1 Frequently Asked Questions Directive 013 and Inactive Well Compliance Program (IWCP, Bulletin ) Updated on March 11, 2016
2 DISCLAIMER: The frequently asked questions that follow are intended to assist in the general understanding of Directive 013: Suspension Requirements for Wells and Inactive Well Compliance Program (IWCP, Bulletin ) and to help answer common questions on the existing requirements and processes. In the event of conflict, the wording of Directive 013 prevails over the wording found in these FAQs. Alberta Energy Regulator Frequently Asked Questions for Directive 013 and Inactive Well Compliance Program (IWCP, Bulletin ) March 11, 2016 Issued by Well Abandonment group, Closure and Liability (Oil &Gas) Alberta Energy Regulator Suite 1000, Street SW Calgary, Alberta T2P 0R4 Inquiries (toll free): [email protected] Website:
3 Contents 1. Directive 013: Suspension Requirements for Wells The Inactive Well Licence List The Digital Data Submission (DDS) System The Inactive Well Compliance Program (Bulletin ) General inquiries Table of Updates FAQ: Directive 013 and Inactive Well Compliance Program i
4
5 1. Directive 013: Suspension Requirements for Wells Q1.1. A1.1. Do I have to reactivate a suspended well on the AER Digital Data Submission system (DDS) for testing purposes? No, as long as the well does not meet the criteria for reactivating suspended wells under Directive 013, section 4, the licensee does not have to reactivate a suspended well on DDS for testing purposes. (Note: The production event status should indicate TESTING in the Petrinex system for the duration of the testing period.) Q1.2. A1.2. Q1.3. A1.3. What date do I use to calculate the inactive well status when a well has never reported any volumetric activity? The rig release or final drill date is used if there is no volumetric activity. Would the well classification change when a suspended well has a new completion performed? Yes, if the new completion has a higher risk classification. No, if the new completion has a risk classification that is either lower or the same as the existing classification. (Note: If the new completion produces enough to be considered reactivated, under Directive 013, then the well must be reactivated and is no longer considered suspended.) Q1.4. A1.4. Q1.5. A1.5. Would the well suspension deadline date change when a suspended well has a new completion performed? No, the suspension deadline date is always based on the volumetric activity reported on Petrinex (or final drill date if there is no volumetric activity). Would activities such as well testing, recompletion, deepening, etc., change the timeframe for the low-risk inactive well to become medium-risk? No, the only activities that could reset the clock for low-risk wells migrating into medium-risk are the following: Complete well abandonment (downhole and surface) as per Directive 020: Well Abandonment. This would require a well licence abandonment report submitted on DDS and change of the well licence status to Abandoned. Reactivating the well in accordance with Directive 013, section 4 reported on DDS (changing well licence status back to Issued or Amended ). FAQ: Directive 013 and Inactive Well Compliance Program 1
6 Q1.6. Do observation wells need to be suspended in accordance with Directive 013? A1.6. No, observation wells are excluded from the requirements of Directive 013 (and as result from the Inactive Well Compliance Program (IWCP), as long as they have been approved by the AER: OGCR (1) A licensee shall suspend a well, in accordance with the requirements established by the Board, within 12 months after the last producing or injection operations have occurred unless (a) the well is produced only to supply a seasonal market, or (b) the well is classed as an observation well. Approval for the conversion of shut-in wells must be granted by the AER s Well Test Group under Directive 040: Pressure and Deliverability Testing Oil and Gas Wells section Changing the status of a well to OBSERVATION is done through Petrinex (by the licensee) and could possibly require a licence amendment under Directive 056: Energy Development Applications and Schedules. From the Directive 013 point of view, there are no inspection requirements for these wells and there are no deadlines for an observation well status. However, observation wells will be randomly audited to verify that they are being used for observation purposes. If the well was suspended and then converted to Observation, the licensee can reactivate it in the AER DDS system with the following in the comments section: [Name of the person doing submission] [Current Date] (dd-month-yyyy): Converted to Observation on dd-month-yyyy. Once the status has been changed to OBSERVATION, the well will be automatically excluded from the Inactive Well Licence List on DDS. If the well is still on the Inactive Well Licence List, the licensee needs to verify the submission on Petrinex. Q1.7. A1.7. One option for the downhole requirement is to set a bridge plug. Does the bridge plug need to be permanent? For a high-risk well, a permanent bridge plug is required. For a medium-risk well, a permanent or retrievable bridge plug can be used. However, a permanent bridge plug is recommended if the well is to be abandoned. Note: It is recommended to follow Directive 020 when choosing a bridge plug type and setting depth. Retrievable bridge plugs and packer with a tubing plug are not acceptable abandonment methods. 2 FAQ: Directive 013 and Inactive Well Compliance Program
7 Q1.8. A1.8. Do the commingled zones have to be suspended separately? There are no specific requirements in the current Directive 013 to segregate all the different zones at the suspension stage if produced commingled. Therefore, to be in compliance with Directive 013 suspension requirements, a bridge plug set above the shallowest completion is sufficient. However, when suspending a well, it is strongly recommended that licensees consider Directive 020: Well Abandonment for the following: porous zones segregation permanent bridge plugs and cement 15 metre (m) distance requirement for zonal abandonment This would reduce the work it would take to abandon a well if and when the licensee decides to do so. When zones are being produced individually (i.e., segregated zonal completion), the licensee must suspend each zone separately. Q1.9. A1.9. What is the suspension deadline date? The suspension deadline date is 12 months after a well is given inactive status. Please refer to Directive 013 for the definition of an inactive well. Note: The well is required to be suspended and reported on the Digital Data Submission System (DDS) in accordance with Directive 013 by the suspension deadline. For example, if the well becomes inactive on July 21, 2014, then the suspension deadline date for completing the suspension work and reporting it on DDS is July 21, 2015 (see figure 1 and figure 8). Q1.10. If a low-risk well has a Downhole Operation (i.e., packer and tubing plug, or bridge plug), does it have to be suspended as a medium-risk well? A1.10. There are no downhole requirements for a low-risk well. If a downhole operation exists, that does not make it a medium-risk well; all the requirements would remain in the low-risk category. Q1.11. Do all low-risk wells become medium-risk under Directive 013 after being inactive for 10 years? A1.11. Yes, all low-risk wells become medium risk after being inactive for 10 years. The initial suspension deadline for medium-risk requirements will be 12 months after the well became a medium-risk type 6 (see figure 1). All subsequent inspection deadlines for medium-risk type 6 wells will be calculated based on the inspection due date in DDS and moved from a specific date to the end of that calendar year. Refer to Q1.35 and Q4.13 for more details. FAQ: Directive 013 and Inactive Well Compliance Program 3
8 July 21, 2014 Low-risk well becomes inactive July 21, 2024 Low-risk well becomes Medium-risk July 21, 2015 Well must be suspended as Low-risk and reported on DDS July 21, 2025 Well must be suspended as Medium-risk and reported on DDS July 21, 2013 Last Volumetric Activity reported on Petrinex for Low-risk well 10 years TIME Figure 1: Calculating Medium risk Type 6 wells Q1.12. Are freshwater wells excluded from the suspension requirements of Directive 013? A1.12. No, once a licensed well becomes inactive, it must be suspended in accordance with Directive 013, regardless of the depth of the well or the salinity of the water being produced. Q1.13. Does the entire wellbore require the use of inhibitor upon suspension? A1.13. Yes, if required (only for medium- and high-risk wells) with the top two metres filled with nonfreezing fluid. Q1.14. What can be used as a non-freezing fluid? A1.14. It is recommended to use any noncompressible nonfreezing fluid that would prevent damaging the wellhead in winter. Using air may increase a potential of casing corrosion and subsequent failure at the air-to-fluid contact depth. Q1.15. If a suspended well is fully abandoned (including surface abandonment where the well is cut and capped), is it automatically removed from the suspended/inactive well lists? A1.15. Yes, once the surface abandonment (cut and cap) is completed and the well licence abandonment is submitted on the DDS system (AER / Submissions / Licence Abandonment / Submit Well Licence Abandonment Report), the well is automatically removed from the Inactive Well Licence List. Q1.16. When reactivating suspended wells, Directive 013 states that wellheads must be inspected, serviced, and pressure tested. For all wells, what are the pressure and time requirements? A1.16. There is no specified time requirement for pressure testing the wellhead. However, the manufacturer s operating manual should provide the pressure testing requirements and conditions 4 FAQ: Directive 013 and Inactive Well Compliance Program
9 for testing the wellhead. The entire reactivation procedure of a suspended well is part of the inspection process and must be submitted on the DDS system. Q1.17. Do downhole pumps need to be removed from low-risk wellbores before suspension? A1.17. Even though this is not a requirement of Directive 013, due to a previous incident where the polish rod leaked, we do recommend that you remove the polish rod. Q1.18. What happens if a well is drilled and cased, but not completed and there is no volumetric activity? A1.18. The final drill date must be used as a last volumetric activity date to calculate Directive 013 suspension deadlines. Q1.19. We have quite a few flow tests that were done that came back with a 0.0 million cubic feet per day volume. Is this considered a reportable volume? A1.19. No, from the Petrinex perspective it is not a reportable volume; and from the Well Test Data Capture view, although licensees do report these 0.0 volumes, we do not consider this a "reportable volume" for any of our requirements. Q1.20. If a well is completely abandoned downhole, meaning all zones are abandoned according to Directive 020, but the well is not surface abandoned, do I still need to comply with the Directive 013 requirements? A1.20. Yes, if all zones in a well are fully abandoned as per Directive 020, the licensee must either perform a surface abandonment (cut and cap) of the well within 12 months in accordance with Directive 020 and submit the well license abandonment report in DDS, or suspend the well in accordance with Directive 013. Q1.21. Are we required to report failures that are detected when performing an initial suspension or ongoing inspections on a suspended well? A1.21. Yes. All failures must be reported accompanied by the date that the failure was detected. This includes packer/plug failures gas migration vent flows casing failures wellhead failures Note: For gas migration / surface casing vent flow (GM/SCVF) issues, the licensee must also submit a separate report under Interim Directive (ID) Based on ID , if GM/SCVF FAQ: Directive 013 and Inactive Well Compliance Program 5
