1 Analysis Of Work Order History Opportunities For Improvements S A Safi, Covaris Pty Ltd A Paper from ICOMS 2007 (Australia) Summary: This paper presents an objective methodology for maintenance data analysis. The purposes of these analyses are to identify strengths and weaknesses in the maintenance management system, opportunities for improvements, and benchmark maintenance key elements against maintenance best practice. The paper contributes ideas on how to analyse large data sets and make useful determinations from an understanding of work order history as well as the loaded PM strategy. This addresses two key traditional problems with modern CMMS: developing a reliability assessment from the work history and continuously improving the PM strategy in a cost effective manner. This paper presents a study of maintenance information obtained from for a site in the food industry. The study covers the analysis of failure modes in the work history and determination whether these modes were in control or further deteriorating. Failure modes and effects analysis (FMEA) is a comprehensive analysis capability to study failure modes determined from reactive maintenance work order history, the costs and equipment impacted, and the time trend in failure histories. 1. INTRODUCTION The computerised maintenance management system (CMMS) was introduced in the 1970s to bring control of the work order process. In developed companies data from work orders has been collected from some years and a statistically valid data set is now available for analysis of equipment condition and maintenance performance. This data can be analyzed to improve maintenance effectiveness and work management processes. This paper describes a development which exploits the now data-rich environment pervading maintenance control in the modern organisation. The raw data for this work are the thousands of work orders held in the maintenance history. These work orders need to be classified according to failure mode, and in this work this is achieved by pattern recognition of key words and synonyms in text fields such as the task description and work completed fields. It is a complex process to accurately allocate multiple work orders to well defined failure modes that reflect the issues impacting on a complex facility. The process involves a number of iterations and alternative methods in viewing the data. Even with the most meticulous attention to detail there can still ensue a small error in incorrect allocation or misunderstanding of the work order terms. However the overall allocations in this procedure are generally of a high enough accuracy to allow a statistically credible analysis of reliability trends. 2. ANALYSIS PROCESS The process described in this paper is a text-based analysis of work order task descriptions whereby key failure modes are identified. Hundreds and even thousands of work orders are processed very quickly using a specialized search program within reliability software developed for this purpose. Failure modes are identified as for example, CHAIN, V BELT, POWER and these modes summarise classic types of problems such as worn chains, replaced V belts, distribution board faults etc. What we are looking for is the high frequency or high impact failure modes and the type of equipment which is affected. The software identifies high frequency failing equipment and then tries to classify why the equipment is failing. In this work the term failure is quite broad it is not just about a breakdown job, and the allocation of a AMMJ 20th ANNIVERSARY YEAR

2 Analysis Of Work Order History 45 failure mode is also executed when a planned and scheduled corrective maintenance job is detected. What we are therefore classifying is the frequency of corrective work which can be addressed by: Modifications to the service schedules Modifications to operating behaviour Design/time-based replacement The process to analyse maintenance data is based on the logic described below in Figure 1. At the heart of the system is an understanding of the failure modes: why equipment fails. In this work the specification of a failure mode is either in terms of a commonly used and well-understood component, eg BEARING or a damage mode that likewise is well understood, eg CRACKING. Due to the need to automate the processing of thousands of work orders, the specification is necessarily kept simple to one or two words. The reliability engineering analysis of the corrective maintenance work orders from a maintenance system (independent of CMMS in use) has the methodology [1] given in the text below. Select work orders which are reactive in nature (breakdowns,...) Allocate work to characteristic failure modes Advise on number of work orders, number of affected equipment, total cost and total hours of WO s for each failure mode. Advise on critical equipment which have the most reactive work Group the equipment into common equipment types Advise on changes in MTBF for critical failure modes Determine what are the key failure modes Advise on key issues affecting particular equipment within the group Advise on time trends in the key failure modes and specify if failure modes are increasing or decreasing over time Determine if key equipment are less reliable or more reliable Advise on design limitations in the equipment Figure 1 Logic of analysis A first cut of work orders is allocated to a set of primary failure modes derived on inspection from the work orders hence this first cut process achieves the following: o Specifies the primary failure modes o Makes some bulk allocations of work orders to these failure modes o Identifies that portion of the work order data set which will not be allocated to failure modes since the work is more to do with housekeeping, etc A second, finer cut is made where a primary failure mode with a very large grouping of work orders is broken out into a number of more specific failure modes, and the accuracy of the work order allocation is improved by a more detailed view of each registered failure mode (in the first cut, the thousands of work orders were viewed and considered, when making the second cut the tens to hundreds of work orders allocated to a failure mode were considered) Each primary failure mode is then considered in detail and a set of very specific secondary failure modes is derived. The logic is that a PM work order is intended to address the failure mode and the operations within a PM are intended to address each of the secondary failure modes. Vol 21 No 2 AMMJ

3 46 Analysis Of Work Order History The list of work orders allocated to each failure mode is then considered, and the effects of the failure mode are specified by: o The range of equipment affected by the failure mode as determined by the equipment associated with work orders allocated to the failure mode o The sum cost of work orders allocated to a failure mode - the software also handles the sum amount of labour hours. o The Mean Time Between Failures MTBF for either failure modes or specific equipment. MTBF is defined as: Software called MaintSpeak has been developed to perform FMEA analysis [2]. 2.1 RELIABILITY ENGINEERING REPORTS The reliability engineering software has the capability to analyse maintenance data form various commercial CMMS/EAM s. Four main sections in this analysis are: 1. Failure modes why equipment fails within the factory, based on corrective maintenance work history. Time trends for failure modes are tracked using MTBF (mean time between failures) statistics. 2. Top failing equipment which equipment requires the most corrective maintenance work. Time trends for failing equipment are tracked using MTBF statistics. 3. Failure mode distributions analysed for the critical types of machines as determined from the failure trends. 4. Time trend the failure rate both seasonally throughout the calendar year and trends over years. Failure modes are determined from the work history and tabulated from most frequent to least frequent. In some cases the failure modes which are dominant cost drivers may not be as frequent as the high incidence items. Table 1 shows an example of the first few failure modes sorted by number of work orders for a site in food industry [3]. N work orders refers to the number of corrective maintenance work orders stored for the failure mode and N Equipment refer to the number of impacting equipment and total cost is the cost of all work orders. The software can calculates the total cost and hours associated with a specific failure mode. In this case labour hours were not provided in the data set but total costs have been compiled. No. Mode Name No Work Orders No Equipment Total Cost 1 CONVEYOR BELT GENERAL DRIVE BEARING Table 1 Failure modes sorted by N work orders [3] The trends of the failure modes are investigated by reporting the time trend analysis of the MTBF calculated as the time between instances of corrective work order. This plot communicates whether the reliability associated with a failure mode is improving or reducing. Figure 2 shows an example of failure history trend. The plot report data between 4/2003 and 9/2006 with the x axis reported in number of days from 4/2003. The vertical axis reports MTBF measured in days. If the value of the plot is 2.0, then it means that there are two days between occurrences of corrective work orders. If the value drops below 1.0 to say 0.5, then this means that there are on average two corrective work orders created every day. The plots are called Duane plots in honour of the creator of the report type. The filter Duane plot reports a success for the maintenance team providing all filter jobs are being reported in the system. There is a recent correction down of the MTBF but otherwise this is an excellent result which communicates technical improvement. AMMJ 20th ANNIVERSARY YEAR

