1 Concrete Pipe 2012 Southern Alberta Product Guide
2 About Lafarge World leader in building materials, Lafarge extracts resources from the heart of the earth to make materials to bring to the heart of life. Present in 79 countries, the Group responds to the world s demand for housing and infrastructure. Lafarge is driven by the needs of its customers, shareholders, local communities, engineers and architects. The Group creates high value-added solutions which encourage creativity while leaving a lighter trace on the world. Lafarge Pipe Contacts Tina Larson, P.Eng. General Manager [email protected] Chris McQuarrie Sales Manager Pipe & Field Inquiries [email protected] Jac (Jake) Kofoed, E.I.T. Sales Engineer Manhole Inquiries [email protected] Jeana Arkes Sales Coordinator Manhole Inquiries [email protected] Jennifer Tallent Shipping Coordinator Shipping [email protected] Shane Mulligan, P.Eng Design and Marketing Engineer Stormceptor and Technical Inquiries [email protected] Andre Geurts, C.E.T. Operations Manager [email protected] Gary Twomey, E.I.T. Quality Control Engineer [email protected] Dixie Goodman Administrative Assistant Billing Inquiries [email protected] Brenda Issa Purchasing [email protected] Shelly Harwood Office Coordinator [email protected] Other Lafarge Contacts Product Line Contact Phone Aggregates Eldon Martin [email protected] Asphalt Allen Gervais [email protected] Concrete Block Fred Woodlock [email protected] Concrete Precast (Architectural & Structural) Isabel Suarez [email protected] Concrete Ready-Mix John Pistak [email protected] Construction & Paving Brent Hrycenko [email protected] Foothills Ready-Mix Tom Prince [email protected] Pro-Con Roadworks Craig Meadus [email protected]
3 INDEX Terms and Conditions Plugs, Caps and Transition Slabs Concrete Pipe Pipe... 5 Standard Installation Beddings SIDD Pipe Bends/ Flared Ends... 9 Box Sections Catch Basins Manholes Estimating Guide for 1200 Diameter Manholes Type 5A Manhole Order Form Type 1-S Manhole Order Form Type 1-S Manholes / Lift Stations Large Manholes Tee Riser Manholes Check Valve Manholes Stormceptor Miscellaneous Material Material Handling Notes: 1. All concrete products in this catalogue are manufactured using sulphate resistant cement - CSA A3000 Type HS or HSb. 2. Restocking charges will be 10% for returned undamaged stock items. Cancelled orders are subject to 100% restocking charge with the following exceptions: 30% for stock items with minor repairable damage and 30% for up to 5 prebenched bases or Type 1-S manholes per project. 3. Prices effective January 1, 2012, subject to change. 1 PIPE 2012
4 TERMS AND CONDITIONS 1. Acceptance of terms: The purchaser agrees that the prices levied by Lafarge North America for product/services take into consideration and are predicted on the purchaser assuming and releasing Lafarge North America of certain liabilities and responsibilities by requesting product/services of Lafarge North America, the purchaser voluntarily elects to enter into this agreement and to be bound by all terms and conditions hereof rather than negotiate a different agreement which would execute the exculpatory indemnification, hold harmless and other provisions herein and wherein, such negotiated agreement would among other things involve substantially higher prices and/or require provisions of adequate insurance by and for the expense of the purchaser to protect Lafarge North America against the liabilities and responsibilities assumed by the purchaser herein. 2. Lafarge North America shall not be responsible for any direct or indirect damages whatsoever caused to the purchaser or otherwise by delays in deliveries, whether arising from fires, strikes, labour difficulties, material procurement difficulties, damage to plant or equipment, governmental regulations, accidents, transportation delays, or from any other cause whatsoever. 3. Orders will be accepted for reasonable color uniformity and finish of material. However, Lafarge North America does not accept responsibility for exact shade duplication or finish. 4. Any production and delivery commitments made by Lafarge North America are subject to the receipt by Lafarge North America of all necessary information, details, and final approved drawings within the time specified. 5. Material will be delivered in full truck-load quantities as close to the job site as trucks of Lafarge North America can reasonably proceed under their own power. Unloading time in excess of 30 minutes will be charged by Lafarge North America to the purchaser at prevailing rates. 6. Pallets left at the job site will be charged to the purchaser, but full credit will be given when they are returned in good condition, freight prepaid, to Lafarge North America. 7. Restocking charges will be 10% for undamaged stock items. Stock items with minor repairable damage and custom built items (prebenched manholes, type 1-S manholes and other non-stock items) that are returned or ordered and not shipped will be subject to a 30% restocking fee. No credit will be given for returned unrepairable products. 8. The purchaser shall inspect all material at the time of delivery and mark any damage or shortage on the delivery ticket. The use or installation of material or the failure to notify Lafarge North America of any defect within seven days after delivery will be deemed unconditional acceptance of the material and all obligations of Lafarge North America with respect to such material shall thereupon terminate the obligation of Lafarge North America under this warranty is expressly limited to repairing or replacing defective material and the purchaser shall not have any claim for labour, other material or anything other than for such repair or replacement. This warranty is in lieu of all other warranties, expressed or implied, with respect to the material covered hereunder. 9. Lafarge North America will not assume liability for any charge for defective materials or for alterations of defective materials, or for any work, except in cases where the prior written authorization of Lafarge North America has been given. 10. The purchaser shall assume responsibility for any dirt left on the street by Lafarge North America s trucks as a result of conditions at the place of deliver. 11. Terms of payment: Terms of payment rendered by Lafarge North America are net cash within thirty (30) days from the date of invoice issuance, in Canadian and in accordance with any payment instructions written on the invoice. If any invoice is not paid by the end of the said thirty (30) days, interest at the rate of two percent (2%) per month (26.8% per annum) shall be charged on all outstanding amounts. For unpaid amounts collected through legal proceedings or by a collection agency, the purchaser shall pay attorney and agency fees and reasonable costs thereof incurred by Lafarge North America in addition to the amount of the invoice and any accrued interest. PIPE
5 PLUGS, CAPS AND TRANSITION SLABS Nominal Inside Diameter Dimensions (mm) End Type Wall Designation mm in Plug ID Bell OD Plug Weight Cap Weight Bell C Bell C Bell B Bell C Bell C Bell Straight Bell Straight Bell Straight Bell Straight C C 762 C 914 C Straight C Straight B Straight C Straight Straight B C B C Straight C Straight B Straight C Straight C Straight B Notes: 1. The weight of any transition slab will vary depending on opening size, but will not exceed the values denoted above. 2. For the price of a transition slab, use the price of the larger cap/plug that is required. 3. All plugs and caps are 300 mm thick plus the length of the pipe spigot or bell connection Decrease Flow Create Storage Increase Flow DIRECTION OF FLOW Pipe Cap Pipe Plug 3 PIPE 2012
