Huwer Bank Stabilization and Riparian Fencing Project: 06.SHU.01
|
|
|
- Phyllis Malone
- 9 years ago
- Views:
Transcription
1 Huwer Bank Stabilization and Riparian Fencing Project: 06.SHU.01 Prepared for: Howard and Joe Huwer Prepared by: Tom Minor Prepared with the financial support of: B.C. Hydro Bridge Coastal Fish and Wildlife Restoration Program
2 Executive Summary The Huwer Bank Stabilization and Riparian Fencing Project is jointly funded by BC Hydro Bridge Coastal Fish and Wildlife Restoration Program (BCRP), the Environmental Farm Plan (EFP), Fisheries and Oceans Canada (DFO), the B.C Cattleman s Association and the landowners, Joe and Howard Huwer. The original goal of the project was to protect 450 m of stream bank and old growth cedar riparian area while increasing instream habitat values by building 30 habitat structures. These structures use a combination of large woody debris, brushy material and rock to reduce the erosive force of the river near the bank and while providing instream and above-stream cover to improve fish habitat. The project resulted in the construction of 71 habitat structures covering approximately 950 m of bank. The increase in the number of structures was partially due to the development of rock on-site and partially by an increase proportion of the landowner s contribution. i
3 Table of Contents List of Figures... ii Introduction... 1 Goals and Objectives... 1 Study Area... 2 Methods... 5 Results... 7 Discussion Recommendations Acknowledgements References Appendices I. Financial Statement II. Performance Measures Actual Outcomes III. Confirmation of BCRP Recognition List of Figures Figure 1: Aerial view of project site... 2 Figure 2: Location of project... 3 Figure 3: Location of bank work... 4 Figure 4: Hawthorn being loaded for bank work... 7 Figure 5: Eroding bank before treatment... 9 Figure 6: Treated bank... 9 Figure 7: Planting frozen shrubs with excavator Figure 8: Planted bank Figure 9: Fence lines ii
4 Introduction Four years ago, the Huwers began to do bank stabilization work on the Shuswap River upstream of their Bailey bridge to prevent erosion around the left bank bridge abutments. The Huwers wanted the bank work to improve fish habitat values as well as prevent bank erosion. Lee Hesketh was hired to design and supervise the work. Habitat structures using whole trees and shrubs as well as large rock were constructed along 750 m of bank. The structures provide lowand high-water refuge for juveniles as well as bank stability. By adding brushy material to the structures that dampen the current close to be bank and providing dense in-stream and abovestream cover. They also have helped to maintained pool holding areas with cover for adults by accelerating and converging the current around the root wads and logs. After the success of this first project, the Huwers wanted to continue this work upstream. Shifting river channels has been eroding the banks on several corners and recently formed logjams have accelerated the process. This property has high habitat values that include a 2 km groundwater-fed pond and creek complex and 2 km of riverbank. This riverine riparian area contains one of the last stands of mature cedar on the middle Shuswap River. Typical of Interior old growth cedar, these trees are largely shells with cavities that provide nesting and denning sites for a variety of birds and mammals. Bank erosion and the slow downstream migration of meanders are natural processes. The toppled trees provide instream cover for fish and often cause scouring and pool habitat. This project used bank stabilization techniques that incorporates the trees that have recently fallen in and adds additional large woody debris (LWD) to enhance fish and wildlife habitat. By building the habitat structures, the erosion is reduced, the old growth riparian trees preserved, holding pools maintained and created and brushy in-stream cover added for juvenile refuge areas. The Huwer family participated in four of the five major BC Hydro and BCRP funded projects in the area. The Ireland Creek Side Channel (02.SH.36) and the Huwer Groundwater Complex (05.SH.02) were built on Huwer properties. The Huwers were one of the seven landowners involved with Procter Channel (02.SH.35). The Limmer/Lang Channel (B.C. Hydro) also borders Huwer properties and required their cooperation. Their previous involvement with BCRP projects prompted them to apply for funding to help complete this work. The Huwer Bank Stabilization and Riparian Fencing Project is a jointly funded project by BC Hydro Bridge Coastal Fish and Wildlife Restoration Program (BCRP), the Environmental Farm Plan (EFP), Fisheries and Oceans Canada (DFO), the B.C Cattleman s Association and the landowners, Joe and Howard Huwer. Goals and Objectives The goal of this project was to protect the cedar riparian area on the Huwer property and improve fish habitat by building 44 habitat structures along 450 m of the left bank of the Shuswap River and building 4 km of riparian fence. 1
5 Study Area Lawrence Road, off Mabel Lake Road, 20 kms north of Lumby, UTM , to , , approximately 8 km downstream of the Wilsey Dam on the Middle Shuswap River and 6 km downstream of Bessette Creek, the Middle Shuswap River s main tributary. This section of the Shuswap River is one of the most heavily utilized spawning areas on the Middle Shuswap River (Arc 2001). The river is braided and contained in one channel for only about 1/3 of its length along the Huwer property. Logjams have contributed to creation of the various channels and lateral movement over the past few years (Figure 2). The Huwer property consists of 640 acres of which approximately 100 acres are cleared. The uncleared portion of the property is cedar/spruce/cottonwood forest in the floodplain (el. 408 m) while the hillside is Douglas fir. Most on the land is on the west side of the river and is accessible only by their Bailey bridge. The land is used for summer pasture and a winter-feeding area for cattle. Extent of bank work Figure 1: The bank stabilization began at upper (downstream) area and ended at the lower (upstream) arrow. This area is roughly 1200 m long with approximately 950 m treated. The 3600m riparian fence will exclude livestock from the riverbank and pond area. 2
