MORNINGTON PENINSULA RATEPAYERS AND RESIDENTS ASSOCIATION INC and McCRAE ACTION GROUP
|
|
|
- Edmund Williamson
- 9 years ago
- Views:
Transcription
1 MORNINGTON PENINSULA RATEPAYERS AND RESIDENTS ASSOCIATION INC and McCRAE ACTION GROUP 31 March 2015 Reg No: A B PO Box 4087 Rosebud Vic Central Coastal Board PO Box 500 East Melbourne Vic 8002 Dear Central Coastal Board Central Regional Coastal Plan Draft The Mornington Peninsula Ratepayers and Residents Association Inc. and its precinct group, the McCrae Action Group is pleased to comment on the Central Regional Coastal Plan Draft. Our Association includes members who are active in the Friends of Rosebud Foreshore and the McCrae Foreshore Coastal Groups who help maintain the McCrae and Rosebud Foreshores. We have previously provided our views on the development of the Coastal Plan in April 2014 Our submission is as follows: Summary: Item 1 indicates that we are aligned with, and support, the submission by Peninsula Speaks Inc. The Central Coastal Board needs to ensure that any subsequent Coastal Management Plans are consistent with the Victorian Coastal Strategy 2014 and that there is no local government or departmental parochialism. Items 3 and 4 indicate that planners can be unrealistic in what can be achieved. Funding for coastal projects is likely to become under increasing pressure as the government is proposing to peg local government rates increases. The Central Regional Coastal Plan needs to also consider the efficient management of the coast. It may be that some managers need to look at their effectiveness and efficiency and/or some reorganisation is necessary to better utilise funds available. More emphasis needs to be placed on adaption planning for climate change and sea level rise. Inundation of some coastal areas will also be
2 affected by increased storm run off. Some actions may be able to be implemented now rather than being put off. In recent years some barriers have arisen which make life difficult for some of the volunteer groups. These groups may need support for recruiting and assistance with funding. Details 1. Our Association is affiliated with Peninsula Speaks Inc which co-ordinates and facilitates input into environmental matters on the Mornington Peninsula for groups like our Association. In this instance we are fully aligned with the Peninsula Speaks submission but have added a few additional comments of our own. 2. We support the concept for Regional Coastal Plans providing high level direction as on occasions local authorities can be parochial and narrowly focussed on their own self-interest. They seldom look beyond their own particular area and often do not consider the wider benefit to the Melbourne and Victorian community of our bays, coasts and foreshores. A major example of this was the Mornington Peninsula Shire s Southern Peninsula Aquatic Centre. Although the Victorian Coastal Strategy indicated that development on coastal Crown land should be coastal dependent some councillors and shire executives tried for many years to locate the Centre on Crown land on the Rosebud Foreshore. There are over 150 aquatic or leisure centres located inland in Victoria so it was quite clear that such a centre is not coastal dependent. Literally, hundreds of thousand dollars of ratepayers money was wasted by the shire executives. Following a recent by-election the balance of power in the Council changed and the new Council voted to write to the then Minster Ryan Smith who withdrew consent to use the foreshore. 3. Further need for high level direction on Coastal Pans is the Mt Eliza to Point Nepean Coastal Action Plan (CAP) which was prepared in Consistent with the Victorian Coastal Act 1995 the Plan was reviewed by the Central Coastal Council in 2011 which found that 24% of the proposed actions in 2005 CAP, despite these being the result of much community effort and funds were deemed no longer required, and only 26% CAP was completed. Despite the review and significant research and strategies being developed on climate change and sea level rises since 2005 the CAP has still not been revised. 4. On the 14 November 2011 the Mornington Peninsula Shire Council approved the Rosebud Foreshore Management Plan which was subsequently approved Minister on 9 May The management plan outlined around 100 actions many being in a medium to high category which were proposed to be undertaken within a 1-3 year timeframe. We have not undertaken an audit but would be very surprised if the shire s performance on delivering the Rosebud Foreshore Management Plan is any better than its performance on delivering the Mt Eliza to Point Nepean Coastal Action Plan. 2
