1 Wind Potential in Argentina, situation and prospects Author: MSc. Carlos V. M. Labriola Energy and Sustainability Group Electrotecnia Department Faculty of Engineering National University of Comahue Buenos Aires 1400, Neuquén (8300) Argentina. Abstract: Patagonia Region in Argentina has one of the best wind characteristics of the world. From 1980 there were local motivation, from Governmental Investments to Privates ones. During the 1990s there was an expansion of energy production investments from non renewable energy fuels which stopped in The energy needs due to demand rise changes from 300MW per year (1999) to 800MW per year (). Since 2005 there have been motivation from different private companies including oil ones, to produce electricity from wind energy. This work describes the wind potential in Patagonia in three aspects: meteorological wind potential, technological one based on technical availabilities in Argentina, and business potential for wind energy investments. Also this work intends to show an approach for the present and actual figures on these upper aspects. Key words: Patagonia, Wind Energy, Wind Potential, Manufacturing, Business, Technology 1. Introduction: Argentina has one of the best regions of wind characteristics, it is The Patagonia. Its name comes from the marks that the Indian s feet made on soil when Magallanes saw them during one stop of his travel around the world. The meteorological average wind speed in this region is from 5 to 10 m/s approximately at 10 m height [1], which is represented in the first Wind Map of Patagonia by Dr. Barros. The meteorological wind power at 10m height of Patagonia is about MW [1]. Wind behaviour is quit special in Patagonia: low average wind speed correspond to places where wind is very seasonal (spring and summer), as Comahue Region (Neuquén Rio Negro ), but with strong gusts of wind from 30 to 47 m/s. Also wind direction changes during the gust in 70% of times during gales [2]. This behaviour is worst near Los Andes Mountain Range. In 1980 s there were some National State installation and development of wind turbines, but low maintenance and non prevision of teetering condition respectively motivate to abandon these investments. During 1990 s Cooperatives of electrical facilities made the first private investment in wind energy to produce electricity for the National Grid [3]. Actually the Cooperative of Comodoro Rivadavia has the biggest wind farm in Argentina (see Table 1). 11 Nq. Ch. 12 S.C. L.P. R.N G. Gregores Pto. Madryn T.F. Best Wind B.A. Fig. 1: Patagonia location in Argentina (See Table 1) During the 1990 s, Neuquén, Chubut and Santa Cruz provincial governments offered economical advantages to install a production plant of wind turbines to different companies. Also they have provincial laws including subsidies for wind energy which is plus to National subsidy from National Renewable Energy Law [4].
2 There is small wind turbine production in Córdoba and Buenos Aires (INVAP), which devices would not resist Patagonian gusts of wind. The National Grid in the Middle and South Patagonia has about 132kV lines which become saturated during the peak hour. This regional grid needs to be interconnected with the National Grid of 500kV which will permit to export to the rest of the country from 1000MW (: one simple line) to 3000 MW (In the future: two compensated line). The first span of 500kV from Choele Choel to Puerto Madryn was finished during 2005, but primarily this line will be used to transport energy from Combined Cycle Power Station using residual natural gas [5]. It is proposed to combine the production of electrical energy with a Wind Farm of 200MW [6]. There are some implementations of Hydrogen obtained by electrolysis of water with energy from wind turbines in Pico Truncado but it is a subsided investment by the National Government. The H 2 production is about 1m 3 per day only for R&D. The Installed power of Wind Turbines in operation in Argentina is represented in Table 1. The company locations are represented by numbers in Figure 1. TABLE 1: Wind Turbine Installations in operation in Argentina. Province Company (see Fig. 1) Buenos Aires 1.CRETAL Tandil 2.CEPA Pehuen Có 3.CEPA Bajo Hondo 4.CED Darregueira 5.CEMB - M.Buratovich 6.CEC - Claromecó Chubut 7.PECORSA 8.C.Rivadavia 8.CEECR- C.Rivadavia Wind Speed 7,2 m/s 7,8 m/s 7,4 m/s 11,2 m/s Date 26/05/95 17/02/95 10/12/98 12/10/97 22/10/97 26/12/98 19/01/94 12/09/ /01 18/3/96 9.COAGUA- Rada Tili 10,8m/s La Pampa 10.CSPGA Gral. Acha 7,21m/s 12/02 02/04 Purchaser MICON 2x400KW MICON 1x400KW BONUS 3x600KW MICON 1x750KW BONUS 2x600KW MICON 1x750KW TOTAL MICON 2x250KW MICON 8x750KW GAMESA16x660 KW MICON 1x400KW NEG-MICON 1x900KW NEG-MICON 1x900KW TOTAL Total Power KW Neuquén 11.COPELCO Cutral Có 7,2 m/s 20/10/94 MICON 1x400KW 400 Santa Cruz 12. MPT Pico Truncado 9m/s 02/01- ENERCON /05 4x600KW TOTAL WIND POWER IN OPERATION, ARGENTINA Enercon installed a plant for assembling and manufacturing in Brazil for their biggest wind turbines. During July, the first Argentinean private prototype of 1MW turbine fell down in Comodoro Rivadavia. It belongs to Pescarmona Company. Dr. Kirchner, Argentinean president, created the new State Energy Enterprise (ENARSA) which will try to develop new non renewable fuel prospecting and renewable energy investments. The installation of wind turbines is limited to 1,5-2 MW in Argentina, because there are no cranes for more than 50m high nacelles. Investments for more than 2MW per machine, justify to import the respectively crane for 70m height. On the other hand there are some Universities in Argentina that offer research, training and careers related to Renewable Energy. The University of Salta offers an MSc Course mainly oriented to Solar Energy. National University of Comahue (UNCo) included Renewable Energy in Secondary or High School Teacher Training. There is a Research Group in Energy and Sustainability (UNCo) which developed a Vertical Axis Wind Turbine particularly for wind characteristics near the mountain range. National University of Austral Patagonia (UNPa) offers a Mechanical Engineer career with specialization in Renewable Energy [7]. National Technological University (UTN) by means of Academic Unit of Confluence, Plaza Huincul, Neuquén, offers a Technical Degree of two years preparing technician for operation and installation of Renewable Energy investments [8]. Specialized Workers salary is from U$S 500 to U$S 700 and for ordinary workers U$S 300 to U$S 500.