6 06SHU01 March 14, 2007 Huwer Project Wilsey Dam Figure 2: The project is located on the Shuswap River 8 km downstream of Wilsey Dam in the Southern Interior. 3
7 06SHU01 March 14, 2007 Huwer Bridge Start of existing bank work Project Area End of existing bankwork Start of new work Shuswap River Shuswap River Mabel Lake Road End of new work Bessette Creek Wilsey Dam Side Channel widened during 2006 freshet Figure 3: Location of Huwer property and bank work. Lumby 41
8 Methods A work permit were obtained on August 30 (Ministry of Environment File #A35753). Work began in early November, developing rock on the Huwer property. In mid-november, access was developed to the drier areas. After there was sufficient frost in the ground to allow passage of loaded dump trucks, access to the wetter sites was cleared. Material Collection Rock development began in October. As the river access was opened, some rock was delivered to each habitat structure location. Because of the lack of space between trees, only one or two loads could be placed per structure. The amount of wood and brush that could be placed before excavation work began was also limited. Three excavators were used. A John Deere 150 developed and loaded rock from two pits on the Huwer property. Two Hitachi 120 excavators were used to build the habitat structures, for placing extra woody debris and for re-planting the shrubs. Two dump trucks were employed for delivering rock and some woody material. Because there was no hauling on or across public roads, full-length trees and shrubs could be hauled with the dump trucks (Figure 4). One of the trucks belongs to the landowner and was counted as in-kind. A 360 Timberjack line skidder was used to collect wood (mostly windfall and old logging debris) from the hillside and pasture areas of the Huwer property and skid the material to the work sites. Douglas fir, hemlock and cedar were the preferred species and most often used especially for the larger trees because of their longevity. Whole hawthorn shrubs from recent land clearing were also used. The hawthorn is dense, very strong and long lasting. When used in the habitat structures, the thorns tend to collect other material that adds to the dampening effect of the structures. The skidder was also used to move some of the frozen shrubs from the fence line to the riverside for planting. Habitat Structures Location of each habitat structure was marked with 1 m wooden stakes and flagging in June. Each structure is placed at a location where it will be most effective in deflecting the flow away from the bank. The structure farthest upstream was placed 10 m downstream of a bedrock outcrop that formed the left bank. Subsequent structures were placed an average of 15 m apart so each structure is at the downstream end of the lee of the structure immediately upstream.. There was some variation in distance between structures due to the spacing of the cedar trees growing at the edge of the bank. The structures were placed to minimize disturbance to the roots of these trees. The large woody debris (LWD) of the main structure deflects the thalweg away from the bank while the brushy material placed in between the larger wood and on the downstream end of the structure reduces the erosive force or the water around the structure and dampens the eddy effect caused by the deflection. Before a structure was placed, the area was examined for redds. All work was completed without damage to redd sites either directly or by creating a souring action or other flow alteration that would affect redds downstream of the structure. At the start of the excavation work, the bank overhang was pulled back. The vegetation and organic layer of soil covering the work area peeled back and removed in such a manner as to 5
9 preserve as much of the root structure as possible and placed to the side for later re-use. This material was replaced over the disturbed area after construction is complete. A trench was excavated in the riverbank perpendicular to the river to approximately 0.3 m above the water level. The length of the trench was determined by the LWD to be placed in the bank. Generally, one-third to one-half the length of the log or tree was buried in the bank. The trench excavation is continued below water level but with a narrow berm maintained between water and trench to isolate the work area from the river and prevent any release of silt. Once below the waterline, s the excavator removed the saturated material slowly, so as not to create a vacuum that would cause the berm to fail. Once the trench is excavated to slightly below the streambed level, large angular rock was placed. The large rocks are placed individually for a tight fit. Smaller rock was packed between the large rocks to form a tight matrix and compacted with the bucket. This base layer brought the trench back up to water level. The rock base below streambed level will reduce the risk of future undercutting. The width of the trench was generally 2 m wide depending upon the material to be placed, the cohesiveness of bank material, depth of water and height of bank. The bank material was sufficiently fine that seepage was not a problem here. However, the trench was backfilled from the river end first so that any seepage could be removed with the bucket from the end of the trench farthest from the river before placing the next bucketful of rock. This prevented any silty water displaced from the trench from entering into the river. A pump was kept on hand in case the bank and berm material was porous and seepage became a problem. Enough discharge hose was on hand so that the silty water could be pumped far enough so as not to flow back to the river or muddy the work site. Once a base was placed level with the waterline, the first layer of smaller trees and/or logs and brush clumps were placed with tops extending out