10 is classified as Non-serious, the inspection outcome in the Well Licence Suspension Report must indicate Satisfactory because the repair operations of non-serious GM/SCVF can be postponed until well abandonment. If the SCVF/GM is classified as serious, it must be repaired within 90 days in accordance with ID Q1.22. Which wells are excluded from Directive 013 suspension requirements? A1.22. Excluded from Directive 013 suspension requirements are wells with a licence status of Re-Entry, Abandoned, RecCertified, and RecExempt; observation wells; cavern wells with associated scheme approval; geothermal wells (used only for HVAC heating purposes); training wells; and farm wells. Q1.23. Is it a requirement to pressure test a well if it has a rod or a pump jack? A1.23. There is a requirement to make sure everything is properly shut in. If the rod is an issue when it comes to getting a proper pressure test, you will have to remove it. However, if you can get a proper test without removing it, you may leave it in. Q1.24. If the AER approves both class 1A & class II disposal in a well, under which risk category will the well belong? A1.24. It will be the highest risk category. Therefore, the well must be classified as a class 1A under the high-risk category (Directive 013, section 3, table 1). Q1.25. Where a licensee has a well that was drilled in 1975, fully abandoned (downhole and surface) in 1985, and re-entered in 2005, what is the rig release date for that well? A1.25. It will be the most recent date of Q1.26. Is it possible to request an extension to an existing Directive 013 deadline? A1.26. No, under the AER s Compliance Assurance Program, self-disclosures or extensions pertaining to the Inactive Well Compliance Program and Directive 013 requirements will not be accepted (see Bulletin ). Q1.27. What is compliance with Directive 013? A1.27. An inactive well is considered to be compliant with Directive 013 if it meets the following requirements: downhole (if applicable), 6 FAQ: Directive 013 and Inactive Well Compliance Program
11 surface, ongoing inspections, and reporting on DDS under Well Licence Suspension Report Note: You should NOT submit the surface inspections until all downhole work and pressure testing are completed (if applicable). If surface inspection and downhole work (including pressure testing) are conducted on different dates, the latest activity date must be used as an inspection date for DDS reporting. Q1.28. When reactivating medium-risk or high-risk wells, do I need to report a well-pressure test? A1.28. Medium-risk and high-risk wells must be pressure tested before reactivation to ensure wellbore integrity. The licensee must keep the record of the pressure tests on a well file and report it on DDS under Well Licence Suspension Report/Reactivate Well Licence as a mandatory well reactivation submission after the well acquires active status (i.e., it operates for at least1 hour per month for three consecutive months). Q1.29. Is the AER giving any consideration to the fact that a lot of good producing wells are shut in because they are not economical to produce at this time and they will become noncompliant? A1.29. Yes, those considerations are in Directive 013. If the well is not being operated and has not been fully abandoned in accordance with Directive 020, it must be suspended under Directive 013 to ensure public and environmental safety. Q1.30. Where can I find a list of our critical sour wells? A1.30. The list of critical sour wells can be ordered from AER Information Services at [email protected]. Q1.31. Does any suspended well (low risk, medium risk, and high risk) have to be disconnected from associated pipelines? A1.31. Yes, if the well is suspended, it may need to be disconnected from associated pipelines. Directive 013 doesn t specify that the wellhead has to be physically disconnected from the pipeline once the well is shut in and requires suspension (see Directive 013, section 3, table 1): There shall be no wellhead leaks. Regular wellheads require servicing and pressure testing of sealing elements at time of suspension and at each subsequent inspection. All outlets except surface casing vents are to be bull plugged or blind flanged with needle valves. Valves must be functional (open/close). Grease and service as required to maintain functionality. FAQ: Directive 013 and Inactive Well Compliance Program 7
12 However, disconnecting the pipeline from the wellhead is a requirement in the pipeline regulations for discontinuation, Pipeline Rules, section 82: (1) Unless otherwise authorized by the Regulator, a licensee shall discontinue, abandon or return to active flowing service a pipeline that has not seen active flowing service within the last 12 months. (3) When a pipeline or part of a pipeline is discontinued, the licensee shall ensure that the pipeline or the part of the pipeline that is discontinued is (a) physically isolated or disconnected from any operating facility or other pipeline, (b) cleaned, if necessary, (c) purged with fresh water, air or inert gas, any of which may include the addition of internal corrosion inhibitors if the licensee is prepared to mitigate the environmental effects that could occur as a result of accidental release or spillage, (d) protected by suitable internal and external corrosion control measures, (e) not isolated or disconnected in a manner that results in an adjoining operating pipeline having fittings or connection points remaining that would create stagnant fluid traps or dead legs, unless (i) those locations are permanently accessible and subject to a scheduled inspection program, or (ii) the contained fluids are confirmed and documented as being non-corrosive, and (f) left in a safe condition. Q1.32. Which risk category and requirements must be used for SAGD or CSS wells? A1.32. The answer will depend on many factors, such as proximity to a steam chamber, whether steaming operations are in the area, whether there are any well integrity concerns, etc. The current Directive 013 has no specific category for thermal wells. We recommend considering the following when suspending a thermal well and reporting it on DDS: Wells within 300 m of steam-assisted gravity drainage (SAGD) wells: - Suspend with a bridge plug or tubing plug; report it on DDS as Medium Risk suspended Wells within 1000 m of cyclic steam stimulation (CSS) wells: - Suspend with a bridge plug or tubing plug; report it on DDS as Medium Risk suspended. All other wells (including wells that do not penetrate the SAGD/CSS injection zone): - Suspend in accordance with Directive 013, table 1. However, the onus is on the operator to risk assess each well individually and suspend it in accordance with Directive 013 to ensure environmental and public safety. 8 FAQ: Directive 013 and Inactive Well Compliance Program
13 Q1.33. We have a scale inside the tubing, and we were able to pressure test it to 7 megapascals for 10 minutes would that qualify as a tubing plug for medium-risk or high-risk suspension? A1.33. No, the actual tubing plug must be installed to ensure long-term isolation. Q1.34. How can I declassify a critical sour well? A1.34. If the well is licensed as Critical Sour, it must be suspended in accordance with the high-risk category under Directive 013. When the sour zone no longer meets the definition of critical sour (e.g., it is properly abandoned in accordance with Directive 020, the zone is depleted, etc.) the well can be declassified from critical sour under AER ID 90-01, section 5.2. However, until the well licence classification is changed, the well will remain in the high-risk category. Applications for declassification must be submitted to [email protected]. Q1.35. Do inspections need to be reported within 30 days or within 12 months? A1.35. The deadline for an inspection (work completed and reported on DDS) is calculated based on the inspection due date in DDS and moved from a specific date to the end of that calendar year. For example, if a medium-risk well is suspended on April 1, 2015, using a packer and tubing plug, the inspection frequency is three years and the inspection due date would be April 1, The inspection deadline date (that means work completed and reported on DDS) is December 31, If the report is missing on December 31, 2018, the well will be noncompliant with Directive 013 requirements. Q1.36. Is the timeline for re-inspection calculated from the date of last inspection or from the date of last volumetric activity? A1.36. Re-inspection is calculated based on the date of the last inspection. See Q1.35 for more details. Q1.37. Our company has a few wells that were licensed as re-entry wells, but they were never reentered. The well licence status has changed to amended. How does that affect the inactive well list? A1.37. In this case the well will appear on the inactive well licence list as noncompliant. The licensee will have to revert the well licence status back to Abandoned or Reclaimed. For details please contact Directive 056 group at [email protected]. Q1.38. We have a scenario where a well is suspended, and we did an inspection and found that a tubing plug has failed. The inspection outcome is then unsatisfactory with repairs required. We are conducting the necessary repairs. What compliance status is assigned to the well while repairs are ongoing? A1.38. The well will have a status of noncompliant until the repairs have been completed. FAQ: Directive 013 and Inactive Well Compliance Program 9
14 Q1.39. In a scenario in which a well with a five-year inspection cycle was inspected and the inspection outcome was satisfactory, what happens if two years later an AER field inspector inspects it and finds a leak? Since we ve not been required to inspect during that timeframe, how will enforcement be managed in this case? A1.39. The leak will be inspected and investigated for the root cause. The enforcement will be issued under the wellsite inspection compliance category. For the specifics on the compliance assurance process, contact [email protected]. Q1.40. When we remove all the valve handles on the wellhead (instead of chaining and locking), can we leave the removed handles at the wellsite? A1.40. No, all valve handles must be removed from the wellsite or locked inside the secure facility to prevent accidental opening of the well by anyone. Q1.41. Can the pressure gauge be left connected and substitute for the bull plug? A1.41. Yes, leaving the pressure gage connected instead of bull plug will satisfy the Directive 013 requirement to have all outlets except surface casing vents bull plugged or blind flanged with needle valves. However, it is recommended to consider the fragile nature of the pressure gauge, which can be damaged in the winter months or due to an act of vandalism. Q1.42. We have a freshwater well that is completed with the slotted liner. How do we suspend it in accordance with medium risk requirements of Directive 013 (e.g., bridge plug)? A1.42. Freshwater wells are required to be abandoned and reclaimed after being inactive for more than three years in accordance with Water Act section 55. Accordingly, this type of well will never become a medium risk - Type 6 under Directive The Inactive Well Licence List Q2.1. A2.1. Where can I find the Inactive Well Licence List? The Inactive Well Licence List can be downloaded from both the AER website and the DDS system: AER website: (under supplemental information section) DDS: AER > Reports > Licence > View/Download Inactive Well Licence List Note: This report is a list of inactive well licences that become inactive under Directive 013. It is automated and updated daily and requires Microsoft Excel 2007 (or a more recent version). 10 FAQ: Directive 013 and Inactive Well Compliance Program