3 2. Prospects into the future: The first aspect is to analyze the Meteorological Wind Potential. Taking into account, Dr. Barros studies, the wind potential at 10m height is about MW. If we analyze at different height than 10m this potential results in the values shown in Table 2. TABLE 2: Wind Potential at different Heights using the log law of wind profile applied to power production Magnitude Power PZr Zr Zo Z ln1 : ln (Z/Zo) ln2: ln(zr/zo) Pzr.(ln1/ln2) ,1 34 5,83 4, ,21 4, ,40 4, ,66 4, ,91 4, ,24 4, Unit MW m m m MW Z: heights obtained from the performance of VESTAS and ENERCON turbines from 400kW to 3MW. 1. There is a constraint about height of cranes used to fit the nacelles. The availability of cranes is up to 50 m height. 2. In this way the power is limited between 1 and 2MW in the best condition of wind characteristic. 3. It is necessary a High Voltage Transmission System of 500kV to export energy to others areas or countries. Taking into account the upper considerations on Atlantic area of Patagonia from Golfo San Matías to Río Gallegos, a wind power generation of about MW using machines around 1,5 could be obtained in Patagonia in the best case at present [8][9]. The available Total Power from electrical generation plants connected to the Whole Sale Energy Market in Argentina is about 24000MW. As electrical procedures establish, 20% of installed available power stations can be supplied by wind energy, so the possible local wind energy market today is up to 4800MW. Map References: 500kV High Voltage Lines in present operation 500kV High Voltage Lines in operation on kV High Voltage Lines in future operation Fig. 2: High Voltage System in Argentina The second aspect is the Technological Wind Potential. Some considerations are necessary to estimate this aspect: The last limitation in Argentina for wind energy is the distribution transmission line system of 132kV. The present local High Voltage System has 132kV lines which are saturated. The new 500kV line from Choele Choel to Puerto Madryn was finished during 2005 [10]. It can transmit 1000MW. During, a local company offered to install a power plant from 350 to 500MW with natural gas as fuel and a wind farm up to 200MW near Puerto Madryn. The second track of 500kV line will be installed from Puerto Madryn to Pico Truncado. This city has a County s Investment of 2,4MW of wind energy (see Table 1) and has an experimental plant for producing Hydrogen. This line will be finished during 2007, (expected for August). The third track of 500kV line from Pico Truncado to Río Gallegos is projected to be in service in the next future (2010). This Patagonian 500kV System was primarily designed to export non renewable energy, although there is capability to export 1000 MW from renewable or non renewable energy. In the case to intend installations of Manufacture Wind Turbine Company, there are some different strategic sites. Table 3 presents a comparison of North and middle location in Patagonia.
