An Enhanced Critical Path Method for Multiple Resource Constraints
|
|
|
- Muriel Curtis
- 9 years ago
- Views:
Transcription
1 An Enhaned Critial Path Method for Multiple Resoure Constraints Chang-Pin Lin, Hung-Lin Tai, and Shih-Yan Hu Abstrat Traditional Critial Path Method onsiders only logial dependenies between related ativities that may have to share ommon resoures. The method has then been expanded to allow for the identifiation of resoure-onstrained ativities and the size of those resoures. They are usually alled ativity-based resoure assignments and leveling. However, one the number of resoures inreases, it beomes more and more diffiult to draw the orresponding graph/network and explore the resoure- onstrained ritial path. Therefore, in order to solve a multiple-resoure-onstrained projet, the Petri Nets theory is introdued for modeling those resoure sharing proesses. Beause Petri nets is ommonly used for modeling the dynami behavior of disrete systems, it is intended in this researh to apply Petri net theory in modeling and analyzing ompliated projets with multiple resoure onstraints. Furthermore, analysis on the size of eah resoure for performane enhanement an then be done by hanging the numbers of tokens in eah of the resoure plaes that were added for resoure onstraints. Cost analysis has to be reonsidered sine the additions of resoures onstraints will alter the original shedule of eah ativities and inrease the duration of the projet. Ativity rashing may have to be done that shifts more resoures towards required ativity and results in dereased projet duration. I. INTRODUCTION URRENTLY for the design and management of omplex Cprojets, Critial Path Method (CPM) and Program Evaluation and Review Tehnique (PERT) are the two most ommonly used tools. CPM and PERT an be used with all kinds of projets, inluding manufaturing, onstrution, software development, researh projets, produt development, engineering, and plant maintenane, among others. Any projet with interdependent ativities an apply these methods of mathematial analysis. The original CPM onsidered only logial dependenies between related ativities that may have to share ommon resoures. The method has then been expanded to allow for the identifiation of resoure-onstrained ativities and the size of those resoures. They are usually defined through proesses alled ativity-based resoure assignments and resoure leveling. A resoure-leveled shedule may inlude delays due to resoure bottleneks and may ause a previously shorter path to beome the longest or the "ritial" path. Manusript reeived August 30, This work was supported in part by the National Siene Counil under Grant NSC E C. P. Lin is with the National Taiwan Oean University, Keelung, TAIWAN (phone: ext.3243; fax: ; [email protected]). H. L. Tai is with the National Taiwan Oean University, Keelung, TAIWAN ( @mail.ntou.edu.tw). S. Y, Hu is with the National Taiwan Oean University, Keelung, TAIWAN ( @mail.ntou.edu.tw). In Kelley and Walker [1], a large engineering projet involves almost all the engineering and raft skills as well as the funtions represented by researh, development, design, prourement, onstrution, vendors, fabriators and the ustomer. Management must devise plans whih will tell with as muh auray as possible how the efforts of the people representing these funtions should be direted toward the projet's ompletion.[2] However, one the size of eah resoure inrease, it beomes more and more diffiult to draw a graph/network and explore the resoure-onstrained ritial path. Therefore, in order to solve a omplex resoure-onstrained projet, the Petri Nets (PN) theory is then introdued for modeling and analysis. Beause Petri nets is ommonly used for modeling the dynami behavior of disrete systems, it is intended in this researh to apply Petri net theory in modeling and analyze large resoure-onstrained projets. Peterson[3], [4] has developed properties, onepts, and tehniques of Petri nets for a searh of natural, simple, and powerful methods in desribing and analyzing the flow of information and ontrol in systems, partiularly systems that may exhibit asynhronous and onurrent ativities. The major use of Petri nets has been the modeling of systems of events in whih it is possible for some events to our onurrently but there are onstraints on the onurrene, preedene, or frequeny of these ourrenes.[5], [6] A.G. Colombo and A. Saiz de Bustamante [7] have defined Timed PN (TPN) as a marked PN in whih a set of speifiations are provided and a set of rules are defined suh that to eah legal exeution sequene, a timed exeution sequene an be univoally assoiated.[8] Time is represented as a state of the system. Beause the number of different shedules grows very quikly with the number of mahines as well as the length of the shedule, olored Petri nets were proposed by Zuberek [9] as a uniform representation of entire lasses of shedules. Verifiation of real-time systems is a tough problem: time, unertainty, omplex synhronizations, preemptive sheduler, distribution. [10]-[13] Kumar and Ganesh [14] have presented oversights that may be due to the inadequay of the traditional models to represent these fators effetively. The later models suh as venture (V)ERT, graphial (G)ERT, ontrolled ativity networks, and tools like time/ost tradeoff urves and influene matrix approahes also are not apable of inorporating these fators. In ontrast, Petri nets an inorporate these fators and thus provide a powerful methodology for resoure alloation in projets. In the ontext of researh by Chetty and Reddy [15], the benefits of PNs were presented. Extensions to PNs were
