1 Introduction to Procurement and Step by Step Guide Why would you use it? Not sure where to start with your school's procurement issues? Don't know what, or who, is involved in successful procurement? How does it work? This tool introduces the concept of what is "good-practice procurement". The three key stages of procurement are explained, and a checklist of key steps in each stage helps you to keep track of what schools need to do to ensure that their procurement delivers optimal value for money.
2 Introduction to Procurement Procurement Overview Procurement is the process of acquiring goods and services. A school will procure many goods and services, from cleaning and payroll, to stationery and desks. Any spend that is not staff-cost will fall under the banner of school procurement. Procurement usually accounts for between 10-15% of a school s budget. With rising pressure on schools to display good value for money on their non-staff spend, effective procurement is becoming increasingly important. What is this tool? This tool provides an introduction to Procurement, an explanation of what constitutes good procurement and a three-stage process that you can follow to ensure that they procure products and services that a way that delivers the best possible value for money. The checklists at each stage help you keep track of where you are in your procurement exercise, and the key tasks that need to be completed. You can re-use these procurement checklists for any future procurements. Throughout this introduction to Procurement, we reference other VfM tools that you may find useful. These are in the Procurement Resource Library which you can access on the VfM Website.
3 What is Procurement? What is procurement? Procurement is simply the process of acquiring goods and services. A school will procure many goods and services, from cleaning and payroll, to stationery and desks. Any spend that is not staff-cost will fall under the banner of school procurement. Good procurement is getting goods and services at the best possible price, in the right quantity and quality, in the right place and from the right source. Benefits of good procurement: By devoting time and effort to good procurement, you will lower the overall costs of your non-staff spend thereby allowing you to invest in the things that really matter to your school. Additionally, well-run contracts will save you time and allow you to focus on running your school and educating children. There are three key stages in good procurement: Planning, Purchasing, and Managing. Together, these make the procurement cycle. The procurement cycle The procurement cycle Planning, Purchasing and Managing are the key stages of a good procurement exercise. Within each stage there are a number of steps that you can take. Following these steps will help ensure that you are getting the best possible value for money on your non-staff spend. The following pages will go through each stage in more detail, provide you with a checklist of suggested steps and point you in the direction of further tools in this document to help you. The higher the value of the contract, the more important it is for you to follow each step in the process.
4 Procurement cycle: Planning The planning stage kicks off at the point where your school identifies the need for a new good/service or decides to review an existing one Steps Checklist 1. Demand management. Before you jump into a procurement exercise, take a step back and consider: do you actually need this product or service? How important is it to the operation of your school? Does it contribute to the objectives of the school? Internal view 2. Understand your requirements. What exactly do you need to buy, and how much of it? Consider: did you buy too little/much last time? Is demand going to change (e.g. because of changes to pupil or teacher numbers)? 3. Take a school-wide view. Are different departments buying the same goods separately? Could you centralise buying and buy in bulk? Can you collaborate with other schools in your area or cluster? Remember it is more effective to buy in bulk, and you have more customer power as a result. Key guidance to help you with this stage can be found in the Procurement Resources Library Info on 4 buying channels Demand management Benchmarking guide What is TUPE? Sourcing guide for schools External view 4. Benchmark your school. Use the schools financial benchmarking website to understand how your spend per pupil on this contract compares with other schools of similar size. This will give you an indication of whether you can achieve better value for money by switching suppliers or altering the terms of your contract. Also consider: how feasible is it for you to change suppliers are there termination clauses in your contract? Will TUPE be an issue? 5. Understand where you can buy from. By shopping around you are more likely to find a contract that best meets your requirements. Have you considered all key four buying channels that schools can access? These are your LA, the OGC, Education consortia and local/private market suppliers. Can you access a framework contract? Pull together a shortlist of potential suppliers. 6. Make a decision. Decide next steps: do you want to proceed to the next stage?
