PolyPipe RECOMMENDED. Heat Fusion Joining Procedures
|
|
|
- Victoria Edwards
- 9 years ago
- Views:
Transcription
1 PolyPipe RECOMMENDED Heat Fusion Joining Procedures
2 TABLE OF CONTENTS INTRODUCTION 1 FEDERAL REGULATIONS 1 QUALIFICATION PROCEDURE 2 HEAT FUSION 2 INCLEMENT WEATHER 3 NOTES ON FUSION CONFIDENCE 4 FUSION CHECKLIST 5 BUTT FUSION 6 PROCEDURE 6 QUALIFICATION 10 SADDLE FUSION 14 DEFINITIONS 14 PROCEDURE 15 QUALIFICATION 17 SOCKET FUSION 21 EQUIPMENT REQUIREMENTS 21 HEATER TEMPERATURE 21 PROCEDURE 21 QUALIFICATION 23 APPENDIX A 27 HYDRAULIC FUSION MACHINE GAUGE PRESSURE 27 REFERENCES 28
3 FIGURES FIGURE I BUTT FUSION BENT STRAP TEST SPECIMEN 10 FIGURE II SADDLE FUSION BENT STRAP TEST SPECIMEN 17 FIGURE III SOCKET FUSION BENT STRAP TEST SPECIMEN 23 TABLES TABLE I BUTT FUSION: APPROXIMATE MELT BEAD SIZE 7 TABLE II BUTT FUSION: BEAD WIDTHS PER WALL THICKNESS 9 TABLE III BUTT FUSION: TROUBLESHOOTING GUIDE 13 TABLE IV SADDLE FUSION: MAXIMUM HEATING/MINIMUM COOLING TIMES 15 TABLE V SADDLE FUSION: TROUBLESHOOTING GUIDE 20 TABLE VI SOCKET FUSION: TIME CYCLES 22 TABLE VII SOCKET FUSION: TROUBLESHOOTING GUIDE 26 The statements and technical data given in this brochure were developed on the basis of conservative test measures and are believed to be accurate. The information is meant to serve only as a general guide; however, the individual user is encouraged to verify the specific parameters of each application. Due to wide variations in service conditions, quality of installation, etc., no warranty or guarantee, expressed or implied, is given in conjunction with the use of this material. In addition, this procedure does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this procedure to establish appropriate safety and health practices and to determine the applicability of regulatory limitations prior to use.
4 INTRODUCTION An integral part of any pipe system is the method used to join the system components. Proper engineering design of a system will take into consideration the type and effectiveness of the techniques used to join the piping components and appurtenances, as well as, the durability of the resulting joints. The integrity and versatility of the joining techniques used for polyethylene pipe allow the designer to take advantage of the performance benefits of polyethylene in a wide variety of applications. There are three types of heat fusion joints currently used in the industry: Butt, Saddle and Socket Fusion. Additionally, there are two methods for producing the socket and saddle fusion joints. In addition to the fusion procedures that follow, electrofusion is recognized as an acceptable method of producing socket and saddle fusions but is not addressed in this document. The fusion procedures that follow have been proven to consistently produce sound fusion joints when used correctly and are recommended for the joining of PolyPipe products. The recommended procedures for butt and saddle fusions are consistent with the Plastic Pipe Institute (PPI) TR-33, Generic Butt Fusion Procedures and TR-41, Generic Saddle Fusion Procedures. POLYPIPE PRODUCTS GAS DISTRIBUTION M&I, WATER AND SPECIALTY POLYPLUS TM POLYPIPE GDB50 (GB50) POLYPIPE EHMW PLUS POLYPIPE GDB40 (GB40) POLYPIPE EHMW POLYPIPE GDB30 (GB30) POLYPIPE PW POLYPIPE GDY20 POLYPIPE DUCT POLYPIPE LIGHTVIEW FEDERAL REGULATIONS Individuals who are involved in joining gas piping systems must note certain qualification requirements of the U.S. Department of Transportation Pipeline Safety Regulations. The U.S. Department of Transportation, D.O.T., requires that all persons who make fusion joints in polyethylene gas piping systems must be qualified under the operator s written procedures (49 CFR, Part 192, (a)), and require that gas system operators ensure that all persons who make fusion joints are qualified (49 CFR, Part 192, (d)). These fusion joining procedures, when used to join PolyPipe gas pipe and fittings, are qualified in accordance with U.S. Department of Transportation Regulations. D.O.T. regulations require that written procedures for butt fusion, saddle fusion and socket fusion joining of polyethylene gas piping must be qualified before use by subjecting specimen joints to required test procedures (CFR 49, Part 192, (a)). D.O.T. regulations require that each joint in a gas piping system must be made in accordance with written procedures that have been proved by testing to produce strong gastight joints (CFR 49, Part 192, (b)). 1
5 D.O.T. regulations require that all persons who make joints in polyethylene gas piping must be qualified under the operator s written procedures (CFR 49, Part 192, (a)). D.O.T. regulations require that the gas system operator must ensure that all persons who make or inspect joints are qualified (CFR 49, Part 192, (d) & ). Where an operator is already using qualified procedures that are in compliance with the D.O.T., these recommended procedures do not constitute a requirement for that operator to change to these fusion procedures. Qualification Procedure Due to the requirements of the U.S. Department of Transportation, any person joining polyethylene gas pipe must receive training in each of the fusion procedures (49 CFR, Part 192). Each operator should make a sample joint for each procedure used. Each sample joint must pass the following inspections and tests: 1. Pressure and tensile testing as described in , CFR, 2. Ultrasonically inspected and found to contain no flaws, or 3. Cut into at least three (3) strips, each of which is: (a) Visually examined and found free of voids or discontinuity on the cut surface of the joint. (b) Deformed by bending, torque or impact, and if failure occurs, must not initiate in the joint area. A person must be re-qualified under an applicable procedure during a 12-month period for the following conditions: 1. The individual does not make any joints under the procedure. 2. The individual has three (3) joints or 3% of the joints made, whichever is greater, that are found to be unacceptable by , CFR. Each operator shall establish a method to determine that each person making a joint in plastic pipelines in his/her system is qualified in accordance with this section. HEAT FUSION The principle behind heat fusion is to heat two surfaces to a designated temperature, and then fuse them together by application of a sufficient force. This applied force causes the melted materials to flow and mix, resulting in a permanent, monolithic fusion joint. When fused according to the recommended procedures, the fusion or joint becomes as strong as or stronger than the pipe itself in both tensile and pressure properties. PolyPipe fusion procedures require specific tools and equipment for the fusion type and for the sizes of pipe and fittings to be joined. Butt Fusion This technique consists of heating the squared ends of two pipes, a pipe and fitting, or two fittings by holding them against a heated plate, removing the plate when the proper melt is obtained, promptly bringing the ends together and allowing the joint to cool while maintaining the appropriate applied force. 2
6 Saddle Fusion This technique involves melting the concave surface of the base of a saddle fitting, while simultaneously melting a matching pattern on the surface of the pipe, bringing the two melted surfaces together and allowing the joint to cool while maintaining the appropriate applied force. Socket Fusion This technique involves simultaneously heating the outside surface of a pipe end and the inside of a fitting socket, which is sized to be smaller than the smallest outside diameter of the pipe. After the proper melt has been generated at each face to be mated, the two components are joined by inserting one component into the other. The fusion is formed at the interface resulting from the interference fit. The melts from the two components flow together and fuse as the joint cools. Properly fused polyethylene joints do not leak. If a leak is detected during hydrostatic testing, it is possible for a system failure to occur. Caution should be exercised in approaching a pressurized pipeline and any attempts to correct the leak should not be made until the system has been depressurized. Note: Polyethylene cannot be joined by solvent bonding or threading. Extrusion welding or hot air welding is not recommended for pressure applications. INCLEMENT WEATHER Polyethylene has reduced impact resistance in sub-freezing conditions. Additional care should be exercised while handling in sub-freezing conditions. In addition, polyethylene pipe will be harder to bend or uncoil. In inclement weather and especially in windy conditions, the fusion operation should be shielded to avoid precipitation or blowing snow and excessive heat loss from wind chill. The heating tool should also be stored in an insulated container to prevent excessive heat loss. Remove all frost, snow or ice from the OD and ID of the pipe; all surfaces must be clean and dry prior to fusing. The time required to obtain the proper melt may increase when fusing in cold weather. The following recommendations should be followed: 1. Maintain the specified heating tool surface temperature. Do not increase the tool surface temperature. 2. Do not apply pressure during zero pressure butt fusion heating steps. 3. Do not increase the butt fusion joining pressure. In butt fusion, melt bead size determines heating time; therefore, the procedure automatically compensates when cold pipe requires longer time to form the proper melt size. The outside diameter of polyethylene pipe and fittings will contract in cold weather conditions. This can result in loose or slipping cold rings. For best results, clamp one cold ring in its normal position adjacent to the depth gage. Shim around the pipe behind the clamp with paper, tape, etc., and place a second cold ring over this area. This cold ring will prevent slippage while the inner cold ring will allow for the pipe to expand during the heating cycle of the fusion process. 3