4 Analysis Of Work Order History 47 Figure 2 Example Failure History Trends [2] 3. CASE STUDY This section presents a study of maintenance information obtained from a site in food industry in February 2006 [4]. It covers maintenance improvement opportunities and reliability engineering trends obtained from their CMMS work order history. Maintenance history data for the site was analysed for the period between March 2001 to January There were 25,339 records in maintenance history database. The objective of this report is to specify the key targets for maintenance improvement. 3.1 FAILURE MODES The analysis identified 68 failure modes. Table 2 shows the top 20 failure modes determined from the CMMS work history, from most frequent to least frequent work orders including breakdown and corrective maintenance work orders were included in the analysis. No. Mode Name N work orders N Equip 1 VALVES SEALING CONVEYOR CLEANING/CIP PACKER/INVOLVO PUMP FILLER LEAKING JAM DRIVE FLOW METERS/GAUGES/SENSORS TANKS VIDEO JET/PRINTING BOX FORMING/CARTONS BLENDER LIGHTING CUPS BOTTLE BUILDINGS FINE TUNE Table 2 Top 20 Failure Modes Vol 21 No 2 AMMJ

5 48 Analysis Of Work Order History These work orders were processed and 9371 work orders were allocated to identified failure modes, which means that 86.2% of the work orders were allocated. Allocation of above 80% of the work orders is required to ensure a statistically valid distribution. Time trends in the key failure modes were tracked using MTBF statistics. Table 3 shows the trends of the top four failure modes. Generally Table 3 indicates that in recent times reliability associated with these failure modes has increased, although there has been some drop. The sudden fall of MTBF plots can be due to either a poor level of recording early on or failure rates increasing with operational usage. Conveyor Table 3 Cleaning Top 4 Failure Modes MTBF No. Equip ID Equip Desc N Modes N Instances First Date Last Date FILLER /10/ /01/ FILLER /07/ /01/ FILLER /01/2002 9/01/ INVOLVO PACKER /02/2002 9/01/ INVOLVO PACKER /08/2001 9/01/ SLEEVER /07/2001 9/01/ BLOW MOULDER No /08/2003 9/01/ FILLER /01/ /01/ FILLER /04/ /01/ INVOLVO PACKER /04/2004 9/01/ W&D PALLETISER /02/2004 9/01/ FILLER /12/ /01/ BOTTLE CAPPER /10/2003 9/01/ INVOLVO PACKER /07/ /01/ FILLER /12/2003 9/01/ INVOLVO PACKER /03/ /01/ TRADE WASTE DAF PLANT /09/2003 3/01/ BLOW MOULDER No /08/2003 9/01/ FILLER /12/ /01/ FUJI SHRINK SLEEVER /04/ /12/2005 Table 4 Equipment with most failure records AMMJ 20th ANNIVERSARY YEAR

6 Analysis Of Work Order History TOP 20 EQUIPMENT The equipment with the most issues at the site are shown in Table 4. N Modes refers to the number of different failure modes impacting the equipment, N instances refers to the number of corrective maintenance work orders stored for the equipment and the dates refer to the first and last work order recorded in the data set analysed for this item of equipment. Table 4 shows the top 20 failing equipment for this site. Table 5 presents the failure history trend for two of the above equipment. This table plots the time based changes in MTBF for specific equipment. Table 5 has similar trend as shown in Table 3 which indicates that in recent times reliability associated with these equipment has increased, although there has been some fall off. The sudden fall of MTBF plots can be due to either a poor level of recording early on or failure rates increasing with operational usage. Table 5 Failure history trend for two equipment We need to be careful with this result since we were advised on site that with changes in the clerical support to the maintenance department, not all work was being recorded into the CMMS. The change in clerical support to the maintenance department was around the time we observe the sudden drop in MTBF plats. If minor jobs associated with the equipment included above is being missed, then the reliability trends will kick up as shown in the period of this change. We considered the fact that the key failure modes reported in previous section show similar improvement pattern. As a consequence we acknowledge the trends in improvement shown in this section but we recommend that the result be treated with caution. 3.3 FAILURE MODE DISTRIBUTIONS Failure mode distributions were analysed for the critical types of machines as determined from the failure trends. Fillers Packers Fillers Filler 1 has obvious problems. Almost a third of these issues are associated with sealing. The other key problems are lifters, something to do with bottles, heaters, valves, flow meters and knives. Based on the evidence to date this filler needs a complete rework of its PM strategy. Problems with the Filler 2 are cups and lidding devices. These would need to be checked for adequate setup procedures, PM alignments and any design issues. The feedback on the work orders does not point to any issues other than timing. There are labeller issues on the Filler 3, Filler 5 and Filler 6. These would need to be checked for design flaws since the work order feedback is poor and does not define the problem other than missing labels. Issues could be the speed of the machine. Filler 4 has a heater problem. Vol 21 No 2 AMMJ