2 proposed to suit this area of appliation. The use of a P-matrix for token movements was proposed. Chang-Pin Lin and MuDer Jeng [16] have developed unique methodology in performing integration at today s manufaturing environment by reating a ommon, modular, flexible, and integrated objet model that unifies an advaned objet-oriented arhiteture onept and heterogeneous manufaturing appliation development in an open and multi-supplier manufaturing environment. In Pantouvakis and Manoliadis [17], leveling generally onsists of two stages: The first one performs projet sheduling without imposing resoure onstraints. Early/late start and finish dates with ativity floats are then alulated. The seond stage attempts to reshedule the ativities of the projet, preferably within their float time, so that the projet an be exeuted with a limited number of resoures and with or without time delay. Penzek and Polrola [18] onsider two main models of real-time systems: Petri nets with time and timed automata. They have defined Petri nets, disuss their time extensions, and provide a definition of time Petri nets. Some work by Didier Lime [19] has been devoted to analytial results of shedulability, giving worst-ase response-time for tasks. Time management in Pedro and Silva [20] is a ritial omponent of workflow-based proess. Important aspets of time management inlude: the planning for the workflow proess exeution on time, estimating workflow exeution duration, avoiding deadline violations, and satisfying all time onstraints speified. Gonzalez del Foyo and Reinaldo Silva [21] apply Time Petri Nets to model the temporal behavior for workflow systems using TINA as a tool to support the verifiations of the ativities deadlines. The proess is based on the onstrution of a unique Timed Graph where verifiation of TCTL formulas is made avoiding the neessity of the onstrution of a Timed Graph for eah formula. Latif Salum [22] presented Timed PNs to model event duration that improves the urrent analysis tehniques and overomes these diffiulties. Ismail, Rashid and Hilo [23] have indiated that a traditional CPM shedule is not realisti sine it assumes unlimited resoures, some of whih are highly limited in pratie. Although traditional RCS an onsider resoure limitations, they do not provide the orret floats and ritial path, as the CPM does. An enhaned projet management methodology has been developed in order to handle multiple limited resoures whih have beome more and more important in ompliated large projets. The existing and newly developed analysis tools for Petri net an be applied to ahieve this goal by onverting CPM network to its orresponding Petri net model in whih the resoure onstraints ould be added into the projet model. One the Petri net model was built, the reahability analysis an be arried out to obtain the optimal resoure sharing sequene whih will ahieve the shortest projet duration with the existing limited resoures. However, the addition of resoure onstraints will inrease the projet duration, it is then neessary to apply ost analysis by inreasing the number of eah resoure type and by rashing the duration of eah ativity. Analysis on the size of eah resoure for performane enhanement an be done by inreasing the numbers of tokens in eah of the resoure plaes being added for resoure onstraints. Corresponding ost analysis should be done to determine the most ost effetive resoure. Ativity rash may have to be determined that is ahieved by shifting more resoures towards the ompletion of that ativity, resulting in dereased time spent and often a redued quality of work, as the premium is set on speed. II. RELATED THEORY A. Critial Path Method CPM is a projet modeling tehnique developed in the late 1950s by Morgan R. Walker of DuPont and James E. Kelley, Jr. of Remington Rand. At about the same time Booz Allen Hamilton and the U.S. Navy have developed the Program Evaluation and Review Tehnique (PERT) whih is very similar to the basis and exeution of the CPM. The essential tehnique for using CPM is to onstrut a model of the projet that inludes the following: 1. A list of all ativities required to omplete the projet, 2. The duration that eah ativity will take to ompletion, and 3. The preedene relationships between all ativities. Using these values, CPM alulates the longest path of planned ativities to the end of the projet, and the earliest and latest that eah ativity an start and finish without making the projet longer. This proess determines whih ativities are "ritial" (i.e., on the longest path) and whih have "total float" (i.e., an be delayed without making the projet longer). In projet management, a ritial path is the sequene of projet network ativities whih add up to the longest overall duration. This determines the shortest time possible to omplete the projet. Any delay of an ativity on the ritial path diretly impats the planned projet ompletion date (i.e. there is no float on the ritial path). A projet an have several, parallel, near ritial paths. An additional parallel path through the network with the total durations shorter than the ritial path is alled a sub-ritial or non-ritial path. Sine projet shedules hange regularly, CPM allows ontinuous monitoring of the shedule, whih allows the projet manager to trak the ritial ativities. In additions, beause it is possible that non-ritial ativities may be delayed beyond their total float, the CPM network will reate a new ritial path and delay projet ompletion. B. Petri Net Theory Petri net theory onsists of a graphial tool for modeling systems dynami behavioral and a set of mathematial theorems to analyze their behavioral and strutural properties. Definition 1: A Petri net is a 5-tuple PN= (N, M o ) = (P, T, I +, I -, M o ), where (1) P={p 1,p 2,, p m } denotes a finite set of plaes, (2) T={t 1,t 2,, t n } denotes a finite set of transitions,
3 (3) P T andp T, (4) I - is the input inidene funtion defined on P T, I + is the output inidene funtion defined on T P, and (I -, I + ) denote the set of ar links between plaes and transitions, (5) p Pt T I pt 0I pt 0 and t Tp P I pt 0I pt 0, (6) M o is a set of token values defined on P and is alled the initial marking. Definition 2: A Petri net graph ontains three basi entities: Cirles represent plaes (onditions), Bars represent transitions (events), and Ars represent input and output inidene funtions. A plae represents one and only one proposition and a transition represents a transformation funtion. Marking is represented by Tokens whih are shown as dots in plaes. Definition 3: Petri net transition firing rule is defined as follows: (1) Transition t j is enabled and ready to be fired if: M(p) I ( p, t j ), p t j (where t j represent the set of all input plaes of t j ). (2) An enabled transition an be fired aording to the ourrene of the atual event on the transition. (3) After fired the transition, I ( p, t j ) tokens are removed from eah of the assoiated input plaes and I ( p, t j ) tokens are added into eah of its orresponding output plaes. Definition 4: A Petri net an be represented in a mathematial form by its inidene matrix C. The inidene matrix C an be represented as in Eq. 1: C mn C C m1 12 m2 where = I - (p i,t j ) and ij 1n mn m1 ij = I + (p i,t j ) 12 m2 1n... mn The mathematial formulation of transforming an initial marking M o into a new marking M by firing a set of enabled transitions is shown as in Eq. 2, M = M o + C y [2] where y is a transition firing vetor. Definition 5: A Petri net graph onsists of 4 basi