7 The proper cycle time for any particular condition can be determined by making a melt pattern on a piece of scrap pipe using the recommended standard heating time. If the melt pattern is incomplete, increase the heating time by three (3) second intervals until a complete melt pattern is established. Each time the procedure is repeated, a new piece of scrap pipe should be used. For additional information concerning cold weather procedures, refer to ASTM D2657, Standard Practice for Heat Fusion Joining of Polyolefin Pipe and Fittings, Annex A1. NOTES ON FUSION CONFIDENCE Reliable fusion joints of polyethylene piping systems can be accomplished under reasonable latitude of conditions. The following is a listing of general notes to help ensure proper equipment and techniques are utilized: 1. The fusion operator must have adequate training and understanding of the equipment and tools and the fusion procedure Improper understanding of the operation of the equipment and tools can produce a fusion of poor quality. The operator must understand thoroughly how to use the equipment and tools, their function and operation. The operator should adhere to the equipment manufacturer s instructions. Contact pressures and heating/cooling cycles may vary dramatically according to pipe size and wall thickness. Operators should not rely exclusively on automated fusion equipment for joint qualification. In addition, visual inspection and qualification should always be made. If necessary, test fusions should be made to determine correct pressures and heat/cool cycle times. Destructive test methods, such as bend back tests, may be necessary to formulate correct pressures and heat/cool cycle times (refer to Qualification Procedures). 2. Pipe and fitting surfaces must be clean and properly prepared Any contaminants present on the surfaces or poor preparation of the surfaces cannot produce a quality fusion joint. Ensure that all pipe and fitting surfaces are clean. If surfaces are reintroduced to contaminants, they should be cleaned again. 3. Heater plates must be clean, undamaged and the correct surface temperature. Heater surfaces are usually coated with a non-stick material. Cleaning techniques should be used accordingly. If a solvent is deemed necessary, do not use gasoline or other petroleum products. Refer to the equipment manufacturer s instructions for proper cleaning products. Recommended heating tool temperatures are specified for each procedure. This temperature is indicative of the surface temperature, not the heating tool thermometer. The surface temperature should be verified daily by using a surface pyrometer. If a crayon indicator (melt stick) is used, it should not be used in an area that will be in contact with the pipe or fitting. If the heater plate is not in use, it is recommended that it be stored in an insulated holder. This not only protects the heater surfaces from contaminants, but it can also prevent inadvertent contact, which can result in serious injuries. 4
8 4. Proper equipment and condition of tools and equipment for the job Each type of fusion requires special tools and equipment. Fusions performed with the incorrect fusion equipment, materials or tools can result in a poor fusion. Fusion Checklist Inspect pipe lengths and fittings for unacceptable cuts, gouges, deep scratches or other defects. Damaged products should not be used. Refer to PolyPipe InfoBrief No. 17 for allowable surface damage according to the Plastics Pipe Institute (PPI) and the American Gas Association (AGA). Any surface damage at pipe ends that could compromise the joining surfaces or interfere with fusion tools and equipment should be removed. Be sure all required tools and equipment are on site and in proper working order. Pipe and fitting surfaces where tools and equipment are fitted must be clean and dry. Use clean, dry, non-synthetic (cotton) cloths or paper towels to remove dirt, snow, water and other contaminants. Shield heated fusion equipment and surfaces from inclement weather and winds. A temporary shelter over fusion equipment and the operation may be required. Relieve tension in the line before making connections. When joining coiled pipe, making an S-curve between pipe coils can relieve tension. In some cases, it may be necessary to allow pipe to equalize to the temperature of its surroundings. Allow pulled-in pipes to relax for several hours to recover from tensile stresses. Pipes must be correctly aligned before making connections. Trial fusions. A trial fusion, preferably at the beginning of the day, can verify the fusion procedure and equipment settings for the actual jobsite conditions. Refer to Qualification Procedures for detailed information on the bend back test procedure. 5
9 BUTT FUSION Heater Surface Temperature: Minimum 400 o F Maximum 450 o F ( o C) Heating tool surfaces must be to temperature before you begin. All points on both heating tool surfaces where the heating tool surfaces will contact the pipe or fitting ends must be within the prescribed minimum and maximum temperatures and the maximum temperature difference between any two points on the heating tool fusion surfaces must not exceed 20 o F (11 o C) for equipment for pipe smaller than 18 diameter, or 35 o F (19 o C) for larger equipment. Heating tool surfaces must be clean. Interface pressure : Minimum 60 psi Maximum 90 psi ( kpa; bar) Interface pressure is used to calculate a fusion joining pressure value for hydraulic butt fusion machines or manual machines equipped with force reading capability. The interface pressure is constant for all pipe sizes and all butt fusion machines. However, fusion joining pressure settings are calculated for each butt fusion machine, which are dependent upon the OD and DR (Dimension Ratio). For hydraulic machines, the interface pressure, the fusion surface area, the machine s effective piston area and frictional resistance, and if necessary, the pressure needed to overcome external drag resistance, are used to calculate hydraulic fusion joining pressure gauge settings (refer to Appendix A). The equipment manufacturer s instructions are used to calculate this value. The proper amount of force should be verified by visual inspection of the joint. NOTE: The interface pressure and the hydraulic gauge pressure are not the same. For manual machines without force reading capability, the correct fusion joining force is the force required to roll the melt beads over to the pipe surface during joining. Procedure 1. Secure Clean the inside and outside of the component, pipe or fitting ends by wiping with a clean, dry, lint-free cloth or paper towel. Remove all foreign matter. Align the components of the machine, place them in the clamps, and then close the clamps. Do not force pipes into alignment against open fusion clamps. Component ends should protrude past the clamps enough so that facing will be complete. Bring the ends together and check high-low alignment. Adjust alignment as necessary by tightening the high side down. 2. Face Place the facing tool between the component ends, and face them to establish smooth, clean, parallel mating surfaces. Complete facing produces continuous circumferential shavings from both ends. Face until there is minimal distance between the fixed and moveable clamps. If the machine is equipped with facing stops, face down to the stops. Stop the facer before moving the pipe ends away from the facer. Remove the facing tool, and clear all shavings and pipe chips from the component ends. Do not touch the component ends with your hands after facing. 6