5 Procurement cycle: Purchasing The purchasing stage is where you actually acquire the product or service Steps 1. Establish value of good or service. Estimate the cost of the value of good or service over the full life of the contract (e.g. if it is a three-year contract, multiply the annual cost by three). This will influence your decision in step 2. Checklist 2. Establish route to market (simple quote/formal tender/framework/existing supplier?) If Step 1 has highlighted that the value of the good or service exceeds 156,000, then you have to follow an OJEU process or access an existing framework contract (see tool below). For medium -high value contracts (typically k) aim to carry out a formal tendering process and obtain 3 quotes. For low value contracts (less than 10,000), a simple quotation exercise may suffice. Alternatively, if your Planning stage has suggested that you are completely satisfied with your current supplier, you may wish to simply extend the contract. However, we would recommend that for medium-large value contracts, you test the market by collecting quotes to ensure that you continue to achieve the best possible value for money. Key tools to help you with this stage: How to write a specification What is OJEU? Tendering 3. Develop specification. Using your findings from the Planning stage, summarise your requirements in a specification. Try to consult with the key users of the good or service when you are writing your specification. E.g. for field maintenance, consult your caretaker, and sports teachers, as they may know more about what is required than you! 4. Run competition: Issue your specification to your shortlisted suppliers, include a deadline. Include your evaluation criteria which will inform suppliers what the key factors are which influence your decision. E.g. you will score suppliers 50% cost, 30% quality, and 20% flexibility. 5. Evaluation: Evaluate the suppliers based on your criteria. Depending on the value and nature of the good or service, you may wish to involve your governing body, or other stakeholders (e.g. parents, teachers) in the decision making process. 6. Choose supplier: Based on your evaluation, choose a supplier and inform them of their success. Negotiate any final terms, carefully read all terms and conditions and sign the relevant paperwork. Inform the remaining bidders that they were unsuccessful and provide feedback if possible.
6 Procurement cycle: Managing At the Managing stage you monitor the performance of your supplier to ensure that you continue to receive the agreed level of service and quality Steps Checklist 1. Agree working relationship: Confirm logistical and operational issues, e.g. time of delivery, key contact personnel etc. Also agree the Key Performance Indicators (KPIs) you would like to monitor to ensure that the supplier is delivering against your specification. An example KPI is % of deliveries on time you may have specified in your specification that you require a minimum of 95% deliveries on time. Key tools to help you with this stage: Contract Management 2. Monitor performance: Actively monitor your supplier s performance. Record any issues, evidence of poor/excellent performance (you can do this using a Contract Scorecard see Contract Management tool below. Schedule regular meetings to discuss performance. Try to encourage a two-way mutually beneficial relationship by asking your supplier what could I do better?. Having a good working relationship will benefit both you and your supplier. 3. Closing down and/or preparing for contract renewal: As the contract approaches its expiry date, ensure that you have left sufficient time to run through the Procurement Cycle again. Ensure any outstanding issues and balances are resolved before the contract end date. Review the contract: what worked well, what didn t work well? Did you order too little/too much? What could be improved? This is all useful information that will help you in your next procurement exercise.