15 Figure 2: Locating the Inactive Well Licence List on DDS Q2.2. A2.2. Q2.3. A2.3. Who can see the Inactive Well Licence List? Effective March 1, 2016, the inactive well licence list is available to everyone. Refer to Q2.1. What information does the Inactive Well Licence List provide? The columns in the Inactive Well Licence List are Well Licence Number Licensee s Name Licensee s BA Code UWI Well Surface Location AER Field Centre Well Licence Status Final Drill Date Last Volumetric Activity Date Directive 013 Inactive Status Date Industry Reported Suspension Date Next Inspection Due Date Industry Reported Risk Class AER Deemed Risk Class FAQ: Directive 013 and Inactive Well Compliance Program 11
16 Directive 013 Compliance Status Noncompliance Details IWCP marker Additional Information Q2.4. A2.4. How does the Inactive Well Licence List calculate Directive 013 compliance status? Directive 013 compliance status is calculated based on both the information currently reported on the DDS system under Well Licence Suspension Report and on historical volumetric data from Petrinex. The business logic for the Inactive Well Licence List applies Directive 013 requirements to the reported information on DDS and Petrinex and assesses compliance with Directive 013. Note: For Inactive Well Licence List updates, the information from Petrinex is updated monthly; the information from DDS is updated daily. Q2.5. A2.5. What is the Inactive Well Licence List? The Inactive Well Licence List contains the inventory of wells that are inactive in accordance with Directive 013. The list consists of critical sour wells that have had no volumetric activity for six consecutive months, and any other well that has had no volumetric activity for 12 consecutive months. Q2.6. A2.6. In the Inactive Well Licence List, what does the Forecasted Inactive Well List tab provide? The Forecasted Inactive Well List tab in the Inactive Well licence List provides the inventory of wells that could potentially become inactive under Directive 013. The list consists of critical sour wells that have had no volumetric activity for three consecutive months, and any other well that has had no volumetric activity for six consecutive months. Q2.7. A2.7. Q2.8. A2.8. Q2.9. A2.9. If a well has a drilling licence but has never been drilled, is it considered inactive under Directive 013? These wells are considered to be paper wells and are not included on Inactive Well Licence List. After logging into DDS I cannot see the link to download the Inactive Well Licence List; what do I do? Contact your company DDS administrator to get access to this part of DDS. If the AER Deemed Risk Class is showing up as high-risk and we believe that it should be a medium-risk or low-risk well, what could be the reason for the discrepancy? The high-risk category (Directive 013, section 3, table 1) consists of critical sour wells (perforated or not), acid gas wells, and class 1A waste disposal wells. These designations are assigned when the 12 FAQ: Directive 013 and Inactive Well Compliance Program
17 well is either licensed or approved for scheme operations. If a well appears as high risk, that means one of these designations is still assigned to the well. To remove Critical Sour status, a declassification request must be sent to [email protected] in accordance with ID 90-01, section 5.2. If the approval is granted, the licensee will receive a declassification letter and the electronic record of the well will be updated to Declassified Critical Sour. To remove an acid gas designation, either the scheme must be terminated or the well licence must be removed from the scheme. The licensee must submit a request to the Directive 065 group, providing all the supporting documentation to verify the reason for termination. Reasons could be that the licensee has never completed (perforated) the zone approved for acid gas injection, the licensee has never injected acid gas into the approved zone and there are no offset wells in the area that are injecting, or have injected acid gas into the same zone, or the zone with acid gas was completely and fully abandoned in accordance with level-a requirements of Directive 020. After the Directive 065 team reviews and approves the application, the scheme approval gets terminated or the well licence gets removed from the scheme by the Directive 065 group. Q2.10. A2.10. We removed the critical sour or acid gas designation, but the well is still showing up as high-risk on the AER Inactive Well Licence List. Why? The reason could be in one of the following: The licensee had reported the well as high risk on DDS. In this case the AER business rules will default to the licensee reported risk class if it is higher than the AER deemed risk class. Removal of the critical sour or acid gas designations wasn t updated by the AER personnel who issued the approval. Follow up with the AER group that issued the approval to update the well s electronic records. Q2.11. A2.11. We have updated the record with the most recent inspection on the DDS system; however, the Inactive Well Licence List is still showing the well as noncompliant for the reason, Suspension is not reported for the current inactive period. Why? Suspension not reported for current inactive period means that the well doesn t have a suspension report on the AER s DDS system for the most recent inactive period (after the Directive 013 Inactive Status Date ). To address this issue, the well reactivation must be submitted through the DDS system to reflect the latest active period. After that, the suspension records with the correct dates (after Directive 013 Inactive Status Date ) must be resubmitted. FAQ: Directive 013 and Inactive Well Compliance Program 13
18 Q2.12. A2.12. We have fully abandoned the well downhole and at surface (cut and cap) in accordance with Directive 020; however, the well is still showing up on the Inactive Well Licence List. Why? When the well is completely abandoned in accordance with Directive 020, the licensee must submit a well licence abandonment report on DDS. This will change the well licence status to Abandoned and will automatically remove it from the Inactive Well Licence List with its next update. Always verify the well licence status to ensure that it is showing Abandoned ; otherwise the well will remain on the Inactive Well Licence List. Note: The downhole abandonment information must be submitted in accordance with Directive 059 prior to the well licence abandonment (Directive 020 submission). To submit a well licence abandonment report, please log into DDS under AER>Submissions>Licence Abandonment>Submit Well Licence Abandonment Report Q2.13. A2.13. We have an old well that we know has been fully abandoned in accordance with Directive 020 (downhole and surface), but we cannot find the record for it. What do we do? The licensee will have to conduct a gas migration test to confirm that the well is not leaking. Every effort should be made to track down the original surface abandonment information. You may want to try pulling the files at the Core Research Centre to see if you can find anything. If there is absolutely no information, you must complete the following: Locate the well using the well coordinates, and confirm the location using a metal detector. Conduct a gas migration (GM) test to ensure that there is no indication that the well is leaking (infrared method is acceptable) If vegetation distress is noted, investigate the well further, and if the well is identified to have active gas migration, repair the well. The licensee must keep a record of the GM tests (in-house) in case the well is ever selected for audit. For the DDS submission, you will need to enter the date on which you located the well and completed the GM test. Please use the recent GM test date for the required SCVF Test Date or Static Fluid Level Test Date field in the DDS system. Also, in the comments field of your DDS submission, clarify the situation with respect to the lack of data and the recent site inspection and testing. 14 FAQ: Directive 013 and Inactive Well Compliance Program
19 Q2.14. A2.14. Q2.15. A2.15. Q2.16. A2.16. Q2.17. A2.17. Why is our currently producing well listed as noncompliant due to Inactive well reported as reactivated? A well attains active status after it has operated for a minimum of 1 hour per month for 3 consecutive months. Therefore, noncompliance reason Inactive well reported as reactivated means that the licensee submitted the well reactivation report on DDS before obtaining the active status (i.e., 1 hour per month for three consecutive months). As soon as the well meets the reactivation criteria, it will automatically be removed from the inactive well licence list. Why is the well listed as noncompliant due to Failure Repair Completed Date not submitted? This is because the latest inspection outcome submitted in DDS indicates Repair required. This means that during the last inspection some deficiencies were identified under Directive 013 requirements but haven t been repaired yet. The noncompliant status will remain for the well until the deficiencies are repaired and the well inspection report is updated, respectively, indicating repair completed date We have a reclamation certificate for the well. Why the well showing up on the Inactive Well Licence List? The well is missing a well licence abandonment report (cut and cap), and as result the well licence status hasn t been changed to RecCertified. Please submit a well licence abandonment report on DDS as per Directive 020 (see also Q2.12 in this section). Why are some of our observation wells showing up in the Inactive Well Licence List? The status of a well is changed to OBSERVATION through Petrinex (by the licensee), and it could possibly require a licence amendment under Directive 056. Once the status has been changed to OBSERVATION, the well will automatically be excluded from the Inactive Well Licence List on DDS. If the well is still listed on Inactive Well Licence List, the licensee needs to verify the submission on Petrinex. Please refer to Q1.6 in the Directive 013 section of this document for details. Q2.18. A2.18. Q2.19. Why are some of our cavern wells included in the Inactive Well Licence List and some of them not? Only the cavern wells with a scheme approval are excluded from the Inactive Well Licence List. On the Inactive Well Licence List, why is the Directive 013 Inactive Status Date is older than the Last Volumetric Activity Date? Is it 6 or 12 months after the last volumetric activity date? FAQ: Directive 013 and Inactive Well Compliance Program 15
