Action Plan to Improve 2015/16 Staff Survey Results
|
|
|
- Esther Reynolds
- 9 years ago
- Views:
Transcription
1 TB 076/15 Meeting title Report title Trust Board Action Plan to Improve 2015/16 Staff Survey Results Meeting date 26 June 2015 Lead director Report author FOI status Report summary Purpose Recommendation Kevin Croft - Director of People and Organisational Development Nicola Bell - Head of Learning and Organisational Development Disclosable This paper sets out the key actions proposed by the Trust Executive Committee to achieve an improvement in the Staff survey results in 2015/16. Agree the action plan Action plan approved Corporate objective links CQC standard Identified risks and risk management actions Resource implications Legal implications Equality impact assessment Our patients, Our services, Our people, Our finances Safe, effective, caring, responsive, well-led Not acting on staff feedback and improving their working lives has an adverse effect on patient care and the organisation s ability to deliver is priorities and living its values for 2015/16 Investment is required to support a number of the actions proposed (e.g. additional recruitment) but these resources have been secured through budget setting, separate business case proposal of the QCIP programme. No additional resources are being requested by approval of this paper. None A more structured and consistent approach to access to training or career progression will help reduce the risk of discrimination to staff with protected characteristics. Report history Trust Executive Committee Approval May 2015 Considered by other committees Appendices Trust Executive Committee May 2015 None 1
2 TB 076/15 EPSOM AND ST HELIER UNIVERSITY HOSPITALS NHS TRUST ACTION PLAN TO IMPROVE 2015/16 STAFF SURVEY RESULTS TRUST BOARD MEETING: 26 JUNE INTRODUCTION The March Trust Board agreed the 7 objectives for improving staff survey results The next step from the March discussion was to produce more detailed plans with milestones and timelines. This paper presents those more detailed plans approved by the Trust Executive Committee in May. 2. OBJECTIVES FOR 2015/16 To deliver the Trust s strategy, 25 initiatives have been identified for 2015/16. Action plans have been developed to deliver these 25 corporate initiatives. Of these we have identified 5 key peoplerelated initiatives having the most significant impact on the staff experience as measured by the staff survey. From mapping these and 2 others to our 19 poor areas of the Staff Survey we believe these 7 objectives will enable us to achieve our aim of at least 50% of our staff survey responses being rated above average in These objectives will be the focus of our Staff Survey action plan: 1. Increase our substantively employed clinical workforce by 200+ whole time equivalents (WTEs) by end 2015/16 2. Achieving 95%+ staff having had an appraisal and completed their statutory and mandatory training. 3. Enhance leadership within the trust, in particular by progressing board development, appointing Associate Medical Directors and developing clinical leaders in the directorates. 4. Develop and implement a one team, one trust programme to deliver internal (cross site) and external integration and support the on-going transformation of our services in line with best practice. 5. Patient First established as the primary patient experience improvement initiative 50% of staff to have completed by end 2015/16 Plus 6. Improving people management practices across the organisation, 7. Improving staff engagement and staff survey response rate for ACTION PLAN & MILESTONES Appendix 1 sets out the action plan to date, including key milestones and lead responsibilities from within the People & Organisational Development directorate. 2
3 TB 076/15 4. TRUST BOARD ACTION The Trust Board are asked to approve the action plan.. 3
