Environmental Health and Safety Guidelines For Construction, Renovation and Demolition
|
|
|
- Everett Haynes
- 9 years ago
- Views:
Transcription
1 Environmental Health and Safety Guidelines For Construction, Renovation and Demolition Prepared by: University of Maryland Department of Environmental Safety and Facilities Management FINAL 3/1/04
2 TABLE OF CONTENTS PAGE I. PURPOSE... 1 II. SCOPE... 1 III. DEFINITIONS... 2 A. Asbestos Containing Material (ACM)... 2 B. Competent Person... 2 C. Confined Space... 2 D. Department of Environmental Safety... 2 E. Imminent Danger... 4 F. Lead-Based Paint... 4 G. Material Safety Data Sheets (MSDS)... 4 H. Project Manager... 4 I. Project Monitor... 4 J. Site Inspector... 4 IV. TRAINING... 5 V. DUTIES AND RESPONSIBILITIES... 5 A. University Project Mangers... 5 B. DES Employees... 7 C. DES Director or Designee... 7 D. Site Inspectors... 7 E. Contractors and Subcontractors... 8 VI. GENERAL UM ENVIRONMENTAL HEALTH AND SAFETY REQUIREMENTS... 8 A. Emergency Procedures... 9 B. Work Issues Protection of Property Clean-Up Demolition: Preparatory Operations Asbestos and Lead-Based Paint Portable Ladders and Scaffolds Site Access and Use Fall Protection Contractor Tools and Equipment (including Manlifts) FINAL 3/1/04
3 9. Transfer of Flammable Liquids to Containers, Equipment, and Vehicles Lockout/Tagout Confined Space Entry Excavation Safety Welding/Burning/Torch/Soldering HAZCOM Standard Personal Protective Equipment (PPE) and Hazard Signage Hazardous Materials Hazardous and Regulated Waste Spills and Releases Natural Resources Permitting and Compliance Issues Fire Protection/Life Safety C. SMALL PROJECTS VII. REGULATORY REQUIREMENTS AND INFORMATION VIII. PUBLIC/PRIVATE PARTNERSHIP PROJECTS IX. REGULATORY AGENCY INSPECTIONS APPENDIX A - DES SUBJECT SPECIFIC CONTACTS APPENDIX B - ASBESTOS PERMIT APPENDIX C - DES ENVIRONMENTAL HEALTH AND SAFETY FACT SHEETS CONSTRUCTION TOPICS APPENDIX D - FEDERAL OSHA WEB PAGE APPENDIX E - MARYLAND OSH WEB PAGE FINAL 3/1/04
4 Environmental Health and Safety Guidelines For Construction, Renovation and Demolition I. Purpose This guidance document has been prepared by the University of Maryland (UM) Departments of Environmental Safety (DES) and Facilities Management (FM) to define the environmental, health, and safety (EHS) responsibilities of FM personnel managing Contractors who conduct work on campus property. These guidelines apply to Contractor activities that may impact the safety and health of UM employees and contractual personnel; pose an environmental hazard; or are contrary to Federal/State regulations and contract requirements. The information provided in this document should be used to assist Project Managers and Site Inspectors in the identification of construction hazards and facilitate inter-departmental communications. Furthermore, it should be used by Contractors as a reference source for basic health, safety, and environmental information while working on the UM campus and affiliated locations. This document does not address all EHS issues that may arise during a construction, renovation or demolition project. It is designed to address those EHS issues that are typically encountered during the course of UM projects. If conditions are encountered during a project that are not addressed in this document or clarification is required relative to site specific conditions, the Project Manager should consult with DES. II. Scope This guidance document applies to all FM units that hire outside Contractors to perform work on campus and affiliated off-campus locations. Oversight of contractual services is the general responsibility of the contracting FM department. The individual responsible for coordinating and accepting the work is referred to in this document as the Project Manager. The individual who inspects the progress of work at the project site is referred to as the Site Inspector. Many contracted services have the potential for direct impact to UM students, faculty, staff, employees and visitors. Failure to comply with construction specifications or accepted EHS practices and regulations may pose a risk to the campus community, UM assets, and the environment. Page 1 FINAL 3/1/04
5 In all circumstances, outside Contractors are directly and legally responsible for the health and safety of their employees, and for compliance with environmental, health and safety regulations. They must also correct EHS deficiencies that are brought to their attention. An identified imminent danger must be corrected immediately. Failure to adequately address deficiencies is cause for progressive actions up to and including discharge from campus. For these reasons, this guidance document is written to explain the roles and responsibilities for conducting and managing work performed by Contractors. This document is not intended to replace a Contractor s safety program nor summarize all the EHS regulations governing the Contractor s operations. Should situations arise which are not covered in these guidelines, or if you have a question about a guideline, contact the UM Project Manager or DES (301) /61. III. Definitions A. Asbestos Containing Material (ACM) A material that contains detectable asbestos according to the Maryland Asbestos Oversight Committee (AOC). B. Competent Person A person who is trained and capable of recognizing existing and predictable hazards in the workplace and has the authority to take corrective action and/or stop work. In terms of fall protection, this individual can also identify dangerous conditions in the personal