RTD S SUBCONTRACTOR PERFORMANCE SELF-INSURED PROGRAM. Presenter: Marla Lien, General Counsel Regional Transportation District Denver, Colorado
|
|
|
- Russell Mathews
- 10 years ago
- Views:
Transcription
1 RTD S SUBCONTRACTOR PERFORMANCE SELF-INSURED PROGRAM Presenter: Marla Lien, General Counsel Regional Transportation District Denver, Colorado
2 PURPOSE OF THE PROGRAM To eliminate bonding as an obstacle to the participation of small and disadvantaged business sub-contractors in RTD construction projects. Background 2004 RTD signed Memoranda of Understanding (MOUs) with The African American Leadership Group (TAALG), the Hispanic Contractors Association, and Colorado Women s and Minority Chamber committing to keep those and other DBE/SBE contractors and business groups informed of RTD FasTracks project development and contracting opportunities. A key concern raised by these groups the impediment bonding posed to small businesses. 2
3 RTD EXPERIENCE WITH SELF INSURANCE RTD had a history of owner-controlled and self-insured programs for construction projects Liability Worker s Compensation Railroad Protection Builder s Risk Property coverage Risk/benefit principles comparable - avoid premiums and transaction costs for multiple party coverage 3
4 LEGAL REQUIREMENTS DRIVING THE PROGRAM COLORADO BONDING REQUIREMENT C.R.S requires that contractor s post a bond in a penal sum not less than one-half of the total amount payable under the terms of the contract or for contracts in excess of $500 million not less than one half the maximum amount payable in any contract year. Bond pays for labor, materials of performance for work by contractor. Contractor s typically flow down bonding requirements to their sub-contractor s but this is not statutorily required in Colorado. FEDERAL DBE REQUIREMENTS 49 C.F.R.26.51(b) Race-neutral means include, but are not limited to, the following: (2) providing assistance in overcoming limitations such as inability to obtain bonding or financing (e.g. by such means as simplifying the bonding process, reducing bonding requirements, eliminating the impact of surety costs from bids and providing services to help DBE s and other small business obtain bonding and financing). 4
5 KEY PROGRAM ELEMENTS RTD sets up self-funded risk pool to cover claims that could otherwise have been made against subcontractor sureties failure to pay for materials, or failure to perform RTD prohibits contractors from requiring subcontractor payment and performance bonds RTD prohibits subcontractors from obtaining bonds unless there is no charge in the bid RTD establishes eligibility and monitoring requirements for subcontractors in program ALL subcontractors with contracts equal to or less than $500 thousand required to participate in program Whether or not DBE/SBE, Whether or not able to bond independently Program would not be affordable if only high risk subcontractors were included 5
6 COST OF THE PROGRAM Program funding is based on assumed savings no premiums collected from participants Note: in Colorado, a surety bond is an insurance contract (see, C.R.S ; Transamerica Premier Insurance Company v. Brighton School District 27 J, 940 P. 2d 348 (Colo. 1997)). The receiving or collection of any premium, commission, membership fees, assessments, dues or other consideration for any insurance or any part thereof by an unauthorized insurer constitutes transacting insurance business in Colorado (C.R.S ). RTD works with insurance broker to determine amount each sub-contractor would have paid for bonds had it been required to provide them, plus overhead and profit that would have been added at every tier RTD deposits that amount in Program Fund Prime contractor agrees by contract to limit claims against subcontractors that would have been made against payment or performance bond to amounts in Program Fund. Prime must require subs at every level to put corresponding contract requirement in its subcontracts. 6
7 COST OF THE PROGRAM (CONT.) RTD responsible for administration of claims Prime may pursue claims process under prime contract if claims not resolved to Prime contractor satisfaction All subcontractors participating required to be qualified for Program though RTD Evaluation Process and to allow ongoing monitoring of performance Evaluation and Monitoring cost in addition to loss fund Retention of insurance broker to develop cost model, evaluate savings, develop manual, administer program in addition to loss fund 7
8 EVALUATION AND MONITORING Evaluation Each subcontractor required to submit pre-qualification Evaluation forms Monitoring Years in business Employee and management experience Business controls financial, scheduling and estimating Financial capacity of company assets, working capital, lines of credit Dollar volume of annual and project experience Prior bonding and claims experience Monitoring is designed to avoid poor or late performance, or non-payment of suppliers or sub-subcontractors Subcontractors submit to RTD and Prime Contractor Scheduling Manpower utilization projections Monthly earned values Payment status to all vendors and sub-subcontractors Lien waivers from suppliers and sub-subcontractors Change order requests RTD and Contractor may meet with, request corrective action procedures or require financial monitoring of subcontractor 8
9 RESULTS West Corridor construction near completion No claims 39 subcontractors in the Program - 38 DBE subcontractors 13 new subcontractors to RTD 9 subcontractors that had never qualified for a bond 11 contractors did not qualify Contract maximum value increased to about $1 million based on change orders Average value of enrolled subcontractors $270,756 Total value of work $8.1 million covered by program Estimated savings to RTD compared to construction bonds - $243,681 (does not include Program Development and Monitoring) 9
PREQUALIFICATION APPLICATION REQUIREMENTS
PREQUALIFICATION APPLICATION REQUIREMENTS To be eligible to bid and contract work with Webcor, subcontractors are required to be prequalified annually. If you have any questions, please contact Webcor
Construction Surety Bonds
Construction Surety Bonds September 17, 2014 Presented by: Walt Caldwell [email protected] What is a Surety Bond An instrument where one party (Surety) guarantees the obligations of a second party
Subguard Default Insurance vs. Traditional Performance and Payment Bonds for Subcontractors.
