1 1 Business Continuity Exercise: Electricity Supply Failure Appendix 4.4
2 2 Housekeeping Fire safety Breaks and refreshments Toilets Mobiles and pagers
3 3 Introduction Respect each others contributions What s said in the room stays in the room
4 Course Objectives To test the business continuity arrangements in your work place To identify any shortfalls in the existing business continuity arrangements To implement improvements from the lessons identified 4
5 Business Continuity Business impact analysis & risk assessment Exercising & Testing Operational planning & control Business Continuity Strategy 5 Establish & implement BC procedures
6 6 Exercise Groups Nominate one person to be the scribe Decide how you are going to deliver the feedback at the end of each session
7 Exercise Background An organisation can be affected by a loss of electrical supply for a number of reasons, some of them internal (for example, on-site fire or flood) some external (e.g. damage to the mains supply by public works) 7
8 Exercise Scenario - Day hrs There is a sudden loss of power affecting a block used for the care and treatment of patients The back-up generator comes into operation but fails after about ten minutes 150 patients are affected 8
9 Question What is the impact of this disruption? Please describe including the impact on any equipment used for the care, treatment and diagnosis of patients, and the impact on those patients; the impact on communications and IT; What immediate action must be taken to ensure the safety and welfare of staff and patients? 9
10 Inject 1 Day hrs The estates and facilities (E&F) team have established that the original problem was caused by a contractor working on a major building site next to your site and has damaged one of the feeds to your organisation The contractor has so far been unable to offer a time when services will be restored, as the equipment needed to effect a repair is not immediately available Members of the E&F team are working to re-start the generator but have not yet identified the problem 10
11 Question What is the Maximum Tolerable Period of Disruption? What is the Recovery Time Objective? 11
12 Inject 2 Day Power has still not been restored The contractor has obtained the equipment and material needed to effect a repair, and estimates power will be restored by 1900hrs The E&F team have not yet been able to re-start the generator 12
13 Question What action should be taken to ensure that disruption to services is kept to a minimum? To what extent do existing plans anticipate and deal with such a situation? 13
14 Inject 3 Day hrs The E&F team have established the cause of the generator failure but do not have the necessary spare parts on site to effect a repair They have arranged an emergency delivery of the spares by courier from a supplier but the spares will not arrive until 1830hrs It is estimated that repairs will be completed by 1930hrs 14
15 Question What further action (if any) could be taken at ward level to minimise disruption to patient care? 15
16 Question What actions might be taken following such an incident in order to: a) Reduce the risk of such an incident occurring in future? b) Ensure that the impact of any similar incident in future is minimised? 16
17 Question Communication plan Who will need to be communicated with? During the incident During the recovery After the incident 17
18 Lessons Identified From the exercise today in your groups discuss and create a list in your workbook a list of lessons that you have identified today that you need to consider when you review your plan 18
19 Course Objectives To test the business continuity arrangements in your work place To identify any shortfalls in the existing business continuity arrangements To implement improvements from the lessons identified 19
20 20 Questions
21 21 Evaluation
Business Continuity Exercise: IT Service Failure Appendix 4.5
1 Business Continuity Exercise: IT Service Failure Appendix 4.5 2 Housekeeping Fire safety Breaks and refreshments Toilets Mobiles and pagers 3 Introduction Respect each others contributions What s said
More informationBusiness Continuity Exercise: Denial of Access Primary Care and Pharmacies Appendix 4.3
1 Business Continuity Exercise: Denial of Access Primary Care and Pharmacies Appendix 4.3 2 Housekeeping Fire safety Breaks and refreshments Toilets Mobiles and pagers 3 Introduction Respect each others
More informationBusiness Continuity: NHS Workshop Appendix 1.1
1 Business Continuity: NHS Workshop Appendix 1.1 2 Housekeeping Fire safety Breaks and refreshments Toilets Mobiles and pagers 3 Introduction Respect each others contributions What is said in the room
More informationBUSINESS CONTINUITY ASSESSMENT CHECKLIST
BUSINESS CONTINUITY ASSESSMENT CHECKLIST This assessment checklist will help you put your business continuity plan together. The assessment has been split into sections for ease of reference. Document
More informationSOMERSET COUNTY COUNCIL [NAME OF SETTING] BUSINESS CONTINUITY PLAN TEMPLATE
SOMERSET COUNTY COUNCIL [NAME OF SETTING] BUSINESS CONTINUITY PLAN TEMPLATE 2013 Setting Name Author Date Completed Date to be Reviewed Version Page 1 of 18 Update Log VERSION NO. DATE BY WHOM ACTION Any
More informationBusiness Continuity Plan Template
Business Continuity Plan Template Disclaimer This publication has been produced to provide a guide for people anticipating going into business and for business owners. It should not be regarded as an
More informationDisaster Recovery. Policy - External
Disaster Recovery Policy - External Disaster Recovery Policy Modified by: Rob Wray, IT and Development Manager November 2008 Approved by: Alan Matthews, Managing Director Georgia Cogdon, Executive Assistant
More informationIt may also include denial of use of property, plant and equipment or the inability of employees to attend their place of work.
