1 Investigation on the Effects of Twin Tunnel Excavations Beneath a Road Underpass Eshagh Namazi Researcher, Department of Geotechnics and Transportation, Faculty of Civil Engineering, Universiti Teknologi Malaysia (Formerly a Tunnel Engineer at Bamrah Construction); [email protected] Hisham Mohamad Lecturer, Department of Geotechnics and Transportation, Faculty of Civil Engineering, Universiti Teknologi Malaysia ; [email protected] Mohammad Ehsan Jorat Researcher, Department of Geotechnics and Transportation, Faculty of Civil Engineering, Universiti Teknologi Malaysia; [email protected] Mohsen Hajihassani Researcher, Department of Geotechnics and Transportation, Faculty of Civil Engineering, Universiti Teknologi Malaysia; [email protected] ABSTRACT Excavation of tunnels underneath cities often intrudes the existence of piled foundation and in severe cases, can cause damage to the overlying structures. As there are very limited published case studies concerning understanding of the interaction between piled structure and tunneling, there is a significant uncertainty regarding tunnel-pile interaction. In this paper, a case study of the effects of two subway tunnels on the contiguous pile walls which support a road underpass is investigated using three-dimensional Finite Element simulations. The interaction between the tunnels and piles is investigated with a special attention to the effect of tunnel face pressures. Through the numerical modelling and field data, it is shown with presence of the piles, the minimum pressure to support the tunnel face is less than minimum face pressure in the green field condition. Field experience indicates that excessive tunnel face pressure can cause temporary heave to the ground surface but also cause damage to the cutter head of tunnel boring machine. KEYWORDS: Pile Walls, Numerical Modeling, Surface Settlement, Face Pressure INTRODUCTION Construction of subway tunnels in the urban environment is a complex problem particularly when tunnels are excavated very close to existing structures supported with pile foundation system. The design and execution of these tunnels requires assessment of the impact of the tunnel-induced ground movement on the stability and integrity of existing piled foundations (Mohamed and Mattar, 2009; Cheng et al. 2007; Mroueh and Shahrour, 2002; Jacobsz et al. 2001; Leung et al. 2000; Chen et al
2 Vol. 16 [2011], Bund. D ; Vermeer and Bonnier, 1991). Several researchers have focused on the influence zone for 2D pile-soil-tunneling interaction based on case studies and numerical simulations (Lee and Bassett, 2007; Selemetas et al., 2006; and Kaalberg et al. 2006; Lee et al. 2007; Coutts and Wang, 2000). In these studies the effects of different parameters (e.g. distance of the pile from tunnel centre, position of the pile tip regarding to the horizontal tunnel axis, pile and tunnel diameter) on the interaction between pile and tunnel have been investigated to develop understanding of the interaction mechanism between tunnels and piles. In the first part of this paper, a case study of the effects of tunneling on the contiguous piles is presented. The 3D-finite element (PLAXIS 3D TUNNEL Package) was performed to investigate the effect of tunnel advancement on the contiguous pile with special attention to the most important parameter of excavation called face pressure. In the second part, parametric study of the effect of tunnel face pressure on the interaction between tunnel and piles is carried out. The last part represents the longitudinal settlement measured at the ground surface where the high face pressure was used in the tunneling operation. SITE DESCRIPTIONS The growth and expansion of Shiraz, a southern city of Iran, and increase in the number of vehicles and population led to construction of subway in order to overcome the transportation problems. The South eastern part of Line І of that subway with length of approximately 14 km consisted of a twin tunnel. The running tunnels were excavated by Earth Pressure Balance (EPB) of 6.88 m external diameter with tail-skin grouting. The tunnel linings were made from pre-fabricated reinforced concrete segments forming an internal tunnel diameter of 6 m. A particular interest of Line Ι project between stations Zirgozar and Zand Cross was the constructions of tunnels below an existing Zand Underground Motorway (Zand Underpass). Figure 1 shows the longitudinal section of Shiraz tunnel between the stations, under the Zand Underpass. The distance between the stations is 1215 m whereas the underpass length is about 607 m. Next to the Zand Underpass, cars must pass downward and upward ramps of 6.5% with lengths of 135 m. The twin tunnel underneath, on the other hand, were excavated with a generally more gentle slope of 1.9% running from the stations to their deepest point of approximately 16 m along the Underpass. The spacing of the two tunnel centre-lines next to the Underpass is equivalent to two tunnel diameters. Figure 1: longitudinal section of the tunnels under the Zand Underpass The Underpass was formed by two contiguous pile walls and a roof slab which was connected to the walls by pin connection. The roof slab was 0.8m thick. The contiguous pile walls formed of many piles with diameter of 1.2m and spacing of 0.1m. The filling between
3 Vol. 16 [2011], Bund. D 443 the piles comprised of cement and bentonite mixture. Figure 2 shows the geometry of the structure and the position of the pile walls regarding to the tunnels. The mechanical properties of the Underpass partitions are given in table 1. 8 m 5.2 m Made ground Clayey sand 4 m 3.2 m 3.6 m 13.6 m 1.2 m Inorganic Silt 6.7 m 7 m Clayey sand 3 m Inorganic Silt 1.8 m R=3.44 m Clayey sand Figure 2: Description of geological conditions of the site GROUND CONDITION The site investigation includes three boreholes close to the area (Bamrah Construction, 2004). The sequence of strata identified from these boreholes is summarized in Figure 3. The ground profile consisted of made ground at the top, and the next clayey sand overlying the intermittent layers of clayey sand and inorganic silt. The tunnels were excavated in the clay and inorganic silt. Table 1 summarizes the characteristics of the soil used for the analyses. The water table was taken as approximately 8m below the ground surface, i.e. within the inorganic silt. Table 1: Mechanical properties of encountered materials (After Bamrah Construction, 2004) GROUP γ unsat (kn/m 3 ) γ sat (kn/m 3 ) E(MPa) υ C (kpa) Φ(o) Ψ(o) R int MADE GROUND CLAYEY SAND INORGANIC SILT SEGMENT EA=30000(MN/m) EI=225(MN/m/m) ROOF SLAB E=23(GPa) Thickness = 0.8 (m) CONTIGUOUS PILE E=19.23(GPa) Diameter =1.4 (m)