4 APPENDIX ONE - IMPROVING STAFF SURVEY RESULTS - DELIVERY PLAN TRUST BOARD - 26 JUNE 2015 Completed Plans/processes in place Action required at this point Mile stone missed QUARTER 1 QUARTER 2 QUARTER 3 QUARTER 4 1 Increase our substantively employed clinical workforce by 200+ wte by end of 2015/ Recruitment Targets (pro rata) sw Add Prof Scientific & Technical Additional Clinical Services Allied Health Professionals Healthcare Scientists Medical & Dental Nursing & Midwifery Registered TOTAL Programme Set Up sw Appointment to Head of Nursing and Midwifery Recruitment-in post 5th May 2015 Review current clinical staff in post and vacancy factors by staff group Review turnover by staff group also taking account of seasonal trends Identify number of staff that will need to be recruited to meet turnover figures and increase establishment by 200 WTE 1.3. HCA Recruitment sw Phase 2 of HCA recruitment campaign staff in post Phase 3 of HCA recruitment campaign commence
5 Phase 3 of HCA recruitment campaign continues to staff in post Plan to be in place for HCA recruitment throughout the year Recruitment of HCA to be monitored through Directorate Workforce meeting Identify additional resources required to deliver recruitment plan Funding agreed to support resources required 1.4. RN Recruitment (Overseas) sw Phase 2 of Overseas Nurse Recruitment (Italy) staff in posts Phase 3 of the Overseas Nurse Recruitment Campaign (Spain) Phase 4 of the Overseas Nurse Recruitment Campaign (Italy) Phase 5 of the Overseas Nurse Recruitment Campaign (Spain) Phase 6 of the Overseas Nurse Recruitment Campaign (Philippines) Phase 7 of the Overseas Nurse Recruitment Campaign (India) 1.5. RN Recruitment (UK) sw Epsom Open Day for Registered Nurses Plans to be put in place for St Helier Open Day Evaluation of success of nurse recruitment open days open days Programme of Open Days throughout the year to be put in place if cost effective Rolling adverts to be placed for St Helier for RNs Programme for individual RN adverts for Epsom to be agreed 1.6. Medical Recruitment sw
6 Select Agencies for Overseas and UK recruitment Agree programme of Medical Recruitment with the Agencies Identify additional specialist medical staffing recruitment resources Funding agreed to support resources required Recruitment to additional recruitment posts Recruitment Plans for medical staff by Directorate 1.7. Recruitment to other clinical posts sw Agree with directorates the vacancies by staff group Agree with Directorates a recruitment programme to fill their vacancies throughout the year QUARTER 1 QUARTER 2 QUARTER 3 QUARTER 4 2 Achieving 95% of staff having appraisals and completed their Statutory and Mandatory Training 2.1. Appraisals / Performance & Development Review NB Review appraisal process and documentation Launch process and documentation Deliver workshops Set up for Q1 success including review of spans of control and setting of WIRED to monitor and report stages Quarter 2 - Delivering PBA and PBMs to communicate about reviewed appraisal process to directorates Quarter 3 - Reviewing delivering Quarter 4- End of year review Review automated online tools / systems Appoint preferred supplier Agree system roll-out
7 System configuration/set-up & staff training Implement new system 2.2. Statutory and Mandatory Training NB Benchmark London Trusts Monitor and report compliance Review time taken to complete training programmes and how to reduce Review of online options Set-up new on-line system Move to a more competency-based approach QUARTER 1 QUARTER 2 QUARTER 3 QUARTER 4 3 Enhance leadership within the trust, in particular by progressing board development 3.1. Clinical Leadership & Operational Management Re-design SW TEC Discussion Feedback on proposals Final TEC approval Board Approval Job descriptions released Appointments confirmed Go-Live 3.2. Board Development NB Trust Board Diagnostic Board Development plan approved by Board Commission support for longer-term board development Board development activities