6 Nominal Inside Diameter CONCRETE PIPE - DIMENSIONS Dimensions (mm) Lifting Wall End Type Pin Designation Wall mm in Pipe ID Pipe OD Bell OD Thickness Note:. Bell Thickness Bell Length Bell C Bell C Bell B Bell C Ton Bell C Ton Ton Ton Ton Spiggot Length Bell C 686 Straight Bell C 762 Straight Bell C 914 Straight Bell C 1067 Straight Ton Straight B Ton Straight C Ton Straight C Ton Straight Ton Straight B C B C Ton Straight C Ton Straight B Ton Straight C Ton Straight C Ton Straight B Dimensions subject to change. If precise measurements are needed, please contact us. 2. Other wall designations for select pipe sizes are available. Please contact our office if additional information is required. PIPE
7 ASTM C76 CLASS II TO V, CSA A257.2 STRENGTH IN BRACKETS, ASTM C361 Pipe Nominal Inside Diameter Weight mm in kg/m kg/piece Bell End Type Bell Bell Bell Bell Bell Bell Straight Jacking Bell Straight Jacking Bell Straight Jacking Bell Straight Jacking Straight Jacking Straight Jacking Straight Jacking Straight Jacking Straight Jacking Straight Jacking Straight Jacking Straight Jacking Straight Jacking Straight Jacking Notes 1. Each pipe 2.44m in length, with exception of 3000mm diameter (2.10m). 2. Beveled pipe available (maximum 12mm (1/2 ) bevel) at 25% extra. See page 9 or contact us for limitations. 3. Jacking pipe is straight wall pipe with a 200mm wide metal band around the bell and additional reinforcing. 4. For jacking pipe 12mm chipboard cushion to be supplied and installed by contractor. 5. Microtunnel pipe available in mm diameter, produced at our Edmonton Plant. Please call for details. 6. ASTM C1417 (Direct Design) pipe available in all sizes shown above. See page 8 for additional information. 5 PIPE 2012
8 PIPE CLASS ESTIMATION TABLE Pipe Diameter (mm) Installation Maximum Depth to Invert for: Pipe Diameter Installation Maximum Depth to Invert for: Type: Class II Class III Class IV Class V (mm) Type: Class II Class III Class IV Class V Notes: 1. Table based on recommended loadings and calculations from Standard Practice for the Design and Installation of Rigid Gravity Sewer Pipe in the City of Calgary, January This table is provided for convenience, but is not intended to replace proper engineering design. 2. Minimum cover over crown: Type 1 Installation: 0.6m Type 2 Installation: 0.8m Type 3 Installation: 1.2m Type 4 Installation: 1.3m 3. For installation depths not shown in the table, or for other conditions not matching above, please contact us for design assistance. We will design the pipe for the required depth, using standard installation beddings. 4. Type 1 installations require prior approval from the City of Calgary for Calgary based projects. 5. Type 1 installations require greater soil stiffness from the surrounding soils than Type 2, 3, and 4 installations. Proper field verification of soil properties and compaction levels must be performed to ensure compliance with the design requirements. PIPE
9 STANDARD INSTALLATION BEDDINGS Soil and Compaction (% Standard Proctor Density) Requirements Installation Haunch and Lower Side Type Outer Bedding (Trench Wall) Description Soil Classifications USCS Soil Types 1 95% Category I 90% Category I, or 95% Category II, or 100% Category III Category I Gravelly Sand SW, SP GW, GP 2 90% Category I or 95% Category II 85% Category I, or 90% Category II, or 95% Category III Category II Sandy Silt GM, SM, ML Also GC, SC with less than 20% passing # % Category I, or 90% Category II, or 95% Category III 85% Category I, or 90% Category II, or 95% Category III Category III Silty Clay CL, MH GC, SC, CH 4 85% Category III, or No Compaction required for Category I or II 85% Category III, or No Compaction required for Category I or II Notes: 1. The Pipe Class Estimation Table on the following page is based on the Standard Practice for the Design and Installation of Rigid Gravity Sewer Pipe in the City of Calgary, using the following parameters: Backfill soil density: 2165 kg/m 3 CL-800 Highway Live Loading Bedding types as defined in ASTM C1479 (details above) Full fluid load in pipe Embankment installation (most conservative) 2. The Pipe Class Estimation Table is provided for covenience, but is not intended to replace proper engineering design. 7 PIPE 2012
10 SIDD CONCRETE PIPE ASTM C1417 SIDD concrete pipe, which refers to a more robust engineering design versus that offered by ASTM C76, is now required for all pipe 1050 mm diameter and larger by the City of Calgary s standard specification for sewer construction. Beneficial characteristics of SIDD design: Conservative Analyses are based on the worst case (embankment) loadings, voids in the haunch zone, the greatest predicted loads, and measurable requirements that more accurately assess long-term performance of the system. Versatile The designer can choose between installation types to suit specific site conditions and budgetary constraints. The four standard installations can be used to optimize the total installed cost by evaluation of the relative pipe cost and backfill material supply and compaction cost. Quantifiable Definite and measurable levels of acceptance are prescribed, which provides better direction for the designer and contractor. Nominal Inside Diameter Weight End Type: mm in kg/m kg/piece Bell Straight Straight Straight Straight Straight Straight Nominal Inside Diameter Weight mm in kg/m kg/piece Nominal Inside Diameter Weight mm in kg/m kg/piece Notes: 1. Cover range is to the TOP OF PIPE and is based on achieving a Type 2 Standard Installation as per ASTM C see page 7 for details. 2. Pipe designed in accordance with ASCE Standard Practice for Direct Design of Buried Precast Concrete Pipe Using Standard Installations (SIDD) using the loading assumptions on page 7. Shop drawings available upon request. 3. See page 4 for pipe dimensions and lift anchor sizes. All Taxes & Freight Charges Extra PIPE
11 CURVED ALIGNMENT / PIPE BENDS ASTM C76, CSA A257.2 Nominal Diameter (mm) 12.5mm Joint Opening Minimum Radius (m) Deflection Angle per Joint (Degrees) 12.5mm Joint Opening and 12.5mm Bevel Minimum Radius (m) Deflection Angle per Joint (Degrees) Weight kg/piece Bends/Flared Ends Notes: 1. If your specified radius is smaller than shown, you will require bends and/or manholes to meet the required radius. 2. All bends custom manufactured to required angle. 3. Bevelled pipe not available in sizes mm. 4. Above radii and angles based on standard pipe wall shown on page All bends are manufactured to a lay length of 2.44m, with the exception of 3000mm nominal diameter (2.10m). 9 PIPE 2012
12 Nominal Dia (mm) Notes: Weight kg/ pc Price Each 1. Spigot end required for inlet, bell for outlet. 2. No volume discount on bar screens. FLARED ENDS Dimensions (mm) A B C L W $ $1, $1, $1, $1, $2, $3, $3, $4, $5, PIPE
13 STANDARD CONCRETE BOX SECTIONS Thinking Inside the Box Precast concrete box sections are designed to meet job specific requirements and are manufactured under factory controlled conditions employing the latest in dry cast manufacturing technology. Precast box sections are the logical solution to problems of restricted head room, minimum cover, limited trench width or excessive over fills, and can be designed for jacking under roads without traffic interruption. Concrete box sections can be used in a variety of applications to meet the needs of your project beyond the conveyance of storm water, industrial waste and sanitary sewage. Innovative product solutions include: Highway bridge culverts Stormwater retention tanks Rural bridge applications Vertical vaults Rip-rap lined culverts for fish crossing Utility corridors or pedestrian tunnel crossings Box Sections DIMENSIONS (mm) Box Size Span x Rise Standard Length Side Wall Thickness Top Wall Thickness Bottom Wall Thickness Haunch Plug/Top/Base Slab Thickness Approximate Storage Volume (m3) 1200 x x x x x x x Notes: 1. Shorter standard lengths are available for all box sizes with the exception of those highlighted in italics in the table above. 2. For adjustable box sizes up to 4.0m in rise and span refer to page 23 for details. 11 PIPE 2012
