 Standard From of Agreement Between Owner and Design- Builder AGREEMENT made as of the day of in the year of (In words, indicate day, month and year) BETWEEN the Owner: (Name,
OBJECTIVE To establish procedures for administration of construction manager agreements, including negotiation, contracting and payments.
OP-B-11-D2 ADMINISTRATION OF CONSTRUCTION MANAGER AGREEMENTS SPECIFIC AUTHORITY Sections 240.209(3)(p), 1001.74, 1013.46, F. S. OBJECTIVE To establish procedures for administration of construction manager
OP-B-11-D2 ADMINISTRATION OF CONSTRUCTION MANAGER AGREEMENTS
OP-B-11-D2 ADMINISTRATION OF CONSTRUCTION MANAGER AGREEMENTS SPECIFIC AUTHORITY Sections 240.209(3)(p), 1001.74, 1013.46, F. S. OBJECTIVE To establish procedures for the administration of construction
CALIFORNIA DEPARTMENT OF TRANSPORTATION CONTRACTOR LIABILITY INSURANCE
CALIFORNIA DEPARTMENT OF TRANSPORTATION CONTRACTOR LIABILITY INSURANCE The following are excerpts from Caltrans 2010Standard Specifications. Specifications are subject to change so refer to the project
Document A105 TM. Standard Form of Agreement Between Owner and Contractor for a Residential or Small Commercial Project
Document A105 TM 2007 Standard Form of Agreement Between Owner and Contractor for a Residential or Small Commercial Project MODIFIED AIA Document A105 2007 Water Main, Union Fire District, Tuckertown Station
PREPARING DETAILED BREAKDOWNS FOR CHANGE ORDER PROPOSALS
PREPARING DETAILED BREAKDOWNS FOR CHANGE ORDER PROPOSALS I. GENERAL A. All work to be performed under the change order must be itemized, including the work of all subcontractors. B. Items must be relevant
TLHAMATSI AFRICA PROJECTS CONSTRUCTION MANAGEMENT PRESENTATION. PRESENTED BY: BAKANG MOENG [email protected]
TLHAMATSI AFRICA PROJECTS CONSTRUCTION MANAGEMENT PRESENTATION PRESENTED BY: BAKANG MOENG [email protected] CONSTRUCTION MANAGEMENT - DEFINED Act of managing the construction process Contractual arrangement
AIA Contract Documents, by Family as of 10/20/2015
A101 2007 A101 1997 Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum A101 2007 SP A102 2007 A111 1997 A103 2007 A114 2001 Agreement Between Owner and Contractor, for
Invitation to Bid and Instructions to Bidders (This is Phase I of the project please note on any Bid that it Applies to Phase I only) May 1, 2015
Invitation to Bid and Instructions to Bidders (This is Phase I of the project please note on any Bid that it Applies to Phase I only) May 1, 2015 For PROJECT : Renovation and Repair of Atlanta Jewish Academy
ARTICLE 11. INSURANCE AND BONDS
Provide submittals to Architect / Engineer that are required by any governing body or other authorities. Upon receipt of the Contractor s list, the Architect will make an inspection to determine whether
Contractor s Guide. April 2016
Contractor s Guide April 2016 The Minnesota Housing Finance Agency does not discriminate on the basis of race, color, creed, national origin, sex, religion, marital status, status with regard to public
INDEX. bonded contract, 289 insureds, 243. misrepresentation, 291 obtaining, 242
INDEX B non-conforming tender, 284 boiler and machinery insurance, performance bond 241 default by the obligee, 288 coverage, 243 failure to notify, 289 definition of the accident, 245 material variation
Document A101. Standard Form of Agreement Between Owner and Contractor where the basis of
TM Document A101 2007 Instructions Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum GENERAL INFORMATION Purpose. AIA Document A101 2007 is intended
Construction Management At-Risk
Oconee County Schools P.O. Box 146, 34 School Street Watkinsville, GA 30677 706-769-5130 706-769-3513 REQUEST FOR PROPOSALS ISSUE DATE: March 10, 2016 RFP REF: Construction Management At-Risk Construction
The AIA B 141-1997 Standard Form of Agreement between the Owner and Architect is hereby amended as follows:
AMENDMENT A to AIA B 141-1997 between the Owner, Colorado College, and Architect (Firm s name) with Standard Form of Architect s Services made as of (Contract date). PROJECT: (Project name) The numbering
Atrium Skylight Repair Carleton Lodge
Requirement Period of Contract The successful bidder shall complete the work no later than 27 November 2015. Closing Date Quotations must be submitted no later than close of business day (11:59 pm) on
Terms and Conditions for Purchase Orders for Recycling Materials
Terms and Conditions for Purchase Orders for Recycling Materials This Agreement is made by and between AEROJET-GENERAL CORPORATION, an Ohio corporation with a place of business at Rancho Cordova, California
DOCUMENT 009113 - ADDENDA ADDENDUM NUMBER ONE (1) A. Project Name: BHFC 16-001 New Single Family Dwelling Unit 1. 7264 Dahlia Circle
DOCUMENT 009113 - ADDENDA ADDENDUM NUMBER ONE (1) 1.1 PROJECT INFORMATION A. Project Name: BHFC 16-001 New Single Family Dwelling Unit 1. 7264 Dahlia Circle B. Owner: Brownsville Housing Finance Corporation.