4 Vol. 16 [2011], Bund. D 444 NUMERICAL MODELING In order to investigate the tunnel advancement on the contiguous piles, 3D-Numerical modelling was performed using a commercial Finite Element program, i.e. PLAXIS 3D Tunnel (Brinkgreve and Broere, 2004). This software provides the flexible features to model the details of tunnel construction in soils. The finite element mesh used in numerical modelling is presented in Figure 3. The model is 100 m wide, 30 m deep and 70 m long. The geometrical boundaries considered here was found to be far enough from the tunnels axis in order to minimise the influence of boundaries on the tunnelling model. The model includes 4130 elements and nodes. The soils were modelled using 15-noded wedge elements, whereas 8-node plate elements represented the tunnel lining (Figure 3). To simulate the soilstructure interaction, a 16-node interface element was used. The water table is assumed to produce the hydrostatic initial pore water pressure. An elastic-plastic soil model using the Mohr-coulomb failure criterion is adapted in this study. Because the soils are prevalently fine-grained and relatively low permeable, the analyses were carried out in undrained condition. In general, the process of tunnel construction under the Underpass was modelled in two steps (for more information for simulation of tunnelling, see Potts and Zdravkovic, 2001). First, the initial conditions were set up for the model before excavation of the tunnels. It was achieved by specifying the distribution of effective vertical and horizontal stress (using coefficient of earth pressure at rest, K0=0.5) and pore water pressure. The initial conditions were completed with simulating the underpass structure. In this stage, the vehicles loads were calculated and applied to the model. After establishing the initial conditions, the analyses continued with modeling excavation of the first tunnel. The tunnel excavation process was done through a step-by-step method in 16 phases. In each phase, the excavation process consists of: (i) excavation of the soil, (ii) application of pore water pressure, (iii) support pressure at the tunnel face to prevent active failure at the face, (iv) installation of the tunnel lining and finally (v) the grouting of the gap between the soil and the newly installed lining. The second tunnel excavation was modeled after the completion of the first tunnel in which the same manner of step-by-step method is applied. Figure 3: Three dimensional finite element model of the tunnels under the Underpass
5 Vol. 16 [2011], Bund. D 445 PREDICTION OF SURFACE SETTLEMENT TROUGH Prior to assessing the influence of piles walls on the settlement-induced by tunnelling, the green-field surface settlement trough obtained by numerical modelling is compared with empirical method and field data. The green-field settlement troughs are obtained in the same geology conditions as the Zand Underpass ones. Figure 4 compares the surface settlement profile after excavation both tunnels. There is an agreement between field data and numerical modelling in terms of magnitude and shape of profile except maximum settlement which is under predicted. Results calculated using empirical method which was expressed by Peck (1969) are also shown in Figure 4. The superposition principle is used to obtain the settlement trough due to excavation of both tunnels. The volume loss of 1.1% was used to calculate the settlement trough induced by each tunnel. Although the empirical method predicts maximum settlement more accurately than the numerical model, the settlement in the far field was over predicted. Figure 4: Surface Settlement Trough in the Green-field conditions Figure 5 shows the predicted surface settlement by numerical modelling where both of the tunnels have been completed, for green-field and actual conditions (with the presence of the Underpass). The existing of structure would normally modify the surface settlement owing to tunnelling excavation. In this case however, the two Finite Element (FE) ground surface settlement plots are almost identical to each other except at the point where the contiguous piles walls are located. Piles walls do not follow exactly green-field movement induced by tunnels at the piles location and soil movement surrounding the piles also altered due to presence of piles. This is due to the additional of displacement (settlement) caused by the piles. The displacement-induced by pile can be divided to the displacement caused by pile loading and the displacement by presence of pile without load. The displacement induced by loading is in accord to the green-field ground movement and displacement caused by presence of pile is in resistant to the green-field ground movement. Position of the pile tip regarding to the horizontal tunnel axis determines which one is dominance: pile loading or presence of the piles. In this example, because the tunnels are excavated exactly beneath the piles, loading increases the vertical effective stress and consequent ground movement beneath the pile tip. But in the different situation where the tunnel is excavated adjacent to the piles, the existing of the piles decreases the ground displacement induced by excavation (Ng et al., 2005; Huang
6 Vol. 16 [2011], Bund. D 446 et al., 2009). Such phenomenon, as discussed in the previous section, is called the shielding effect. Surface Settlement (mm) Transversal Coordinate (m) Actual Condition Green-Field Condition Figure 5: Effect of contiguous piles on the surface settlement trough Figure 6 shows the soil displacement pattern around the Zand Underpass after excavation of the tunnels in FE. In general, before excavation of the tunnels the pile-soil system was in equilibrium. The surrounding soil applies an upward friction force (i.e. positive friction) to resist the downward displacement of the pile. When the tunnels are excavated, however, the equilibrium is disturbed and the soil moves to the tunnels boundaries. In this situation, the displacement of surrounding soil is larger than displacement of the piles and the downward fiction force (i.e. negative friction) exerts an additional load on the piles. The piles transfer their loads to the soil before excavation of the tunnel but after excavation of the tunnel the piles carry the load induced by soil displacement. Figure 6: Soil displacement pattern around the Zand Underpass in FE