10 3. Align Bring the component ends together, check alignment and check for slippage against fusion pressure. Look for complete contact all around both ends with no detectable gaps, and outside diameters in high-low alignment. If necessary, adjust the high side by tightening the high side clamp. Do not loosen the low side clamp because components may slip during fusion. Re-face if high-low alignment is adjusted. 4. Melt Verify that the contact surface of the heating tool is maintaining the correct temperature. Place the heating tool between the component ends, and move the ends against the heating tool. Bring the component ends together under pressure to ensure full contact. The initial contact pressure should be held very briefly and released without breaking contact. Pressure should be reduced when evidence of melt appears on the circumference of the pipe. Hold the ends against the heating tool without force (drag force may be necessary to ensure contact). Beads of melted polyethylene will form against the heating tool at the component ends. When the proper melt bead size is formed, quickly separate the ends, and remove the heating tool. The proper bead size is dependent upon the size of the component. Approximate values are shown in Table I. Table I Approximate Melt Bead Size Approximate Wall Thickness, inches Melt Bead Size* (Approximate) mm and smaller 1/32 1/ mm mm 7.6 mm 1/16 2 mm Above Above 7.6 mm 19 mm 1/8 3/ mm Above Above 19 mm 29.2 mm 3/16 1/4 5 6 mm Above Above 29.2 mm 40.6 mm 1/4 5/ mm Above Above 40.6 mm 55.9 mm 5/16 7/ mm Above Above 55.9 mm 76.2 mm 7/16 9/16 11 mm *The appearance of the melt swell zone may vary depending on the pipe material. The melt bead width is to be determined by measuring the distance from the heater plate to the melt swell origin. During heating, the melt bead will expand out flush to the heating tool surface, or may curl slightly away from the surface. If the melt bead curls significantly away from the heating tool surface, unacceptable pressure during heating may have occurred. 5. Join Immediately after the heating tool is removed, quickly inspect the melted ends, which should be flat, smooth and completely melted. If the melt surfaces are acceptable, immediately and in a continuous motion, bring the ends together and apply the correct joining force (or fusion pressure). The correct fusion pressure will form a double bead that is rolled over to the surface on both ends. A concave melt surface is unacceptable; it indicates pressure during heating. Do not continue. Allow the component ends to cool and start over with Step 1. 7
11 6. Hold Hold joining force against the ends until the joint is cool. The joint is cool enough for gentle handling when the double bead is cool to the touch. Cool for about seconds per inch of pipe diameter. Do not try to decrease the cooling time by applying water, wet cloths or the like. Avoid pulling, installation, pressure testing and rough handling for at least an additional 30 minutes. Heavier wall thickness pipes require longer cooling times. 7. Inspection On both sides, the double bead should be rolled over to the surface, and be uniformly rounded and consistent in size all around the joint. 1. The gap (A) between the two single beads must not be below the fusion surface throughout the entire circumference of the butt joint. 2. The displacement (V) between the fused ends must not exceed 10% of the pipe/fitting minimum wall thickness. 3. Refer to Table II for general guidelines for bead width, B, for each respective wall thickness. 8
12 Minimum Wall Thickness, Table II Bead Widths per Wall Thickness Approximate Bead Width (B), in. Minimum Wall Thickness, in. Approximate Bead Width (B), in. in. Minimum Maximum Minimum Maximum.118 5/32 1/ /32 25/ /32 9/ /8 13/ /16 5/ /32 7/ /4 11/ /16 29/ /32 3/ / /16 7/ /8 1-1/ /32 1/ /16 1-3/ /8 9/ / /16 19/ /8 1-7/ /2 5/ /16 1-1/ /2 11/ /4 1-9/ /2 11/ / / /16 3/ /8 1-3/ /2 1-13/16 Instructions: Determine the wall thickness of the pipe/fitting. Find the wall thickness above. If the exact wall thickness is not shown, use the next lowest wall thickness for determination of bead width. 4. The size differential (S max S min ) between two single beads shall not exceed X% of the actual bead width (B). S X 100 B Where X = Percent difference of bead width, % Pipe to pipe, maximum X = 10% Pipe to fitting, maximum X = 20% Fitting to fitting, maximum X = 20% S = S max - S min, inches B = Width of bead, inches NOTE: When butt fusing to molded fittings, the fitting side bead may have an irregular appearance. This is acceptable provided the pipe side bead is correct. 9
13 Qualification 1. Prepare a sample joint. Sample lengths should be at least 6 or 15 times the minimum wall thickness (see Figure I). 2. Observe the fusion process and verify the recommended procedure for butt fusion is being followed. 3. Visually inspect the sample joint for quality. 4. Allow the joint to cool completely (minimum of one hour). 5. Prepare the sample as shown in Figure I. The sample should be cut lengthwise into at least three longitudinal straps with a minimum of 1 or 1.5 times the wall thickness in width. Figure I Butt Fusion Bent Strap Test Specimen (Reference ASTM D2657) 6. Visually inspect the cut joint for any indications of voids, gaps, misalignment or surfaces that have not been properly bonded. 7. Bend each sample at the weld with the inside of the pipe facing out until the ends touch. The inside bend radius should be less than the minimum wall thickness of the pipe. In order to successfully complete the bend back, a vise may be needed. For thick wall pipe, a hydraulic assist may be required. 8. The sample must be free of cracks and separations within the weld location. If failure does occur at the weld in any of the samples, then the fusion procedure should be reviewed and corrected. After correction, another sample weld should be made per the new procedure and re-tested. 10
14 Butt Fusion ACCEPTABLE FUSIONS Proper alignment and double roll-back bead. Bend back testing. No gaps or voids. (See Figure I) 11
15 Butt Fusion UNACCEPTABLE FUSIONS Melt bead too small due to insufficient heat time. Melt bead too large due to excessive heating and/or over-pressurizing of joint. Misalignment. Incomplete facing. 12
16 Table III Butt Fusion Troubleshooting Guide Observed Condition Excessive double bead width Double bead v-groove too deep Flat top on bead Non-uniform bead size around pipe One bead larger than the other Beads too small Bead not rolled over to surface Beads too large Square type outer bead edge Rough, sandpaper-like, bubbly, or pockmarked melt bead surface Overheating Excessive joining force Possible Cause Excessive joining force Insufficient heating Pressure during heating Excessive joining force Overheating Misalignment Defective heating tool Worn equipment Incomplete facing Misalignment Component slipped in clamp Worn equipment Heating iron does not move freely in the axial direction Defective heating tool Incomplete facing Insufficient heating Insufficient joining force Shallow v-groove Insufficient heating & insufficient joining force Deep v-groove Insufficient heating & excessive joining force Excessive heating time Pressure during heating Hydrocarbon (gasoline vapors, spray paint fumes, etc.) contamination 13
17 SADDLE FUSION Heater Surface Temperature: Minimum 490 o F - Maximum 510 o F ( o C) Heater tool surfaces must be up to temperature before you begin. All points on both heating tool surfaces where the heating tool surfaces will contact the pipe and fitting must be within the prescribed minimum and maximum temperatures. Heater tool surfaces must be clean. Interface Pressure: Minimum 54 psi Maximum 66 psi ( kpa ; bar) Definitions Initial Heat (Bead-up) The heating step used to develop a melt bead on the main pipe. Initial Heat Force (Bead-up Force) The force (pounds) applied to establish a melt pattern on the main pipe. The Initial Heat Force is determined by multiplying the fitting base area (in 2 ) by the initial heat interfacial pressure (psi). Heat Soak Force The force (pounds) applied after an initial melt pattern is established on the main pipe. The Heat Soak Force is the minimum force (essentially zero) that ensures the fitting, heater and main stay in contact with each other. Fusion Force The force (pounds) applied to establish the fusion bond between the fitting and the pipe. The Fusion Force is determined by multiplying the fitting base area (in 2 ) by the fusion interfacial pressure (psi). Total Heat Time A time that begins when the heater is placed on the main pipe and Initial Heat Force is applied and stops when the heater is removed. Maximum heating times are shown in Table IV for both pressure (hot tapping) and non-pressure fusion applications. Cool Time The time required to cool the joint to approximately 120 o F (49 o C). The Fusion Force must be maintained for 5 minutes on 1-1/4 IPS or 10 minutes for all other main sizes, after which the saddle fusion equipment can be removed. The joint must be allowed to cool for an additional 30 minutes before tapping the main or joining to the branch outlet. Recommended minimum cooling times are shown in Table IV. 14