INTRODUCTION Business resilience (or continuity) is the process of planning and responding to incidents and disruptions in order to continue the delivery of services at an acceptable level. Business continuity
More informationHow To Manage A Business Continuity Strategy
Business continuity strategy 2009 2012 Table of contents 1 Why this strategy is needed 3 2 Aim of the strategy 4 3 Our approach to business continuity 4 PROCESS 4 STRUCTURE 5 DOCUMENTATION 6 DISRUPTION
More informationDATA RECOVERY SOLUTIONS EXPERT DATA RECOVERY SOLUTIONS FOR ALL DATA LOSS SCENARIOS.
More information
BUSINESS CONTINUITY POLICY RM03
BUSINESS CONTINUITY POLICY RM03 Applies to: All NHS LA employees, contractors, secondees and consultants, contractors and/or any other parties who will carry out duties on behalf of the NHS LA Version:
More informationBusiness Continuity Plan
Business Continuity Plan IMMEDIATE ACTIONS Manager/Supervisor 1. Ensure emergency services contacted 2. Ensure safety of personnel 3. Co-ordinate with the emergency services 4. Contact Senior members of
More informationEPRR: Toolkit Facilitator Guide
NHS England Business Continuity Management EPRR: Toolkit Facilitator Guide APPENDIX 1 1 [Intentionally Blank] INTRODUCTION The document has been designed to assist you to deliver the outcomes of the workshop
More informationAUDIT GUIDELINES FOR SCHOOL DISASTER RECOVERY PLANNING
AUDIT GUIDELINES FOR SCHOOL DISASTER RECOVERY PLANNING Introduction It has become increasingly common for schools to place a great deal of reliance upon PC s and computer systems to manage and operate
More informationbusiness continuity plan for:
business continuity plan for: Insert your company name here Our statement of Business Continuity is: > To ensure all employees are competent to do their tasks, and to provide adequate training > To review
More informationBusiness Continuity Policy and Business Continuity Management System
Business Continuity Policy and Business Continuity Management System Summary: This policy sets out the structure for ensuring that the PCT has effective Business Continuity Plans in place in order to maintain
More informationPOLICY. 1) Business Continuity Management 2) Disaster Recovery 3) Critical Incident Management 4) Risk Management
POLICY Policy Title: Management Descriptors: 1) Management 2) Disaster Recovery 3) Critical Incident Management 4) Risk Management Category: Risk Management Intent Organisational Scope Definitions Policy
More informationScenario 1 ~ Water Damage. Phase 1
Phase 1 On Friday evening, after you have locked up and gone home for the evening, an internal pipe running between the suspended ceiling and the floor of a flat above bursts. You arrive at your business
More informationBUSINESS CONTINUITY PLAN
Business Logo Here BUSINESS CONTINUITY PLAN FOR SMALL TO MEDIUM SIZED BUSINESSES DATE :??? VERSION:?? PRODUCED BY DURHAM CIVIL CONTINGENCIES UNIT BUSINESS CONTINUITY PLAN LIST OF CONTENTS 1. DISCLAIMER...4
More informationBusiness Continuity Planning
Business Continuity Planning We believe all organisations recognise the importance of having a Business Continuity Plan, however we understand that it can be difficult to know where to start. That s why
More informationAPPENDIX 1 PRODUCT SPECIFICATION
APPENDIX 1 PRODUCT SPECIFICATION Product Specifications Voice System Maintenance Service 1. Introduction This document contains information describing the Voice System Maintenance Service. This document
More informationSCHOOLS BUSINESS CONTINUITY PLANNING GUIDANCE
SCHOOLS BUSINESS CONTINUITY PLANNING GUIDANCE This guidance is to be used as a tool to support you in your business continuity planning and aligns to the schools business continuity plan template provided.