7 Vol. 16 [2011], Bund. D 447 TUNNEL FACE PRESSU URE The evaluation of the tunnel face-support pressure is a critical component in both the design and construction phases of Tunnel Boring Machines (TBM). In practice, face pressure is usually the primary control parameterr during excavation and is one of the most significant factors that have a direct effect on the magnitude of surface settlements. The higher face pressures are applied, the smaller surface settlementt will be observed. In cases of very high face pressure, the surface heave occurred. Today, there are several analytical and empirical methods to calculate the tunnel face pressure in the green-field conditions (without presence of surface structures) based on failure mechanism of tunnel face (Broere, 2001; Anognostou and Kovari 1996; Leca and Dormieux 1990; Atkinson and Potts 1977; Broms & Bennemark 1967). These methods are not able to consider the effects of existing structures on the face pressure. This limitation can be overcome by introduction of the finite element method. In this paper, in order to investigate the influence of the contiguous piles on the face pressure, the minimum pressure obtained from green-field conditions was compared with that of actual conditions (with the presence of the Underpass). The minimum face pressures in the models were obtained by decreasing the initial face pressure until the failure occurs in the tunnel face. The failure occurred when the face pressure remained constant in the infinite displacement (Figure 7). The initial face pressure in the green-field condition was calculated to be 150 KN/m2 from the analytical solution (Leca and Dormieux 1990). Figure 7 illustrates the minimum face pressure as fraction of initial pressure against soil displacement. It can be seen that the minimum face pressure of the tunnel support in the green-field is more than when the condition of structure exists. The underpass existencee declines the minimum face pressure from 68% to 65% of initial load. Such finding can be explained as follows. The contiguous piles wall in the Underpass act as shield and do not let the soil in front of the TBM face move freely. This shielding effect decreases the soil volume which moves to the face and consequently declines the face pressure. Figure 7: Face pressure related to face displacement at Greenfield and actual (with existence of Zand Underpass)
8 Vol. 16 [2011], Bund. D 448 EFFECTS OF FACE PRESSURE ON THE SURFACE SETTLEMENT TROUG H The numerical parametric study has been done to assess the effect of tunnel face pressure on the surface settlement due to excavation of tunnels under the structure. The tunnels are excavated with face pressures of 115Kpa, 140Kpa and 215Kpa at the level of tunnel axis. Figure 8 shows the surface settlement trough after excavation of both tunnels related to the different face pressures. In general, a decrease of the face pressure causes larger stress release of the soil at the cutting face and it leads to increasing of the surface settlement (Kasper and Meschke, 2006) ). When the tunnels are excavated underneath the Underpass, the piles resist release of more soil stress at the face. In other words, when the face pressure decreases, the piles contribute to support the tunnel face and resist increase of more surface settlement. As the figure shows, when the face pressuree decreases around two times from 215Kpa to 115Kpa the maximum surface settlement increases just 1.4mm. In another way, at presence of the piles, large increasing of the face pressure causes small decreasing of the surface settlement. Figure 8: Surface settlement trough for different value of tunnel face pressure INFLUENCE OF HIGH FACE PRESSURE In the previous section by parametric study, we showed that the piles resist the upward force generated by the face pressure when controlling the surface settlement. This section represents the longitudinal settlement measured at the ground surface where the high face pressure was used in the tunnelling operation. Since there was an uncertainty in the effect of the Underpass structure on the face pressure, actual high face pressure of 210kPa was applied in the first 169m-part of the tunnel operation under the Underpass of the site. This was much higher than the predicted minimum face pressure mentioned in the previous sections. Figure 9 shows longitudinal settlements during excavation of the first tunnel for three TBM head positions. Clearly when the TBM advanced, the ground surface settlement increased. As the figure shows a slight temporary heave of the ground surface of approximately 1mm can be observed in front of the TBM. Although the high face pressure decreases the final settlement, this pressure can also cause damage to TBM cutter head as
9 Vol. 16 [2011], Bund. D 449 indicated by the field observation (Bamrah Construction, 2010). Replacement of the cutter head had to be made which lead to further delays and interruption to the tunnelling operation. Surface Settlement (mm) Figure 9: Field measurement of longitudinal surface settlement CONCLUSION A 3D numerical analysis with assistance of field data has been presented to study the effects of face pressure on the surface settlement induced by tunnelling under the piled walls. Numerical modelling results showed the minimum pressure to support the tunnel face is less than minimum face pressure in the green field condition. In fact, applying the green-field pressure to the tunnel face in the presence of piles is a conservative method. The parametric study illustrated that increasing the face pressure significantly does not help to reduce the final surface settlement significantly but only slight. Field observation of the Shiraz subway tunnels under the existing Zand underpass showed excessive tunnel face pressure causes temporary heave to the ground surface but also cause damage to the TBM cutter head. REFERENCES TBM position:+10.5m Longitudinal Coordinate (m) 1. Anagnostou, G. and Kovári, K.(1996). Face Stability Conditions with Earth-Pressure- Balanced Shields. Tunn. Undergr. Sp. Tech. 11(2), Atkinson, J.H., and Potts, D.M. (1977). Stability of a Shallow Circular Tunnel in Cohesionless Soil. Géotechnique 27(2), Bamrah Construction. (2004). Geotechnical engineering of Shiraz subway report. Shiraz Subway Construction Company, Shiraz, Iran (In Persian). 4. Bamrah Construction. (2010). Report of first TBM damage in Shiraz subway. Shiraz Subway Construction Company, Shiraz, Iran (In Persian). 5. Brinkgreve, R. B. J., and Broere, W. (2004). Plaxis 3D tunnel manual. Version 2. Online manual. 6. Broere, W.(2001). Tunnel Face Stability and New CPT Applications. Ph.D Thesis,Technical Univer-sity of Delft Broms, B.B., and Bennmark, H.(1967). Stability of Clay at Vertical Opening. ASCE Journal of the Soil Mechanics and Foundations Division. SM1,
