1 TRUST NAME: Southern Health & Social Care Trust Emergency Preparedness & Response Annual Report to PHA/HSCB (DATES THE REPORT RELATES TO) From: 1/4/14 To: 31/3/15 Report Completed by: Position in Trust: Teresa Cunningham Emergency Planner 1
2 1. Introduction This section should include a general summary of Trust Emergency Preparedness & Response management structures and processes within the organisation and across sites with roles and responsibilities of key officers. 1.1 Within the SHSCT, the Medical Director has responsibility for Emergency Planning and is responsible for reporting to the Trust s Senior Management Team and Trust Board on emergency planning issues. The Medical Director is supported by a Senior Manager - the Emergency Planning and Business Continuity Manager. Staff from all directorates engage in emergency planning and business continuity management. The Trust has a multi-disciplinary Emergency Planning and Business Continuity Committee comprised of senior managers, clinicians, Public Health Agency representation, Northern Ireland Fire and Rescue Service, Northern Ireland Ambulance Service, Police Service Northern Ireland and Council representation. It is chaired by the Medical Director or the Emergency Planner and meets on a quarterly basis with the aim of ensuring strategic leadership. The Trust s Emergency Planning Manager also participates in the following regional and local fora: Regional Emergency Planning Forum, frequency quarterly promotion of emergency planning, sharing of good practice, development of policies and guidance. Regional Business Continuity Meetings hosted by DHSSPS sporadic meetings now. Southern Civil Emergency Preparedness Group ((SCEPG)formerly Southern Responders Group) Meeting hosted jointly by Council and PSNI, multi-agency forum (PSNI,NIAS, NIFRS, SHSCT, PHA, Local Councils, MCA, NIHE, Red Cross) meets at least quarterly to raise awareness of individual agency roles in Emergency Planning, development and exercising of multi-agency plans/protocols, share learning, debrief following incidents/exercises. Southern Group Emergency Planning Sub-group, meets usually on a quarterly basis Hosted by Emergency Planning Co-ordinator from the Southern Group of councils - to update on pertinent emergency planning issues, share learning and to progress actions (eg exercises). Cross Border Emergency Planning Group recently reconvened with representation from blue light services, councils and Health Agencies from both sides of the border. Meets usually on a quarterly basis and currently aiming to develop protocols for cross border working and facilities and resource mapping. Attendance as requested at local Council meetings to discuss emergency planning issues. Attendance at other relevant planning groups convened eg development of Mass Casualty Guidance (DHSSPS led). 2
3 There are 3 Emergency Support Centre Teams within the Trust to assist with the response to community incidents, particularly in relation to the establishment of Emergency Support Centres when members of the public are evacuated from their homes. There is a team in each of the 3 areas, Armagh & Dungannon, Newry & Mourne and Craigavon & Banbridge. Each team has 8 members and one member from each team is on call every day, 24/7, all year round. 1.2 Short Term Planning Groups Evacuation and Sheltering Guidance In an Evacuation and Sheltering planning group was established to develop evacuation and sheltering guidance. Work on this is ongoing. Transport Protocol for Severe Weather A Small planning group was established to develop a Transport Protocol to outline the arrangements in place for staff to access 4x4 assistance during periods of severe weather, to ensure they get out to their clients in the community and to assist getting staff into the hospitals for work. Work is ongoing. Special Incidents Plan - CBRN In a small working group was also established to develop a Special Incidents (CBRN) plan. In 2014 the draft plan was reviewed in light of new guidance (Initial Operational Response) on dry decontamination. The draft plan has been issued for consultation to relevant stakeholders. The plan and the arrangements for dry decontamination have to be completed by August Ebola Planning Group A multi-disciplinary group with representation from NIAS was established to develop an Ebola Plan to deal with any potential presentations at the acute hospitals. The plan continues to be kept under review in light of international and local guidance. Ebola exercises have been carried out on both acute sites and the specified PPE has been purchased. 2. Notification of Incidents to Trust This section using (table and text) should highlight the number; date and types of incidents notified to the Trust since the previous report and the level of response activated. 3
4 Table 1 identifies the incidents that were alerted in the time period 1/4/14 to 31/3/15. Table 1 Incidents notified to Trust: Date Incident Level of Response Activated/Outcome 25/6/14 Emergency Support Centre (ESC) Response to explosion The locality ESC Manager was contacted at 05:30hrs on 25 th June 2014 by PSNI to advise there had been an explosion in Keady, near an ATM. The PSNI decided, as a precaution, to evacuate 12 properties in the immediate vicinity. ESC Manager was advised the Council was opening a rest centre at Keady Recreation Centre;. 06:10hrs On call manager arrived at Keady Recreation Centre and spoke with a care taker. Given that the main centre was attached to a school which was due to open in under two hours they agreed it would be more prudent to use the pavilion on the same site for the ESC. He advised PNSI accordingly. At approximately 07:30hrs a constable from the PSNI attended the centre, and advised evacuees were making alternate arrangements. Consequently it was agreed that the Emergency Support Centre would be stood down. 13/11/14 Emergency Support Centre (ESC) Response to flooding 15/11/14 Emergency Support Centre (ESC) Response to potential flooding ESC was activated in response to a flooding incident in Bridge Street and Cleary Crescent in Newry. No evacuees presented at the centre which was established in Newry Sports Centre. A call was received by Emergency Planner and on-call manager for C&B ESC Team from Lewis Porter Craigavon & Banbridge Council advising an ESC may be required for the Ashgrove area in Portadown due to potential flooding. ESC team was put 4