14 STANDARD CONCRETE BOX SECTIONS Underground Stormwater Storage Alternatives Concrete box sections offer a high quality, structurally superior alternative for underground stormwater storage for every day or low impact development projects. With an estimated life span of over 100 years, concrete box sections are the dependable choice for converying and storing stormwater. Box section plugs or caps as required (monolithic alternatives available). Steel plate drilled epoxied on site to limit movement (by contractor). Flow channels May be sawcut in the field by contractor(recommended), though precast or scarring options are available. Swift lift pins (typical). Box sections placed in close proximity to limit gaps. Manhole or alternative access opening as required. Pipe entries as required. Notes: 1. Manufacture of box sections includes supply of concrete product only. Rub-R-Nek is available upon request, but does not constitute a water tight seal. Sealing is not the responsibility of Lafarge, including recommendation of sealing product, sealing contractor, or sealing procedure. It is recommended, however, that the groundwater conditions at the subject site be taken into consideration, as hydraulic gradients may impact sealant performance. 2. Design can be achieved using any box sizes offered in our catalogue. 3. Design solutions can be achieved using any combinations of boxes, wide and long. 4. Contact Lafarge for design inquiries. PIPE
15 1200 X m Long 1200 X m Long 1800 X m Long 2400 X m Long 2400 X m Long 2440 X m Long 3000 x m Long CONCRETE BOX SECTIONS - PRICES ASTM C1433 Span x Rise x Length Weight Per Piece Lift Clutches Required Culvert, Price Per Metre 3240 Plug / Cap, Each 985 Bend, Each 3240 Sloped Inlet/Outlet, Each 2430 Culvert, Price Per Metre 3600 Plug / Cap, Each 1295 Bend, Each 3600 Sloped Inlet/Outlet, Each 2700 Culvert, Price Per Metre 6180 Plug / Cap, Each 2440 Bend, Each 6180 Sloped Inlet/Outlet, Each 4635 Culvert, Price Per Metre 8065 Plug / Cap, Each 3230 Bend, Each 8065 Sloped Inlet/Outlet, Each 6050 Culvert, Price Per Metre 9220 Plug / Cap, Each 4435 Bend, Each 9220 Sloped Inlet/Outlet, Each 6915 Culvert, Price Per Metre Plug / Cap, Each 5810 Bend, Each Sloped Inlet/Outlet, Each 9630 Culvert, Price Per Metre Plug / Cap, Each 7310 Bend, Each Sloped Inlet/Outlet, Each Ton 4 Ton 8 Ton 8 Ton 8 Ton 8 Ton 8 Ton Notes: 1. Prices are based on standard applications designed to ASCE and produced to ASTM C1433. Please contact us for specific project quotes or CHBDC designs. 2. See page 24 for pricing of vertically installed boxes. 3. Kent Seal gasket (see page 34 for pricing) is available for box joints but may not provide a water tight seal. Additional measures by contractor may be needed if a water tight joint is required x1800 and 3000x2400 box sections now available with a gasketed joint. 5. Please call for pricing on our new large boxes up to 4m span. 6. Refer to your local municipality s installation requirements for information on joint connections. 13 PIPE 2012
16 CATCH BASIN COMPONENTS PIPE
17 914MM DIAMETER CATCH BASIN MATERIAL ASTM C478, CSA A257.4 Frame & Covers Tops & Collars Barrels Bases Item Description Weight kg/pc Monolithic CB Benched Base (See note 3) Upstream Monolithic Monolithic CB Flat Bottom Shallow Monolithic CB Base 914 ID x 1080 High (36 x42 ) Complete with gasket for SDR 35 or rough opening. (up to 450mm pipe) 914 ID x 1000 High (36 x39.5 ) Complete with higher benching and gasketed pipe opening 914 ID x 1220 High (36 x48 ) Complete with gasket for SDR 35 or rough opening. (up to 450mm pipe) 914 ID x 406 High (36 x16 ) Complete with gasket for SDR 35 or rough opening. (up to 300mm pipe) Flat CB Base 1100 Dia. x 152 Deep Base " CB Barell with Weeper Holes 914 ID x 1067 High (36"x42") With Weeper Holes " CB Barrel 914 ID x 914 High (36"x36") " CB Barrel 914 ID x 762 High (36" x 30") " CB Barrel 914 ID x 610 High (36" x 24") " CB Barrel 914 ID x 457 High (36" x 18") " CB Barrel 914 ID x 305 High (36" x 12") 250 6" CB Barrel 914 ID x 152 High (36" x 6") 125 Collar 67mm High Collar for K3 Top Slab/Grate 30 'C' Top - Square Curb Also fits K1 Frame & Grate 1320 x 1100 with openings for square curb grates 345 'K2' Top - Rolled Curb 1270 x 1120 with opening for rolled curb grate 260 'K3' Top - Rectangular Area Drain 1100 Dia. with opening for rectangular grate 270 'M' Top - Circular Area Drain 1100 Dia. With opening for round grate or solid frame and cover 285 'E' Top - Square Area Drain 1100 Dia. with opening for square grate 285 'C' Frame and Grate Rectangular Area Drain and Storm Back 150 'K2' Frame and Grate To Fit Rolled Curb 210 'K3' Frame and Grate Rectangular Area Drain 85 'E' Frame and Grate Square Area Drain 70 Round Frame and Grate City of Calgary Frame and Slotted Cover 150 Flat Inlet Control Device ICD for Monolithic CB - Curved Inlet Control Device ICD curved to fit CB Barrels Catchbasins Notes: All Taxes & Freight Charges Extra 1. Concrete catch basin products manufactured to ASTM C478 / CSA A Type E Frame and Grate not approved for use in City of Calgary Storm Drainage System. 3. Benching is for dead ends only. Monolithic bases available as new style dry cast with flat joint or old style wet cast with 25mm lip. 4. Barrels, Flat CB Base, and Type K3, E, and M top slabs have 25mm lip. Type C and K2 top slabs have flat joint. 15 PIPE 2012
18 TYPE 5A MANHOLES PREBENCHED BASE All newly built prebenched bases incorporate an engineered pipe to manhole connector. The boot-style gasket clamps onto the pipe, reducing infiltration and exfiltration. For profile pipe (i.e. ultra-rib, X2), a straight wall adaptor is recommended to maintain the integrity of the seal. PIPE
19 1200MM DIAMETER TYPE 5A MANHOLE MATERIAL For Pipe up to 600mm Diameter ASTM C478 / CSA A257.4 Bases Barrels & Adapters Top Slab & Collars Accessories Item Description Weight kg/pc 150 mm Pre-Bench 813 High Prebenched Base with Maximum Pipe size of 150 (6") mm Pre-Bench 813 High Prebenched Base with Maximum Pipe size of 200 (8") mm Pre-Bench 813 High Prebenched Base with Maximum Pipe size of 250 (10") mm Pre-Bench 813 High Prebenched Base with Maximum Pipe size of 300 (12") mm Pre-Bench 813 High Prebenched Base with Maximum Pipe size of 375 (15") mm Pre-Bench 813 High Prebenched Base with Maximum Pipe size of 450 (18") mm Pre-Bench 813 High Prebenched Base with Maximum Pipe size of 525 (21") mm Pre-Bench 914 High Prebenched Base with Maximum Pipe size of 600 (24") See note Cul-De-Sac Pre-Bench 813 High Cul-De-Sac Prebenched Base with 4 or more openings See Note Flat Mono Base 813 High Monolithic Flat Base 1900 Flat Base 1600 Square x 254 Deep Base " MH Barrel 1220 ID x 2440 High Barrel c/w 6 Steps " MH Barrel 1220 ID x 1220 High Barrel c/w 3 Steps " MH Barrel 1220 ID x 813 High Barrel c/w 2 Steps " MH Barrel 1220 ID x 406 High Barrel c/w 1 Step " MH Barrel 1220 ID x 305 High Barrel c/w 1 Step 395 Perforated MH Barrel 1220 ID x 914 High, Perforated Barrel 705 MH Spiggot to Spiggot Adaptor 1220 ID x 305 High Spigot-Spigot Adapter c/w 1 Step 525 MH Bell to Bell Adaptor 1220 ID x 508 High Bell-Bell Adapter c/w 1 Step 530 STD Top Slab 1220 ID x 178 Deep with 710 Dia. Offset Opening 630 "C" Top Slab 1220 ID x 178 Deep with Opening for 'C' Frame and Grate 630 Red Deer Top Slab 1220 ID x 178 Deep with 640 Dia. Offset Opening for Red Deer Sanitary Manholes 630 8" MH Collar 710 ID x 203 High c/w MH Step Recesses for Step-G 205 6" MH Collar 710 ID x 152 High c/w MH Step Recesses for Step-G 155 4" MH Collar 710 ID x 101 High c/w MH Step Recesses for Step-G 105 3" MH Collar 710 ID x 76 High c/w MH Step Recesses for Step-G 75 2" MH Collar 710 ID x 50 High c/w MH Step Recesses for Step-G 50 STD City of Calgary F&G City of Calgary Frame and Cover Dia.x 150 High 150 Frame & Cover City of Calgary Frame and Cover Dia.x 250 High 170 Frame & Cover Town and Country Style Frame and Cover Dia.x 150 High 190 Aluminum Step 300mm Wide Ladder Rung - Install in Barrels with 25mm Dia. Drilled Hole Aluminum Poly Step 300mm Wide Poly Coated Ladder Rung - Install in Barrels with 25mm Dia. Drilled Hole Galvanized Step 300mm Wide Ladder Rung - Install in Collars in Step Recess Gasket Manhole Circular Gasket - no lube style ICD Inlet Control Device to fit Prebenched Manhole - custom order Manholes 1. Prebenched bases are made to order - please contact us for a schedule. Approved drawings or manhole order forms are required for manufacture mm from invert to barrel shoulder except for 600mm concrete pipe mm height. 