18 Table IV Maximum Heating/Minimum Cooling Times Main Size 1-1/4 IPS 2 IPS 3 IPS & larger Maximum Heating Time 1/16 melt pattern visible around the base of the fitting. Do not exceed 15 seconds when hot tapping. 1/16 melt pattern visible around the base of the fitting. Do not exceed 35 seconds when hot tapping. Minimum Cooling Time 5 min + 30 min 10 min + 30 min 1/16 melt pattern visible around the base of the fitting. 10 min + 30 min Interfacial Area Rectangular base fittings The major width times the major length of the saddle base, without taking into account the curvature of the base or sides, minus the area of hole in the center of the base. Round base fittings The radius of the saddle base squared times (3.1416), without taking into account the curvature of the base or sides, minus the area of the hole in the center of the base. Fitting Labels The Initial Heat Force, Heat Soak Force and Fusion Force will be listed in the lower right hand corner of the fitting label for the majority of saddle fusion fittings. This eliminates the need to calculate the information in the field. For example, 80/0/40 represents the Initial Heat Force, Heat Soak Force and Fusion Force, respectively. If this information is not located on the fitting, please contact the fitting manufacturer for the correct fusion parameters. Procedure 1. Preparation This procedure requires the use of a saddle fusion tool. This tool must be capable of holding and supporting the main, rounding the main for proper alignment between the pipe and fitting, holding the fitting, and applying and indicating the proper force during the fusion process. A. Install the saddle fusion tool on the main according to the manufacturer s instructions. The tool should be centered over a clean, dry location where the fitting will be fused. Secure the tool to the main. A main bolster or support is recommended under the pipe on 6 IPS and smaller main pipe sizes. B. Abrade the surface of the main, where the fitting will be joined, with a grit utility cloth until a thin layer of material is removed from the pipe surface. The abraded area must be larger than the area covered by the fitting base. After abrading, clean the residue away with a clean, dry cloth. C. Abrade the fusion surface of the fitting with grit utility cloth. Remove all dust and residue with a clean, dry cloth. Insert the fitting in the saddle fusion tool loosely. Using the saddle fusion tool, move the fitting base against the main pipe and apply about 100 pounds-force to seat the fitting. Secure the fitting in the saddle fusion tool. 15
19 2. Heating The heating and fusing process must be performed with accuracy and efficiency, especially when fusing to a pressurized main pipe. WARNING: Overheating or excessive time between these two processes can have detrimental effects, including pipeline rupture. The heater must be fitted with the correct heater adapters. The heater adapter fusion surface must be between 490 o F to 510 o F (254 o C to 266 o C). Ensure the heating surfaces are clean. Determine the saddle fusion force from the fitting label or by calculation. A. Place the heating tool on the main centered beneath the fitting base. Immediately move the fitting against the heater faces, apply the Initial Heat Force (see fitting label), and start the heat time. Apply the Initial Heat Force until melt is first observed on the crown of the pipe main (Initial Heat is the term used to describe the initial heating (bead-up) step to develop a melt bead on the main pipe and is usually 3-5 seconds) and then reduce the force to the Heat Soak Force (bead-up force) (see fitting label). Maintain the Heat Soak Force until the Total Heat Time is complete. B. At the end of the Total Heat Time, remove the fitting from the heater and the heater from the main with a quick, snapping action. Quickly check for an even melt pattern on the pipe main and heated fitting surfaces (no unheated areas). The Total Heat Time ends when one of the following conditions are met: i. When the Total Heat Time expires for a pressurized 1-1/4 IPS or 2 IPS main, or ii. When a melt bead of approximately 1/16 is visible around the fitting base for a 1 1/4 IPS or 2 IPS non-pressurized main, or a larger pressurized or non-pressurized main. 3. Fusion and Cooling Regardless of whether the melt patterns are satisfactory, quickly press the fitting onto the main pipe (within 3 seconds) after removing the heater and apply the Fusion Force (see the fitting label). Maintain the Fusion Force on the assembly for 5 minutes on 1-1/4 IPS and for 10 minutes for larger sizes. When this initial cooling time has expired, the saddle fusion equipment may be removed. Cool the assembly for an additional 30 minutes before rough handling or tapping the main. If the melt pattern was not satisfactory or if the fusion bead is unacceptable, cut off the saddle fitting above the base to prevent use, relocate to a new section of main, and make a new saddle fusion using a new fitting. NOTE: The Fusion Force may need to be adjusted during the initial cooling period; however, the fusion force should never be reduced. 4. Inspection Visually inspect the fusion bead around the entire base of the fitting at the main pipe. The fusion bead should be of uniform size. The fusion should have a three-bead shape, which is characteristic of this type of fusion. The first bead is the fitting base melt bead. The second or outermost bead is the result of the heater tool face on the main pipe. The third bead, or center bead, is the main pipe melt bead. All beads should be of uniform size with the first and third beads approximately 1/8 and the second bead being generally smaller. 16
20 Qualification 1. Prepare at least two sample joints. The main pipe length should be a minimum of 2 or seven times the maximum saddle fitting base dimension, whichever is greater. 2. Observe the fusion process and verify the recommended procedure for saddle fusion is being followed. 3. Visually inspect the sample joint for quality. 4. Allow the joint to cool completely (minimum of one hour). The main should not be tapped for this qualification process. 5. Prepare test straps as shown in Figure II. Cut the joint lengthwise along the main pipe and through the saddle fitting. Figure II Saddle Fusion Bent Strap Test Specimen (Reference ASTM D2657) 6. Visually inspect the joint for any voids, gaps, misalignment or surfaces that have not been properly bonded. 7. Bend each test strap 180 o with the inside facing out. 8. The fusion joint must be free of cracks, voids, gaps and separations. 9. Test the other sample joint by impact against the saddle fitting. The failure must occur by either tearing the fitting, bending the fitting at least 45 o or by removing a section of the pipe. Failure at the fusion is not acceptable. This test is a federal requirement for qualification of fusion procedures, but is not a requirement for individual qualification. 10. If failure does occur at the weld in any of the samples, then the fusion procedure should be reviewed and corrected. After correction, another sample weld should be made per the new procedure and re-tested. 17
21 Saddle Fusion ACCEPTABLE FUSIONS Proper alignment, melt and force. Bend back testing. No gaps or voids. (See Figure II) 18
22 Saddle Fusion UNACCEPTABLE FUSIONS Fitting misaligned on pipe. Excessive heating and/or over-pressurizing of joint. Insufficient melt. Excessive force. 19
23 Table V Saddle Fusion Troubleshooting Guide Observed Condition Non-uniform bead size around fitting base One bead larger than the other Beads too small Beads too large Absence of third bead, or third bead widely separated from center bead Pressurized main blowout (beside base or through fitting base) Rough, sandpaper-like, bubbly, or pockmarked melt bead surface Possible Cause Misalignment Defective heating tool Fitting not secured in heating tool Heating temperature not within specified range Misalignment Heating temperature not within specified range Fitting slipped in clamp Defective or worn equipment Insufficient heating Insufficient joining force Excessive heating time Excessive joining force Incorrect pipe main heating tool Insufficient joining force Excessive heating Heating temperature not within specified range Incorrect heating tool faces Excessive time to start heating or in joining the fitting to the main pipe after heating time cycle Hydrocarbon (gasoline vapors, spray paint fumes, etc.) contamination 20