over water. The angle of material varied with the desired area of influence and length of material but generally about 40 o off the downstream bank to 40 o off the upstream bank. The brushy material was fanned out to dampen the stream energy around the base of the structure. The brushy material used was often the tops of coniferous trees left from recent logging on the hillside. Some longer shrubs like hawthorn were place so the tops hung in the water at the downstream end of the structure to dampen the eddy effect of the LWD. A mixture of rock and excavated soil was packed in with the woody material to fill the voids and compacted with the bucket. Larger logs/trees ( m butt diameter x 5 7 m) were placed over top of the first layer and large rock placed around the end of the logs and along the edge of bank. This LWD and the large rock used to secure them are the main anchors that will hold the structure in place. Large rock is placed as ballast. The rock face at the water will prevent erosion of the disturbed material along water s edge and movement of the anchor log. Smaller rock and the remainder of the bank material were compacted with the bucket around the logs and ballast rock. Finally, the topsoil, sod and shrubs were placed over top. Trees that had recently fallen into the river and were still adjacent to the bank were secured in place by placing the larger logs over the trunk of the tree behind the root wad and brushy material in the gap between the root and the bank. Fencing The fence line was cleared after the ground was frozen with a Case 1150E cat, provided by the landowner. Larger shrubs were lifted and replanted with the 120 excavator. Posts are being driven with a Hitachi 120 excavator. The fence will be a six strand fence with four strands of 6
10 high tensile wire and two strands of barbed wire. The two center strands of barbed wire discourage cattle from pushing against the fence or putting their heads through the fence to graze, often loosening the wire. The two upper and lower strands of high tensile wire reduce the potential to injure wild life jumping over or slipping under the fence. Planting The existing large shrubs such as Douglas maple (Acer glabrum), mountain alder (Alnus incana ssp tenuifolia), and beaked hazelnut (Corylus cornuta) found along the riverbank and fence line were lifted with the excavator and placed to the side during site preparation. These shrubs were replanted after the bank work was done. Grass seeding was done during the last week of March. Additional planting of live willow stakes will be done in April. The EFP and landowner are sharing the cost of planting. Results Seventy-one habitat structures were built covering approximately 950 m of bank. Approximately 450 loads of rock (3600 m 3 ) were loaded from the two pits developed on the Huwer property. Both the rock and woody material were developed on the Huwer property. Cycle time was about 15 minutes. The majority of the wood and brushy material was skidded to the work site and is harder to quantify. Roughly two truckloads (Figure 5) were used per 3 habitat structures. Figure 4: Hawthorne being loaded into the demolition-style box of one of the dump trucks to be taken to the river on the Huwer property Approximately 1700 m of the riparian fence line is through un-cleared land and required some brushing and leveling. Another 1900 m is at the edge cleared fields on the outside of the existing riparian band. 7
11 Figure 5: A higher than average runoff and shift in the river accelerated the rate of erosion. Some of the recently fallen trees were incorporated into the bank work. Figure 6: Seventy-one habitat structures were built and the bank re-sloped along approximately 1000 m of bank. Additional woody debris was placed along top of bank for wildlife cover and to create microclimates for spring planting of willow cuttings and spruce seedlings. 8
12 Figure 7: Shrubs were removed for construction, stored out of the way and later replanted with the excavators. Fifteen to twenty-five centimeters of frost in the ground allowed the shrubs to be lifted easily with most the root mass in tact. The frozen dirt clump could easily be handled later for re-planting. The area will be heavily grass seeded and planted with live willow stakes. Figure 8: Shrubs removed for construction were replaced along the top of bank. 9
13 Existing fence New fence Bank work Figure 9: The new fence will protect 3600 m of riparian area along the river and pond. 10
14 Discussion This project was jointly funded by BC Hydro Bridge Coastal Fish and Wildlife Restoration Program (BCRP), the Environmental Farm Plan (EFP), Fisheries and Oceans Canada (DFO), the B.C Cattleman s Association and the landowners, Joe and Howard Huwer. BCRP portion of the funding was dedicated largely to the material and construction of the habitat structures. The work that was originally planned included 30 habitat structures over 430 m. The additional work was done because shifts in the river in the spring of 2006 that increased the rate of erosion on the upstream end of the Huwer property. The additional bank that was treated is on a side channel where erosion was occurring at a slower rate than the rest of the property. It was thought that this area wouldn t have to be treated for at least several years. However, the loss of an upstream logjam caused the side channel to widen and increased the portion of the river s flow into the side channel, accelerating the rate of erosion. The landowner covered the additional costs for construction. The cost of the additional work were offset to some degree by developing all the construction material on site. The cost of developing the rock was offset by getting the rock as in-kind and the shorter haul cycle for the trucks. The EFP will provide some additional funding for the extra planting and fencing. The treated area now extends upstream to a hard point where bedrock will prevent any further lateral movement of the channel. This will prevent upstream erosion from working down and around the habitat structures There was an