Numerical analysis of an upstream tailings dam
|
|
|
- Frederica Rich
- 9 years ago
- Views:
Transcription
1 NGM 2016 Reykjavik Proceedings of the 17 th Nordic Geotechnical Meeting Challenges in Nordic Geotechnic 25 th 28 th of May Numerical analysis of an upstream tailings dam L. Hassellund, R. Knutsson, H. Mattsson & S. Knutsson Luleå University of Technology, Sweden, ABSTRACT This paper presents a case study of how the finite element method can be utilized to analyze stability of upstream tailings dams. Upstream tailings dams are usually raised gradually and the increased load normally influences the stability in an unfavorable way; the load generates excess pore water pressures and reduced stability. In this study, an upstream tailings dam in Northern Sweden was numerically simulated with the finite element software PLAXIS 2D in order to assess the stability of the dam. Upstream tailings dams are sensitive to high raising rates since initiated excess pore water pressures might not have time to dissipate. Stability analysis of a tailings dam is an application that is very suitable to carry out using finite element software; once a finite element model of the complex geometry of a dam has been established, it is easy to stepwise add new soil volumes, associated with each new raising, to the model. In this case study, it was found that strengthening actions were needed in order to maintain a stable structure. Rockfill berms were gradually added on the downstream slope of the model to obtain a factor of safety above a recommended value. The volumes of rockfill needed for the berms were minimized by numerical optimization to reduce costs. The stability between the years 2024 and 2034 was analyzed; with an annual deposition cycle. The performed numerical study resulted in a future plan for placement of rockfill berms to establish sufficient stability of the tailings dam. It was found that the volume of rockfill in the berms needed, varied during the years studied. Numerical modeling, as presented in this paper, is a useful tool for the dam owner to plan and design for future raisings of a tailings dam. Keywords: Numerical simulation, tailings dam, stability, excess pore water pressure 1 INTRODUCTION Waste material from mining facilities has to be taken care of in economic, environmental and safety aspects. This waste material is usually deposited in large impoundments surrounded by embankment dams i.e. tailings dams. The tailings dams have to be raised continuously to maintain storage for new generated tailings material. Tailings dams can be raised mainly by three different methods; upstream construction, downstream construction or centerline construction (Vick, 1990). The aim of this paper is to show how the finite element method, in this case with the software PLAXIS 2D (Brinkgreve et al., 2014), can be utilized as a tool for dam safety analysis. A tailings dam mainly built by the upstream method is investigated between the years 2024 and 2034 to assess its future stability. The tailings dam is raised annually and its stability is ensured by adding rockfill berms on the downstream slope of the dam. The locations of the berms are optimized with the aim to minimize the total volume of rockfill. If sufficient stability of the studied dam in the existing impoundment can be achieved in the future, the owner does not need to find other deposition options for the generated tailings. The tailings dam investigated in this paper is located in Aitik in Northern Sweden and has previously been examined by Ormann et al. (2013), Ormann et al. (2011) and Knutsson et al. (2015); where numerical simulations were utilized. Both in Ormann et al. (2013) and Ormann et al. (2011) the time period studied is not the same as in the present study, nor the constitutive model for the tailings material. The study conducted by Knutsson et al. (2015) contains deformation analyses and estimations of excess pore water pressures between the years 2014 and IGS 727 NGM Proceedings
2 MILLING FACILITY Modelling, analysis and design CLARIFICATION POND DECANT POND AITIK TAILINGS IMPOUNDMENT Figure 1 The studied tailings dam E-F is located between the tailings impoundment and the clarification pond. The red line shows the examined cross section of the tailings dam. (Knutsson, 2014) The results were used to assess the dam stability. By utilizing the factors of safety, FoS, alert values were estimated for monitoring programs. Studies regarding tailings material in the Aitik impoundment were carried out by Bjelkevik (2005) and Bhanbhro (2014) where behaviors and material properties of the tailings were investigated. 2 AITIK TAILINGS DAM The tailings dam studied is located in Aitik, Northern Sweden. The Aitik mine is an open pit copper mine that has been operational since 1968 and is owned by Boliden Mineral AB. The ore contains less than one percent of copper and with an annual production of 39 million tonnes of ore (year 2014) huge amounts of waste material are generated. The impoundment area, where the tailings material is deposited, is approximately 13 km 2 and is surrounded by tailings dams and by natural heights. The tailings dam E-F is chosen for the numerical analysis in this study and is located between the tailings impoundment and the clarification pond, see Figure 1. The most critical failure scenario occurs when a failure of tailings dam E-F results in a failure of the embankment dam surrounding the clarification pond. A failure like this might cause environmental damages downstream of the impoundment facilities. (Sweco Infrastructure AB and TCS AB, 2012) The tailings material is mixed with water from the processing plant to produce a slurry. Thereafter, the slurry is distributed through pipes and deposited in the impoundment. Between approximately the period 15 th of October and 30 th of April the tailings material is deposited from a single discharge point from tailings dam A-B, close to the milling facility, see Figure 1 (Sweco Infrastructure AB and TCS AB, 2012). This method is used to prevent freezing in the pipes. Between approximately the period 1 st of May and 14 th of October the spigot method (Blight, 2010) is used and the tailings are distributed through spigots placed around the impoundment, see Figure 1. The spigot method creates segregation in the tailings material; coarser particles are settled close to the dam structure and finer particles further away. This phenomenon with coarser and finer particles separated, creates good foundation conditions for future dike constructions. The coarser particles contribute to a denser foundation which is required by the upstream method. The dissipation of excess pore water pressures corresponds to the consolidation process where coarser grained soil have higher hydraulic conductivity and allow the phreatic line to disperse faster than finer grained soil. The area between the dam structure and the decant pond is called beach and is required to NGM Proceedings 728 IGS