Subguard Default Insurance vs. Traditional Performance and Payment Bonds for Subcontractors. The following article is taken from excerpts of: Understanding & Negotiating Construction Contracts Kit Werremeyer
INSURANCE REQUIREMENTS FOR MASTER AGREEMENT CONTRACTORS
INSURANCE REQUIREMENTS FOR MASTER AGREEMENT CONTRACTORS Without limiting CONTRACTOR's indemnification of COUNTY, and in the performance of this Contract and until all of its obligations pursuant to this
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 2 1109 S. Marion Avenue, Mail Station 2015 Lake City, Florida 32025-5874
ADVERTISEMENT FOR LETTERS OF INTEREST FOR A DESIGN BUILD PROJECT (PROCUREMENT METHOD SHORTLISTING OF PROPOSERS WITH TECHNICAL AND PRICE EVALUATION BY ADJUSTED SCORE) PROCUREMENT NUMBER: E2N44 Financial
DENVER URBAN RENEWAL AUTHORITY GUIDELINES FOR UTILIZATION OF SMALL BUSINESS ENTERPRISES IN URBAN REDEVELOPMENT PROJECTS.
DENVER URBAN RENEWAL AUTHORITY GUIDELINES FOR UTILIZATION OF SMALL BUSINESS ENTERPRISES IN Policy Statement URBAN REDEVELOPMENT PROJECTS November 2014 The Denver Urban Renewal Authority ("DURA") has determined
PREQUALIFICATION APPLICATION REQUIREMENTS
PREQUALIFICATION APPLICATION REQUIREMENTS To be eligible to bid and contract work with Webcor, subcontractors are required to be prequalified annually. If you have any questions, please contact Webcor
Surety Bond Associates. Understanding Contract Surety Bonding: An Orientation for Veteran Owned Small Contractors
Surety Bond Associates Understanding Contract Surety Bonding: An Orientation for Veteran Owned Small Contractors Contract Surety Bonds Bid Bond Performance Bond Payment Bond Who Requires Bonds? Public
U.S. Small Business Administration Surety Bond Guarantee Program. Opening the Door to Bonding
U.S. Small Business Administration Surety Bond Guarantee Program Opening the Door to Bonding What Is a Surety Bond? A three party written agreement between the surety, the contractor and the project owner.
IMPORTANT! - Please use the attached Application for Payment. All payment requests must be submitted on our form. Thank you!
` SUBCONTRACTOR: PHONE PROJECT: LOCATION: Page 1 of 6 SUBCONTRACT (SHORT FORM) JOB NO.: COST CODE: PRICE: This agreement is made and effective, by and between SUN CONSTRUCTION & FACILITY SERVICES, INC.
AAPA Legal & Risk Management Seminar Introduction to Wrap-up or Owner Controlled Insurance Programs
AAPA Legal & Risk Management Seminar Introduction to Wrap-up or Owner Controlled Insurance Programs July, 2005 Table of Contents What Is An OCIP Or Wrap-Up? When Should An OCIP Or Wrap-up Be Considered?