3 5 Following is a copy of our submission to the shire s preliminary hearing on the budget. Our Suggestion is that if the shire cannot improve its performance on managing the foreshore then it should be handed back to Parks Victoria Review the cost to maintain the Rosebud Foreshore and the camping operation. In 2005 the Shire executed an agreement with Parks Victoria to takeover the management of the Rosebud Foreshore. Shortly after the Shire accepted responsibility the Manager - Recreation and Leisure stated in response to a question by Mr. Gary Howard at the , 223 Budget Hearing that: The net operating cost of the Rosebud Foreshore Reserve is three hundred and seventy thousand dollars ($370,000) per annum for 2006/2007. This compares to an initial expectation of approximately three hundred thousand dollars ($300,000) per annum. We do expect however to improve on this once we have managed camping operations for a full year. The Business Plan (see Table 2) in the Council approved Rosebud Coastal Management Plan indicates that the predicted loss for the Shire to manage the foreshore was -$420,000 for and -$345,000 for and Advice from the officer who prepared the budget was that there were further additional costs that would be incurred by some of the Shire s units such as, the Strategic Planning Unit which is required to prepare master plans in accordance with the Management Plan. Business Plan included in the Rosebud Management Plan. 3
4 A further response was received from Mr Kevin Clarke shortly before he resigned from the Shire concerning the expenditure on the Foreshore. This was different from the Business Plan and it was difficult to correlate the two estimates. The Association suggests that since taking over the management of the foreshore from Parks Victoria ratepayers now appear to have to fund a loss of around $ million per annum. This does not include the cost for capital works which will be required for projects such as relocating the Bowling Club, construction of the Civic Square or the $4 million cost of the proposed Jetty Road, Rosebud precinct works. We note that the Shire s camping fees only increased by 2-4% this financial year compared to an average increase in rates of 5.9%. Other adjacent foreshore managers, such as those at Dromana, West Rosebud and Whitecliffs to Camerons Bight are managed by foreshore committees at little or no cost to ratepayers and this raises the question as to why the Shire can t do the same. The Association suggests that the Shire needs to look at its management costs and there needs to be some accountability, particularly in view of the statement above by the Manager- Recreation and Leisure. If the Shire cannot manage the foreshore at little or no cost to ratepayers it should look at handing over the management to a committee of management like the adjacent areas or returning the foreshore management to Parks Victoria. 6 To our knowledge Rosebud has been flooded three times in the last five or six years. The article in the Herald Sun dated 21 October 2012 (Attachment 1) reflects the work undertaken by DELWP and the Municipal Association of Victoria and the Bayside Municipalities projects. While the issues have been identified there is an attitude that it is many years away and there is no urgency for action to be taken. It is our position that this continued work should be given a high priority and there are a number of sensible decisions and actions which can be taken now rather than being deferred. 7 Our Association includes members who are active in the Friends of Rosebud Foreshore and the McCrae Foreshore Coastal Groups who help maintain the McCrae and Rosebud Foreshores. Feedback from these members is frustration with insurance. We understand that they now have to find their own insurance. It also seems for health and safety reasons they must now work under supervision from the shire. In addition these groups are finding that their supporters are getting older and are having difficulty in recruiting new younger members. They are not blaming the shire or any of the departments who assist them but any help they could get would be appreciated. Yours faithfully Dr Alan Nelsen President Tel: Mob: Attachment 1. Herald Sun dated 21 October