24 SOCKET FUSION Equipment Requirements In order to produce a quality socket fusion, the following equipment is required for this procedure: Apparatus Socket fusion tools manufactured in accordance with ASTM F1056. Heating Tool Faces Consisting of two parts, a male end for the interior socket surface and a female end for the exterior pipe surface. Rounding Clamps (Cold Ring) - Device to maintain the roundness of the pipe and control the depth of pipe insertion into the socket during the joining operation. Depth Gauge Proper positioning of the rounding clamp. Chamfering Tool Device to bevel the end of the pipe. The depth gauge and chamfering tool may be combined into a single tool. Holding Tools Recommended for socket fusion of 2 IPS and larger pipe and fittings. Heater Temperature Heater Surface Temperature: Minimum 490 o F Maximum 510 o F ( o C) In order to obtain a proper melt, a uniform temperature must be maintained across the heating surface. All points on both heating surfaces where the heating surfaces will contact the pipe and fitting must be within the prescribed minimum and maximum temperatures. Heating tool surfaces must be clean. Procedure 1. Preparation A. Verify heating temperature is within the specified temperature range (490 o F 510 o F). B. Cut the pipe end squarely, and clean the pipe end and fitting, both inside and out with a clean, dry, lint-free cloth. Do not touch cleaned surfaces with your hands. C. Chamfer the outside edge of the pipe end slightly. The pipe should be free of debris and burrs. D. Place the cold ring on the pipe as determined by the depth gauge Place the depth gauge over the chamfered end of the pipe. Clamp the cold ring immediately behind the depth gauge. 2. Heating A. Review the recommended heating times in Table VI. The heating time begins after Step C has been completed. 21
25 B. Insert the fitting onto the male heating face. The fitting should be held against the back surface of the male heater face. C. Insert the pipe into the female heating face. The female socket heating face should be against the cold ring clamp. D. Hold the pipe and fitting in place against the heater faces for the recommended heating time as shown in Table VI. Table VI Socket Fusion Time Cycles PE2406 PE3408 Pipe Size Heating Time, seconds Cooling Time, seconds Heating Time, seconds Cooling Time, seconds 1/2 CTS /4 CTS CTS /2 IPS /4 IPS IPS /4 IPS /2 IPS IPS IPS IPS Fusion and Cooling A. At the end of the heating time, simultaneously remove the pipe and fitting straight out from the tool using a snap action. Do not torque or twist the pipe or fitting during removal. B. A QUICK inspection should be made of the melt pattern on the pipe end and fitting socket. If there is evidence of an incomplete melt pattern, do not continue with the fusion procedure. C. Immediately insert the pipe straight into the socket of the fitting so that the cold ring is flush against the end of the fitting socket. While cooling, pressure should be maintained on the fusion per the recommended cooling time shown in Table VI. D. Allow the joint to cool an additional five (5) minutes before removing the cold ring. An additional 10 minutes of cooling time is recommended before exposing the joint to any type of stresses (ie., burial or testing). 4. Inspection Visually inspect the weld. A complete impression of the rounding clamp should be visible in the melt pattern at the end of the socket. There should be no gaps, voids or unbonded areas. 22
26 Qualification 1. Prepare a sample joint such as a coupling with pipe socket fused to both ends. The pipe should be at least 6 or 15 times the wall thickness in length. 2. Observe the fusion process and verify the recommended procedure for socket fusion is being followed. 3. Visually inspect the sample joints for quality. 4. Allow the sample to cool completely (minimum of one hour). 5. Prepare test straps as shown in Figure III. Cut the joints lengthwise into at least three longitudinal straps with a minimum of 1 or 1.5 times the wall thickness in width. Figure III Socket Fusion Bent Strap Test Specimen (Reference ASTM D2657) 6. Visually inspect the cut joint for any indications of voids, gaps, misalignment or surfaces that have not been fused. 7. Bend each test strap 180 o with the inside of the pipe facing out. 8. The fusion joint must be free of cracks, voids, gaps and separations. If failure does occur at the weld in any of the samples, then the fusion procedure should be reviewed and corrected. After correction, another sample weld should be made per the new procedure and re-tested. 23
27 Socket Fusion ACCEPTABLE FUSIONS Proper alignment and stab depth. Melt bead flattened due to cold ring. No gaps or voids. Bend back testing. (See Figure III) No gaps or voids. 24
28 Socket Fusion UNACCEPTABLE FUSIONS Short stab depth caused by failure to use a depth gauge. Excessive stab depth caused by failure to use a cold ring. Misalignment. 25
29 Table VII Socket Fusion Troubleshooting Guide Observed Condition No evidence of cold-ring impression in socket fitting melt bead Gaps or voids around the pipe at the socket fitting edge Wrinkled or collapsed pipe end Voids in fusion bond area Unbonded area on pipe at end of pipe Socket melt extends past end of pipe Rough, sandpaper-like, bubbly, or pockmarked melt bead surface Possible Cause Insufficient heating time Depth gauge not used Cold ring not used Cold ring set at incorrect depth Pipe or fitting not removed straight from heater face Components not joined together straight when fusing Cold ring not used Cold ring set at incorrect depth Cold ring not utilized Cold ring set at incorrect depth Incorrect heating sequence Pipe or fitting not removed straight from heater face Components not joined together straight when fusing Cold ring not used Cold ring set at incorrect depth Cold ring not used Cold ring set too deep Cold ring set too shallow Hydrocarbon (gasoline vapors, spray paint fumes, etc.) contamination 26
30 APPENDIX A HYDRAULIC FUSION MACHINE GAUGE PRESSURE The manufacturer of the fusion machine should be consulted for guidance in determining the proper conversion of PolyPipe s recommended interfacial pressure to the gauge pressure. The effective hydraulic piston area must be available in order to calculate the required hydraulic gauge pressure. The calculation for hydraulic gauge pressure is as follows: P G OD ID P A P I DF Where P G = Hydraulic Gauge Pressure, psi OD = Pipe outside diameter, inches ID = Pipe inside diameter, inches P I = Required interfacial pressure, psi A P = Total hydraulic piston area, in 2 DF = Hydraulic fusion pressure required to move the carriage holding the pipe (generally accepted minimum is 30 psi). *The drag factor is an important parameter easily overlooked. If two long pieces of pipe are being fused, the drag factor can easily reach several hundred pounds per square inch (psi). 27
31 REFERENCES 1. Plastics Pipe Institute Technical Report-33. Generic Butt Fusion Joining Procedure for Polyethylene Gas Pipe, Plastics Pipe Institute Technical Report-41. Generic Saddle Fusion Joining Procedure for Polyethylene Gas Pipe, Plastics Pipe Institute.Polyethylene Joining Procedures, March ASTM D Standard Practice for Heat Fusion Joining of Polyolefin Pipe and Fittings. Volume American Society of Testing and Materials. Baltimore, ASTM F Standard Specification for Socket Fusion Tools for Use in Socket Fusion Joining Polyethylene Pipe or Tubing and Fittings. Volume American Society of Testing and Materials. Baltimore, Pipeline Safety Regulations. U.S. Department of Transportation. CFR 49. Washington,
32 GAINESVILLE PLANT P.O. Box N. I-35 Gainesville, TX (940) (800) Fax: (940) Sales Fax: (940) ERWIN PLANT P.O. Box Industrial Drive South Erwin, TN (423) Fax: (423) ROARING SPRINGS PLANT P.O. Box Hwy. 70 South Roaring Springs, TX (806) (877) Fax: (806) FERNLEY PLANT 230 Lyon Drive Fernley, NV (775) Fax: (775) SANDERSVILLE PLANT P.O. Box Waco Mill Road Sandersville, GA (478) KIMBALL PLANT 3405 PolyPipe Road Kimball, NE (308) Fax: (308) PolyPipe is an active member of the Plastics Pipe Institute, AWWA, AGA and ASTM. PolyPipe, Inc N. I-35 I P.O. Box 390 I Gainesville, TX Phone I I Facsimile Sales Facsimile I ISO 9001:2000 C /05
HEAT FUSION JOINING PROCEDURES
HEAT FUSION JOINING PROCEDURES TABLE OF CONTENTS INTRODUCTION...1 FEDERAL REGULATIONS...1 HEAT FUSION...2 INCLEMENT WEATHER...3 NOTES ON FUSION CONFIDENCE...3 FUSION CHECKLIST...4 BUTT FUSION...5 Procedure...6
Socket Heat Fusion Techniques. A Guide for Instruction and Training in Vanguard Socket Heat Fusion
Socket Heat Fusion Techniques A Guide for Instruction and Training in Vanguard Socket Heat Fusion TABLE OF CONTENTS This brochure has been developed to assist those responsible for socket fusion joining
