COMMONWEALTH OF VIRGINIA LRK,'S UNCE AT RICHMOND, SEPTEMBER 7,2012 TRUL CE.. P 112 : 51 APPLICATION OF FINAL ORDER
|
|
- Gabriel Morgan
- 8 years ago
- Views:
Transcription
1 COMMONWEALTH OF VIRGINIA STATE CORPORATION COMMISSION LRK,'S UNCE AT RICHMOND, SEPTEMBER 7,2012 TRUL CE.. P 112 : 51 APPLICATION OF VIRGINIA ELECTRIC AND POWER COMPANY For approval and certification of electric transmission facilities for the Lexington-Cloverdale 500 kv Transmission Line Rebuild pursuant to and et seq. of the Code of Virginia CASE NO. PUE LM FINAL ORDER On May 2, 2012, Virginia Electric and Power Company d/b/a Dominion Virginia Power ("Dominion Virginia Power" or "Company") filed with the State Corporation Commission ("Commission") an application for approval and certification of electric transmission facilities ("Application") under and et seq. of the Code of Virginia ("Code") to rebuild, entirely within existing rights-of-way, its 500 kv Lexington-Cloverdale Line #566 in Rockbridge County, which runs approximately 7.4 miles from the Company's Lexington Substation to a point of interconnection with a 500 kv transmission line owned by Appalachian Power Company ("APCo").' The Company further proposed to construct and install associated facilities at its Lexington Substation. 2 Construction of Line #566 began in the early 1960s and was completed in It is part of the first 500 kv transmission system built in North America. Dominion Virginia Power has proposed to remove Line #566's existing weathering steel lattice towers, which support the line's 500 kv conductors, and replace them with new galvanized steel lattice towers. The Company ' Application at2. From this point of interconnection, at APCo's Structure #11151, APCo's 500 kv line runs approximately 37.1 miles to APCo's Cloverdale Substation in Botetourt County. 2 id.
2 also wishes to replace the existing two kcmil bundled AAAC conductors with three triple-bundled kcmil ACSR 45/7 phase conductors. According to the Company, rebuilding Line #566 as proposed would increase the transfer capability of its portion of the line from 1810 MVA to 4325 MVA. Dominion Virginia Power also proposed to replace one existing 500kV breaker and install one additional 500 kv breaker and associated equipment within the existing substation fence at the Lexington Substation, in order to accommodate the termination of the rebuilt Line #566.3 The projected in-service date for the rebuilt line is May The estimated cost is approximately $17.0 million, of which approximately $14.1 million would be spent on transmission line construction and approximately $2.9 million would be spent on modifications at the Lexington Substation. 4 Dominion Virginia Power stated in its Application that these changes are necessary because power flow studies it conducted with PJM Interconnection, L.L.C., forecast that by Spring of 2014, during periods Of light system load, the loading on Line #566 will violate mandatory North American Electric Reliability Corporation ("NERC") Reliability Standards during certain contingencies and that the failure to address these projected NERC violations could lead to service interruptions and could potentially damage Dominion Virginia Power's electrical facilities in this area. 5 On May 30, 2012, the Commission entered an Order for Notice and Comment that, among other things, docketed the Application, established a procedural schedule, provided interested persons the opportunity to become a respondent, file written comments, or request a ' Id. at Id. at 4. 5 Id. at
3 hearing on the Application, and directed the Commission's Staff ("Staff") to investigate the Application and present its findings in a report ("Staff Report") As noted in the Commission's Order for Notice and Comment, the Staff requested that the Department of Environmental Quality ("DEQ") coordinate a review of the Company's proposed project by state and local agencies and file a report on the review. On July 19, 2012, DEQ filed its report ("DEQ Report") with the Clerk of the Commission. The DEQ Report offers ten general recommendations for the Conunission's consideration that are in addition to any requirements of federal, state, or local law. Specifically, the DEQ Report contains the following recommendations to Dominion Virginia Power regarding the Project. The Company should : Conduct an on-site delineation of all wetlands and stream crossings within the project area with verification by the U.S. Army Corps of Engineers, using accepted methods and procedures, and follow DEQ's recommendations to avoid and minimize impacts to wetlands and streams. Follow DEQ's recommendations regarding air quality protection, as applicable. Reduce solid waste at the source, reuse it and recycle it to the maximum extent practicable, and follow DEQ's recommendations to manage waste, as applicable. Coordinate with the Department of Conservation and Recreation ("DCR") regarding DCR's recommendations, as well as check for updates to the Biotics Data System database if a significant amount of time passes before the project is implemented. Coordinate with the DCR Karst Program regarding its recommendations to protect karst features. Coordinate with the Department of Game and Inland Fisheries regarding its recommendations for wildlife protection. Coordinate with the Department of Historic Resources regarding its recommendations to protect historic and archaeological resources. 3
4 Coordinate with the Department of Aviation regarding its recommendations. Follow the principles and practices of pollution prevention to the maximum extent practicable. Ln Limit the use of pesticides and herbicides to the extent practicable. 6 On August 7, 2012, Staff filed its Staff Report summarizing the results of its investigation of the Company's Application. Staff concluded that the Company reasonably demonstrated the need for the proposed rebuild of the 500 kv Lexington-Cloverdale Line #566 and for the 7 associated substation work. The Staff recommended that the Commission issue the necessary 8 certificate of public convenience and necessity for the proposed project. On August 14, 2012, Dominion Virginia Power filed comments ("Comments") with the Clerk of the Commission stating that it agrees with and supports the recommendations set forth in the Staff Report, including the Staff s findings and conclusions concerning the need for the project. The Company further noted in its Comments that two hearing requests were filed in the form of public comments in this proceeding. However, since the hearing requests were originally filed, one of the requests was retracted and it has been determined that the other request actually pertained to a different transmission facility. NOW THE COMMISSION, upon consideration of this matter, is of the opinion and finds that the public convenience and necessity require that the proposed Lexington-Cloverdale 500 kv transmission line be constructed and that the associated work at the Company's existing 6 DEQ Report at Staff Report at I I - 8 Id. 4