4 TABLE 3: Comparison of locations to install a manufacturing Wind Turbine Plants Place Advantages Disadvantages Other Considerations Neuquén- It is in the midway between Atlantic It is not near the best places It is in the Comahue Cipolletti and Pacific Oceans with access to of wind in Patagonia. respective harbors for export. Routes and train is available to access the harbors. region. North Patagonia. Harbor in Argentina: San Antonio Este. Harbor in Chile: Saavedra Puerto Madryn - Comodoro Rivadavia It is near the best places of wind in Patagonia. They are near the harbor for Atlantic Ocean The third aspect is to consider the Business Potential to develop wind energy investments. The worker salaries are around Asian figures, and therefore the worker market is competitive. Then the installation costs can be cheaper than in Europe or Asia with good technical level because of the energy installations during the 1990s. The Wholesale Electrical Energy Market price in Argentina is the cheapest in Latin America, from In 2000 the average energy price was about 0,004 U$S/kW and now is about 0,001U$S/kW and fixed by de Secretary of Energy Office[10]. During, the Government establish free prices for new private energy contracts and deals between Energy Generation Companies and Demand Companies. In this way there was a partial free-trade in Whole Sale Energy Market. It is possible to analyze different situations for investments taking into account different energy prices with the following consideration frame: Energy prices in the Whole Sale Energy Market: present value (1,3U$S/MW) and possible ones in the future (2,3 to 4 U$S/MW). Period of useful operation: 25 years. It is the ordinary period for generation engines Investment: Wind Farm of 100MW at 1000U$S/MW: Total of U$S Costs of Maintenance/Operation U$S per year It is supposed three workers for maintenance and two form operations. There is no a good harbor in Chile for exporting wind turbines through Pacific Ocean at this latitude. through Temuco. It is in the middle of Patagonia region on the Atlantic area. Cost of Land: it is negligible because they are fiscal or public lands. Coefficient Plant: Patagonia is divided in two regions: CP=0,3 in North Patagonia and CP=0,4 in Atlantic and Middle land zone of Chubut and Santa Cruz. Taking into account the upper considerations on Net Present (NPV) calculations, their results are in Table 4. TABLE 4: Economical Approach for Wind Energy Investment Comparison Plant Coeff. : 0,30 Plant Coeff. : 0,40 Energy Price Net Present Net Present 1,3 Negative Negative 2,3 Negative Positive 4 Positive Positive (U$S/MW) NPV was chosen because it is the investing indicator more simple and effective than others. Also this economical comparison tries to be only and approach to good conditions for wind energy business. 3. Conclusion and Considerations: It is possible to produce wind energy in Argentina but the following considerations in Table 4 should be put in practice: TABLE 4: Conclusions and Considerations Consideration With the actual technology the Meteorological Wind Potential is between to MW, with the limitation of cranes availability in Argentina. The best area to produce wind energy in Argentina is in Chubut and Santa Cruz provinces (Puerto Madryn Comodoro Rivadavia Pico Truncado Gobernador Gregores). There are High Voltage Transmission Lines (500kV) to Puerto Madryn, in the next future (august 2007) there will be to Pico Truncado. It is possible to transmit up to 500MW today of Wind power in Argentina from Patagonia. Reference Table 2 [1] Barros, 1985
5 The target in the next future (2020) is to obtain 8% from renewable Energy in the Whole sale Energy Market (Today 8% represents nearby 1600MW).Also with the limit of 20%, it could be possible to generate up to 4800MW but more 500kV HVTL are necessary to export the energy to other areas or countries. The present fixed energy price in the Whole Sale Market by Argentinean Secretary of Energy is not enough for wind energy investment. It is necessary to rise the energy price to between 2 to 3 U$S/MW for CP=0,4 or nearby 4 U$S/MW for CP=0,3, by means of new energy contracts or/and National plus Provincial subsidies. These figures permits to begin thinking about wind energy generation business could be profitable. It is necessary to convert the subsidies from $ to dollar with the same figure. 500kV Transmission Lines on Neuquén are very close to Transmission Line System of South Chile. It is possible to interconnect them for exporting energy at international prices instead of natural gas. But it is not possible in the present condition of energy deficit in Argentina. If it is not possible to increase the present price or subsidies, it is necessary 50% of capital participation by the Argentinean Government. Local careers and technician training are already available. These qualified workers can be included into Wind Energy production in construction, installation, operation and supervision areas. Salaries are one third to one half of international ones for qualified workers. [4] National Law, Table 4. [4] National Law,. [7] Labriola, 2005 [8]Labriola, The technical scene and an approach to economical scene is set. As we all know any engineering system is embedded in political, juridical, economical and social systems on which it depends. This is to say that technical decisions and performance is conditioned by many and different factors beyond engineering issues, mainly in developing countries. Finally we must view the development of energy systems in general and wind energy in particular, as holistic and multidisciplinary processes which lead to decision making [11] Acknowledgements: To UNCo which permits my specialization. To UTN which permits to apply on working areas. To National University of La Plata which permits to continue my PhD studies. References: [1] Barros, V.: Wind Map of Argentina with 20 years of Data, [2] Lässig, E. -Palese, C.: Study of wind behaviour in Comahue Region, International Congress of Electrical Distribution, Mar del Plata, Buenos Aires Province, [3] COPELCO: First International Course o Wind Energy Maintenance in Latin America, Cutral Có, Neuquén, organized by COPELCO Cooperative, MICON and CREE, March [4] National Law of Renewable Energy, : It include geothermal and Biomass in the former RE Law (1998) which proposed Wind and Solar energy subsidies with $1/MW of RE generation. [5] N.E.E.P: National Electrical Energy Plan, [6] Trelew, : Provincial announcement that there will be a local Investment of nearby MW of Renewable and Non Renewable Energy Power plants at 50Km form Trelew, Chubut province. [7] Labriola, C., 2005: Technicature of Renewable Energy and Environment, National Technological University, Argentina C., : Presentation during the annual meeting of European Renewable Energy RTD and International Cooperation, Florence, Italy august. [9] Labriola, C., 2000: 5 th. Chapter of Thesis of MSc. Course in The University of Reading, United Kingdom, September, [10] CAMMESA, : Whole Market Electrical Company of Energy Transactions, Reports from [11] Blockley, D. Godfrey, P.,: Doing it differently, Thomas Telford Limited, Bristol, UK, 2000.