3 Numerical analysis of an upstream tailings dam Note: Zones A to J represent tailings with different material properties. Figure 2 Material zones in the tailings dam. The red lines show the size of the dam year 2015 and the blue lines show the outer boundaries. The whole geometry is presented for year make the phreatic level decrease before reaching the downstream slope of the dam. (Lottermoser, 2010) The beach at tailings dam E-F is between 100 and 200 meters wide. (Sweco Infrastructure AB and TCS AB, 2012) 3 FINITE ELEMENT MODEL To increase impoundment storage for generated tailings, tailings dams have to be raised continuously with sufficient stability. According to Swedish recommendations, the stability of tailings dams has to be sufficient for a very long time; i.e years (Bjelkevik, 2005; Svensk Energi AB/SveMin, 2012). Svensk Energi AB/SveMin (2012) recommends factors of safety, FoS, for tailings dams to be above 1.5 during normal operation conditions. Plane strain conditions were applied in the finite element model since the dam was considered to be a long structure i.e. the length of the dam is much larger than the width of the dam; no deformations along the longitudinal direction were expected. By simulating future raisings at the tailings dam between the years 2024 and 2034 in the finite element software PLAXIS 2D, the dam stability was assessed. If the dam stability in the simulations results in FoS values below the recommended value, strengthening actions have to be implemented. In this numerical analysis, rockfill berms were placed on the downstream slope of the dam to increase the dam stability. Rockfill berms were assumed to be constructed on the downstream slope of the tailings dam between the period 15 th of October and 30 th of April, to increase the dam stability during the following dike construction. An optimization technique, where the volume of rockfill was minimized to fulfill the recommended stability, was utilized in the simulations. The basic idea with the technique was to place as small volumes of rockfill as possible on the downstream slope of the dam to obtain FoS values above the recommended value. The optimization technique used in this study was basically the same technique as used by Knutsson et al. (2015) and Ormann et al. (2013). In this paper and the paper by Knutsson et al. (2015) smaller rockfill berms were placed on several different places on the downstream slope, whilst Ormann et al. (2013) placed the whole volume of rockfill at only one additional suitable position on the downstream slope of the dam. The most suitable positions for the rockfill berms were found by trying various locations and different volumes. The procedure was repeated until a FoS above 1.5 was obtained for a reasonable small total volume of rockfill. 3.1 Geometry The geometry of the dam cross section was provided by the dam owner Boliden Mineral AB. The geometry was extended with future dike raisings with the same layout as the dikes constructed today (year 2015), see Figure 2. The width of the geometry was chosen sufficiently large to obtain realistic numerical results. The geometry was assumed to be closed for water flow in the left and the right IGS 729 NGM Proceedings
4 Modelling, analysis and design Table 1 Values of material properties for tailings in the dam structure in Figure 2 (Knutsson, 2014; Pousette, 2007; Bhanbhro, 2014). The material properties are defined in e.g. Brinkgreve et al. (2014). Unit A B C D E F G H I J ref E 50 ref E oed kpa kpa ref E ur kpa m p ref kpa ν ur c ref kpa φ ψ R f γ unsat kn/m γ sat kn/m e init k x m/days k y m/days 8.64E E E E E E vertical outer boundaries of the model, see Figure 2. The lower horizontal outer boundary was also assumed to be closed. Both horizontal and vertical deformations were modeled to not occur in the bottom boundary and for the left and right outer boundaries only vertical deformations were allowed. The foundation for tailings dam E-F as well as the starter dike consist of till, see Figure 2. The first six dike raisings, counted from the starter dike, were also constructed of till. The subsequent dike raisings were constructed of compacted tailings. All dike constructions were equipped with filters and rockfill on the downstream slope to protect the slope from surface erosion. The tailings were disposed and depending on the milling process of the tailings, the material properties vary over the years. The rockfill berms were constructed during the winter, due to less work activity at the impoundment that time compared to summer periods. Furthermore, rockfill materials are less sensitive to freezing and thawing than materials with lower hydraulic conductivity. 3.2 Material properties The geometry of the tailings dam studied was divided into different subareas to represent different soil layers, see Figure 2. The subareas have various sizes and different material properties. The values of the material parameters in Table 1 and Table 2 correspond to the letters and names shown in Figure 2. All values of the material properties for the tailings in the impoundment came from laboratory tests presented by Pousette (2007). The constitutive model Hardening Soil (Brinkgreve et al., 2014) was chosen for the tailings material, since parameter values were available. Values of material properties for the constitutive model were evaluated by Pousette (2007), Knutsson (2014) and Bhanbhro (2014). The values of material properties for the tailings evaluated for Hardening Soil can be seen in Table 1. By using Hardening Soil, in the analyses, deformations could be realistically modeled, since Hardening Soil is a better constitutive model than the simpler constitutive model NGM Proceedings 730 IGS
5 Numerical analysis of an upstream tailings dam Table 2 Values of material properties for filter, rockfill and till in the dam structure in Figure 2 (Sweco Infrastructure AB and TCS AB, 2012; Jonasson, 2008). The material properties are defined in e.g. Brinkgreve et al. (2014). Unit Filter Rockfill Till (starter dike) Till (underground) E kpa v c ref kpa φ ψ γ unsat kn/m γ sat kn/m e init k x m/days k y m/days Mohr Coulomb when analyzing deformations (Brinkgreve et al., 2014). The constitutive model Mohr Coulomb was chosen for filter, rockfill and till since values of material properties were available, see Table 2. The values of material properties for the Mohr Coulomb model were provided from geotechnical investigations reported by Jonasson (2008). All values used as material properties in the simulations were assumed to be valid also in the future. No studies about future behavior of this tailings material have been composed; for instance, regarding changes of stiffness and strength caused by aging effects. The increased load from the dike constructions is first carried by the pore water in the form of excess pore water pressures. The excess pore water pressures will then slowly decrease during consolidation and the load transforms gradually over to the soil skeleton. The hydraulic conductivity in the soil material and drainage conditions in the surroundings determines the rate of excess pore water pressure dissipation. This is modeled in PLAXIS 2D for each activity, by first assuming undrained conditions that will change into drained conditions if complete consolidation is achieved. 