7 Procurement key principles Throughout any procurement exercise, keep in mind these key principles of procurement: Collaborate & network Public sector procurement rules Can you combine your buying power by collaborating with other schools? Can you aggregate your spend and combine services within your school? Are you part of a buying consortium? For low-value contracts (typically below 10,000), try to obtain at least three quotes For medium-value contracts (between 10,000-50,000), obtain at least three written Have good knowledge of your school quotes. Follow a formal tendering process if possible. For high value contracts ( 50,000+) follow a formal tendering process. Any value above 156,000 (goods & services) or 3.9m(works), you have to follow an OJEU process. If your procurement will have an effect on staff, you have to take into account TUPE Understand the financial challenges your school faces? Is this procurement really necessary? Is it vital to the operation of your school? Will it contribute to the objectives of the school? Have you consulted the necessary stakeholders? (teachers, parents, pupils, governors) Is there external funding available to support this procurement? Sustainability can environmental impacts be reduced? Key tools to help you with this principle: Sourcing guide Information on 4 key buying channels What is OJEU? What is TUPE? Demand management Also remember: regularly benchmark your school & contracts Do you know how your spend on products and services compares with other schools with similar characteristics to yours? When was the last time you compared your current suppliers to what other suppliers could offer you? Guide to benchmarking
Procurement Benchmarking
Procurement Benchmarking Why would you use it? Are you concerned you're spending too much on products or services? Do you know how your school spend compares to similar schools? How does it work? This
Page 97. Executive Head of Asset Planning, Management and Capital Delivery
Page 97 Agenda Item 7 Report to: Strategy and Resources Committee Date: 16 December 2013 Report of: Executive Head of Asset Planning, Management and Capital Delivery Ward Location: Not applicable Author
GUIDE ON HOW TO DO BUSINESS WITH LIVERPOOL JOHN MOORES UNIVERSITY
GUIDE ON HOW TO DO BUSINESS WITH LIVERPOOL JOHN MOORES UNIVERSITY PRODUCED BY LIVERPOOL JOHN MOORES UNIVERSITY PROCUREMENT SERVICE First Issued - ISSUED 11 th February 2011 VERSION 5.0 updated 13/04/15
Becoming Tender Ready
Becoming Tender Ready Difference Between Procurement & Tendering Procurement is the process of acquiring goods, works and services, covering both acquisition from third parties and from in-house providers.
Contract Management Framework
Contract Management Framework Contents Purpose and Scope... 2 The Contract... 2 The importance of the Contract... 2 Contract Management... 3 The Toolkits... 4 Outline of establishing a Contract Management
How to do Business with the London. Borough of Sutton
How to do Business with the London Borough of Sutton February 2013 1 About this guide This guide has been developed to assist businesses wishing to sell their goods and services to the Borough. Contents
Contract and Vendor Management Guide
Contents 1. Guidelines for managing contracts and vendors... 2 1.1. Purpose and scope... 2 1.2. Introduction... 2 2. Contract and Vendor Management 2.1. Levels of management/segmentation... 3 2.2. Supplier
Delivering best value to Hammersmith and Fulham Schools. Karen Ponos Business Manager
Delivering best value to Hammersmith and Fulham Schools Karen Ponos Business Manager 1 Agenda Findel Education Who we are and what we offer Furniture Overview Local Support - Your Account Manager Our offer
PROCUREMENT & LOGISTICS DEPARTMENT
PROCUREMENT & LOGISTICS DEPARTMENT Tender/OJEU Procedure Overview This procedure applies to all purchases over 50,000 not covered by existing contracts and should be followed in conjunction with the Tender/OJEU
A guide on how to do business with Stockport NHS Foundation Trust. Procurement Buying In to Buying Locally
A guide on how to do business with Stockport NHS Foundation Trust Procurement Buying In to Buying Locally Contents Page Introduction 3 Aim of the guide 4 Corporate Citizenship more than a hospital 4 The
To be used in conjunction with the Invitation to Tender for Consultancy template.
GUIDANCE NOTE Tendering for, choosing and managing a consultant Using this guidance This information is not intended to be prescriptive, but for guidance only. Appointing consultants for relatively small
Outsourcing. Knowledge Summary
Knowledge Summary Outsourcing P&SM professionals should have the knowledge and skills required to manage the outsourcing process and to advise colleagues of the most appropriate solution to obtain best
RDTL Procurement Best Practice Guide 7: Managing Contracts. RDTL MINISTRY OF FINANCE Procurement Service BEST PRACTICE GUIDE 7: MANAGING CONTRACTS
RDTL MINISTRY OF FINANCE Procurement Service BEST PRACTICE GUIDE 7: MANAGING CONTRACTS 1 RDTL Procurement Guidelines The Procurement Legal Regime Decree Law sets out new procurement processes which must
European Commission Green Public Procurement (GPP) Training Toolkit - Module 1: Managing GPP Implementation. Joint procurement.