3. Minimum 90 degrees between 600mm diameter pipes. 4. Any prebenched manhole with four or more openings will be charged as a cul-de-sac manhole. 5. All other prebenched manholes available with pipe openings in 45 degree increments only. Other angles accommodated through flexibility in connection of pipe with manhole or an oversized hole. 6. Prebenched manhole bases come complete with circular cast-in rubber gasket for SDR 35 pipe. 7. In areas with high groundwater, manhole gaskets and 2440mm high barrels are recommended. 8. An order sheet is required for all prebenched manholes. See page All manhole material is designed to meet City of Calgary specifications. Please advise if other requirements are necessary. PIPE
20 Depth to Lowest Invert (m) ESTIMATING GUIDE FOR 1200mm DIAMETER TYPE 5A MANHOLES Prebenched Base Manhole Barrels Top Slab Collars Frame & Cover Notes: 1. Estimating guide based on prebenched manholes - 250mm pipe size used for prices mm and 75mm Collars are not used in the above but are available for grade adjustment mm High barrels are not show above, but may be used in place of mm high barrels. PIPE
21 MANHOLE ORDER FORM FAX TO: Contractor: Job Name: Date Required: 5A 5A 5A (outlet) (outlet) (outlet) Manhole Number: Rim Elevation: Side Pipe Size Material Invert A B C D E F G H Comments: Manhole Number: Rim Elevation: Side Pipe Size Material Invert A B C D E F G H Comments: Manhole Number: Rim Elevation: Side Pipe Size Material Invert A B C D E F G H Comments: 19 PIPE 2012
22 MANHOLE ORDER FORM FAX TO: Contractor: Job Name: Date Required: 1S Avoid using large pipes on side A (Interferes with steps) Manhole Number: Rim Elevation: Side Pipe Size Material Invert A B C D Size (if specified): (check one) Skimming Comments: 1S Avoid using large pipes on side A (Interferes with steps) Manhole Number: Rim Elevation: Side Pipe Size Material Invert A B C D Size (if specified): (check one) Skimming Comments: 1S Avoid using large pipes on side A (Interferes with steps) Manhole Number: Rim Elevation: Side Pipe Size Material Invert A B C D Size (if specified): (check one) Skimming Comments: PIPE
23 TYPE 1-S MANHOLES / LIFT STATIONS 1.2 1S 1.5 1S 1.9 1S 2.4 1S 2.8 1S Description For Pipe Sizes up to Approx. Weight (kg) each piece/ each half Dimension A B&C D E F G Top & Bottom Half 2020 High High Intermediate Top Half 1010 High Flat Base Slab Skimming Manhole (Top & Bottom Half) Top & Bottom Half 2020 High High Intermediate Top Half 1010 High Flat Base Slab Skimming Manhole (Top & Bottom Half) Top & Bottom Half 2000 High High Intermediate Top Half 1000 High Flat Base Slab Skimming Manhole (Top & Bottom Half) Top & Bottom Half 2400 High High Intermediate High Intermediate Top Half 1200 High Flat Base Slab Skimming Manhole (Top & Bottom Half) Top & Bottom Half 2800 High High Intermediate High Intermediate Top Half 1400 High Flat Base Slab Skimming Manhole (Top & Bottom Half) Notes: 1. 1-S Manholes & Liftstations are NOT prebenched. 2. Standard depth of cover 5 meters (10 meters available upon request). 3. Use intermediate sections between top and bottom sections of 1-S manhole to meet drop manhole invert requirements. 4. Where design invert rim to invert is less than the minimum shown, the City of Calgary requires a complete top and bottom be used, in which case it must be lowered and field benched to invert. Elsewhere, a top half 1-S (half of price shown) plus a base slab may be used, subject to approval by project engineer. 5. Kent Seal gasket (see page 34) is available for Type 1S manhole joints but is very dependent on field installation. Additional measures by contractor may be needed if a watertight joint is required. 6. Top and bottom half walls taper from the thickest point at the top/base slab to the centre (dimension E ). This may affect mounting of equipment, gates, etc. 21 PIPE 2012
24 TYPE 1-S MANHOLES / LIFT STATIONS Notes: Pipe Size (mm) Maximum Angle off of Face for Type 1S Manhole Size: 1200mm 1500mm 1930mm 2400mm 2800mm If pipe angle is greater than shown, use larger manhole. PIPE
25 BIG BOX MANHOLES Our biggest box manholes are available for use as Type 1-S manholes or lift stations. These sections are able to handle up to 3000mm diameter pipe. BIG BOX SIZING GUIDELINE Box Size Weight of Top & Bottom Slab (kg) 300mm Wall Thickness Weight of Section (kg) Lifting Clutches Required Weight of Top & Bottom Slab (kg) 350mm Wall Thickness Weight of Section (kg) Lifting Clutches Required Haunch Dimension 3.0m Span x 2.5m Rise Ton Ton m Span x 3.0m Rise Ton Ton m Span x 3.5m Rise Ton Ton m Span x 4.0m Rise Ton Ton m Span x 3.5m Rise Ton Ton m Span x 4.0m Rise Ton Ton m Span x 4.0m Rise Ton Ton 300 Large Manholes Notes: 1. All weights approximate and based on 2.5m section lengths. For shorter lengths, please scale appropriately or call. 2. For sizes not shown, consider using standard box sections on page 11 or call for additional information. 3. Call for pricing and construction schedules. 23 PIPE 2012
26 LARGE MANHOLE / LIFT STATION MATERIAL ASTM C478 / CSA A257.4, ASTM C1433 Item Description (Nominal I.D.) Lifting Clutches Required Weight (kg/piece) 1500 Dia High Barrel Top Slab / Base Slab 4 Ton Large Diameter Manholes 1800 Dia Dia Dia 2400 Dia 2700 Dia 2440 High Barrel Top Slab / Base Slab 2440 High Barrel Top Slab / Base Slab 2440 High Barrel Top Slab / Base Slab 2440 High Barrel Top Slab / Base Slab 2440 High Barrel Top Slab / Base Slab 4 Ton 8 Ton 8 Ton 8 Ton 8 Ton Dia 2100 High Barrel Top Slab / Base Slab 20 Ton x High Box Top Slab / Base Slab 4 Ton x High Box Top Slab / Base Slab 4 Ton Concrete Boxes 1800x x x High Box Top Slab / Base Slab 2000 High Box Top Slab / Base Slab 2000 High Box Top Slab / Base Slab 8 Ton 8 Ton 8 Ton x High Box Top Slab / Base Slab 8 Ton x High Box Top Slab / Base Slab 8 Ton Notes: 1. Base slabs can also be made oversized to resist flotation in high ground water conditions. Call for pricing. 2. Price includes rubber gaskets and lube for large diameter round manholes only. Kent Seal gasket (see page 34) is available for box manhole joints, but is very dependent on field installation. Additional measures by contractor may be needed if a watertight joint is required. 3. See page 16 for manhole barrel dimensions and page 11 for box dimensions 4. Top slabs & base slabs are typically 300mm thick. 5. For shorter sections, please call. PIPE
27 TEE RISER MANHOLES Dimensions (mm) Weight Diameter Length Height (kg/piece) PIPE 2012
28 CHECK VALVE MANHOLES Nominal Pipe Size (mm) Manhole Type Notes: 1. Check valve manholes come complete with cast-in neoprene gaskets for C900 PVC pipe. Weight (kg/piece) dia. Monolithic base dia. Monolithic base m Type 1-S m Type 1-S m Type 1-S Item SAMPLING CHAMBER BASE / TOP SLABS Weight (kg/piece) 840mm square base for 600mm Sampling Chamber mm Round base for 900mm Sampling Chamber mm Top Slab for 900mm Sampling Chamber 650 PIPE