7 50 Analysis Of Work Order History Equipment FILLER 1 FILLER 2 FILLER 3 FILLER 4 FILLER 5 FILLER 6 FILLER 7 FILLER 8 Total No Failure Mode 1 FILLER CONVEYOR BEARING VALVES DRIVE SEALING FLOW METERS/SENSORS PNEUMATICS LIFTER LEAKING PUMP PLC LUBRICATION FILTER JAM BOTTLE CLEANING/CIP HEATER BLOCKAGE CUPS KNIVES LID APPLICATOR OVERLID LABEL/LABELLER FORMING BOX FORMING Packers Table 6 Failure mode distributions for fillers Packer 1 and 2 have obvious issues with forming which need to be investigated from both a set-up and design issue. We would expect the box forming issues across all of the packers to be a function of both set-up and PM issues. Fine tuning problems of packer 2 and 3 need to be considered as set up issues, although why Packer 1 is not an issue also needs to be evaluated Packer 1 has a video jet problem which we would expect to have been resolved by now. Packer 4 has a nozzle problem and its entire glueing system need investigation. In fact common across all the packers is a need to check the PM strategy for the glueing systems. In general we would recommend a check of the PM strategies and set-up procedures for the case packers. 4. CONCLUSION The large data sets now available in the maintenance systems used by modern enterprises are offering a new resource to the reliability engineering. This paper presents a methodology to analyse maintenance data sets form a broad range of computerised maintenance management systems. The purposes of these analyses are to identify strengths and weaknesses in the maintenance management system and opportunities for improvements. The developed methodology to perform failure modes and effect analysis was described. AMMJ 20th ANNIVERSARY YEAR

8 Analysis Of Work Order History 51 Easy to use and yet powerful software introduced to facilitate FMEA. It captures work orders from the CMMS and allocates selected work to defined failure modes. It also specifies which equipment is affected by a selected failure mode, what is the total cost of the work and what is the total amount of labour hours spent on work in this mode. The results from the case study, show outcomes from the analysis and wide range of reports, which can be provided from analysing the computerised maintenance management system data sets were presented. Although the examples used here are drawn from a database of 25,000 work orders, the author has experience in analyzing data sets up to half a million work orders which presents new challenges in the data management environment. Equipment PACKER 1 PACKER 2 PACKER 3 PACKER 4 PACKER 5 Dept Total No Failure Mode 1 PACKER/INVOLVO CONVEYOR VALVES DRIVE FLOW METERS/GAUGES/SENSORS PNEUMARICS VIDEO JET/PRINTING NOZZLE FINE TUNE JAM HEATER BOX FORMING/CARTONS CYLINDER GUIDES BRAKE GLUEING HOSE FORMING BEARING CLEANING/CIP ELECTRICAL PROBLEM CHANNELISER GEARBOX 2 1 Table 7 Failure mode distributions for packers ACKNOWLEDGEMENT The authors acknowledge the input of work colleagues at Covaris Pty Ltd and the many clients and research partners who have contributed to this work. REFERENCES 1. S. Safi, B. Bigdeli, Maintenance Engineering Bureau Using Maintenance Data to Drive Improvement, ICOMS- 2005, Paper 43, Hobart (2005) 2. MaintSpeak, FMEA Analysis Software, Covaris Pty Ltd, R. Platfoot, Report on Maintenance Improvement, Covaris Pty Ltd, Unpublished Internal Document for a food industry company (2006). 4. S. Safi, R. A. Platfoot, Report on Maintenance Improvement, Covaris Pty Ltd, Unpublished Internal Document for a food industry company (2006). Vol 21 No 2 AMMJ

FAILURE MODES AND EFFECT ANALYSIS (FMEA)

FAILURE MODES AND EFFECT ANALYSIS (FMEA) FAILURE MODES AND EFFECT ANALYSIS (FMEA) INTRODUCTION While defining the functions and desired standards of performance of an asset, the objectives of maintenance with respect to that asset are defined.

More information

Enhance Production in 6 Steps Using Preventive Maintenance

Enhance Production in 6 Steps Using Preventive Maintenance Enhance Production in 6 Steps Using Preventive Maintenance 1 Enhance Production in 6 Steps Using Preventive Maintenance Preventive Maintenance (PM) is 30% less expensive than reactive approaches Using

More information

Predictive Maintenance

Predictive Maintenance PART ONE of a predictive maintenance series Predictive Maintenance Overview Predictive maintenance programs come in all shapes and sizes, depending on a facility s size, equipment, regulations, and productivity

More information

CDS TROUBLESHOOTING SECTION I. VACUUM. 1.0. Weak vacuum at wand. Gauge reads normal (10hg to 14hg)

CDS TROUBLESHOOTING SECTION I. VACUUM. 1.0. Weak vacuum at wand. Gauge reads normal (10hg to 14hg) CDS TROUBLESHOOTING SECTION I. VACUUM 1.0. Weak vacuum at wand. Gauge reads normal (10hg to 14hg) 1.1. Clogged hoses or wand tube. Disconnect hoses and carefully check for an obstruction. 1.2. Excessive

More information

PATTERN MATCHING OF LIVE DATA TO IMPLEMENT PROACTIVE NETWORK MANAGEMENT

PATTERN MATCHING OF LIVE DATA TO IMPLEMENT PROACTIVE NETWORK MANAGEMENT PATTERN MATCHING OF LIVE DATA TO IMPLEMENT PROACTIVE NETWORK MANAGEMENT Eur Ing Steve Mustard, Product Manager, LogicaCMG Dr Mark Thornton, Solutions Director, Helveta Abstract Supervisory Control And

More information

Choosing Between Electromechanical and Fluid Power Linear Actuators in Industrial Systems Design

Choosing Between Electromechanical and Fluid Power Linear Actuators in Industrial Systems Design Choosing Between Electromechanical and Fluid Power Linear Actuators in Industrial Systems Design James Marek, Business Unit Director, Thomson Systems Thomson Industries, Inc. 540-633-3549 www.thomsonlinear.com

More information

Useful Key Performance Indicators for Maintenance

Useful Key Performance Indicators for Maintenance PO BOX 2091, ROSSMOYNE, WA, 6148 AUSTRALIA Phone: Fax: Email: Website: +61 (0) 402 731 563 +61 (8) 9457 8642 [email protected] www.lifetime-reliability.com Abstract Useful Key Performance Indicators