More informationBUSINESS CONTINUITY PLAN
BUSINESS CONTINUITY PLAN [Name of Team/Service/Organisation] [Insert Building Name and Address] [Insert date] Detailing arrangements for: Incident Management Business Continuity Recovery and Resumption
More informationBusiness Continuity Management For Small to Medium-Sized Businesses
Business Continuity Management For Small to Medium-Sized Businesses Produced by NORMIT and Norfolk County Council Resilience Team For an electronic copy of this document visit www.normit.org Telephone
More informationNHS Lancashire North CCG Business Continuity Management Policy and Plan
Agenda Item 12.0. NHS Lancashire North CCG Business Continuity Management Policy and Plan Version 2 Page 1 of 25 Version Control Version Reason for update 1.0 Draft for consideration by Executive Committee
More informationLeicester City Council Schools Business Continuity Incident Management Plan
Leicester City Council Schools Business Continuity Incident Management Plan GLEBELANDS PRIMARY SCHOOL CHANCEL ROAD LEICESTER LE4 2WF OII6 234 0010 office@glebelands.leicester.sch.uk -! 2 - UPATED 31 March
More informationWEST SOMERSET COLLEGE CONTINGENCY & BUSINESS CONTINUITY PLAN
WEST SOMERSET COLLEGE CONTINGENCY & BUSINESS CONTINUITY PLAN is committed to safeguarding and promoting the welfare of children and young people and expects all staff and volunteers to share this commitment.
More informationNOT PROTECTIVELY MARKED BUSINESS CONTINUITY. Specialist Operations Contingency Planning Business Continuity Manager 17.09.12
POLICY BUSINESS CONTINUITY Policy owners Policy holder Author Head of Services Specialist Operations Contingency Planning Business Continuity Manager Policy No. 132 Approved by Legal Services 17.09.12
More informationOadby and Wigston Borough Council. Information and Communications Technology (I.C.T.) Section
Appendix 1 Oadby and Wigston Borough Council Information and Communications Technology (I.C.T.) Section Information Communication Technology Contingency and Disaster Recovery Plan Version 0.1 10/04/09
More informationDocument Details. 247Time Backup & Disaster Recovery Plan. Author: Document Tracking. Page 1 of 12
Document Details Title: Author: 247Time Backup & Disaster Recovery Plan Document Tracking Page 1 of 12 TABLE OF CONTENTS 1 INTRODUCTION... 3 1.1 OVERVIEW... 3 1.2 DEFINED REQUIREMENT... 3 2 DISASTER OVERVIEW...
More informationEach section has handy hints and advice on completing your plan along with links to further information which you can download and print.
Information on business continuity plans for businesses with 10 or fewer employees You will find that it is quick, easy and inexpensive to create a business continuity plan. This is a basic five-step guide
More informationBusiness Continuity Guidance for Suppliers & Contractors. Blackburn with Darwen Borough Council
Business Continuity Guidance for Suppliers & Contractors For further information please contact: Rachel Hutchinson Civil Contingencies Manager Blackburn with Darwen Borough Council Contents 1. Introduction...