29 The calm during the storm Surface access for ease of maintenance Weir directs water to quiet chamber below Durable precast concrete Patented technology prevents captured pollutants from scouring Impervious liner provides double wall containment for hydrocarbons Captures and stores a wide range of particle sizes, from 20 to 2,000 microns, for later removal Treated water exits the unit Sediment lies dormant for later removal Free oils are trapped for later removal Quiet chamber creates ideal conditions for free oils to rise and sediment to settle Easy to install Small footprint saves time and money with limited disruption to your site. Seamless Minimal drop between inlet and outlet pipes makes Stormceptor ideal for retrofits and new development projects. Flexible Multiple inlets can connect to a single unit. Can be used as a bend structure. Stormceptor 27 PIPE 2012
30 Removing more pollutants Stormceptor removes more pollutants from stormwater than any other separator Maintains continuous positive treatment of total suspended solids (TSS) regardless of flow rate Designed to remove a wide range of particle sizes (from 20 to 2,000 microns), as well as free oils, heavy metals, and nutrients that attach to fine sediment Can be designed to remove a specific particle size distribution (PSD) A calm treatment environment Stormceptor slows incoming stormwater to create a non-turbulent treatment environment, allowing free oils and debris to rise, and sediment to settle Patented scour prevention technology ensures pollutants are captured and contained during all rainfall events, even extreme storms PCSWMM for Stormceptor - Leading the Industry The most accurate, easy to use design tool available. This continuous simulation modeling software combines up-to-date local rainfall data from hundreds of stations across North America with a selection of particle sizes to design the best system for your site Developed with Computational Hydraulics International (CHI), internationally acclaimed expert Dr. Bill James, and Imbrium Systems Proven Performance Recent tests conducted for the New Jersey Department of Environmental Protection (NJDEP) found Stormceptor has the highest TSS removal rate of seven stormwater treatment technologies tested During NJDEP s rigorous testing, Stormceptor did not scour with the unit loaded to design capacity Stormceptor s performance is backed by Canada s stringent Environmental Technology Verification (ETV) Program With over 20,000 units operating worldwide, Stormceptor performs and protects every day, in every storm. Model Notes: 1. All models (except STC-300) include 1-300mm manhole barrel and 1-100mm collar. Extra material to suit final grade available at extra cost - see page Call for sizing assistance. We will need to know the drainage area, imperviousness (or runoff coefficient), flow control, and required treatment level. 3. Please call for pricing. Total Weight (kg) Heaviest Piece (kg) Typical Depth from Bottom to Outlet Invert (mm) STC STC STC STC STC STC STC STC STC STC STC STC PIPE
31 STC-300 Can be used as a catchbasin (inlet) or a manhole (inline), or both. 29 PIPE 2012
32 STC 750 through 1500 STANDARD DIMENSIONS (mm) Model A B C D Weight of Heaviest Piece (kg) STC STC STC Notes: 1. For shallow installation requirements, please call for assistance with alternate material configurations. PIPE
33 STC-2000 through 6000 SECTION VIEW For plan view, see STC , previous page STANDARD DIMENSIONS (mm) Model Treatment Chamber Diameter Orifice Diameter A B C D Weight of Heaviest Piece (kg) STC STC STC STC STC Notes: 1. For shallow installation requirements, please call for assistance with alternate material configurations. 31 PIPE 2012
34 STC-9000 through PIPE
35 NEW STORMWATER TREATMENT TECHNOLOGIES Extended Oil Storage (EOS) hydrocarbon spill protection in dry and wet weather The EOS model features increased storage for safe containment compared to standard Stormceptor models Creates a non-turbulent treatment environment, allowing oil to rise and sediment to settle Patented scour prevention technology ensures captured oil and sediment remain in unit for secure storage and easy removal Renowned Stormceptor protection from pollutants carried in stormwater runoff One system for your large stormwater capacity needs The StormceptorMAX responds to the needs of large-scale industrial and residential areas which may require a single stormwater management device. It provides stormwater quality treatment for large drainage areas and industrial spill volume capture of 15,000+ gallons. It is modular and expandable depending on the site size and water quality objectives. For more information on these new Stormceptor technologies, call us, or visit 33 PIPE 2012
36 MISCELLANEOUS MATERIAL Concrete, Cement Products & Gaskets & Lube Lifting Clutches Other Description Concrete Hydrant Pad Type HS (formerly Type 50) Cement 40kg bag Patching Cement Compound 40kg bag 1200 Dia. Manhole Barrel Gaskets Kent Seal 25mm Thick Mastic Coil Gasket Gasket Lubricant 3.5kg pail Subaqueous Gasket Lubricant (underwater use) 3.5kg pail 2 Ton 3-5 Ton 8-10 Ton 20 Ton Safety Platforms for manholes Hatches Keep your sediment sedentary. Stormceptor prevents scour during extreme rainfall events. zz z z zzzzz To learn more about Stormceptor, the importance of particle size distribution, and the role of oil/grit separators in your stormwater management projects, visit PIPE
37 CONCRETE PIPE HANDLING & INSTALLATION PROCEDURES Although each shipment of pipe is blocked and tied down by the hauler, inspect each pipe shipment upon arrival before unloading. Set aside damaged pipe and notify the pipe plant so that repair or replacement can be arranged. Damaged ends, chips or cracks that do not pass through the wall can usually be repaired. Provide padding between the pipe and lifting device to avoid damage during offloading. Stockpile pipe with all the bells arranged at the same end. If stacking pipe, each row should be arranged in the opposite direction with the spigot end protruding to keep the bells from resting on them. Ensure that the bottom row of stockpiled pipe is securely blocked at each end. All flexible gasket materials, including joint lubricating compounds, should be stored in a cool dry place. Rubber gaskets and preformed bulk mastics should be kept clean, away from oil, grease, excessive heat and out of the sun. Gaskets are made so that a precise volume of rubber is used from each joint, to provide a long lasting, tight and flexible joint. O-ring gaskets for ASTM C76 & C361 pipe require a lubricant for proper installation. See Gasket Installation on the following page for gasket and lubrication procedures. Do NOT transport pipe over uneven ground using lift anchors this dynamic loading may cause damage to the lift anchor and concrete. Care must be taken not to tamper with lift pins. Tampering would include heating, hammering, welding, or side loading the pins or anything else that could damage the pin or concrete. Keep the trench clean and dewatered with a firm bottom free of mud, taking care to prevent foreign material from entering the joint or pipe. Before the pipe is installed a bell hole must be dug in the bedding to accommodate the bell. Failure to do this can cause beam breaks or cracks in the barrel of the pipe. During insertion of the spigot into the bell, before the pipe is homed, the pipe should be partially supported to minimize lateral pressure on the gasket and to maintain concentricity until the gasket is properly positioned. Once the bell and spigot have been carefully aligned, the pipe must be homed with a direct thrust and not moved from side to side as it enters the bell. Proper homing can be achieved as shown or with blocks and lever bars, or mechanical come-alongs suitably braced to ensure even entry into the bell. Back hoes and tractors are NOT recommended for this purpose. If the bell and spigot are not carefully aligned, the gasket will be displaced causing a leak or splitting of the bell. Length of Chain (mm) A 1440 B 400 C 1040 D 1940 Pipe Laying Sling 35 PIPE 2012 Material Handling