5 ATTACHMENT 1 - THE SUNDAY AGE Climate change bill of $1b for suburbs Date: October 21, 2012 Cameron Houston WATERFRONT communities from Southbank to the Mornington Peninsula face a damage bill of more than $1 billion from severe storms and rising sea levels over the next 90 years, according to a confidential climate change report. The report, by federal, state and local governments, warns that parts of Rosebud foreshore could be completely submerged by 2100 during coastal flooding, while residents around Elwood's canals face massive annual losses if government and local councils fail to act. Maps from the report show a large section of Point Nepean Road would be regularly cut off during storms, while local residents and businesses would encounter frequent floods resulting from climate change. Illustration: Matt Golding. 5
6 The research warns that riverfront properties at Southbank are at greatest risk from flooding, with the annual cost of damage expected to increase from about $3 million in 2011 to almost $20 million by The annual cost of flooding in Elwood would rise from about $2.5 million in 2011 to $15 million by the end of the century, according to the report, which is based on data from Melbourne Water. Mordialloc would also experience a sharp increase in flood damage without immediate government action. Due to be released next February, the Port Phillip Coastal Adaption Pathways Program examined four vulnerable coastal areas and another flood-prone area in North Melbourne known as Arden-Macaulay. All four Melbourne councils involved with the research have been briefed on the findings. The report, excerpts of which have been obtained by The Sunday Age, establishes a cost-benefit framework that will be used to shape planning decisions and infrastructure investment by governments. While some owners of foreshore land in Queensland and New South Wales will be urged to implement a ''staged retreat'', councils in Melbourne's flood-prone areas will be advised to adapt to climate change challenges. The adaption option includes resilience to flooding and providing moderate protection from floods, according to a confidential document from Mornington Peninsula Shire Council. At a private briefing in Rosebud on September 24, Mornington councillors and staff prepared a community response to the report. ''If somebody leaks this report in the next few weeks or the federal government releases it we need to be able to reassure the community. If this got out, without the right information, it could upset people,'' a council officer told the meeting. Another council officer at the meeting said: ''There is clearly a lot of concern amongst people engaged in coastal management issues that the media don't treat this issue well; they tend to jump to extreme positions and seek to divide the community.'' An audio recording of the meeting was accidentally placed on the council's website. Yesterday, federal Climate Change Minister Greg Combet said scientific evidence had proved that climate change was real and posed significant risks for future generations. ''This is why we have also been working closely with state and local authorities to help start planning for climate change so we can adapt our infrastructure and minimise the economic impacts,'' Mr Combet said. Estimates by the Climate Change Department from last year revealed that 247,600 coastal homes across Australia worth up to $63 billion were at risk of inundation from a sea level rise of 1.1 metres over the next century. A recent study by the United Nations Intergovernmental Panel on Climate Change estimated Australian sea levels would rise by 90 centimetres by Municipal Association of Victoria chief executive Rob Spence said the long-term prospects for coastal property owners around Port Phillip Bay were more positive than in other states. ''Reassuringly for all five case study areas, even under the worst-possible scenarios modelled, the research confirms it is economically viable to occupy the areas,'' Mr Spence said. He said the affected municipalities had already begun work to mitigate the impact of climate change. In June, Victorian Planning Minister Matthew Guy introduced measures to counter coastal inundation, including a 20-centimetre floor-level rise in new houses in urban infill developments. [email protected] Read more: 6