5 Lexington Substation be perfon-ned as proposed in the Company's Application. Further, the Commission finds that certificates of public convenience and necessity should be issued authorizing the project. LM Approval The statutory scheme governing the Company's Application is found in several chapters of Title 56 of the Code. Section A of the Code provides that "it shall be unlawful for any public utility to construct... facilities for use in public utility service... without first having obtained a certificate from the Commission that the public convenience and necessity require the exercise of such right or privilege." Section of the Code further directs the Commission to consider several factors when reviewing the Company's Application. Subsection A of the statute provides that : Whenever the Commission is required to approve the construction of any electrical utility facility, it shall give consideration to the effect of that facility on the environment and establish such conditions as may be desirable or necessary to minimize adverse environmental impact.... In every proceeding under this subsection, the Commission shall receive and give consideration to all reports that relate to the proposed facility by state agencies concerned with environmental protection ; and if requested by any county or municipality in which the facility is proposed to be built, to local comprehensive plans that have been adopted.... Additionally, the Commission (a) shall consider the effect of the proposed facility on economic development within the Commonwealth... and (b) shall consider any improvements in service reliability that may result from the construction of such facility. Section B of the Code further provides that : "[a]s a condition to approval the Commission shall determine that the line is needed and that the corridor or route the line is to follow will reasonably minimize adverse impact on the scenic assets, historic districts and environment of the area concerned." 5
6 The Code ftu-ther requires that the Commission consider existing right-of-way easements when siting transmission lines. Section C of the Code provides that "[fln any hearing the public service company shall provide adequate evidence that existing rights-of-way cannot adequately serve the needs of the company." In addition, C of the Code provides that "[p]rior to acquiring any easement of right-of-way, public service corporations will consider the feasibility of locating such facilities on, over, or under existing easements of rights-of-way." Need and Service Reliabilily We find that the Company's load growth forecasts support the need for the project. The need for the project to resolve projected violations of NERC Standards has not been questioned. Thus, the uncontroverted evidence in this case indicates that the proposed rebuild is necessary to ensure that reliable service is maintained. We therefore find that the proposed rebuild of the Lexington-Cloverdale Line #566 will effectively meet the Company's long-term transmission reliability needs. Economic Development We find that the proposed project will promote economic development in the Commonwealth of Virginia by maintaining the operational reliability of the transmission line and, in turn, continuing to ensure the delivery of sufficient supplies of electrical power. As an added benefit, the project will increase the transmission capacity for west-to-east power flows, thereby further supporting economic development in the area. Routing and Right-of-Way The Company did not consider any routing alternatives for its proposed transmission line since, if approved, the line would be located entirely on existing rights-of-way. Thus, Dominion Virginia Power was not required, in accordance with C of the Code, to demonstrate 6
7 that existing rights-of-way could not adequately serve its needs. Similarly, C of the Code is inapplicable to this proceeding because the Company seeks no additional easements associated with the proposed project. Scenic Assets and Historic Districts We find that the proposed project will have a minimal impact on scenic assets and historic districts consistent with B of the Code. As is discussed previously, the proposed rebuilt line will be located in existing rights-of-way. Due to the fact that the proposed project vall be constructed along the same route as the existing line, adverse impacts on scenic assets and historic districts in the region will be minimized as required by B of the Code. Environmental Impact Under A and B of the Code, the Commission is required to consider the proposed project's impact on the environment and to establish such conditions as may be desirable or necessary to minimize adverse environmental impacts. The statute further provides that the Commission shall receive, and give consideration to, all reports that relate to the proposed project by state agencies concerned with environmental protection. We find that there are no adverse environmental impacts that would prevent the construction or operation of the proposed project. The DEQ Report, as well as the DEQ Supplement prepared by the Company as part of its Application, supports a finding that the Company's proposed route reasonably minimizes adverse environmental impacts, provided that the Company complies with the DEQ recommendations.9 We therefore firid that, as a condition 9 The DEQ recommendations are listed above and are discussed in the DEQ Report. 7
8 to our approval herein, the Company must comply with all of DEQ's recommendations as provided in the DEQ Report. We ftirther find that the proposed project does not represent a hazard to human health or LM safety. There is no evidence in this case that the project represents a public health or safety hazard. Accordingly, IT IS ORDERED THAT : (1) The Company is authorized to construct and operate the proposed Lexington-Cloverdale 500 kv transmission line, which runs approximately 7.4 miles from the Company's Lexington Substation to a point of interconnection with a 500 kv transmission line owned by APCo, on the route proposed in the Company's Application, subject to the findings and conditions imposed herein. The Company also is authorized to perform necessary construction and installations at the Lexington Substation as set forth in the Company's Application. (2) Pursuant to , , and related provisions of Title 56 of the Code, the Company's request for a certificate of public convenience and necessity to construct and operate the proposed Lexington-Cloverdale 500 kv transmission line and to perform necessary construction work at the Lexington Substation is granted as provided for herein, subject to the requirements set forth in this Final Order. (3) Pursuant to the Utility Facilities Act,'o the Company is issued the following certificates of public convenience and necessity : Certificate No. ET- I 07i, which authorizes Virginia Electric and Power Company under the Utility Facilities Act to operate certificated transmission lines and facilities in Rockbridge County, all as shown on the map attached to the certificate, and to construct 10 Va. Code Ann et seq. (Supp ).