SOWITEC GROUP THE LARGEST WIND DEVELOPER IN LATIN AMERICA -RIDERS OF THESTORM- Erfurt 19.6.2012
SOWITEC GROUP THE LARGEST WIND DEVELOPER IN LATIN AMERICA -RIDERS OF THESTORM- Erfurt 19.6.2012 CONTENT 1. About SoWiTec group / SoWiTec Argentina 2. Energy market Argentina 3. Why invest into Argentina
Renewable Energy in Argentina
Renewable Energy in Argentina 1.ABO WIND 2.Why Investing in Argentina? 3.Current Opportunities 4.Renewable Energy in Argentina 5.ABO WIND in Argentina 6.Our Projects in Argentina 7.Contact Details 1. ABO
VIENTOS DEL SECANO WIND FARM 50 MW/12,6 MW
VIENTOS DEL SECANO WIND FARM 50 MW/12,6 MW MAYOR BURATOVICH DEPARTMENT OF VILLARINO PROVINCE OF BUENOS AIRES Parques Eólicos Pampeanos S.A. is a company created by ABO WIND 1 Project Description VIENTOS
Ministry of Power & Energy
Ministry of Power & Energy Institutional Frame work Power sector overview Renewable energy policy Major issues and barriers Institutional Framework Sustainable Energy Authority The Sri Lanka Sustainable
INTI National Institute of Industrial Technology. Argentina OBJECTIVES AND AIMS ACTIVITIES
INTI National Institute of Industrial Technology. Argentina OBJECTIVES AND AIMS To promote the generation and transfer of technological innovation to industries To ensure that the quality of processes,
WIND AND SOLAR ENERGY DEVELOPMENTS IN IRAN
WIND AND SOLAR ENERGY DEVELOPMENTS IN IRAN H. Kazemi Karegar a,b, A.Zahedi a,v. Ohis a, G. taleghani b and M. Khalaji b a Department of Electrical & Computer Systems Engineering, PO Box 35, Monash University,
Photovoltaic in Mexico Recent Developments and Future
Photovoltaic in Mexico Recent Developments and Future Rodolfo Martínez Strevel Berlin, Germany May 23th, 2013 Bufete de Tecnología Solar, S.A. (BUTECSA) Production of Primary Energy in Mexico, 2011 % 7,0
Wind Energy Development in Jamaica
ACCELERATING ADVANCED ENERGY TECHNOLOGIES Wind Energy Development in Jamaica Group Managing Director, Petroleum Corporation of Jamaica Presentation Outline Country Profile Jamaica Case Study: Wind Energy
Case Study 5 Use of Wind Turbine Technology
Case Study 5 Use of Wind Turbine Technology 1. Context Hong Kong relies on an adequate and reliable electricity supply for its economic development. Our electricity needs are met by the two electricity
Renewable Energy Strategy for 2020 and Regulatory Framework. Eng. Hatem Amer Egyptian Electric Regulatory and Consumer Protection Agency
Renewable Energy Strategy for 2020 and Regulatory Framework Eng. Hatem Amer Egyptian Electric Regulatory and Consumer Protection Agency Objectives of the Agency Regulate, supervise, and control all matters
Telefónica South America Feasibility Studies
1 Telefónica South America Feasibility Studies The GSMA conducted a six country study for Telefónica in South America. The countries covered by this study were Argentina, Chile, Colombia, Mexico, Nicaragua,
Asian Journal on Energy and Environment
As. J. Energy Env. 2005, 6(02), 139-144 Asian Journal on Energy and Environment ISSN 1513-4121 Available online at www.asian-energy-journal.info The Small Hydropower Project as the Important Renewable
Electricity Generation from Renewable Energy in Sri Lanka: Future Directions
Electricity Generation from Renewable Energy in Sri Lanka: Future Directions Presented by M.M.C. Ferdinando, Secretary, Ministry of Power and Energy R.J. Gunawardana, Additional General Manager (Transmission),
Optimization of the coupled grid connection of offshore wind farms
Optimization of the coupled grid connection of offshore wind farms Dirk Schoenmakers Graduation project at Evelop Netherlands BV Technical University of Eindhoven September 2008 Supervisors: TU Eindhoven
The Real Cost of Electrical Energy. Outline of Presentation
2 Outline of Presentation Data Sources Electricity Demand and Supply Cost to Meet Demand Profile Electricity Pricing Cost Impact of Dispatching Generation (Load Following) Simplifying Assumptions Electricity
Renewable Energy Partnership EU-MENA
Renewable Energy Partnership EU-MENA Berlin, 28 March 2008 Dr.-Ing. Hani El Nokraschy www.nokraschy.net www.solarec-egypt.com www.menarec.org Big Problems need Big Solutions. Till 2050 the fossil fuels
Recent Developments in US-Mexico Electricity Trade: A Tale of Two Borders
Recent Developments in US-Mexico Electricity Trade: A Tale of Two Borders Nicolas Puga, Principal San Diego, California October 18-19, 2007 Historical trends of US-Mexico electricity trade may soon change
Brazilian Smart Grid: Regulatory Issues and R&D Projects
Brazilian Smart Grid: Regulatory Issues and R&D Projects André Pepitone da Nóbrega Director Brussels, Belgium June 18th, 2012 Brazilian Electric Power Highlights Source: BIG/ANEEL Apr/2012, PDE 2020 Facilities
How To Build A 100Mw Wind Farm In Ques