omponents as: Plae: The input data or signals, data buffer onditions Transition: Aggregation, tasks or ativities Token: Dynami Ar: Diretion or path Timed Petri Net (TPN) is a time extension of the lassial Petri net model that allows for expliit treatment of real-time, whih is assoiated usually with the transition in the net and represents the time intervals to be used in order to fire the respetive transition. By ooperating time variables into Petri nets, timed Petri [1] nets further allow us to derive prodution yle time, identify bottlenek workstations, verify timing onstraints, and so on. They an also be used to obtain prodution rates, throughput, average delays, ritial resoure utilization, reliability measures, and so on when the time variables are random. III. RESEARCH METHODOLOGY The main objetive of researh is to develop a methodology in order to extend the traditional projet management tool for multiple resoure onstrained projets that are the quite ommon in today's projet analysis, espeially in the areas of onstrution management, manufaturing proess planning, and et. Steps in the proposed methodology is presented as follows. Step 1.Apply traditional CPM methodology to draw the projet network, ompute all the basi timely fators, inluding ES, EF, LS, LF, TF, and find the ritial path of the projet network with all the ritial ativities Step 2.In order to onsider multiple resoure onstraints in managing the projet, the CPM network will firstly be onverted into orresponding Petri net by the rules of onversion. Furthermore, the resulting Petri net has to be verified by applying strutural analysis algorithm and the omputation of make span in Timed Petri net. Step 3.Next, the required resoure onstraints should be added into the Petri net whih will then reate one onflit in the net for eah resoure onstraint. Repeat this step for eah of the resoure onstraint. Step 4.Reahability analysis with timely onsideration will be arried out to obtain the best sequene for eah of the onflit in the net. The optimal sequene ombination with the lowest make span of the omplete projet an then be found as the best pratial projet shedule. Step 5. In order to find the atual ritial path of the projet, it is then neessary to onvert the Petri net model bak to the CPM model with the onsiderations of sequene for onflit ativities. One onverted, the CPM network an be reanalyzed to disover the atual ritial path and the assoiated ritial ativities. Step 6. Finally, in order to arry out neessary redutions on the projet make span, the proess to rash ritial ativity one by one based on their limited rashing time has to be done. the ost analysis for ativity rashing will be exeuted to obtain the possible rashing time and its orresponding rashing ost for the projet management, and the results will be quite different from the traditional CPM ost analysis without onsiderations of resoure onstraints. A. Conversion between CPM network and Petri net The onversion rules to transform CPM network into Petri net as shown in Fig. 1 whih inlude : 1. Burst node whih reates several transitions, one for the burst purpose from one plae into multiple plaes, and the others represent the underlying ativities; 2. Merge node whih also reates several transitions, one for the merge purpose from multiple plaes into one plae, and the others represent the underlying
4 ativities. Fig. 2. CPM network of the sample ase. Table I PROJECT DETAILS Ativity Duration Preedene Resoures A 2 - B 3 - C 5 - D 4 B E 4 A F 3 B G 6 CD First, the traditional CPM that does not onsider resoure sharing is applied to ompute and analyze the sample ase projet. The Early Start(ES) Early Finish(EF) Late Start (LS) Late Finish(LF) Total Float(TF) times are omputed through forward and bakward proesses as shown in Table II. The irtial path an then be determined to be B-D-G with ritial ativities of zero TF. Fig. 1. Conversion rules from CPM to Petri Net. B. Representation of resoure onstraints in Petri net model Petri nets inorporate Resoure onstraints for the designated projet by adding resoure plaes into the graph of CPM. The number of eah resoure type an then be represented by the number of tokens in eah of the resoure plaes. The duration of eah ativity is presented by the time onsumption for the transition whih is onverted from the ativity in the orresponding CPM. The resoure sharing is represented by the onneted ars from and to the resoure plae with the transitions that share the same resoure. IV. CASE STUDY For the demonstration purpose, one simple ase was used to present the feasibility of the proposed methodology and the importane of the results for deision making. The projet being shown as in Fig. 2 is a ase whih involve 7 (A, B, C, D, E, F, G) ativities and the required preedene relationships between them. In additions, 2 types of limited resoures are introdued to represent the possible sharing of required resoure among ativities as listed in Table I. Table II PROJECT COMPUTATIONAL RESULTS Ativity ES EF LS LF TF A B C D E F G Existing method for resoure sharing an be applied for single resoure onstraint, suh as, Woodworth s shedule after forward resoure sheduling pass to adjust the shedules of ativities that share the same resoure. Fig. 3 shows the move of shedule due to the resoure sharing among ativities C, D, and E that inreases the total projet duration from 11 days for none resoure onstraint to 12 days for single resoure onstraint. However, one the types of limited resoures used in the projet inrease, it is very diffiult to reshedule the ativities due to the ompliated resoure sharing proesses by the existing resoure leveling methods. The proposed methodology for handling multiple resoure onstraints will then be presented in the following setions. Fig. 3. Resheduling for limited resoure.