Integrated Local Flood Management and Drainage Strategy OVERVIEW
Integrated Local Flood Management and Drainage Strategy OVERVIEW Flooding is a natural phenomenon. In urban areas where drainage relies on pipe networks, open channels and creeks, flooding can cause infrastructure
responding to climate change South east councils
South east councils responding to climate change Winner - Innovation Award, Victorian Coastal Awards for Excellence, 2009 Finalist - Excellence in Marine and Coastal Management, United Nations Association
Planning for sea level rise. Assessing development in areas prone to tidal inundation from sea level rise in the Port Phillip and Westernport Region
Planning for sea level rise Assessing development in areas prone to tidal inundation from sea level rise in the Port Phillip and Westernport Region Table of contents Introduction 1 New flood levels for
BUSINESS REGULATION BENCHMARKING: PLANNING, ZONING AND DEVELOPMENT ASSESSMENTS
42/120 Collins Street GPO Box 1472 Telephone +613 8664 2664 Melbourne 3000 Melbourne 3001 Facsimile +613 8664 2666 www.bca.com.au 31 August 2010 Ms Christine Underwood Business Regulation Benchmarking
Guideline: A risk assessment approach to development assessment in coastal hazard areas
Guideline: A risk assessment approach to development assessment in coastal hazard areas Prepared by: Environment Planning, Department of Environment and Heritage Protection State of Queensland, 2013. The
Melbourne Water s Submission. Draft Victorian Floodplain Management Strategy
Melbourne Water s Submission Draft Victorian Floodplain Management Strategy Waterways, drainage and floodplains are essential to life and liveability. The rivers, creeks, estuaries, wetlands and floodplains
Redland City Council. 1. Recommendation. 2. Local government metrics. The Commission recommends:
1. Recommendation The Commission recommends: (i) the existing local government area of Redland Shire Council remains unchanged; (ii) the local government be renamed Redland City Council; (iii) the local
APPENDIX 1 Floodplain Management Strategies & Guidelines
APPENDIX 1 Floodplain Management Strategies & Guidelines A. Port Phillip Flood Management Plan (2012) B. Draft Flood Management Strategy Port Phillip and Westernport (2015) C. Revised Draft Victorian Floodplain
Australian Strategic Policy Institute National Security Dinner West Tower Suite, Level 35, Sofitel Hotel 25 Collins Street, Melbourne 21 August 2008
Australian Strategic Policy Institute National Security Dinner West Tower Suite, Level 35, Sofitel Hotel 25 Collins Street, Melbourne 21 August 2008 Introduction Thank you Chris it s a great pleasure to
2. The costs of natural disasters
2. The costs of natural disasters Key Points Without action, the forecast annual cost in real terms of natural disasters (across government, business and communities) in Australia is expected to reach
FLOOD RISKS IN LONDON
Environment Committee FLOOD RISKS IN LONDON Summary of findings April 2014 About this summary 2 This is a summary of the findings of the Environment Committee s investigation into flood risk. In January
Melbourne Water. Principles for Provision of Waterway and Drainage Services for Urban Growth
Melbourne Water Principles for Provision of Waterway and Drainage Services for Urban Growth Contents About Melbourne Water 3 Principles for Creating Development Services Schemes 4 Preface 4 (Original)
Queens Park. Revised Draft Master Plan
Queens Park Nature-Based Accommodation Revised Draft Master Plan Disclaimer This publication may be of assistance to you but the Great Ocean Road Coast Committee do not guarantee that it is without flaw
October 15, 2013. Mayor and Council City of New Westminster 511 Royal Avenue New Westminster, BC V3L 1H9
October 15, 2013 Mayor and Council City of New Westminster 511 Royal Avenue New Westminster, BC V3L 1H9 RE: Business Plan Advancing a Collaborative, Regional Approach to Flood Management in BC s Lower
Guidelines for State Agency Management of Volunteer Activity
Guidelines for State Agency Management of Volunteer Activity June 2008 Department of Premier and Cabinet Contents Introduction... 3 Scope and Definitions... 4 Relationship between Agencies and Volunteers...