10 Vol. 16 [2011], Bund. D Coutts, D.R. and Wang, J. ( Monitoring of reinforced concrete piles under horizontal and vertical loads due to tunnelling. In: Tunnels and underground structures by Zhao, Shirlaw and Krishna, Singapore, Chen, L. T., Poulos, H. G. and Loganathan, N. (1999). Pile responses caused by tunnelling. Journal of Geotechnical and Geoenvironmental Engineering, 125 (3), Cheng, C. Y., Dasari, G. R., Chow, Y. K., and Leung, C. F. (2007). Finite element analysis of tunnel-soil-pile interaction using displacementcontrolled model. Tunnelling and Underground Space Technology, 22(4), Huang, M., Li, C. Z. Z. (2009). A simplified analysis method for the influence of tunneling on grouped piles. Tunnelling and Underground Space Technology,24 (4), Jacobsz, S. W., Standing, J. R., Mair, R. J., Soga, K., Hagiwara, T. & Sugiyama, T. (2001). Tunnelling effects on driven piles. Proc. Int. Conf. Response of buildings to excavation induced ground movements, London. 13. Kaalberg, F.J., Von Tol, A.F., Bosch, J.W. (2006). Dutch research on the impact of shield tunnelling on pile foundations. Proceeding of 5th International symposium at Amesterdam, 2005: Geotechnical Aspects of Underground Construction in soft Ground. 14. Kasper, T., Meschke, G. (2006). On the influence of face pressure, grouting pressure and TBM design in soft ground tunnelling. TunnellingandUndergroundSpaceTechnology, 21, Leca, E., and Dormieux, L. (1990). Upper and lower bound solutions for the face stability of shallow circular tunnels in frictional material. Ge otechnique, 40(4), Lee Y, J., Bassett, R. H. (2007). Influence zones for 2D pile soil tunnelling interaction based on model test and numerical analysis. Tunnelling and Underground Space Technology, 22, Leung, C. F., Chow, Y. K., and Shen, R. F. (2002). Behavior of pile subject to excavationinduced soil movement. J. Geotech. Geoenviron. Eng., 126(11), Mohamed A. Meguid., Mattar, j. (2009). Investigation of Tunnel-Soil-Pile Interaction in Cohesive Soils. Journal of Geotechnical and Geoenvironmental Engineering, 135 (7), Mroueh, H., and Shahrour, I. (2002). Three-dimensional finite element analysis of the interaction between tunneling and pile foundations. International journal for numerical and analytical methods in geomechanics, 26, Ng, C.W.W., Chan, S.H., Lam, S.Y. (2005). Centrifuge and numerical modeling of shielding effects on piles in consolidating soil. In: Proceedings of 2nd China Japan Geotechnical Symposium, Tongji University Press, Shanghai, Peck, R.B. (1969). Deep excavations and tunnelling in soft ground. Proc. 7th Int. Conf.on Soil Mechanics and Foundation Engineering, Mexico City, State of the Art Volume, Potts, D.M., and Zdravkovic, L. (2001). Finite element analysis in geotechnical engineering:application. Thomas Telford, London, UK 23. Vermeer, P.A., and Bonnier, P.G. (1991). Pile settlements due to tunnelling. Proc. 10thEuropean Conf. on Soil Mechanics and Foundation Engineering, Florence, Balkema, Vol. 2, p ejge
Estimation of Adjacent Building Settlement During Drilling of Urban Tunnels
Estimation of Adjacent Building During Drilling of Urban Tunnels Shahram Pourakbar 1, Mohammad Azadi 2, Bujang B. K. Huat 1, Afshin Asadi 1 1 Department of Civil Engineering, University Putra Malaysia
Appendix A Sub surface displacements around excavations Data presented in Xdisp sample file
Appendix A Sub surface displacements around excavations Data presented in Xdisp sample file Notation B1 = lowest level of basement slab c = cohesion E = drained Young s Modulus Eu = undrained Young s Modulus
Numerical Simulation of CPT Tip Resistance in Layered Soil
Numerical Simulation of CPT Tip Resistance in Layered Soil M.M. Ahmadi, Assistant Professor, [email protected] Dept. of Civil Engineering, Sharif University of Technology, Tehran, Iran Abstract The paper
Analysis of an Underground Structure Settlement Risk due to Tunneling Vahdatirad, Mohammadjavad; Ghodrat, Hadi; Firouzianbandpey, Sarah; Barari, Amin
Aalborg Universitet Analysis of an Underground Structure Settlement Risk due to Tunneling Vahdatirad, Mohammadjavad; Ghodrat, Hadi; Firouzianbandpey, Sarah; Barari, Amin Published in: Songklanakarin Journal
How To Calculate Tunnel Longitudinal Structure
Calculation and Analysis of Tunnel Longitudinal Structure under Effect of Uneven Settlement of Weak Layer 1,2 Li Zhong, 2Chen Si-yang, 3Yan Pei-wu, 1Zhu Yan-peng School of Civil Engineering, Lanzhou University
Validation of methods for assessing tunnelling-induced settlements on piles
Validation of methods for assessing tunnelling-induced settlements on piles Mike Devriendt, Arup Michael Williamson, University of Cambridge & Arup technical note Abstract For tunnelling projects, settlements
Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains
Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains Doug Jenkins 1, Chris Lawson 2 1 Interactive Design Services, 2 Reinforced
Proceedings 2005 Rapid Excavation & Tunneling Conference, Seattle
Proceedings 2005 Rapid Excavation & Tunneling Conference, Seattle EPB-TBM Face Support Control in the Metro do Porto Project, Portugal S. Babendererde, Babendererde Engineers LLC, Kent, WA; E. Hoek, Vancouver,
Open Access Numerical Analysis on Mutual Influences in Urban Subway Double-Hole Parallel Tunneling
Send Orders for Reprints to [email protected] The Open Construction and Building Technology Journal, 2014, 8, 455-462 455 Open Access Numerical Analysis on Mutual Influences in Urban Subway Double-Hole
An Innovative Method For Assessing Tunnelling-Induced Risks To Adjacent Structures
An Innovative Method for Assessing the Tunnelling-Induced Risks to Adjacent Structures Monograph 25 U X U Z PB 2009 William Barclay Parsons Fellowship Monograph 25 An Innovative Method For Assessing Tunnelling-Induced
ESTIMATION OF UNDRAINED SETTLEMENT OF SHALLOW FOUNDATIONS ON LONDON CLAY
International Conference on Structural and Foundation Failures August 2-4, 2004, Singapore ESTIMATION OF UNDRAINED SETTLEMENT OF SHALLOW FOUNDATIONS ON LONDON CLAY A. S. Osman, H.C. Yeow and M.D. Bolton
Behaviour of buildings due to tunnel induced subsidence
Behaviour of buildings due to tunnel induced subsidence A thesis submitted to the University of London for the degree of Doctor of Philosophy and for the Diploma of the Imperial College of Science, Technology
NUMERICAL MODELLING OF PIEZOCONE PENETRATION IN CLAY
NUMERICAL MODELLING OF PIEZOCONE PENETRATION IN CLAY Ilaria Giusti University of Pisa [email protected] Andrew J. Whittle Massachusetts Institute of Technology [email protected] Abstract This paper
A study on the causes of troubles in shield tunneling site with numerical analysis