9 and operate facilities as authorized in Case No. PUE , cancels Certificate No. ET- 1 07h, issued to Virginia Electric and Power Company. (4) The Commission's Division of Energy Regulation forthwith shall provide the Company copies of the certificates issued in Ordering Paragraph (3) with the detailed map attached. (5) The transmission line and associated substation work approved herein must be constructed and in service by May 1, 2014, provided, however, the Company is granted leave to apply for an extension for good cause shown. (6) As there is nothing further to come before the Commission, this matter is dismissed and the papers filed herein shall be placed in the file for ended causes. AN ATTESTED COPY hereof shall be sent by the Clerk of the Commission to : Lisa S. Booth, Esquire, and Charlotte P. McAfee, Esquire, Dominion Resources Services, Inc., 120 Tredegar Street, Richmond, Virginia, ; Stephen H. Watts, 11, Esquire, McGuireWoods LLP, One James Center, 901 East Cary Street, Richmond, Virginia ; and C. Meade Browder, Jr., Esquire, Division of Consumer Counsel, Office of Attorney General, 900 East Main Street, Second Floor, Richmond, Virginia ; and a copy shall be delivered to the Commission's office of General Counsel and Division of Energy Regulation. 9
Virginia State Corporation Commission efiling CASE Document Cover Sheet
Virginia State Corporation Commission efiling CASE Document Cover Sheet Case Number (if already assigned) pue-201 1-00011 Case Name (if known) Application of Virginia Electric and Power Company for approval
More informationfiled electronically in docket office on 10/16/15
filed electronically in docket office on 10/16/15 COMMONWEALTH OF VIRGINIA STATE CORPORATION COMMISSION AT RICHMOND, APRIL 24, 2015 SCC-CLFRK'S OFFICE 5 COCIKLNT CONTROL CENTER APPLICATION OF Z3I5 APfl
More informationCOMMONWEALTH OF VIRGINIA AT RICHMOND, OCTOBER 19,2011
COMMONEALTH OF VIRGINIA STATE CORPORATION COMMISSION AT RICHMOND, OCTOBER 19,2011 cc APPLICATION OF 7 0i 110 VIRGINIA ELECTRIC AND POER COMPANY CASE NO. PUE-201 1-00015 D/B/A DOMINION VIRGINIA POER For
More informationREBUILD IN ROCKBRIDGE COUNTY
COMMONEALTH OF VIRGINIA STATE CORPORATION COMMISSION"' PREFILED STAFF TESTIMONY ON THE VIRGINIA ELECTRIC AND POER COMPANY LEXINGTON-CLOVERDALE 500 kv TRANSMISSION LINE REBUILD IN ROCKBRIDGE COUNTY CASE
More informationVirginia Electric and Power Company Subsection A 4 Rate Adjustment Clause. Direct Testimony and Exhibits
Virginia Electric and Power Company Subsection A 4 Rate Adjustment Clause Table of Contents Direct Testimony and Exhibits David M. Wilkinson James D. Jackson, Jr. Paul B. Haynes Filing Schedule 46 Filing
More informationControl Number : 14637. Item Number : 5. Addendum StartPage : 0
Control Number : 14637 Item Number : 5 Addendum StartPage : 0 Pubtic Utility Commission of Tex s 7800 Shoal Creek Boulevard Austin, Texas 78757-1098 512/458-0100. (Fax) 458-8340 Pat Wood, III Chairman
More informationVirginia State Corporation Commission efiling CASE Document Cover Sheet
Case Number (if already assigned) Case Name (if known) Virginia State Corporation Commission efiling CASE Document Cover Sheet PUE-2015-00117 Application of Virginia Electric and Power Company For approval
More informationCOMMONWEALTH OF VIRGINIA, ex rel. I LI P
COMMONEALTH OF VIRGINIA STATE CORPORATION COMMISSION AT RICHMOND, NOVEMBER 14,2013 COMMONEALTH OF VIRGINIA, ex rel. I LI P 43 STATE CORPORATION COMMISSION Concerning the establishment of a renewable energy
More informationCOMMONWEALTH OF VIRGINIA ORDER FOR NOTICE AND HEARING. On July 8, 2015, Prince George Electric Cooperative ("PGEC" or "Cooperative") filed
COMMONWEALTH OF VIRGINIA STATE CORPORATION COMMISSION sj AT RICHMOND, JULY 24, 2015 _ ninc & :::c^;:;; :, ceiltrol CENTER APPLICATION OF 2315 JUL 2^ P ^"^ P tfuss PRINCE GEORGE ELECTRIC COOPERATIVE CASE
More informationBEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION'^^ j E DIRECT TESTIMONY RAJESH GUPTA PROJECT MANAGER, ENTERGY SERVICES, INC.
BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION'^^ j E s : D IN THE MATTER OF THE APPLICATION OF ENTERGY ARKANSAS, INC. FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED TO CONSTRUCT AND OPERATE
More informationChase Tower, Eighth Floor. P.O. Box 1588. July 7,2006
STEPTOE & JOHNSON ATTORNEYS AT LAW Chase Tower, Eighth Floor Writer's Contact Information P.O. Box 1588 Charleston, WV 25326-1588 (304) 353-8000 (304) 353-8180 Fax (304) 353-8113 www.steptoe-johnson.com
More informationCOMMONWEALTH OF KENTUCKY BEFORE THE KENTUCKY STATE BOARD ON ELECTRIC GENERATION AND TRANSMISSION SITING
COMMONWEALTH OF KENTUCKY BEFORE THE KENTUCKY STATE BOARD ON ELECTRIC GENERATION AND TRANSMISSION SITING In the Matter of the Application of The ) Cincinnati Gas & Electric Company for a ) Construction
More informationSOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD
SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD HOLLAND CLIFF HEWITT ROAD 230 KV TRANSMISSION LINE PROJECT ELECTRIC ALTERNATIVE EVALUATION STUDY BLACK & VEATCH CORPORATION B&V Project 146026(G)
More informationTitle 20 PUBLIC SERVICE COMMISSION. Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES. Chapter 02 Engineering
Title 20 PUBLIC SERVICE COMMISSION Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES Chapter 02 Engineering Authority: Public Utility Companies Article, 2-121, 5-101 and 5-303, Annotated Code of Maryland.
More informationControl Number : 38597. Item Number: 373. Addendum StartPage: 0
Control Number : 38597 Item Number: 373 Addendum StartPage: 0 { C31 ^ IOF DENTUN 215 E. McKINNEY DENTON, TX 76201 (940) 349-8230 FAX (940) 349-8120 UTILITY ADMINISTRATION September 21, 2010 Public Utility
More informationRESTRICTIVE COVENANTS. THIS DECLARATION OF RESTRICTIVE COVENANTS is made this day of, 20, by RECITALS
STATE OF NEW YORK COUNTY OF DECLARATION OF RESTRICTIVE COVENANTS THIS DECLARATION OF RESTRICTIVE COVENANTS is made this day of, 20, by, ("Declarant"), A New York corporation with offices at,, New York.