15 April 2011 Re: Expansion of the Victorian Energy Efficiency Target
Mr Anthony Williamson Principal Policy Officer, Energy Sector Development Division Department of Primary Industries Email: [email protected] 15 April 2011 Re: Expansion of the Victorian
Managing stormwater flooding risks in Melbourne
V I C T O R I A Auditor General Victoria Managing stormwater flooding risks in Melbourne Ordered to be printed by Authority. Government Printer for the State of Victoria PP No. 144, Session 2003-05 ISBN
Page 1 of 9. John Noonan, Manager Regulatory Services (Planning and Building)
Page 1 of 9 PLANNING COMMITTEE REPORT Agenda Item 5.5 PROPOSAL FOR SUBURB RENAMING FOR THE MELBOURNE CONVENTION CENTRE DEVELOPMENT AS SOUTH WHARF 2 October 2007 Division Sustainability & Regulatory Services
Capturing Value Uplift Benefiting from the Private Sector
Capturing Value Uplift Benefiting from the Private Sector April 2013 Contents Understanding the wealth effect of Infrastructure Current Initiatives Transit Oriented Development The Challenge: Move away
The Value of Golf Tourism
The Value of Golf Tourism to Australia September 2014 The Value of Golf Tourism to Australia contents 1. REPORT HIGHLIGHTS...1 2. INTRODUCTION...2 Source Data... 3 Tourism Research Australia... 3 2014
Climate Change and Infrastructure Planning Ahead
Climate Change and Infrastructure Planning Ahead Climate Change and Infrastructure Planning Ahead Infrastructure the physical facilities that support our society, such as buildings, roads, railways, ports
1. a) How effective is the current Climate Change Act 2010 in driving climate change action by:
Public Submission Review of Climate Change Act 2010 City of Melbourne Questions 1. a) How effective is the current Climate Change Act 2010 in driving climate change action by: Government? (tick one only)
Objective 4: Enhanced community education, flood awareness and preparedness
Objective 4: Enhanced community education, flood awareness and preparedness Understanding the extent and full impacts of flooding is essential for planning for potential future pressures on the drainage
Summary: Introduction
Summary: Melbourne Water has a range of responsibilities in the Port Phillip and Westernport region, including responsibilities for the protection and restoration of waterways and, in collaboration with
Fact Sheet: Commercial Personal Training and Fitness Groups
Fact Sheet: Commercial Personal Training and Fitness Groups Introduction It is a requirement under the Crown Land Acts Amendment (Lease and Licence Terms) Act 2009 that personal trainers and fitness groups
Discussion Paper. Strengthening Local Government. Strengthening councils and communities
Strengthening councils and communities Building a new framework for measuring performance in Local Government Strengthening Local Government Discussion Paper November 2013 Table of contents Why measure
Climate Resilience. 1. Introduction. 2. Climate Resilience. 3. Management Approach
1. Introduction This document forms part of our Disclosures on Management Approach (DMA) series, prepared in accordance with the Global Reporting Initiative s G4 Guidelines. The DMA series is designed
Property Leasing Officer. Corporate Services. Darren Gillies
POSITION TITLE Property Leasing Officer POSITION NUMBER: 0625 CLASSIFICATION/BAND: City of Greater Geelong Enterprise Agreement (as amended from time to time) Band 5 Salary $59,575.15 to $67,729.35 per
Environment Officer (part time)
Information for potential applicants Title: Department: Enquiries: Closing Date: Environment Officer (part time) Planning and Environment Derek Hibbert, Coast and Bushland Coordinator on telephone 1300
City Services. Engineering Services. Jamie Westhorpe
POSITION TITLE: Asset Management Engineer POSITION NUMBER: 0054 CLASSIFICATION/BAND: City of Greater Geelong Enterprise Agreement (as amended from time to time) Band 7 Salary $78,414.74 to $87,096.90 per
Corporate Services. Darren Gillies
POSITION TITLE Document Management Officer POSITION NUMBER: 0688 CLASSIFICATION/BAND: City of Greater Geelong Enterprise Agreement (as amended from time to time) Band 4 Salary $54,091.42 to $57,949.63
Council Strategy DOC/15/86752