More informationBusiness Continuity Management Policy and Plan
Business Continuity Management Policy and Plan 1 Page No: Contents 1.0 Introduction 3 2.0 Purpose 3 3.0 Definitions 4 4.0 Roles, Duties & Responsibilities 4 4.1 Legal And Statutory Duties, Responsibilities
More informationUniversity of Sunderland Business Assurance Information Security Policy
University of Sunderland Business Assurance Information Security Policy Document Classification: Public Policy Reference Central Register Policy Reference Faculty / Service IG 003 Policy Owner Assistant
More information1.0 Policy Statement / Intentions (FOIA - Open)
Force Policy & Procedure Reference Number Business Continuity Management D269 Policy Version Date 23 July 2015 Review Date 23 July 2016 Policy Ownership Portfolio Holder Links or overlaps with other policies
More informationBUSINESS CONTINUITY PLAN
Business Logo or Name here BUSINESS CONTINUITY PLAN FOR PERSONAL CARE PROVIDERS TEMPLATE PREPARED BY DEVON COUNTY COUNCIL EMERGENCY PLANNING SERVICE BUSINESS CONTINUITY PLAN LIST OF CONTENTS 1. DISCLAIMER...
More informationBUSINESS CONTINUITY MANAGEMENT POLICY
BUSINESS CONTINUITY MANAGEMENT POLICY A GUIDE TO BUSINESS CONTINUITY AND SERVICE RECOVERY PLANNING Version 1.1 Ratified by BHR CCGs Governing Bodies Date ratified September 2013 Name of Director Lead Marie
More informationICT Disaster Recovery Plan
7 Appendix A ICT Disaster Recovery Plan Definition of a Disaster A computer disaster is the occurrence of any computer system or associated event which causes the interruption of business, leading in the
More informationHow To Manage A Disruption Event
BUSINESS CONTINUITY FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Manager Organisational
More informationBus incident management planning: Guidelines
Bus incident management planning: Guidelines What is incident management planning? Incident management planning is everything your business does to prepare for potential disruptive or damaging incidents.
More informationUnit Guide to Business Continuity/Resumption Planning
Unit Guide to Business Continuity/Resumption Planning (February 2009) Revised June 2011 Executive Summary... 3 Purpose and Scope for a Unit Business Continuity Plan(BCP)... 3 Resumption Planning... 4 Assumptions
More informationBUSINESS CONTINUITY PLAN (TEMPLATE)
Appendix J BUSINESS CONTINUITY PLAN (TEMPLATE) (Michigan Healthcare Professionals, PC: insert text here to include name, logo etc.) Date of Plan: Last updated on: Amendments: please notify (insert name)
More informationEmergency Response and Business Continuity Management Policy
Emergency Response and Business Continuity Management Policy Owner: John Duffy, Registrar & Secretary Last updated: September 2012 Version: 04 Document control Date Version Author Changes To be populated
More informationBusiness continuity plan
Business continuity plan CONTENTS INTRODUCTION 2 - Scope - Components BUSINESS IMPACT ANALYSIS 3 - Business Affairs - Information Technology RISK ASSESSMENT 5 - Broad Categories of Hazards - Hazard Table
More informationMastering Disaster A DATA CENTER CHECKLIST
Mastering Disaster A DATA CENTER CHECKLIST Disaster Doesn t Sleep It s not always a hurricane or a power grid failure that causes businesses to lose their data. More often than not, an isolated event like
More informationNORTH HAMPSHIRE CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY MANAGEMENT POLICY AND PLAN (COR/017/V1.00)
NORTH HAMPSHIRE CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY MANAGEMENT POLICY AND PLAN (COR/017/V1.00) Subject and version number of document: Serial Number: Business Continuity Management Policy
More informationBusiness Continuity Policy