ALTO VALLE WIND FARM - 100 MW Fotomontage of PARQUE EÓLICO DEL ALTO VALLE 100 MW VILLA EL CHOCÓN DEPARTMENT OF CONFLUENCIA PROVINCE OF NEUQUÉN Parque Eólico del Alto Valle S.A. is a company created by
Renewable Energy Management System (REMS): Using optimisation to plan renewable energy infrastructure investment in the Pacific
Renewable Energy Management System (REMS): Using optimisation to plan renewable energy infrastructure investment in the Pacific Abstract: Faisal Wahid PhD Student at the Department of Engineering Science,
Outline. Introduction to Wind Energy. US Wind Energy Installations. ME 483 Alternative Energy Engineering II 1
Wind Power Introduction February, Introduction to Wind Energy Larry Caretto Mechanical Engineering 48 Alternative Energy Engineering II February, Outline Current use of wind energy Advantages and disadvantages
Where and Why Does the Wind Blow?
EXPLORATION Where and Why Does the Wind Blow? Examine the map and the key. Most sources say that areas with annual average wind speeds greater than 6.5 meters per second at 80-100 m are suitable for utility
Who are we? *Based on an average annual domestic household electricity consumption of 4,700KWh (DECC).
Who are we? We re one of the world s leading power and gas companies. Here in the UK, we supply energy to more than 5 million customers, generate enough electricity for around 8 million homes and employ
Daniel Iglesias- CARE Carlos Villar- Hinsilblon Buenos Aires, Argentina ARGENTINA: GENERAL INFORMATION Capital: Buenos Aires Population: 40MM 35% lives in BA and suburbs Surface Area: 2.8 Mio Km² Currency:
COMPETITIVE ELECTRIC ENERGY MARKET IN GREECE
NATIONAL TECHNICAL UNIVERSITY OF ATHENS (NTUA) GREECE COMPETITIVE ELECTRIC ENERGY MARKET IN GREECE EVANGELOS DIALYNAS Professor NTUA Director of Electric Power Division 1 Competitive Electric European
Solar and Wind Energy for Greenhouses. A.J. Both 1 and Tom Manning 2
Solar and Wind Energy for Greenhouses A.J. Both 1 and Tom Manning 2 1 Associate Extension Specialist 2 Project Engineer NJ Agricultural Experiment Station Rutgers University 20 Ag Extension Way New Brunswick,
Electric Power Systems An Overview. Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas
Electric Power Systems An Overview Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas Overview Power Generation Conventional power generation Power generation from renewables
Study to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid
Pakistan Study to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid Final Report: Executive Summary - November 2015 for USAID Energy Policy
Net Metering Summary Within Northeast Utilities
Net Metering Summary Within Northeast Utilities Gordon Belcher EEI/AEIC meeting Oct 2013 1 Northeast Utilities Connecticut Light & Power CL&P s territory contains 85% of the state of CT EEI/AEIC meeting
Power Tariff Structure in Thailand 23 October 2012, Singapore Dr. Pallapa Ruangrong Energy Regulatory Commission of Thailand
Power Tariff Structure in Thailand 23 October 2012, Singapore Dr. Pallapa Ruangrong Energy Regulatory Commission of Thailand Singapore EAS ABOUT THAILAND Population 67 Million Customers (at end-2011) 19
The Electric Power System
The Electric Power System Islamic Republic of Iran Iranian Power System 1 2 Basic facts Area: 1,648,195 km 2 Population: 78,311,923 (Based on 2014 Census) Number of electricity consumers: near to 31 million
Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment
Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment March 20, 2009 Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment Table of Contents:
EUROPASS DIPLOMA SUPPLEMENT
EUROPASS DIPLOMA SUPPLEMENT TITLE OF THE DIPLOMA Técnico Superior en Energías Renovables TRANSLATED TITLE OF THE DIPLOMA (EN) (1) Higher Technician in Renewable Energy Sources --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
New York s Transmission Challenges and Opportunities: An Overview
New York s Transmission Challenges and Opportunities: An Overview By: Dr. Matthew Cordaro 2012 is shaping up to be the year of the grid. Governor Cuomo has proposed an energy highway aimed at finding ways
China s Future Generation Assessing the Maximum Potential for Renewable Power Sources in China to 2050 REPORT FEBRUARY
REPORT FEBRUARY 2014 China s Future Generation Assessing the Maximum Potential for Renewable Power Sources in China to 2050 William Chandler, Chen Shiping, Holly Gwin, Lin Ruosida, Wang Yanjia Entri about
Introduction to Ontario's Physical Markets
Introduction to Ontario's Physical Markets Introduction to Ontario s Physical Markets AN IESO MARKETPLACE TRAINING PUBLICATION This document has been prepared to assist in the IESO training of market
Integration of Renewable Resources