Council Strategy Council strategy title: Council strategy owner: Adopted by: Date adopted: July 2015 Document Reference no: Drainage Upgrade Strategy Director Infrastructure Services Bayside City Council
THE NATIONAL STANDARDS FOR VOLUNTEER INVOLVEMENT
THE NATIONAL STANDARDS FOR VOLUNTEER INVOLVEMENT Contents Introduction...3 The National Standards Aims and Principles...4 Using the National Standards...5 Standards Overview...6 STANDARD 1: LEADERSHIP
THE NATIONAL STANDARDS FOR VOLUNTEER INVOLVEMENT
THE NATIONAL STANDARDS FOR VOLUNTEER INVOLVEMENT Volunteering Australia, 2015 April 2015 VOLUNTEERING AUSTRALIA Level 2, 202 City Walk Canberra ACT 2601 T: 02 6251 4060 E: [email protected]
Continuous. Improvement. Review Kit. for planning and responsible authorities February 2006. A Victorian Government Initiative
Continuous Improvement Review Kit for planning and responsible authorities February 2006 A Victorian Government Initiative Published by the Victorian Government Department of Sustainability and Environment
Community Groups & Holidays
Community Groups & Holidays Group Support Ratios 1:1 Carer to client totally dependent on support 1:2 1:3 Carer to 2 clients, client is independent but requires supervision; help on occasion Carer to 3
SUFFOLK COASTAL DISTRICT COUNCIL DOMESTIC FLOOD PROTECTION POLICY
SUFFOLK COASTAL DISTRICT COUNCIL DOMESTIC FLOOD PROTECTION POLICY 1. Introduction 1.1 The Council recognises the threat to local communities from flooding following severe weather events and as a result
THE NEW PLACE TO BE AS FEATURED IN BUSINESS IN FOCUS DECEMBER 2012
THE NEW PLACE TO BE AS FEATURED IN BUSINESS IN FOCUS DECEMBER 2012 Frankston City enjoys a prime location on the eastern shores of Port Phillip Bay, just 40 km southeast of Melbourne. Easily accessible
Asset Management and Maintenance by Councils
Asset Management and Maintenance by Councils Victorian Auditor-General s Report February 2014 2013 14:22 V I C T O R I A Victorian Auditor-General Asset Management and Maintenance by Councils Ordered
Doing business with local government
Doing business with local government A guide to better understand how to successfully become a supplier for local government. 02 Doing business with local government Introduction 3 About this guide 3 What
Standing Council on Police and Emergency Management
Standing Council on Police and Emergency Management Communiqué 29 June 2012 The Standing Council on Police and Emergency Management (SCPEM) met in Melbourne today, chaired by the Hon Peter Ryan MLA, Deputy
Planning for Casey s Community
2 July 2013 ITEM 2 ATTACHMENT 1 Council Report from Meeting This information is circulated separately. Council Meeting Page 9 Amendment C143 to the Casey Planning Scheme Revisions to various areas within
Water Security Action Plan 2011-2016
Water Security Action Plan 2011-2016 Approved on: 30 May 2011 Owner: Program Manager, Sustainable City 8203 7723 Trim Reference: ACC2011/59983 Net Review Date: 2013 1 1. Introduction Why Has Council Developed
8.7 DRAINAGE MAINTENANCE SERVICES CONTRACT AMENITY JAMES LENIHAN, DRAINAGE MAINTENANCE ENGINEER
8.7 DRAINAGE MAINTENANCE SERVICES CONTRACT LOCATION/ADDRESS: GENERAL MANAGER: PREPARED BY: TRIM FILE NO: 14/06/1912 ATTACHMENTS: WHOLE OF MUNICIPALITY FIONA BLAIR, INFRASTRUCTURE & AMENITY JAMES LENIHAN,
WHAT DOES CLIMATE CHANGE MEAN FOR YOUR LOCAL AREA?
WHAT DOES CLIMATE CHANGE MEAN FOR YOUR LOCAL AREA? THE FEDERAL ELECTORATE OF MARIBYRNONG The Climate Council is an independent, crowd-funded organisation providing quality information on climate change
Latrobe City Council Submission Emissions Reduction Fund Green Paper February 2014
Latrobe City Council Submission Emissions Reduction Fund Green Paper February 2014 For further information in relation to this submission please contact Allison Jones General Manager Economic Sustainability
Housing Association Regulatory Assessment
Welsh Government Housing Directorate - Regulation Housing Association Regulatory Assessment Melin Homes Limited Registration number: L110 Date of publication: 20 December 2013 Welsh Government Housing
1. The purpose of this report is to seek a formal response to each of the recommendations contained in the Peoples Panel Report.