5 on standby however the rest centre was not required. Lessons Learned ESC Activations The PSNI have not always notified Trust when an ESC is to be set up. This issue continues to be raised and reinforced with PSNI, through Southern Responders Group meetings and by the SHSCT Emergency Planner with PSNI Emergency Planner. Flooding November 2014 Identified the need to establish data sharing agreements between PSNI and other agencies to facilitate prompt sharing of information on vulnerable clients during an emergency situation. It also identified the need to establish mechanisms within the Trust to quickly gather information on vulnerable clients from information systems. Work is on-going within Southern Civil Emergency Preparedness Group re data sharing agreements. A section on lessons learned from any issues identified in relation to the various notifications should be outlined along with actions taken to address any identified areas of concern (see debrief reports). 3. Incidents responded to by Trust This section should outline details of the Trust response to all incidents responded to since the previous report. Lessons learned from debriefs (internal and Multi-agency) should be included along with actions taken to address any identified areas of concern. (Trusts should append reports on the incident if relevant / appropriate) 3.1 Severe Weather Flooding Newry On 13/11/15 the Trust s Emergency Planner was contacted by the Emergency Planning Co-ordinator from the Southern Group of Councils to advise that a Silver Command and Control team was being established to deal with the fallout from the heavy rainfall overnight and predicted for the coming days. A Senior Manager from the Trust liaised closely with the command and control team in relation to the identification of vulnerable people in the Bridge Street and Cleary Crescent areas of Newry which were worst affected by flooding following the heavy rainfall. 5
6 3.2 Strike Action In March 2015, the Trust implemented its business continuity plans in response to Industrial strike action by SHSCT staff and other public services. Reporting arrangements were put in place to report impact on services to the Health & Social Care Board. 3.3 EVENTS There were no major events in SHSCT area during Emergency Preparedness Training Individual Specialised Training This section should outline details of the individual specialised emergency preparedness & response training attended since the previous report by members of staff including dates qualifications obtained and organisation/agency providing the training. 4.1 HOSPITAL MAJOR INCIDENT MEDICAL MANAGEMENT (HMIMM) AND SUPPORT HMIMMS training was provided to 4 staff in MARCH 201 ED Consultant, DHH Clinical Sister, CAH ED Clinical Sister, CAH ED ED Manager, DHH Nominations continue to be made for future courses. 4.2 DECONTAMINATIONTENTS New decontamination tents were delivered to the 2 acute hospitals in March Two staff from estates attended the Cupola Tent training sessions and will roll out training to estates and portering/security staff on both sites. 4.3 EMERGENCY DEPARTMENT STAFF TRAINING Three members of staff attended the Powered Respirator Protective Suits (PRPS) Train the Trainer training in October 2014 and are currently drawing up a programme to roll this out to the relevant staff in the Emergency Departments of both acute hospitals. 6
7 4.4 RQIA ESTATES SEMINAR RESIDENTIAL AND NURSING HOME The Trust s Nurse Consultant for Older People attended this seminar which took place in November and made a presentation on the learning arising from the Trust s response to a fire in a residential nursing home which occurred in EMERGENCY SUPPORT CENTRES The Trust s Emergency Planning Co-ordinator continues to meet individually with all new ESC Managers to talk through roles and responsibilities. New team members are also inducted by their team colleagues and are invited to attend multi-agency awareness sessions facilitated by members of the Southern Civil Emergency Preparedness Group (SCEPG). 4.6 LOGGIST TRAINING Three members of staff attended loggist training funded by the PHA and delivered by Bond Solon. Feedback on the training from staff was good. 4.7 BUSINESS CONTINUITY TRAINING The Trust s Emergency Planner and Business Continuity Manager and an Estates Representative attended Business Continuity training funded by the PHA and delivered by Risk and Resilience. This will assist the Emergency Planner in the development and maintenance of a business continuity management strategy for the Trust. 5 Exercises This section should summarise the individual exercises national and local (both attended and run) by trust staff including dates, area of response tested and the name of the organisation /agency facilitating the exercise. 5.1 Southern Regional College Desktop Exercise The Southern Civil Emergency Preparedness Group (SCEPG) facilitates an annual desktop exercise for students from the Southern Regional College studying the Extended Level 3 Diploma in Uniformed Public Services. Emergency Planning scenarios are presented to the students and they are asked to think about the problems/ issues which would arise and how they think the emergency services would respond. Members of the SCEPG guide them through potential solutions. As well as providing an excellent practical learning opportunity for the students, it provides a further opportunity for multi-agency engagement to learn about the roles and responsibilities of the various agencies in an emergency situation. Such an exercise was carried out in May
8 5.3 Exercise Stannis March 2015 Three members of staff attended the regional outbreak exercise, Exercise Stannis. The debrief report is awaited and learning arising will be incorporated into the review of Trust plans. 