5 In order to onsider multiple resoure onstraints in managing the projet, the CPM network will firstly be onverted into orresponding Petri net by the rules of onversion. Furthermore, the resulting Petri net has to be verified by applying strutural analysis algorithm and the omputation of make span in Timed Petri net. Burst node will reate several transitions, one for the burst purpose from one plae into multiple plaes, and the others represent the underlying ativitie. Merge node will also reates several transitions, one for the merge purpose from multiple plaes into one plae, and the others represent the underlying ativities. The onverted Petri net from the CPM in Fig. 2 is shown as in Fig. 4. duration and the ost effetiveness in the inreasing number of resoures. Aordingly, the number of eah resoure an not be higher than the number of ativities (transitions) sharing this type of resoure, otherwise, it beomes no resoure onstraint. In order to show the hanges by inreasing the number of eah resoure type, the reahable markings of the Petri net model is listed in Table III by the exeuting time. P0 T0 P1 s P0 T1 s T0 P4 P3 P2 T4(2) T3(3) T2(2) P1 T1 P7 P6 P5 P16 T6(6) T5 R1 P4 P3 P2 P17 R2 P9 P8 T4(2) T3(3) T2(2) T8(3) T7(6) P7 P6 P5 T6(6) T5 P11 T9 P9 P8 P13 T8(3) T7(6) T10(6) P11 P12 P14 P10 T9 T11 P13 P15 T10(6) Fig. 5. Petri Net with resoure onstraints. P12 P14 T11 P15 P10 Fig. 4. CPM onverted to Petri Net. The use of Fig. 5 after the onversion inreases Resoure onstraint graph for the example, this example of onneting three Transition Resoure onstraint were Transition3, Transition6, Transition8, in the absene of restritions under what onditions there are many paths to go. A path Transition3 Transition8 Transition6 were obtained for the shortest projet duration. Studies in this sample ase onsider only one unit for eah resoure type, therefore the ativities sharing the same resoure have to be exeuted sequentially instead of in parallel. In additions, the resoure sizes for eah resoure type should be inreased to find their effets on the projet Table III PROJECT DURATIONS FOR DIFFERENT RESOURCE SIZES Resoure 0/0 1/1 1/2 1/3 2/1 2/2 2/3 sizes(r1/r2) Time(day) In order to justify the effetiveness of inreasing numbers of token in eah resoure type, it is neessary to arry out ost analysis. The expeted benefit for the sample projet is 1 million with no resoure onstraint. By inreasing the number of resoure onstraints, the benefit will derease aordingly as shown in Table IV. The ost for one type one resoure is 50 thousands and for type two resoure is 80 thousands. The ost is 15 thousands for eah day whih was delayed. The onsiderations of ost inlude inventory, raw material, equipment maintenane and et. The best ombination of resoure numbers between resoure
6 type one and two is 1/2 whih will provide the highest benefit for the projet management. Table IV PROJECT PROFITS FOR DIFFERENT RESOURCE SIZES Resoure Duration Resoure Duration Profit onstraint Cost Cost 0/ / / / / / / V. CONCLUSIONS A new projet management methodology based on Critial Path Method and Petri net theory was developed in order to handle multiple limited resoures whih have beome more and more important in ompliated large projets. Conversion rules between CPM and Petri net were developed to reate the Petri net model for the additions of resoure onstraints into the projet model. Petri net strutural properties verifiation analysis an then be applied to verify the orretness of the network model. One the Petri net model was built, the reahability analysis an be arried out to obtain the optimal resoure sharing sequene whih will ahieve the shortest projet duration with the existing limited resoures. Furthermore, analysis on the numbers of eah resoure types for performane enhanement an be done by inreasing the numbers of tokens in eah of the resoure plaes being added for resoure onstraints. Corresponding ost analysis should be done to determine the most ost effetive resoure. The ritial path for the projet by onsidering the resoure onstraints an then be found by onverting the Petri net model bak to CPM network with additional preedene ativities and apply the neessary redution rules. The modified CPM network an then be used to find the right ritial path and ritial ativities whih require more attentions for projet management. Results through the ase study show the feasibility of the proposed methodology and the value of the Petri net analysis algorithm. Multiple resoure onstrained projet an then be analyzed more effetively and orretly for best projet management. Proeedings of the IEEE, vol. 77, no. 4, [7] A.G. Colombo and A. Saiz de Bustamante (eds.), System Reliability Assessment, Kluwer p.., 1990, pp [8] L. Popova, " On Time Petri Nets," J. Inform, Proess, Cybern, EIK27, 1991, pp [9] W.M. Zuberek, "Appliation of timed Petri nets to modeling the shedules of manufaturing ells," IEEE, 1995, pp [10] J. W. Herrmann, and E. Lin, "Petri Nets: Tutorial and Appliations," The 32th Annual Symposium of the Washington Operations Researh Management Siene Counil Washington, D.C.,November 5, [11] A. Sawhney, "Petri Net based Simulation of Constrution Shedule," Proeedings of the 1997 Winter Simulation Conferene, pp [12] T. Aura and J. Lilius, "Time Proesses for Time Petri Nets," 1997 [13] Ashok Kumar V. K. and L. S. Ganesh, "Use of Petri Nets for Resoure Alloation in Projets," IEEE Transations on Engineering Management, vol. 45, no. 1, February 1998, pp [14] V. A. Jeetendra, O. V. Krishnaiah Chetty and J. Prashanth Reddy, "Petri Nets for Projet Management and Resoure Levelling," Int. J. Adv Manuf Tehnol, vol. 16, pp , , pp [15] C. P. Lin, and M. D. Jeng, "An Expanded SEMATECH CIM Framework for Heterogeneous Appliations Integration," IEEE Transations on Systems, Man, and Cybernetis - Part A: Systems and Humans, vol. 36, no. 1, January 2006, pp [16] J. P. Pantouvakis and O. G. Manoliadis, "A Pratial Approah to Resoure Constrained Projet Sheduling," Epeuvt / Operational Researh. An International Journal, vol. 6, no. 3, 2006, pp [17] W. Penzek and A. P olrola, "Petri Nets with Time," Studies in Computational Intelligene, vol. 20, 2006, pp [18] D. Lime On Time Petri Nets and Sheduling, IRCCyN / Eole Centrale de Nantes 5 septembre,2007. [19] G. Agnarsson and R. Greenlaw, Graph Theory :Appliations, and Algorithms, Pearson Prentie Hall Pearson Eduation,In.,2007. [20] P. M. Gonzalez del Foyo, J. R. Silva, "Using Time Petri Nets for Modeling and Verifiation of Timed Constrained Workflow Systems," ABCM Symposium Series in Mehatronis, vol. 3, 2008, pp [21] L. Salum, "Petri nets and time modeling," Int J Adv Manuf Tehnol, 2008, pp [22] A. Ismail, K. A. Rashid, and W. J. Hilo, "Literature Review in Resoure-Constrain Critial Path Method," Tehniques European Journal of Sientifi Researh, vol.29, no. 2, 2009, pp [23] D. Z. Chen, C. P. Lin, M. H. Huang, and C. Y. Huang, "Construting a new patent bibliometri performane measure by using modified itation rate analyses with dynami bakward itation windows," Sientometris, vol. 82, 10 June 2009, pp , [24] D. Z. Chen, M. H. Huang, H. C. Hsieh, and C. P. Lin, "Identifying missing relevant patent itation links by using bibliographi oupling in LED illuminating tehnology," Journal of Informetris, vol. 5, 2011, pp REFERENCES [1] J. Kelley, and M. Walker, "Critial-Path Planning and Sheduling," Proeedings of the Eastern Joint Computer Conferene,1959. [2] T. C. Hu, Integer Programming and Networks Flows. Addison Wesley reading, Massahusetts, [3] J. L. Peterson, "Petri Nets," Computing Surveys, vol 9, no. 3, [4] J. L. Peterson, Petri Net Theory and The Modeling of Ssystems, Prentie-Hall, In, Englewood Cliffs, [5] G. Memmi and G. Rouairol, Linear Algebra in Net Theory, Net Theory and Appliation," Leture Notes in Computer Siene, Springer Verlag / Berlin Heidelberg New York, 1984, pp [6] T. Murata, "Petri Nets: Properties, Analysis and Appliations,"