3.3 Mesh generation The geometry of the tailings dam was divided into 15-noded triangular finite elements. In order to choose a proper mesh, different element coarseness were tested in the simulations. The most convenient mesh was chosen considering both computation time and accuracy of the results, see Figure 3. Local mesh refinements were performed in the downstream toe of the dam to achieve more accurate results in the computations. Figure 3 Generated mesh in the model with local mesh refinements at the dam toe. 3.4 Computation phases All computations in the software PLAXIS 2D were defined with initial conditions, described in an initial phase at a pre-defined time. This initial time point for the studied tailings dam E-F was chosen to be in year 2007, since the raising rate of the dam increased that year. It was assumed, due to the low raising rate earlier, that no excess pore water pressures existed in the dam structure at the defined initial time point. All IGS 731 NGM Proceedings
6 Modelling, analysis and design deformations were set to zero in the initial phase. One year was divided into different activities that were inserted in the simulations as computation phases, see Figure 4. Between the period 15 th of October and the 30 th of April, no discharge of tailings from dam E-F was taking place. This period is called winter in Figure 4. In the vicinity of the analyzed cross section, it was assumed that spigotting of tailings took place between the period 1 st of May and 31 st of July. Followed by a period of 15 days of rest, 15 days of dike construction and another 15 days of rest. The rests were needed for the working process for dike constructions. After that, spigotting continued 14 th of September until 14 th of October. Month January February March April May June July August September October November December Activities (120 days) (121 days if leap year) Spigotting (91 days) Rest (15 days) Dike construction (15 days) Rest (15 days) Spigotting (31 days) (78 days) Figure 4 Annual activities at dam E-F used in the computations. In order to assess the slope stability of tailings dam E-F, consolidation computations were executed. The times defined in Figure 4 correspond to the duration of each activity where consolidation was computed. The worst case was found when the load increased within the dam structure and consolidation was still not completed. This occurred immediately after a new dike was constructed. The increased load gave increased excess pore water pressures and thus decreased FoS values. With the intention of examining the dam stability, safety computations were performed after each consolidation computation. The factor of safety is defined in PLAXIS 2D by FoS = available strength strength at failure (1) where the available strength is the strength from the effective stress state and input strength parameters. The strength at failure is obtained by decreasing the input strength parameters in small increments until an unstable structure is obtained. The FoS assessed in PLAXIS 2D gives the global FoS of the whole dam geometry. (Brinkgreve et al., 2014) 3.5 Water conditions The phreatic line defined in the simulations was assumed to be at the surface of the tailings material, see a), b) and c) in Figure 5 depending on the activity described in Figure 4. As can be seen, the location of the phreatic line was changing depending on the activity. When the phreatic line reached the point where the beach and the dike construction intersects (dike toe) the groundwater level started to incline as a straight line between fixed measurement points in the dikes, see d) in Figure 5. Thereafter, the phreatic line was assumed to be horizontal. This level represents the highest allowed water level in the clarification pond. The field measurements regarding ground water location were provided by Boliden Mineral AB. 4 RESULTS Stability analyses were conducted to assess the future stability of the studied tailings dam. The stability of the tailings dam, subjected to raisings, was first analyzed without rockfill berms added on the downstream slope of the dam. The result indicated a trend of decreasing FoS. Strengthening actions were therefore required. This was modeled by adding rockfill berms on the downstream slope. NGM Proceedings 732 IGS
7 Factor of safety Numerical analysis of an upstream tailings dam a) b) c) d) Figure 5 Location of the phreatic line: a) between 14 th of September and 30 th of April b) between 1 st of May and 14 th of August c) between 15 th of August and 13 th of September d) in the dam toe during all activities. 4.1 Stability with no strengthening methods The studied raisings of the tailings dam were simulated without any strengthening methods on the downstream slope of the dam to investigate if sufficient stability was obtained. It was shown in the simulations that after only three years the FoS was decreasing to values continuously below the recommended value of 1.5. Since the FoS did not fulfill the recommended value no further analyses without strengthening methods were performed. The result from these simulations gave the FoS shown in Figure 6. 1,7 1,6 1,5 1, , Year Figure 6 Values of FoS with no rockfill berms added on the downstream slope of the dam. The highest computed FoS value each year occurs when maximum consolidation is achieved, due to decreased excess pore water pressures in the dam structure, see a) in Figure 7. Maximum consolidation is obtained immediately before spigotting in the spring i.e. 30 th of April. When the spigotting begins, 1 st of May, the FoS starts to decrease. This phenomenon occurs because of increased load from newly deposited tailings. The increased load contributes to excess pore water pressures and thereby reduced stability. Later in August when a new dike construction takes place, the FoS makes a rapid drop due to increased load which contributes to excess pore water pressures in the dam, see b) in Figure 7. The lowest FoS corresponds to the time when maximum excess pore water pressures are obtained, see c) in Figure 7. When consolidation of the tailings material continues after a dike is constructed, the FoS starts to increase again. a) Maximum consolidation b) New dike construction c) Consolidation starts again Figure 7 Enlargement of the red rectangle in figure 6. a) maximum consolidation in the soil is obtained, b) load from a new dike construction is applied, c) the soil begins to consolidate, highest values of excess pore water pressure are also find in this phase. The most critical slip surface in year 2027, associated with the lowest FoS, occurred directly after a new dike was constructed, see Figure 8. The slip surface is located in the upper part of the downstream slope of the dam and the shape is almost circular. Since the FoS is below the recommended value of 1.5, the dam structure was further investigated by adding rockfill berms on the downstream slope of the dam. 4.2 Stability with strengthening methods The FoS from the simulations with rockfill berms added on the downstream slope of the dam can be seen in Figure 9. The figure shows that the FoS for the whole time period studied are above the recommended value of 1.5. It can also be noted in Figure 9 that the IGS 733 NGM Proceedings