More information345 kv Brazos Valley Connection Project FAQs
345 kv Brazos Valley Connection Project FAQs Overview 1. Who is CenterPoint Energy Houston Electric, LLC? CenterPoint Energy Houston Electric, LLC (CenterPoint Energy) is an electric utility that maintains
More informationOF THE STATE OF DELAWARE
BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF DELAWARE IN THE MATTER OF THE APPLICATION OF ) CHESAPEAKE FIBER, LLC FOR A CERTIFICATE ) OF PUBLIC CONVENIENCE AND NECESSITY TO ) PSC DOCKET NO. 12-178
More informationBILL NO. ORDINANCE NO.
BILL NO. ORDINANCE NO. AN EMERGENCY ORDINANCE OF THE CITY OF FRESNO, CALIFORNIA, ADDING SECTION 9-235 OF THE FRESNO MUNICIPAL CODE RELATING IMPLEMENTATION OF THE DIGITAL INFRASTRUCTURE AND VIDEO COMPETITION
More informationORDINANCE NO. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF HERCULES DOES HEREBY ORDAIN AS FOLLOWS:
ORDINANCE NO. ADDING SECTION 6-1.34 TO CHAPTER 1, TITLE 6 OF THE HERCULES CITY CODE, WHICH IMPLEMENTS THE PROVISIONS OF THE DIGITAL INFRASTRUCTURE AND VIDEO COMPETITION ACT OF 2006, CODIFIED IN CALIFORNIA
More informationPJM Merchant Transmission Request. Queue #R75. Mitchell Shepler Hill 138 Kv Feasibility / System Impact Study
PJM Merchant Transmission Request Queue #R75 Mitchell Shepler Hill 138 Kv Feasibility / System Impact Study 413038v1a March 2007 PJM Interconnection 2007. All rights reserved. Preface The intent of the
More informationPROJECT NO. 24462 PROPOSAL FOR PUBLICATION OF NEW 25.88 AS APPROVED AT THE SEPTEMBER 25, 2002 OPEN MEETING
PROJECT NO. 24462 PERFORMANCE MEASURES FOR THE RETAIL ELECTRIC MAKRET PUBLIC UTILITY COMMISSION OF TEXAS PROPOSAL FOR PUBLICATION OF NEW 25.88 AS APPROVED AT THE SEPTEMBER 25, 2002 OPEN MEETING The Public
More informationFINAL. Alternative Evaluation. for the. Proposed Burlington-Wray 230-kilovolt Transmission Project
FINAL Alternative Evaluation for the Proposed Burlington-Wray 230-kilovolt Transmission Project Prepared by Tri-State Generation and Transmission Association, Inc. 1100 W. 116th Avenue Westminster, Colorado
More information1. Who is CenterPoint Energy Houston Electric, LLC?
1. Who is CenterPoint Energy Houston Electric, LLC? CenterPoint Energy Houston Electric, LLC (CenterPoint Energy or the Company) is an electric utility that maintains the wires, towers, poles, and electric
More informationDEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATER SUPPLY MANAGEMENT. Principles for Ground Water Pollution Prevention and Remediation
DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATER SUPPLY MANAGEMENT DOCUMENT NUMBER: 383-0800-001 EFFECTIVE DATE: December 1, 1996 TITLE: AUTHORITY: POLICY: Principles for Ground Water Pollution Prevention
More informationIN THE UNITED STATES DISTRICT COURT FOR THE SOUTHERN DISTRICT OF WEST VIRGINIA CHARLESTON DIVISION
IN THE UNITED STATES DISTRICT COURT FOR THE SOUTHERN DISTRICT OF WEST VIRGINIA CHARLESTON DIVISION LISA COINER, STEPHEN COINER, and JARED COINER, a minor under the age of 18 years, who sues by his father,
More information012-0840-001 / September 25, 1996 / Page i
DOCUMENT NUMBER 012-0840-001 DEPARTMENT OF ENVIRONMENTAL PROTECTION OFFICE OF POLICY AND COMMUNICATIONS TITLE: AUTHORITY: POLICY TO ENCOURAGE VOLUNTARY COMPLIANCE BY MEANS OF ENVIRONMENTAL COMPLIANCE AUDITS
More informationThe State of New Jersey, New Jersey Department of Environmental Protection
STUART RABNER ATTORNEY GENERAL OF NEW JERSEY R.J. Hughes Justice Complex 25 Market Street PO Box 093 Trenton, NJ 08625-0093 Attorney for Plaintiff State of New Jersey, New Jersey Department of Environmental
More informationCase No. CV-08-00810 R NOTICE TO CLASS OF PROPOSED SETTLEMENT OF CLASS ACTION
UNITED STATES DISTRICT COURT CENTRAL DISTRICT OF CALIFORNIA STEPHEN STETSON, SHANE LAVIGNE, CHRISTINE LEIGH BROWN-ROBERTS, VALENTIN YUI KARPENKO, and JAKE JEREMIAH FATHY, individually and on behalf of
More informationEldorado-Ivanpah Transmission Project WELCOME To Southern California Edison Company s Eldorado-Ivanpah Transmission Project OPEN HOUSE
WELCOME To Southern California Edison Company s Eldorado-Ivanpah Transmission Project OPEN HOUSE 1 1 Welcome to The Eldorado-Ivanpah Transmission Project Open House How is the open house organized? This
More informationMEMORANDUM. Managers, Administrators, Clerks, Attorneys, and Planners
MEMORANDUM To: From: Managers, Administrators, Clerks, Attorneys, and Planners Kimberly S. Hibbard, General Counsel Date: September 15, 2013 Re: City Authority to Regulate Wireless Telecommunications HB
More informationAMERICAN TRANSMISSION SYSTEMS, INCORPORATED A FIRSTENERGY COMPANY CONSTRUCTION NOTICE INLAND SUBSTATION EXPANSION PROJECT
AMERICAN TRANSMISSION SYSTEMS, INCORPORATED A FIRSTENERGY COMPANY CONSTRUCTION NOTICE INLAND SUBSTATION EXPANSION PROJECT OPSB CASE NO.: 16-0280-EL-BNR February 10, 2016 American Transmission Systems,
More informationBEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO
BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO IN THE MATTER OF THE APPLICATION OF ) PUBLIC SERVICE COMPANY OF ) COLORADO FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY DOCKET NO.