Open and Extensible Business Process Simulator
UNIVERSITY OF TARTU FACULTY OF MATHEMATICS AND COMPUTER SCIENCE Institute of Computer Siene Karl Blum Open and Extensible Business Proess Simulator Master Thesis (30 EAP) Supervisors: Luiano Garía-Bañuelos,
A Holistic Method for Selecting Web Services in Design of Composite Applications
A Holisti Method for Seleting Web Servies in Design of Composite Appliations Mārtiņš Bonders, Jānis Grabis Institute of Information Tehnology, Riga Tehnial University, 1 Kalu Street, Riga, LV 1658, Latvia,
Sebastián Bravo López
Transfinite Turing mahines Sebastián Bravo López 1 Introdution With the rise of omputers with high omputational power the idea of developing more powerful models of omputation has appeared. Suppose that
Static Fairness Criteria in Telecommunications
Teknillinen Korkeakoulu ERIKOISTYÖ Teknillisen fysiikan koulutusohjelma 92002 Mat-208 Sovelletun matematiikan erikoistyöt Stati Fairness Criteria in Teleommuniations Vesa Timonen, e-mail: vesatimonen@hutfi
SLA-based Resource Allocation for Software as a Service Provider (SaaS) in Cloud Computing Environments
2 th IEEE/ACM International Symposium on Cluster, Cloud and Grid Computing SLA-based Resoure Alloation for Software as a Servie Provider (SaaS) in Cloud Computing Environments Linlin Wu, Saurabh Kumar
Supply chain coordination; A Game Theory approach
aepted for publiation in the journal "Engineering Appliations of Artifiial Intelligene" 2008 upply hain oordination; A Game Theory approah Jean-Claude Hennet x and Yasemin Arda xx x LI CNR-UMR 668 Université
Channel Assignment Strategies for Cellular Phone Systems
Channel Assignment Strategies for Cellular Phone Systems Wei Liu Yiping Han Hang Yu Zhejiang University Hangzhou, P. R. China Contat: [email protected] 000 Mathematial Contest in Modeling (MCM) Meritorious
WORKFLOW CONTROL-FLOW PATTERNS A Revised View
WORKFLOW CONTROL-FLOW PATTERNS A Revised View Nik Russell 1, Arthur H.M. ter Hofstede 1, 1 BPM Group, Queensland University of Tehnology GPO Box 2434, Brisbane QLD 4001, Australia {n.russell,a.terhofstede}@qut.edu.au
A novel active mass damper for vibration control of bridges
IABMAS 08, International Conferene on Bridge Maintenane, Safety and Management, 3-7 July 008, Seoul, Korea A novel ative mass damper for vibration ontrol of bridges U. Starossek & J. Sheller Strutural
Granular Problem Solving and Software Engineering
Granular Problem Solving and Software Engineering Haibin Zhu, Senior Member, IEEE Department of Computer Siene and Mathematis, Nipissing University, 100 College Drive, North Bay, Ontario, P1B 8L7, Canada
REDUCTION FACTOR OF FEEDING LINES THAT HAVE A CABLE AND AN OVERHEAD SECTION
C I E 17 th International Conferene on Eletriity istriution Barelona, 1-15 May 003 EUCTION FACTO OF FEEING LINES THAT HAVE A CABLE AN AN OVEHEA SECTION Ljuivoje opovi J.. Elektrodistriuija - Belgrade -
Neural network-based Load Balancing and Reactive Power Control by Static VAR Compensator
nternational Journal of Computer and Eletrial Engineering, Vol. 1, No. 1, April 2009 Neural network-based Load Balaning and Reative Power Control by Stati VAR Compensator smail K. Said and Marouf Pirouti
An integrated optimization model of a Closed- Loop Supply Chain under uncertainty
ISSN 1816-6075 (Print), 1818-0523 (Online) Journal of System and Management Sienes Vol. 2 (2012) No. 3, pp. 9-17 An integrated optimization model of a Closed- Loop Supply Chain under unertainty Xiaoxia
Discovering Trends in Large Datasets Using Neural Networks
Disovering Trends in Large Datasets Using Neural Networks Khosrow Kaikhah, Ph.D. and Sandesh Doddameti Department of Computer Siene Texas State University San Maros, Texas 78666 Abstrat. A novel knowledge
Hierarchical Clustering and Sampling Techniques for Network Monitoring
S. Sindhuja Hierarhial Clustering and Sampling Tehniques for etwork Monitoring S. Sindhuja ME ABSTRACT: etwork monitoring appliations are used to monitor network traffi flows. Clustering tehniques are
Agile ALM White Paper: Redefining ALM with Five Key Practices
Agile ALM White Paper: Redefining ALM with Five Key Praties by Ethan Teng, Cyndi Mithell and Chad Wathington 2011 ThoughtWorks ln. All rights reserved www.studios.thoughtworks.om Introdution The pervasiveness
Deadline-based Escalation in Process-Aware Information Systems
Deadline-based Esalation in Proess-Aware Information Systems Wil M.P. van der Aalst 1,2, Mihael Rosemann 2, Marlon Dumas 2 1 Department of Tehnology Management Eindhoven University of Tehnology, The Netherlands
A Keyword Filters Method for Spam via Maximum Independent Sets
Vol. 7, No. 3, May, 213 A Keyword Filters Method for Spam via Maximum Independent Sets HaiLong Wang 1, FanJun Meng 1, HaiPeng Jia 2, JinHong Cheng 3 and Jiong Xie 3 1 Inner Mongolia Normal University 2
FIRE DETECTION USING AUTONOMOUS AERIAL VEHICLES WITH INFRARED AND VISUAL CAMERAS. J. Ramiro Martínez-de Dios, Luis Merino and Aníbal Ollero
FE DETECTION USING AUTONOMOUS AERIAL VEHICLES WITH INFRARED AND VISUAL CAMERAS. J. Ramiro Martínez-de Dios, Luis Merino and Aníbal Ollero Robotis, Computer Vision and Intelligent Control Group. University
Weighting Methods in Survey Sampling
Setion on Survey Researh Methods JSM 01 Weighting Methods in Survey Sampling Chiao-hih Chang Ferry Butar Butar Abstrat It is said that a well-designed survey an best prevent nonresponse. However, no matter
Capacity at Unsignalized Two-Stage Priority Intersections
Capaity at Unsignalized Two-Stage Priority Intersetions by Werner Brilon and Ning Wu Abstrat The subjet of this paper is the apaity of minor-street traffi movements aross major divided four-lane roadways
Soft-Edge Flip-flops for Improved Timing Yield: Design and Optimization
Soft-Edge Flip-flops for Improved Timing Yield: Design and Optimization Abstrat Parameter variations ause high yield losses due to their large impat on iruit delay. In this paper, we propose the use of
Computer Networks Framing