5.4 Exercise Gueckedou In October 2014, five members of staff attended a regional ebola exercise hosted by the PHA. There was considerable learning from the exercise which was incorporated into the Trust s Viral Haemorrhagic Fever Management Plan. 5.5 CAH Live Exercise In September 2014 the Trust carried out a live multi-agency exercise at CAH. The exercise involved a live evacuation of a hospital ward requiring establishment of a hospital control team. When the evacuation was completed, the exercise continued as a desktop exercise with injects to the hospital control team which resulted in the establishment of the Trust s Bronze Command and Control Team. Both teams had multi-agency representation ie NIFRS, PSNI, NIAS. The aim of the exercise was to test the hospital fire evacuation procedures at Craigavon Area Hospital. The objectives of the exercise were to: examine roles and responsibilities of key responders examine inter-agency dependencies discuss activation & communication issues involved in evacuation test business continuity plans discuss the role of the media stimulate team networking identify training needs The exercise objectives were fully met. A hot debrief was carried out immediately after the exercise and a full debrief was carried out in November The debrief report was shared with participants and other Trust Emergency Planners via the Health Emergency Planning Forum. An action plan has been compiled and the learning arising will be incorporated into existing plans. This exercise provided a further opportunity for multi-agency engagement and collaboration both in the planning and execution of the exercise. Feedback on the exercise from participants was very positive and the need for further multi-agency exercises was highlighted FINAL EXERCISE CAHOUT DEBRIEF REPORT.pdf 8
9 5.6 Local Ebola Exercise The Trust carried out a number of ebola exercises on each of the acute sites (CAH and DHH). 6. Controls Assurance Standards This section should note the Trust score against Controls Assurance Standard and outline the areas of concern along with an action plan as to how the specific areas will be addressed. This section will inform a significant part of the individual Trust; PHA/HSCB annual performance meetings. The Trust s Controls Assurance Score this year was substantive (84). The main areas of concern for the Trust are set out in the attached report: EMERGENCY PLANNING ACTION PLAN 31 MARCH 2015 UPDATED doc.docx 7. Business Continuity Management progress This section should summarise the work carried out by the trust and highlight the relationship within the trust of business continuity and emergency preparedness. A scoping exercise was carried out in to identify the Division/Service Business Continuity/Contingency plans already in existence throughout the Trust. The Emergency Planner has compiled an inventory of plans and is in the process of putting performance management arrangements in place. Updates are included in the Medical Directors Report which is presented to the Trust s Senior Management Team, Governance Committee and Trust Board. 8. Emergency Preparedness & Response Audit This section should identify any emergency preparedness & response audits carried out by the trust since the last report. There were no audits carried out in the past year other than self assessment for Controls Assurance Standards. 9. Areas of future risk in relation to emergency preparedness & response within the trust. 9
10 Looking to the next year this section should summarise the areas of risk and include an action plan as to how the risks are to be managed. CONTROLS ASSURANCE STANDARDS Following completion of Controls Assurance Standards, an action plan was developed to identify the actions necessary to improve compliance for the forthcoming year. The action plan will be monitored in to ensure actions are implemented. EXERCISE DEBRIEF A debrief report was compiled following Exercise CAHOUT identifying lessons learned and the actions necessary to improve Trust and multi-agency preparedness for dealing with a fire evacuation. The debrief report was shared with all exercise participants and the action plan will be monitored in the forthcoming year to ensure implementation of actions arising from lessons learned. DECONTAMINATION ACTION PLAN The Trust has a live decontamination action plan which is regularly reviewed and updated in line with the introduction of new guidance (eg Initial Operational Response). The action plan is monitored to ensure completion of actions listed. 10. Action plan for the next 12 months to manage identified risks and areas of concern raised during responses to actual incidents. This section should give a detailed action plan as to how the risks are to be managed and how areas of concern are to be addressed in the following 12 months. Ref: Decontamination Action Plan DECONTAMINATION ACTION PLAN UPDATE AS AT 14 April 2014.docx Ref: Debrief Report Exercise CAHOUT FINAL EXERCISE CAHOUT DEBRIEF REPORT.pdf Ref: Controls Assurance Standards Action Plan 10 EMERGENCY PLANNING ACTION PLAN 31 MARCH 2015 UPDATED doc.docx
11 Appendix to annual report Where relevant or appropriate this should include fuller reports on significant exercises / training; audits or incidents responded to. 11
12 12
THE ROLE OF LEAD GOVERNMENT DEPARTMENTS IN PLANNING FOR AND MANAGING CRISES
THE ROLE OF LEAD GOVERNMENT DEPARTMENTS IN PLANNING FOR AND MANAGING CRISES THE FRAMEWORK FOR ACTION 1. Most incidents are handled at a local level by the emergency services and by the appropriate local
More informationIncident Management Plan
Incident Management Plan Document Control Version 1 Name of Document NHS Guildford and Waverley CCG Incident Management Plan Version Date 1st December 2015 Owner Director of Governance and Compliance [Accountable
More informationTrust Board of Directors. Monitor Compliance Framework N/A N/A N/A N/A YES. The Board is asked to:
NLG(15)286 DATE 30 June 2015 REPORT FOR Trust Board of Directors REPORT FROM Wendy Booth, Director of Performance Assurance & Trust Secretary CONTACT OFFICER Graham Jaques, Resilience Manager, Trustwide
More informationIndependent Assurance External evidence that risks are being effectively managed (e.g. planned or received audit reviews)
Total Risk Score Total Risk Score SHA Risk Matrix Risk Matrix Trust Details Name of Trust: NHS Address: Francis Crick House Post Code: NN3 6BF Name of Chief Executive: John Parkes Name of Person to contact
More informationThe Royal Wolverhampton NHS Trust
The Royal Wolverhampton NHS Trust Trust Board Report Meeting Date: 22 April 2013 Title: Emergency Preparedness Annual Report 2012/2013 Executive Summary: Action Requested: Report of: Author: Contact Details:
More informationAn Introduction to. Business Continuity Planning
An Introduction to Business Continuity Planning Company Profile Practical Experience European Head Office Extensive Client Base Established 1998 Expert Consultants Global Network Why BCP? I am often asked
More information11. Health and disability services
11. Health and disability services Summary The Ministry of Health and all other health sector agencies undertake the planning necessary to provide health and disability services in the event of any emergency.