How To Get A Construction Contract In The United States
SOUTH CAROLINA LIEN AND BOND CLAIMS William ( Trey ) W. Watkins, Jr. 145 King Street, Suite 300 Charleston, SC 29401 843-329-9500 1 Introduction to Surety 3 Main differences between Insurance and Bonds
Construction Company Capacity Assessment
Business/Firm Name: Vendor NCDOT Number: Contact Address: Construction Company Capacity Assessment Name/Title of Person Taking Assessment: Phone Contact Information: Email Contact Information: List Current
Welcome to the City of Chicago. Department of Procurement Services. Rahm Emanuel, Mayor Jamie Rhee, Chief Procurement Officer
Welcome to the Bid & Bond Room Rahm Emanuel, Mayor Jamie Rhee, Chief Procurement Officer The remains committed to the growth and development of small, minority and women-owned business enterprises and
The Davis Companies are comprised of Specialized Risk Experts in the areas of
The Davis Companies are comprised of Specialized Risk Experts in the areas of Insurance Brokerage, Financial Consulting, and Contractor Development Services. Through common ownership, The Davis Companies
INSURANCE REQUIREMENTS FOR CONSTRUCTION CONTRACTS ABOVE $25,000
Page 1 of 9 DOCUMENT 00850 INDEMNIFICATION AND INSURANCE REQUIREMENTS EXHIBIT B-1 INSURANCE REQUIREMENTS FOR CONSTRUCTION CONTRACTS ABOVE $25,000 Indemnity The Contractor shall indemnify, defend, and hold
contracting opportunities
The City of Baltimore Small Business Resource Center is gearing up for its Local Contractor Development Program (LCDP) and will offer its 2012 Contractor s College beginning October 3 rd, 2012 through
ADDENDUM TO SUBCONTRACT [Contractor s Consolidated Insurance Program]
ADDENDUM TO SUBCONTRACT [Contractor s Consolidated Insurance Program] The Subcontract Agreement between LAYTON CONSTRUCTION COMPANY, INC., a Utah corporation ( Contractor ) and, a ( Subcontractor ) dated
Certification. Olivia Mendoza Office of Economic Development and International Trade Director, Minority Business Office
Minority & Women s Business Certification Olivia Mendoza Office of Economic Development and International Trade Director, Minority Business Office Certification Panelist Jim Kidd U.S. Small Business Administration
Contract Financing for the Contractor
a Contract Financing for the Contractor SBA s Contract CAPLines Program A Presentation For The Contractor SBA has a Loan Guaranty Program To help Contractors Obtain Financing for Contract Work Its Called
[ controlled insurance programs - Controlled Insurance Programs Act - codification - effective date - emergency ]
ENGROSSED SENATE BILL NO. By: Coates of the Senate and Quinn of the House [ controlled insurance programs - Controlled Insurance Programs Act - codification - effective date - emergency ] BE IT ENACTED
OWNER S CHECKLIST ISSUES FOR PERFORMANCE AND PAYMENT BONDS Produced by the ABA Forum on the Construction Industry Division 12: Owners and Lenders
OWNER S CHECKLIST ISSUES FOR PERFORMANCE AND PAYMENT BONDS Produced by the ABA Forum on the Construction Industry Division 12: Owners and Lenders Christopher Dunn, Esquire Claramargaret H. Groover, Esquire
Contract Review: Key Terms That May Put Your Company At Risk
Contract Review: Key Terms That May Put Your Company At Risk Grady Dotson, CPCU, Vice-President of CSDZ, Utah Will Kieffer, AFSB, Surety Account Executive, CSDZ, Utah Surety Bond Review Three Party Agreement:
STANDARD CONTRACT EXECUTION FORMS
THE BIDDING AND CONTRACT PROVISIONS Document Section 00 50 00 - Standard Contract Execution Forms (Standard Contract Set) STANDARD CONTRACT EXECUTION FORMS 1. EXECUTION OF THE AGREEMENT 1.1 Extraneous
INTRODUCTION TO BID/PERFORMANCE AND PAYMENT BONDS AND THE SBA BOND GUARANTEE PROGRAM:
INTRODUCTION TO BID/PERFORMANCE AND PAYMENT BONDS AND THE SBA BOND GUARANTEE PROGRAM: U.S. Small Business Administration Phoenix SBA Office March 21, 2013 Mark S. Hewitt, CPCU, AFSB, AIM Western National
SECTION 00 73 16 INSURANCE REQUIREMENTS
SECTION 00 73 16 INSURANCE REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES 1.02 Insurance Requirements 1.02 INSURANCE REQUIREMENTS A. The successful Contractor shall procure and maintain for the duration
TWELFTH ANNUAL SOUTHERN SURETY AND FIDELITY CLAIMS CONFERENCE
TWELFTH ANNUAL SOUTHERN SURETY AND FIDELITY CLAIMS CONFERENCE CONTRACTOR DEFAULT INSURANCE v. SURETY BONDS ARE TRADITIONAL CONTRACT BONDS OBSOLETE? PRESENTED BY: ELISE M. FROHSIN, ESQUIRE STARNES & ATCHISON,
Pricing of Construction Contract Change Order Documentation
The contract language contained in this Exhibit will supplement and take precedence over all other change order pricing contract provisions in the Contract Documents provided by the Owner, Design-Builder
said subcontractor initiates his work.