Integration of Renewable Resources David Hawkins and Clyde Loutan PSERC Presentation October 2, 2007 Renewable Portfolio Standards Goals 2 Source: Kevin Porter; Exeter Associates, Inc Current Level of
Renewable Electricity and Liberalised Markets REALM. JOULE-III Project JOR3-CT98-0290 GREECE ACTION PLAN. By ICCS / NTUA K. Delkis
Renewable Electricity and Liberalised Markets REALM JOULE-III Project JOR3-CT98-0290 GREECE ACTION PLAN By ICCS / NTUA K. Delkis October 1999 INTRODUCTION AND BACKGROUND Background to Renewable Energy
Proposal for the Establishment of an World Small Wind Turbine Test and Training Center" in China)
Chinese Wind Energy Equipment Association (CWEEA) Chinese Wind Energy Association (CWEA) Proposal for the Establishment of an World Small Wind Turbine Test and Training Center" in China) CWEA and CWEEA
Full Scale Program for Renewable Energy in Egypt
Full Scale Program for Renewable Energy in Egypt Contents Evolution of Egypt Needs of Electricity and its supply mix Renewable Energy Policy and Targets Renewable Energy Program Components Conclusions
ASSOCIATION INC Geothermal Energy: New Zealand s most reliable sustainable energy resource
NEW PO Box 11-595 ZEALAND GEOTHERMAL Tel: 64-9-474 2187 ASSOCIATION INC Geothermal Energy: New Zealand s most reliable sustainable energy resource Current Status, Costs and Advantages of Geothermal East
Demand Response Market Overview. Glossary of Demand Response Services
Demand Response Market Overview Glossary of Demand Response Services Open Energi has partnered with Tarmac to provide Demand Response What s inside... Market Overview Balancing Electricity Supply and Demand
OFF-GRID SOLAR CASE STUDY AND OPPORTUNITIES IN KENYA J.M.P. MBITHI Deputy Director, Renewable Energy MINISTRY OF ENERGY AND PETROLEUM
OFF-GRID SOLAR CASE STUDY AND OPPORTUNITIES IN KENYA J.M.P. MBITHI Deputy Director, Renewable Energy MINISTRY OF ENERGY AND PETROLEUM PRESENTATION SUMMARY Introduction-Power situation in Kenya Off-grid
Arktis en kilde til fornybar energi?
Arktis en kilde til fornybar energi? Ånund Killingtveit 1 1 Norwegian University of Science and Technology Centre for environmental design of renewable energy - CEDREN SRREN was prepared for WG III In
Renewable Energy in the manufacturing and tourism industry in Egypt. Regulatory Framework and market potential
Renewable Energy in the manufacturing and tourism industry in Egypt Regulatory Framework and market potential Part 1 Electricity Self-consumption 2 Egypt s Electricity Sector Figures 2013 27 GW Peak Load
5-Minute Refresher: RENEWABLE ENERGY
5-Minute Refresher: RENEWABLE ENERGY Renewable Energy Key Ideas Renewable energy is a source of energy that can be used and replenished naturally in a relatively short period of time. Non renewable energy
Electricity Demand and Supply in Myanmar
RAJAWALI FOUNDATION INSTITUTE FOR ASIA Electricity Demand and Supply in Myanmar Prepared for Proximity Designs Myanmar This research paper was written by David Dapice ([email protected]), of the
ESBI Carbon Solutions. Partnering with Countries to Achieve their Full Carbon Credit Potential
ESBI Carbon Solutions Partnering with Countries to Achieve their Full Carbon Credit Potential ESB International ESB International (ESBI) is a growing international energy company and one of Europe s leading
ELECTRICAL RESEARCH INSTITUTE (IIE) Renewable Energy
ELECTRICAL RESEARCH INSTITUTE (IIE) Renewable Energy Calle Reforma 113, col. Palmira, 62490, Cuernavaca, Mor. MEXICO Tel: +52 777 3623811 Contact: Jorge M. Huacuz Email: [email protected] Presents: Esmeralda
Brochure Introducing HVDC
Brochure Introducing HVDC ABB and HVDC The world s first commercial high-voltage direct current (HVDC) link, situated between the Swedish mainland and the island Gotland, was delivered by ABB already in
Dominion. Dan Weekley Vice President, Corporate Affairs. Dan Stoddard Senior Vice President, Nuclear Operations. March 24, 2016
Dominion Dan Weekley Vice President, Corporate Affairs Dan Stoddard Senior Vice President, Nuclear Operations March 24, 2016 Dominion Profile Power and Natural Gas Infrastructure Overview Leading provider
Energy Strategic Plan Los Angeles Community College District Community College League Conference
Energy Strategic Plan Los Angeles Community College District Community College League Conference Larry Eisenberg Executive Director, Facilities Planning and Development November 16,2006 West Los Angeles
Determination of the CO2 Emissions Factor the electrical system of the Dominican Republic
VI International Symposium on Energy & Innovation & Entrepreneurship Forum San Juan, Puerto Rico [20.feb.2014] Determination of the CO2 Emissions Factor the electrical system of the Dominican Republic
Electrolysis for grid balancing Where are we?