More informationBusiness Continuity Exercise: Electricity Supply Failure Appendix 4.4
1 Business Continuity Exercise: Electricity Supply Failure Appendix 4.4 2 Housekeeping Fire safety Breaks and refreshments Toilets Mobiles and pagers 3 Introduction Respect each others contributions What
More informationBUSINESS CONTINUITY MANAGEMENT POLICY
BUSINESS CONTINUITY MANAGEMENT POLICY Version No: 1 Issue Status: awaiting Trust Board approval Date of Ratification: 11th April 2012 Ratified by: Risk Management Committee Policy Author(s): Stuart Coalwood
More informationMajor Incident Procedures. What businesses and the voluntary sector need to know
Major Incident Procedures What businesses and the voluntary sector need to know Introduction This guide is designed to increase the understanding of the roles and responsibilities of the emergency services
More informationEmergency Quick Reference Guide
Township of Rideau Lakes - Emergency Response Plan 1 Emergency Quick Reference Guide Upon the arrival of three or more members, the Community Control Group (CCG) may initiate its function. Ensure that
More informationBusiness Continuity Management For Small to Medium-Sized Businesses
Business Continuity Management For Small to Medium-Sized Businesses Produced by NORMIT and Norfolk County Council Resilience Team For an electronic copy of this document visit www.normit.org Telephone
More informationChapter 11 Wales. Revision to Emergency Preparedness
Chapter 11 Wales Revision to Emergency Preparedness Civil Contingencies Act Enhancement Programme October 2011 V3: Last updated 09/12/2010 PAGE 1 Chapter 11 (Wales) of Emergency Preparedness, Revised Version
More informationMajor Incident Plan. Valid on date of print only Page 1 of 32
Major Incident Plan Status: ratified Originating Date: June 2009 Date Ratified: June 2009 Next review Date: June 2010 Accountable Director: Director of Nursing Governance and Performance Policy Author:
More informationTHE ROYAL WOLVEHRAMPTON HOSPITALS NHS TRUST. Head of Planning/Emergency Preparedness
THE ROYAL WOLVEHRAMPTON HOSPITALS NHS TRUST Report To: Trust Board 12 April 2010 Report of: Subject: Author: Chief Operating Officer Emergency Preparedness Head of Planning/Emergency Preparedness Purpose
More informationHelping you reach your potential...
SKILLS_2_SHARE_PROSPECTUS_2 16/6/10 08:42 Page 2 STRATEGIC AND OPERATIONAL TRAINING AND MANAGEMENT Helping you reach your potential... COURSE PROSPECTUS SKILLS_2_SHARE_PROSPECTUS_2 16/6/10 08:42 Page 3
More informationEmergency Preparedness Guidelines
DM-PH&SD-P7-TG6 رقم النموذج : I. Introduction This Guideline on supports the national platform for disaster risk reduction. It specifies requirements to enable both the public and private sector to develop
More informationBusiness Continuity Exercise: IT Service Failure Appendix 4.5
1 Business Continuity Exercise: IT Service Failure Appendix 4.5 2 Housekeeping Fire safety Breaks and refreshments Toilets Mobiles and pagers 3 Introduction Respect each others contributions What s said
More informationNHS Commissioning Board Business Continuity Management Framework (service resilience)
NHS Commissioning Board Business Continuity Management Framework (service resilience) 1 P a g e NHS Commissioning Board Business Continuity Management Framework Date 7 January 2013 Audience NHS Commissioning
More informationTRUST POLICY FOR EMERGENCY PLANNING
TRUST POLICY FOR EMERGENCY PLANNING Reference Number: CL-OP/ 2013/027 Version: 1.4 Status: New Draft Author: Ashley Reed Job Title: Head of Security and EPO Version / Amendment History Version Date Author
More informationSECURITY MANAGEMENT Annual Report 2009/10
Quality care for you, with you SECURITY MANAGEMENT Annual Report 2009/10 Version 0_1 Presented to Board of Directors September 2010 Author of report: Kate Corley Presented by: Dr Gillian Rankin For information/approval
More informationCity of Sault Ste. Marie Emergency Response Plan
Schedule A to By-law 2008-40 REVISION CONTROL Date Version Comments iii Table of Contents 1.0 Introduction... 1 2.0 Purpose... 1 3.0 Scope... 1 4.0 Legal Authority... 2 5.0 Community Background... 2 6.0
More informationNHS in Scotland. A Model Management Structure for Fire Safety
NHS in Scotland A Model Management Structure for Fire Safety NHS in Scotland, P&EFEx, December 1999 Contents 1. About this document page 3 2. Background and Introduction page 4 3. The Three Levels of Fire
More informationNHS FORTH VALLEY Major Emergency Response Plan
NHS FORTH VALLEY Major Emergency Response Plan Date of First Issue Circa 2004 Approved 26 / 05 / 2015 Current Issue Date 15 / 05 / 2015 Review Date 31 / 12 /2016 Version 8.0 Restricted EQIA No Author /
More informationAPPENDIX J INCIDENT MANAGEMENT
APPENDIX J INCIDENT MANAGEMENT THE BACKGROUND TO INCIDENT MANAGEMENT This guideline plan is designed to help emergency services manage incidents. PURPOSE OF THE GUIDELINE PLAN The plan provides: A step-by-step
More informationThe San Diego Model A Skilled Nursing Disaster Preparedness and Response Plan
The San Diego Model A Skilled Nursing Disaster Preparedness and Response Plan Introduction In response to their experience in the wildfires of 2007, skilled nursing facilities and county emergency planners
More informationPlanning for an Influenza Pandemic