A study on the causes of troubles in shield tunneling site with numerical analysis 1 B.K. Rho, 2 S.Y. Choo, 2 M.K. Song Korea Rail Network Authority, Daejeon, Korea 1 ; Danwoo E&C Co., Ltd., Sungnam, Korea
Tests and Analyses on Shear Strength Increment of Soft Soil under Embankment Fill
Tests and Analyses on Shear Strength Increment of Soft Soil under Embankment Fill Guanbao Ye Professor Key Laboratory of Geotechnical and Underground Engineering,Tongji University, Ministry of Education,
Numerical analysis of boundary conditions to tunnels
Global journal of multidisciplinary and applied sciences Available online at www.gjmas.com 2015 GJMAS Journal-2015-3-2/37-41 ISSN 2313-6685 2015 GJMAS Numerical analysis of boundary conditions to tunnels
SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT
SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT 1.0 SOIL IMPROVEMENT 1.1 General Soil Investigation Information are provided in Part B1 annex as a guide to the Contractor for his consideration
State Route 640 Itinerary Agrigento-Caltanissetta-A19. Description of work
Description of work Sicily Tunnel Caltanissetta Year: 2013 In progress Client: Anas s.p.a. Contractor: Empedocle 2 s.c.p.a. Total length: 28 km Works amount: 175.000.000,00 Activities: Construction design
Impacts of Tunnelling on Ground and Groundwater and Control Measures Part 1: Estimation Methods
Impacts of Tunnelling on Ground and Groundwater and Control Measures Part 1: Estimation Methods Steve Macklin Principal Engineering Geologist GHD Melbourne 1. Introduction, scope of Part 1 2. Terminology
GUIDANCE NOTES FOR DEVELOPMENTS OR ENGINEERING WORKS IN THE VICINITY OF SPT SUBWAY INFRASTRUCTURE JULY 2005
GUIDANCE NOTES FOR DEVELOPMENTS OR ENGINEERING WORKS IN THE VICINITY OF SPT SUBWAY INFRASTRUCTURE JULY 2005 CONTENTS 1.0 INTRODUCTION 2.0 OVERVIEW OF SPT APPROACH TO DEVEOPMENTS/WORKS IN THE VICINITY OF
A Theoretical Solution for Consolidation Rates of Stone Column-Reinforced Foundations Accounting for Smear and Well Resistance Effects
The International Journal of Geomechanics Volume, Number, 135 151 (00) A Theoretical Solution for Consolidation Rates of Stone Column-Reinforced Foundations Accounting for Smear and Well Resistance Effects
4.3 Results... 27 4.3.1 Drained Conditions... 27 4.3.2 Undrained Conditions... 28 4.4 References... 30 4.5 Data Files... 30 5 Undrained Analysis of
Table of Contents 1 One Dimensional Compression of a Finite Layer... 3 1.1 Problem Description... 3 1.1.1 Uniform Mesh... 3 1.1.2 Graded Mesh... 5 1.2 Analytical Solution... 6 1.3 Results... 6 1.3.1 Uniform
When to Use Immediate Settlement in Settle 3D
When to Use Immediate Settlement in Settle 3D Most engineers agree that settlement is made up of three components: immediate, primary consolidation and secondary consolidation (or creep). Most engineers
Validation of Cable Bolt Support Design in Weak Rock Using SMART Instruments and Phase 2
Validation of Cable Bolt Support Design in Weak Rock Using SMART Instruments and Phase 2 W.F. Bawden, Chair Lassonde Mineral Engineering Program, U. of Toronto, Canada J.D. Tod, Senior Engineer, Mine Design
Penetration rate effects on cone resistance measured in a calibration chamber
Penetration rate effects on cone resistance measured in a calibration chamber K. Kim Professional Service Industries, Inc, Houston, TX, USA M. Prezzi & R. Salgado Purdue University, West Lafayette, IN,
CHAPTER 9 FEM MODELING OF SOIL-SHEET PILE WALL INTERACTION
391 CHAPTER 9 FEM MODELING OF SOIL-SHEET PILE WALL INTERACTION 9.1 OVERVIEW OF FE SOIL-STRUCTURE INTERACTION Clough and Denby (1969) introduced Finite Element analysis into the soil-structure interaction
STRUCTURAL DAMAGE OF A 5-STOREY BUILDING: DIFFERENTIAL SETTLEMENT DUE TO CONSTRUCTION OF AN ADJACENT BUILDING OR BECAUSE OF CONSTRUCTION DEFECTS?
STRUCTURAL DAMAGE OF A 5-STOREY BUILDING: DIFFERENTIAL SETTLEMENT DUE TO CONSTRUCTION OF AN ADJACENT BUILDING OR BECAUSE OF CONSTRUCTION DEFECTS? Ioannis Anastasopoulos National Technical University of
By D. P. StewarP and M. F. Randolph z
T-BAR PENETRATION TESTING IN SOFT CLAY By D. P. StewarP and M. F. Randolph z ABSTRACT: A t-bar penetration test for soft clay that can be performed with existing cone penetration test (CPT) equipment is
PREDICTING THE HYDRAULIC CONDUCTIVITY OF MAKASSAR MARINE CLAY USING FIELD PENETRATION TEST (CPTU) RESULTS
Proceedings of the Sixth International Conference on Asian and Pacific Coasts (APAC 2011) December 14 16, 2011, Hong Kong, China PREDICTING THE HYDRAULIC CONDUCTIVITY OF MAKASSAR MARINE CLAY USING FIELD
INTRODUCTION TO SOIL MODULI. Jean-Louis BRIAUD 1
INTRODUCTION TO SOIL MODULI By Jean-Louis BRIAUD 1 The modulus of a soil is one of the most difficult soil parameters to estimate because it depends on so many factors. Therefore when one says for example:
Program COLANY Stone Columns Settlement Analysis. User Manual
User Manual 1 CONTENTS SYNOPSIS 3 1. INTRODUCTION 4 2. PROBLEM DEFINITION 4 2.1 Material Properties 2.2 Dimensions 2.3 Units 6 7 7 3. EXAMPLE PROBLEM 8 3.1 Description 3.2 Hand Calculation 8 8 4. COLANY
EN 1997-1 Eurocode 7. Section 10 Hydraulic Failure Section 11 Overall Stability Section 12 Embankments. Trevor L.L. Orr Trinity College Dublin Ireland
EN 1997 1: Sections 10, 11 and 12 Your logo Brussels, 18-20 February 2008 Dissemination of information workshop 1 EN 1997-1 Eurocode 7 Section 10 Hydraulic Failure Section 11 Overall Stability Section
Tunnelling & Underground. Specialists
Tunnelling & Underground Specialists Mined Tunnels Excavation at Ayer Rajah Avenue, Singapore Introduction Amberg & TTI Engineering Pte Ltd (AETTI) was established in Singapore in 2002 by Amberg Engineering
The Cut-and-Cover and Coverand-Cut Techniques in Highway Engineering
The Cut-and-Cover and Coverand-Cut Techniques in Highway Engineering A. Mouratidis Professor of Highway Engineering, Aristotle University of Thessaloniki Email: [email protected] ABSTRACT The
Risk Management Applied to Mechanized Tunnelling in Urban Area Piergiorgio GRASSO - GEODATA, Italy
Risk Management Applied to Mechanized Tunnelling in Urban Area Piergiorgio GRASSO - GEODATA, Italy ITA CBT Seminario SAT2008 Sao Paolo, June 25 2008 1 Contents Peculiar aspects of Tunnelling in urban areas
Interpretation of clogging effects on the hydraulic behavior of ion treated geotextiles
9 th International Conference on Geosynthetics, Brazil, 2010 Interpretation of clogging effects on the hydraulic behavior of ion treated geotextiles Lee, K. W. Department of Civil Engineering, Dongseo
c. Borehole Shear Test (BST): BST is performed according to the instructions published by Handy Geotechnical Instruments, Inc.