8 3.3. Executive Team Development KC Business planning workshop Needs analysis Agree team development plan Team development activities 3.4. Directorate Management Team Development NB Needs analysis Agree team development plan Team development activities Agree 2016/17 development plan 3.5. Wider leadership development Agree senior leader composition Quarterly leadership development events 3.6. Introduce structured approach to talent management and succession planning Commission external support with London Leadership Academy funding ( 10k) Stakeholder engagement in system design Approve system design & target audience Pilot talent review at mid-year review Conduct end of year review Agree 2016/17 Talent Management actions & priorities QUARTER 1 QUARTER 2 QUARTER 3 QUARTER 4 4 Develop a one team, one trust programme to deliver internal and external integration and support the on going transformation of our service in line with best practice 4.1. Improving team effectiveness NB
9 Meet with Aston to understand options to support across site integrated working to include: Pilot Team journey online for managers Review potential of using Kings Fund Cultural assessment tool Review impact on 'One Ward, One Team' initiative Produce plan of Options for TEC 4.2. Improve integrated working across teams, sites and sectors NB Plan to be developed 5 Patient First is established as our primary experience improvement initiative across the trust with 50% of staff having completed the programme 2015/16. Evidence of continuous change & improvement. QUARTER 1 QUARTER 2 QUARTER 3 QUARTER Corporate sessions NB Identify dates/ venues for corporate sessions up to end Q2 Communicate sessions and book staff Delivery of sessions by TEC members Review further sessions required for Q3 and 4 Embed patient First actions into the new appraisal system Input all activity and report via WIRED top patient First Steering group 5.2. Directorate led sessions DMTs to deliver local sessions DMTs report activity and actions to Patient First Steering group each month 5.3. Evidence of Continuous change Agree impact assessment tool
10 Directorate reports to Patient First Steering Group Follow-up Patient First participants for feedback on progress Patient First Conference Further action to be agreed QUARTER 1 QUARTER 2 QUARTER 3 QUARTER 4 6 Improve staff engagement and motivation demonstrated by having a least 50% of our staff survey Reponses rates above average 6.1. Improving People Management practice NB Develop 'Managers Framework for individual and team effectiveness Re-communicate the online resource Establish an APPRECIATE Faculty Review/ refresh existing APPRECIATE programme Deliver APPRECIATE Programme Develop Mentorship scheme for managers/supervisors Implement scheme Develop options for Action Learning Sets by bands groups 6.2. Improving staff engagement & staff survey response rate NB/LT Develop trust wide approach to staff engagement through establishing a Staff Engagement Group: Request for volunteers to form SEG Set up first SEG meeting - Monthly promotion of 'you said we did' key messages from Staff survey incorporating SFFT SFFT to incorporate 'you said in Staff Survey we did ' key messages plus one other question - June will be linked to managers - Poster campaign Set up communication plan for 2015 Staff survey to include distribution, count down, confidentiality etc.
11 Deliver plan Receive 2015 survey results Action planning for 2016/17 informed by 2015 results 6.3. Pro-Active Health and Wellbeing SW Plan to be further developed 6.4. Incident feedback Review the effect of the new incident reporting system on feedback given to staff Develop mechanisms for assessing and reporting effectiveness of staff feedback from on-line system Further action to be agreed
National publication of inpatient nursing staffing
Report to: HPFT Board Date: 26 June 2014 Report by: Mary Mumvuri (Head of Nursing and Patient Safety) Subject: Nature of Report National publication of inpatient nursing staffing Open 1. Background This
Board of Directors 22 nd May 2015
AGENDA ITEM: Item 14 Board of Directors 22 nd May 2015 PRESENTED BY: PREPARED BY: Jan Bloomfield, Executive Director of Workforce and Communications Denise Needle, Deputy Director of workforce (Development)
CENTRAL MANCHESTER UNIVERSITY HOSPITALS NHS FOUNDATION TRUST
CENTRAL MANCHESTER UNIVERSITY HOSPITALS NHS FOUNDATION TRUST Report of: Paper prepared by: Director of Patient Services/Chief Nurse Gill Heaton Director of Nursing (adults) Cheryl Lenney Date of paper:
Human Resources Report 2014 and People Strategy
24 February 2015 Council 5 To consider Human Resources Report 2014 and People Strategy Issue 1 The annual report on Human Resources issues and a proposed People Strategy. Recommendations 2 Council is asked
STAFF SURVEY REPORT AND ACTION PLAN
Affiliated Teaching Hospital BOARD OF DIRECTORS: 27 TH MAY 2016 AGENDA ITEM: 10.2 SUBJECT: STAFF SURVEY REPORT AND ACTION PLAN RESPONSIBLE DIRECTOR: Director of Human Resources & Organisational Development
PURPOSE OF THE PAPER To provide the committee with an overview of the Director of Nursing portfolio during quarter 1 of 2015-2016
ENC 10 Meeting Date 30 th July 2015 Title of Paper Lead Director Author Director of Nursing Quarterly Report Kathryn Halford, Director of Nursing Kathryn Halford, Director of Nursing PURPOSE OF THE PAPER
Report to: Trust Board Agenda item: 13 Date of Meeting: 25 April 2012
Report to: Trust Board Agenda item: 13 Date of Meeting: 25 April 2012 Title of Report: Status: Board Sponsor: Author: Appendices HR Quarterly Report For information Lynn Vaughan, Director of Human Resources
Deirdre Fowler Director of Nursing, Midwifery and Quality. Debbie Stewart Lead nurse Nursing Workforce
Report of: Responsible Officer Accountable Officer Author of Report: Deirdre Fowler Director of Nursing, Midwifery and Quality Debbie Stewart Lead nurse Nursing Workforce Subject/Title Background papers
Monthly report of Nurse and Midwifery Staffing Levels May 2014. Kathryn Halford, Director of Nursing
ENC 7 Meeting Trust Board Date 2 nd July 2014 Title of Paper Lead Director Author Monthly report of Nurse and Midwifery Staffing Levels May 2014 Kathryn Halford, Director of Nursing Kathryn Halford, Director
Steve Gregory, Director of Nursing and Operations
SUMMARY REPORT Meeting Date: 20.11.14 Agenda Item: 8.3 Enclosure Number: 6 Meeting: Title: Author: Accountable Director: Other meetings presented to or previously agreed at: Trust Board OUR STAFF: ENSURING
HR Corporate Objectives and Strategy Action Plan January 2013
Reference Objective / Strategy Action Responsibility Target Date (CO1) By 2016 we will be in the top 20% of Acute Trusts as measured by the NHS National Staff Survey Embed the Trust values into reward
SHEFFIELD TEACHING HOSPITALS NHS FOUNDATION TRUST EXECUTIVE SUMMARY REPORT TO THE TRUST HEALTHCARE GOVERNANCE COMMITTEE
SHEFFIELD TEACHING HOSPITALS NHS FOUNDATION TRUST EXECUTIVE SUMMARY REPORT TO THE TRUST HEALTHCARE GOVERNANCE COMMITTEE I TO BE HELD ON MONDAY 26 NOVEMBER 2012 Subject: Supporting Director: Author: Status
Provide effective and timely HR guidance and support in customer services review by minimising redundancy and delivering.4m savings in a full year
Objective 1 Customer Services Review Appendix A Provide effective and timely HR guidance and support in customer services review by minimising redundancy and delivering.4m savings in a full year Published
Delivering High Quality Compassionate Care
Strategy 2015-17 Nursing Delivering High Quality Compassionate Care 1 Foreword Lincolnshire Partnership NHS Foundation Trust (LPFT) is the main provider of NHS mental health and wellbeing services in Lincolnshire,
Nursing & Midwifery Establishment Review Six Monthly Report. Em Wilkinson-Brice, Deputy Chief Executive / Chief Nurse
Agenda item: 9.3, Public Board meeting Date: Title: Nursing & Midwifery Establishment Review Six Monthly Report Prepared by: Presented by: Bernadette George, Head of Safety, Risk & Patient Experience,
REPORT FOR: HEALTH AND WELLBEING BOARD
REPORT FOR: HEALTH AND WELLBEING BOARD Date of Meeting: October 2 nd 2013 Subject: INFORMATION REPORT Review of School Nursing and Health Visiting in Harrow and Barnet Responsible Officer: Dr Laura Fabunmi
Trust Board Meeting: Wednesday 11 March 2015 TB2015.33. Oxford University Hospitals Trust Nursing and Midwifery Strategy 2015-2018
Trust Board Meeting: Wednesday 11 March 2015 Title Oxford University Hospitals Trust Nursing and Midwifery Strategy 2015-2018 Status History This is a new paper Presented to the Trust Management Executive