abundance woody and brushy material on the property for construction materials. A windstorm last summer left blowdown scattered around the property. Clearing debris for access to the riverbank and for the fence line also provided woody and brushy material. There was also some recent clearing around one of the fields provided hawthorn and other shrubs to incorporate into the structures. The bank work for this project was originally scheduled for August but was delayed when it was determined that the decking of the Huwer s Bailey bridge would have to be replaced before rock could be hauled across it. While the landowner was trying to source affordable decking, the problem was circumvented by developing rock on the Huwer property so that the bridge didn t have to be used. The cost of developing the rock was offset by not having to purchase rock and by the shorter cycle time. The trucks were able to make a round trip in minutes as opposed to 30 to 45 minutes from the nearest quarry. The second cause for delay was the access to the river remained too wet in many places to haul truckloads of rock without hauling in gravel first. This would have been expensive and would have created a more intrusive and permanent roadway than was wanted. This problem was solved by waiting for sufficient frost to be able to haul materials with only minor clearing. Waiting for cold weather had additional benefits. The Shuswap River is typically at its lowest level during the winter months with less threat of surges due to rain. Low water is critical for installing the habitat structures at the proper depth without causing siltation or the extensive use of pumps and additional isolation techniques. Once the ground is frozen, disturbance to the soil and root structure of the vegetation is minimized. Shrubs along the access routes, for example, can be cut off at ground level and the root systems left intact. With 15 to 25 cm of frost, the shrubs that had to be removed for 11
15 construction could be lifted with the excavator and stored nearby with the frozen root balls intact. The frost also protects the smaller shrubs and non-woody vegetation from being destroyed. The above ground material is removed during work but the root systems remain intact and the plants quickly re-grow in spring. Another change to the original plan was the placement of extra woody debris along the top of bank in the treatment area. This was done because of the extensive area of the work. While the entire treatment area is to be seeded and planted with deciduous trees, the added debris will off immediate cover for wildlife along the river. It will also allow for planting trees in protected pockets. There was a delay in the delivery of the fencing materials for the project. The fencing is expected to be completed in April. The EFP is covering part of the cost of clearing for the fence and erecting the fence. As soon as the fencing is completed, willows stakes will be planted and protected with vole guards and wire. Recommendations The bank work should be inspected during and after freshet for stability. Any adjustments can be made during the August in-stream work window with proper notification. Re-vegetation should be checked after freshet and re-seeding done in any areas where the earlier seeding didn t take on the bank slope. Acknowledgements This project was made possible with funding from BC Hydro Bridge Coastal Fish and Wildlife Restoration Program, the Environmental Farm Plan, Fisheries and Oceans Canada and the B.C Cattleman s Association. References Arc Environmental Ltd., 2001, Shuswap River Fish/Aquatic Information Review. 12
16 06SHU01 Appendix I March 14, 2007 Project # 06SH01 Financial Statement Form Budget Actual BCRP Other BCRP Other INCOME Total Income by Source $ 64,145 $ 73,199 $ 64,145 $ 130,099* Grand Total Income $ 137,344 $ 194,244* EXPENSES Project Pesonnel Wages $ - $ 7,776 $ - ongoing* Consultant Fees $ 2,540 $ 6,360 $ 2,520 $ 3,150* Contractors Skidder $ 1,365 $ - $ 1,365 $ 5,980 Truck $ 420 $ - $ 420 $ 420 Excavator $ 4,500 $ 12,500 $ 4,500 $ 52,864 Excavator (rock) $ 54,120 $ 15,000 $ 54,120 $ 20,000 Cat $ - $ - $ - $ 4,550 Truck $ - $ - $ - $ 10,855 Tractor $ - $ 4,615 $ - $ 6,862* Materials and Equipment $ - silt control $ - $ 750 $ - $ - chainsaws. Handtools $ - $ 750 $ - $ - Woody material for structures (lwd, swd) $ - $ 13,200 $ - $ 13,200 Fence materials $ - $ 12,248 $ - $ 12,248* Permits $ - $ - $ - $ 130 Signage $ 1,200 $ - $ 1,060 $ - Administration $ - $ - $ - $ - Total Expenses $ 64,145 $ 73,199 $ 63,985 $ 130,259 Grand Total Expenses $ 137,344 $ 194,244* BALANCE $ - $ - * cost to date: there will be additional costs as fencing and planting are completed
17 06SHU01 Appendix II March 14, 2007
18 06SHU01 Appendix III March 14, 2007
Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices
Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices Purpose The purpose of this document is to provide guidance and recommendations for minimizing potential impacts to
How To Plan A Buffer Zone
Backyard Buffers Protecting Habitat and Water Quality What is a buffer? A buffer (also called a riparian buffer area or zone) is the strip of natural vegetation along the bank of a stream, lake or other
CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES
GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES WATER RESOURCES MANAGEMENT DIVISION Water Investigations
Appendix C. Project Opportunities. Middle Twisp River (RM 7.8 18.12)
Appendix C Project Opportunities Middle Twisp River (RM 7.8 18.12) This table describes project opportunities by project area. Locator maps of the project opportunities are included below the table. Reach
Background Information: The Mamquam River Floodplain Restoration Project
Background Information: The Mamquam River Floodplain Restoration Project The Mamquam River Floodplain Restoration project is being undertaken in partnership with the Squamish River Watershed Society, Fisheries
River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a