More information

Utilities Engineering Technician Trailblazer Assessment Plan ASSESSMENT PLAN. Utilities Engineering Technician

Utilities Engineering Technician Trailblazer Assessment Plan ASSESSMENT PLAN. Utilities Engineering Technician Utilities Engineering Technician Trailblazer Assessment Plan ASSESSMENT PLAN Utilities Engineering Technician Jan Newberry, Training Manager, South West Water Chair of Trailblazer Project Team 18/08/2015

More information

Software MANAGEMENT, CONTROL AND DATA CAPTURE IN PRODUCTION PLANT PRODUCTION QUALITY SCHEDULING MAINTENANCE Powering your Process PRODUCTION QUALITY SCHEDULING MAINTENANCE We present the state-of-the-art

More information

Re-engineering and function testing at Handtmann Zittau WELCOME

Re-engineering and function testing at Handtmann Zittau WELCOME Re-engineering and function testing at Handtmann Zittau WELCOME Handtmann Maschinenfabrik GmbH & Co. KG / VVZ 3/01/2015 page 1 Agenda Generell Information Handtmann Zittau Re-engineering Handtmann Zittau

More information

Best Practice Guide BPGCS007

Best Practice Guide BPGCS007 Best Practice Guide BPGCS007 ENERGY MANAGEMENT Introduction: With rising fuel costs, opening of electricity and gas markets to alternate suppliers and climate change, the requirement to monitor and reduce

More information

PUMP MAINTENANCE SCHEDULE AND CHECKLISTS

PUMP MAINTENANCE SCHEDULE AND CHECKLISTS PUMP MAINTENANCE SCHEDULE AND CHECKLISTS Providing a maintenance schedule defined specifically by run hours or yardage pumped serves only as a general guideline given the large amount of variables a unit

More information

The Secondary Impact of System Optimisation on Building Equipment; Maintenance and Life Expectancy

The Secondary Impact of System Optimisation on Building Equipment; Maintenance and Life Expectancy ENVIRONMENTAL GROUP The Secondary Impact of System Optimisation on Building Equipment; Maintenance and Life Expectancy Dr. Houman Tamaddon JUNE 2015 INTRODUCTION The increased pace of global energy consumption

More information

Autonomous Maintenance

Autonomous Maintenance Autonomous Maintenance TPM & Autonomous Maintenance I run it, you fix it! I fix it, you run it! What is Maintenance? Why is Possible Utilization Rate Necessary? One way to look at Lean (JIT) production

More information

A-1. Chapter 1. Project planning. Chapter 1. Festo Didactic Mechatronics

A-1. Chapter 1. Project planning. Chapter 1. Festo Didactic Mechatronics A-1 Project planning A-2 Mechatronics specialists are responsible for the complete service life of an industrial machine, from the initial planning phase through to its disassembly and disposal. This cycle

More information

Mechanical Engineering Technician- Plant Technician

Mechanical Engineering Technician- Plant Technician Mechanical Engineering Technician- Plant Technician A competent Mechanical Engineering Technician- Plant Maintenance is expected to: 1. Ability to plan and execute work in a safe and responsible manner

More information

ADVANTAGES OF Tankless Adhesive Melting Systems For End-of-Line Packaging

ADVANTAGES OF Tankless Adhesive Melting Systems For End-of-Line Packaging White Paper ADVANTAGES OF Tankless Adhesive Melting Systems For End-of-Line Packaging Nordson Corporation For carton sealing, case sealing, tray forming and a host of other packaging applications, the

More information

Making the Most of SáOá SM Services

Making the Most of SáOá SM Services MAINTENANCE PRODUCTS AND SERVICES Making the Most of SáOá SM Services With S O S Services, you don t just get test results, you get accurate analysis from the people who know your Cat equipment best. Your

More information

Feedback Tutorial Letter Business Operations BOP611S Assignment number 1: April 2016

Feedback Tutorial Letter Business Operations BOP611S Assignment number 1: April 2016 Feedback Tutorial Letter Business Operations BOP611S Assignment number 1: April 2016 Dear Students, Let me congratulate you in completing your assignment number 1 for Business Operations in the first semester.

More information

BACKPACK SPRAYERS. MODEL NOS: KSP16 & KSP20 Part Nos: 3402270 & 3402275 OPERATING & MAINTENANCE INSTRUCTIONS GC04/12

BACKPACK SPRAYERS. MODEL NOS: KSP16 & KSP20 Part Nos: 3402270 & 3402275 OPERATING & MAINTENANCE INSTRUCTIONS GC04/12 BACKPACK SPRAYERS MODEL NOS: KSP16 & KSP20 Part Nos: 3402270 & 3402275 OPERATING & MAINTENANCE INSTRUCTIONS GC04/12 INTRODUCTION Thank you for purchasing this CLARKE Sprayer, designed for use only with

More information

REDUCING THE COST OF PREVENTIVE MAINTENANCE

REDUCING THE COST OF PREVENTIVE MAINTENANCE REDUCING THE COST OF PREVENTIVE MAINTENANCE Deryk Anderson Business Analyst - Maintenance Oniqua Enterprise Analytics [email protected] T: +61 7 3859 9523 SUMMARY: Lean Manufacturing and Lean Maintenance

More information

Machine Tool Failure Data Analysis For Condition Monitoring Application

Machine Tool Failure Data Analysis For Condition Monitoring Application Machine Tool Failure Data Analysis For Condition Monitoring Application S. Saravanan, G.S.Yadava and P.V.Rao 1 Industrial Tribology Machine Dynamics & Maintenance Engineering Centre (Itmmec) 1 Department

More information

Design Utility Lever Thermostatic Bath Shower Mixer

Design Utility Lever Thermostatic Bath Shower Mixer Design Utility Lever Thermostatic Bath Shower Mixer Installation Instructions & User Guide Please keep these instructions for future reference and request of replacement parts General Information Thank

More information

Trouble Shooting. Pump

Trouble Shooting. Pump Trouble Shooting Pump Trouble Possible Cause Remedy Oil leaking in the area of water pump crankshaft Worn crankshaft seal, bad bearing, grooved shaft, or failure of retainer o-ring. Excessive play on crankshaft