38 INSTALLATION PROCEDURES Transporting, Lowering and Placing Pipe in Trench Pipe is laid into position using the Pipe Laying Sling in its symmetrical mode. They are lowered into the trench close to the previous pipe laid. The pipe may be prevented from rolling laterally by partial backfilling. Joining Pipe The long leg of the Pipe Laying Sling is attached to the farthest anchor on the previously laid pipe. The free leg is attached - out of the way on the clevis link provided. Locate the center of lift over the closest anchor of the previously laid pipe. This will properly align the direction of pull. The pipe is pulled into position by slowly raising the boom on the crane or backhoe without moving the boom forward or backward. Releasing the Load When the pipe has been pulled into position, the load is released and the Pipe Laying System is moved to the next pipe, and the process is repeated. Warning: Anchors can become overloaded and fail if the crane or backhoe continues to apply load after the connection has been completed. When handling precast concrete elements, extreme care should be taken to ensure that impact or dynamic loads are kept to a minimum. Impact or dynamic loads can greatly increase the applied load to the anchors. Failure to observe the above warnings may lead to property damage, personnel injury and death. PIPE
39 Self-Lube Gasket mm Pipe 1950mm Pipe GASKET INSTALLATION - PIPE Gasket Installation Wedge Gasket mm Pipe O-Ring Gasket mm Pipe C361 Pipe Spigot Gasket Spigot Gasket Gasket Spigot Carefully clean all dirt and foreign substances from the jointing surface of the bell or groove end of pipe. Carefully clean all dirt and foreign substances from the jointing surface of the bell or groove end of pipe. Lubricate bell jointing surface liberally. Use a brush, cloth, sponge or gloves to cover entire inside surface. Only approved lubricant should be used. Carefully clean spigot or tongue end of pipe, including the gasket recess. Carefully clean spigot or tongue end of pipe, including the gasket recess. Lubricate the spigot or tongue end of pipe, especially the gasket recess. Lubricate the gasket thoroughly before it is placed on the spigot or tongue. Fit the gasket carefully. Equalize the rubber gasket stretch by running a smooth, round object, inserted between gasket and spigot, around the entire circumference several times. Align bell and spigot of pipes to be jointed. Before homing the joint, check that the gasket is in contact with the entry taper around the entire circumference. Make sure pipe is aligned. Align bell and spigot of pipes to be jointed. Before homing the joint, check that the gasket is in contact with the entry taper around the entire circumference. Make sure pipe is aligned. 37 PIPE 2012
40 BOX CULVERT HANDLING How to Handle and Set Concrete Box Sections As with lifting any concrete element, special care should be taken by the driver of the placement vehicle to ensure that the impact or dynamic loads are reduced to a minimum. Impact of dynamic loads can greatly overload the anchors and cause failure. Load must be applied to all anchors simultaneously. Direction of Lift Vertical Spreader Bar Direction This Box Section Does Not Move This Box Section Does Not Move of Box Section Movement Correct Method for Pulling Box Sections Together To pull the box section into position, the long leg of the lift sling is coupled to the previously placed box section. The free short leg is hung into the hook provided for this purpose. Ensure that the top guide pulley of the crane is over the outer lifting anchor of the previously placed box section so that the direction of pull is slightly inclined towards the placed box section. Warning: The anchors can be overloaded and fail if the crane continues to pull on the sling after the connection is complete. Direction of Lift Vertical Spreader Bar PIPE
41 CATCHBASIN AND MANHOLE HANDLING Lifting Eye Installation Extended Lip Direction of Lift Note: Direction of extended lip should be in the direction of the lift. How to Use the Universal Lifting Eye Side View Spreader Bar Side View Side View A = Minimum Edge Distance Two typical each side Top View Top View Lift Anchors Note: Load must be applied simultaneous to all Swift Lift Anchors in order to safely lift product. 39 PIPE 2012
42 CATCHBASIN AND MANHOLE HANDLING Typical Applications Base/Extension Strip Lift Set Base/Slab/Lid/ Roof Strip Handle Set Base/Extension/ Roof Strip Handle Set PIPE
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant
Table of Contents. 2015 Con Cast Pipe Price List - Page 1
Table of Contents Conditions of Sale - Pages 2 & 3 Reinforced Concrete Pipe, Caps, and Plugs - Page 4 Scribed Holes & Knockouts - Page 4 Reducers & Increasers - Page 4 Concrete Pipe Approximate Mass &
Section 02702 SEWER PIPE INSTALLATION AND TESTING
PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete
SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
Wastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
SOUTHERN ALBERTA CONCRETE PIPE. & Precast Drainage Systems 2015. Building better cities
SOUTHERN ALBERTA CONCRETE PIPE & Precast Drainage Systems 05 Building better cities CONCRETE PIPE & Precast Drainage Systems 05 Lafarge Pipe Contacts General Manager Tina Larson, P.Eng. 09950 [email protected]
SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE
6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction
SECTION 02630 STORM DRAINAGE SYSTEM
SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE
SECTION 6A STORM DRAIN DESIGN Mar. 2002 S E C T I O N 6A STORM DRAIN - DESIGN
S E C T I O N 6A STORM DRAIN - DESIGN 6A.l Scope 6A.2 Storm Water Quantity 6A.3 Storm Drain Hydraulics 6A.4 Depths 6A.5 Locations 6A.6 Curved Storm Drains 6A.7 Manholes 6A.8 Catch basins 6A.9 Storm Drain
PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE
REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0
Fabricated Drainage Products
Fabricated Drainage Products Complete Drainage System Inline Drains are used At the beginning of a drain line Add a new water inlet to an existing drain line using a riser pipe and tee HARCO Surface Drainage
SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING
SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent
The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
SECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES
SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing
DIVISION 4300 STORM DRAINAGE
DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection
The Manitoba Water Services Board SECTION 027030 Standard Construction Specifications September 2013 Page 1 of 21
September 2013 Page 1 of 21 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the construction of sewers including: the supply and installation of pipe, saddles, tees,
Section 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
SANITARY SEWER SPECIFICATIONS
SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST
SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST For permanent structures per Delaware SCS Pond Code 378 and Delaware Sediment and Stormwater Regulations KEY PROJECT INFORMATION Item meets standard
3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.