20 A2.19. The Inactive Well Licence List logic accesses the historical volumetric data from Petrinex and identifies the periods with no volumetric activity for 6 or 12 consecutive months (based on the risk category of the well). This determines the Directive 013 inactive status date. If after the Directive 013 inactive status date, the well has reported some volumetric activity but not enough to meet the reactivation criteria of Directive 013, section 4, the inactive status date will remain. Q2.20. A2.20. We have reported the suspension on Petrinex. Why is the well still showing up as noncompliant on the Inactive Well Licence List? To comply with Directive 013, a well licence suspension report must be submitted on DDS. Please refer to Directive 013, section 8. Petrinex is a system that collects the volumetric data and status for individual production events. One well can have several production events. The DDS system collects data based on the well licence number as required by AER directives (including Directive 013). Petrinex and DDS are two different systems and support two separate processes. There is no direct link between two submissions. Q2.21. A2.21. Q2.22. A2.22. Q2.23. A2.23. We have sold a well to a different licensee. Why is it still showing up as ours on the Inactive Well Licence List? This is a well licence transferring issue and must be addressed by the Liability Management Group ( [email protected]). Until the well licence status is changed (e.g., to Re-entry ) or transfer is completed, the current licensees must ensure that the well is properly suspended in accordance with Directive 013. How can I clarify the specific reason for why the well is noncompliant on the inactive well licence list? The estimated reason of noncompliance is provided in the Noncompliance details column of the inactive well licence list. It is as accurate as the information that is reported under Directive 013. It is a licensee s responsibility to complete a full review of the inactive well and Directive 013 to ensure compliance. Do we have to suspend wells that are on the forecasted inactive well list, and will it keep those from being transferred to the Inactive Well Licence List? No, the wells listed on the forecasted inactive well list don t have to be suspended until they become inactive under Directive 013. The forecasted inactive well list contains wells that could potentially become inactive in accordance with Directive 013 and is provided to help licensees with operational planning of the Directive 013 activities (also see Q2.6). 16 FAQ: Directive 013 and Inactive Well Compliance Program
21 3. The Digital Data Submission (DDS) System Q3.1. A3.1. Where can I find the link to the AER DDS system? The link to the AER DDS system is on the AER website under Systems & Tools : Figure 3: Locating the link to the DDS system. Q3.2. A3.2. Q3.3. How do I access DDS? Each licensee has its own DDS administrator login credentials and its own person assigned as DDS administrator. To access DDS, contact your company s DDS administrator for the login name and password. Where do I submit the well licence suspension report on DDS? A3.3. Once you logged in, on the left-side menu under AER > Submissions > Licence Suspension > Submit Well Licence Suspension Report (see figure 4). FAQ: Directive 013 and Inactive Well Compliance Program 17
22 Figure 4: Locating the well licence suspension report menu Q3.4. Which menu item is for the well licence suspension submission? A3.4. Manage well licence suspension (see figure 5): Figure 5: Licence suspension menu items 18 FAQ: Directive 013 and Inactive Well Compliance Program
23 Q3.5. Do I have to complete all five tabs when submitting a well licence suspension? A3.5. Yes, all five tabs must be completed (see figure 6): Figure 6: Well licence suspension report window Q3.6. A3.6. Q3.7. A3.7. Is there a general help file for the well licence suspension part of DDS? Yes, the help file notes are on each page and are marked as Help. They are typically located at the upper right corner of the page. When trying to update the suspension details with a new Suspension Class and Well Operational Type it is greyed out and I am unable to edit it. How can I update this information? To allow this correction of the Suspension Details tab, licensees must identify this as an operation change as follows (see also the screenshot below): 1. Go to the Inspection List tab. 2. Click on the latest inspection record link. 3. Set Operation Changes from No to Yes (in the right lower corner). 4. Click Update List in the middle of the screen. 5. Click OK to the pop-up window. 6. Go back to Suspension Details tab and update the information as needed. 7. Click Submit to save the changes. FAQ: Directive 013 and Inactive Well Compliance Program 19
24 Figure 7: Setting the Operation Changes to allow suspension details to be updated Q3.8. A3.8. When trying to submit the inspection for a low-risk well (as per Directive 013 calculations), the DDS pop-up notification window identifies this well as medium risk type 6, and doesn t allow the inspection to be submitted under the low-risk category. Why is this happening, and how can I correct the well licence suspension report? Suspension Date submitted in the well licence suspension report is used by the DDS system for calculating 10 years for low-risk well to become medium-risk type 6. If the deadline passes, the system doesn t allow any records to be submitted under the low-risk category. To address this issue, please submit a reactivation report (reactivate on DDS) for this well licence indicating in the comments section the following: DD-MONTH-YYYY [Your Name] Reactivated to submit most recent low-risk inspection Then resubmit the suspension report with correct information and dates (suspension date must be the date of the last inspection). Also refer to Q1.11 in the Directive 013 section of this document for details on how to calculate medium-risk type 6 timelines. Q3.9. A3.9. I have accidentally submitted the incorrect inspection information. How can I delete this single inspection report and submit the correct one? A single well inspection report cannot be deleted. To address this issue, in the inspection comments please indicate that an inspection was incorrectly submitted: 20 FAQ: Directive 013 and Inactive Well Compliance Program
25 Invalid inspection report due to incorrect data submission Then submit the correct inspection report on top of the incorrect one. The Inactive Well Licence List logic will only consider the most recent inspection record (by submission date). Q3.10. I have accidentally submitted a well licence suspension report from a different well licence number. How can I remove this report and submit the correct one? A3.10. The well licence suspension report can no longer be deleted by either the AER or the licensee. To address this issue, please submit the reactivation report (reactivate on DDS) for this well licence indicating in the comments section the following: DD-MONTH-YYYY [Your Name] Reactivated to remove the incorrect data submission from a different well licence Then resubmit the suspension report with correct information and dates. Inactive Well Licence List logic will only consider the current well licence suspension report. Q3.11. When submitting suspension details for the medium-risk type 6 category on wells that were low-risk type 1, what do I indicate for the downhole operation? A3.11. For the downhole operation on a low-risk type 1 migrated to a medium-risk type 6, the Cement plug option should be chosen. Q3.12. What date should be entered in the Suspension Date field on DDS? A3.12. The date when suspension operations are fully completed according to the requirements of Directive 013. Q3.13. If a well suspension is late, should we backdate the Suspension Date to compensate for an incorrect 10-year maturation date calculated by DDS? A3.13. No, you must always enter the correct suspension date (the date when the suspension was completed). Q3.14. We are working on a full well-status audit and have come across several wells that are suspended in the field but that were never reported on DDS. Should we be backdating the suspension to the actual date that the well was suspended? A3.14. Yes, the Suspension Date must always indicate when the actual work was done. Q3.15. On the DDS there is a question under "Suspension Details" Gas over bitumen well Yes or No? When answering this question, are you asking if this well is in a GOB area i.e. Athabasca oil sands area, Cold lake oil sands area? Or are you asking has this well been ordered Shut-in due to GOB? FAQ: Directive 013 and Inactive Well Compliance Program 21
26 A3.15. See the DDS online guide, Using the Suspension Details Screen. It reads, Indicate if there is gas over bitumen using the Gas Over Bitumen list. The Gas Over Bitumen List is found on the AER Website. All of the content for the Gas Over Bitumen (or Bitumen Conservation) can be found here: Q3.16. There is a View/Edit Suspension List option in the DDS Well Licence Suspension Menu Selection area. Can you confirm my understanding that this list is inaccurate and that the Inactive Well Licence List is correct? A3.16. Yes, View/Edit Suspension List doesn t contain all the suspended wells and should be used with caution (see figure 5). It is recommended to use the Inactive Well Licence List (see section 2 of these FAQs) as it is correct and contains all the wells that are currently inactive under Directive 013. Q3.17. In DDS under inspection details it states No is equivalent to Not Tested for the casing failure, packer/plug failure, wellhead failure, and gas migration / vent flow (see figure 7). The choices are Yes or No. Are these tests not mandatory? Does anything flag if they say No? A3.17. Casing failure and packer/plug failure tests are mandatory for wells that require pressure testing in accordance with Directive 013. Wellhead testing is mandatory for all wells. It is recommended to test all wells for surface casing vent flow / gas migration at the time of initial suspension and any subsequent inspection. If any failures are identified, it must be reported as Yes under well licence suspension report. SCVF/GM and casing failures must also have a separate report completed in accordance with ID (also see Q1.21). 4. The Inactive Well Compliance Program (Bulletin ) Q4.1. What will change in the Inactive Well Licence List on April 1, 2015? A4.1. Q4.2. A4.2. Q4.3. On April 1, 2015, the Inactive Well Licence List will have added an additional column named IWCP. This column will have only Y or N options for each individual well and will indicate which wells are part of the Inactive Well Compliance Program. How will the AER notify the licensee about the IWCP annual target quotas? Each licensee will be receiving a notice of noncompliance letter by registered mail or by (if registered with the IWCP team at [email protected]) as well as through the IWCP annual target quotas and progress report (published on the AER website on April 1, 2015). Which wells will be marked as IWCP on the Inactive Well Licence List? A4.3. All noncompliant inactive wells with Directive 013 on April 1, Q4.4. A4.4. Are the exemption approvals that were previously approved by the AER still valid? The licensee is required to submit documentation showing the exemption as soon as possible. The AER will review each exemption on a case-by-case basis and decide whether the exemption 22 FAQ: Directive 013 and Inactive Well Compliance Program
27 conditions have been met. Requests must be submitted to Until the exemption is reviewed and acknowledged by the AER, the well will remain subject to current Directive 013 requirements and compliance assurance process. Q4.5. A4.5. How do I calculate my company s IWCP annual target quota? The IWCP annual target quota is calculated as follows: Note: Selling, purchasing, or transferring wells (compliant or noncompliant) does not contribute to meeting a yearly quota. Also, the fifth-year inventory includes Annual Target Quota wells and all noncompliant IWCP wells acquired by the licensee during the last two years of the program. Q4.6. A4.6. Q4.7. Why does selling wells not contribute to meeting the IWCP annual target quota? The IWCP goal is to address the backlog of noncompliant inactive wells under Directive 013 with a 20 per cent reduction industry-wide per year. Selling wells creates a risk of all wells being left with a few licensees in the last year of the IWCP, and potentially becoming orphan. Would it be possible to get the slide from the IWCP information sessions explaining potential scenarios for the IWCP annual target quotas? FAQ: Directive 013 and Inactive Well Compliance Program 23