Computer Networks Framing Saad Mneimneh Computer Siene Hunter College of CUNY New York Introdution Who framed Roger rabbit? A detetive, a woman, and a rabbit in a network of trouble We will skip the physial
) ( )( ) ( ) ( )( ) ( ) ( ) (1)
OPEN CHANNEL FLOW Open hannel flow is haraterized by a surfae in ontat with a gas phase, allowing the fluid to take on shapes and undergo behavior that is impossible in a pipe or other filled onduit. Examples
Improved SOM-Based High-Dimensional Data Visualization Algorithm
Computer and Information Siene; Vol. 5, No. 4; 2012 ISSN 1913-8989 E-ISSN 1913-8997 Published by Canadian Center of Siene and Eduation Improved SOM-Based High-Dimensional Data Visualization Algorithm Wang
A Robust Optimization Approach to Dynamic Pricing and Inventory Control with no Backorders
A Robust Optimization Approah to Dynami Priing and Inventory Control with no Bakorders Elodie Adida and Georgia Perakis July 24 revised July 25 Abstrat In this paper, we present a robust optimization formulation
TRENDS IN EXECUTIVE EDUCATION: TOWARDS A SYSTEMS APPROACH TO EXECUTIVE DEVELOPMENT PLANNING
INTERMAN 7 TRENDS IN EXECUTIVE EDUCATION: TOWARDS A SYSTEMS APPROACH TO EXECUTIVE DEVELOPMENT PLANNING by Douglas A. Ready, Albert A. Viere and Alan F. White RECEIVED 2 7 MAY 1393 International Labour
i_~f e 1 then e 2 else e 3
A PROCEDURE MECHANISM FOR BACKTRACK PROGRAMMING* David R. HANSON + Department o Computer Siene, The University of Arizona Tuson, Arizona 85721 One of the diffiulties in using nondeterministi algorithms
Recovering Articulated Motion with a Hierarchical Factorization Method
Reovering Artiulated Motion with a Hierarhial Fatorization Method Hanning Zhou and Thomas S Huang University of Illinois at Urbana-Champaign, 405 North Mathews Avenue, Urbana, IL 680, USA {hzhou, huang}@ifpuiuedu
Chapter 1 Microeconomics of Consumer Theory
Chapter 1 Miroeonomis of Consumer Theory The two broad ategories of deision-makers in an eonomy are onsumers and firms. Eah individual in eah of these groups makes its deisions in order to ahieve some
Henley Business School at Univ of Reading. Pre-Experience Postgraduate Programmes Chartered Institute of Personnel and Development (CIPD)
MS in International Human Resoure Management For students entering in 2012/3 Awarding Institution: Teahing Institution: Relevant QAA subjet Benhmarking group(s): Faulty: Programme length: Date of speifiation:
Classical Electromagnetic Doppler Effect Redefined. Copyright 2014 Joseph A. Rybczyk
Classial Eletromagneti Doppler Effet Redefined Copyright 04 Joseph A. Rybzyk Abstrat The lassial Doppler Effet formula for eletromagneti waves is redefined to agree with the fundamental sientifi priniples
Solving the Game of Awari using Parallel Retrograde Analysis
Solving the Game of Awari using Parallel Retrograde Analysis John W. Romein and Henri E. Bal Vrije Universiteit, Faulty of Sienes, Department of Mathematis and Computer Siene, Amsterdam, The Netherlands
protection p1ann1ng report
f1re~~ protetion p1ann1ng report BUILDING CONSTRUCTION INFORMATION FROM THE CONCRETE AND MASONRY INDUSTRIES Signifiane of Fire Ratings for Building Constrution NO. 3 OF A SERIES The use of fire-resistive
The Application of Mamdani Fuzzy Model for Auto Zoom Function of a Digital Camera
(IJCSIS) International Journal of Computer Siene and Information Seurity, Vol. 6, No. 3, 2009 The Appliation of Mamdani Fuzzy Model for Auto Funtion of a Digital Camera * I. Elamvazuthi, P. Vasant Universiti
Learning Curves and Stochastic Models for Pricing and Provisioning Cloud Computing Services
T Learning Curves and Stohasti Models for Priing and Provisioning Cloud Computing Servies Amit Gera, Cathy H. Xia Dept. of Integrated Systems Engineering Ohio State University, Columbus, OH 4310 {gera.,
Electrician'sMathand BasicElectricalFormulas
Eletriian'sMathand BasiEletrialFormulas MikeHoltEnterprises,In. 1.888.NEC.CODE www.mikeholt.om Introdution Introdution This PDF is a free resoure from Mike Holt Enterprises, In. It s Unit 1 from the Eletrial
In order to be able to design beams, we need both moments and shears. 1. Moment a) From direct design method or equivalent frame method
BEAM DESIGN In order to be able to design beams, we need both moments and shears. 1. Moment a) From diret design method or equivalent frame method b) From loads applied diretly to beams inluding beam weight
A Survey of Usability Evaluation in Virtual Environments: Classi cation and Comparison of Methods
Doug A. Bowman [email protected] Department of Computer Siene Virginia Teh Joseph L. Gabbard Deborah Hix [ jgabbard, hix]@vt.edu Systems Researh Center Virginia Teh A Survey of Usability Evaluation in Virtual
Behavior Analysis-Based Learning Framework for Host Level Intrusion Detection
Behavior Analysis-Based Learning Framework for Host Level Intrusion Detetion Haiyan Qiao, Jianfeng Peng, Chuan Feng, Jerzy W. Rozenblit Eletrial and Computer Engineering Department University of Arizona
Big Data Analysis and Reporting with Decision Tree Induction
Big Data Analysis and Reporting with Deision Tree Indution PETRA PERNER Institute of Computer Vision and Applied Computer Sienes, IBaI Postbox 30 11 14, 04251 Leipzig GERMANY [email protected],
Price-based versus quantity-based approaches for stimulating the development of renewable electricity: new insights in an old debate
Prie-based versus -based approahes for stimulating the development of renewable eletriity: new insights in an old debate uthors: Dominique FINON, Philippe MENNTEU, Marie-Laure LMY, Institut d Eonomie et
Chapter 6 A N ovel Solution Of Linear Congruenes Proeedings NCUR IX. (1995), Vol. II, pp. 708{712 Jerey F. Gold Department of Mathematis, Department of Physis University of Utah Salt Lake City, Utah 84112
Henley Business School at Univ of Reading. Chartered Institute of Personnel and Development (CIPD)
MS in International Human Resoure Management (full-time) For students entering in 2015/6 Awarding Institution: Teahing Institution: Relevant QAA subjet Benhmarking group(s): Faulty: Programme length: Date
Green Cloud Computing
International Journal of Information and Computation Tehnology. ISSN 0974-2239 Volume 4, Number 4 (2014), pp. 431-436 International Researh Publiations House http://www. irphouse.om /ijit.htm Green Cloud
Intelligent Measurement Processes in 3D Optical Metrology: Producing More Accurate Point Clouds
Intelligent Measurement Proesses in 3D Optial Metrology: Produing More Aurate Point Clouds Charles Mony, Ph.D. 1 President Creaform in. [email protected] Daniel Brown, Eng. 1 Produt Manager Creaform in.