Training and education framework for fertility nursing
Training and education framework for fertility nursing Carmel Bagness November 2013 A training and education framework for fertility nursing: grant usage feedback report Contents Introduction 3 Background
Clinical Governance and Workforce Committee Summary Report
Committee: Trust Board Meeting Date: 25 June 2015 This paper is for: Assurance and Information Title: Clinical Governance and Workforce Committee Summary Report Purpose: The purpose of this report is to
Position statement on the education and training of health care assistants (HCAs)
Position statement on the education and training of 1 of health care care assistants (HCAs) Introduction This document provides commissioners, education providers and employers with guidance on best practice
JOB DESCRIPTION. Temporary Project Manager Corporate Services Redesign 3 to 6 months. 1.0 WTE Secondment Band 6 or 7, dependant upon expertise
JOB DESCRIPTION Job Title: Grade: Work Base: Accountable to: Responsible to: Temporary Project Manager Corporate Services Redesign 3 to 6 months 1.0 WTE Secondment Band 6 or 7, dependant upon expertise
North Middlesex University Hospital NHS Trust. Annual Audit Letter 2005/06. Report to the Directors of the Board
North Middlesex University Hospital NHS Trust Annual Audit Letter 2005/06 Report to the Directors of the Board 1 Introduction The Purpose of this Letter 1.1 The purpose of this Annual Audit Letter (letter)
Application Information Pack HR Assistant Maternity cover Fixed term contract 10 months
Application Information Pack HR Assistant Maternity cover Fixed term contract 10 months Introduction to Girlguiding Thank you for your interest in the role of HR Assistant (maternity cover).this document
CENTRAL MANCHESTER UNIVERSITY HOSPITALS NHS FOUNDATION TRUST
CENTRAL MANCHESTER UNIVERSITY HOSPITALS NHS FOUNDATION TRUST Agenda Item 9.1 Report of: Executive Director of Human & Corporate Resources Margot Johnson Paper prepared by: Head of Operational HR - Gill
INVESTORS IN PEOPLE BRONZE ASSESSMENT REPORT
INVESTORS IN PEOPLE BRONZE ASSESSMENT REPORT for Bedford Citizens Housing Association Page: 1 of 13 Key Information Assessment Type Investors in People Specialist Assessment Jeannette Stanley Visit Date
Compassion In Practice: A Summary of the Implementation Plans. are. is our business. Developing our culture of compassionate care
Compassion In Practice: A Summary of the Implementation Plans Care Compassion Commitment are Competence Courage is our business Communication Developing our culture of compassionate care 1 Compassion in
Board briefing of Nursing and Midwifery Staffing Levels. January 2014
Board briefing of Nursing and Midwifery Staffing Levels January 2014 Paper produced: February 2015 Status: A Paper for Information Dame Eileen Sills DBE Chief Nurse and Director of Patient Experience Board
EXECUTIVE SUMMARY FRONT SHEET
EXECUTIVE SUMMARY FRONT SHEET Agenda Item: Meeting: Quality and Safety Forum Date: 09.07.2015 Title: Monthly Board Report- Publication of Nursing and Midwifery Staffing Levels June 2015 Exception Report
Scotland s public sector workforce. Good practice guide
Scotland s public sector workforce Good practice guide Prepared by Audit Scotland March 2014 Contents Introduction... 4 Purpose of the guide... 4 What s in the guide?... 4 Part 1. Good practice in workforce
JOB DESCRIPTION & PERSON SPECIFICATION. Based in Blackrock Hospice 1.0WTE Indefinite Duration Assistant Director of Nursing & Operations
JOB DESCRIPTION & PERSON SPECIFICATION Based in Blackrock Hospice 1.0WTE Indefinite Duration Assistant Director of Nursing & Operations JOB DESCRIPTION TITLE: Assistant Director of Nursing & Operations
Welsh Health Informatics Professional Development Programme Career Framework Project Overview
Welsh Health Informatics Professional Development Programme Career Framework Project Overview Jackie Barker Head of Health Informatics Professional Development Informing Healthcare Who are health informatics
Complaint and Concern handling and learning