INSURANCE REQUIREMENTS FOR ALL CITY CONTRACTS
INSURANCE REQUIREMENTS FOR ALL CITY CONTRACTS 1. GENERAL PROVISIONS A. Indemnification. The Contractor shall indemnify and save harmless the City of Lincoln, Nebraska from and against all losses, claims,
Construction Management Services Delmar School District RFP No. DSD16001-CONSTR_MAN
Construction Management Services Delmar School District RFP No. DSD16001-CONSTR_MAN The Delmar School District (DSD) is seeking the professional services of a Construction Management (CM) firm for the
AIA Document A312 - Electronic Format. Performance Bond
AIA Document A312 - Electronic Format Performance Bond THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES: CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION
PENNSYLVANIA HOUSING FINANCE AGENCY ADDENDUM TO OWNER-ARCHITECT AGREEMENT FOR DESIGN SERVICES AND CONSTRUCTION CONTRACT ADMINISTRATION
PENNSYLVANIA HOUSING FINANCE AGENCY ADDENDUM TO OWNER-ARCHITECT AGREEMENT FOR DESIGN SERVICES AND CONSTRUCTION CONTRACT ADMINISTRATION THIS ADDENDUM shall amend the American Institute of Architects Document
REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT AT-RISK FOR LOGANVILLE ELEMENTARY SCHOOL (REPLACEMENT) FOR THE WALTON COUNTY SCHOOL DISTRICT
ADVERTISEMENT: REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT AT-RISK FOR LOGANVILLE ELEMENTARY SCHOOL (REPLACEMENT) FOR THE WALTON COUNTY SCHOOL DISTRICT The WALTON COUNTY SCHOOL DISTRICT will receive
Christopher Noble, Negotiating Owner-Architect Agreements: Theory and Practice (revised February 2011)
Christopher Noble, Negotiating Owner-Architect Agreements: Theory and Practice (revised February 2011) Construction projects are usually complex undertakings with numerous participants, linked by a web
REQUEST FOR QUOTATION
Requirement The City of Ottawa, hereinafter referred to as the City, is requesting the submission of quotations for the completion of masonry restoration at the Nepean Creative Arts Centre located at 35
FABENS INDEPENDENT SCHOOL DISTRICT FABENS, TEXAS. REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES (CM @ Risk) FOR
FABENS INDEPENDENT SCHOOL DISTRICT FABENS, TEXAS REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES (CM @ Risk) FOR A New High School Competition Gym RFP No. 052015-036 PROPOSALS ARE DUE 10:00
Nominated Subcontractors on International Projects: Approaches to Risk Allocation
Nominated Subcontractors on International Projects: Approaches to Risk Allocation September 5, 2005 (he following outline was used in a presentation to the Overseas Construction Association of Japan, Inc.