28 A4.7. Here is the slide: Q4.8. A4.8. Q4.9. A4.9. Q4.10. I am confused by what is meant by April 1st of each year. Could you clarify? This means that you have to meet your IWCP annual target quota by March 31 of each year; on April 1 the new quota begins. This is based on the AER fiscal year. Once a licensee has been given the IWCP annual target quota, if there are circumstances preventing them from bringing those wells into compliance, will the AER be giving any consideration to that? No, the program is designed to be flexible from the beginning. The licensee can choose what wells they want to work on each year. If the licensee fails to meet the annual target quota, the AER will issue a response in accordance with Compliance Assurance Program. If the licensee brings as many wells as possible into compliance with Directive 013 before April 1, 2015, would that contribute to meeting 20 per cent for each year? A4.10. It will reduce an overall inventory of wells that will be marked as IWCP and as a result will reduce the number of wells in each year s IWCP annual target quota. Q4.11. Will we be able to submit an extension request if we are unable to meet the IWCP annual target quota? A4.11. No. Please refer to Bulletin : 24 FAQ: Directive 013 and Inactive Well Compliance Program
29 Under the AER s Compliance Assurance Program, self-disclosures or extensions pertaining to IWCP and Directive 013 requirements will not be accepted. Q4.12. Will the Inactive Well Compliance Program introduce any new suspension requirements for inactive wells? A4.12. No, the Inactive Well Compliance Program is designed to address the backlog of noncompliant wells with Directive 013. The actual suspension requirements are in Directive 013. Q4.13. When we look at the Inactive Well Licence List there are wells that are marked as part of the program but they show as compliant. Is that because of the changes made to Directive 013? A4.13. Yes, due to the following three changes made to Directive 013 compliance logic on the Inactive Well Licence List, a number of wells became compliant on April 1, 2015: Suspension deadline The suspension deadline date is now 12 months after the inactive status date. The well is required to be suspended and reported on DDS in accordance with Directive 013 by the suspension deadline. For example, if the well becomes inactive on April 21, 2015, the suspension deadline date for completing the suspension work and reporting it on DDS is April 21, Inspection deadline The deadline for inspections will be calculated based on the inspection due date in DDS and moved from a specific date to the end of that calendar year. For example, if the medium-risk well is suspended on April 1, 2015, using a packer and tubing plug, the inspection frequency is three years and the inspection due date would be April 1, The inspection deadline date will be December 31, 2018 (see figure 8). Reactivation criteria For a well to attain active status and be reactivated on DDS, it must report volumetric activity for at least one hour per month for three consecutive months. These wells were included in the IWCP inventory because these changes were not introduced until April 1, 2015, which didn t provide enough time to all licensees for the operational planning of Directive 013 activities. FAQ: Directive 013 and Inactive Well Compliance Program 25
30 March 15, 2015 Inactive Status Date Licensee has completed initial suspension Ongoing inspection Due Date Inspection frequency (e.g. 3 years) March 15, 2014 Last Volumetric Activity Date March 15, 2016 Initial suspension Deadline Date (completed and reported on DDS) December 31, 2018 Ongoing inspection Deadline Date (inspection completed and reported on DDS) TIME Figure 8: Calculating ongoing inspection deadlines Q4.14. Will wells marked as IWCP and compliant on April 1, 2015, count toward our first year IWCP annual target quota? A4.14. No, the IWCP annual target quota is always calculated based on the amount of IWCP noncompliant wells as of April 1 of each year divided by the number of years left in the program. Q4.15. If more than 20 per cent of a licensee s total IWCP inventory is made to be compliant this year, will that decrease the quota required in future years? A4.15. Not directly. The IWCP annual target quota for the next year is calculated from the number of IWCP noncompliant wells on April 1 of each program year divided by the number of years remaining in the program. Q4.16. Where can I find the IWCP annual target quotas and progress report? A4.16. The IWCP annual target quotas and progress report can be downloaded from the DDS system and requires Microsoft Excel 2007 (or a more recent version). It can be found at AER > Reports > Licence > View/Download Inactive Well Licence List (see figure 9). Note: This report is updated every six months during the first weeks of October and April of each IWCP year. 26 FAQ: Directive 013 and Inactive Well Compliance Program
31 Figure 9: Locating the IWCP annual target quotas and progress report on DDS Q4.17. We have completed our target quota for this year. Can we get a formal confirmation letter from the AER that we are compliant with IWCP requirements for this year? A4.17. Compliance confirmation letters will not be issued during the program year. All licensees that have met their IWCP target quotas for the year will be receiving a Compliance Achieved letter from the AER distributed between April 1 and April 30 of each IWCP year. Q4.18. We have completed our target quota for this year; however, before the March 31 deadline we sold some of our compliant wells to another licensee. How can we obtain credit for the work that was conducted? A4.18. The Inactive Well Compliance Program was designed to exclude wells that were transferred, purchased, or sold. On April 1 of each IWCP year, the AER will conduct a review and calculate the compliance status not including wells that were transferred, purchased, or sold during the year. When a licensee is found to be noncompliant with meeting the IWCP annual target quota, the AER will issue a Notice of Noncompliance Failure to Comply letter, indicating the number of outstanding wells to meet the target quota. To include compliant wells that were sold or transferred out after the work was completed for the current IWCP year, the licensee must submit the following information in response to the AER failure to comply letter: a. A copy of the AER inactive well licence list dated April 1 of the current calendar year with the following requirements: The list must contain ONLY the wells that have been transferred/sold and that are to be taken into consideration to fulfil the IWCP annual target quota. Abandoned or reactivated FAQ: Directive 013 and Inactive Well Compliance Program 27
32 wells must be added to the list along with the well licence number, UWI, surface location, licensee name, and BA code of the company the wells were transferred or sold to. All wells on the list must comply with Directive 013 requirements on April 1 of the current calendar year. The Directive 013 compliance status on the AER Inactive Well Licence List on April 1 of the current calendar year must indicate Compliant for all wells that were not abandoned or reactivated. b. Copies of the DDS submission confirmation for each well (i.e., the DDS well licence suspension report, the DDS well licence reactivation report, or the DDS well licence abandonment report, whichever applies) c. The current wellbore schematic for each well on the list d. Well site photos (at least one photo per well site) for each well individually, verifying surface compliance in accordance with Directive 013. The photo must include the well licence number, the UWI, and the date on which it was taken. The information must be submitted to [email protected] with the subject line indicating Compliant IWCP Year [x] transferred wells. Once the information has been reviewed, the licensee will receive an AER response indicating whether the request was granted. 5. General inquiries Q5.1. A5.1. Q5.2. A5.2. Q5.3. A5.3. How often are the FAQs updated? FAQs are updated regularly, based on the number of questions pending to be added to it. The history of updates can be tracked through the table of updates in section 6 of this document. How many Q&A sessions is the AER providing, and is it an ongoing activity? Yes, Q&A sessions are an ongoing activity and are designed to address any questions related to Directive 013, the Inactive Well Compliance Program, the Inactive Well Licence List, and suspension submissions on the AER s Digital Data Submission (DDS) system. Q&A sessions are offered monthly in the online and in-house formats. For details, please visit the Directive 013 page on the AER website. What if after attending the Q&A session I have another question, do I have to attend another Q&A session? Yes, you are required to register and attend one of the next available sessions to ask any questions related to Directive 013, the Inactive Well Compliance Program, the Inactive Well Licence List, or suspension submissions on the DDS system. 28 FAQ: Directive 013 and Inactive Well Compliance Program
33 To improve the effectiveness and efficiency of the compliance assurance and surveillance efforts, effective March 5, 2015, the AER is no longer responding to Directive 013 and Inactive Well Compliance Program questions by or by telephone. All questions related to Directive 013, the Inactive Well Compliance Program, the Inactive Well Licence List, and suspension submissions on the AER Digital Data Submission system must be addressed through the ongoing preregistered information sessions. Before attending one of the sessions, please read Directive 013, Bulletin , and related FAQs and make sure that your questions are not already answered in one of these documents. For details, please visit the Directive 013 page on the AER website. Q5.4. A5.4. How do I cancel my registration for Q&A session? Please contact Eventbrite for the specific instructions ( or visit the following link: 6. Table of Updates Release date Sections updated Questions added/edited Feb. 24, 2015 N/A (original release) N/A 1 Directive 013: Suspension Requirements for Wells 1, 11, 14, 35, 36, 37, 38, 39 2 The Inactive Well Licence List 1, 6, 20, 23 May 28, The Digital Data Submission System 16 4 The Inactive Well Compliance Program (Bulletin ) 13, 14, 15, 16 5 General inquiries 1, 2, 3, 4 1 Directive 013: Suspension Requirements for Wells 3, 4, 7, 9, 11, 21, 22, 27, 28, 32, 36, 40, 41, 42 March 11, The Inactive Well Licence List 1, 2, 3,12, 13, 14, 15, 20, 21, 23, 3 The Digital Data Submission System 8, 15, 17 4 The Inactive Well Compliance Program (Bulletin ) 5 General inquiries 2, 3 2, 13, 16, 17, 18 FAQ: Directive 013 and Inactive Well Compliance Program 29
DDS Basic User Manual v 1.1 (May 2013) DDS USER GUIDE
DDS USER GUIDE This is a guide for the basics of DDS, setting up users etc.. For more details on each submission section Please refer http://www.aer.ca/ search for the users guides available. ALBERTA ENERGY
Directive 059: Well Drilling and Completion Data Filing Requirements
Directive 059 Directive 059: Well Drilling and Completion Data Filing Requirements December 19, 2012 Effective June 17, 2013, the Energy Resources Conservation Board (ERCB) has been succeeded by the Alberta
The Inactive Well Compliance Program: Alberta s latest attempt to bring the inactive well problem under control 1.