Overview It is unlikely that a new pandemic influenza strain will first emerge within Elgin County. The World Health Organization (WHO) uses a series of six phases, as outlined below, of pandemic alert
More informationTrust Board Report. Review of the effectiveness of the IM&T Committee
1. Introduction Trust Board Report Review of the effectiveness of the The meets every eight weeks, with a specific responsibility for governance, strategic direction, approval and direction of developments
More informationPandemic Influenza Plan 2015/2016
NOT PROTECTIVELY MARKED Pandemic Influenza Plan 2015/2016 Policy number: N/A Version 1.5 Approved by Name of author/originator Owner (director) Executive Management Team Mark Twomey, Deputy Director of
More informationGUIDANCE ON MANDATORY TRAINING FOR PROVIDERS OF CARE IN REGULATED SERVICES
GUIDANCE ON MANDATORY TRAINING FOR PROVIDERS OF CARE IN REGULATED SERVICES 9 TH Floor Riverside Tower 5 Lanyon Place Belfast BT1 3BT Tel: (028) 9051 7500 Fax: (028) 90517501 ISSUE DATE: MAY 2010 REVIEW
More informationEMERGENCY COMMUNICATION PLAN
EMERGENCY COMMUNICATION PLAN 2 Document Control Revision: 1 Date: 4 February 2014 Status: Document change control: Approved by EPC Revision # Change Description Date Author 1 Initial document release as
More informationB E F O R E T H E E M E R G E N C Y
B E F O R E T H E E M E R G E N C Y RESPONSIBILITY / LIABILITY for Homeland Security / Emergency Management Duty of Care - Counties and Cities ARE responsible for the safety of their citizens. Following
More informationPreparedness in the Southwest
Preparedness in the Southwest Risk Assessment and Hazard Vulnerability Developed by The Arizona Center for Public Health Preparedness Cover Art www.azcphp.publichealth.arizona.edu Chapter 1 Importance
More informationPandemic Influenza. NHS guidance on the current and future preparedness in support of an outbreak. October 2013 Gateway reference 00560
Pandemic Influenza NHS guidance on the current and future preparedness in support of an outbreak October 2013 Gateway reference 00560 Purpose of Guidance To provide an update to EPRR Accountable Emergency
More informationEmergency Management Planning Criteria For Residential Treatment Facilities
Emergency Management Planning Criteria For Residential Treatment Facilities The following minimum criteria are to be used for Comprehensive Emergency Management Plans (CEMP) for Therapeutic Group Homes
More informationLeading Care Job Description Core Elements For Ward Sisters /Charge Nurses (AfC Band 7)
Leading Care Job Description Core Elements For Ward Sisters /Charge Nurses (AfC Band 7) 15 July 2011 Version 2 Ward Sister Charge Nurse Band 7 Job Description The Chief Nursing Officer requested the Northern
More informationMajor Incident COMMUNICATIONS STRATEGY AND PLAN
Major Incident COMMUNICATIONS STRATEGY AND PLAN ELFT staff must use the version published on the Trust Intranet for managing an incident response or training purposes. Version 2.2 8 th September 2014 Revision
More informationBusiness Continuity Management Framework
Business Continuity Management Framework Date of Issue: November 2013 Review Date: November 2014 Written by: Jackie Orchard Risk & Business Continuity Manager Authorised by: Signed off by: DCC Francis
More informationThe Role of Military Public Health and Healthcare Providers in National Bioterrorism Event Consequence Management
The Role of Military Public Health and Healthcare Providers in National Bioterrorism Event Consequence Management COL (Ret) Zygmunt F. Dembek, PhD, MS, MPH, LHD EpiMilitaris Conference Hotel Zamek Ryn
More informationSECTION ONE OVERVIEW OF POLICING AND COMMUNITY SAFETY PARTNERSHIPS
SECTION ONE OVERVIEW OF POLICING AND COMMUNITY SAFETY PARTNERSHIPS PURPOSE OF PCSPS PCSPs, which were established in April 2012 under the Justice Act (NI) 2011, provide a mechanism to identify and address
More informationCritical Incident Management Policy
Name of Policy Critical Incident Management Policy Description of Policy This policy outlines ACU s commitment to effectively respond and manage incidents and critical incidents. Students, staff, contractors
More informationEmergency Management Planning Criteria for Nursing Home Facilities (Criteria)
Emergency Management Planning Criteria for Nursing Home Facilities (Criteria) The following minimum criteria are to be used when developing Comprehensive Emergency Management Plans (CEMP) for all Nursing
More informationNURSING HOME STATUE RULE CRITERIA
NURSING HOME STATUE RULE CRITERIA Page 1 of 11 Nursing Homes Statutory Reference 8 400.23 (2)(g), Florida Statutes Rules; criteria; Nursing Home Advisory Committee; evaluation and rating system; fee for
More informationNHS Lancashire North CCG Business Continuity Management Policy and Plan
Agenda Item 12.0. NHS Lancashire North CCG Business Continuity Management Policy and Plan Version 2 Page 1 of 25 Version Control Version Reason for update 1.0 Draft for consideration by Executive Committee
More informationNOT PROTECTIVELY MARKED BUSINESS CONTINUITY. Specialist Operations Contingency Planning Business Continuity Manager 17.09.12
POLICY BUSINESS CONTINUITY Policy owners Policy holder Author Head of Services Specialist Operations Contingency Planning Business Continuity Manager Policy No. 132 Approved by Legal Services 17.09.12
More informationESSEX FIRE AUTHORITY Essex County Fire & Rescue Service