TAUNTON & SOMERSET NHS FOUNDATION TRUST Complaint and Concern handling and learning Report to: Trust Board on 25 September 2013 Purpose of the Report: (Please type in Bold) This report sets out how the
Advanced Practice (Public Health)
Advanced Practice (Public Health) Author: Claire Barley (Head of Professional and Organisational Development) and Kelly McFadyen (Professional and Organisational Development Manager) Date: 2 December 2014
MEETING OF TRUST BOARD EXECUTIVE SUMMARY AGENDA ITEM 4.2
MEETING OF TRUST BOARD EXECUTIVE SUMMARY TITLE & DATE: AGENDA ITEM 4.2 National NHS Staff Survey and Trust Staff Satisfaction Survey 2013 Action Plan 27 February 2014 This paper is for: Approval x Decision
Director of Nursing & Quality. Helen Coleman Associate Director for Nursing Workforce
Reporting to: Trust Board - March 2015 Paper 8 Title Sponsoring Director Author(s) Nursing Revalidation Director of Nursing & Quality Helen Coleman Associate Director for Nursing Workforce Previously considered
JOB DESCRIPTION. Tatchbury Mount base and other Southern Health Sites as required
JOB DESCRIPTION Job Title: Band: Hours: Location: Accountable to: Lead Manager for Workforce Planning & Resourcing 8a 37.5 per week Tatchbury Mount base and other Southern Health Sites as required Deputy
NHS Sickness Absence Rates. January 2014 to March 2014 and Annual Summary 2009-10 to 2013-14
NHS Sickness Absence Rates January 2014 to March 2014 and Annual Summary 2009-10 to 2013-14 Published 22 July 2014 We are the trusted source of authoritative data and information relating to health and
Registered Nurses and Health Care Support Workers. A summary of RCN policy positions
Registered Nurses and Health Care Support Workers A summary of RCN policy positions 2 Registered Nurses and Health Care Support Workers - A summary of RCN policy positions Overview Overview This briefing
Revalidation of nurses and midwives
Revalidation of nurses and midwives An independent report by KPMG on the impact of revalidation on the health and care system for the Nursing and Midwifery Council (NMC) Appendices 10 August 2015 Contents
Risk Management Strategy & Implementation Plan 2014 2016
St George s Healthcare NHS Trust: the next decade Risk Management Strategy & Implementation Plan 2014 2016 DRAFT VERSION 6.0 UPDATED 19.11.14 Executive summary We know, from external assurances received
National NHS Staff Survey 2012 Action Plan. Previously considered by: Senior Management Team on 22 May 2013
AGENDA ITEM 2013-4/21 Report to: Trust Board Date of meeting: 7 June 2013 Report title: Responsible Director: Report author: National NHS Staff Survey 2012 Action Plan Executive Director of Operations
Recruitment and Selection Procedure
Recruitment and Selection Procedure INTRODUCTION The College aims to attract, select and retain the best candidate to any given vacancy within the college. The College is committed to safeguarding and
NHS Staff Survey action plan update
ENCLOSURE: S Date of Trust Board 29 th April 2015 Title of Report Purpose of Report Abstract Risks and benefits of proposed action Strategic Objective and/or Annual Plan Objective and/or Quality Goal Recommendation
Investors in People Assessment Report. Presented by Alli Gibbons Investors in People Specialist On behalf of Inspiring Business Performance Limited
Investors in People Assessment Report for Bradstow School Presented by Alli Gibbons Investors in People Specialist On behalf of Inspiring Business Performance Limited 30 August 2013 Project Reference Number
Human Resources Report 2014
Item 7 Item # Council CounciRemunerationl 3 February Date19 2015 March 2013 Human Resources Report 2014 Purpose of paper Action Public/Private Corporate Strategy 2013-15 Decision Trail Recommendations
A new era for HR. Trinity College Dublin Human Resources Strategy 2014 to 2019
A new era for HR Trinity College Dublin Human Resources Strategy 2014 to 2019 Introduction This revised HR strategy is a response from the HR function in College to the new College Strategy 2014-2019,
PEN CONFERENCE 9 JUNE 2015 FEEDBACK FROM THE WORKSHOP WHAT ELSE CAN WE DO TO ATTRACT, RETAIN AND DEVELOP PEOPLE IN THE CARE SECTOR?