European Commission Green Public Procurement (GPP) Training Toolkit - Module 1: Managing GPP Implementation Joint procurement Fact sheet Toolkit developed for the European Commission by ICLEI - Local Governments
CONTRACTS STANDING ORDERS (CSOs) 2015 / 2016 CSO 2015-6 1
CONTRACTS STANDING ORDERS (CSOs) 2015 / 2016 CSO 2015-6 1 PART 3G Contracts Standing Orders 2015/16 Definitions Aggregation is the combining together of the total contract value from separate contracts
Contract Management The Mavericks Won t Like This!
Contract Management The Mavericks Won t Like This! Keith Wallis How Much Did That Project Cost? Real Life Example Original contract amount $500K Variations scope changes not visible Total variations =
Contract Standing Orders and Procedure - A Guide For Council Employees
Hampshire County Council Constitution Part 3:F Contract Standing Orders 1. Interpretation 2. Status of, and Compliance with, Contract Standing Orders 3. Approval to Commence Procurement 4. Contract Value
INTRODUCTION. The Merlin Principles. The Elements of each Principle
0 INTRODUCTION The development of the Merlin Standard has been progressed as a joint exercise between the Department for Work and Pensions (DWP) and its providers operating in the Welfare to Work (W2W)
Monitoring the Performance of Suppliers
CIPS Position on Practice Monitoring the Performance of Suppliers The term performance monitoring means measuring, analysing and managing a supplier's ability to comply with, and preferably exceed, their
Step by Step Project Planning
Step by Step Project Planning Contents Introduction The Planning Process 1 Create a Project Plan...1 Create a Resource Plan...1 Create a Financial Plan...1 Create a Quality Plan...2 Create a Risk Plan...2
Subvented Social Welfare Non-Governmental Organisations Procurement Procedures
Subvented Social Welfare Non-Governmental Organisations Procurement Procedures Corruption Prevention Department Independent Commission Against Corruption March 2001 CONTENTS Pages Introduction 1 The Basic
PROCEDURE FS 1 PROCUREMENT POLICY
PROCEDURE FS 1 PROCUREMENT POLICY CONTENTS Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7 Section 8 Section 9 Section 10 Section 11 Section 12 Section 13 Appendix A Appendix B Appendix
Chapter 2 INDUSTRIAL BUYING BEHAVIOUR: DECISION MAKING IN PURCHASING
Chapter 1 THE ROLE OF PURCHASING IN THE VALUE CHAIN The role and importance of the purchasing and supply function in the value chain. The difference between concepts such as ordering, buying, purchasing,
White paper. Reverse e-auctions. A Recipe for Success
White paper s A Recipe for Success Executive Summary Enterprises and organizations whether small, medium or large have used s with varied degrees of success in the strategic sourcing cycle. While some
WATFORD BOROUGH COUNCIL PROCUREMENT RECOMMENDATION SUBMITTED BY: TRICIA TAYLOR - CORPORATE DIRECTOR
WATFORD BOROUGH COUNCIL PROCUREMENT RECOMMENDATION TO: CORPORATE MANAGEMENT BOARD SUBMITTED BY: TRICIA TAYLOR - CORPORATE DIRECTOR REQUIREMENT: INTEGRATED HR SYSTEMS WITH PAYROLL DATE: 11 November 2008
FINANCIAL MANAGEMENT STANDARD IN SCHOOLS (FMSiS)
FINANCIAL MANAGEMENT STANDARD IN SCHOOLS (FMSiS) East Riding of Yorkshire Council Updated by Schools Finance May 2009 ERYC FMSiS Guide 1 ERYC FMSiS Guide 2 CONTENTS PAGE 1) Introduction 2) Background 3)
Supply Chain Strategy. Edition 01-2014
Supply Chain Strategy Edition 01-2014 Contents Executive Summary Mutual Benefits of the Supply Chain 01 04 Subcontractor Relations Guidelines 05 Levels of Engagement 07 Introduction Tiered Supply The Chain
How To Get A Contract From The Taxman
Procuring Professional Services Buying Support www.buyingsupport.co.uk Procuring Professional Services What are they? Why are they needed? The 7 Steps to Best Value 2 What are Professional Services? Management
Outsourcing. Definitions. Outsourcing Strategy. Potential Advantages of an Outsourced Service. Procurement Process