The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:
Stormwater/Wetland Pond Construction Inspection Checklist
: Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials
CW 2130 - GRAVITY SEWERS TABLE OF CONTENTS
August 2010 CW 2130 - GRAVITY SEWERS TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications... 1 1.4 Referenced Standard Details...
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit
Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS
TABLE OF CONTENTS 2.18 CONCRETE AND/OR CORRUGATED STEEL STORM SEWER... 1 2.18.1 GENERAL... 1 2.18.2 MATERIALS... 1 2.18.2.1 Storm Sewer Pipe... 1 2.18.2.2 Cement Mortar... 1 2.18.2.3 Granular Materials...
SECTION 03400 PRECAST CONCRETE STRUCTURES
PART 1 GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, and equipment required to install precast concrete manholes, sanitary leaching rings, pump station, valve chamber, structures, frames,
SECTION 724 PIPE CULVERTS
SECTION 724 PIPE CULVERTS 724.1 Description. This work shall consist of providing pipe or pipe arch of the diameter or shape designated, laid upon a firm bed and backfilled as specified. Where appropriate
SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE
SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE PART 1: GENERAL 1.01 SECTION INCLUDES PVC pressure pipe and fabricated fittings in nominal sizes 4-inches through 12-inches with cast iron pipe equivalent
SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES
SECTION 33 05 16.13 PRECAST CONCRETE PART 1 - GENERAL 1.01 SECTION INCLUDES A. This item shall consist of the construction of both sanitary and storm sewer precast concrete manholes in accordance with
Native InDesign 2890 SaniTite Brochure 1/8" 100 300 CMYK April 17, 07
Sanitary Sewer Pipe Tough pipe for a tough environment SaniTite Sanitary Sewer Pipe delivers the features that engineers, contractors and municipalities demand durability, performance, handling, toughness
32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.
SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and
CLEANING, INSPECTION, AND TESTING OF SEWERS
CLEANING, INSPECTION, AND TESTING OF SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Cleaning, Inspecting, and Testing Sanitary Sewers B. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials
LS 2540 SEWER LATERALS AND INSPECTION TEES
LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown
TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe
TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TN 5.14 February 2010 Introduction It may be at times necessary, in an aging infrastructure, to rehabilitate drainage and sanitary lines
SECTION G SEWERS (STORM, SANITARY AND FDC)
G-1 GENERAL SECTION G SEWERS (STORM, SANITARY AND FDC) The Consulting Engineer is to monitor all specified pipe and granular materials, pipe slopes and run lengths and ensure the outlined criteria below
Royal Seal Gasketed Sewer Pipe
Royal Seal Gasketed Sewer Pipe Royal Seal Gasketed Sewer Pipe Royal Seal gasketed sewer pipe with our specially designed Double Seal Locked-In (DSLI ) gasket is an extremely durable pipe with a leak proof
SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE
SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel
CHAPTER 6 - SANITARY SEWER
CHAPTER 6 - SANITARY SEWER 6.1 GENERAL This section covers the requirements for PVC plastic sewer pipe materials and installation in sanitary sewer construction. 6.2 PIPE PVC gravity sewer pipe and fittings
SECTION 9.02 BUILDING SUBSURFACE DRAINS (PERIMETER, ETC.)
CHAPTER 9 SEWER / STORM DRAIN / IRRIGATION LINES SECTION 9.01 GENERAL This section covers the requirements for piping materials and installation of Lehi City sewer, storm drainage and irrigation collection
STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200
STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES PART 1 - GENERAL A. Description This section includes materials, testing, and installation of precast concrete
Guide to working on Public Sewers
Guide to working on Public Sewers affected by Building Works Introduction Severn Trent Water Ltd requires the work to be done in order to protect the public sewer and minimise the risk of us having to
CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS
CCU Engineering Specifications Section 003300 Effective Date: Nov. 1st, 2011 Page 1 of 5 PRECAST CONCRETE PRODUCTS PART 1 - GENERAL The following specification is intended for use for the design, selection
SECTION 33 41 00 REINFORCED CONCRETE PIPE. A. The following is a list of SPECIFICATIONS, which may be related to this section:
SECTION 33 41 00 REINFORCED CONCRETE PIPE PART 1 GENERAL 1.01 SECTION INCLUDES A. This section includes construction of reinforced concrete pipe for storm drainage, culverts, and sanitary sewer, including
CHAPTER 11 STORM DRAINAGE
CHAPTER STORM DRAINAGE SECTION PC 0 GENERAL 0. Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. Storm water discharge shall be
June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL
7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction
Table 4.9 Storm Drain Inlet Protetion Applicable for
BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection
CHAPTER 5. Storm Sewer
CHAPTER 5 Storm Sewer A. Introduction All proposed developments shall have a properly designed and constructed storm water conveyance system. This chapter deals only with the conveyance system. Storm water
Note: All dimensions are nominal. All weights are for shipping purposes only. Availability is subject to change.
CHANNEL DrAiNS Durable Designed for maximum durability and drainage, NDS Channel Drains are a proven alternative to traditional concrete drains. UV inhibitors in the grates, channel and component parts
EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines
EXHIBIT "A Technical Specifications for Water and Sewer Service Lines Water and Sewer Line Bedding and Backfill: Drawings show cross-section of trench, pipe laid on top of 6" min. bedding material, bedding
SECTION 02732 BUILDING SEWERS. B. Connection of building sanitary drainage system to municipal sewers.