Arctic Insulation & Manufacturing The Pre-Insulated Pipe People
Arctic Insulation & Manufacturing The Pre-Insulated Pipe People Butt Fusion Process for McElroy Small Diameter Hand Operated Equipment MiniMc Fusion Machine ½ CTS 1 IPS 1 LC Fusion Machine ½ CTS 1 IPS
General Guidelines for Butt, Saddle, and Socket Fusion of Unlike Polyethylene Pipes and Fittings TN-13/2007
General Guidelines for Butt, Saddle, and Socket Fusion of Unlike Polyethylene Pipes and Fittings TN-13/2007 105 Decker Court, Suite 825, Irving, TX 75062 P: 469-499-1044 F: 469-499-1063 www.plasticpipe.org
SECTION 33 11 00.13 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS
SECTION 33 11 00.13 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS PART 1: GENERAL 1.01 SECTION INCLUDES Furnishing and installing up to 16-inch high density polyethylene (HDPE) pipe and fittings for
Recommended Minimum Training Guidelines for PE Pipe Butt Fusion Joining Operators for Municipal and Industrial Projects TN-42 / March 2013
Recommended Minimum Training Guidelines for PE Pipe Butt Fusion Joining Operators for Municipal and Industrial Projects TN-42 / March 2013 105 Decker Court, Suite 825, Irving, TX 75062 P: 469-499-1044
Generic Butt Fusion Joining Procedure for Field Joining of Polyethylene Pipe TR-33
Generic Butt Fusion Joining Procedure for Field Joining of Polyethylene Pipe TR-33 2012 105 Decker Court, Suite 825, Irving, TX 75062 Phone: 469-499-1044 Fax: 469-499-1063 www.plasticpipe.org Contents
Butt Fusion Welding of HDPE Pipes Work Procedure
Butt Fusion Welding of HDPE Pipes Work Procedure A pipeline is as good as its weakest point. Accordingly it is not only important that quality pipes and components are used in a piping system, but also
General Guidelines for Repairing Buried PE Potable Water Pressure Pipes
515 General Guidelines for Repairing Buried PE Potable Water Pressure Pipes Introduction Traditional piping systems have gasket-sealed bell and spigot joints every 20 feet, which can be a potential maintenance
SECTION 15125 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION
SECTION 15125 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION PART 1 GENERAL.01 SECTION INCLUDES Furnishing and installing 4 inch through 16 inch high density
HDPE Fusion Procedures
P.O. Box 245 Syracuse, NY 13211 www.roth-america.com 888-266-7684 HDPE Fusion Procedures P/N: 2300100907 Table of Contents: Section 1: Overview Allowable Piping Materials...3 Acceptable HDPE Pipe...3 Section
GENERAL RUBBER LINING PRINCIPLES
GENERAL RUBBER LINING PRINCIPLES I. METAL PREREQUISITES Metal to be lined should meet the requirements as stated in section 8 Metal Fabrication and section 12 Blasting and Cementing Procedures. The surface
1.3.2 Method of construction and restoration of existing water service connections. This shall include:
1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting
Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer
Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer The user may choose to adopt part or all of this Model Specification; however, the user should ensure that all parts
SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE
SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE PART 1: GENERAL 1.01 SECTION INCLUDES PVC pressure pipe and fabricated fittings in nominal sizes 4-inches through 12-inches with cast iron pipe equivalent
A Guide to Thermoform Processing of Polypropylene. Introduction
A Guide to Thermoform Processing of Polypropylene Introduction Thermoforming is the process of heating plastic sheet to a pliable state and forming it into shape. Thermoforming offers processing advantages
PRE INSTALLATION MANUAL
REINFORCED CONCRETE PIPE PRE INSTALLATION INSPECTION & REPAIR MANUAL Kentucky Transportation Cabinet Kentucky Department of Highways Division of Materials 1227 Wilkinson Boulevard Frankfort, KY 40601 (502)
Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe
Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe 1. GENERAL The following supplemental sewer main specifications are intended to address the installation of high-density polyethylene
INSPECTION, MAINTENANCE AND RECHARGE SERVICE MANUAL P/N 16303
WATER MIST HAND PORTABLE FIRE EXTINGUISHERS Model B270 ¾ Gallon Model B272 2 ½ Gallon INSPECTION, MAINTENANCE AND RECHARGE SERVICE MANUAL P/N 6303 All fire extinguishers should be installed, inspected
SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE
SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel
MS-3/2009 HDPE (High Density Polyethylene) Pipe and Fittings Specification for Buried Potable Water
MS-3/2009 HDPE (High Density Polyethylene) Pipe and Fittings Specification for Buried Potable Water 105 Decker Court, Suite 825, Irving, TX 75062 P: 469-499-1044 F: 469-499-1063 www.plasticpipe.org HDPE
SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)
APPLICATIONS Process Industry Weak Acids Alkalies Compressed Air Pulp & Paper MODELS ASM - Flanged Connection OPTIONS Control Rods Oil & Gas Water & Waste Pump suction & discharge Sea water Chemical lines
DiscPlus DX195 and DX225 Air Disc Brakes
Revised 11-04 Technical Bulletin Revised 1 Technical 11-04 Bulletin DiscPlus DX195 and DX225 Air Disc Brakes Inspection, Installation and Diagnostics Air Disc Brake Inspection Intervals and Procedures
Oil and Gas Pipeline Design, Maintenance and Repair
Oil and Gas Pipeline Design, Maintenance and Repair Dr. Abdel-Alim Hashem Professor of Petroleum Engineering Mining, Petroleum & Metallurgical Eng. Dept. Faculty of Engineering Cairo University [email protected]
725-R-599 PIPE LINING. (Revised 05-01-12) SECTION 725, BEGIN LINE 1, INSERT AS FOLLOWS: SECTION 725 SLIP LINING OF EXISTING PIPE
PIPE LINING (Revised 05-01-12) The Standard Specifications are revised as follows: SECTION 725, DELETE LINES 1 THRU 317. SECTION 725, BEGIN LINE 1, INSERT AS FOLLOWS: SECTION 725 SLIP LINING OF EXISTING
Section 6 Brake Drum Failure Analysis. Brake Drum Wear Conditions. What is Normal Wear? What is Deep or Excessive Wear? WARNING. Deep, Uniform Wear
Section Brake Drum 6 Failure Analysis WARNING To prevent serious eye injury, always wear safe eye protection when you perform vehicle maintenance or service. Figure 6.1 ASBESTOS AND NON-ASBESTOS FIBERS
Operator s Manual Socket Fusion Tooling System
Operator s Manual Socket Fusion Tooling System Original Language: English Manual: SW00401 Revision: C 05/14 This product and other products could be protected by patents or have patents pending. All the
Peel Adhesion of Pressure Sensitive Tape
Harmonized International Standard Call Letters PSTC 101 Date of Issuance 10/00 Revised 10/03 Revised 05/07 Peel Adhesion of Pressure Sensitive Tape 1. SCOPE 1.1 These methods cover the measurement of the
GAS DISTRIBUTION PRODUCTS STEEL SERVICE TEES
GAS DISTRIBUTION PRODUCTS STEEL SERVICE TEES CONTINENTAL INDUSTRIES ABOUT US THE ULTIMATE CONNECTION Our Company Continental Industries, headquartered in Tulsa, Oklahoma, was formed in 1958 and is today
Engineering Specifications
PUREFLOW PEX PRODUCTS PART 1 GENERAL 1.1 SUMMARY 1.1.1 This specification covers Branch & Main, Parallel Water Distribution Systems (MANABLOC), Cross-linked Polyethylene tubing and fittings using PEX Press
REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542
1.0 INTENT REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES 1.01 It is the intent of this specification to provide for the reconstruction of pipelines and conduits by the installation of a resin-impregnated
BRAKE DRUM AND ROTOR SERVICE INFORMATION
SERVICE INFORMATION To achieve maximum drum life and optimum performance, proper brake maintenance and brake balance are essential. Consult your truck or trailer manufacturer s maintenance manual for proper
VdS 2100-09en. VdS Guidelines for water extinguishing systems. Non-return valves. Requirements and test methods. VdS 2100-09en : 2011-05 (01)
VdS Guidelines for water extinguishing systems VdS 2100-09en Requirements and test methods VdS 2100-09en : 2011-05 (01) Publishing house: VdS Schadenverhütung GmbH Amsterdamer Str. 172-174 50735 Köln,
DIVISION 4300 STORM DRAINAGE
DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES
NDT Procedure for Liquid Penetrant Inspection TRINITY NDT. An ISO 9001:2008 Certified Company
NDT Procedure for Liquid Penetrant Inspection A Nondestructive testing (NDT) Procedure suitable for General Liquid/Dye Penetrant Inspections. This is a sample LPT procedure and may be required to be modified
T A B L E T 1 T E S T S A N D I N S P E C T I O N C A B L E P C U T A N D P C U T - A
T A B L E T 1 1 of 7 Tests & Inspection Cable PCUT & PCUT-A (Table T1) T E S T S A N D I N S P E C T I O N C A B L E P C U T A N D P C U T - A No. Test Scale MOC Requirements G 20:10:001:01 Defined Test
TITANIUM FABRICATION CORP.