More information

MAINTENANCE MANAGEMENT

MAINTENANCE MANAGEMENT www.thebowquarter.co.uk MAINTENANCE MANAGEMENT Scheduled routine maintenance each year is as follows. Projects classified as exceptional works such as external/internal decorations are excluded, as are

More information

TPM. Total Productive Maintenance

TPM. Total Productive Maintenance TPM Total Productive Maintenance TPM - definition TPM can be defined as a systematic work method aiming to develop disturbance free processes at lowest possible cost through the commitment of all co-workers

More information

Failure Analysis Methods What, Why and How. MEEG 466 Special Topics in Design Jim Glancey Spring, 2006

Failure Analysis Methods What, Why and How. MEEG 466 Special Topics in Design Jim Glancey Spring, 2006 Failure Analysis Methods What, Why and How MEEG 466 Special Topics in Design Jim Glancey Spring, 2006 Failure Analysis Methods Every product or process has modes of failure. An analysis of potential failures

More information

An Artesian Whitepaper

An Artesian Whitepaper An Artesian Whitepaper This short paper talks about the subject of the semantic web, providing a definition and context and outlining how this can be exploited to drive commercial productivity particularly

More information

Hydraulic Trouble Shooting

Hydraulic Trouble Shooting Hydraulic Trouble Shooting Hydraulic systems can be very simple, such as a hand pump pumping up a small hydraulic jack, or very complex, with several pumps, complex valving, accumulators, and many cylinders

More information

Pressure Vessels (Air Compressors) and LPG Tanks

Pressure Vessels (Air Compressors) and LPG Tanks Pressure Vessels (Air Compressors) and LPG Tanks 1. Identification of Workplace Hazard Any container, tank or vessel that contains pressurized material is a potential hazard to employees due to the force

More information

CIM Computer Integrated Manufacturing

CIM Computer Integrated Manufacturing INDEX CIM IN BASIC CONFIGURATION CIM IN ADVANCED CONFIGURATION CIM IN COMPLETE CONFIGURATION DL CIM A DL CIM B DL CIM C DL CIM C DL CIM B DL CIM A Computer Integrated Manufacturing (CIM) is a method of

More information

Reliability Solutions

Reliability Solutions Reliability Solutions Developing a World-Class Approach to Lubrication Lubrication is the cornerstone of an effective reliability-driven asset management program. A major bearing manufacturer has indicated

More information

Calibration & Preventative Maintenance. Sally Wolfgang Manager, Quality Operations Merck & Co., Inc.

Calibration & Preventative Maintenance. Sally Wolfgang Manager, Quality Operations Merck & Co., Inc. Calibration & Preventative Maintenance Sally Wolfgang Manager, Quality Operations Merck & Co., Inc. Calibration: A comparison of two instruments or measuring devices one of which is a standard of known

More information

Effective Root Cause Analysis For Corrective and Preventive Action

Effective Root Cause Analysis For Corrective and Preventive Action Effective Root Cause Analysis For Corrective and Preventive Action Manuel Marco Understanding Key Principles Requirement need or expectation that is stated, generally implied, or obligatory Generally implied

More information

CNC MILLING MACHINE TROUBLE SHOOTING. 1. Trouble Shooting. No Trouble Solution. 1.Check the air pressure

CNC MILLING MACHINE TROUBLE SHOOTING. 1. Trouble Shooting. No Trouble Solution. 1.Check the air pressure CNC MILLING MACHINE TROUBLE SHOOTING 1. Trouble Shooting No Trouble Solution 1 Tool magazine( (Umbrella type) Noise for tool changing Can t change the tool Tool number in chaos Tool magazine keep rotation

More information

Seradex White Paper A newsletter for manufacturing organizations April, 2004

Seradex White Paper A newsletter for manufacturing organizations April, 2004 Seradex White Paper A newsletter for manufacturing organizations April, 2004 Using Project Management Software for Production Scheduling Frequently, we encounter organizations considering the use of project

More information

How to Analyze and Communicate Preventive Maintenance Address Now or Pay Later

How to Analyze and Communicate Preventive Maintenance Address Now or Pay Later How to ANALYZE AND COMMUNICATE PREVENTIVE MAINTENANCE - ADDRESS NOW - OR PAY LATER Tuesday, February 22, 2012, 10:15 a.m. 11:30 a.m. John Poytress Moderator Clovis USD Doug Halverson Presented by Clovis

More information

SWITCHING STRATEGIES: MOVING TO CONDITION- BASED MAINTENANCE. By David Stevens, Technical Manager & Trainer, AVT Reliability

SWITCHING STRATEGIES: MOVING TO CONDITION- BASED MAINTENANCE. By David Stevens, Technical Manager & Trainer, AVT Reliability SWITCHING STRATEGIES: MOVING TO CONDITION- BASED MAINTENANCE By David Stevens, Technical Manager & Trainer, AVT Reliability Balancing cost reduction and efficiency improvement targets is a common source

More information

Key Steps to a Management Skills Audit

Key Steps to a Management Skills Audit Key Steps to a Management Skills Audit COPYRIGHT NOTICE PPA Consulting Pty Ltd (ACN 079 090 547) 2005-2013 You may only use this document for your own personal use or the internal use of your employer.

More information

HITACHI EXTENDED LIFE PROGRAM

HITACHI EXTENDED LIFE PROGRAM HITACHI EXTENDED LIFE PROGRAM HITACHI EXTENDED LIFE PROGRAM Always with the Customer All new Hitachi equipment has our comprehensive manufacturer s warranty. These days however, equipment owners feel they

More information

Express Technology. Maintenance Solutions www.expresstechnology.com 251.929.3200. 2011 Express Technology Inc.