8 Factor of safety Modelling, analysis and design annual distribution of the values of FoS is very similar each year. The highest value of the FoS occurred when maximum consolidation was achieved and the lowest value of the FoS was achieved immediately after a new dike construction, due to increased load giving increased excess pore water pressures. The positions of the added rockfill berms can be seen in Figure 10. The rockfill berms added on the downstream slope of the dam increased the FoS so that values above the recommended value were obtained in all computation phases. The slip surface representing the lowest FoS in year 2027 with rockfill berms added on the downstream slope of the dam can be seen in Figure 11. The slip surface is located deep, throughout the whole dam body and embraces a much larger volume of soil than the slip surface in Figure 8. The slip surface obtained in Figure 11 is non-circular. The volumes of rockfill modeled in the simulations, during winters, on the downstream slope of the dam can be seen in Figure 12. The volumes were calculated with a constant dam length of 1500 meters. Thus, the south end of the dam consists of another dam and the north end of dam E-F consists of a dam corner, see Figure 1. It was noted that different volumes of rockfill were needed different years to obtain values of the FoS above the recommended value. Between the years 2030 and 2033, larger amounts of rockfill were needed compared to the other years studied. 5 CONCLUDING REMARKS It was shown that if no rockfill berms were added on the downstream slope of the dam the slip surfaces were almost circular and located in the upper part of the dam structure. However, the factor of safety, FoS, gradually decreased below the recommended value of 1.5 as the dam was raised. Strengthening actions were required to obtain values of the FoS above the recommended value. Rockfill berms were thus added in the simulations on the downstream slope of the dam structure. It was stated that with enough rockfill berms on the downstream slope of the dam the stability between the years 2024 and 2034 was sufficient according to the recommended value of 1.5. When rockfill berms were added on the downstream slope of the dam the values of the FoS increased and the shape of the slip surfaces changed, they started to go deep through the whole dam and embraced larger volumes of soil. The distribution of the FoS has a similar trend during each year in the analyses with rockfill berms. The FoS are located above the recommended value in all simulations which FoS = 1.39 Figure 8 The most critical slip surface after dike construction year 2027; without any rockfill berms added. 1,7 1,6 1,5 1,4 1, Year Figure 9 FoS when rockfill berms were added on the downstream slope of the dam. NGM Proceedings 734 IGS
9 Volume [Mm 3 ] Numerical analysis of an upstream tailings dam Figure 10 Rockfill plan for future raisings at the studied dam E-F. FoS = 1.50 Figure 11 The most critical slip surface after dike construction year 2027; with rockfill berms added. 1,4 1,2 1 0,8 0,6 0,4 0, Year Figure 12 Volume rockfill used on the downstream slope of the dam in the simulations indicated that a good optimization of rockfill berms was performed. Different volumes of rockfill had to be added each year in order to increase the values of FoS. The increased dam stability comes from the resisting moment of the added berms and if longer distances, i.e. levers, between the point of rotation and the point of gravity in the berms were utilized, less amount of rockfill had to be used. Once a geometry of a structure was inserted into a finite element software it is easy to do further investigations and analyses, by stepwise add or remove soil volumes to the structure. Thus, gradual raisings of a tailings dam is a good example of an engineering application that is particularly suitable to analyze in a finite element software. This study has shown, that the finite element software PLAXIS 2D is a very good tool in finding the most convenient locations as well as volumes for rockfill berms to be added, using stability analysis when raising tailings dams. 6 ACKNOWLEDGEMENTS The authors would like to express their sincere thanks to Boliden Mineral AB, Sweden for giving us this opportunity to carry out the presented study regarding the tailings dam E-F at the Aitik mine. The authors would also like to express special thanks to Mr. Peter Marthin and Mr. Anders Forsgren, Boliden Mineral AB and Ms. Annika Bjelkevik, TCS AB for encouraging support and site information. IGS 735 NGM Proceedings
10 Modelling, analysis and design Mr. Riaz Bhanbhro at Luleå University of Technology (LTU), is to be acknowledged for performing laboratory tests and for evaluation of material parameters and Mr. Fredrik Jonasson at SWECO Energuide AB, for providing information from field data. The research presented was carried out within the environment of "Swedish Hydropower Centre - SVC" at LTU. The support from the SVC environment is highly appreciated and acknowledged for. SVC was established by the Swedish Energy Agency, Elforsk and Svenska Kraftnät together with Luleå University of Technology, The Royal Institute of Technology, Chalmers University of Technology and Uppsala University. Luleå University of Technology is acknowledged for additional financial support and for providing laboratory resources for the work. Ormann, L., Zardari, M.A., Mattsson, H., Bjelkevik, A. & Knutsson, S. (2013) Numerical analysis of strengthening by rockfill embankments on an upstream tailings dam. Canadian Geotechnical Journal, 50, Pousette, K. (2007) Laboratorieförsök på anrikningssand från Aitik. Ödometerförsök, Triaxialförsök. Luleå, Sweden: Luleå University of Technology. (In Swedish) (Internal working document) Svensk Energi AB/SveMin. (2012) GruvRIDAS - Gruvindustrins riktlinjer för dammsäkerhet. Stockholm, Sweden: Föreningen för gruvor, mineraloch metallproducenter i Sverige. (In Swedish) Sweco Infrastructure AB, TCS AB. (2012) Bilaga A5 - Teknisk Beskrivning Dammar - Förutsättningar för nuvarande och fortsatt deponering i befintligt sandmagasin vid Aitikgruvan. Stockholm, Sweden: Sweco Infrastructure AB, TCS AB. Project number: and (In Swedish) (Internal report) Vick, S.G. (1990) Planning, Design, and Analysis of Tailings Dams. Vancouver, Canada: Bitech Publishers Ltd. 7 REFERENCES Bhanbhro, R. (2014) Mechanical Properties of Tailings Basic Description of a Tailings Material