TITANIUM FABRICATION CORP. Titanium, Zirconium, and Tantalum Clad Construction General Considerations In many applications, particularly for large pressure vessels designed for high temperature and pressure,
PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta
PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification Number: 3503-11.2.610 Rev. 2 Rubber Lined Steel Pipe and Fittings Mechanically Coupled Plain End Type System Issued Revised Approved
I BEAM TRACK INSTALLATION
PDQ 0/700 FESTOON SYSTEM INSTALLATION AND MAINTENANCE INSTRUCTIONS INTRODUCTION The PDQ Festoon System was designed to run on one of three sizes of I-beams: S x., S8 x 8. and S x.. System trolleys must
Installer s Guide 18-AH39D1-13
18-AH39D1-13 Cased Aluminum "Convertible" Coils 4TXCA018BC3HC** 4TXCA024BC3HC** 4TXCB025BC3HC** 4TXCB026BC3HC** 4TXCB031BC3HC** 4TXCB032BC3HC** ALL phases of this installation must comply with NATIONAL,
Fusion Equipment Safety Information... Page 4. Manual Butt Fusion Machine Procedure... Page 18. Hydraulic Butt Fusion Machine Procedure...
Table of Contents Fusion Equipment Safety Information........ Page 4 Tips For Success............................. Page 15 Manual Butt Fusion Machine Procedure....... Page 18 Hydraulic Butt Fusion Machine
CamSplice Assembly Manual
Corning Cable Systems SRP-006-038 Issue 9, September 2000 Page 1 of 6 CamSplice Assembly Manual Table of Contents 1. General... 1 2. Precautions... 1 3. Tools and Materials... 2 4. Cable and Fiber Preparation...
NDT Procedure for Liquid Penetrant Inspection
NDT Procedure for Liquid Penetrant Inspection A Nondestructive testing (NDT) Procedure suitable for General Liquid/Dye Penetrant Inspections. This is a sample LPT procedure and may be required to be modified
60.12. Depend-O-Lok FxE Expansion Coupling. System No. Submitted By Spec Sect Para Location Date Approved Date. DEPEND-O-LOK FxE EXPANSION COUPLING
60.1 D-O-L FxE expansion couplings are a bolted, split-sleeve design that provides for expansion and contraction at the coupled joint. These couplings are furnished with restraint rings that, when affixed
Guidelines for Earthquake Bracing of Residential Water Heaters
Guidelines for Earthquake Bracing of Residential Water Heaters Department of General Services Division of the State Architect 1102 Q Street, Suite 5100 Sacramento, CA 95814 Phone: (916) 324-7099 Fax: (916)
AIRWORTHINESS BULLETIN
1. Applicability All operators and maintainers of small gas turbine engines. 2. Purpose This AWB highlights the importance of proper installation of engine tubing and provides general advice on their maintenance.
Lenntech. 1000 psi End port pressure vessels 2.5. User s Guide to: Phoenix Vessel Technology Limited. Model number: 1503
1 User s Guide to: Phoenix Vessel Technology Limited 1000 psi End port pressure vessels 2.5. Model number: 1503 Lenntech [email protected] Tel. +31-152-610-900 www.lenntech.com Fax. +31-152-616-289 Phoenix
FINGERPRINTING IS A SCIENCE - TAKE A SCIENTIFIC APPROACH
FINGERPRINTING IS A SCIENCE - TAKE A SCIENTIFIC APPROACH FINGERPRINT CLEAN HANDS ONLY DRY HANDS THOROUGHLY ROLL FINGERS FROM NAIL-TO-NAIL NOTE THE CORES AND DELTAS TAKE IMPRESSIONS IN CORRECT ORDER PRODUCE
MGB Chrome Bumper Conversion
MGB Chrome Bumper Conversion Installation Instructions For 1974 1/2-1980 MGB This kit requires cutting, welding, and painting. Professional installation recommended. Note: Every MGB body is slightly different
JIS G3472 Electric Resistance Welded Carbon Steel Tubes for Automobile Structural Purposes
JIS G3472 Electric Resistance Welded Carbon Steel Tubes for Automobile Structural Purposes 1. Scope This Japanese Industrial Standard specifies the electric resistance welded carbon steel tubes, hereinafter
COATING & WRAPPING OF UNDERGROUND PIPING
CONSTRUCTION STANDARD SPECIFICATION DOCUMENT NO :SEC-PJ-000-SPC-PI-008 TOTAL PAGES : 8 Page 1 of 8 CONTENTS 1. SCOPE 2. DEFINITION 3. CODES AND STANDARDS 4. MATERIALS Page 2 of 8 1. SCOPE This specification
with installation dynafact boost GAUGE this manual is for use with systems 64050-64054
owners manual with installation instructions dynafact boost GAUGE this manual is for use with systems 64050-64054 GENERAL INSTALLATION PRACTICES This manual is an installation guide for all 1. Banks DynaFact
Repair of Hyd-ro-ac Actuators
Repair of Hyd-ro-ac Actuators OVERHAUL INSTRUCTIONS SS-.2A-1V SS-.5A-1V SS-.5A-2V Read the entire contents of these instructions before installing the actuator and before making any connections to the
Electrofusion Installation Procedure Manual
Electrofusion Installation Procedure Manual It is important to read and understand all instructions before attempting a fusion. Permanent field installations should be done only by operators who have been
Specification for Rotary Drill Stem Elements
Addendum 1 March 2007 Effective Date: September 1, 2007 Specification for Rotary Drill Stem Elements ANSI/API SPECIFICATION 7-1 FIRST EDITION, MARCH 2006 EFFECTIVE DATE: SEPTEMBER 2006 ISO 10424-1:2004
Pipe Flange Bolting Guide Aztec Bolting Services, Inc.
Pipe Flange Bolting Guide Aztec Bolting Services, Inc. 1. Introduction: In the quest to eliminate leaks in piping and pressure vessel systems, it is necessary to first develop an understanding of the mechanisms
Trouble shooting guide
guide DPR/PSR Leak Insuffi ciently tightened, shallow bite Tighten the nut according to correct number of turns, direct assembly only for maintanance/repair, use of recommended pre-assembly machines Mark
Guidelines for Earthquake Bracing Residential Water Heaters
Guidelines for Earthquake Bracing Residential Water Heaters Department of General Services Division of the State Architect In accordance with the Health and Safety Code Section 19215, the Division of the
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials
FOREWORD. The Plastics Pipe Institute. This Technical Note, TN-30, was first issued in January 2006 and was revised and republished in September 2013.
Requirements for the Use of Rework Materials in Manufacturing of Polyethylene Gas Pipe TN-30/2013 105 Decker Court, Suite 825, Irving, TX 75062 P: 469-499-1044 F: 469-499-1063 www.plasticpipe.org FOREWORD
TERMOSIGN APPLICATION INSTRUCTIONS
TERMOSIGN APPLICATION INSTRUCTIONS Product s characteristics Termosign - preformed thermoplastic pavement marking system must be applied to a completely dry surface; must be applied to a surface free of
SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD
SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD 21.01 SCOPE: It is the intent of the Specification to define the approved methods and materials
NEW ELECTRICAL SUBSTATION Building 300 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK
ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within
Reasons for reissue are provided in Section 6, REVISION SUMMARY.
Reasons for reissue are provided in Section 6, REVISION SUMMARY. The FRONT OF TOOL has the AMP marking on the link. The BACK OF TOOL (Wire Side), into which the wire is inserted, has the wire size marked
SPECIFICATION Aluminum Module Frames. Allowed anodization before fabrication for clear frames.
SPECIFICATION Allowed anodization before fabrication for clear frames. Page 2 of 9 1. SCOPE 1.1. This document provides general requirements for aluminum frames used in the assembly of photovoltaic modules.