Committee report to Council Agenda item 5.1 Council Panel recommendations on the 10 Year Financial Plan 25 November 2014 Committee Future Melbourne (Finance) Presenter Phu Nguyen, Chief Financial Officer
Corporate Services. Organisation Development. Andrew Keen
POSITION TITLE Coordinator Employee Relations and HR Business Partnering POSITION NUMBER: 0251 CLASSIFICATION/BAND: City of Greater Geelong Enterprise Agreement (as amended from time to time) Annualised
Bolton s Flood Risk Management Strategy
Bolton s Flood Risk Management Strategy www.bolton.gov.uk Public Summary Bolton s Flood Risk Management Strategy Public Summary Introduction Over 5.5 million properties in England and Wales are at risk
A guide to the AER s review of gas network prices in Victoria
A guide to the AER s review of gas network prices in Victoria March 2013 Commonwealth of Australia 2013 This work is copyright. Apart from any use permitted by the Copyright Act 1968, no part may be reproduced
Climate Change Resilience of Melbourne
Climate Change Resilience of Melbourne 1 Authors Ned Wales Associate Professor, Institute of Sustainable Development and Architecture, Bond University Isara Khanjanasthiti Research Assistant, Institute
QUT Digital Repository: http://eprints.qut.edu.au/ This is the author version published as:
QUT Digital Repository: http://eprints.qut.edu.au/ This is the author version published as: Jordan, Graham and Kumar, Arun and Koronios, Andy (2009) Service driven asset management. In: Proceedings of
think inside the Box
Discover Box Hill think inside the Box 2300 New Dwellings were approved from 2010-2014 26% 70% of New Dwellings in Whitehorse are located in Box Hill between 2004-2011 Growth in population between 2006-2011
GREAT BARRIER REEF. Climate Change Action Plan
GREAT BARRIER REEF Climate Change Action Plan 2007 2011 Climate change is now recognised as the greatest long-term threat to the Great Barrier Reef. The Great Barrier Reef is internationally renowned as
Customer Engagement Program. Stage 1 Report. March 2014. Understanding customer values, needs & expectations. Government of South Australia
Customer Engagement Program Stage 1 Report Understanding customer values, needs & expectations March 2014 Government of South Australia Welcome to SA Water s Customer Engagement Program This report summarises
2015 National Local Government Human Resources Conference
Municipal Association of Victoria 2015 National Local Government Human Resources Conference Sponsor and exhibitor opportunities 11 13 November 2015 Sofitel Melbourne on Collins The Municipal Association
Page 1 of 24. To present the Asset Management Policy 2014 for Council adoption.
Page 1 of 24 COMMUNITY AND SERVICES SPECIAL COMMITTEE REPORT 9 DECEMBER 2104 AGENDA ITEM 6.1 ASSET MANAGEMENT POLICY 2014 REVIEW Director: Manager: Ian Butterworth Director Infrastructure and Engineering
11.4 Voluntary Purchase. 11.5 House Raising and Flood Proofing
11.4 Voluntary Purchase As mentioned in Section 10 in certain high hazard areas of the floodplain, it may be impractical or uneconomic to mitigate flood hazard to existing properties at risk, or flood
London Borough of Merton Local Flood Risk Management Strategy
Local Flood Risk Management Strategy Summary 2014-2020 Introduction In response to the severe flooding across large parts of England and Wales in summer 2007, the Government has recently enacted the Flood
Budget development and management within departments
V I C T O R I A Auditor General Victoria Budget development and management within departments Ordered to be printed by Authority. Government Printer for the State of Victoria No. 39, Session 2003-2004
Conversation Toolkit. Guide. To assist individuals and groups to participate in the development of the Metropolitan Planning Strategy.