The Inactive Well Compliance Program: Alberta s latest attempt to bring the inactive well problem under control 1 Barry Robinson 2 On July 4, 2014, the Alberta Energy Regulator ( AER ) announced the Inactive
number 2) proposed well's type, location, elevation, total depth, etc. 3) site inspection, 2) assess the adequacy of the proposed engineering
APPENDIX 8 - FORMS USED IN THE OIL, GAS AND SOLUTION MINING PROGRAM Application for Permit to Drill, Deepen, Plug Back or Convert a Well Subject to the Oil, Gas and Solution Mining Law (185-12-5). - Applicant
10 Wireline operations
10 WIRELINE OPERATIONS... 1 10.1 GENERAL... 1 10.2 WELL BARRIER SCHEMATICS... 1 10.3 WELL BARRIER ACCEPTANCE CRITERIA... 1 10.3.1 Well control equipment configuration... 1 10.3.2 Deployment of toolstrings...
Tax Executives Institute
Tax Executives Institute Texas Oil and Gas Transactions May 6, 2013 Circular 230 disclaimer Any US tax advice contained herein was not intended or written to be used, and cannot be used, for the purpose
Directive 042: Measurement, Accounting, and Reporting Plan (MARP) Requirement for Thermal Bitumen Schemes
Directive 042 Directive 042: Measurement, Accounting, and Reporting Plan (MARP) Requirement for Thermal Bitumen Schemes September 6, 2006 Effective June 17, 2013, the Energy Resources Conservation Board
Owner-User Pressure Equipment Integrity Management Requirements
the pressure equipment safety authority Owner-User Pressure Equipment Integrity Management Requirements AB-512 Edition 2, Revision 0 Issued 2015-06-25 Owner-user Pressure Equipment Integrity Management
The Pipelines Regulations, 2000
PIPELINES, 2000 P-12.1 REG 1 1 The Pipelines Regulations, 2000 being Chapter P-12.1 Reg 1 (effective April 1, 2000) as amended by the Statutes of Saskatchewan, 2014, c.21. NOTE: This consolidation is not
Incident Reporting Requirements
Incident Reporting Requirements Directive PNG014 February 2016 Revision 1.0 Governing Legislation: Acts: The Oil and Gas Conservation Act The Pipelines Act, 1998 Regulations: The Oil and Gas Conservation
The WOGCC has 41 full-time employees, an Assistant Attorney General, and a contracted hydrogeologist.
Wyoming Oil & Gas Conservation Commission Strategic Plan Update: January 1, 212 through December 31, 212 Quality of Life Result: Wyoming s natural resources are managed to maximize the economic, environmental
Operating Criteria: Resource Recovery Requirements for Oil Sands Mine and Processing Plant Operations
Directive 082 Release date: April 11, 2016 Effective date: April 11, 2016 Replaces previous edition issued February 13, 2013 Operating Criteria: Resource Recovery Requirements for Oil Sands Mine and Processing
Accounts. Step by Step Data Setup Wizard and How to Guide. online
online Accounts Step by Step Data Setup Wizard and How to Guide Main Tel. 0845 450 7304 Support Tel. 0844 484 9412 Email [email protected] Free 30day trial www.liquidaccounts.com Page 1 Online Accounts
Frequently Asked Questions
Frequently Asked Questions Administrator Functions How do I add a new employee to my organization? As an administrator, select Add User from the drop down option under the Administrator tab. If the new
SMALL GAS OPERATOR OPERATION AND MAINTENANCE PLAN
SMALL GAS OPERATOR OPERATION AND MAINTENANCE PLAN Facility Name: Address: QUALIFIED PERSONNEL All tasks shall be completed by a person that is qualified to that task (see operators qualification of individuals
MEETINGONE ONLINE ACCOUNT MANAGEMENT PORTAL ACCOUNT ADMIN USER GUIDE
MEETINGONE ONLINE ACCOUNT MANAGEMENT PORTAL ACCOUNT ADMIN USER GUIDE CONTENTS Description of Roles... 4 How to Login... 4 Select a Role... 5 Overview of Tabs... 6 Home Tab... 7 Account Profile Tab... 7
e@syfile TM Employer USER GUIDE
e e@syfile Employer User Guide e@syfile Employer User Guide e@syfile Employer User Guide e@syfile Employer User Guide 2012 e@syfi e@syfile TM Employer USER GUIDE MAY 2012 I r User Guide e@syfile Employer
Plug and Abandonment Forum
Plug and Abandonment Forum Developments in Non-Traditional Plug and Abandonment Methods Thomas Ferg ConocoPhillips Norway June 13, 2013 Efficient P&A Thoughts - Do as Much as Possible Without a Rig Remove
Electronic Reporting of Drinking Water Quality Monitoring Information. User Manual for Drinking Water Operators. Web Form Data Submission
Electronic Reporting of Drinking Water Quality Monitoring Information User Manual for Drinking Water Operators Web Form Data Submission Prepared by: Alberta Environment Environmental Assurance Monitoring,
Employer Portal User Guide Last Updated: October 2015
Employer Portal User Guide Last Updated: October 2015 San Francisco City Option PO Box 194367 San Francisco, CA 94119-4367 Phone: 1(415) 615-4492 Fax: 1(415) 615-4392 Email: [email protected]
USB Driver INSTALLATION GUIDE 6 NOVEMBER 2013 RIGHT SOLUTIONS RIGHT PARTNER D0002065-B
USB Driver INSTALLATION GUIDE D0002065-B 6 NOVEMBER 2013 RIGHT SOLUTIONS RIGHT PARTNER Omega Well Monitoring ALS Oil & Gas 105 1437 47 Avenue NE Calgary, AB Canada T2E 6N7 T: +1 403 232 1400 F: +1 403
Bizconferencing Service
Bizconferencing Service Welcome! Thank you for using Dialog Bizconferencing Service, the flexible and cost effective Conference Solution that is secure and easy to use anytime, anywhere! This requires
PaymentNet Federal Card Solutions Cardholder FAQs
PaymentNet Federal Card Solutions It s easy to find the answers to your questions about PaymentNet! June 2014 Frequently Asked Questions First Time Login How do I obtain my login information?... 2 How
Wayland Student & Adjunct Email Account Instructions
Wayland Student & Adjunct Email Account Instructions Wayland Baptist University (WBU) provides email accounts to students and adjunct professors. These email accounts are an official form of communication
Security, Audit, and e-signature Administrator Console v1.2.x
Security, Audit, and e-signature Administrator Console v1.2.x USER GUIDE SAE Admin Console for use with: QuantStudio Design and Analysis desktop Software Publication Number MAN0010410 Revision A.0 For
Payco, Inc. Evolution and Employee Portal. Payco Services, Inc.., 2013. 1 Home
Payco, Inc. Evolution and Employee Portal Payco Services, Inc.., 2013 1 Table of Contents Payco Services, Inc.., 2013 Table of Contents Installing Evolution... 4 Commonly Used Buttons... 5 Employee Information...