River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a At a glance River restoration benefits: Improved planform, channel cross-section, flow variation and sediment process. Improved
The Teton Creek Restoration Project Summary:
The Teton Creek Restoration Project Summary: The Teton Creek Restoration Project area extends for approximately one mile upstream from the Cemetery Road Bridge and includes the Aspen Pointe, The Aspens
Stream Restoration Post-Implementation Annual Monitoring Report Year 2: 2013 Covering the Period of July 2012 to July 2013
NCDA&CS - North Carolina Forest Service Stream Restoration Post-Implementation Annual Monitoring Report Year 2: 2013 Covering the Period of July 2012 to July 2013 For the N.C. Division of Water Quality
City of Shelbyville Site Inspection Checklist
City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather
Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile
Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality
Outlet stabilization structure
Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural
Neversink River East Branch
Neversink River East Branch Management Unit 10 Summary of Post-Flood Recommendations Intervention Level Full restoration of the stream reach including the eroding bank site between Station 38380 and Station
Prattsville Berm Removal Project. 1.0 Project Location
Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed
Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
Sand and Silt Removal from Salmonid Streams
Sand and Silt Removal from Salmonid Streams Stream bank erosion Poor land use practices Sources of Sand and Silt Impacts of Sand and Silt Interstitial spaces infilled Little or no flow through the streambed
Final Report. Dixie Creek Restoration Project. Funded by Plumas Watershed Forum
Final Report Dixie Creek Restoration Project Funded by Plumas Watershed Forum Plumas Corporation January 2009 1 Background FR-CRM staff presented this project to the Dixie Valley Landowners Association
Floodplain Connectivity in Restoration Design
Floodplain Connectivity in Restoration Design 2015 Symposium on Restoration in a Contaminated Environment: Lessons Learned and Challenges in Moving Forward Part II April 2015 Karin Boyd Applied Geomorphology,
SE-10 STORM DRAIN INLET PROTECTION. Objectives
STORM DRAIN INLET PROTECTION SE-10 Objectives Erosion Control - EC Sediment Control - SE Tracking Control - TC Wind Erosion Control - WE Non-Storm Water Management - NS Waste and Materials Management -
RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.
RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.htm#storm Definition: A permanent, erosion-resistant ground cover
Monitoring Riparian Areas With a Camera
Monitoring Riparian Areas With a Camera By Michael DeLasaux 1, Holly George 2, and Philip Mainwaring 3 Riparian areas are next to streams, springs, rivers, ponds and lakes. Physical characteristics that
Rural Flooding: The Potential Role of Forestry
Rural Flooding: The Potential Role of Forestry Nadeem Shah, Tom Nisbet, & Huw Thomas Centre for Forestry and Climate Change Structure Background Woodland and Flood Alleviation The Theory. Studies on Woodland
Storm Drain Inlet Protection
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category
Storm Drain Inlet Protection
Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective
Appendix C. Municipal Planning and Site Restoration Considerations
Appendix C Municipal Planning and Site Restoration Considerations 67 68 Appendix C - Municipal Planning and Site Restoration Considerations This appendix contains best practice standards for site planning
The Hydrologic Cycle. precipitation evaporation condensation transpiration infiltration surface runoff transport groundwater water table.
The Hydrologic Cycle Page 1 of 1 Name Directions: The hydrologic cycle consists of the processes that change and move water through the earth s system. Use the terms below to label the hydrologic cycle.
Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes
Chapter 2 Flash Flood Science A flash flood is generally defined as a rapid onset flood of short duration with a relatively high peak discharge (World Meteorological Organization). The American Meteorological
Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002
Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed Summary Report 2002 DOE/BP-00005268-5 November 2002 This Document should be cited as follows: "Restoring Anadromous Fish Habitat in Big Canyon
Fisheries and Oceans Canada-Saskatchewan District 2011 Post-Flood Shoreline Restoration and Stabilization Protocol
Fisheries and Oceans Canada Pêches et Océans Canada Fisheries and Oceans Canada-Saskatchewan District 2011 Post-Flood Shoreline Restoration and Stabilization Protocol 1.0 Introduction Valid until March
Ruby River Grayling - Gravel Spawning Beds Monitoring Report January 2008
Ruby River Grayling - Gravel Spawning Beds Monitoring Report January 2008 In partnership with Montana Department of Fish, Wildlife, and Parks (FWP), American Wildlands, and Wildlife Forever, the Madison
OSU Extension FACT SHEET
OHIO STATE UNIVERSITY EXTENSION! OSU Extension FACT SHEET Ohio State University Extension, 2120 Fyffe Road, Columbus, OH 43210 Shale Oil and Gas Development Fact Sheet Series A Landowner s Guide to Understanding
Streambank stabilization, streambank fencing, nuisance species control, riparian zone management
Streambank stabilization, streambank fencing, nuisance species control, riparian zone management Stream Habitat Restoration Cost Considerations MARK COCKE, Civil Engineer Natural Resources Conservation
Watershed Works Manual
National Rural Employment Guarantee Act Watershed Works Manual DRAINAGE LINE TREATMENT: GABION STRUCTURE Baba Amte Centre for People s Empowerment Samaj Pragati Sahayog September 2006 Drainage Line Treatment:
SECTION 5. Sediment Control Measures
SECTION 5 Sediment Control Measures 60. STORM DRAIN INLET PROTECTION When Runoff from earth change activities will discharge to a catch basin or storm drain inlet. A newly constructed catch basin or storm
Prepared By: Tom Parker Geum Environmental Consulting, Inc.