Business Continuity Policy St Mary Magdalene Academy V1.0 / September 2014 Document Control Document Details Document Title Document Type Business Continuity Policy Policy Version 2.0 Effective From 1st
More informationBusiness Continuity (Policy & Procedure)
Business Continuity (Policy & Procedure) Publication Scheme Y/N Can be published on Force Website Department of Origin Force Operations Policy Holder Ch Supt Head of Force Ops Author Business Continuity
More informationIt s the Business! Business continuity considerations for all organisations
It s the Business! Business continuity considerations for all organisations It ll never happen to me That s what they all say isn t it? But it happens a lot more than you d think. Statistics show that
More informationCOMCARE BUSINESS CONTINUITY MANAGEMENT
COMCARE BUSINESS CONTINUITY MANAGEMENT Title Business Continuity Management Version 2.1 Authorised by Executive Committee Effective date Authorisation date 10/7/2012 10/7/2012 COMCARE BUSINESS CONTINUITY
More informationEmergency Planning and Business Continuity Policy
Nottingham University Academy of Science and Technology Emergency Planning and Business Continuity Policy Responsible officer: Vice Principal Curriculum & Quality Date approved: 15/07/2014 Review date:
More informationSouth Norfolk Council Business Continuity Policy
South Norfolk Council Business Continuity Policy 1 Title: Business Continuity Policy Date of Publication: TBC Version: 2 Published by: Emergency Planning Team Review date: April 2014 Document Owner: Document
More informationCouncil Policy Business Continuity Management
Policy Name: Business Continuity Management Council Policy Business Continuity Management ADOPTED BY COUNCIL: 19 th April 2016 DATE OF NEXT REVIEW: 18 th April 2020 RESPONSIBLE OFFICER: REFERENCES: Chief
More informationTalentLink Disaster Recovery & Service Continuity
Technical Services Briefing Document TalentLink Disaster Recovery & Service Continuity Version 1.2 (January 2012) Contents Overview Planning for Service Continuity Disaster Recovery Process Business Continuity
More informationBusiness Continuity Management
Business Continuity Management Version 1 approved by SMG December 2013 Business Continuity Policy Version 1 1 of 9 Business Continuity Management Summary description: This document provides the rationale
More informationAttachment #2. BUSINESS CONTINUITY PLAN Plan Development Guidelines
Version 2 May 2004 TABLE OF CONTENTS PURPOSE OF DOCUMENT... 2 ASSOCIATION RULE REQUIREMENT BY-LAW NO. 17.19.... ERROR! BOOKMARK NOT DEFINED. GUIDELINES FOR NING... 2 SCOPE OF THE PLAN... 2 GOVERNANCE AND
More informationBusiness Continuity Management & Disaster Recovery GETTING STARTED Checklist for Local Businesses & Organisations
Business Continuity Management & Disaster Recovery GETTING STARTED Checklist for Local Businesses & Organisations Name of Organisation: Date: This Document has been designed to assist local businesses
More informationBusiness Continuity Plan
NIPEC/11/25 (replacing NIPEC/11/11) NORTHERN IRELAND PRACTICE AND EDUCATION COUNCIL FOR NURSING AND MIDWIFERY Business Continuity Plan November 2011 Review date: November 2012 Centre House 79 Chichester
More informationNHS 24 - Business Continuity Strategy
NHS 24 - Strategy Version: 0.3 Issue Date: 20/09/2005 Status: Issued for Board Approval Status: draft Page 1 of 13 Table of Contents 1 INTRODUCTION...3 2 PURPOSE...3 3 SCOPE...3 4 ASSUMPTIONS...4 5 BUSINESS
More informationFULLY MANAGED SERVICE COMPLETE SUPPORT FOR YOUR MOBILE ENTERPRISE
FULLY MANAGED SERVICE COMPLETE SUPPORT FOR YOUR MOBILE ENTERPRISE At Spirit, we realise that our customers are looking for choice, flexibility and value. That s why we have developed our special Fully