Electrolysis for grid balancing Where are we? Copenhagen May 10, 2012 Raymond Schmid, Global Market Strategist [email protected] Our company Global provider of On-site hydrogen water electrolysers
Union des Comores. Vice presidency in charge of the Ministry of Energy. Company of Production of Electricity. Presented by : ALI MBARAKA Djamal
Union des Comores Vice presidency in charge of the Ministry of Energy Company of Production of Electricity Presented by : ALI MBARAKA Djamal 1) General information of each country 2) Current energy policy
Renewable Wind. Wind Basics. Energy from Moving Air. The Daily Wind Cycle. Wind Energy for Electricity Generation
Renewable Wind Wind Basics Energy from Moving Air Wind is simply air in motion. It is caused by the uneven heating of the Earth's surface by the sun. Because the Earth's surface is made of very different
A"Local"Authority"Biomass"Supply"Chain;" experiences"in"north"lanarkshire"and" Stockport" November"2013"
A"Local"Authority"Biomass"Supply"Chain;" experiences"in"north"lanarkshire"and" Stockport" November"2013" Councils"operaAng"or"planning" wood"fuel"depots" Stockport" North"Lanarkshire"Council" Oldham"Council"
Outline of FREA, Fukushima Renewable Energy Institute, AIST
Outline of FREA, Fukushima Renewable Energy Institute, AIST Yoshiro OWADANO FREA November 17, 2014 2 Fukushima Renewable Energy Institute, FREA Missions (based on the government s announcement, July 2011)
The Economics of Nuclear Power: Is New Nuclear Competitive?
The Economics of Nuclear Power: Is New Nuclear Competitive? Craig A. Severance CPA Author, Business Risks and Costs of New Nuclear Power (2009) Co-Author, The Economics of Nuclear and Coal Power (1976)
Understanding Residential Electricity and Natural Gas Bills and Prices in Edmonton
15006-103 AVENUE Phone: +1 780 484 0476 EDMONTON, ALBERTA Fax: +1 780 484 3956 CANADA T5P 0N8 E-mail: [email protected] Understanding Residential Electricity and Natural Gas Bills and Prices in Edmonton 2007
DANISH DISTRICT ENERGY PLANNING EXPERIENCE
MOWAT ENERGY, A RESEARCH HUB AT THE MOWAT CENTRE, AT THE REQUEST OF THE ONTARIO MINISTRY OF ENERGY FUTURE INNOVATION IN ENERGY PLANNING: A SPECIAL SESSION TO ADVISE ON ONTARIO S LONG-TERM ENERGY FUTURE
Glossary of Terms Avoided Cost - Backfeed - Backup Generator - Backup Power - Base Rate or Fixed Charge Baseload Generation (Baseload Plant) -
Glossary of Terms Avoided Cost - The incremental cost Flint Energies would pay for the next kilowatt-hour of power in the open marketplace for energy. Flint Energies Board of Directors sets this Avoided
Sihwa Tidal Power Plant: a success of environment and energy policy in Korea
Sihwa Tidal Power Plant: a success of environment and energy policy in Korea May 2007 Prof. Nohyoung Park Korea University Energy Situations in Korea Korea started its industrial development in the 1970s,
World s Greenest High Performance Data Center
World s Greenest High Performance Data Center EcoDataCenter Sustainability for future generations Our Services Colocation Data Center for Mission Critical Requirements Lockable racks, cages, private rooms
Simulation of parabolic trough concentrating solar power plants in North Africa
Simulation of parabolic trough concentrating solar power plants in North Africa And its contribution to a 100% renewable energy supply for Germany in 2050 BY: Daniel Horst Outline Simulation program CSP
Distributed Generation: Frequently Asked Questions
Distributed Generation: Frequently Asked Questions 1) What is distributed generation (DG)? Generating technologies located close to where the electricity is being used that are connected to the electric
Overturning Stability of Offshore Wind Power Substructure with Bucket Foundation
Website: www.ijetae.com (ISSN 2250-2459, ISO 9001:2008 Certified Journal, Volume 5, Issue 10, October 2015) Overturning Stability of Offshore Wind Power Substructure with Bucket Foundation Young-Jun You
Enerdata - Global Energy Markets Insights and Analytics. CleanTuesday Rhône-Alpes Grenoble, 22 mars 2011
Enerdata - Global Energy Markets Insights and Analytics CleanTuesday Rhône-Alpes Grenoble, 22 mars 2011 Enerdata is a global energy intelligence company Private independent company incorporated in 1991
LADWP GREEN POWER PROGRAM
LADWP GREEN POWER PROGRAM INTRODUCTION The Los Angeles Department of Water and Power (DWP), as the power provider for the City of Los Angeles, is offering its customers a comprehensive green power program
Workshop Putting Science into Standards: Power-to-Hydrogen and HCNG
Workshop Putting Science into Standards: Power-to-Hydrogen and HCNG Keynote 1: Power to Gas potential & requirements P. Röttgen E.ON Innovation Center Energy Storage EASE Vice President 1 EASE is the European
Ancillary Services and Flexible Generation
Ancillary Services and Flexible Generation Contents Ancillary Services Overview Types of Ancillary Services Market Impact Benefits of Medium Speed Solution Contact Information What are Ancillary Services?