Prepared By: Tom Parker Geum Environmental Consulting, Inc. Topics covered: Definition of riparian and floodplain restoration Floodplain attributes as a basis for developing criteria for restoration designs
Angora Fire Restoration Activities June 24, 2007. Presented by: Judy Clot Forest Health Enhancement Program
Angora Fire Restoration Activities June 24, 2007 Presented by: Judy Clot Forest Health Enhancement Program California Tahoe Conservancy Independent California State Agency within the Resources Agency Governed
Year 2 7-15-10 Post Restoration Monitoring Summary Rock Creek Project Monitoring and Analysis conducted by Bio-Surveys,LLC. Contact: strask@casco.
Year 2 7-15-10 Post Restoration Monitoring Summary Rock Creek Project Monitoring and Analysis conducted by Bio-Surveys,LLC. Contact: [email protected] Project Sponsors include: The City of Corvallis Oregon
Storm Drain Inlet Protection - IP
Storm Drain Inlet Protection - IP DEFINITION A temporary protective device formed around a storm drain drop inlet to trap sediment. PURPOSE To prevent sediment from entering storm drainage systems, prior
Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS
Chapter 3 3.01 General Provisions 3.01.1 Introduction 3.01.2 Application and Interpretation of Chapter 3.01.3 Unbuildable Lots 3.01.4 Other Permits 3.01.5 Prohibited Activities 3.02 Service Provider Letter
Environmental Case Study Decatur, Georgia, DeKalb County A Suburban Creek Resists Channelization
Introduction A visual examination of Doolittle Creek in a highly developed suburban county in Georgia yielded telltale signs of a creek whose original streambed had been altered. Examination of official
EFB 496.10/696.03 Online Wetland Restoration Techniques Class Syllabus
EFB 496.10/696.03 Wetland Restoration Techniques Online Class Syllabus SUNY-ESF College of Environmental Science and Forestry Summer Session II 2015 Wetland Restoration Techniques is a graduate and undergraduate
Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration
Stream Rehabilitation Concepts, Guidelines and Examples Pierre Y. Julien Wuhan 2005 Objectives Part I - Stream restoration and rehabilitation: 1. Present and discuss important concepts, laws, criteria
HFQLG Project Evaluation Form
HFQLG Evaluation Form Names: Watershed Restoration Defensible Fuel Profile Zone Loyalton Pines Wildland Urban Interface Fuels Reduction Types: Watershed Restoration - Implemented pond and plug restoration
1 Introduction. 1.1 Key objective. 1.2 Why the South Esk
1 Introduction 1.1 Key objective The aim of this study is to identify and assess possible options for improving the quality of the river channel and habitats in the River South Esk catchment whilst helping
SURFACE REMEDIATION AND MANAGEMENT OVERVIEW
SURFACE REMEDIATION AND MANAGEMENT OVERVIEW Giant Mine Remediation Project Environmental Assessment Public Hearings September 10-14, 2012 Adrian Paradis (AANDC) Mike Nahir (AANDC) Bruce Halbert (Technical
BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.
BMP-7 BMP: STORM DRAIN INLET PROTECTION Definition A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. To prevent sediment from entering storm drainage systems
Appendix C. Re-vegetation and Rehabilitation Sub-Plan
Appendix C Re-vegetation and Rehabilitation Sub-Plan DRENNAN SOLAR ENERGY FACILITY REVEGETATION & REHABILITATION PLAN PRODUCED FOR ERM ON BEHALF OF SOLAIREDIRECT BY [email protected] JUNE 2013 BACKGROUND
COMPLIANCE REPORT MUDDY HOLLOW CULVERT REMOVAL FILE NUMBER 25358N
COMPLIANCE REPORT MUDDY HOLLOW CULVERT REMOVAL FILE NUMBER 25358N Submitted by the National Park Service Point Reyes National Seashore Point Reyes Station, California, 94956 Project Description: Muddy
What Is Rehabilitation?