ESSEX FIRE AUTHORITY Essex County Fire & Rescue Service MEETING Essex Fire Authority AGENDA ITEM 14 MEETING DATE 5 September 2012 REPORT NUMBER SUBJECT REPORT BY Risk and Business Continuity Department
More informationEmergency Recovery. Corporate Business Continuity Plan
` Emergency Recovery Corporate Business Continuity Plan Section Summary: This document is for use when an incident or emergency affects our ability to provide a normal service to our partner responders
More informationBusiness Continuity Policy
Business Continuity Policy Ref. No. TP/028 Title: Business Continuity Policy Page 1 of 15 DOCUMENT PROFILE and CONTROL. Purpose of the document: Provides an overview of the London Ambulance Service NHS
More informationCommunity Capacity Case Study: The Meadows
Community Capacity Case Study: The Meadows 1. Project Summary: An Emergency Alert Plan for Potential Huntly Flooding was developed to ensure the smooth evacuation and care of vulnerable persons living
More informationThe following submission is provided on behalf of the Trustees and Members of Ambulance New Zealand
Ambulance New Zealand Submission: CIVIL DEFENCE EMERGENCY MANAGEMENT AMENDMENT BILL 2015 - CONSULTATION The following submission is provided on behalf of the Trustees and Members of Ambulance New Zealand
More informationEMERGENCY MANAGEMENT PLANNING CRITERIA FOR HOSPITALS
EMERGENCY MANAGEMENT PLANNING CRITERIA FOR HOSPITALS The following minimum criteria are to be used when developing Comprehensive Emergency Management Plans (CEMP) for all hospitals. These criteria will
More informationBusiness Continuity Management Policy and Plan
Business Continuity Management Policy and Plan Version No Author Date of Update 0.3 Allan Jude and Charmaine Grundy 05/06/2015 1 P a g e Contents Contents... 2 1. Introduction... 3 2. Purpose... 4 3. Definitions...
More informationEMERGENCY MANAGEMENT PLANNING CRITERIA FOR AMBULATORY SURGICAL CENTERS
EMERGENCY MANAGEMENT PLANNING CRITERIA FOR AMBULATORY SURGICAL CENTERS The following criteria are to be used when developing Comprehensive Emergency Management Plans (CEMP) for all ambulatory surgical
More informationProcess for reporting and learning from serious incidents requiring investigation
Process for reporting and learning from serious incidents requiring investigation Date: 9 March 2012 NHS South of England Process for reporting and learning from serious incidents requiring investigation
More informationPSPSOHS606A Develop and implement crisis management processes
PSPSOHS606A Develop and implement crisis management processes Revision Number: 1 PSPSOHS606A Develop and implement crisis management processes Modification History Not applicable. Unit Descriptor Unit
More informationEmergency Preparedness, Resilience and Response (EPRR)
GB 15/135 Emergency Preparedness, Resilience and Response (EPRR) Introduction The NHS needs to plan for and respond to a wide range of emergencies and business continuity incidents that could affect the
More informationGuidance for the Operation of the Emergency Mass Text Procedure
Guidance for the Operation of the Emergency Mass Text Procedure 1 Contents Page No. 1. Introduction 3 2. Definitions 3 3. Responsibilities and Authorisations 3 4. Circumstances of Use 6 5. Initiating an
More informationA Guide to the Role of Community Flood Wardens
A Guide to the Role of Community Flood Wardens What is a Community Flood Warden Scheme? Community Flood Warden schemes are completely voluntary, and can consist of a single person or several people acting
More informationCEMP Criteria for Residential Treatment Facilities
CEMP Criteria for Residential Treatment Facilities Lee County Emergency Management The following minimum criteria are to be used when Comprehensive Emergency Management Plans (CEMP) for all Residential
More informationManagement of flooding downstream of dams
Management of flooding downstream of dams Attachment to Victoria State Flood Emergency Plan Version 1.0 (6 February 2013) This plan is produced by the Victoria State Emergency Service and Department of
More informationEMERGENCY MANAGEMENT PLANNING CRITERIA FOR ADULT DAY CARE FACILITIES
The following criteria are to be used for the development of Comprehensive Emergency Management Plans (CEMP) for Adult Day Care (ADC). The criteria will serve as a recommended plan format for the CEMP,
More information1.0 Policy Statement / Intentions (FOIA - Open)
Force Policy & Procedure Reference Number Business Continuity Management D269 Policy Version Date 23 July 2015 Review Date 23 July 2016 Policy Ownership Portfolio Holder Links or overlaps with other policies
More information*****IMPORTANT SUBMITTAL INFORMATION*****
The following minimum criteria are to be used when developing Comprehensive Emergency Management Plans (CEMP) for all Nursing Homes. The criteria serve as the required plan format for the CEMP, and will
More informationDISTRIBUTION LIST. Document Distributed to: Date. Interim Business Continuity Plan V0_1 Draft. Senior Management Team 20 th March 2012
Corporate Business Continuity Plan Version 0_2 Draft 30 th March 2012 Version 0_2 Draft 1 Record of Alterations Version Date Description of Alterations Version 0_1 draft 19 th March 2012 First draft for
More informationBusiness Continuity Plan Toolkit
Business Continuity Plan Toolkit March 2015 1 Contents The Template instructions for use... 2 Introduction... 3 What is the purpose of this toolkit?... 3 Why do you need a Business Continuity Plan?...