PEN CONFERENCE 9 JUNE 2015 FEEDBACK FROM THE WORKSHOP WHAT ELSE CAN WE DO TO ATTRACT, RETAIN AND DEVELOP PEOPLE IN THE CARE SECTOR? The feedback from this workshop will inform the Workforce Strategy 1.
Careers & Employability Division. Recruiting students for work experience, placements and part-time jobs. www.manchester.ac.
Careers & Employability Division Recruiting students for work experience, placements and part-time jobs Students at The University of Manchester A flexible and cost-effective workforce Students can bring
DIRECTOR OF PEOPLE & ORGINAISATIONAL DEVELOPMENT NICK MERNOCK EMPLOYEE SUCCESSION PLANNING STRATEGY
AGENDA ITEM: REPORT TO: POLICY & FINANCE COMMITTEE DATE: 19 TH OCTOBER, 2006 REPORT NO. REPORTING OFFICER: CONTACT OFFICER: OFFICERS CONSULTED: SUBJECT: CFO/193/06 CHIEF FIRE OFFICER DIRECTOR OF PEOPLE
Summary of findings. The five questions we ask about hospitals and what we found. We always ask the following five questions of services.
Barts Health NHS Trust Mile End Hospital Quality report Bancroft Road London E1 4DG Telephone: 020 8880 6493 www.bartshealth.nhs.uk Date of inspection visit: 7 November 2013 Date of publication: January
Financial performance
Financial performance In our first NHS Financial Temperature Check briefing 2 we noted the number of organisations that were overspending or reporting a deficit has increased since the 2012/13 financial
Decisions 1. Permission to tender for a recruitment partner to supply 15 permanent social work practitioners with a contract value of 159,000.
ACTION TAKEN UNDER DELEGATED POWERS BY OFFICER 28 th October 2015 Title Report of Wards Status Recruitment of Children s Social Work Practitioners Nicola Francis, Family Services Director All Public Enclosures
THE UNIVERSITY OF MANCHESTER PARTICULARS OF APPOINTMENT
THE UNIVERSITY OF MANCHESTER PARTICULARS OF APPOINTMENT FACULTY OF MEDICAL & HUMAN SCIENCES MANCHESTER PHARMACY SCHOOL CENTRE FOR PHARMACY POSTGRADUATE EDUCATION Lead Pharmacy Technician, Learning Development
BOARD OF DIRECTORS. David Wilkinson Director of Workforce & OD. For Assurance
BOARD OF DIRECTORS Date of Meeting: 26 March 2014 Title of Report: Status: Public Report of: David Wilkinson Director of Workforce & OD Prepared by and contact details: Purpose of the Report: Sue Smith
TRUST BOARD 24 OCTOBER 2012. OCH Phase 4 Chemotherapy Project The Macmillan Cancer Treatment and Support Centre Outline Business Case
Our vision: To be amongst the best TRUST BOARD 24 OCTOBER 2012 def Agenda Item: 8 OCH Phase 4 Chemotherapy Project The Macmillan Cancer Treatment and Support Centre Outline Business Case PURPOSE PREVIOUSLY
Dr JULIA PHILIPPOU. Managing careers as a strategy for developing a dynamic workforce
Inaugural Commonwealth Nurses Conference Our health: our common wealth 10-11 March 2012 London UK Dr JULIA PHILIPPOU Managing careers as a strategy for developing a dynamic workforce In collaboration with
Advanced Nursing Practice Roles Guidance for NHS Boards
Advanced Nursing Practice Roles Guidance for NHS Boards NB: Whilst the work has been focused upon Nursing, we are keen to ensure that this initiative reflects frameworks and processes that can be applied
CENTRAL MANCHESTER UNIVERSITY HOSPITALS NHS FOUNDATION TRUST
CENTRAL MANCHESTER UNIVERSITY HOSPITALS NHS FOUNDATION TRUST Report of: Paper prepared by: Adrian Roberts, Executive Director of Finance Simon Walsh, Head of Procurement and E-Commerce Date of paper: August
CHIEF NURSE / DIRECTOR OF CLINICAL GOVERNANCE
www.gov.gg/jobs JOB POSTING CHIEF NURSE / DIRECTOR OF CLINICAL GOVERNANCE JOB TITLE Chief Nurse / Director of Clinical Governance SALARY Attractive Remuneration Package available with post TYPE Full Time