Design Manual Chapter 6 - Geotechnical 6B - Subsurface Exploration Program 6B-2 Testing A. General Information Several testing methods can be used to measure soil engineering properties. The advantages,
Numerical study of long-term settlement following twin tunnel construction
Martínez, R., R., Schroeder, F. F. and and Potts, D.(2015). Numerical study of of long-term settlement following twin twin tunnel construction. Obras y y Proyectos 17, 17, 23-29 Numerical study of long-term
Numerical study of rate effects in cone penetration test
Numerical study of rate effects in cone penetration test Daichao Sheng, Richard Kelly, Jubert Pineda and Lachlan Bates Australian Research Council Centre of Excellence for Geotechnical Science and Engineering,
A HYBRID GROUND DATA MODEL TO SUPPORT INTERACTION IN MECHANIZED TUNNELING
A HYBRID GROUND DATA MODEL TO SUPPORT INTERACTION IN MECHANIZED TUNNELING F. HEGEMANN P. MANICKAM K. LEHNER M. KÖNIG D. HARTMANN Department of Civil and Environmental Engineering, Ruhr-University of Bochum,44780
Optimised Design for Soil Nailed Walls 1
Optimised Design for Soil Nailed Walls 1 J A R Ortigao 1 and E M Palmeira 2 1 Federal University of Rio de Janeiro, Rio de Janeiro, Brazil 2 University of Brasília, Brasília, Brazil INTRODUCTION The first
Milan M5 metro extension the construction of Lotto station
Milan M5 metro extension the construction of Lotto station Giuseppe LUNARDI, Rocksoil S.p.A., Italy [email protected] Luca MANCINELLI, Rocksoil S.p.A., Italy, [email protected] Massimiliano
Embankment Consolidation
Embankment Consolidation 36-1 Embankment Consolidation In this tutorial, RS2 is used for a coupled analysis of a road embankment subject to loading from typical daily traffic. Model Start the RS2 9.0 Model
Worked Example 2 (Version 1) Design of concrete cantilever retaining walls to resist earthquake loading for residential sites
Worked Example 2 (Version 1) Design of concrete cantilever retaining walls to resist earthquake loading for residential sites Worked example to accompany MBIE Guidance on the seismic design of retaining
Soil behaviour type from the CPT: an update
Soil behaviour type from the CPT: an update P.K. Robertson Gregg Drilling & Testing Inc., Signal Hill, California, USA ABSTRACT: An initial application of CPT results is to evaluate soil type and soil
10-1 10. CONSOLIDATION
10-1 10. CONSOLIDATION 10.1 INFLUENCE OF DRAINAGE ON RATE OF SETTLEMENT When a saturated stratum of sandy soil is subjected to a stress increase, such as that caused by the erection of a building on the
GOWANUS EXPRESSWAY TUNNEL PRIMER
GOWANUS EXPRESSWAY TUNNEL PRIMER T he New York State Department of Transportation is currently studying the replacement of the Gowanus Expressway with a tunnel. This investigation involves looking at a
SUGGESTION ABOUT DETERMINATION OF THE BEARING CAPACITY OF PILES ON THE BASIS OF CPT SOUNDING TESTS
SUGGESTION ABOUT DETERMINATION OF THE BEARING CAPACITY OF PILES ON THE BASIS OF CPT SOUNDING TESTS JóZSEF PUSZTAI About the authors Pusztai József Budapest University of Technology and Economics, Department
DEM modelling of the dynamic penetration process on Mars as a part of the NASA InSight Mission
Proceedings of the 4th European Young Geotechnical Engineers Conference (EYGEC), Durham, UK Osman, A.S. & Toll, D.G. (Eds.) 05 ISBN 978-0-9933836-0 DEM modelling of the dynamic penetration process on Mars
Numerical Analysis in the Design of Urban Tunnels. Numerical Analysis in the Design of Urban Tunnels
Torino, 19-24 June 2005 Keynote Lecture Numerical Analysis in the Design of Urban Tunnels Michael Kavvadas Assoc. Professor of Civil Engineering NATIONAL TECHNICAL UNIVERSITY OF ATHENS SCHOOL OF CIVIL
Applying a circular load. Immediate and consolidation settlement. Deformed contours. Query points and query lines. Graph query.
Quick Start Tutorial 1-1 Quick Start Tutorial This quick start tutorial will cover some of the basic features of Settle3D. A circular load is applied to a single soil layer and settlements are examined.