More informationLondon Borough of Merton
London Borough of Merton STRATEGIC BUSINESS CONTINUITY PLAN April 2014 Distribution List: Name Ged Curran Caroline Holland Yvette Stanley Simon Williams Chris Lee Title Chief Executive Director of Corporate
More informationBusiness Continuity Business Continuity Management Policy
Business Continuity Business Continuity Management Policy : Date of Issue: 28 January 2009 Version no: 1.1 Review Date: January 2010 Document Owner: Patricia Hughes Document Authoriser: Tony Curtis 1 Version
More informationBusiness Continuity Plan Guidance and Template to support Small Businesses
Business Continuity Plan Guidance and Template to support Small Businesses Disclaimer This template and guidance is provided as general information about Business Continuity Planning. It is not intended
More informationReady for Anything BUSINESS CONTINUITY GUIDE FOR BUSINESS OWNERS. Plan to Stay in Business
BUSINESS CONTINUITY GUIDE FOR BUSINESS OWNERS Administration, Louisiana Economic Development and participating universities. All opinions, conclusions or recommendations expressed are those of the author(s)
More informationBUSINESS CONTINUITY PLAN
Business Logo or Name here BUSINESS CONTINUITY PLAN FOR RESIDENTIAL CARE HOMES PRODUCED BY DURHAM CIVIL CONTINGENCIES UNIT BUSINESS CONTINUITY PLAN LIST OF CONTENTS 1. DISCLAIMER...4 2. AIM...4 3. BUSINESS
More informationBusiness Continuity Management Policy and Plan
Business Continuity Management Policy and Plan Version No Author Date of Update 0.3 Allan Jude and Charmaine Grundy 05/06/2015 1 P a g e Contents Contents... 2 1. Introduction... 3 2. Purpose... 4 3. Definitions...
More informationBusiness Unit CONTINGENCY PLAN
Contingency Plan Template Business Unit CONTINGENCY PLAN Version 1.0 (Date submitted) Submitted By: Business Unit Date Version 1.0 Page 1 1 Plan Review and Updates... 3 2 Introduction... 3 2.1 Purpose...
More information[INSERT NAME OF SCHOOL] BUSINESS CONTINUITY PLAN
Plan Ref No: [INSERT NAME OF SCHOOL] BUSINESS CONTINUITY PLAN PLAN DETAILS Date Written Plan Owner Plan Writer Version Number Review Schedule 6 monthly Annually Date of Plan Review Date of Plan Exercise
More informationwould your business stay afloat?
would your business stay afloat? A guide to preparing your business for flooding Environment Agency A guide to preparing your business for flooding 0 Flooding is the most common and widespread natural
More informationBUSINESS CONTINUITY PLAN 1 DRAFTED BY: INTEGRATED GOVERNANCE MANAGER 2 ACCOUNTABLE DIRECTOR: DIRECTOR OF QUALITY AND SAFETY 3 APPLIES TO: ALL STAFF
BUSINESS CONTINUITY PLAN 1 DRAFTED BY: INTEGRATED GOVERNANCE MANAGER 2 ACCOUNTABLE DIRECTOR: DIRECTOR OF QUALITY AND SAFETY 3 APPLIES TO: ALL STAFF 4 COMMITTEE & DATE APPROVED: GOVERNING BODY, 5 MARCH
More informationBT Conferencing Business Continuity Management. Planning to stay in business
BT Conferencing Business Continuity Management Planning to stay in business Planning for the unexpected In today s connected world, businesses are increasingly dependent on their communications and networked
More informationVICTOR KHANYE LOCAL MUNICIPALITY PLAASLIKE MUNISIPALITEIT. ICT Business Continuity Plan. DRAFT v0.1 Page 1 of 9
VICTOR KHANYE LOCAL MUNICIPALITY PLAASLIKE MUNISIPALITEIT ICT Business Continuity Plan Policy Number: Approved by Council: Resolution No: Review Date: DRAFT v0.1 Page 1 of 9 Contents 1 Purpose, scope and
More informationDisaster Recovery Plan
Disaster Recovery Plan This guide sets forth items to consider in the review of the firm s disaster recovery plan. You should form a committee to assess the plan and should assign activities under the
More informationEmergency Management Plan