Express Technology. Maintenance Solutions www.expresstechnology.com 251.929.3200. 2011 Express Technology Inc. EQUIPMENT MANAGEMENT PREVENTATIVE MAINTENANCE BREAKDOWN MAINTENANCE DOWNTIME TRACKING WORK ORDERS MAINTENANCE HISTORY PARTS INVENTORY PARTS RECEIVING PURCHASE ORDERS Express Technology Maintenance Solutions

More information

Workplace Color Coding Standards

Workplace Color Coding Standards Workplace Color Coding Standards You won t GET LEAN... until you GET VISUAL! 7381 Ardith Ct., Byron Center, MI 49315 616.583.9400 info@ Why do we use color to communicate? How much information in our daily

More information

LOCAL GOVERNMENT SERVICES JOB EVALUATION SCHEME:

LOCAL GOVERNMENT SERVICES JOB EVALUATION SCHEME: LOCAL GOVERNMENT SERVICES JOB EVALUATION SCHEME: TECHNICAL NOTE NO. 14: CONSISTENCY CHECKING OF JE OUTCOMES (formerly issued as Quality Assurance NJC circular dated 14Apr03) 1. Introduction 1.1 The NJC

More information

MAINTENANCE OF SMALL WATER SUPPLY, SANITATION AND IRRIGATION SCHEMES

MAINTENANCE OF SMALL WATER SUPPLY, SANITATION AND IRRIGATION SCHEMES MAINTENANCE OF SMALL WATER SUPPLY, SANITATION AND IRRIGATION SCHEMES John van Rijn INDEVELOPMENT MAINTENANCE OF SMALL WATER SUPPLY, SANITATION AND IRRIGATION SCHEMES Any part of this publication may be

More information

DUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD

DUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD DUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD JOB DESCRIPTION POSITION TITLE: Air Conditioning Mechanic DEPARTMENT: Plant TITLE OF IMMEDIATE SUPERVISOR: Supervisor, Maintenance Services Position Summary

More information

Evaluate, Clean, and Tune Guidance

Evaluate, Clean, and Tune Guidance Evaluate, Clean, and Tune Guidance The Evaluate, Clean and Tune (ECT) process serves three essential purposes in the Weatherization Assistance Program (WAP). The first is to evaluate the existing system

More information

PERPLEXING VARIABLE FREQUENCY DRIVE VIBRATION PROBLEMS. Brian Howes 1

PERPLEXING VARIABLE FREQUENCY DRIVE VIBRATION PROBLEMS. Brian Howes 1 PERPLEXING VARIABLE FREQUENCY DRIVE VIBRATION PROBLEMS Brian Howes 1 1 Beta Machinery Analysis Ltd., Calgary, AB, Canada, T3C 0J7 ABSTRACT Several unusual vibration problems have been seen recently that

More information

- 1 - Cost Drivers. Product Diversity - Difference in product size, product complexity, size of batches and set-up times cause product diversity.

- 1 - Cost Drivers. Product Diversity - Difference in product size, product complexity, size of batches and set-up times cause product diversity. - 1 - Traditional Cost Accounting It arbitrarily allocates overheads to the cost objects. Total Company s overhead is allocated based on volume based measure e.g. labour hours, machine hours. Here the

More information

World-Class Oil Sampling It is Possible

World-Class Oil Sampling It is Possible www.lubecontrol.com.au World-Class Oil Sampling It is Possible Lube Control Pty Ltd Providing lubrication solutions! Unit 5/53 Norfolk Rd, Marion, SA 5043 t: (08) 8298 5563 f: (08) 8298 6253 e: [email protected]

More information

Integrating Quality Assurance into the GIS Project Life Cycle

Integrating Quality Assurance into the GIS Project Life Cycle Integrating Quality Assurance into the GIS Project Life Cycle Abstract GIS databases are an ever-evolving entity. From their humble beginnings as paper maps, through the digital conversion process, to

More information

At Bently Nevada Corporation (BNC) we know one. Establishing a Lubricant Analysis Program. Joshua Hutton. John Kitchens.

At Bently Nevada Corporation (BNC) we know one. Establishing a Lubricant Analysis Program. Joshua Hutton. John Kitchens. Establishing a Lubricant Analysis Program Authored by: Rett Jesse Manager, North American Services Bently Nevada Corporation e-mail: [email protected] Joshua Hutton Summer Intern, BNC Student at Cal

More information

Lubrigard. A Guide To Lubrication Management

Lubrigard. A Guide To Lubrication Management Lubrigard FROM AUDITING TO IMPLEMENTATION LUBRIGARD PROVIDES THE SERVICES, TRAINING, AND PRODUCTS TO TRANSFORM REACTIVE MAINTENANCE INTO PROACTIVE MAINTENANCE. A Guide To Lubrication Management P R O A

More information

Topics of the Presentation

Topics of the Presentation Drill Rig Safety Topics of the Presentation Personnel safety and monitoring PPE Health (Drugs and Alcohol) Drill Rig operation Safe set up procedures Safe operation of machine Safety related accidents

More information

Mobile field balancing reduces vibrations in energy and power plants. Published in VGB PowerTech 07/2012

Mobile field balancing reduces vibrations in energy and power plants. Published in VGB PowerTech 07/2012 Mobile field balancing reduces vibrations in energy and power plants Published in VGB PowerTech 07/2012 Dr. Edwin Becker PRÜFTECHNIK Condition Monitoring PRÜFTECHNIK Condition Monitoring GmbH 85737 Ismaning

More information

Document Title Press Maintenance Checklist used in performing routine maintenance on punch presses

Document Title Press Maintenance Checklist used in performing routine maintenance on punch presses Document Title Press Maintenance Checklist used in performing routine maintenance on punch presses Press Maintenance Check List Daily (before each shift) Point of operation guards and devices Other equipment

More information

Introduction. Section 2. Introduction 2-1

Introduction. Section 2. Introduction 2-1 2-1 Section 2 This manual describes the installation and use of the DuraBlue 4 L (D4L), DuraBlue 10 L (D10L), and DuraBlue 16 L (D16L) adhesive melters. When necessary, the reader is referred to the documentation

More information

LONG INTERNATIONAL. Andrew Avalon, P.E., PSP and Curtis W. Foster

LONG INTERNATIONAL. Andrew Avalon, P.E., PSP and Curtis W. Foster Andrew Avalon, P.E., PSP and Curtis W. Foster LONG INTERNATIONAL Long International, Inc. 5265 Skytrail Drive Littleton, Colorado 80123-1566 USA Telephone: (303) 972-2443 Fax: (303) 200-7180 www.long-intl.com