SECTION 02732 BUILDING SEWERS PART 1 GENERAL 1.01 SECTION INCLUDES A. Lateral piping, fittings, and accessories. B. Connection of building sanitary drainage system to municipal sewers. 1.02 REGULATORY
8.01 STORM SEWERS, CATCH BASIN LEADS, AND EXTENSIONS
8.01 STORM SEWERS, CATCH BASIN LEADS, AND EXTENSIONS 8.01.01 Description This work shall consist of installing lines of storm sewer pipe of the required inside diameter, and the necessary appurtenances,
Beacon Hill Sewer District Standard Specifications
Beacon Hill Sewer District Standard Specifications Residential Gravity Side Sewer Including Design Criteria and Standard Construction Drawings Residential Gravity Side Sewer Design Criteria 1. Provisions
SECTION 16402 UNDERGROUND ELECTRIC SERVICE
SECTION 16402 UNDERGROUND ELECTRIC SERVICE PART 1 GENERAL 1.1 SUMMARY A. Description of System 1. Furnish all labor, materials, and equipment for below grade work external to buildings as required, and
SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.
SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings
STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES. 1. Trenching, Backfilling and Compacting: 02223
STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES PART 1 - GENERAL A. Description This section describes the installation of gravity sewer pipelines fabricated of vitrified
San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS
ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by
SECTION 7- STORM SEWER
SECTION 7- STORM SEWER 7.1. STORM SEWERS.... 7-1 7.2. SUMP DRAINS... 7-3 7.3. CATCH BASINS... 7-3 7.4. MANHOLES... 7-4 7.5. STORM SEWER CALCULATIONS... 7-4 7.6. CULVERTS AND BRIDGES... 7-5 7.7. OPEN CHANNELS...
A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.
PART 1 GENERAL 1.1 SCOPE A. This item shall include the work necessary for the installation of storm sewer line construction. B. Reference Section 3800 Trenching and Backfill and the General Conditions,
Specifications for Residential Property Owners Connection to New Public Sewer
Specifications for Residential Property Owners Connection to New Public Sewer Spalding Tract property owners are required to connect to the community sewer system when construction is complete and the
Uniclass L7315 + L2123 EPIC J3413. CI/SfB (52.5) Heavy duty channel drainage system ACO S Range
Uniclass L7315 + L2123 EPIC J3413 CI/SfB (52.5) Heavy duty channel drainage system ACO S Range ACO S Range CHANNEL DRAINS Load Class BS EN 1433:2002 Optimum solution The ACO S Range is an interconnecting
City of Shelbyville Site Inspection Checklist
City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather
The Most Advanced Name in Drainage Systems. Sanitary Sewer Pipe
The Most Advanced Name in Drainage Systems Sanitary Sewer Pipe SaniTite Sanitary Sewer Pipe delivers the features that engineers, contractors and municipalities demand durability, performance, handling,
The Verdura Wall check with your local building department
The Verdura Wall The Verdura Wall by Soil Retention Products, Inc of Carlsbad, California can be constructed as a gravity retaining structure or a geosynthetic reinforced segmental retaining wall, depending
SECTION 33 41 03 POLYVINYL CHLORIDE (PVC) PIPE
SECTION 33 41 03 POLYVINYL CHLORIDE (PVC) PIPE PART 1 GENERAL 1.01 SECTION INCLUDES A. This section includes all labor, materials, equipment, and incidentals required and installation of Polyvinyl Chloride
Unit Price Averages Reports
Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation
SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT
SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT The following are minimum requirements for installation of conventional trench sewage disposal systems in St. Mary s County,
SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.
SUBDRAINS AND FOOTING DRAIN COLLECTORS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subdrains B. Subdrain Cleanouts and Outlets C. Footing Drain Collectors D. Storm Sewer Service and Connections 1.02 DESCRIPTION
Section 402. STORM SEWERS
402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide
FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation
644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING
SECTION 5: SANITARY SEWER SYSTEM DESIGN
SECTION 5: SANITARY SEWER SYSTEM DESIGN 5.01 GENERAL Sanitary sewer improvements shall be designed to serve the ultimate level of City development as defined in the General Plan and the Wastewater Facilities
SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)
Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks
HDPE PRODUCTS QUALITY, PERFORMANCE AND ECONOMY COMBINED
QUALITY, PERFORMANCE AND ECONOMY COMBINED LANE S HDPE DRAINAGE PIPE Scan for more information on Lane s HDPE product line. Lane provides the complete product line to meet all your HDPE drainage needs -
The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11
Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;
SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
Storm Sewer Trenchless Upgrade Alternatives and Recommendations
Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for
Puddle Flange. FRANK Puddle Flange
Puddle Flange FRANK Puddle Flange The problem Problems keep on occurring when connecting pipes during construction work. Pipes laid in the ground must be introduced into concrete walls or shafts. In many
Concrete Pipes. Concrete Pipes
Various Types of Manufactured and Supplied by the Wolfman Company 1. Data Concrete pipes of all types are manufactured at Wolfman according to IS-27 (May 2010). IS 27 is the Israeli Standard that adopted
CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST
CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST NOTE: The following list shall only be used as a guide and shall not be used in lieu of the specifications found in the CITY OF ANN ARBOR PUBLIC
SECTION 02612 NONREINFORCED CONCRETE SEWER PIPE
SECTION 02612 PART 1 GENERAL 1.1 SUMMARY A. Section Includes: Furnishing and installing nonreinforced concrete sewer pipe. Provide concrete sewer pipe less than 12 inches in diameter, and in other sizes
Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
SECTION 200: STORM SEWER CONSTRUCTION STANDARDS
SECTION 200: STORM SEWER CONSTRUCTION STANDARDS Page No. Description 200-2 201 GENERAL 200-2 201.1 SPECIFICATIONS 200-2 201.2 CONNECTION TO EXISTING FACILITIES 200-3 202 MATERIALS 200-3 202.1 PIPES 200-4
Emergency Spillways (Sediment basins)
Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]
Installation PowerPoint for Grasscrete Formers
Installation PowerPoint for Grasscrete Formers 1 This document describes the two single-use tools utilized to create the Grasscrete product. The original Former is a vacuum formed light gauge plastic mold
ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application.
ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application. Article II provides rules governing the allowable connection to the City POTW and the construction and inspection of
EFFECTIVE FEBRUARY 2014. note: drainage permit required to call for a dampproof inspection
EFFECTIVE FEBRUARY 2014 note: drainage permit required to call for a dampproof inspection 1. ROOF DRAINS/DECK DRAINS (INTERIOR ) All roof and deck drains within the perimeter of the building shall be APPROVED
STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY
STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY Approved and adopted as Official Document Number 800576 this 10th day of December, 1980 Donald R. Boyd, P.E., Director Water
FY08 SEWER POINT REPAIRS BID TABULATION
6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "
PRE INSTALLATION MANUAL
REINFORCED CONCRETE PIPE PRE INSTALLATION INSPECTION & REPAIR MANUAL Kentucky Transportation Cabinet Kentucky Department of Highways Division of Materials 1227 Wilkinson Boulevard Frankfort, KY 40601 (502)
53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:
Division 53: Slip-Lining of Existing Sewer Line 53.01 GENERAL: This section includes all labor, materials, transportation, equipment necessary to rehabilitate by means of Instituform deteriorated sections
SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
Access chambers and maintenance shafts. Issue 1
Access chambers and maintenance shafts Issue 1 Contents Access chambers (worker-entry) 1 Applications 2 Benefits 2 Design information 3 Components 3 Precast base 3 Shaft 3 Taper top (option one) 3 Squat
Engineering Specifications February, 2004 Schedule H to Bylaw 7452, Subdivision Bylaw Page 18
Schedule H to Bylaw 7452, Subdivision Bylaw Page 18 3.4 Sanitary Sewers 3.4.1 Materials 3.4.1.1 The class and type of pipe and fittings, together with required class of bedding and trench widths, shall