Master of Science Program (M.Sc.) in Renewable Energy Engineering in Qassim University
Master of Science Program (M.Sc.) in Renewable Energy Engineering in Qassim University Introduction: The world is facing the reality that the global energy demand is increasing significantly over the coming
Treasury Grants for Energy Property in Lieu of Tax Credits
Treasury Grants for Energy Property in Lieu of Tax Credits Jeffrey Davis Partner +1 202 263 3390 [email protected] August 11, 2009 Mayer Brown is a global legal services organization comprising
Smart Grids initiative. Electrical Engineering Institute of Renewable Energies Dipl.-Wirtsch.-Ing. Alexander von Scheven 1
- Smart Grids initiative Electrical Engineering Institute of Renewable Energies Dipl.-Wirtsch.-Ing. Alexander von Scheven 1 Agenda in Germany - the German Smart Grids initiative 4. First - 5. Outlook and
Viking Link Interconnector
Viking Link Interconnector Public information event for Bicker Parish Why we re here today We re here today to introduce the Viking Link project, to explain what we want to build and to answer any questions
CANADIAN RENEWABLE ENERGY POLICIES. Matthew H. Brown InterEnergy Solutions 2007
CANADIAN RENEWABLE ENERGY POLICIES Matthew H. Brown InterEnergy Solutions 2007 The following offers an overview of Canadian federal and provincial policies that promote renewable energy. It is excerpted
Solar Energy. Airports Going Green Aimee Fenlon
Solar Energy Airports Going Green Aimee Fenlon 1 Renewable vs. Non-Renewable Electrical Generation Renewables: Source Advantages Disadvantages Solar PV No CO2; Needs no Fuel Intermittent no power at night,
Press Release. FY 2012/13 Alstom achieves a solid commercial and operational performance and free cash flow turns positive
Press Release 7 May 2013 FY 2012/13 Alstom achieves a solid commercial and operational performance and free cash flow turns positive Between 1 April 2012 and 31 March 2013, Alstom booked 23.8 billion of
UTILITY RATE STRUCTURE
UTILITY RATE STRUCTURE Electricity and Natural Gas Service Residential Commercial Industrial Examples Electricity Use Characteristics Variety of customers with differing use patterns: residential- lighting,
The role of coal in the UK generation industry. Philip Garner - Director General of the Confederation of UK Coal Producers
The role of coal in the UK generation industry Philip Garner - Director General of the Confederation of UK Coal Producers Recent History In 1983 there were 170 underground mines owned by the National Coal
Applicability of Trigeneration Systems in the Hotel Buildings: The North Cyprus Case
Applicability of Trigeneration Systems in Hotel Buildings: The North Cyprus Case M. OZDENEFE, U. ATIKOL Department of Mechanical Engineering Eastern Mediterranean University Gazimagusa, North Cyprus, Mersin
SECTOR ASSESSMENT (SUMMARY): ENERGY 1. 1. Sector Performance, Problems, and Opportunities
Country Partnership Strategy: Bangladesh, 2011 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Power generation gap. Bangladesh endures long
There s power in wind: fact sheet
There s power in wind: fact sheet Why do we need clean energy? Australia s clean energy future The climate is changing. The majority of climate scientists from around the world confirm greenhouse gases
Enabling PV in Argentina
Enabling PV in Argentina Study about the solar market and business environment solar PV systems in Argentina Published by: German Solar Association BSW-Solar / Bundesverband Solarwirtschaft e.v. Französische
Millennium Pipeline Company, LLC Response to New York State Energy Highway RFI
Millennium Pipeline Company, LLC Response to New York State Energy Highway RFI www.millenniumpipeline.com One Blue Hill Plaza, 7th Floor Post Office Box 1565 Pearl River, N Y 10965 845.620.1300 Voice 845.620.1320