Council of Ontario Universities. COFO Online Reporting System. User Manual
Council of Ontario Universities COFO Online Reporting System User Manual Updated September 2014 Page 1 Updated September 2014 Page 2 Table of Contents 1. Security... 5 Security Roles Defined in the Application...
eopf Release E Administrator Training Manual
eopf Release E Administrator Training Manual i The United States Office Of Personnel Management eopf Administrator Training Manual for eopf v5 eopf Version 4.1, July 2007, March 2008, March 2009; eopf
BOWLING CENTER INSPECTIONS MANUAL
BOWLING CENTER INSPECTIONS MANUAL Revised January 2008 CONTENTS Page I Introduction 3 II Local Association Inspection Team...4 Appointment & Qualifications of Team Members Establishing Policies Liability
ARIBA Contract Management System. User Guide to Accompany Training
ARIBA Contract Management System User Guide to Accompany Training Technical Training Team 6/29/2010 Table of Contents How to use this Guide... 4 Contract Management Process... 5 ARIBA- Getting Started...
Frequently Asked Questions for logging in to Online Banking
Frequently Asked Questions for logging in to Online Banking Why don t I recognize any of the phone numbers on the Secure Code page? I can t remember my password; can I reset it myself? I know I have the
How to Benchmark Your Building. Instructions for Using ENERGY STAR Portfolio Manager and Southern California Gas Company s Web Services
How to Benchmark Your Building Instructions for Using ENERGY STAR Portfolio Manager and Southern California Gas Company s Web Services This document is a quick-start guide for entering your property into
Microsoft Office via Office 365 Subscription Download/Install Instructions and Frequently Asked Questions
Download and Installation for Windows or Mac Computer 1. Sign into your Olivet email account at http://email.olivet.edu. (Note: If you need assistance getting into your Olivet email, you must contact the
Table of Contents. Access this document and other HRIS information at http://ai.catholic.net.au/hris Page 1
Table of Contents 1. Introduction... 2 2. General... 3 2.1 What is a Secret Question and Answer... 3 2.2 Set up Secret Question and Answer... 4 2.3 General Questions... 6 3. Home Portal... 7 3.1 Mail Inbox...
(Adopted July 7, 1989)(Amended December 7, 1990) (Amended May 13, 1994) FUGITIVE EMISSIONS OF VOLATILE ORGANIC COMPOUNDS
(Adopted July 7, 1989)(Amended December 7, 1990) (Amended May 13, 1994) RULE 1173. FUGITIVE EMISSIONS OF VOLATILE ORGANIC COMPOUNDS (a) (b) Purpose This rule is intended to control volatile organic compounds
This procedure is used by the Staff Member to certify their monthly time statement.
Purpose This procedure is used by the Staff Member to certify their monthly time statement. Reference Factsheets contain additional information on the different eligibility and documentation requirements
ONTARIO REGULATION proposed to be made under the
Caution: This draft regulation is provided solely to facilitate dialogue concerning its contents. Should the decision be made to proceed with the proposal, the comments received during consultation will
The United States Office Of Personnel Management eopf System Administrator Training Manual for eopf Version 4.0.
The United States Office Of Personnel Management eopf System Administrator Training Manual for eopf Version 4.0. Copyright 1994-2007 by Northrop Grumman. All rights reserved. Northrop Grumman, the Northrop
The United States Office Of Personnel Management eopf Human Resources Specialist Training Manual for eopf Version 4.0.
The United States Office Of Personnel Management eopf Human Resources Specialist Training Manual for eopf Version 4.0. Copyright 1994-2007 by Northrop Grumman. All rights reserved. Northrop Grumman, the
AARP Medicare Supplement Program. Information Guide. Alabama Launch. 1 For internal use only
AARP Medicare Supplement Program Information Guide Alabama Launch 1 Table of Contents How to enroll with Healthy Contributions...3-5 AARP Medicare Supplement Program at a glance.....6 Fitness Incentive
OIL SANDS CONSERVATION RULES
Province of Alberta OIL SANDS CONSERVATION ACT OIL SANDS CONSERVATION RULES Alberta Regulation 76/1988 With amendments up to and including Alberta Regulation 119/2016 Office Consolidation Published by
Bulletin 2015-15. 2015 AER Administration Fees (Industry Levy)
Bulletin 2015-15 May 6, 2015 2015 AER Administration Fees (Industry Levy) Energy Regulation Program The Alberta Energy Regulator (AER) regulates energy resource development within Alberta and has a mandate
Getting Started with the DCHR Service Desk. District Service Management Program
Getting Started with the DCHR Service Desk District Service Management Program October 30, 2008 Contacting the District Service Management Group You can access the District Service Management group s website
DSS Electronic Facility Clearance System (e-fcl) Submission Site User Guide
U. S. Department of Defense Defense Security Service Industrial Security Program DSS Electronic Facility Clearance System (e-fcl) Submission Site User Guide June 2013 Version 7.2 1 e-fcl Submission Site
Answers to Cardmember questions about Online Services and statement delivery.
Answers to Cardmember questions about Online Services and statement delivery. For more information, please contact your Program Administrator or Customer Service. Online Statements What is an Online Statement?
WebBidder Draft User Guide for 800MHz and 2.6GHz mock auctions
WebBidder Draft User Guide for 800MHz and 2.6GHz mock auctions November and December DotEcon Ltd 17 Welbeck Street London W1G 9XJ www.dotecon.com Introduction i Content 1 Part 1 Navigation and basic functionality
Client Ordering and Report Retrieval Website
1165 S. Stemmons Frwy. Suite 233 Lewisville, TX 75067 800-460-0723 Client Ordering and Report Retrieval Website The Reliable Reports Client Ordering Website allows client users to submit, view, and retrieve
College Faculty Salary & Credentialing System User Document 1
WELCOME! The College Faculty Salary and Credentialing System has been developed to streamline the process of Salary Placement and Credentialing submission, review, and approval. Features include: Secure
Customer admin guide. UC Management Centre
Customer admin guide UC Management Centre June 2013 Contents 1. Introduction 1.1 Logging into the UC Management Centre 1.2 Language Options 1.3 Navigating Around the UC Management Centre 4 4 5 5 2. Customers
E-mailing a large amount of recipients
E-mailing a large amount of recipients DO NOT use the TO or CC field! If you have a large list of recipients you need to send an email you, you should never try sending one large email with all of the
Control of Hazardous Energy (Lockout / Tagout)
WAUKESHA COUNTY TECHNICAL COLLEGE Control of Hazardous Energy (Lockout / Tagout) Release Date: March 26, 2012 Revision Date: March 26, 2012 Revision Level: 1 TABLE OF CONTENTS Purpose... 1 Scope... 1 Responsibilities...
Electronic Ticket System
UNIVERSITY OF GEORGIA Electronic Ticket System New Options Available as of January 2010 Insert the complete email address (valid UGA address only) instead of the UGA MyID to send tickets to Approvers.
PayPal Integration Guide
PayPal Integration Guide Table of Contents PayPal Integration Overview 2 Sage Accounts Setup 3 Obtaining API credentials from PayPal 4 Installing Tradebox Finance Manager 5 Creating a connection to PayPal
Wellbore Integrity Restoration Services
Wellbore Integrity Restoration Services New Life for Mature Wells Optimize and extend recovery with cost-effective, integrated services for permanent casing repair and a full range of isolation applications.
PULSE Dashboard Administrator Guide (Updated 2/19/15)
PULSE Dashboard Administrator Guide (Updated 2/19/15) All functions described in this document may be performed from a workstation on the network with the exception of Updating the Pulse Dashboard Software
Outlook Data File navigate to the PST file that you want to open, select it and choose OK. The file will now appear as a folder in Outlook.
Migrate Archived Outlook Items Outlook includes archiving functionality that is used to free up space on the mail server by moving older items from the mail server to PST files stored on your computer
Employee Work Hours Change (Temporary Basis)
PeopleSoft HR ECR Automation Process Employee Work Hours Change (Temporary Basis) May 2012 Table of Contents Create an Hours Change Request... 3 Hours Change Only Request Page... 9 Hours Change with Earnings
Frequently Asked Questions on Renting Textbooks
Frequently Asked Questions on Renting Textbooks HOW MUCH CAN I SAVE BY RENTING A TEXTBOOK? Although individual prices can vary by book, you can save an average of more than 50% of the cost of a new textbook
Table of Contents. Page 3
Welcome to Exchange Mail Customer Full Name Your e-mail is now being delivered and stored on the new Exchange server. Your new e-mail address is @rit.edu. This is the e-mail address that you should give
Fact sheet 6: for farmers
Fact sheet 6: for farmers Fuel Oil Storage February 2011 Are you planning to substantially alter your fuel oil store, or add a new one? If so, this fact sheet will help you meet the requirements of The
SS-AAEA Journal of Agricultural Economics Influence of Regulation on Oil and Gas Well Abandonment Rates in Alberta, Canada By Sarah Prescott.