CIPS takes the view that the outsourcing of services to specialist providers can often lead to better quality of services and increased value for money. Purchasing and supply management professionals should
Tender feedback in Catering & Cleaning
Briefing 12-44 September 2012 Tender feedback in Catering & Cleaning This briefing provides the information that those tendering for public sector contracts should request in the event that a particular
Quest 2014 Gplus 9 Financial Management and Performance Outcomes
Financial Management and Performance Outcomes The development of an effective financial plan Understanding across the team of the financial performance of the facility The effective address of any financial
Leeds City Council Procurement Strategy October 2013
Leeds City Council Procurement Strategy October 2013 Contents 1. Introduction 2. Background 3. Our ambition 4. Our strategy 5. Who we will work with 6. What we will achieve and how we will achieve it 7.
How To Manage A Contract
Contract Management Checklist Preparation This section deals with laying good foundations before a contract is let. The contract should be actively managed. You should have a plan for doing this, which
SODEXO FACILITIES MANAGEMENT SERVICES CONTRACT; OPTIONS FOR SCHOOLS FROM 9th APRIL 2011 FOR CATERING AND BUILDING CLEANING SERVICES
WILTSHIRE COUNCIL SCHOOLS FORUM 02 December 2010 SODEXO FACILITIES MANAGEMENT SERVICES CONTRACT; OPTIONS FOR SCHOOLS FROM 9th APRIL 2011 FOR CATERING AND BUILDING CLEANING SERVICES Purpose of Report 1.
Best Practice in Design of Public-Private Partnerships (PPPs) for Social Infrastructure, particularly in Health Care and Education
EMAIL [email protected] WEB www.fosterinfrastructure.com Best Practice in Design of Public-Private Partnerships (PPPs) for Social Infrastructure, particularly in Health Care and Education
Complete Tender Management E AUCTIONS
Complete Tender Management E AUCTIONS Authority Guide April 2012 CTM_Auction_CA EN 6.9.docx Page 1 Version Control Version Date Amendment 1.0 March 2012 Split Tender and Contract Management manuals NEW
LSB Procurement Framework
LSB Procurement Framework Introduction Procurement covers the typical purchase of services, supplies and works required to enable project delivery and to manage the infrastructure. The Services Board (LSB)
Facilities Management Shared Learning Seminar
Facilities Management Shared Learning Seminar How the National Procurement Service Can Help Welsh public services to improve their Facilities Management 1 st May 2014 Overview of the National Procurement
Driving Operations through Better, Faster Decision Making
Driving Operations through Better, Faster Decision Making Driving Operations through Better, Faster Decision Making Operations faces increasing pressure from all sides. Picky customers know that your competitors
Procurement guidance Managing and monitoring suppliers performance
Procurement guidance Managing and monitoring suppliers performance Procurement guidance: Managing and monitoring suppliers performance Page 2 of 16 Table of contents Table of contents... 2 Purpose of the
Doing business with local government
Doing business with local government A guide to better understand how to successfully become a supplier for local government. 02 Doing business with local government Introduction 3 About this guide 3 What
Good Practice Framework. Performance Management
Good Practice Framework Performance Management Decision Gatewa y Good Practice Framework Strategic Planning STRATEGIC PLANNING Policy Context Needs Assessment Strategic Review Outcomes Continuous Improvement
Better Practice Contract Management Framework
Better Practice Contract Management Framework Better practice element Comment: What is required and why Governance Agencies contract delegations are clear and consistent with general financial delegations
The Tender Process. 1. The Process. 2. Why Use Tendering?