More informationGeneration Interconnection Feasibility Study Report-Web Version. PJM Generation Interconnection Request Queue Position Z1-055
Generation Interconnection Feasibility Study Report-Web Version For PJM Generation Interconnection Request Queue Position Z1-055 South Bend Generation Project March 2014 PJM Interconnection 2014. All rights
More informationIN THE SUPREME COURT OF THE STATE OF KANSAS ADMINISTRATIVE ORDER NO. 268
IN THE SUPREME COURT OF THE STATE OF KANSAS ADMINISTRATIVE ORDER NO. 268 FILED OCT 2 2 2012 CAROL G GREEN CLERi OF; ~~~ _,_:.TE COURTS Re: Technical Standards Governing Electronic Filing and Transmission
More information121 FERC 61,143 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION
121 FERC 61,143 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Joseph T. Kelliher, Chairman; Suedeen G. Kelly, Marc Spitzer, Philip D. Moeller, and Jon Wellinghoff.
More informationINVESTORS TITLE INSURANCE COMPANY P.O. Drawer 2687 Chapel Hill, North Carolina 27515-2687
ALTA COMMITMENT FORM This Commitment is not complete without appropriate Schedules and corresponding Jacket unless otherwise agreed in writing. SCHEDULE A 1. Commitment Date 03/17/2014 Time 08:00 AM Comm.
More informationUNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) )
UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Potomac-Appalachian Transmission Highline, LLC PJM Interconnection, L.L.C. and Potomac-Appalachian Highline Transmission, LLC )
More informationAll routes and route segments included in this notice are available for selection and approval by the Public Utility Commission of Texas.
Application of Brazos Electric Power Cooperative, Inc. to Obtain a Certificate of Convenience and Necessity for a Proposed Transmission Line in Denton County, Texas PUBLIC UTILITY COMMISSION OF TEXAS (PUC)
More informationTHIS VOLUNTARY SETTLEMENT AGREEMENT CONCERNING A DEVELOPMENT OF. entered into this day of, 2014, and executed in triplicate originals
VOLUNTARY SETTLEMENT AGREEMENT BETWEEN THE CITY OF BRISTOL, VIRGINIA AND WASHINGTON COUNTY, VIRGINIA, PURSUANT TO VIRGINIA CODE SECTION 15.2-3400 (November 2014) THIS VOLUNTARY SETTLEMENT AGREEMENT CONCERNING
More informationUNITED STATES DISTRICT COURT EASTERN DISTRICT OF WASHINGTON ) ) ) ) ) ) ) ) ) ) ) ) )
Case :-cv-000-tor Document Filed 0/0/ 0 John T. John, WSBA # Daniel J. Oates, WSBA # 0 Alaskan Way, Suite 00 Seattle, Washington Telephone: ( -00 Email: jjohn@grahamdunn.com doates@grahamdunn.com Attorney
More informationHow To Get A Court Order To Stop A Man From Selling A Car To A Woman
DISTRICT COURT, CITY AND COUNTY OF DENVER, COLORADO 1437 Bannock Street Denver, CO 80202 STATE OF COLORADO, ex rel. JOHN W. SUTHERS, ATTORNEY GENERAL, Plaintiff, v. GARY E. MAES, individually and d/b/a
More informationPIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY
PIPELINE ROUTING PERMIT For A NATURAL GAS PIPELINE IN DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PUC DOCKET No. G002/GP-05-1706 In accordance with the requirements
More informationNATURAL GAS ACT. (Note: All underlined material was added to the Natural Gas Act by the Energy Policy Act of 2005)
NATURAL GAS ACT Section 2 Section 3 Section 7 Section 15 Section 19 Section 21 Section 22 Definitions Exportation or importation of natural gas; LNG terminals Construction, extension, or abandonment of
More informationKIMBERLY COSTAIN SUNBURY PRIMARY CARE, P.A. [ 1] Kimberly Costain appeals from the dismissal of her amended
MAINE SUPREME JUDICIAL COURT Decision: 2008 ME 142 Docket: Pen-07-652 Argued: April 9, 2008 Decided: September 9, 2008 Reporter of Decisions Panel: SAUFLEY, C.J., and CLIFFORD, ALEXANDER, LEVY, SILVER,
More informationChapter 80 CABLE TELEVISION
Chapter 80 CABLE TELEVISION 80-1. Title. 80-10. Compliance with standards. 80-2. Definitions. 80-11. Company liability; 80-3. Franchise required. indemnification. 80-4. Grant of authority. 80-12. Franchise
More informationAPS Service Territories
May 23, 2013 GFOAz 2013 May Quarterly Training APS Franchises 101 Can I get fries with that? APS Franchises & Technical Services Kendra Cea, 602-371-78727872 Agenda APS Overview Overview of utility Franchises
More informationOFFICE OF CABLE TELEVISION. I/M/O Verizon New Jersey, Inc. Application for a System-wide Cable Television Franchise BPU Docket No.