Review of the Management of Sickness Absence Conwy County Borough Council
Audit 2004/2005 Date: December 2005 Authors: Ros Adams and George Jones Ref: 1072A2005 Review of the Management of Sickness Absence Conwy County Borough Council Contents Summary Report Introduction 3 Background
15/24. NHSBT Board Meeting. 1 Date / title of meeting. 26 th March 2015. 2 Title of paper Your Voice employee survey outcome and actions
15/24 1 Date / title of meeting NHSBT Board Meeting 26 th March 2015 2 Title of paper Your Voice employee survey outcome and actions 3 Status Official and disclosable 4 Tweet (max 140 characters) Outcome
January 2016. Brand and Campaigns Executive: Information for Candidates
January 2016 Brand and Campaigns Executive: Information for Candidates Thank you for expressing interest in the role of Brand and Campaigns Executive. We have compiled this information pack to tell you
JOB DESCRIPTION. Contract Management and Business Intelligence
JOB DESCRIPTION DIRECTORATE: DEPARTMENT: JOB TITLE: Contract Management and Business Intelligence Business Intelligence Business Insight Manager BAND: 7 BASE: REPORTS TO: Various Business Intelligence
Culture of Care Barometer: project plan
Culture of Care Barometer: project plan 1. Background to the Culture of Care Barometer: its origins The healthcare agenda over recent years has been dominated by quick fix solutions. As a result both the
JOB DESCRIPTION. Chief Nurse
JOB DESCRIPTION Chief Nurse Post: Band: Division: Department: Responsible to: Responsible for: Chief Nurse Executive Director Trust Services Trust Headquarters Chief Executive Deputy Chief Nurse Head of
The post holder will be guided by general polices and regulations, but will need to establish the way in which these should be interpreted.
JOB DESCRIPTION Job Title: Membership and Events Manager Band: 7 Hours: 37.5 Location: Elms, Tatchbury Mount Accountable to: Head of Strategic Relationship Management 1. MAIN PURPOSE OF JOB The post holder
Council Meeting, 26/27 March 2014
Council Meeting, 26/27 March 2014 HCPC response to the Final Report of A Review of the NHS Hospitals Complaint System Putting Patients Back in the Picture by Right Honourable Ann Clwyd MP and Professor
PERSONNEL SPECIFICATION
PERSONNEL SPECIFICATION POST Patient Flow Manager Band 7 DEPARTMENT LOCATION Emergency Care and Medicine Altnagelvin Hospital DATE June 2014 FACTORS ESSENTIAL DESIRABLE QUALIFICATIONS AND/OR EXPERIENCE
Progress on the System Sustainability Programme. Submitted to: NHS West Norfolk CCG Governing Body, 31 July 2014
Agenda Item: 9.1 Subject: Presented by: Progress on the System Sustainability Programme Dr Sue Crossman, Chief Officer Submitted to: NHS West Norfolk CCG Governing Body, 31 July 2014 Purpose of Paper:
inclusive Talent Management Comprehensive Implementation Handbook and Toolkit
inclusive Talent Management Comprehensive Implementation Handbook and Toolkit Helping You to Maximise the Potential of Your People and Your Organisation 2 nd Edition May 2014 Supporting you in partnership
Triennial Review of NHS Blood and Transplant (NHSBT) A Review of NHS Blood and Transplant (NHSBT) Call for Evidence
Triennial Review of NHS Blood and Transplant (NHSBT) A Review of NHS Blood and Transplant (NHSBT) Call for Evidence August 2015 Title: Triennial Review of NHS Blood and Transplant Call for Evidence Author:
GUIDANCE NOTES FOR APPLICANTS
GUIDANCE NOTES FOR APPLICANTS Please read these notes carefully, as well as the Job Description and Person Specification, before completing and submitting your application. APPLICATION INFORMATION Please