The Tender Process CiCS Programme and Project Unit July 2014 This document briefly describes when and how a project should undertake the tendering process when making a significant purchase of either goods
Office Move Checklist
Office Move Checklist Plan your entire office move from start to finish with this definitive Moving Office Checklist. It guides you through each step of the planning process and is loaded with top tips
Procurement driving better value for money. Guide 7 to Sustainable Procurement. Manage the contract and disposal route
Procurement driving better value for money Guide 7 to Sustainable Procurement Manage the contract and disposal route A guide for agencies July 2010 This guide is part of a series of documents focussed
Best Practice exensys Asset Purchases
Best Practice exensys Asset Purchases Table of Contents Introduction:... 3 Overview:... 3 Benefits:... 4 Conclusion:... 4 Introduction: Accounting of fixed assets is a complex task. To effectively manage
Working in a consortium A guide for third sector organisations involved in public service delivery
Working in a consortium A guide for third sector organisations involved in public service 2 Working in a consortium: A guide for third sector organisations involved in public service Working in a consortium
ADVERT POSITION: SPECIALIST: CONTRACTS MANAGEMENT JOB LEVEL: 6 DURATION 3 YEAR CONTRACT LOCATION: NATIONAL OFFICE PORTFOLIO: DSU
ADVERT POSITION: SPECIALIST: CONTRACTS MANAGEMENT JOB LEVEL: 6 DURATION 3 YEAR CONTRACT LOCATION: NATIONAL OFFICE PORTFOLIO: DSU PURPOSE: To lead and facilitate effective organisation-wide contracts development,
APPENDIX A (CFO/263/09) Merseyside Fire & Rescue Service ICT Outsourcing Procurement Support. Final Report
Merseyside Fire & Rescue Service ICT Outsourcing Procurement Support Final Report Version 1.1 Oct 2009 Contents 1. Executive Summary...3 2. Context and Background...3 3. Deliverables and Value Added...
OTHER POSTS POST 20/37 : ASSISTANT DIRECTOR: HUMAN RESOURCES DEVELOPMENT, REF NO: MISA 15/2016
ANNEXURE I MUNICIPAL INFRASTRUCTURE SUPPORT AGENT The Municipal Infrastructure Support Agent (MISA) is a Government Component within the Ministry for Cooperative Governance and Traditional Affairs. It
Department of Health PFU & PPP Forum. Benchmarking and market testing in NHS PFI projects. Code of Best Practice
Department of Health PFU & PPP Forum Benchmarking and market testing in NHS PFI projects Code of Best Practice This Code of Best Practice provides guidance and advice on good practice to NHS Trusts, Project
CABINET. 24 March 2015
CABINET 24 March 2015 Title: Procurement of Electricity and Gas Supplies Report of the Cabinet Member for Finance Open Report with Exempt Appendix 4 Wards Affected: All Report Author: Andrew Sivess Group
TUPE: Frequently Asked Questions For Schools becoming an Academy
TUPE: Frequently Asked Questions For Schools becoming an Academy 1. PURPOSE This document is for Governors, Head Teachers and staff of schools who have received the Academy Order from the Department for
Circular 10/14: Initiatives to assist SMEs in Public Procurement
Ref: DPE108/001/2014 16 April 2014 To Heads of Departments 1 Circular 10/14: Initiatives to assist SMEs in Public Procurement A Dhuine Uasail, 1. In the context of the reform of the Public Service and
What Can Professional Procurement do for You? David Henchliffe FCIPS
What Can Professional Procurement do for You? David Henchliffe FCIPS Agenda Introduction Goal alignment Modern procurement Basic techniques Keys Conclusion Introduction David Henchliffe, FCIPS Chairman
Aggregation. Is bigger always better?