Conversation Toolkit Guide To assist individuals and groups to participate in the development of the Metropolitan Planning Strategy. Contents 1 About the Toolkit 1 2 About the Metropolitan Planning Strategy
Major & State Significant Projects Committee. East West Link Consolidated Business Case SUBMISSION PROPOSAL
Cabinet Secretariat Reference Submission No. MSSPC 12 Copy No. Submission to: Submission Title: Portfolio/s: Major & State Significant Projects Committee East West Link Consolidated Business Case Roads,
Strategy and Performance. Darren Gillies
POSITION TITLE: Corporate Strategy Administrator POSITION NUMBER: 0382 CLASSIFICATION/BAND: City of Greater Geelong Enterprise Agreement (as amended from time to time) Band 6 Salary $75,511.23 to $81,544.90
Logan City Council. Strategic Planning and Performance Management Framework
Logan City Council Strategic Planning and Performance Management Framework 1 Table of contents 1. Overview 3 a) Purpose 3 b) Key Features 3 2. Context 4 a) National Framework for Sustainability 4 b) Elements
Brendan Wood Business Solutions GAMING MACHINES ARRANGEMENT REVIEW
GAMING MACHINES ARRANGEMENT REVIEW Do you think the venue operator model is meeting the three objectives listed and why? How do you think the venue operator model could better achieve its operations? Financial
FLOOD RISK STATEMENT IN SUPPORT OF THE CONNECTING HERNE BAY AREA ACTION PLAN PREFERRED OPTIONS DOCUMENT
FLOOD RISK STATEMENT IN SUPPORT OF THE CONNECTING HERNE BAY AREA ACTION PLAN PREFERRED OPTIONS DOCUMENT Canterbury City Council January 2008 1 APPLICATION OF THE PPS25 SEQUENTIAL AND EXCEPTION TESTS 1.0
Centre for Sustainable Organisations and Work & Gippsland Trades and Labour Council Inc. People and the Economy Report No.1
Centre for Sustainable Organisations and Work & Gippsland Trades and Labour Council Inc Labour Market Profile: Latrobe Valley Region, Gippsland, Victoria People and the Economy Report No.1 2015 www.rmit.edu.au/research/csow
21.04 LAND USE. Managing amenity through land use strategies
21.04 LAND USE This section contains objectives and strategies for land use, under the themes of: Housing and community Retail, entertainment and the arts Office and commercial use Industry Education and
Community Emergency Planning Guide
Community Emergency Planning Guide Our district has experienced numerous events over past years. Evidence from previous emergencies has shown that communities that plan and manage their own needs before,
APPENDIX "F' TREE REMOVAL F-1
APPENDIX "F' TREE REMOVAL F-1 TABLE OF CONTENTS Page 1.0 Purpose...3 2.0 Objectives...3 3.0 Definitions...3 4.0 Statutory Authority...5 5.0 Responsibility...5 6.0 Tree Removal Criteria...6 7.0 The Tree
A simple guide to planning and building in Brisbane. From Brisbane City Council
A simple guide to planning and building in Brisbane. From Brisbane City Council rural living leafy suburbs Our Brisbane: from bush to bay EVER WONDERED HOW A CITY GROWS? WHO DECIDES WHAT GOES WHERE? OR
Gladstone Ports Corporation Limited
Gladstone Ports Corporation Limited Human Resources Committee Charter #159378v5 Adopted by Board 17/7/07 1 Table of Contents 1. TERMS OF REFERENCE... 3 2. ROLE AND RESPONSIBILITIES... 3 3. RELATIONSHIP
Review of the Energy Savings Scheme. Position Paper
Review of the Energy Savings Scheme Position Paper October 2015 Contents Executive summary... 3 Energy Savings Scheme Review Report package... 3 Expanding to gas... 3 Target, penalties and duration...
Draft model Work Health and Safety Codes of Practice
Submission to Safe Work Australia Draft model Work Health and Safety Codes of Practice MANAGING RISKS IN CONSTRUCTION WORK PREVENTING FALLS IN HOUSING CONSTRUCTION Prepared by Roofing Tile Association
Community Services. Family Services. Megan Holbrook
POSITION TITLE: Early Childhood Educator - Certificate III qualified (Integrated Centres / Services) POSITION NUMBER: 2467 & 0098 CLASSIFICATION/BAND: City of Greater Geelong Enterprise Agreement (as amended