INDIRECT METHODS SOUNDING OR PENETRATION TESTS. Dr. K. M. Kouzer, Associate Professor in Civil Engineering, GEC Kozhikode
INDIRECT METHODS SOUNDING OR PENETRATION TESTS STANDARD PENETRATION TEST (SPT) Reference can be made to IS 2131 1981 for details on SPT. It is a field edtest to estimate e the penetration e resistance
PILE FOUNDATIONS FM 5-134
C H A P T E R 6 PILE FOUNDATIONS Section I. GROUP BEHAVIOR 6-1. Group action. Piles are most effective when combined in groups or clusters. Combining piles in a group complicates analysis since the characteristics
EVALUATING THE IMPROVEMENT FROM IMPACT ROLLING ON SAND
EVALUATING THE IMPROVEMENT FROM IMPACT ROLLING ON SAND D.L. Avalle, Broons Hire (SA) Pty Ltd, Australia J.P. Carter, The University of Sydney, Australia Abstract Impact rolling, utilising a non-circular
Cone Penetration Testing in Geotechnical Practice. Tom Lunne Peter K. Robertson John J.M. Powell
Cone Penetration Testing in Geotechnical Practice Tom Lunne Peter K. Robertson John J.M. Powell BLACKIE ACADEMIC & PROFESSIONAL An Imprint of Chapman & Hall London Weinheim New York Tokyo Melbourne Madras
Structural Performance of Highway Bridges under Given Foundation Settlements
ASEE 2014 Zone I Conference, April 3-5, 2014, University of Bridgeport, Bridgeport, CT, USA. Structural Performance of Highway Bridges under Given Foundation Settlements Zhan Su*; Qian Wang, PhD, PE, Assistant
Module 7 (Lecture 24 to 28) RETAINING WALLS
Module 7 (Lecture 24 to 28) RETAINING WALLS Topics 24.1 INTRODUCTION 24.2 GRAVITY AND CANTILEVER WALLS 24.3 PROPORTIONING RETAINING WALLS 24.4 APPLICATION OF LATERAL EARTH PRESSURE THEORIES TO DESIGN 24.5
Laterally Loaded Piles
Laterally Loaded Piles 1 Soil Response Modelled by p-y Curves In order to properly analyze a laterally loaded pile foundation in soil/rock, a nonlinear relationship needs to be applied that provides soil
Comparison of Continuous Dynamic Probing with the Standard Penetration Test for Highly Weathered Limestone of Eastern Sudan
Comparison of Continuous Dynamic Probing with the Standard Penetration Test for Highly Weathered Limestone of Eastern Sudan Prof. Dr. Khairul Anuar Kassim Deputy Dean, Research and Graduate Studies, Faculty
How To Design A Foundation
The Islamic university - Gaza Faculty of Engineering Civil Engineering Department CHAPTER (2) SITE INVESTIGATION Instructor : Dr. Jehad Hamad Definition The process of determining the layers of natural
CPTic_CSM8. A spreadsheet tool for identifying soil types and layering from CPTU data using the I c method. USER S MANUAL. J. A.
CPTic_CSM8 A spreadsheet tool for identifying soil types and layering from CPTU data using the I c method. USER S MANUAL J. A. Knappett (2012) This user s manual and its associated spreadsheet ( CPTic_CSM8.xls
DESIGN OF PILES AND PILE GROUPS CONSIDERING CAPACITY, SETTLEMENT, AND NEGATIVE SKIN FRICTION
DESIGN OF PILES AND PILE GROUPS CONSIDERING CAPACITY, SETTLEMENT, AND NEGATIVE SKIN FRICTION Introduction Bengt H. Fellenius, Dr.Tech., P.Eng. Background Notes for Demo Example for UniPile at www.unisoftltd.com
Drained and Undrained Conditions. Undrained and Drained Shear Strength
Drained and Undrained Conditions Undrained and Drained Shear Strength Lecture No. October, 00 Drained condition occurs when there is no change in pore water pressure due to external loading. In a drained
Safe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM
BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM Swaminathan Srinivasan, P.E., M.ASCE H.C. Nutting/Terracon David Tomley, P.E., M.ASCE KZF Design Delivering Success for
CE 366 SETTLEMENT (Problems & Solutions)
CE 366 SETTLEMENT (Problems & Solutions) P. 1) LOAD UNDER A RECTANGULAR AREA (1) Question: The footing shown in the figure below exerts a uniform pressure of 300 kn/m 2 to the soil. Determine vertical
Field tests using an instrumented model pipe pile in sand
Field tests using an instrumented model pipe pile in sand D. Igoe University College Dublin K. Gavin University College Dublin B. O Kelly Trinity College Dublin Reference: Igoe D., Gavin K., and O'Kelly
METHOD OF STATEMENT FOR STATIC LOADING TEST
Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents
NEGATIVE SKIN FRICTION AND SETTLEMENT OF PILES. Dr. Bengt H. Fellenius, P. Eng. University of Ottawa, Canada
Fellenius, B. H., 1984. Negative skin friction and settlement of piles. Second International Seminar, Pile Foundations, Nanyang Technological Institute, Singapore, November 28-30, 12 p. NEGATIVE SKIN FRICTION
Improvement in physical properties for ground treated with rapid impact compaction
International Journal of the Physical Sciences Vol. 6(22), pp. 5133-5140, 2 October 2011 Available online at http://www.academicjournals.org/ijps ISSN 1992-1950 2011 Academic Journals Full Length Research
SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS
SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS Vince Luongo Petrifond Foundation Co., Ltd. PROJECT DESCRIPTION The York Durham Sanitary System (YDSS) Interceptor in the Town of Richmond Hill located
P. Lu, Sh. Huang and K. Jiang
416 Rev. Adv. Mater. Sci. 33 (2013) 416-422 P. Lu, Sh. Huang and K. Jiang NUMERICAL ANALYSIS FOR THREE-DIMENSIONAL BULK METAL FORMING PROCESSES WITH ARBITRARILY SHAPED DIES USING THE RIGID/VISCO-PLASTIC
Geotechnical Measurements and Explorations Prof. Nihar Ranjan Patra Department of Civil Engineering Indian Institute of Technology, Kanpur
Geotechnical Measurements and Explorations Prof. Nihar Ranjan Patra Department of Civil Engineering Indian Institute of Technology, Kanpur Lecture No. # 13 (Refer Slide Time: 00:18) So last class, it was
ASSESSMENT OF SHEAR WAVE VELOCITY FROM INDIRECT INSITU TESTS
Proceedings of Indian Geotechnical Conference IGC-2014 December 18-20, 2014, Kakinada, India ASSESSMENT OF SHEAR WAVE VELOCITY FROM INDIRECT INSITU TESTS Kant, L., M. Tech Student, Department of Earthquake
Consolidation and Settlement Analysis
19 Consolidation and Settlement Analysis Patrick J. Fox Purdue University 19.1 Components of Total Settlement 19.2 Immediate Settlement 19.3 Consolidation Settlement Total Consolidation Settlement Rate
International Journal of Scientific & Engineering Research, Volume 4, Issue 9, September-2013 409 ISSN 2229-5518
International Journal of Scientific & Engineering Research, Volume 4, Issue 9, September-2013 409 Estimation of Undrained Shear Strength of Soil using Cone Penetration Test By Nwobasi, Paul Awo Department
Numerical Modelling for Shallow Tunnels in Weak Rock By Evert Hoek Unpublished Notes
Numerical Modelling for Shallow Tunnels in Weak Rock By Evert Hoek Unpublished Notes Introduction When designing a shallow tunnel in a poor quality rock mass, the designer has to face a number of problems
Outline MICROPILES SUBJECT TO LATERAL LOADING. Dr. Jesús Gómez, P.E.