Page 1 of 15 Emergency Management Plan Section 1 Arrangements Revision 4 - March 2016 Page 2 of 15 Contents 1.0 ARRANGEMENTS 1.1 Introduction 1.2 Purpose & Scope 1.3 University Location & Population 1.4
More informationDERBYSHIRE COUNTY COUNCIL BUSINESS CONTINUITY POLICY
DERBYSHIRE COUNTY COUNCIL BUSINESS CONTINUITY POLICY VERSION 1.0 ISSUED JULY 2015 CONTENTS Page CONTENTS VERSION CONTROL FOREWORD i ii iii POLICY 1 Scope 1 Aim and Objectives 1 Methods and Standards 1
More information85-01-55 Overview of Business Continuity Planning Sally Meglathery Payoff
85-01-55 Overview of Business Continuity Planning Sally Meglathery Payoff Because a business continuity plan affects all functional units within the organization, each functional unit must participate
More informationBUSINESS CONTINUITY PLAN and. DISASTER RECOVERY PLAN for
BUSINESS CONTINUITY PLAN and DISASTER RECOVERY PLAN for Copyright Protection This AFRA Business Continuity Plan and Disaster recovery Plan, 2011, its variants and updated versions, is a product developed
More informationRisk Management Guidelines
Business Continuity Management Understanding Risk We live in an unpredictable world. No matter how effectively a business protects itself through insurance, there are some risks that cannot be anticipated,
More informationBUSINESS CONTINUITY MANAGEMENT POLICY
BUSINESS CONTINUITY MANAGEMENT POLICY AUTHORISED BY: DATE: Andy Buck Chief Executive March 2011 Ratifying Committee: NHS Rotherham Board Date Agreed: Issue No: NEXT REVIEW DATE: 2013 1 Lead Director John
More informationSCHEDULE 25. Business Continuity
SCHEDULE 25 Business Continuity 1. Scope 1.1 This schedule covers TfL s requirements in respect of: any circumstance or event which renders, or which TfL considers likely to render, it necessary or desirable
More informationA risky business. Why you can t afford to gamble on the resilience of business-critical infrastructure
A risky business Why you can t afford to gamble on the resilience of business-critical infrastructure Banking on a computer system that never fails? Recent failures in the retail banking system show how
More informationBUSINESS CONTINUITY STRATEGY
BUSINESS CONTINUITY STRATEGY January 2009 CONTENTS Page BACKGROUND 1 OVERVIEW 1 AIM AND OBJECTIVES 1 CORE BUSINESS OF THE COUNCIL 2 ORGANISATION STRUCTURE 2 RISK IDENTIFICATION AND MITIGATION STRATEGIES
More informationBUSINESS CONTINUITY MANAGEMENT PLAN
BUSINESS CONTINUITY MANAGEMENT PLAN For Thistley Hough Academy Detailing arrangements for Recovery and Resumption of Normal Academy Activity Table of Contents Section Content 1.0 About this Plan 1.1 Document
More informationBusiness Continuity Policy & Plans
Agenda Item 8.3a SNCCG Governing Body 11.03.2014 Business Continuity Policy & Plans Ref Number: Version: 1 Status: Pending Approval Author: A Brown Approval body Governing Body Date Approved Date Issued
More informationNHS Durham Dales, Easington and Sedgefield Clinical Commissioning Group. Business Continuity Plan
NHS Durham Dales, Easington and Sedgefield Clinical Commissioning Group Business Continuity Plan Page 1 Review To be done annually Author Chief Operating Officer Reviewer Head of Corporate Services Version
More informationLondon Local Authorities Business Continuity Guidance for Suppliers & Contractors
London Local Authorities Business Continuity Guidance for Suppliers & Contractors This document has been produced by the LAP-IG Supply Chain Resilience Sub Group. For further information please contact:
More informationService Description Document Control Service Description Documentation Approval Service Description Document Reviews
Service Description Document Control Title Service Descriptions for Desktop Support Status Final Version 1 Distribution List Service Description Documentation Approval Created by Lachlan Pollock Date 27/06/11