More informationEMERGENCY PREPAREDNESS & RESPONSE PROCEDURE
1 of 12 DOCUMENT REVISION HISTORY Revision No. Date DESCRIPTION OF CHANGES Pages Affected By 00 01/07/2003 Draft Issued For Comment All HSEQ Dept. 01 01/09/2003 Total Change First Approved Issue All HSEQ
More informationTrust Board Meeting 19 May 2009
Trust Board Meeting 19 May 2009 Paper Ref: 18.24 Emergency Preparedness Title: This report is compiled to assist the Trust Board in Summary: maintaining an awareness of Emergency Preparedness activities
More informationAssisted Living Facilities & Adult Care Comprehensive Emergency Management Plans
Assisted Living Facilities & Adult Care Comprehensive Emergency Management Plans STATUTORY REFERENCE GUIDANCE CRITERIA The Henrico County Division of Fire s Office of Emergency Management provides this
More informationScore 50% to 80% - Discernable reportable progress to date
Red Amber Green Score up to 50% - Little reportable progress to date Score 50% to 80% - Discernable reportable progress to date Score up to 80% to 100% - Nearing completion Sn: Date Description EPRR Workplan
More informationState and Regional Emergency Management Committees Part 5: Emergency Management Manual Victoria
State and Regional Emergency Management Committees Part 5: Emergency Management Manual Victoria Contents 5.1 Introduction...5 1 5.2 Committees in Emergency Management...5 1 5.3 State Crisis and Resilience
More informationBusiness Continuity Policy
Business Continuity Policy 1 NHS England INFORMATION READER BOX Directorate Medical Commissioning Operations Patients and Information Nursing Trans. & Corp. Ops. Commissioning Strategy Finance Publications
More informationEMERGENCY PREPAREDNESS POLICY
EMERGENCY PREPAREDNESS POLICY CONTROLLED DOCUMENT CATEGORY: CLASSIFICATION: Policy Emergency Planning PURPOSE This document sets out the strategic framework for the management of emergency preparedness
More informationBUSINESS CONTINUITY PLAN 1 DRAFTED BY: INTEGRATED GOVERNANCE MANAGER 2 ACCOUNTABLE DIRECTOR: DIRECTOR OF QUALITY AND SAFETY 3 APPLIES TO: ALL STAFF
BUSINESS CONTINUITY PLAN 1 DRAFTED BY: INTEGRATED GOVERNANCE MANAGER 2 ACCOUNTABLE DIRECTOR: DIRECTOR OF QUALITY AND SAFETY 3 APPLIES TO: ALL STAFF 4 COMMITTEE & DATE APPROVED: GOVERNING BODY, 5 MARCH
More informationUniversity Emergency Management Plan
University Emergency Management Plan This plan has been designed to be consistent with the format of the Emergency Action Plans held by the departments and buildings of the University. This will enable
More informationSimple Tabletop Exercise, Interdependency Natural Disaster Scenario Scenario #8 Facilitator s Guide
Simple Tabletop Exercise, Interdependency Natural Disaster Scenario Scenario #8 Facilitator s Guide Scenario Summary Background: It is March in Zenith City and the residents are experiencing a cold spring.
More informationMeasuring your capabilities in Fleet Safety Management ACC Fleet Saver
Measuring your capabilities in Fleet Safety Management ACC Fleet Saver Audit Standard 29 May 2014 Table of Contents Page 2 1. Getting Started...3 2. Critical element 1: Registered Owner Commitment to Safety
More informationBOSTON MEDFLIGHT HELICOPTER CRASH INCIDENT
I. PURPOSE BOSTON MEDFLIGHT HELICOPTER CRASH INCIDENT To provide guidance and procedures for emergency response to a Boston MedFlight helicopter crash at Boston University Medical Center. II. SITUATION
More informationPilot Nursing Home Emergency Management Assessment Tool
Pilot Nursing Home Emergency Management Assessment Tool Introduction The Pilot Nursing Home Emergency Management Project (NHEMP) Assessment Tool, developed by the Primary Care Development Corporation (PCDC),
More informationDRAFT DRADDDDDFT. NHS Commissioning Board Incident Response Plan (National)
DRAFT DRADDDDDFT NHS Commissioning Board Incident Response Plan (National) NHS Commissioning Board Incident Response Plan (National) Date 22 March 2013 Audience Copy NHS Commissioning Board (NHS CB) director
More informationGUIDANCE ON MANDATORY TRAINING FOR PROVIDERS OF CARE IN REGULATED SERVICES
GUIDANCE ON MANDATORY TRAINING FOR PROVIDERS OF CARE IN REGULATED SERVICES 9 TH Floor Riverside Tower 5 Lanyon Place Belfast BT1 3BT Tel: (028) 9051 7500 Fax: (028) 90517501 ISSUE DATE: September 2012
More informationTo support residents living in registered residential care lead an independent, healthy, positive and fulfilling life.
JOB DESCRIPTION: RESPONSIBLE TO: PURPOSE OF POST: Team Leader Care Manager To support residents living in registered residential care lead an independent, healthy, positive and fulfilling life. To deliver
More informationAnnual Emergency and Business Continuity Report 2010/11
Annual Emergency and Business Continuity Report 2010/11 Document Information To report on the Trust Emergency Planning and Business Continuity Management Plan and provide assurance to the Board that Emergency
More informationFood Standards Scotland. Incident Management Plan for Non-routine Incidents.