from Sweden. Licentiate thesis. Luleå, Sweden: Graphic Production. Bjelkevik, A. (2005) Water Cover Closure Design for Tailings Dams State of Art Report. Licentiate thesis. Luleå, Sweden: Universitetstryckeriet. Blight, G. (2010) Geotechnical Engineering for Mine Waste Storage Facilities. London, U.K.: Taylor & Francis Group. Brinkgreve, R.B.J., Engin, E. & Swolfs, W.M. (2014) Plaxis Delft, the Nederlands: Plaxis bv. Jonasson, F. (2008) PM Förslag på materialparametrar för Övriga material vid beräkning i PLAXIS. Project number: , Luleå, Sweden: SWECO VBB (In Swedish) (Internal report) Knutsson, R. (2014) Numerical analyses of Aitik tailings dam. Luleå, Sweden: Luleå University of Technology. (Internal working document) Knutsson, R., Viklander, P. & Knutsson, S. (2015) The use of numerical modeling in alert level set-up for instrumentation in tailings dams. In Proceedings of 25 th Congress and 83 rd Annual Meeting of International Commission of Large Dams (ICOLD), Stavanger, Norway, June Q.98-R. Lottermoser, B. (2010) Mine wastes - Characterization, Treatment and Environmental impacts. New York, U.S.: Springer. Ormann, L., Zardari, M.A. Mattsson, H., Bjelkevik, A. & Knutsson, S. (2011) Numerical Analysis of Curved Embankment of an Upstream Tailings Dam. Electronical Journal of Geotechnical Engineering (EJGE), 16, NGM Proceedings 736 IGS
UNDER DRAINAGE AND FILTER DESIGN
UNDER DRAINAGE AND FILTER DESIGN Tailings and HLP Workshop 28 April to 1 May 2010 INTRODUCTION The internal drainage is of crucial importance to the reliability and safety of a tailings dam throughout
Benchmarking Multi-Dimensional Large Strain Consolidation Analyses D. Priestley 1, M.D. Fredlund 2 and D. van Zyl 3
Benchmarking Multi-Dimensional Large Strain Consolidation Analyses D. Priestley 1, M.D. Fredlund 2 and D. van Zyl 3 1,3 University of British Columbia 6350 Stores Road Vancouver, BC, V6T 1Z4 2 SoilVision
Emergency Spillways (Sediment basins)
Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]
A CASE-STUDY OF CUA_DAT CFRD IN VIETNAM
A CASE-STUDY OF CUA_DAT CFRD IN VIETNAM Giang Pham Hong, Michel Hotakhanh, Nga Pham Hong, Hoai Nam Nguyen, Abstract:Dams have been taken an important role in time and surface redistribution of water for
Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains
Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains Doug Jenkins 1, Chris Lawson 2 1 Interactive Design Services, 2 Reinforced
Embankment Consolidation
Embankment Consolidation 36-1 Embankment Consolidation In this tutorial, RS2 is used for a coupled analysis of a road embankment subject to loading from typical daily traffic. Model Start the RS2 9.0 Model
Appendix B. Kensington Project Tailings Storage Facility Consolidation Testing & Modeling
Appendix B Kensington Project Tailings Storage Facility Consolidation Testing & Modeling Reclamation and Closure Plan April 2013 For the Kensington Gold Project Memorandum Date: February 21, 2005 Our Ref:
4.3 Results... 27 4.3.1 Drained Conditions... 27 4.3.2 Undrained Conditions... 28 4.4 References... 30 4.5 Data Files... 30 5 Undrained Analysis of
Table of Contents 1 One Dimensional Compression of a Finite Layer... 3 1.1 Problem Description... 3 1.1.1 Uniform Mesh... 3 1.1.2 Graded Mesh... 5 1.2 Analytical Solution... 6 1.3 Results... 6 1.3.1 Uniform
INTRODUCTION TO SOIL MODULI. Jean-Louis BRIAUD 1
INTRODUCTION TO SOIL MODULI By Jean-Louis BRIAUD 1 The modulus of a soil is one of the most difficult soil parameters to estimate because it depends on so many factors. Therefore when one says for example:
ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY
ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY ANNEX D1: BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN DRA FOR SAFETY D1-1 ANNEX D1 BASIC CONSIDERATIONS
Drained and Undrained Conditions. Undrained and Drained Shear Strength
Drained and Undrained Conditions Undrained and Drained Shear Strength Lecture No. October, 00 Drained condition occurs when there is no change in pore water pressure due to external loading. In a drained
CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST
CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST 1 Permeability is a measure of the ease in which water can flow through a soil volume. It is one of the most important geotechnical parameters. However,
CHAPTER: 6 FLOW OF WATER THROUGH SOILS
CHAPTER: 6 FLOW OF WATER THROUGH SOILS CONTENTS: Introduction, hydraulic head and water flow, Darcy s equation, laboratory determination of coefficient of permeability, field determination of coefficient
6.0 Results of Risk Analyses
6. Results of Risk Analyses A risk analysis of the optimized embankment designs for the Salton Sea restoration project was conducted jointly by Kleinfelder and representatives from Reclamation. A risk
2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT
2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT Open channel flow is defined as flow in any channel where the liquid flows with a free surface. Open channel flow is not under pressure; gravity is the
. Address the following issues in your solution:
CM 3110 COMSOL INSTRUCTIONS Faith Morrison and Maria Tafur Department of Chemical Engineering Michigan Technological University, Houghton, MI USA 22 November 2012 Zhichao Wang edits 21 November 2013 revised
Estimation of Adjacent Building Settlement During Drilling of Urban Tunnels
Estimation of Adjacent Building During Drilling of Urban Tunnels Shahram Pourakbar 1, Mohammad Azadi 2, Bujang B. K. Huat 1, Afshin Asadi 1 1 Department of Civil Engineering, University Putra Malaysia
Numerical Simulation of CPT Tip Resistance in Layered Soil
Numerical Simulation of CPT Tip Resistance in Layered Soil M.M. Ahmadi, Assistant Professor, [email protected] Dept. of Civil Engineering, Sharif University of Technology, Tehran, Iran Abstract The paper
When to Use Immediate Settlement in Settle 3D
When to Use Immediate Settlement in Settle 3D Most engineers agree that settlement is made up of three components: immediate, primary consolidation and secondary consolidation (or creep). Most engineers
EN 1997-1 Eurocode 7. Section 10 Hydraulic Failure Section 11 Overall Stability Section 12 Embankments. Trevor L.L. Orr Trinity College Dublin Ireland
EN 1997 1: Sections 10, 11 and 12 Your logo Brussels, 18-20 February 2008 Dissemination of information workshop 1 EN 1997-1 Eurocode 7 Section 10 Hydraulic Failure Section 11 Overall Stability Section
Figure 2.31. CPT Equipment
Soil tests (1) In-situ test In order to sound the strength of the soils in Las Colinas Mountain, portable cone penetration tests (Japan Geotechnical Society, 1995) were performed at three points C1-C3
Watershed Works Manual
National Rural Employment Guarantee Act Watershed Works Manual DRAINAGE LINE TREATMENT: GABION STRUCTURE Baba Amte Centre for People s Empowerment Samaj Pragati Sahayog September 2006 Drainage Line Treatment:
CHAPTER 9 FEM MODELING OF SOIL-SHEET PILE WALL INTERACTION