68 1701. Definitions. As used in Sections 1701 through 1707 of this title: 1. "Contractor" includes all prime and general contractors, subcontractors, independent contractors and persons engaged in contract
SUBCONTRACTOR QUALIFICATION (Completion of this Qualification Form is Required of ALL Subcontractors)
GENERAL COMPANY INFORMATION: Legal Company Name: Street Address: Main Office Phone: Contractor Registration No: D/B/A: Mailing Address: Main Office Fax: State Tax No. (UBI): Parent Company: Company Organization:
EXHIBIT G ROLLING OWNER CONTROLLED INSURANCE PROGRAM (ROCIP)
EXHIBIT G ROLLING OWNER CONTROLLED INSURANCE PROGRAM (ROCIP) 1.0 Definitions Certificate of Insurance: Contract: Contractor: Contractor insurance cost City (Sponsor): Owner Controlled Insurance Program
The Surety Safeguard for Third Party Vendor Contracts. How Surety Bonds Protect Taxpayer Dollars
The Surety Safeguard for Third Party Vendor Contracts How Surety Bonds Protect Taxpayer Dollars The Surety Safeguard for Third Party Vendor Contracts How Surety Bonds Protect Taxpayer Dollars The Surety
Performance and Payment Bonds
Performance and Payment Bonds Submission Requirements 1) Request for Performance and Payment Bonds. (Forms attached for your convenience, please return only with a Performance and or Payment Bond Request.
Getting Connected with the Colorado Department of Transportation (CDOT)
Getting Connected with the Colorado Department of Transportation (CDOT) INTRODUCTION Who is CDOT? CDOT is responsible for 9,146 miles of highway including 3,447 bridges State government agency with funding
CALIFORNIA DEPARTMENT OF TRANSPORTATION CONTRACTOR LIABILITY INSURANCE
CALIFORNIA DEPARTMENT OF TRANSPORTATION CONTRACTOR LIABILITY INSURANCE The following are excerpts from Caltrans 2010Standard Specifications. Specifications are subject to change so refer to the project
Chapter 200 1999 EDITION. Disadvantaged, Minority, Women and Emerging Small Business Enterprises
Chapter 200 1999 EDITION Disadvantaged, Minority, Women and Emerging Small Business Enterprises GENERAL PROVISIONS 200.005 Definitions for ORS 200.005 to 200.075 200.015 Legislative findings 200.025 Advocate
Schedule Q (Revised 1/5/15)
Schedule Q (Revised 1/5/15) CONSTRUCTION CONTRACTOR INSURANCE REQUIREMENTS Section 0.0 Introduction of the Owner-Controlled Insurance Program The City of Oakland (City) has implemented an Owner-Controlled
USING OCIPs AND CCIPS TO BRING ORDER TO PROJECT INSURANCE
USING OCIPs AND CCIPS TO BRING ORDER TO PROJECT INSURANCE CMAA Southern California Chapter October 30, 2014 8:00 a.m. The Grand Conference Center 4101 E. Willow Street Long Beach, CA Panel Greg Kildare
SUBCONTRACTOR / VENDOR PREQUALIFICATION QUESTIONNAIRE
Return to: Phone: 1-208-323-4500 1. General Information Name of Business: SUBCONTRACTOR / VENDOR PREQUALIFICATION QUESTIONNAIRE Petra, Inc. 1097 North Rosario St. Meridian, ID 83642 1-208-323-1147 E-Mail:
INDEPENDENT CONTRACTORS AGREEMENT
INDEPENDENT CONTRACTORS AGREEMENT THIS AGREEMENT entered into by and between (hereafter the Contractor ) and the Park District of Highland Park (hereafter Park District ). WHEREAS, Contractor will be performing
H. The Contractor shall not begin work under the contract until the required insurance has been obtained and approved by the Contracting Agency.