State of New Jersey BOARD OF PUBLIC UTILITIES 44 SOUTH CLINTON AVENUE POST OFFICE BOX 350 TRENTON, NEW JERSEY 08625-0350 WWW.NJ.GOV/BPU OFFICE OF CABLE TELEVISION I/M/O Verizon New Jersey, Inc. Application
More informationTOWER ORDINANCE TOWN OF OWLS HEAD
TOWER ORDINANCE TOWN OF OWLS HEAD Adopted - August 30, 1999 Amended - August 26, 2002 Amended June 1, 2009 TABLE OF CONTENTS PAGE Section 1 Title.. 1 Section 2 Authority.. 1 Section 3 Purpose. 1 Section
More informationAPPENDIX K NATURAL GAS PIPELINE STORAGE PERMITTING PROCESSES
APPENDIX K NATURAL GAS PIPELINE & STORAGE PERMITTING PROCESSES Natural Gas Pipeline & Storage Permitting Processes NiSource follows the Federal Energy Regulatory Commission (FERC) planning and permitting
More informationRule R8-65. REPORT BY PERSONS CONSTRUCTING ELECTRIC GENERATING FACILITIES
Rule R8-65. REPORT BY PERSONS CONSTRUCTING ELECTRIC GENERATING FACILITIES EXEMPT FROM CERTIFICATION REQUIREMENT. (a) All persons exempt from certification under G.S. 62-110.1(g) shall file with the Commission
More informationUNITED STATES OF AMERICA 151 FERC 62,147 FEDERAL ENERGY REGULATORY COMMISSION ORDER AUTHORIZING DISPOSITION OF JURISDICTIONAL FACILITIES
UNITED STATES OF AMERICA 151 FERC 62,147 FEDERAL ENERGY REGULATORY COMMISSION Georgia Power Company Docket No. EC15-132-000 ORDER AUTHORIZING DISPOSITION OF JURISDICTIONAL FACILITIES (Issued June 1, 2015)
More information3 September 9, 2015 Public Hearing
3 September 9, 2015 Public Hearing APPLICANT: PI TELECOM INFRASTRUCTURE T, LLC PROPERTY OWNER: JSW HOLDINGS, LLC STAFF PLANNER: Carolyn A.K. Smith REQUEST: Conditional Use Permit (communications tower-monopole)
More informationROCKBRIDGE COUNTY CODE. Chapter 14 FIRE, EMS AND EMERGENCY MANAGEMENT ARTICLE I. FIRE AND EMS DEPARTMENT
ROCKBRIDGE COUNTY CODE Chapter 14 FIRE, EMS AND EMERGENCY MANAGEMENT Art. I. Fire and EMS Department, 14-1--14-9 Art. II. Fee for Services, 14-10--14-29 Art. III. Drought Management, 14-30--14-39 Sec.
More informationv. Record No. 061373 OPINION BY JUSTICE ELIZABETH B. LACY June 8, 2007 CARLA VON NEUMANN-LILLIE
Present: All the Justices SETTLEMENT FUNDING, LLC v. Record No. 061373 OPINION BY JUSTICE ELIZABETH B. LACY June 8, 2007 CARLA VON NEUMANN-LILLIE FROM THE CIRCUIT COURT OF FAIRFAX COUNTY M. Langhorne Keith,
More informationRidgway Municipal Code 14-6-1. Section 14-6. Cable Television System Permits
Ridgway Municipal Code 14-6-1 Section 14-6 Cable Television System Permits Subsections: 14-6-1 GENERAL PROVISIONS AND DEFINITIONS. 14-6-2 PERMIT REQUIRED: GRANT OF AUTHORITY. 14-6-3 TERM OF PERMIT. 14-6-4
More informationMEMORANDUM City of St. Petersburg, Florida
MEMORANDUM City of St. Petersburg, Florida TO : FROM : RE : The Honorable Chair and Members of the City Council Mayor Rick Baker M. A. Galbraith, Jr., Assistant City Attorney E. Eugene Webb, Ph.D., Manager,
More information8. The City received a $100,000 grant from the Monterey Peninsula Water Management District to conduct initial planning and engineering analyses.
RESOLUTION NO. 14-071 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PACIFIC GROVE CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT (FEIR), ADOPTING THE MITIGATION MONITORING AND REPORTING PLAN, AND APPROVING
More informationAPPENDIX W - REGULATIONS - IDENTITY THEFT CHAPTER 45F. IDENTITY THEFT
APPENDIX W - REGULATIONS - IDENTITY THEFT CHAPTER 45F. IDENTITY THEFT Authority N.J.S.A. 56:8-161 to 166 and 56:11-44 to 50. Source and Effective Date R.2008 d.80, effective April 7, 2008. See: 39 N.J.R.
More informationRESOLUTION NO. RESOLUTION TO JOIN SCHOOLS HEALTH INSURANCE FUND
RESOLUTION NO. RESOLUTION TO JOIN SCHOOLS HEALTH INSURANCE FUND WHEREAS, a number of school boards in the State of New Jersey have joined together to form the SCHOOLS HEALTH INSURANCE FUND hereafter referred
More informationARTICLE 333 Driving Under the Influence; Reckless Driving
27 ARTICLE 333 Driving Under the Influence; Reckless Driving 333.01 Driving under the influence. 333.03 Hazardous driving. 333.02 Reckless driving. 333.99 Penalty. CROSS REFERENCES See sectional histories
More informationTERMS AND CONDITIONS
Virginia Electric and Power Company TERMS AND CONDITIONS XXIV. GENERATOR INTERCONNECTION STANDARD Electric generator interconnection service includes only the ability to interconnect an electric generator
More informationCOMPLAINT AND APPLICATION FOR ORDER TO SHOW CAUSE
Denver District Court 1437 Bannock Street, #256 Denver, CO 80202 AMERICAN CIVIL LIBERTIES UNION OF COLORADO, a Colorado corporation, v. Plaintiff, ALVIN J. LaCABE, JR., in his official capacity as Manager
More informationPortland General Electric Company P.U.C. Oregon No. E-18 Original Sheet No. C-1 RULE C CONDITIONS GOVERNING CUSTOMER ATTACHMENT TO FACILITIES