THE PERFORMANCE OF TRANSIT TIME FLOWMETERS IN HEATED GAS MIXTURES
Proeedings of FEDSM 98 998 ASME Fluids Engineering Division Summer Meeting June 2-25, 998 Washington DC FEDSM98-529 THE PERFORMANCE OF TRANSIT TIME FLOWMETERS IN HEATED GAS MIXTURES John D. Wright Proess
A Context-Aware Preference Database System
J. PERVASIVE COMPUT. & COMM. (), MARCH 005. TROUBADOR PUBLISHING LTD) A Context-Aware Preferene Database System Kostas Stefanidis Department of Computer Siene, University of Ioannina,, [email protected] Evaggelia
Availability, Reliability, Maintainability, and Capability
Availability, Reliability, Maintainability, and Capability H. Paul Barringer, P.E. Barringer & Assoiates, In. Humble, TX Triplex Chapter Of The Vibrations Institute Hilton Hotel Beaumont, Texas February
' R ATIONAL. :::~i:. :'.:::::: RETENTION ':: Compliance with the way you work PRODUCT BRIEF
' R :::i:. ATIONAL :'.:::::: RETENTION ':: Compliane with the way you work, PRODUCT BRIEF In-plae Management of Unstrutured Data The explosion of unstrutured data ombined with new laws and regulations
International Journal of Supply and Operations Management. Mathematical modeling for EOQ inventory system with advance payment and fuzzy Parameters
nternational Journal of Supply and Operations Management JSOM November 0, Volume, ssue 3, pp. 60-78 SSN-Print: 383-359 SSN-Online: 383-55 www.ijsom.om Mathematial modeling for EOQ inventory system with
Parametric model of IP-networks in the form of colored Petri net
Parametri model of IP-networks in the form of olored Petri net Shmeleva T.R. Abstrat A parametri model of IP-networks in the form of olored Petri net was developed; it onsists of a fixed number of Petri
Customer Efficiency, Channel Usage and Firm Performance in Retail Banking
Customer Effiieny, Channel Usage and Firm Performane in Retail Banking Mei Xue Operations and Strategi Management Department The Wallae E. Carroll Shool of Management Boston College 350 Fulton Hall, 140
Performance Analysis of IEEE 802.11 in Multi-hop Wireless Networks
Performane Analysis of IEEE 80.11 in Multi-hop Wireless Networks Lan Tien Nguyen 1, Razvan Beuran,1, Yoihi Shinoda 1, 1 Japan Advaned Institute of Siene and Tehnology, 1-1 Asahidai, Nomi, Ishikawa, 93-19
Optimal Online Buffer Scheduling for Block Devices *
Optimal Online Buffer Sheduling for Blok Devies * ABSTRACT Anna Adamaszek Department of Computer Siene and Centre for Disrete Mathematis and its Appliations (DIMAP) University of Warwik, Coventry, UK [email protected]
An Efficient Network Traffic Classification Based on Unknown and Anomaly Flow Detection Mechanism
An Effiient Network Traffi Classifiation Based on Unknown and Anomaly Flow Detetion Mehanism G.Suganya.M.s.,B.Ed 1 1 Mphil.Sholar, Department of Computer Siene, KG College of Arts and Siene,Coimbatore.
Asymmetric Error Correction and Flash-Memory Rewriting using Polar Codes
1 Asymmetri Error Corretion and Flash-Memory Rewriting using Polar Codes Eyal En Gad, Yue Li, Joerg Kliewer, Mihael Langberg, Anxiao (Andrew) Jiang and Jehoshua Bruk Abstrat We propose effiient oding shemes
VOLTAGE CONTROL WITH SHUNT CAPACITANCE ON RADIAL DISTRIBUTION LINE WITH HIGH R/X FACTOR. A Thesis by. Hong-Tuan Nguyen Vu
VOLTAGE CONTROL WITH SHUNT CAPACITANCE ON RADIAL DISTRIBUTION LINE WITH HIGH R/X FACTOR A Thesis by Hong-Tuan Nguyen Vu Eletrial Engineer, Polytehni University of HCMC, 1993 Submitted to the College of
Impedance Method for Leak Detection in Zigzag Pipelines
10.478/v10048-010-0036-0 MEASUREMENT SCIENCE REVIEW, Volume 10, No. 6, 010 Impedane Method for Leak Detetion in igzag Pipelines A. Lay-Ekuakille 1, P. Vergallo 1, A. Trotta 1 Dipartimento d Ingegneria
Software Ecosystems: From Software Product Management to Software Platform Management
Software Eosystems: From Software Produt Management to Software Platform Management Slinger Jansen, Stef Peeters, and Sjaak Brinkkemper Department of Information and Computing Sienes Utreht University,
MATE: MPLS Adaptive Traffic Engineering
MATE: MPLS Adaptive Traffi Engineering Anwar Elwalid Cheng Jin Steven Low Indra Widjaja Bell Labs EECS Dept EE Dept Fujitsu Network Communiations Luent Tehnologies Univ. of Mihigan Calteh Pearl River,
Chapter 5 Single Phase Systems
Chapter 5 Single Phase Systems Chemial engineering alulations rely heavily on the availability of physial properties of materials. There are three ommon methods used to find these properties. These inlude
IEEE TRANSACTIONS ON DEPENDABLE AND SECURE COMPUTING, VOL. 9, NO. 3, MAY/JUNE 2012 401
IEEE TRASACTIOS O DEPEDABLE AD SECURE COMPUTIG, VOL. 9, O. 3, MAY/JUE 2012 401 Mitigating Distributed Denial of Servie Attaks in Multiparty Appliations in the Presene of Clok Drifts Zhang Fu, Marina Papatriantafilou,
RATING SCALES FOR NEUROLOGISTS
RATING SCALES FOR NEUROLOGISTS J Hobart iv22 WHY Correspondene to: Dr Jeremy Hobart, Department of Clinial Neurosienes, Peninsula Medial Shool, Derriford Hospital, Plymouth PL6 8DH, UK; Jeremy.Hobart@
Computational Analysis of Two Arrangements of a Central Ground-Source Heat Pump System for Residential Buildings
Computational Analysis of Two Arrangements of a Central Ground-Soure Heat Pump System for Residential Buildings Abstrat Ehab Foda, Ala Hasan, Kai Sirén Helsinki University of Tehnology, HVAC Tehnology,
Trade Information, Not Spectrum: A Novel TV White Space Information Market Model
Trade Information, Not Spetrum: A Novel TV White Spae Information Market Model Yuan Luo, Lin Gao, and Jianwei Huang 1 Abstrat In this paper, we propose a novel information market for TV white spae networks,
RISK-BASED IN SITU BIOREMEDIATION DESIGN JENNINGS BRYAN SMALLEY. A.B., Washington University, 1992 THESIS. Urbana, Illinois
RISK-BASED IN SITU BIOREMEDIATION DESIGN BY JENNINGS BRYAN SMALLEY A.B., Washington University, 1992 THESIS Submitted in partial fulfillment of the requirements for the degree of Master of Siene in Environmental
AUDITING COST OVERRUN CLAIMS *
AUDITING COST OVERRUN CLAIMS * David Pérez-Castrillo # University of Copenhagen & Universitat Autònoma de Barelona Niolas Riedinger ENSAE, Paris Abstrat: We onsider a ost-reimbursement or a ost-sharing