Kentucky Department of Education Version of Document A312 2010
Kentucky Department of Education Version of Document A312 2010 Performance Bond CONTRACTOR: (Name, legal status and address) SURETY: (Name, legal status and principal place of business) OWNER: (Name, legal
THE LAW OF BIOMASS Setting Up Shop: Design, Engineering, and Construction of Biomass Projects
THE LAW OF BIOMASS Setting Up Shop: Design, Engineering, and Construction of Biomass Projects Karl F. Oles Stoel Rives LLP 600 University Street, Suite 3600 Seattle, WA 98101-4109 206-386-7535 [email protected]
Purchase Order Terms and Conditions Beloit College
Purchase Order Terms and Conditions Beloit College Accounting Office 608-363-2205 (Tim Miles Controller) 608-363-2206 (Deb Sperry Accounts Payable) 608-363-2897 (fax) The purpose of these terms and conditions
SURETY. and Title: (Any additional signatures appear on the last page of this Performance Bond.)
Performance Bond Document A312 2010 CONTRACTOR: (Name, legal status and address) SURETY: (Name, legal status and principal place of business) OWNER: (Name, legal status and address) CONSTRUCTION CONTRACT
TAFT LIBRARY ADDENDUM STANDARD FORM OF AGREEMENT BETWEEN TOWN OF MENDON ( THE TOWN ) AND ( ARCHITECT ) 1.1 Delete space if no additional information.
TAFT LIBRARY ADDENDUM STANDARD FORM OF AGREEMENT BETWEEN TOWN OF MENDON ( THE TOWN ) AND ( ARCHITECT ) This Addendum is attached to and modifies the Standard Form of Agreement between the Town and Architect,
Canterbury Park Pool Chamber Replacement
Requirement Request For Quotation To provide services, equipment and materials to replace the Concrete Pool Service & Drainage vault at the Canterbury Park Pool located at 2185 Arch Street, Ottawa, ON
CITY OF CORNING REQUEST FOR PRICE QUOTES PAVEMENT MARKINGS
CITY OF CORNING REQUEST FOR PRICE QUOTES PAVEMENT MARKINGS Quotes for the installation of pavement markings for the City of Corning will be received by the City of Corning at the office of the Department
GUIDANCE AND MODEL LANGUAGE
Document B503 2007 Guide for Amendments to AIA Owner-Architect Agreements INTRODUCTION Purpose of This Guide How to Use This Guide Modifications to Owner-Architect Agreements GUIDANCE AND MODEL LANGUAGE
TruexCullins Architecture Fairfield Center School Bid Documents Kitchen and Bathroom Renovation March 1, 2015
Fairfield Center School Kitchen and Bathroom Renovation Project Specifications Owner: Fairfield Center School, 57 Park Street, Fairfield VT 05455 Franklin Central Supervisory Union, 28 Catherine Street,
AGREEMENT BETWEEN CONTRACTOR AND OWNER FOR CONSTRUCTION
AGREEMENT BETWEEN CONTRACTOR AND OWNER FOR CONSTRUCTION OWNER: PROJECT: LOCATION: ARCHITECT/ENGINEER: CONTRACTOR: WORK TO BE COMMENCED: WORK TO BE COMPLETED: THE REGENTS OF THE UNIVERSITY OF MICHIGAN UM
Auditor General Procurement Processes Review - Bid Bonds/Performance Bonds
STAFF REPORT June 22, 2005 To: From: Subject: Administration Committee Deputy City Manager and Chief Financial Officer Auditor General Procurement Processes Review - Bid Bonds/Performance Bonds Purpose:
DEMO Version. Owner and Contractor OCNMP103
Page 1 of 12 AGREEMENT made as of the in the year of (In words, indicate day, month and year) day of BETWEEN the Owner: (Name, address and other information) DEMO Version and the Contractor: (Name, address
Document B101 TM. Standard Form of Agreement Between Owner and Architect
Document B101 TM 2007 Standard Form of Agreement Between Owner and Architect AGREEMENT made as of the th day of in the year 2014 (In words, indicate day, month and year.) BETWEEN the Architect s client
The West Lafayette Engineering Department is requesting quotes for sidewalk repairs needed in the Barbarry Subdivision.