Insurance Requirements (1) General Requirements A. The Contractor shall obtain the insurance described in this section from insurers approved by the State Insurance Commissioner pursuant to RCW Title 48.
Final Audit Follow-up As of January 31, 2014
Final Audit Follow-up As of January 31, 2014 T. Bert Fletcher, CPA, CGMA City Auditor Compliance with the City s MBE Program Policy and Federal DBE Policy for Selected Capital Construction Projects (Report
EXHIBIT B-1 INSURANCE REQUIREMENTS FOR CONSTRUCTION CONTRACTS ABOVE $30,000
INSURANCE REQUIREMENTS F CONSTRUCTION CONTRACTS ABOVE $30,000 Indemnity To the fullest extent allowed by law, the Contractor shall indemnify, defend, and hold harmless the County of Santa Clara (hereinafter
Construction Bonds on Public Projects (Reprinted with permission from NACM s Manual of Credit and Commercial Laws, 104 th edition)
APPENDIX 44 Construction Law Survival Manual www.fullertonlaw.com James D. Fullerton, Esq. 609 Construction Bonds on Public Projects (Reprinted with permission from NACM s Manual of Credit and Commercial
Program Management for School Construction
Program Management for School Construction Presented to: Pasadena Unified School District Board of Education January 13, 2009 Project Delivery Options Design Bid Build Design/Build Construction Management
COMMERCIAL CONSTRUCTION AGREEMENT. This CONTRACT AGREEMENT ( Contract ) is made on, 20, by and between <> ( Owner ) and <> ( Contractor ).
COMMERCIAL CONSTRUCTION AGREEMENT This CONTRACT AGREEMENT ( Contract ) is made on, 20, by and between ( Owner ) and ( Contractor ). A. Contractor wishes to enter into the following Contract with
CDOT Resources for Small Businesses
General Information Resources Civil Rights & Business Resource Center is responsible for promoting and maintaining equal opportunity and participation for highway construction contractors and consultants
TABLE OF CONTENTS I. PURPOSE... 3 II. GOALS...3 III. DEFINITIONS... 3-4
CARROLL COUNTY MINORITY BUSINESS ENTERPRISE POLICY Department of the Comptroller Bureau of Purchasing 10/03/02 TABLE OF CONTENTS I. PURPOSE... 3 II. GOALS...3 III. DEFINITIONS... 3-4 IV METHODS OF PROCURMENENT
MINNESOTA STATE COLLEGES AND UNIVERSITIES General Insurance Requirements for Contractors & Vendors
Certificate of Liability Insurance, Form ACORD25: Following are the insurance requirements of the State of Minnesota acting through its Board of Trustees of the Minnesota State Colleges and Universities,
PROJECT LIABILITY PROGRAM INSURANCE PROCEDURES MANUAL PROJECT NAME PROJECT NUMBER FOR THE
PROJECT LIABILITY PROGRAM INSURANCE PROCEDURES MANUAL FOR THE PROJECT NAME PROJECT NUMBER Presented By: Swinerton Builders and Arthur J. Gallagher & Co. Insurance Brokers of California, Inc. Table of Contents
"Wrap Ups" For Schools: IT S ABOUT TIME
Owner Controlled Programs Presented By: Bill Poland, Keenan & Associates Owner Controlled Programs (OCIPs) "Wrap Ups" For Schools: IT S ABOUT TIME Legislative History Schools & Risk Management Pre 1999
AIA Document A310 TM 2010
AIA Document A310 TM 2010 Bid Bond CONTRACTOR: OWNER: «Lane County» «125 East Eighth Avenue BOND AMOUNT: $ PROJECT: (Name, location or address, and Project number, if any) «Lane County Adult Corrections
SURETY. and Title: (Any additional signatures appear on the last page of this Performance Bond.)