Marker Tracking and HMD Calibration for a Video-based Augmented Reality Conferencing System
Marker Traking and HMD Calibration for a Video-based Augmented Reality Conferening System Hirokazu Kato 1 and Mark Billinghurst 2 1 Faulty of Information Sienes, Hiroshima City University 2 Human Interfae
CIS570 Lecture 4 Introduction to Data-flow Analysis 3
Introdution to Data-flow Analysis Last Time Control flow analysis BT disussion Today Introdue iterative data-flow analysis Liveness analysis Introdue other useful onepts CIS570 Leture 4 Introdution to
Table of Contents. Appendix II Application Checklist. Export Finance Program Working Capital Financing...7
Export Finane Program Guidelines Table of Contents Setion I General...........................................................1 A. Introdution............................................................1
Findings and Recommendations
Contrating Methods and Administration Findings and Reommendations Finding 9-1 ESD did not utilize a formal written pre-qualifiations proess for seleting experiened design onsultants. ESD hose onsultants
BUILDING CODE SUMMARY GENERAL NOTES DESIGN BUILD ELECTRICAL DESIGN BUILD MECHANICAL & PLUMBING GENERAL NOTES GENERAL NOTES G101
D D BUILDING CODE SUMMARY GENERAL NOTES PROJECT DESCRIPTION: THIS PROJECT IS THE MINOR RENOVATION OF AN EXISTING OUTPATIENT CLINIC. SCOPE CONSISTS OF PAINT, CARPET, TILE, AND UPGRADE TO DIGITAL X-RAY BUILDING
university of illinois library AT URBANA-CHAMPAIGN BOOKSTACKS
university of illinois library AT URBANA-CHAMPAIGN BOOKSTACKS CENTRAL CIRCULATION BOOKSTACKS The person harging this material is responsible for its renewal or its return to the library from whih it was
Optimal Sales Force Compensation
Optimal Sales Fore Compensation Matthias Kräkel Anja Shöttner Abstrat We analyze a dynami moral-hazard model to derive optimal sales fore ompensation plans without imposing any ad ho restritions on the
From a strategic view to an engineering view in a digital enterprise
Digital Enterprise Design & Management 2013 February 11-12, 2013 Paris From a strategi view to an engineering view in a digital enterprise The ase of a multi-ountry Telo Hervé Paault Orange Abstrat In
Srinivas Bollapragada GE Global Research Center. Abstract
Sheduling Commerial Videotapes in Broadast Television Srinivas Bollapragada GE Global Researh Center Mihael Bussiek GAMS Development Corporation Suman Mallik University of Illinois at Urbana Champaign
Interpretable Fuzzy Modeling using Multi-Objective Immune- Inspired Optimization Algorithms
Interpretable Fuzzy Modeling using Multi-Objetive Immune- Inspired Optimization Algorithms Jun Chen, Mahdi Mahfouf Abstrat In this paper, an immune inspired multi-objetive fuzzy modeling (IMOFM) mehanism
Dataflow Features in Computer Networks
Magyar Kutatók 1. Nemzetközi Szimpóziuma 1 th International Symposium of Hungarian Researhers on Computational Intelligene and Informatis Gyula Max Budapest University of Tehnology and Eonomis, Department
SOFTWARE ENGINEERING I
SOFTWARE ENGINEERING I CS 10 Catalog Desription PREREQUISITE: CS 21. Introdution to the systems development life yle, software development models, analysis and design tehniques and tools, and validation
How To Fator
CHAPTER hapter 4 > Make the Connetion 4 INTRODUCTION Developing seret odes is big business beause of the widespread use of omputers and the Internet. Corporations all over the world sell enryption systems
Criminal Geographical Profiling: Using FCA for Visualization and Analysis of Crime Data
Criminal Georaphial rofilin: Usin FCA for Visualization and Analysis of Crime Data Quist-Aphetsi Kester, MIEEE Leturer, Faulty of Informatis Ghana Tehnoloy University Collee Ara, Ghana Email: [email protected]
Bandwidth Allocation and Session Scheduling using SIP
JOURAL OF COUICAIS, VOL., O. 5, AUGUS 006 7 Bandwidth Alloation and Session Sheduling using SIP Hassan HASSA, Jean-arie GARCIA and Olivier BRU LAAS-CRS, oulouse, Frane Email: {hhassan}@laas.fr Abstrat
Unit 12: Installing, Configuring and Administering Microsoft Server
Unit 12: Installing, Configuring and Administering Mirosoft Server Learning Outomes A andidate following a programme of learning leading to this unit will be able to: Selet a suitable NOS to install for
A Three-Hybrid Treatment Method of the Compressor's Characteristic Line in Performance Prediction of Power Systems
A Three-Hybrid Treatment Method of the Compressor's Charateristi Line in Performane Predition of Power Systems A Three-Hybrid Treatment Method of the Compressor's Charateristi Line in Performane Predition
VOLUME 13, ARTICLE 5, PAGES 117-142 PUBLISHED 05 OCTOBER 2005 DOI: 10.4054/DemRes.2005.13.
Demographi Researh a free, expedited, online journal of peer-reviewed researh and ommentary in the population sienes published by the Max Plank Institute for Demographi Researh Konrad-Zuse Str. 1, D-157
Board Building Recruiting and Developing Effective Board Members for Not-for-Profit Organizations
Board Development Board Building Reruiting and Developing Effetive Board Members for Not-for-Profit Organizations Board Development Board Building Reruiting and Developing Effetive Board Members for Not-for-Profit
Previously Published Works UC Berkeley
Previously Published Works UC Berkeley A University of California author or department has made this artile openly available. Thanks to the Aademi Senate s Open Aess Poliy, a great many UC-authored sholarly
arxiv:astro-ph/0304006v2 10 Jun 2003 Theory Group, MS 50A-5101 Lawrence Berkeley National Laboratory One Cyclotron Road Berkeley, CA 94720 USA
LBNL-52402 Marh 2003 On the Speed of Gravity and the v/ Corretions to the Shapiro Time Delay Stuart Samuel 1 arxiv:astro-ph/0304006v2 10 Jun 2003 Theory Group, MS 50A-5101 Lawrene Berkeley National Laboratory
THERMAL TO MECHANICAL ENERGY CONVERSION: ENGINES AND REQUIREMENTS Vol. I - Thermodynamic Cycles of Reciprocating and Rotary Engines - R.S.
THERMAL TO MECHANICAL ENERGY CONVERSION: ENGINES AND REQUIREMENTS Vol. I - Thermodynami Cyles of Reiproating and Rotary Engines - R.S.Kavtaradze THERMODYNAMIC CYCLES OF RECIPROCATING AND ROTARY ENGINES