More information

Plantcom s. Fleet Management. solutions are your competitive advantage. plantcom.com.au. [email protected] l

Plantcom s. Fleet Management. solutions are your competitive advantage. plantcom.com.au. contact@plantcom.com.au l After years of development, and with the assistance from the mining, construction, heavy transport and vehicle rental industries, Plantcom have developed a state of the art fleet management solution that

More information

Gerry Kaelin, FilterSense, USA, describes the ways in which optimising toward compliance with environmental regulations can reduce baghouse

Gerry Kaelin, FilterSense, USA, describes the ways in which optimising toward compliance with environmental regulations can reduce baghouse Gerry Kaelin, FilterSense, USA, describes the ways in which optimising toward compliance with environmental regulations can reduce baghouse maintenance and operational expenses. Making Sense Introduction

More information

National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook

National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook Trainee:... Training Provider:... Year:... Trainee Contact no:... Competency Based Skill Training Logbook Introduction

More information

IBM Tivoli Software. Maximo Business Intelligence Work Packs. Workorder, Asset Failure, Asset and Inventory Management

IBM Tivoli Software. Maximo Business Intelligence Work Packs. Workorder, Asset Failure, Asset and Inventory Management IBM Tivoli Software Maximo Asset Management Version 7.5 Releases Maximo Business Intelligence Work Packs Workorder, Asset Failure, Asset and Inventory Management Revision 4 Pam Denny Maximo Report Designer/Architect

More information

INTRODUCTION TO MACHINE-VISION INSPECTION

INTRODUCTION TO MACHINE-VISION INSPECTION INTRODUCTION TO MACHINE-VISION INSPECTION Machine vision is used in virtually all manufacturing industries to boost quality, productivity, efficiency, and regulatory compliance. Simply put, machine-vision

More information

Customer Support Agreements

Customer Support Agreements Cleveland Brothers Product Support Customer Support Agreements Maximize Uptime Minimize Risk Insulate Prices Increase Profitability Let a CSA go to WORK for your company CUSTOMER SUPPORT AGREEMENTS A CSA

More information

Water Pump Replacement

Water Pump Replacement 1 of 8 2/5/2008 6:36 AM Document ID# 713637 2001 Cadillac Seville Print Water Pump Replacement Tools Required 1. J 38816-A Water Pump Remover & Installer 2. J 38185 Hose Clamp Pliers

More information

ENGINE COOLING SYSTEM

ENGINE COOLING SYSTEM ENGINE COOLING SYSTEM 1988 Toyota Celica 1987-88 TOYOTA Engine Cooling Systems Celica DESCRIPTION The basic liquid cooling system consists of a radiator, water pump, thermostat, cooling fan, pressure cap,

More information

FMEA and FTA Analysis

FMEA and FTA Analysis FMEA and FTA Analysis Why it is Coming to Your Hospital and Your Laboratory Tina A. Krenc Director, R&D Phase Systems Abbott Laboratories 1 Agenda Background on requirements for risk management Tools to

More information

Optimization of Clinical Engineering in Private Healthcare

Optimization of Clinical Engineering in Private Healthcare Optimization of Clinical Engineering in Private Healthcare Speaker: James Herbert Organisation: Medi-Clinic Southern Africa Job Title: Technical Specialist - Clinical Engineering About the Speaker: James

More information

Piston Diagnosis A rough Guide

Piston Diagnosis A rough Guide Piston Diagnosis A rough Guide The process of examining used pistons can tell us a lot of helpful information on the condition of an engine. When engine failure does occur the piston is likely to take

More information

Investigating into Automated Filler Solutions in Manufacturing: A Case Study

Investigating into Automated Filler Solutions in Manufacturing: A Case Study N. Sangster et al.: Investigating into Automated Filler Solutions in Manufacturing: A Case Study 16 ISSN 1000 7924 The Journal of the Association of Professional Engineers of Trinidad and Tobago Vol.42,

More information

PFMEA Process Failure Mode and Effects Analysis. James Davis, General Dynamics

PFMEA Process Failure Mode and Effects Analysis. James Davis, General Dynamics PFMEA Process Failure Mode and Effects Analysis James Davis, General Dynamics Purpose The purpose of this presentation is to share the benefits of a detailed Process Flow Diagram, conducted during a Process

More information

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF

More information

Agile Based Software Development Model : Benefits & Challenges

Agile Based Software Development Model : Benefits & Challenges Agile Based Software Development Model : Benefits & Challenges Tajinder Kumar Assistant Professor, IT Department JMIT Radaur, Haryana Vipul Gupta Assistant Professor, IT Department JMIT Radaur, Haryana

More information

The Principles of the Lean Business System: #5 Prevention. Lean in the 21 st Century Series Professor Peter Hines

The Principles of the Lean Business System: #5 Prevention. Lean in the 21 st Century Series Professor Peter Hines The Principles of the Lean Business System: #5 Prevention Lean in the 21 st Century Series Professor Peter Hines Our Webinar Welcome Webinar will last about 1 hour We will invite you to complete a few

More information

Sage 300 Distribution

Sage 300 Distribution Sage 300 Distribution Win new markets, satisfy your customers, deliver high-quality products and services and steer your business in the right direction with Sage 300 Distribution! In this ever increasing

More information

Contract hire driver s guide

Contract hire driver s guide Contract hire driver s guide Important information Contract hire is provided by Audi Finance. Audi Finance is a trading name of Volkswagen Financial Services (UK) Limited, Brunswick Court, Yeomans Drive,

More information

Total Productive Manufacturing (TPM) Organizing for Maximum Equipment Productivity

Total Productive Manufacturing (TPM) Organizing for Maximum Equipment Productivity Total Productive Manufacturing () Organizing for Maximum Equipment Productivity Robert C. Leachman CSM Program University of California at Berkeley October, 2013 Goals Increase overall equipment efficiency

More information

Process Operators and Maintenance Staff Work Hand-in-hand with DCS-embedded Condition Monitoring

Process Operators and Maintenance Staff Work Hand-in-hand with DCS-embedded Condition Monitoring Process Operators and Maintenance Staff Work Hand-in-hand with DCS-embedded Condition Monitoring Erkki Jaatinen Metso, Tampere, Finland ABSTRACT The capabilities of an on-line condition monitoring system