Location of Aggregate Operations Ready Mix Plant Locations Aggregate Locations Cement Terminal Locations What Is Rehabilitation? Rehabilitation is the treatment of land from which aggregate has been excavated
SECTION 02100 SITE PREPARATION
SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division
Streambank stabilization, streambank fencing, nuisance species control, riparian zone management
Streambank stabilization, streambank fencing, nuisance species control, riparian zone management Stream Restoration Cost Estimates BRIAN BAIR USDA Forest Service Gifford-Pinchot National Forest 1262 Hemlock
Emergency Spillways (Sediment basins)
Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]
IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION
IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION 199 9.1(479,479B) General information. 9.1(1) Authority. The standards contained herein
EPR Exempt Flood Risk Activities: descriptions and conditions
EPR Exempt Flood Risk Activities: descriptions and conditions Version 1 April 2016 We are the Environment Agency. We protect and improve the environment. Acting to reduce the impacts of a changing climate
Cheakamus River October 2003 Flood Restoration Project (04.Ch.03)
Cheakamus River October 2003 Flood Restoration Project (04.Ch.03) NVOS Hatchery in flood October 2003 Canada Government of Canada Fisheries and Oceans North Vancouver Outdoor School Cheakamus River October
Pioneer Park Stormwater Management Rehabilitation Project Town of Richmond Hill Engineering and Public Works Department Design, Construction and
Pioneer Park Stormwater Management Rehabilitation Project Town of Richmond Hill Engineering and Public Works Department Design, Construction and Water Resources Division Presentation Outline Background
REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 LEECH WATER SUPPLY AREA RESTORATION UPDATE
Making a difference... together Agenda Item #9 REPORT #RWSC 2013-17 REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 SUBJECT LEECH WATER SUPPLY AREA RESTORATION UPDATE
SUSTAINABLE URBAN DRAINAGE SYSTEMS
overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being
Ecosystem Services in the Greater Houston Region. A case study analysis and recommendations for policy initiatives
Ecosystem Services in the Greater Houston Region A case study analysis and recommendations for policy initiatives Ecosystem Services Ecosystems provide services through their natural processes that we
Mine Plan of Operations Reclamation Bond Checklist
Mine Plan of Operations Reclamation Bond Checklist NOTE: This checklist is provided to assist the operator in calculating the engineering and environmental costs required to properly stabilize, reclaim,
GEOTECHNICAL ISSUES OF LANDSLIDES CHARACTERISTICS MECHANISMS PREPARDNESS: BEFORE, DURING AND AFTER A LANDSLIDE QUESTIONS FOR DISCUSSIONS
GEOTECHNICAL ISSUES OF LANDSLIDES CHARACTERISTICS MECHANISMS PREPARDNESS: BEFORE, DURING AND AFTER A LANDSLIDE QUESTIONS FOR DISCUSSIONS Huge landslide Leyte, Phillipines, 1998 2000 casulties Small debris
How To Check For Scour At A Bridge
Case Studies Bridge Scour Inspection and Repair Edward P. Foltyn, P.E. Senior Hydraulic Engineer ODOT Bridge Unit 2013 PNW Bridge Inspectors Conference April 2013 REFERENCES Stream Stability at Highway
SECTION 7 LANDSCAPE RESTORATION
SECTION 7 LANDSCAPE RESTORATION 27 7. Landscape and Restoration This section should be read in conjunction with Drawing No.CO8194/A010 Rev. B, Regeneration Strategy As Proposed which can be found at Section
Fireline Rehabilitation on Donnelly Flats fire (B222) Summary: 7/1/99 R.R. Jandt
Fireline Rehabilitation on Donnelly Flats fire (B222) Summary: 7/1/99 R.R. Jandt Assessment- During the suppression effort approximately 20-25 miles of bladed fireline was built using D-8-equivalent dozers.
General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title]
General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title] Purpose These rules set forth the conditions under which a person may, without an individual removal-fill permit
Waterway Technote Drains
Waterway Technote Drains Contents Benefits of good drain practice 1 Are your drains healthy? 2 The Sustainable Dairying Water Accord 3 Planning drain maintenance 3 Fencing and clearing 3 Bank shaping (battering)
Coldwater Heritage Partnership Implementation Grant Final Report Morrison Run Watershed Restoration Project Western Pennsylvania Conservancy Project Summary The goal of the Morrison Run Watershed Restoration
CLIFTY CREEK PLANT MADISON, INDIANA
2015 DAM AND DIKE INSPECTION REPORT GERS-15-018 CLIFTY CREEK PLANT MADISON, INDIANA PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION 1 RIVERSIDE PLAZA COLUMBUS, OHIO Annual Dam and Dike Inspection
Rabbitat. Gimme shelter. That s exactly what brush. Brush Piles for Wildlife
Wildlife and Your Land a series about managing your land for wildlife Rabbitat Brush Piles for Wildlife Have you ever watched a startled rabbit dart across your yard and suddenly disappear as if by magic?