391 CHAPTER 9 FEM MODELING OF SOIL-SHEET PILE WALL INTERACTION 9.1 OVERVIEW OF FE SOIL-STRUCTURE INTERACTION Clough and Denby (1969) introduced Finite Element analysis into the soil-structure interaction
Composite Surfaces Tutorial
Composite Surfaces Tutorial 4-1 Composite Surfaces Tutorial This tutorial will use the same model as the Materials & Loading Tutorial (with some modifications), to demonstrate how to perform a circular
Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing
Brussels, 18-20 February 2008 Dissemination of information workshop 1 Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing Dr.-Ing. Bernd Schuppener, Federal Waterways Engineering
Validation of Cable Bolt Support Design in Weak Rock Using SMART Instruments and Phase 2
Validation of Cable Bolt Support Design in Weak Rock Using SMART Instruments and Phase 2 W.F. Bawden, Chair Lassonde Mineral Engineering Program, U. of Toronto, Canada J.D. Tod, Senior Engineer, Mine Design
Soil Mechanics SOIL STRENGTH page 1
Soil Mechanics SOIL STRENGTH page 1 Contents of this chapter : CHAPITRE 6. SOIL STRENGTH...1 6.1 PRINCIPAL PLANES AND PRINCIPAL STRESSES...1 6.2 MOHR CIRCLE...1 6.2.1 POLE METHOD OF FINDING STRESSES ON
STORMWATER MANAGEMENT CHECKLIST
STORMWATER MANAGEMENT CHECKLIST *This checklist must be completed and part of the Land Disturbing Permit submittal for review if the acreage disturbed is one (1) acre or more: I. SUPPORTING DATA Narrative
Best Management Practices for Coal Ash Storage Facilities
2009 World of Coal Ash (WOCA) Conference - May 4-7, 2009 in Lexington, KY, USA http://www.flyash.info/ Best Management Practices for Coal Ash Storage Facilities Presented by: Christopher D. Hardin, PE
Part 7 GEOTEXTILE FILTER FABRICS
Part 7 GEOTEXTILE FILTER FABRICS Well Screens Slotted casings are normally employed as well screens within the aquifers being taped by water wells. The width of the slots should allow 50 to 60% of the
Soil Strength. Performance Evaluation of Constructed Facilities Fall 2004. Prof. Mesut Pervizpour Office: KH #203 Ph: x4046
ENGR-627 Performance Evaluation of Constructed Facilities, Lecture # 4 Performance Evaluation of Constructed Facilities Fall 2004 Prof. Mesut Pervizpour Office: KH #203 Ph: x4046 1 Soil Strength 2 Soil
Specification Guidelines: Allan Block Modular Retaining Wall Systems
Specification Guidelines: Allan Block Modular Retaining Wall Systems The following specifications provide Allan Block Corporation's typical requirements and recommendations. At the engineer of record's
Liner system design for tailings impoundments and heap leach pads
Liner system design for tailings impoundments and heap leach pads John F. Lupo, Ph.D., P.E. AMEC E&E TAILINGS & MINE WASTE 08, VAIL Liner Systems Liner systems Environmental containment of process solutions
GROUNDWATER FLOW NETS Graphical Solutions to the Flow Equations. One family of curves are flow lines Another family of curves are equipotential lines
GROUNDWTER FLOW NETS Graphical Solutions to the Flow Equations One family of curves are flow lines nother family of curves are equipotential lines B C D E Boundary Conditions B and DE - constant head BC
Applying a circular load. Immediate and consolidation settlement. Deformed contours. Query points and query lines. Graph query.
Quick Start Tutorial 1-1 Quick Start Tutorial This quick start tutorial will cover some of the basic features of Settle3D. A circular load is applied to a single soil layer and settlements are examined.
Numerical analysis of boundary conditions to tunnels
Global journal of multidisciplinary and applied sciences Available online at www.gjmas.com 2015 GJMAS Journal-2015-3-2/37-41 ISSN 2313-6685 2015 GJMAS Numerical analysis of boundary conditions to tunnels
NUMERICAL MODELLING OF PIEZOCONE PENETRATION IN CLAY
NUMERICAL MODELLING OF PIEZOCONE PENETRATION IN CLAY Ilaria Giusti University of Pisa [email protected] Andrew J. Whittle Massachusetts Institute of Technology [email protected] Abstract This paper
USE OF GEOSYNTHETICS FOR FILTRATION AND DRAINAGE
USE OF GEOSYNTHETICS FOR FILTRATION AND DRAINAGE Prof. G L Sivakumar Babu Department of Civil Engineering Indian Institute of Science Bangalore 560012 Functions of a Filter Retain particles of the base
Simulating Sedimentation Model in Balarood Dam Reservoir Using CCHE2D Software
Bulletin of Environment, Pharmacology and Life Sciences Bull. Env. Pharmacol. Life Sci., Vol 4 [1] December 2014: 67-72 2014 Academy for Environment and Life Sciences, India Online ISSN 2277-1808 Journal
NUMERICAL ANALYSIS OF SEEPAGE THROUGH EMBANKMENT DAMS (CASE STUDY: KOCHARY DAM, GOLPAYEGAN)
NUMERICAL ANALYSIS OF SEEPAGE THROUGH EMBANKMENT DAMS (CASE STUDY: KOCHARY DAM, GOLPAYEGAN) *Reza Naghmehkhan Dahande 1 and Ahmad Taheri 2 1 Department of Civil Engineering-Water Management, Islamic Azad
Outlet stabilization structure
Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural
Geosynthetic Mining Solutions at Copper Tailings Dams: A Review of the State of Practice in Chile.
Geosynthetic Mining Solutions at Copper Tailings Dams: A Review of the State of Practice in Chile. Carlos Cacciuttolo, Engineering Council, Chile. Jack Caldwell, Robertson GeoConsultants, Canada. Scott
Module 3. Irrigation Engineering Principles. Version 2 CE IIT, Kharagpur
Module 3 Irrigation Engineering Principles Lesson 9 Regulating Structures for Canal Flows Instructional objectives On completion of this lesson, the student shall be able to learn: 1. The necessity of
ESTIMATION OF UNDRAINED SETTLEMENT OF SHALLOW FOUNDATIONS ON LONDON CLAY
International Conference on Structural and Foundation Failures August 2-4, 2004, Singapore ESTIMATION OF UNDRAINED SETTLEMENT OF SHALLOW FOUNDATIONS ON LONDON CLAY A. S. Osman, H.C. Yeow and M.D. Bolton
Copyright 2011 Casa Software Ltd. www.casaxps.com. Centre of Mass
Centre of Mass A central theme in mathematical modelling is that of reducing complex problems to simpler, and hopefully, equivalent problems for which mathematical analysis is possible. The concept of
Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control
Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Project Name: Tax Map Parcel: Acreage: Plat: ADC Map & Grid Engineering
Storm Drain Inlet Protection
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category
COMPARATIVE STABILITY ANALYSIS OF TAILINGS STORAGE FACILITIES
COMPARATIVE STABILITY ANALYSIS OF TAILINGS STORAGE FACILITIES *J. Mosquera 1, T. Hamade 1, and H. Mitri 1 McGill University 3450 University Street, room 109 Montréal, Québec, Canada H3A 0E8 (*corresponding
ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS
ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF
Interpretation of clogging effects on the hydraulic behavior of ion treated geotextiles
9 th International Conference on Geosynthetics, Brazil, 2010 Interpretation of clogging effects on the hydraulic behavior of ion treated geotextiles Lee, K. W. Department of Civil Engineering, Dongseo
SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS. Prepared by Risi Stone Systems Used by permission.
SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS Prepared by Risi Stone Systems Used by permission. 1-800-UNILOCK www.unilock.com FOREWORD This outline specification has been prepared for
Use of Fly ash from KKAB, for sealing of landfills
Use of Fly ash from KKAB, for sealing of landfills Kristina Hargelius M.Sc. Civ. Eng. [email protected] Abstract The paper must include an abstract, which should be no more than and 150 words.
REINFORCED CONCRETE. Reinforced Concrete Design. A Fundamental Approach - Fifth Edition. Walls are generally used to provide lateral support for:
HANDOUT REINFORCED CONCRETE Reinforced Concrete Design A Fundamental Approach - Fifth Edition RETAINING WALLS Fifth Edition A. J. Clark School of Engineering Department of Civil and Environmental Engineering
NRCS Overview. National Dam Safety Program Technical Workshop #19 February 22-23, 2012
NRCS Overview National Dam Safety Program Technical Workshop #19 February 22-23, 2012 Thomas Brown National Design, Construction, and Soil Mechanics Center (NDCSMC) Fort Worth, Texas NRCS Dam Inventory
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION Design Criteria Drainage Area The drainage area for storm drain inlets shall not exceed one acre. The crest elevations of these practices shall
COVER SYSTEMS FOR MINE CLOSURE AND REHABILITATION TWO CASE STUDIES
COVER SYSTEMS FOR MINE CLOSURE AND REHABILITATION TWO CASE STUDIES Jason Song 1 and Mike O Kane 2 1 O Kane Consultants Inc., 200 1121 Centre Street N.W., Calgary, AB T2E 7K6, Canada Email: [email protected]
THE TRANSITION FROM OPEN PIT TO UNDERGROUND MINING: AN UNUSUAL SLOPE FAILURE MECHANISM AT PALABORA
THE TRANSITION FROM OPEN PIT TO UNDERGROUND MINING: AN UNUSUAL SLOPE FAILURE MECHANISM AT PALABORA Richard K. Brummer*, Hao Li* & Allan Moss *Itasca Consulting Canada Inc., Rio Tinto Limited ABSTRACT At
720 Contour Grading. General. References. Resources. Definitions
720 Contour Grading General Contour grading directs water to a desired point, prevents erosion, provides noise deflection, provides visual fit of the facility into the landscape, and protects desirable
Behaviour of buildings due to tunnel induced subsidence
Behaviour of buildings due to tunnel induced subsidence A thesis submitted to the University of London for the degree of Doctor of Philosophy and for the Diploma of the Imperial College of Science, Technology
Stabilenka HUESKER. and Separation. Engineering with Geosynthetics SKER HUESKER HUESKER HUESKER HUESKERHUES
HUESKER Engineering with Geosynthetics rhuesker HUESKER HUESKER HUESKER HUESKER HUESKERr rhuesker HUESKER Woven HUESKER HUESKER Fabrics HUESKER HUESKERr SKER HUESKER HUESKER HUESKER HUESKERHUES rhuesker
A Strategy for Teaching Finite Element Analysis to Undergraduate Students
A Strategy for Teaching Finite Element Analysis to Undergraduate Students Gordon Smyrell, School of Computing and Mathematics, University of Teesside The analytical power and design flexibility offered
Outotec HIGmills; A Fine Grinding Technology
23 rd International Mining Congress & Exhibition of Turkey 16-19 April 2013 ANTALYA Outotec HIGmills; A Fine Grinding Technology H. Lehto Outotec Finland Oy A. Paz Outotec Pty Ltd, Perth, Australia I.
Determination of Thermal Conductivity of Coarse and Fine Sand Soils
Proceedings World Geothermal Congress Bali, Indonesia, - April Determination of Thermal Conductivity of Coarse and Fine Sand Soils Indra Noer Hamdhan 1 and Barry G. Clarke 2 1 Bandung National of Institute
Laterally Loaded Piles
Laterally Loaded Piles 1 Soil Response Modelled by p-y Curves In order to properly analyze a laterally loaded pile foundation in soil/rock, a nonlinear relationship needs to be applied that provides soil
Methods for Land Reclamation using Soft Soil and Waste
NTU-JTC I3C Seminar Methods for Land Reclamation using Soft Soil and Waste Chu Jian 2 August 2012 1 Outline Part 1. Overview of land reclamation methods Part 2. Methods for land reclamation using soft
Lecture 22 Example Culvert Design Much of the following is based on the USBR technical publication Design of Small Canal Structures (1978)
Lecture 22 Example Culvert Design Much of the following is based on the USBR technical publication Design of Small Canal Structures (1978) I. An Example Culvert Design Design a concrete culvert using the
APPENDIX G SETTLEMENT
APPENDIX G SETTLEMENT TABLE OF CONTENTS G.1 IN T R O D U C T IO N... 1 G.2 MATERIAL PLACEMENT AND COMPACTION... 1 G.2.1 Incom pressible M aterials... 1 G.2.2 Compressible Materials... 2 G.2.3 Soil P lacem
Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile
Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality
CLIFTY CREEK PLANT MADISON, INDIANA
2015 DAM AND DIKE INSPECTION REPORT GERS-15-018 CLIFTY CREEK PLANT MADISON, INDIANA PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION 1 RIVERSIDE PLAZA COLUMBUS, OHIO Annual Dam and Dike Inspection
Cone Penetration Testing in Geotechnical Practice. Tom Lunne Peter K. Robertson John J.M. Powell
Cone Penetration Testing in Geotechnical Practice Tom Lunne Peter K. Robertson John J.M. Powell BLACKIE ACADEMIC & PROFESSIONAL An Imprint of Chapman & Hall London Weinheim New York Tokyo Melbourne Madras
Storm Drain Inlet Protection
Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective
CEEN 162 - Geotechnical Engineering Laboratory Session 7 - Direct Shear and Unconfined Compression Tests
PURPOSE: The parameters of the shear strength relationship provide a means of evaluating the load carrying capacity of soils, stability of slopes, and pile capacity. The direct shear test is one of the
ANALYSIS OF SETTLEMENTS OF TEST EMBANKMENTS DURING 50 YEARS - A Comparison Between Field Measurements and Numerical Analysis BAHATIN GÜNDÜZ