More information

Inspection and Testing of Water-Based Systems

Inspection and Testing of Water-Based Systems Inspection and Testing of Water-Based Systems Standard Model/Computer-Based Testing Level III Content Outline The candidate for NICET certification at Level III in the Inspection and Testing of Water-Based

More information

Introduction to Process Control Actuators

Introduction to Process Control Actuators 1 Introduction to Process Control Actuators Actuators are the final elements in a control system. They receive a low power command signal and energy input to amplify the command signal as appropriate to

More information

Simulations can be run at item and group level giving users flexibility. In brief

Simulations can be run at item and group level giving users flexibility. In brief We all aim to optimize all kinds of aspects of our business, but we all also are aware it s very challenging to put reality in an optimization model. Nevertheless, we require insights which enable us to

More information

SUSPENSION DIAGNOSIS

SUSPENSION DIAGNOSIS SECTION 2A SUSPENSION DIAGNOSIS TABLE OF CONTENTS Diagnosis... 2A-2 General Diagnosis... 2A-2 Hub and Bearing... 2A-7 2A-2 SUSPENSION DIAGNOSIS DIAGNOSIS GENERAL DIAGNOSIS Problems in the steering, the

More information

Operating Instructions Drill rig DRU160

Operating Instructions Drill rig DRU160 Operating Instructions Drill rig DRU160 Index 000 / 001 Original operating instructions 10988825 en / 20.10.2009 Congratulations! With a Hydrostress unit from TYROLIT you have chosen a tried and tested

More information

Market Research Methodology

Market Research Methodology Market Research Methodology JANUARY 12, 2008 MARKET RESEARCH ANALYST Market Research Basics Market research is the process of systematic gathering, recording and analyzing of data about customers, competitors

More information

HSE s Corporate Plan for Internal Health & Safety for 2015/16

HSE s Corporate Plan for Internal Health & Safety for 2015/16 HSE s Corporate Plan for Internal Health & Safety for 2015/16 Introduction This plan contains the actions to be taken across the organisation above the routine management of to address the four specific

More information

Technical Bulletin. Oil Record Book entries: Machinery space operations (Part 1) Including January 2011 amendments to Technical Bulletin 24

Technical Bulletin. Oil Record Book entries: Machinery space operations (Part 1) Including January 2011 amendments to Technical Bulletin 24 UK P&I CLUB Technical Bulletin NUMBER 35 2011 (revised from Bulletin 24) Oil Record Book entries: Machinery space operations (Part 1) Including January 2011 amendments to Technical Bulletin 24 The Club

More information

An Introduction to. Metrics. used during. Software Development

An Introduction to. Metrics. used during. Software Development An Introduction to Metrics used during Software Development Life Cycle www.softwaretestinggenius.com Page 1 of 10 Define the Metric Objectives You can t control what you can t measure. This is a quote

More information

Why outsourcing is the dependable option for independent hotels. A white paper from Berendsen

Why outsourcing is the dependable option for independent hotels. A white paper from Berendsen Why outsourcing is the dependable option for independent hotels A white paper from Berendsen The UK s pipeline of hotels in development is strong and occupancy rates are forecast to increase. As the UK

More information

Consolidation of Grade 3 EQAO Questions Data Management & Probability

Consolidation of Grade 3 EQAO Questions Data Management & Probability Consolidation of Grade 3 EQAO Questions Data Management & Probability Compiled by Devika William-Yu (SE2 Math Coach) GRADE THREE EQAO QUESTIONS: Data Management and Probability Overall Expectations DV1

More information

Most agencies think about cleaning because of debris in the line.

Most agencies think about cleaning because of debris in the line. Most agencies think about cleaning because of debris in the line. If we have an effective cleaning program there should not be a lot of debris in the line after the line is cleaned and tv d for acceptance.

More information

Operating Rate Monitoring System for Welding Robots

Operating Rate Monitoring System for Welding Robots Technical Paper Operating Rate Monitoring System for Welding Robots Koji Inada Yuuki Kishimoto Nobuyoshi Yamanaka The operating rate and the cycle time of the welding robots have conventionally been analyzed

More information

Accounting Building Business Skills. Learning Objectives: Learning Objectives: Paul D. Kimmel. Chapter Thirteen: Cost Accounting Systems

Accounting Building Business Skills. Learning Objectives: Learning Objectives: Paul D. Kimmel. Chapter Thirteen: Cost Accounting Systems Accounting Building Business Skills Paul D. Kimmel Chapter Thirteen: Cost Accounting Systems PowerPoint presentation by Kate Wynn-Williams University of Otago, Dunedin 2003 John Wiley & Sons Australia,

More information

krones AirCo The air conveyor for PET bottles

krones AirCo The air conveyor for PET bottles The air conveyor for PET bottles The PET containers seem to be floating on air PET bottles should be treated gently. This is why the AirCo helps these sensitive lightweights float reliably and gently from

More information

Configuring Microsoft Project Server

Configuring Microsoft Project Server Configuring Microsoft Project Server for Microsoft Project 2013 Length: 1 Day Course Overview After attending this course you will be able to Understand Project Server s capabilities and know how to set

More information

Monitoring Water Use

Monitoring Water Use GIIRS Emerging Market Assessment Resource Guide: What s in this Guide? I. Definition: Water Use II. Why Monitor and Record Water Use? III. How to Monitor and Record Water Use? IV. Water Conservation V.

More information

AUTOMOBILE MECHANIC STUDENT INTERNSHIP SKILLS LIST Provo School District

AUTOMOBILE MECHANIC STUDENT INTERNSHIP SKILLS LIST Provo School District AUTOMOBILE MECHANIC STUDENT INTERNSHIP SKILLS LIST Provo School District Repairs and overhauls automobiles, buses, trucks, and other automotive vehicles: Examines vehicle and discusses with customer or

More information

PLC Based Liquid Filling and Mixing

PLC Based Liquid Filling and Mixing PLC Based Liquid Filling and Mixing 1 Mihir Panchal, 2 Aashish Panaskar. 3 Prof. Lalit Kumar KJ College of Engineering and Management Research, Pune, India Abstract: The objective of this paper is to design,

More information