P.U.C. Oregon No. E-18 Original Sheet No. C-1 RULE C CONDITIONS GOVERNING CUSTOMER ATTACHMENT TO FACILITIES 1. Acceptance of Electricity Service By establishing or requesting a POD or by continuing an
More informationHISTORIC PRESERVATION EXTERIOR REHABILITATION PROGRAM AGREEMENT
HISTORIC PRESERVATION EXTERIOR REHABILITATION PROGRAM AGREEMENT THIS EXTERIOR REHABILITATION PROGRAM AGREEMENT (the "Program Agreement") is made as of the day of, 20, by and between the City of Scottsdale,
More informationCHAPTER 260. AN ACT concerning employee leasing companies. BE IT ENACTED by the Senate and General Assembly of the State of New Jersey:
CHAPTER 260 AN ACT concerning employee leasing companies. BE IT ENACTED by the Senate and General Assembly of the State of New Jersey: C.34:8-67 Definitions relative to employee leasing companies. 1. For
More informationMEMORANDUM CONCERNING TRUSTEE OBJECTIONS TO CHAPTER 13 PLANS AT CONFIRMATION: How to Avoid and/or Resolve Such Objections
MEMORANDUM CONCERNING TRUSTEE OBJECTIONS TO CHAPTER 13 PLANS AT CONFIRMATION: How to Avoid and/or Resolve Such Objections The information as contained in this Memorandum is being provided as a courtesy
More informationLOBBYIST REGISTRATION FORM
OFFICE OF THE CLERK AND RECORDER CITY CLERK DEPARTMENT 201 W. Colfax Ave. Dept 101 Denver, Colorado 80202 cityclerk@denvergov.org LOBBYIST REGISTRATION FORM CHECK ONE: I am: New registration: INDIVIDUAL
More informationSTATE OF GEORGIA DEPARTMENT OF TRANSPORTATION OPEN AGENCY SERVICE CONTRACT
STATE OF GEORGIA DEPARTMENT OF TRANSPORTATION OPEN AGENCY SERVICE CONTRACT Contract #: Total Obligation: AGREEMENT BETWEEN: The Georgia Department of Transportation s location identified in Paragraph 101A
More informationCellular Antenna Towers for Cellular Telecommunications Service or Personal Communications Services
ARTICLE XV CELL TOWER REGULATIONS Cellular Antenna Towers for Cellular Telecommunications Service or Personal Communications Services Sect. 1500 Purpose The purposes of these regulations are: to provide
More informationCITY DEVELOPMENT BOARD[263]
IAC 8/10/11 City Development[263] Analysis, p.1 CITY DEVELOPMENT BOARD[263] [Chapters 1 and 2, IAC 7/27/77, superseded by Chapters 1 to 4, effective 4/12/78] [Prior to 1/9/91, City Development Board[220]]
More informationTreasure Valley Electric Plan - Community Advisory Committee
Treasure Valley Electric Plan - Community Advisory Committee What is a transmission line and why are they necessary? A transmission line is used to conduct electricity between two points. Without high
More informationUNITED STATES DISTRICT COURT DISTRICT OF MINNESOTA. File No.
UNITED STATES DISTRICT COURT DISTRICT OF MINNESOTA Opus Woods Conservation Association, a Minnesota nonprofit corporation; and SFI Ltd. Partnership 54, a Nebraska limited partnership, Plaintiffs, File
More informationA RESOLUTION IMPOSING A HOTEL RENTAL TAX IN WASHINGTON COUNTY, MARYLAND RECITALS
A RESOLUTION IMPOSING A HOTEL RENTAL TAX IN WASHINGTON COUNTY, MARYLAND RECITALS The Board of County Commissioners of Washington County (the Board ) has the authority to adopt a resolution imposing a tax
More information74-601. State corporation commission; creation; members, appointment, terms, vacancies; chairperson; salaries; application of K-GOAL.
74-601. State corporation commission; creation; members, appointment, terms, vacancies; chairperson; salaries; application of K-GOAL. (a) There is hereby created the state corporation commission, which
More informationstated in plaintiffs' Second Amended Complaint, and further, denies liability.
IN THE UNITED STATES DISTRICT COURT FOR THE NORTHERN DISTRICT OF ILLINOIS EASTERN DIVISION COUNCIL FOR DISABILITY RIGHTS, et ) al., ) ) Plaintiffs, ) V. ) No. 05 C 5689 Judge Wayne Andersen CITY OF CHICAGO,
More informationEvaluation of Underground Electric Transmission Lines in Virginia
Report of the Joint Legislative Audit and Review Commission To the Governor and The General Assembly of Virginia Evaluation of Underground Electric Transmission Lines in Virginia HOUSE DOCUMENT NO. 87
More informationVIRGINIA ELECTRIC AND POWER COMPANY ELECTRONIC DATA INTERCHANGE (EDI) TRADING PARTNER AGREEMENT
1 THIS ELECTRONIC DATA INTERCHANGE TRADING PARTNER AGREEMENT (the "Agreement") is made, entered into and effective as of this day of,, by and between Virginia Electric and Power Company d/b/a Dominion
More informationPipelines & The City
Pipelines & The City Purpose of Discussion Pipeline Authority to Use or Cross City Streets Authorized Activities of City Condemnation What Entities in Texas are Authorized by Law to Operate Gas Pipelines?