ANALYSIS OF SETTLEMENTS OF TEST EMBANKMENTS DURING 50 YEARS - A Comparison Between Field BAHATIN GÜNDÜZ Structural Mechanics Master s Dissertation Department of Construction Sciences Structural Mechanics
WORK BREAKDOWN STRUCTURE FOR A TYPICAL MINE
WORK BREAKDOWN STRUCTURE FOR A TYPICAL MINE LEGEND [GeoMine] = Technology Sites [Exploration-Geology-Reserves] = Edumine Courses [GEOCHEMISTRY] = State-of-the-Art Review (SOAR) 1 EXPLORATION [GEOMINE]
Appendix A Sub surface displacements around excavations Data presented in Xdisp sample file
Appendix A Sub surface displacements around excavations Data presented in Xdisp sample file Notation B1 = lowest level of basement slab c = cohesion E = drained Young s Modulus Eu = undrained Young s Modulus
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection
Earth Pressure and Retaining Wall Basics for Non-Geotechnical Engineers
PDHonline Course C155 (2 PDH) Earth Pressure and Retaining Wall Basics for Non-Geotechnical Engineers Instructor: Richard P. Weber, P.E. 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA
Chapter 9. Steady Flow in Open channels
Chapter 9 Steady Flow in Open channels Objectives Be able to define uniform open channel flow Solve uniform open channel flow using the Manning Equation 9.1 Uniform Flow in Open Channel Open-channel flows
PART 3 DEFINITION OF ROCKFILL VERSUS EARTHFILL MATERIAL
PART 3 DEFINITION OF ROCKFILL VERSUS EARTHFILL MATERIAL Allan J. Breitenbach, P.E. AB Engineering Inc. Littleton, Colorado, USA Telephone: 1/720-981-5244 Telefax: 1/720-981-5245 Email: [email protected]
FAN PROTECTION AGAINST STALLING PHENOMENON
FAN PROTECTION AGAINST STALLING PHENOMENON Roberto Arias Álvarez 1 Javier Fernández López 2 2 1 ZITRON Technical Director [email protected] ZITRON Technical Pre Sales Management [email protected]
Technical handbook Panel Anchoring System
1 Basic principles of sandwich panels 3 Design conditions 4 Basic placement of anchors and pins 9 Large elements (muliple rows) 10 Small elements (two rows) 10 Turned elements 10 Slender elements 10 Cantilevering
Modelling the Discharge Rate and the Ground Settlement produced by the Tunnel Boring
Modelling the Discharge Rate and the Ground Settlement produced by the Tunnel Boring Giona Preisig*, Antonio Dematteis, Riccardo Torri, Nathalie Monin, Ellen Milnes, Pierre Perrochet *Center for Hydrogeology
Mining with Paste Fill
Mining with Paste Fill Mehmet Yumlu, Principal Mining Engineer AMC Consultants Pty Ltd AusIMM Cobar Mining Seminar AMC Con nsultants Pty Ltd Outline Introduction ti What is Paste Fill? Why Using Paste
Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
February 4, 2011. [email protected]. Report Recommendations and NIPSCO Responses. 4.3 Maintaining and Controlling Vegetation Growth
February 4, 2011 VIA E-MAIL AND CERTIFIED MAIL #7010 0290 0002 0577 6226 Mr. Stephen Hoffman US Environmental Protection Agency (5304P) 1200 Pennsylvania Avenue, NW Washington, DC 20460 [email protected]
PERMEABILITY TEST. To determine the coefficient of permeability of a soil using constant head method.
PERMEABILITY TEST A. CONSTANT HEAD OBJECTIVE To determine the coefficient of permeability of a soil using constant head method. need and Scope The knowledge of this property is much useful in solving problems
Period #16: Soil Compressibility and Consolidation (II)
Period #16: Soil Compressibility and Consolidation (II) A. Review and Motivation (1) Review: In most soils, changes in total volume are associated with reductions in void volume. The volume change of the
SURFACE REMEDIATION AND MANAGEMENT OVERVIEW
SURFACE REMEDIATION AND MANAGEMENT OVERVIEW Giant Mine Remediation Project Environmental Assessment Public Hearings September 10-14, 2012 Adrian Paradis (AANDC) Mike Nahir (AANDC) Bruce Halbert (Technical
Effect of Changes in the Hydraulic Conditions on the Velocity Distribution around a L-Shaped Spur Dike at the River Bend Using Flow-3D model
Technical Journal of Engineering and Applied Sciences Available online at www.tjeas.com 2013 TJEAS Journal-2013-3-16/1862-1868 ISSN 2051-0853 2013 TJEAS Effect of Changes in the Hydraulic Conditions on
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS
SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS Vince Luongo Petrifond Foundation Co., Ltd. PROJECT DESCRIPTION The York Durham Sanitary System (YDSS) Interceptor in the Town of Richmond Hill located
Open Channel Flow 2F-2. A. Introduction. B. Definitions. Design Manual Chapter 2 - Stormwater 2F - Open Channel Flow
Design Manual Chapter 2 - Stormwater 2F - Open Channel Flow 2F-2 Open Channel Flow A. Introduction The beginning of any channel design or modification is to understand the hydraulics of the stream. The
Collapse of Underground Storm Water Detention System
Collapse of Underground Storm Water Detention System No. 16 March 2008 Shopping malls have large roof areas and large paved areas for parking. In many cases, during heavy rainfall, the drainage from these
Appendix 4-C. Open Channel Theory
4-C-1 Appendix 4-C Open Channel Theory 4-C-2 Appendix 4.C - Table of Contents 4.C.1 Open Channel Flow Theory 4-C-3 4.C.2 Concepts 4-C-3 4.C.2.1 Specific Energy 4-C-3 4.C.2.2 Velocity Distribution Coefficient
STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.
STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill
Soil Mechanics. Outline. Shear Strength of Soils. Shear Failure Soil Strength. Laboratory Shear Strength Test. Stress Path Pore Pressure Parameters
Soil Mechanics Shear Strength of Soils Chih-Ping Lin National Chiao Tung Univ. [email protected] 1 Outline Shear Failure Soil Strength Mohr-Coulomb Failure Criterion Laboratory Shear Strength Test