R44 SERVICE BULLETIN SB-89 (supersedes R44 Safety Alert dated 23 February 2015)
R44 SERVICE BULLETIN SB-89 (supersedes R44 Safety Alert dated 23 February 2015) Page 1 of 6 DATE: 30 March 2015 TO: R44 & R44 II Owners, Operators, and Maintenance Personnel SUBJECT: Main Rotor Blade Modification
STORED PRESSURE STAINLESS STEEL
STORED PRESSURE STAINLESS STEEL WATER FIRE EXTINGUISHERS Model 240-2-1/2 Gallon OWNER'S SERVICE MANUAL NO. 05601 INSPECTION, MAINTENANCE AND RECHARGE All fire extinguishers should be installed, inspected
DOUBLE CONTAINMENT DESIGN & INSTALLATION GUIDE
DC-3-0708 Spears Double Systems are engineered for ease of installation and lower associated installation costs. Complete systems include all necessary components - carrier pipe, containment pipe, centralizer
FIELD ACCEPTANCE OF FIELD WELDING GUIDE
Page 1 of 17 Oklahoma DOT Materials & Testing January 14, 2004 Publication: GFA-FW (Updated to reference current Structural Materials Branch of the ODOT Materials Division URL 07/06/2016) FIELD ACCEPTANCE
Global Presence - Local Commitment. ElectroFusion. ElectroFusion Installation Manual
Global Presence - Local Commitment ElectroFusion ElectroFusion Installation Manual 2 ElectroFusion Installation Manual It is important to read and understand all instructions before performing an ElectroFusion
UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS
UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS: Carefully read these instructions before installing your new air-conditioner. AUSTRALIAN AUTOMOTIVE AIR AL00500054E 1 Table
Ecoflex Wall Penetration Systems: An efficient, sustainable solution for penetrating concrete or block walls
Pre- insulated pipe systems ecoflex Wall Penetration installation guide Ecoflex Wall Penetration Systems: An efficient, sustainable solution for penetrating concrete or block walls Pre-insulated Pipe Systems
CAST IRON THE BASICS. Heatline - Cast Iron Radiators SMOOTH FLAT FILE TO REMOVE ANY SWARF. ONE TIME. ASSEMBLY. JOINTS SHOULD BE TIGHTENED.
CAST IRON THE BASICS 1. DO NOT LIFT ON YOUR OWN. 2. ONLY LIFT THE RADIATOR VERTICALLY. 3. DO NOT LIFT MORE THAN 8/10 SECTIONS AT ANY ONE TIME. 4. POSITION THE RADIATOR BEFORE FINAL ASSEMBLY. 5. THIS PRODUCT
V281C/D and W281C/D 1.0 mm Coaxial to Waveguide Adapters. Operating and Service Manual
V281C/D and W281C/D 1.0 mm Coaxial to Waveguide Adapters Operating and Service Manual Agilent Part Number: 00281-90056 Printed in Malaysia Print Date: March 2013 Supersedes: May 2001 Documentation Warranty
2006 HEADSHOK Service Video #1
LEFTY SPEED DLR DAMPING CARTRIDGE This document explains how to properly remove, disassemble, inspect, reassemble and reinstall the Lefty Speed DLR2 damping cartridge. It is a document to be used in conjunction
METHOD OF STATEMENT FOR STATIC LOADING TEST
Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents
Instructions cover both:
Bryan Flexible Water Tube Removal and Replacement of Flexible Water Tubes Bryan Steam, the originator and leader in the production of flexible tube water and steam boilers for over 90 years, is pleased
The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
Experimental Study on Non Destructive Testing Techniques (NDTT)
Experimental Study on Non Destructive Testing Techniques (NDTT) G.Lalitha 1, K.Bala Showry 2 1 G.Lalitha Assistant Prof, Civil Engineering, BVRIT, TS, India 2 Dr.K.Bala Showry Professor, Mechanical Engineering,
Clad Direct Glaze Window Installation Instructions
Clad Direct Glaze Window Installation Instructions Sill flashing and sealing: 2. An overview of the proper flashing sequence is shown in figure 1. Please read entire installation instructions carefully
4 Installation Requirements
4 Installation Requirements 9 4.1 Code Reference The authority having jurisdiction should be referenced to determine what law, ordinance or code shall apply in the use of flexible duct. Ducts conforming
Surface Decoration. Design techniques used to put on the surface of the pottery. Slip Oxides Glaze Embossed Incised Wax on wet Altered from the wheel
Surface Decoration Design techniques used to put on the surface of the pottery. Slip Oxides Glaze Embossed Incised Wax on wet Altered from the wheel Slip How to apply slip Colored slip is intended to add
Please calculate with around 5% more square meters than needed because you will have material loss due to cutting and sorting.
1. TEKA Soft Loc Installation Guide Thank you for having chosen TEKA Parquet. To guarantee a constant quality product TEKA engineered hardwood flooring is made out of selected wood species and runs only
NORSOK Compact Flange Installation and Assembly Procedure
NORSOK Compact Flange Installation and Assembly Procedure Hytorc Norway www.hytorc.no P.Nødland. Page 2 INTRODUCTION Scope The following main operations are covered in this section: Assembly/disassembly
GATE VALVES ASAHI AV VALVES. Type P (Standard: Plug) Type S (Soft Seal) Contents. (1) Be sure to read the following warranty clauses of our product 1
Serial No. H-V011-E-11 GATE VALVES Type P (Standard: Plug) Type S (Soft Seal) Contents (1) Be sure to read the following warranty clauses of our product 1 User s Manual (2) General operating instructions
Select Radiators Installation Guide
Select Radiators Installation Guide Table of Contents Informational Symbols...3 Before You Begin...4 Select Rough-In... 5 Connection Installation...6 Optional Piping Arrangements...7 Conventional Wall
Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements
University of Pittsburgh Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements Authors: J. M Vandenbossche S. Sachs August 2013 1. Introduction Bonded concrete overlays of asphalt
Quick Start Guide See Inside for Use and Safety Information
3 rd Generation Personal 3D Printer Quick Start Guide See Inside for Use and Safety Information The USB Mass Storage Device Contains the User Guide and Quick Start Guide in other Languages Congratulations
SECTION 15109 PRESTRESSED CONCRETE CYLINDER PIPE
SECTION 15109 PRESTRESSED CONCRETE CYLINDER PIPE PART 1 - GENERAL 1.01 DESCRIPTION A. Work Specified The work specified shall include all labor, materials, tools, equipment, services, and incidentals necessary
Document Library TS Data Sheet 46012 46013 46014
Document Library TS Data Sheet 46012 46013 46014 Rev:2 Effective: 01/11/2002 3M Marine High Strength Repair Filler Data Sheet Status: Active 3M Part No.(s) 46012 46013 46014 3M Part Descriptor(s) Pint
IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION. Generated: Sergiy Papyshev Engineering. Approved: Don Prysi Manufacturing. Approved: Merzuk Ramic Quality
IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION Generated: Sergiy Papyshev Engineering Approved: Don Prysi Manufacturing Approved: Merzuk Ramic Quality Approved: Steven Barnett Administrative DATE DATE DATE
Sun Windows General Information Sun New Construction Window Installation Instructions
Sun Windows General Information Section 1 G F H H H A. Apply Weather Resistive Barrier B. Apply Sill Flashing Tape C. Place Waterproof Sill Shims D. Caulk Back of Nail Fin Sides & Top, Set Window, Fasten
PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta
PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE By H P Gupta & D K Gupta DIFFERENT TYPES OF DAMAGES 1.Minor cracks 0.5 to 5 mm wide in load or non-load bearing walls 2.Major
Rubber Lining Application Manual Revision Date: September 1, 2009. Section 10: Pipe Lining Procedures Page: 10-1
Section 10: Pipe Lining Procedures Page: 10-1 GENERAL PROCEDURE FOR APPLYING RUBBER LINING TO PIPE 1. METAL SPECIFICATION Pipe should be fabricated in accordance with requirements found in RMA Bulletin
Field Application Note
Field Application Note Reverse Dial Indicator Alignment RDIA Mis-alignment can be the most usual cause for unacceptable operation and high vibration levels. New facilities or new equipment installations
WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING
WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING IMPORTANT NOTICES AND INFORMATION Read these instructions in their entirety prior to installing windows. Any local building code requirements
BATHROOM HEATER. User's Manual. Page 2...A515 Page 9...A716
BATHROOM HEATER User's Manual Page 2...A515 Page 9...A716 BATHROOM HEATER User's Manual A515 SAVE THESE INSTRUCTIONS AND READ ALL INSTRUCTIONS BEFORE USING THE HEATER. Dear customers, Thank you for selecting
Chapter 5 - Aircraft Welding
Chapter 5 - Aircraft Welding Chapter 5 Section A Study Aid Questions Fill in the Blanks 1. There are 3 types of welding:, and, welding. 2. The oxy acetylene flame, with a temperature of Fahrenheit is produced
738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted 02-20-14)
POLYMERIC CONCRETE BRIDGE DECK OVERLAY (Adopted 02-20-14) Description The polymeric concrete bridge deck overlay shall consist of an epoxy polymer that acts together with special aggregate to form an overlay