Performance Bond Document A312 2010 CONTRACTOR: (Name, legal status and address) SURETY: (Name, legal status and principal place of business) OWNER: (Name, legal status and address) CONSTRUCTION CONTRACT
PITTSBURG UNIFIED SCHOOL DISTRICT
PITTSBURG UNIFIED SCHOOL DISTRICT New Construction and Modernization Projects PRE-QUALIFICATION PROGRAM QUESTIONNAIRE FOR PROJECTS $20 MILLION AND OVER TABLE OF CONTENTS PAGE NO. GENERAL INFORMATION.......i
CONSULTANT AGREEMENT
Douglas County School District Re.1 Castle Rock, Colorado CONSULTANT AGREEMENT This agreement, dated effective as of is made and entered into by and between the Douglas County School District Re.1, Douglas
CERTIFICATION OF COMPLIANCE WITH SMALL, DISADVANTAGED, MINORITY, WOMEN OWNED, AND HISTORICALLY UNDERUTILIZED BUSINESS POLICY
Exhibit 1 CERTIFICATION OF COMPLIANCE WITH SMALL, DISADVANTAGED, MINORITY, WOMEN OWNED, AND HISTORICALLY UNDERUTILIZED BUSINESS POLICY The undersigned certifies on behalf of the Contractor or Subcontractor
corporation with its principal place of business in the City of
TEXAS DEPARTMENT OF INSURANCE Division of Workers Compensation Self-Insurance Regulation MS-60 7551 Metro Center Dr., Ste 100 Austin, Texas 78744-1645 (512) 804-4775 FAX (512) 804-4776 www.tdi.texas.gov
INSURANCE AND SURETY INFORMATION SHEET
INSURANCE AND SURETY INFORMATION SHEET In order for your company to comply with the bonding and insurance requirements per your contract with the City of Elk Grove there are several things that we require.
SAN BERNARDINO MOUNTAINS COMMUNITY HEALTHCARE DISTRICT
SAN BERNARDINO MOUNTAINS COMMUNITY HEALTHCARE DISTRICT CONTRACTOR PRE-QUALIFICATION QUESTIONNAIRE 1 PRE-QUALIFICATION QUESTIONNAIRE 000 CONTACT INFORMATION Firm Name: Check One: Corporation (as it appears
ADDENDUM A1. Subcontractor Insurance Requirements
ADDENDUM A1 Subcontractor Insurance Requirements Certificates and endorsements must be received and approved prior to the start of any work. No payments will be released until all insurance documents are
Morgan Hill Unified SCHOOL DISTRICT PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE BIDDERS. October 19, 2015
Morgan Hill Unified SCHOOL DISTRICT PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE BIDDERS October 19, 2015 The Morgan Hill Unified School District ( District ) has determined that contractors on future
OAKLAND UNIFIED SCHOOL DISTRICT FOR LOCAL FIRST TIER SUBCONTRACTORS PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE BIDDERS
OAKLAND UNIFIED SCHOOL DISTRICT FOR LOCAL FIRST TIER SUBCONTRACTORS PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE BIDDERS THIS QUESTIONNAIRE MUST BE PRINTED ON BLUE PAPER OAKLAND UNIFIED SCHOOL DISTRICT
SUBCONTRACTOR S QUALIFICATION STATEMENT. Give complete answers to the following questions (attach additional pages if necessary).
1 SUBCONTRACTOR S QUALIFICATION STATEMENT Submitted to: B.C. Construction Co., Inc. 385 Main Street Wakefield, MA 01880 For consideration with regard to: (Name of Project) Date: Give complete answers to
INDEMNIFICATION AND INSURANCE REQUIREMENTS FOR LOS ANGELES COUNTY SERVICE AGREEMENTS
INDEMNIFICATION AND INSURANCE REQUIREMENTS FOR LOS ANGELES COUNTY SERVICE AGREEMENTS Include Section I and Section II.(A. - F.) in all County service agreements. I. Indemnification: Contractor shall indemnify,
Insurance Requirements for Contractors (Without Construction Risks)
Insurance Requirements for Contractors (Without Construction Risks) Contractor shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to
Memorandum Potentially Affected AIA Contract Documents AIA Document A105 2007 AIA Document B105 2007 Important Information
Memorandum Important information related to requirements of state or local laws to include additional provisions in residential construction contracts Potentially Affected AIA Contract Documents AIA Document
Q: Has Dollar General had any claim issues around loosing the common law defenses and exclusive remedy? A: No.