May 19th, 2016 RE: REQUEST FOR QUOTES 2016 Sidewalk Replacement The West Lafayette Engineering Department is requesting quotes for sidewalk repairs needed in the Barbarry Subdivision. The enclosed Quote
Request for Quotation
City of Richmond Business and Financial Services Department Request for Quotation Supply and Delivery of NETWORK SWITCHES Bidders are requested to respond to this Quotation call as instructed subject to
Construction Bonds. Vanessa S. Werden 604.408.2033 [email protected]
Construction Bonds Vanessa S. Werden 604.408.2033 [email protected] What is a bond? A bond is a special form of contract whereby one party guarantees the performance by another party of certain obligations. A
Construction Contract Fundamentals. Baker Tilly refers to Baker Tilly Virchow Krause, LLP,
Construction Contract Fundamentals Baker Tilly refers to Baker Tilly Virchow Krause, LLP, an independently owned and managed member of Baker Tilly International. 2010 Baker Tilly Virchow Krause, LLP About
Performance Bond. Business):
Performance Bond CONTRACTOR (Name and Address): (Name and Address of Principal Place of Business): OWNER (Name and Address): City of Cedar Rapids City Clerk, 101 First Street SE Cedar Rapids, IA 52401
AGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES. Responsibilities of Construction Manager Scope of Construction Manager s Basic Services
AGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES Article I Article II Article III Article IV Article V Article VI Article VII Article VIII Article IX Responsibilities of Construction Manager Scope of Construction
CONSTRUCTION CONTRACT TERMINOLOGY
PAGE 1 ALLOWANCE - in bidding, an amount budgeted for an item for which no exact dollar amount if available; a contingency for unforeseen costs; the classification of connected parts or members according
Eanes Independent School District
EANES INDEPENDENT SCHOOL DISTRICT 601 Camp Craft Road Austin, Texas 78746 Request for Qualifications Construction Manager at Risk Services Eanes Independent School District Construct a District Operations
CONTRACTOR DEFAULT & SURETY PERFORMANCE:
CONTRACTOR DEFAULT & SURETY PERFORMANCE: A PRACTICAL GUIDE FOR UNDERSTANDING AND NAVIGATING A BOND DEFAULT SITUATION TEXAS CITY ATTORNEYS ASSOCIATION SUMMER CONFERENCE JUNE 9-11, 2010 SOUTH PADRE ISLAND,
Standard Mortgage Terms
Page 1 of 45 Standard Mortgage Terms Filed By: Canadian Imperial Bank of Commerce Filing Number: MT160006 Filing Date: March 17, 2016 The following set of standard mortgage terms shall be deemed to be
Construction Company Capacity Assessment
Business/Firm Name: Vendor NCDOT Number: Contact Address: Construction Company Capacity Assessment Name/Title of Person Taking Assessment: Phone Contact Information: Email Contact Information: List Current
2.3.9 Construction Procurement
2.3 Management of the Project 2.3.9 Construction Procurement 2.3.9 Canadian Handbook of Practice for Architects Introduction Obtaining Bids Open Competitive Bids (or Public Tender Call) Invited Competitive
REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES. Part I: Proposal Information
REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES Part I: Proposal Information A. General Information The Berwick Area School District is soliciting proposals for construction management services
EXAM GUIDE. Construction Documents & Services
RE EXAM GUIDE Construction Documents & 2 Knowledge / 3 5 Choice Answers 15 16 Sample Passing Solution 18 Sample Failing Solution 19 20 Copyright 2015 This document, effective August 2015, supersedes all
Construction Insurance and Contract Bonds. Ted Murray CMW Insurance Services Ltd.
Construction Insurance and Contract Bonds Ted Murray CMW Insurance Services Ltd. 1 Outline of Topics MMCD 2009 Insurance Requirements Construction Insurance Contract Bonding 2 MMCD - 2009 3 MMCD - 2009
Construction Management Functions CMGT 500/700
Construction Management Functions CMT 500/700 Project Planning and Design Master Planning Planning Phase Designer Selection Design Phase Bid Phase Award Phase Construction Phase Master Planning AKA Capital
HEALTH OWNER INSURED CONSTRUCTION PROJECTS
HEALTH OWNER INSURED CONSTRUCTION PROJECTS Insurance and Indemnification Clauses (to be included in Supplementary Conditions to the Design - Build Stipulated Price Contract 14-2000 for Health projects