Aggregation Is bigger always better? Contents Purpose of this guidance 1 What is aggregation? 2 When should aggregation be considered? 4 Why use aggregation? 6 Some practical considerations 8 Further reading
MAYFIELD SCHOOL. Author: Torbay Human Resources [April 2011] Renewed 9 th November 2015
MAYFIELD SCHOOL Policy: TUPE Guidelines for Managers Author: Torbay Human Resources [April 2011] Governors Committee: Leadership Date adopted: 23 rd May 2011 Renewed 9 th November 2015 Next review: Autumn
PROGRAMME FOR INTERNATIONAL STUDENT ASSESSMENT (PISA) 2018: CALL FOR TENDER PROCESS. An Overview
PROGRAMME FOR INTERNATIONAL STUDENT ASSESSMENT (PISA) 2018: CALL FOR TENDER PROCESS An Overview Launch of the PISA 2018 Procurement Process In January 2014, the OECD plans to launch the first Call for
How to Tender for our Work
Pembrokeshire County Council Cyngor Sir Penfro How to Tender for our Work Parc Cenedlaethol Arfordir Penfro Pembrokeshire Coast National Park COLEG Sir Benfro Pembrokeshire COLLEGE March 2014 Contents
Business Resources. QCF Units of Assessment Final NVQ Units April 2010
Business Resources QCF Units of Assessment Final NVQ Units April 2010 6 Graphite Square Vauxhall Walk London SE11 5EE T: 0207 0919620 F: 0207 0917340 [email protected] www.skillscfa.org Contents No. Title
QUIZ MODULE 1: BASIC CONCEPTS IN QUALITY AND TQM
QUIZ MODULE 1: BASIC CONCEPTS IN QUALITY AND TQM These questions cover Sessions 1, 2, 5, 6, 7. The correct answer is shown in bold A fundamental attribute of TQM is Drawing control charts Having team meetings
Business Intelligence is a system that collects, integrates, analyses and presents business information to support better business decision making.
UNIVERSITY OF EXETER BUSINESS INTELLIGENCE Key Messages & Communications Plan 1 Key Messages Background: Staff from across the University extract information from a variety of data storage areas to support
Heritage Grants - Receiving a grant
Heritage Grants - Receiving a grant Mentoring and monitoring; Permission to Start; and December 2013 If you require a copy of this guidance in an alternative format (large print, Braille or audio version),
Best Practice Checklist for Contact Centre Outsourcing
Introduction As the old adage goes, the customer is always right; therefore, customer care has always got to be right. Multi-channel contact centres are a fact of modern commercial life. Over 40% of customers
The SME Engagement Handbook
The SME Engagement Handbook The purpose of this document is to help microbusinesses and small to medium enterprises ( SMEs ) interact more effectively when bidding to supply goods or services to larger
How Cisco IT Improved Strategic Vendor Management
How Cisco IT Improved Strategic Strategic sourcing for vendor management results in flexibility, simplicity, and reduced costs. Cisco IT Case Study / Business Management / : This case study describes the
Lead Provider Framework Draft Scope. NHS England / 13/12/13 Gateway Ref: 00897
Lead Provider Framework Draft Scope NHS England / 13/12/13 Gateway Ref: 00897 1 Introduction The commissioning support lead provider framework is being developed in response to requests from CCGs for a
Driving Supplier Performance Improvement:
Driving Supplier Performance Improvement: Using established HR techniques and on-line tools to enhance supplier performance management. Although supplier performance management can be complex and time
Design-Build Process for Project Managers
Vermont Agency of Transportation Design-Build Process for Project Managers This document provides guidance on the preliminary engineering and procurement process and roles and responsibilities of key personnel
Procurement and Contract Management
Procurement and Contract Management Strategy and Practice January 2012 POLICE SERVICE OF NORTHERN IRELAND PROCUREMENT AND CONTRACT MANAGEMENT STRATEGY AND PRACTICE CONTENTS Page The Purpose of this Document
Automated Invoice/P2P Processing
Automated Invoice/P2P Processing Business Solutions Reduce processing costs Eliminate bottlenecks and delays Automate invoice capture Automate requisition processes Improve management reporting Improve