RIMS Webinar January 20, 2011 An Overview of Nonsubscription from Texas Workers Compensation Answers to Participants Questions Prepared by PartnerSource Q: What are the litigation rates associated with
INDEPENDENT CONTRACTOR AGREEMENT (On Call Real Estate Broker Services)
INDEPENDENT CONTRACTOR AGREEMENT (On Call Real Estate Broker Services) THIS AGREEMENT (Contract") is made this 14th day of December, 2010, between the Board of County Commissioners of Sumter County, Florida
Bond Form Commentary and Comparison
Bond Form Commentary and Comparison AIA Document A310 2010, Bid Bond, and AIA Document A312 2010, Performance Bond and Payment Bond INTRODUCTION Since the first publication of The Standard Form of Bond
PERFORMANCE BOND LABOR AND MATERIAL PAYMENT BOND
Section 00 61 13.13 & 00 61 13.16 Douglas County School District Re.1 Castle Rock, Colorado PERFORMANCE BOND LABOR AND MATERIAL PAYMENT BOND 1. FORMS TO BE USED Two (2) separate bonds are required: Both
388 Blohm Ave. PO Box 388 Aromas CA 95004-0388 (831)726-3155 FAX (831)726-3951 email [email protected] ADDENDUM NO. 1
388 Blohm Ave. PO Box 388 Aromas CA 95004-0388 (831)726-3155 FAX (831)726-3951 email [email protected] May 6, 2015 To: All Plan Holders From: Vicki Morris General Manager Subject: Water Serviceline Installation
AGREEMENT BETWEEN THE CITY OF BEVERLY HILLS AND VENDOR TBD FOR PURCHASE AND INSTALLATION OF AUTOMATED LICENSE PLATE RECOGNITION SYSTEMS
AGREEMENT BETWEEN THE CITY OF BEVERLY HILLS AND VENDOR TBD FOR PURCHASE AND INSTALLATION OF AUTOMATED LICENSE PLATE RECOGNITION SYSTEMS NAME OF CONTRACTOR: RESPONSIBLE PRINCIPAL OF CONTRACTOR:, Vendor
Subcontractor / Vendor / Professional Services PREQUALIFICATION FORM
Subcontractor / Vendor / Professional Services PREQUALIFICATION FORM Company Name Address GENERAL INFORMATION Date / / If Corporate Office check here Primary Contact Phone Fax Email Corporate Headquarters
Design-Bid-Build v. Guaranteed Maximum Price Contracting: The Basics for Owner's Counsel
Page 1 of 6 ALM Properties, Inc. Page printed from: New York Law Journal Back to Article Design-Bid-Build v. Guaranteed Maximum Price Contracting: The Basics for Owner's Counsel James E. Hughes New York
corporation with its principal place of business in the City of
TEXAS DEPARTMENT OF INSURANCE Division of Workers Compensation Self-Insurance Regulation MS-60 7551 Metro Center Dr., Ste 100 Austin, Texas 78744-1645 (512) 804-4775 FAX (512) 804-4776 www.tdi.texas.gov
RFP VOICE OVER IP PHONE SYSTEM BID: #14-012- BOE
SPECIFICATIONS AND BID FORMS FOR RFP VOICE OVER IP PHONE SYSTEM MANDATORY WALK-THRU ON THURSDAY, MARCH 13 th from 1:00 P.M. to 3:00 P.M. LOCATION TO BE DETERMINED. BID: #14-012- BOE Due on or before 11:00
HOUSE BILL NO. HB0007. Sponsored by: Representative(s) Miller and Senator(s) Case A BILL. for
00 STATE OF WYOMING 0LSO-0 HOUSE BILL NO. HB000 Sales/use tax-removal of th cent. Sponsored by: Representative(s) Miller and Senator(s) Case A BILL for AN ACT relating to taxation and revenue; reducing
SUBMISSION REQUIREMENTS
GREATER ORLANDO AVIATION AUTHORITY REQUEST FOR CONTRACTOR STATEMENT OF QUALIFICATIONS (RFQ) FOR BP-459 SECURED AREA ACCESS POINT CCTV IMPROVEMENTS ORLANDO INTERNATIONAL AIRPORT SUBMISSION REQUIREMENTS
Table of Contents ARCHIVE
Table of Contents 17.02.11 - Administrative Rules of the Under the Workers Compensation Law -- Security for Compensation -- Self-Insured Employers 000. Legal Authority.... 2 001. Title And Scope.... 2