Food Standards Scotland Incident Management Plan for Non-routine Incidents. May 2015 v 1.0 DOCUMENT CONTROL This Food Standards Scotland (FSS) Incident Management Plan, and its associated internally held
More informationWe are the regulator: Our job is to check whether hospitals, care homes and care services are meeting essential standards.
Inspection Report We are the regulator: Our job is to check whether hospitals, care homes and care services are meeting essential standards. Amvale Medical Transport - Ambulance Station Unit 1D, Birkdale
More informationProcess Safety Management of Highly Hazardous & Explosive Chemicals. Contractor Management & Emergency Planning & Response
Process Safety Management of Highly Hazardous & Explosive Chemicals Contractor Management & Emergency Planning & Response Now That We ve Developed Now That We ve Developed Process Safety Information Process
More informationBrentwood Borough Council Major Incident Plan
Brentwood Borough Council Major Incident Plan Prepared by The Emergency Planning Department June 2012 Prepared by: Luke Lambert Joint Emergency Planning Officer Essex Civil Protection & Emergency Management
More informationBusiness Continuity Policy and Framework and Business Continuity Plan
Oxfordshire Clinical Commissioning Group Business Continuity Policy and Framework and Business Continuity Plan Lead Director: Sula Wiltshire, Director of Quality and Innovation and Emergency Accountable
More informationNHS Central Manchester Clinical Commissioning Group (CCG) Business Continuity Management (BCM) Policy. Version 1.0
NHS Central Manchester Clinical Commissioning Group (CCG) Business Continuity Management (BCM) Policy Version 1.0 Document Control Title: Status: Version: 1.0 Issue date: May 2014 Document owner: (Name,
More informationAssessing the risks to children from domestic violence. No. 7. Policy and practice briefing
No. 7 Policy and practice briefing I feel a lot more confident now going out to visit a family where there is domestic violence. Social worker Assessing the risks to children from domestic violence Julie
More informationRESTRICTED LOCAL RESILIENCE FORUM BOURNEMOUTH DORSET POOLE COMMUNICATIONS PLAN MAJOR TRANSPORT ACCIDENTS PLAN PREPARE RESPOND RECOVER
ED LOCAL RESILIENCE FORUM BOURNEMOUTH DORSET POOLE COMMUNICATIONS PLAN MAJOR TRANSPORT ACCIDENTS PLAN PREPARE RESPOND RECOVER 1. Introduction 1.1 This communications plan supports the ACPO and Dorset Police
More informationDistrict Disaster Risk Management Planning
District Disaster Risk Management Planning GUIDELINES JULY 2007 National Disaster Management Authority 1. Introduction Notifications for establishment of the District Disaster Management Authorities (DDMAs)
More informationAMBULATORY SURGICAL CENTERS (Based upon AHCA Form # 3130-2003 JUL 94)
(Based upon AHCA Form # 3130-2003 JUL 94) The document below is the cross-reference used by Palm Beach County Division of Emergency Management for the annual review and re-certification of your CEMP. Review
More informationMAJOR INCIDENT RESPONSE PLAN
MAJOR INCIDENT RESPONSE PLAN Page 1 of 104 Contents Paragraph Part 1 Forward from the Chief Executive 3 The plan Page 1 Introduction 4 2 Major Incident definitions 7 3 The role of the Acute hospitals 8
More informationBridge Parish Council Community Emergency Plan
BRIDGE Parish Council Caring for the village Bridge Parish Council Community Emergency Plan IF YOU ARE IN IMMEDIATE DANGER CALL 999 October 2014 All enquiries relating to this document should be sent to:
More informationWide Bay Respite Services Supporting the caring role of families. Service Management Policy
Service Management Policy Organisation Structure Flowchart Legislation / Industry Standards Department of Communities, Child Safety & Disability Services (Funding Body) Board of Management Other Agencies
More informationBusiness Continuity Plan
NIPEC/11/25 (replacing NIPEC/11/11) NORTHERN IRELAND PRACTICE AND EDUCATION COUNCIL FOR NURSING AND MIDWIFERY Business Continuity Plan November 2011 Review date: November 2012 Centre House 79 Chichester
More informationArizona Crisis Standards of Care Tabletop Exercise
Arizona Crisis Standards of Care Tabletop Exercise Situation Manual May 19, 2015 This Situation Manual was supported in part by the CDC Cooperative Agreement, Catalog of Federal Domestic Assistance (CFDA)
More informationMENTAL HEALTH AND LEARNING DISABILITY ANNOUNCED INSPECTION. Downe Acute Inpatient Unit. South Eastern Health and Social Care Trust
MENTAL HEALTH AND LEARNING DISABILITY ANNOUNCED INSPECTION Downe Acute Inpatient Unit South Eastern Health and Social Care Trust 9 and 10 May 2012 1 Table of Contents 1.0 Introduction... 3 2.0 Ward Profile...
More informationHow To Prepare For A Bomb Blast
Civil Emergency Planning Plans civils d urgence Project on Minimum Standards and Non-Binding Guidelines for First Responders Regarding Planning, Training, Procedure and Equipment for Chemical, Biological,
More informationWanneroo/Joondalup Local Emergency Management Committee Terms of Reference
Attachment 1 Wanneroo/Joondalup Local Emergency Management Committee Terms of Reference The terms of reference for the Wanneroo/Joondalup Local Emergency Management Committee (LEMC) outline the general
More information