MICROPILES SUBJECT TO LATERAL LOADING Dr. Jesús Gómez, P.E. Micropile Design and Construction Seminar Las Vegas, NV April 3-4, 2008 Outline When are micropiles subject to lateral load? How do we analyze
CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST
CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST 1 Permeability is a measure of the ease in which water can flow through a soil volume. It is one of the most important geotechnical parameters. However,
Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations
Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations Cambridge City Council - East Cambridgeshire District Council - Fenland District Council, Huntingdonshire
Modeling Beams on Elastic Foundations Using Plate Elements in Finite Element Method
Modeling Beams on Elastic Foundations Using Plate Elements in Finite Element Method Yun-gang Zhan School of Naval Architecture and Ocean Engineering, Jiangsu University of Science and Technology, Zhenjiang,
Large deformation analysis of cone penetration testing in undrained clay
Installation Effects in Geotechnical Engineering Hicks et al. (eds) 13 Taylor & Francis Group, London, ISBN 978-1-138-41-4 Large deformation analysis of cone penetration testing in undrained clay L. Beuth
NOTES on the CONE PENETROMETER TEST
GE 441 Advanced Engineering Geology & Geotechnics Spring 2004 Introduction NOTES on the CONE PENETROMETER TEST The standardized cone-penetrometer test (CPT) involves pushing a 1.41-inch diameter 55 o to
Foundation Size Effect on Modulus of Subgrade Reaction on Sandy Soils
Foundation Size Effect on Modulus of Subgrade Reaction on Sandy Soils Aminaton Marto Professor of Faculty of Civil Engineering, University Technology Malaysia (UTM) 81310 Skudai, Johor Bahru, Malaysia;
FOUNDATION TECHNICAL CATEGORY 3 (TC3) AUGUST 2012
FOUNDATION TECHNICAL CATEGORY 3 (TC3) AUGUST 2012 Building and Housing has published technical guidance for foundation repairs and reconstruction for residential properties in green zone Foundation Technical
Equivalent CPT Method for Calculating Shallow Foundation Settlements in the Piedmont Residual Soils Based on the DMT Constrained Modulus Approach.
Equivalent CPT Method for Calculating Shallow Foundation Settlements in the Piedmont Residual Soils Based on the DMT Constrained Modulus Approach. Paul W. Mayne, PhD, P.E., Professor, Geosystems Engineering
BEARING CAPACITY AND SETTLEMENT RESPONSE OF RAFT FOUNDATION ON SAND USING STANDARD PENETRATION TEST METHOD
SENRA Academic Publishers, British Columbia Vol., No. 1, pp. 27-2774, February 20 Online ISSN: 0-353; Print ISSN: 17-7 BEARING CAPACITY AND SETTLEMENT RESPONSE OF RAFT FOUNDATION ON SAND USING STANDARD
Site Investigation. Some unsung heroes of Civil Engineering. buried right under your feet. 4. Need good knowledge of the soil conditions
This is an attempt to create a stand alone self learning module on site investigation. Fasten your seat belts. Sit back, relax and enjoy. 1 2 Site Investigation Some unsung heroes of Civil Engineering
USE OF CONE PENETRATION TEST IN PILE DESIGN
PERIODICA POLYTECHNICA SER. CIV. ENG. VOL. 47, NO. 2, PP. 189 197 (23) USE OF CONE PENETRATION TEST IN PILE DESIGN András MAHLER Department of Geotechnics Budapest University of Technology and Economics
COSMOS 2012: Earthquakes in Action COSMOS 2012
COSMOS 2012 What is SFSI and why is it important? Soil issues in Earthquakes Structures where SFSI important Retaining structures (lateral earth pressure) Foundations (spread and pile footings, bearing
Full Professor, Department of Geotechnical Engineering, Tongji University
TC304: Engineering Practice of risk assesment and management Prof. Hongwei Huang, Department of Geotechniacl Engineering Tongji University, 1239 Siping Road, Shanghai 200092,P.R. China Tel:86-21-65982986(O)
Module 1 : Site Exploration and Geotechnical Investigation. Lecture 4 : In-situ tests [ Section 4.1: Penetrometer Tests ] Objectives
Lecture 4 : In-situ tests [ Section 4.1: Penetrometer Tests ] Objectives In this section you will learn the following Penetrometer Tests Standard penetration test Static cone penetration test Dynamic cone
SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS
Page 1 of 9 SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS 1. GENERAL REQUIREMENTS 1. Description of Work: This work consists of furnishing all materials, equipment and
Toe Bearing Capacity of Piles from Cone Penetration Test (CPT) Data
Toe Bearing Capacity of Piles from Cone Penetration Test (CPT) Data Abolfazl Eslami University of Ottawa, Civil Engineering Department PREPRINT International Symposium on Cone Penetrometer Testing, CPT
Advanced Natural Gas Storage (ANGAS) Project and Verification Tests of Experimental Lined Rock Cavern in Japan
Advanced Natural Gas Storage (ANGAS) Project and Verification Tests of Experimental Lined Rock Cavern in Japan Toru Komatsubara THE JAPAN GAS ASSOCIATION Taku Watanabe TOKYO GAS CO.,LTD. Satoshi Murase
Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations
Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations Nathan A. Ingraffea, P.E., S.E. Associate, KPFF Consulting Engineers, Portland, Oregon, USA Abstract The use of steel sheet
DIRECTIONAL DRILLING
DIRECTIONAL DRILLING 1. General. Installation of pipelines through the levee embankment using directional drilling technology is prohibited. Installation of pipelines through a flood control project foundation
SYDNEY SANDSTONE AND SHALE PARAMETERS FOR TUNNEL DESIGN
Robert Bertuzzi Pells Sullivan Meynink, Unit G3 56 Delhi Road, North Ryde NSW 2113, Australia 1 BACKGROUND Inherent in any set of rock mass parameters are various assumptions regarding, amongst other things