More informationSCADA Business Continuity and Disaster Recovery. Presented By: William Biehl, P.E. 913-601-0104 (mobile) Bill.Biehl@we-inc.com
SCADA Business Continuity and Disaster Recovery Presented By: William Biehl, P.E. 913-601-0104 (mobile) Bill.Biehl@we-inc.com Business Continuity Planning, a Sound Process A Business Continuity Plan: "A
More informationBUSINESS CONTINUITY PLANNING
BUSINESS CONTINUITY PLANNING INDEX Description Page Index 1 Template 1 - Plan Version Control 2 Background 3 Purpose of Business Continuity Plan 3 Roles and Responsibilities 3 Complimentary Links 4 Service/
More informationBUSINESS CONTINUITY PLAN
How to Develop a BUSINESS CONTINUITY PLAN To print to A4, print at 75%. TABLE OF CONTENTS SUMMARY SUMMARY WHAT IS A BUSINESS CONTINUITY PLAN? CHAPTER PREPARING TO WRITE YOUR BUSINESS CONTINUITY PLAN CHAPTER
More informationBNA FEDERAL CREDIT UNION DISASTER RECOVERY PLAN
BNA FEDERAL CREDIT UNION DISASTER RECOVERY PLAN INTRODUCTION The need for a contingency plan for business interruptions is vital to the operations of the BNA Federal Credit Union. Without such a plan,
More informationDisaster Recovery and Business Continuity What Every Executive Needs to Know
Disaster Recovery and Business Continuity What Every Executive Needs to Know Bruce Campbell & Sandra Evans Contents Why you need DR and BC What constitutes a Disaster? The difference between disaster recovery
More informationSimple Tabletop Exercise, Interdependency Natural Disaster Scenario Scenario #8 Facilitator s Guide
Simple Tabletop Exercise, Interdependency Natural Disaster Scenario Scenario #8 Facilitator s Guide Scenario Summary Background: It is March in Zenith City and the residents are experiencing a cold spring.
More informationINFORMATION ASSURANCE
Service Definition Thomson Reuters Legal Matter Management service (Serengeti Tracker) is the highest rated legal matter management, e-billing and analytics system designed for inhouse legal departments.
More informationEENA Operations Document. Contingency Plans. Status of the document: Draft For comments Approved. EENA Operations Document Contingency Plans
EENA Operations Document Contingency Plans Title: Contingency Plans Version: 1.0 Code: 3.2.2 Contingency Plans Revision Date: 02-12-2013 Status of the document: Draft For comments Approved 1 Contributors
More informationThe Business of Continuity
The Business of Continuity The loss of, or serious disruption to, any critical process, function or system can have a significant impact on an organisation; in some cases threatening its very survival.
More informationUniversity of Glasgow. Business Continuity Management. Guidance Notes
University of Glasgow Business Continuity Management Guidance Notes 1 Contents Page 1 Introduction to Business Continuity Management 3 2 Roles and Responsibilities 4 3 Business Impact Analysis 5 4 Developing
More informationEmergency Recovery. Corporate Business Continuity Plan
` Emergency Recovery Corporate Business Continuity Plan Section Summary: This document is for use when an incident or emergency affects our ability to provide a normal service to our partner responders
More informationBUSINESS CONTINUITY PLAN
BUSINESS CONTINUITY PLAN A GUIDE TO PREPARING A PLAN FOR SMALL TO MEDIUM SIZED BUSINESSES PREPARED BY DEVON COUNTY COUNCIL EMERGENCY PLANNING SERVICE CONTENTS 1. DISCLAIMER...3 2. BACKGROUND...3 3. METHODOLOGY...3
More informationPublish Date: 30/06/14 Version: 1.2
Publish Date: 30/06/14 Version: 1.2 Page: 1 Contents 1. Scope 3 2. Service Definitions 3 3. Service Provision 3 4. Optional Service Provision Features 4 5. Hardware RMA Process 4 6. Supported Coverage