Abstract As oil and gas wells age, they become unproductive. Proper abandonment of wells is an important process for both public safety and environmental health. However, well abandonment represents an
Florida Market Assistance Plan Online Referral Agent Guide
Florida Market Assistance Plan Online Referral Agent Guide Contents WELCOME FMAP AGENT GUIDE FMAP Data WELCOME FMAP The Florida Market Assistance Plan (FMAP) is a program authorized by the Florida Legislature
LOGO. HBS Bi-Weekly Exempt Employee Training. Bi-Weekly Exempt Timesheets. Updated 01.27.11
LOGO Bi-Weekly Exempt s HBS Bi-Weekly Exempt Employee Training Updated 01.27.11 Welcome to HBS Training! Welcome to the HBS online training for UCSF Exempt Employees paid on a Bi-Weekly pay cycle. This
Client Marketing: Sets
Client Marketing Client Marketing: Sets Purpose Client Marketing Sets are used for selecting clients from the client records based on certain criteria you designate. Once the clients are selected, you
Montgomery County Public Schools. Financial Management System (FMS) User s Guide. iexpense. Version 3.0. May 2013. Division of Controller
Montgomery County Public Schools Financial Management System (FMS) User s Guide iexpense Version 3.0 May 2013 Division of Controller Copyright and Trademarks Copyright Montgomery County Public Schools,
108-C-215 CRITICAL PATH METHOD SCHEDULE. (Revised 03-24-10)
CRITICAL PATH METHOD SCHEDULE (Revised 03-24-10) The Standard Specifications are revised as follows: SECTION 108, BEGIN LINE 177, INSERT AS FOLLOWS: 108.04.1 Critical Path Method Schedule (a) General Requirements
MILWAUKEE COUNTY APPLICANT TRACKING SYSTEM USER GUIDE
MILWAUKEE COUNTY APPLICANT TRACKING SYSTEM USER GUIDE Page 1 of 17 SEARCH OPEN POSITIONS Enter to see current postings. Search for specific titles, locations, divisions, employment type, and/or compensation
Drake Hosted User Guide
Drake Hosted User Guide Last Revision Date: 11/23/2015 Support.DrakeSoftware.com (828) 524-8020 Drake Hosted User Guide Copyright The Drake Hosted User Guide, Drake Tax Software, and any other related
Banner Frequently Asked Questions (FAQs)
Banner Frequently Asked Questions (FAQs) How do I install Java?...1 Banner prompts me to download and install Java. Is this OK?....1 What Java version should I use?...2 How do I check what version of Java
Gateway EDI Client Website Help Document
Gateway EDI Client Website Help Document Learning your way around a new website can be tricky we know that! This document will serve as a cheat sheet for questions that may arise as you maneuver around
User s Guide for the Texas Assessment Management System
User s Guide for the Texas Assessment Management System Version 8.3 Have a question? Contact Pearson s Austin Operations Center. Call 800-627-0225 for technical support Monday Friday, 7:30 am 5:30 pm (CT),
DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY
DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY FREQUENTLY ASKED QUESTIONS (FAQ) Question: Do fuel tanks fall under the requirements of Directive 055? No. For storage of fuels (e.g.,
Introduction. The following is an outline of the contents of this paper: Definition of Artificial Lift Page 2. How an Oil Well is Produced Page 2
Introduction Canadian Oilwell Systems Company and it s subsidiaries are suppliers of oil well Electric Submersible Pumping systems (ESPs). Such pumps are used to lift oil from oil wells so that the oil
Last updated: October 4, 2013. einvoice. Attorney Manual
einvoice Attorney Manual Welcome to the Bexar County einvoice system! The Bexar County einvoice System is designed to help attorneys submit and track invoices with Bexar County. With this system, an attorney
Last Updated on 11/06/2008. www.jobprotech.com
Last Updated on 11/06/2008 www.jobprotech.com Copyright JobPro Technology, 2008 How to Use this Guide This manual is designed as a reference for JobPro customers. It is not intended to be a replacement
Business Portal for Microsoft Dynamics GP. Requisition Management User s Guide Release 10.0
Business Portal for Microsoft Dynamics GP Requisition Management User s Guide Release 10.0 Copyright Copyright 2007 Microsoft Corporation. All rights reserved. Complying with all applicable copyright laws
Argentina Tataru*, Marcel Adrian Piteiu*, Dan-Paul Stefanescu*, Ioana Vlasin*
WIERTNICTWO NAFTA GAZ TOM 24 ZESZYT 1 2007 Argentina Tataru*, Marcel Adrian Piteiu*, Dan-Paul Stefanescu*, Ioana Vlasin* NEW TECHNICAL CONSIDERATIONS OF ROMGAZ COMPANY REGARDING DRILLING, COMPLETION AND
efiletexas.gov Review Queue User Guide
efiletexas.gov Review Queue User Guide EFS-TF-200-3194 v.4 February 2014 Copyright and Confidentiality Copyright 2014 Tyler Technologies, Inc. All rights reserved. All documentation, source programs, object
Questions and Answers for using MyCareCouncil
Questions and Answers for using MyCareCouncil Below you will find questions and answers about using MyCareCouncil. The questions have been grouped by topic. Please scroll to the appropriate topic. Topic
Frequently Asked Questions
Frequently Asked Questions Development & Maintenance of Web Based Portal and MIS for Monitoring & Evaluation of Vocational Training Improvement Project Version 1.0 Help Desk: [email protected] 0120
BlackBerry Internet Service. Version: 4.5.1. Administration Guide
BlackBerry Internet Service Version: 4.5.1 Administration Guide Published: 2014-01-22 SWD-20140122155744258 Contents 1 Getting started...6 Administrative feature availability... 6 Availability of features
Underground Storage Tanks
Underground Storage Tanks An Informational and Guidance Document for the University Community. Please contact Yale Environmental Health and Safety for latest Regulatory Requirements. A typical UST installation
Offline Payment Methods
Offline Payment Methods STRONGVON Tournament Management System 1 Overview The STRONGVON Tournament Management System allows you to collect online registration, while arranging for offline payment methods
Government of Saskatchewan Executive Council. Oracle Sourcing isupplier User Guide
Executive Council Oracle Sourcing isupplier User Guide Contents 1 Introduction to Oracle Sourcing and isupplier...6 1.0 Oracle isupplier...6 1.1 Oracle Sourcing...6 2 Customer Support...8 2.0 Communications
USER GUIDE: MaaS360 Services
USER GUIDE: MaaS360 Services 05.2010 Copyright 2010 Fiberlink Corporation. All rights reserved. Information in this document is subject to change without notice. The software described in this document
Fact sheet 6: for farmers
Fact sheet 6: for farmers Fuel Oil Storage June 2013 Are you planning to substantially alter your fuel oil store, or add a new one? If so, this fact sheet will help you meet the requirements of The Water
OSP User Guide. 1 P a g e
Online School Payments (OSP) User Guide February, 2014 OSP User Guide Table of Contents Overview...3 Site Information...3 Login to Portal...4 Activity Setup...6 OSP Activity Setup Form...6 Add Activity...7
FACULTY & STAFF RESOURCES
CLASS ROSTERS and GRADES 8/23/10 This document provides information related to on-line services for faculty. Many, but not all, functions can now be done on-line instead of by using paper forms. You will
NORSOK Standard D-010 Rev. 4, August 2012
Below is a listing of the main changes 1. Definitions of suspension, temporary and permanent abandonment 2. Included more examples of well barrier schematics 3. Included illustrations for permanent abandonment
Grants Management System (GMS) and Reports Training OVW. GMS Roles OVW. The Office on Violence Against Women. Grants Management System (GMS)
Grants Management System (GMS) and Reports Training Grant Adjustments Semi-Annual Progress Reports Quarterly Financial Reports Payment Requests (GPRS) Sub-award Reporting (FSRS) GMS Roles Primary Point
ATTACHMENT F ONSHORE PIPELINES DECOMMISSIONING GUIDELINE 1. INTRODUCTION
ATTACHMENT F ONSHORE PIPELINES DECOMMISSIONING GUIDELINE 1. INTRODUCTION After concession is expired or at the end of its economic life, pipeline network and all associated structures are due for decommissioning
eedge Basics: Get Your Database in Order Using eedge mycontacts
eedge Basics: Get Your Database in Order Using eedge mycontacts April 27, 2015, v. 1.1 eedge Basics: Get Your Database in Order with mycontacts 1 eedge myleads and mycontacts The websites in the KW lead
http://office.microsoft.com/client/15/help/preview?assetid=ha103466460&lcid=1033&n...
Page 1 of 5 Lync Web Scheduler Microsoft Lync Web Scheduler is a web-based program that you can use to create Lync Meetings if you don t have Microsoft Outlook, or are on an operating system not based
Add Title. Electronic Services Verification Instructions
Add Title Electronic Services Verification Instructions Electronic Services Verification Instructions Access CHAMPS Enter Daily Tasks What to do if the Client is Not in the Home Log services for Multiple
Richmond Systems. Self Service Portal
Richmond Systems Self Service Portal Contents Introduction... 4 Product Overview... 4 What s New... 4 Configuring the Self Service Portal... 6 Web Admin... 6 Launching the Web Admin Application... 6 Setup
Access to Moodle. The first session of this document will show you how to access your Lasell Moodle course, how to login, and how to logout.
Access to Moodle The first session of this document will show you how to access your Lasell Moodle course, how to login, and how to logout. 1. The homepage of Lasell Learning Management System Moodle is