More informationChapter 32A TELECOMMUNICATION PROVIDERS
Chapter 32A TELECOMMUNICATION PROVIDERS 32A.01.00 Purpose The purposes of this ordinance are to regulate access to and ongoing use of public rights-of-way by telecommunications providers for their telecommunications
More informationAn Overview of Virginia Fence Law Jason H Carter, Extension Agent, Augusta County
An Overview of Virginia Fence Law Jason H Carter, Extension Agent, Augusta County Disclaimer The information presented in this document about Virginia Fence Law and legislation is meant to be for educational
More informationPrepared by and return to: Osama Elshami, Director Utilities & Engineering Dept. City of Coconut Creek 5295 Johnson Road Coconut Creek, Florida 33073
Prepared by and return to: Osama Elshami, Director Utilities & Engineering Dept. City of Coconut Creek 5295 Johnson Road Coconut Creek, Florida 33073 WATER AND WASTEWATER AGREEMENT (Single Family) THIS
More informationPUBLIC UTILITIES PROPOSALS PUBLIC UTILITIES
PUBLIC UTILITIES PUBLIC UTILITIES (a) BOARD OF PUBLIC UTILITIES Regulations of Cable Television Proposed Readoption with Amendments: N.J.A.C. 14:18 Proposed New Rules: N.J.A.C. 14:18-3.27 and 16.8 Proposed
More information4:15-cv-00432-RBH Date Filed 01/29/15 Entry Number 1 Page 1 of 10
4:15-cv-00432-RBH Date Filed 01/29/15 Entry Number 1 Page 1 of 10 IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF SOUTH CAROLINA FLORENCE DIVISION Ryan Michael Stinnett, on behalf of himself CASE
More informationRoseman Technology Site *Caroline County, Virginia 110 Acres Seconds off Interstate 95
Roseman Technology Site *Caroline County, Virginia 110 Acres Seconds off Interstate 95 Water Service Provider: Caroline Location: I - 95 Route 639, Ladysmith Exit 110 County Suitable for Construction:110
More information3:14-cv-00300-JFA Date Filed 07/31/14 Entry Number 80 Page 1 of 3 IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF SOUTH CAROLINA
3:14-cv-00300-JFA Date Filed 07/31/14 Entry Number 80 Page 1 of 3 IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF SOUTH CAROLINA COLUMBIA DIVISION Kaleigh R. Dittus, Courtney A. Snyder, ) Civil
More informationBEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA
BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA F I L E D 05-18-12 08:15 AM In The Matter of the Application of SAN DIEGO GAS & ELECTRIC COMPANY (U 902 E) for a Certificate of Public
More informationTITLE XV: LAND USAGE 150. BUILDING CODE 151. FLOOD DAMAGE PREVENTION 153. SUBDIVISION REGULATIONS 154. ZONING CODE
TITLE XV: LAND USAGE Chapter 150. BUILDING CODE 151. FLOOD DAMAGE PREVENTION 152. MOBILE HOMES AND TRAILER PARKS 153. SUBDIVISION REGULATIONS 154. ZONING CODE 2001 S-7 1 2 Middletown - Land Usage CHAPTER
More informationATTACHMENT G. Network Operating Agreement
ATTACHMENT G Network Operating Agreement 1. PURPOSE OF NETWORK OPERATING AGREEMENT The purpose of this Agreement is to identify contractual requirements related to Network Integration Transmission Service
More informationSec. 22a-1a page 1 (4-97)
Department of Environmental Protection Sec. 22a-1a page 1 (4-97) TABLE OF CONTENTS Connecticut Environmental Policy Act Definitions... 22a-1a- 1 Determination of sponsoring agency.... 22a-1a- 2 Determination
More informationA BILL FOR AN ACT. 2 energy, advanced distributed energy resources, and energy. 3 efficiency in Hawaii provides significant financial, health,
HOUSE OF REPRESENTATIVES K 2570 TWENTY-EIGHTH LEGISLATURE, 2016 IN H.D. 1 STATEOFHAWAII A BILL FOR AN ACT RELATING TO ENERGY MODERNIZATION. BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII: 1 SECTION
More informationPart IV Article XXXVI COMMERCIAL COMMUNICATIONS FACILITIES
Part IV Article XXXVI COMMERCIAL COMMUNICATIONS FACILITIES Section 3600 Statement of Purpose The purposes of this Ordinance are: - to regulate the construction, placement, and modification of communications
More informationDOCKET NO. D-2005-007 CP-2 DELAWARE RIVER BASIN COMMISSION
DOCKET NO. D-2005-007 CP-2 DELAWARE RIVER BASIN COMMISSION East Vincent Township Bartons Meadows Wastewater Treatment Plant East Vincent Township, Chester County, Pennsylvania PROCEEDINGS This docket is
More informationDEPARTMENT OF ENVIRONMENTAL QUALITY
PROJECT IDENTIFICATION DEPARTMENT OF ENVIRONMENTAL QUALITY City of Burton Sanitary Sewer Collection System Improvements State Revolving Fund (SRF) Environmental Assessment April 2015 Applicant: Authorized
More informationCase 1:14-cv-01323-ERK-JMA Document 1-1 Filed 02/27/14 Page 1 of 2 PageID #: 6 CIVIL COVER SHEET (SEE INSTRUCTIONS ON NEXT PAGE OF THIS FORM.
Case 1:14-cv-01323-ERK-JMA Document 1-1 Filed 02/27/14 Page 1 of 2 PageID #: 6 CIVIL COVER SHEET (SEE INSTRUCTIONS ON NEXT PAGE OF THIS FORM.) I. (a) PLAINTIFFS DEFENDANTS Nemet Motors, LLC d/b/a Nemet
More informationState of Kansas Coal Combustion Residuals Part 256 Plan. Kansas Department of Health and Environment Bureau of Waste Management
State of Kansas Coal Combustion Residuals Part 256 Plan Kansas Department of Health and Environment Bureau of Waste Management 9/29/2015 Table of Contents Chapter 1 - Introduction...1 Chapter 2 - Compliance
More informationVirginia Workers Compensation Commission
Virginia Workers Compensation Commission Employer Guide to Virginia Workers Compensation 11 What is Workers Compensation? Workers Compensation is a mandatory insurance requirement for most employers. It
More informationVirginia Workers Compensation Commission Frequently Asked Insurance Questions for Employers
Virginia Workers Compensation Commission Frequently Asked Insurance Questions for Employers The information contained below is general in nature and is not intended and may not be considered as providing
More informationINFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY
ORDER NO. R5-2011-XXXX INFORMATION SHEET Background Triangle Rock, Inc. (Discharger) submitted a Report of Waste Discharge (RWD) on 23 August 2010. The Discharger is expanding the mining operations at
More informationSTATE OF SOUTH CAROLINA DEPARTMENT OF INSURANCE
STATE OF SOUTH CAROLINA DEPARTMENT OF INSURANCE IN THE MATTER OF: UNION NATIONAL LIFE INSURANCE COMPANY 8282 GOODWOOD BOU LEV ARD BATON ROUGE, LA 70806 UNITED INSURANCE COMPANY OF AMERICA ONE EAST WACKER
More information