Appendix H Dredging and Stream Channel Restoration
Appendix H Dredging and Stream Channel Restoration Mankind s intrusion into the natural environment in West Virginia began in earnest following the Civil War when extractive industries and settlement all
Text and photos: Juha Siekkinen, Life+ Return of Rural Wetlands Cover drawing: Jari Kostet Maps and aerial photos: National Land Survey of Finland
Life+ Return of Rural Wetlands Pikku Nuoluanjärvi Wetlands, Liminka Text and photos: Juha Siekkinen, Life+ Return of Rural Wetlands Cover drawing: Jari Kostet Maps and aerial photos: National Land Survey
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION Design Criteria Drainage Area The drainage area for storm drain inlets shall not exceed one acre. The crest elevations of these practices shall
STANDARDS FOR RANGELAND HEALTH ASSESSMENT FOR SAGEHEN ALLOTMENT #0208
STANDARDS FOR RANGELAND HEALTH ASSESSMENT FOR SAGEHEN ALLOTMENT #0208 RANGELAND HEALTH STANDARDS - ASSESSMENT SAGEHEN ALLOTMENT #0208 STANDARD 1 - UPLAND WATERSHED This standard is being met on the allotment.
Upper River Witham: Easton Version 1 (02.12.13)
River Habitat Enhancement Case Studies Upper River Witham: Easton Version 1 (02.12.13) Location: Easton, Lincolnshire (c7km south of Grantham) Upstream Grid Ref: SK 9259 2615 Length: 2km Completion Date:
720 Contour Grading. General. References. Resources. Definitions
720 Contour Grading General Contour grading directs water to a desired point, prevents erosion, provides noise deflection, provides visual fit of the facility into the landscape, and protects desirable
DEPARTMENT OF THE ARMY SECTION 404 REGIONAL GENERAL PERMIT CHANNEL AND BANK PROTECTION STRUCTURES ON THE SOUTH PLATTE RIVER
DEPARTMENT OF THE ARMY SECTION 404 REGIONAL GENERAL PERMIT CHANNEL AND BANK PROTECTION STRUCTURES ON THE SOUTH PLATTE RIVER Permit Expires: December 31, 2017 Regional General Permit No. 87-01 Issuing Office:
A Developer s Guide: Watershed-Wise Development
A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another
Earth Science. River Systems and Landforms GEOGRAPHY 1710. The Hydrologic Cycle. Introduction. Running Water. Chapter 14.
Earth Science GEOGRAPHY 1710 River Systems and Landforms DAVID R. SALLEE Robert W. Christopherson Charlie Thomsen Chapter 14 Introduction Rivers and streams are dynamic systems that continually adjust
3. Design Procedures. Design Procedures. Introduction
Design Procedures 3. Design Procedures Introduction This chapter presents a procedure for the design of natural channels. The chapter primarily focuses on those physical properties of the channel required
How To Assess An Area For Erosion
SKY BASIN (UPPER CA 1 WATERSHED) EROSION ASSESSMENT Prepared by Kevin Drake, CPESC Integrated Environmental Restoration Services, Inc. August 2014 COMMON GROUND UNCOMMON SOLUTIONS P.O. BOX 7559 2780 LAKE
Addendum D. Nomination of Moody Wash ACEC
Addendum D Nomination of Moody Wash ACEC Moody Wash ACEC is hereby nominated by Citizens for Dixie s Future to: BLM St. George Field Office 345 East Riverside Drive St. George, UT 84790 Moody Wash is a
Basic Soil Erosion and Types
Basic Soil Erosion and Types 2015 Wisconsin Lakes Convention Stacy Dehne DATCP Engineer Types of Soil Erosion Rain drop or splash erosion: Erosion preceded by the destruction of the crumb structure due
Various options are discussed below.these low cost, low impact interventions can also be applied as general erosion control methods.
Week 10 River Hydraulics Rehabilitating Urban Waterways (From http://hubpages.com/hub/river-bank-erosion-control-methods) See also the resources placed on Moodle. Water channels should be viewed as a resource
Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.
4.5-p DRAIN INLET PROTECTION Alternative Names: DI protection, Drop Inlet Protection DESCRIPTION Storm drain inlet (DI) protection slows and ponds stormwater, and filters sediment and debris before it
WONDERFUL, WATERFUL WETLANDS
WONDERFUL, WATERFUL WETLANDS OBJECTIVES The student will do the following: 1. List characteristics of wetlands. SUBJECTS: Science, Language Arts TIME: 60 minutes 2. Describe the functions of a wetland.
How To Write A Watercourse Crossing
Code of Practice for Watercourse Crossings Made under the Water Act and the Water (Ministerial) Regulation Consolidated to include amendments in force as of June 24, 2013 Office Consolidation Published
GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold
CHAPTER 11 GLOSSARY OF TERMS Active Channel The channel that contains the discharge Leopold where channel maintenance is most effective, sediment are actively transported and deposited, and that are capable
How To Manage Wildlife And Wildlife Damages At Earthen Dams
Dam Owner s Guide To Animal Impacts On Earthen Dams FEMA L-264 / September 2005 Twenty-five states across the U.S. can write headlines of unsafe dam operations caused by nuisance wildlife intrusions,