fall arrest system or any component as well as their application and use with related equipment. For trenching and shoring, this person is trained in the relevant OSHA requirements, soil types and conditions, acceptable benching and sloping methods and excavation support techniques and equipment. C. Confined Space - A Permit-Required Confined Space is a space that: 1. Is large enough and so configured that an individual can enter and performed assigned work; AND 2. Has limited or restricted means for entry or exit; AND 3. Is not designed for continuous occupancy; AND 4. Has ONE OR MORE of the following characteristics: a. Contains or has the potential to contain a hazardous atmosphere; OR b. Contains a material that has the potential for entrapping, engulfing or suffocating an individual; OR c. Has an internal configuration such that an individual could be trapped or asphyxiated by inwardly converging walls or by a floor which slopes downward and tapers to a smaller cross-section; OR d. Contains any other recognized serious safety or health hazard. D. Department of Environmental Safety (DES) The Department of Environmental Safety is a unit within the Division of Administrative Affairs and Page 2 FINAL 3/1/04
6 has the primary responsibility for facilitating UM compliance with all applicable safety and environmental laws, regulations and permit conditions. DES serves as the lead department in coordinating UM activities with safety and environmental regulatory agencies including Maryland Occupational Safety and Health, Maryland Department of the Environment, Maryland Department of Natural Resources, U.S. Environmental Protection Agency, U.S. Occupational Safety and Health Administration, Nuclear Regulatory Commission and several quasi regulatory institutions. DES is organized into several units including: the Occupational Safety and Health unit (OSH); Environmental Affairs (EA); Safety & Code Services (S&CS); Radiation Safety; Biosafety; Fire Marshal; and Risk Management and Communications. DES units have the following general responsibilities: - EA is responsible for overseeing all environmental compliance activities including hazardous, radioactive and biohazardous waste management; environmental permitting, environmental sampling, spill response and environmental cleanup activities. - OSH is responsible for facilitating compliance with applicable safety and health regulations including: hazard communication; fall protection; confined space entry; lockout/tagout; asbestos and lead management; accident/incident investigation and mitigation; and indoor air quality investigations. - Safety & Code Services reviews project designs managed by FM for fire, health and safety issues; code compliance, and coordinates health and safety issues associated with construction, renovation and demolition projects including asbestos and lead management. S&CS includes an Assistant State Fire Marshal who must approve all project design documents, test and accept fire suppression systems and issue final occupancy approvals. - The Fire Marshal Unit includes additional Assistant State Fire Marshals who have jurisdiction over ongoing campus activities including activities that pose a risk to building occupants, existing fire suppression systems, management of the hot works permits program and public assemblies. - Risk Management and Communication is responsible for the campus Worker s Compensation Program and management of UM s insurance claim process. - Biosafety is responsible for the approving and overseeing the safe use of biological agents and response to biological incidents. - Radiation Safety has overall authority over licensing, purchase and use of radioactive sources. - The Manager of Natural Resource Permitting is responsible for advising, facilitating, reviewing, and tracking, all natural resource permits associated with construction. These include wetland, floodplain, sediment and erosion control, stormwater and forestation permits. Page 3 FINAL 3/1/04
7 All DES departments may be reached by calling (301) The DES web page, located at includes subject specific contacts within the Department (See Appendix A); Fact Sheets summarizing key EHS issues; training opportunities including online training; all DES procedures and policies; DES forms, permit applications and databases related to confined spaces and ACM inventories; online permits; and links to Material Safety Data Sheet databases and regulatory agency web sites. E. Imminent Danger - An imminent danger is defined as a condition or practice that (1) could reasonably be expected to cause death or serious physical harm to UM faculty, staff or students, and/or Contractor personnel, or (2) has or may cause an uncontrolled release of hazardous or otherwise regulated material to the air, water or soil. F. Lead-Based Paint (LBP) A paint containing at least 0.7 milligrams of lead per square centimeter (0.7 mg-pb/cm2) of surface area or 0.5% lead by weight. G. Material Safety Data Sheet (MSDS) A document supplied by a manufacturer that describes the ingredients, health hazards and means of protection related to a hazardous material. MSDS s are required by and must meet the informational requirements specified by OSHA. H. Project Manager - The individual responsible for coordinating and accepting the Contractor s work. The Project Manager may officially carry that job title (e.g., Project Manager for construction of a new building), or may have that contingent duty assigned by FM. The Project Manager is the primary conduit of information between the contractor and the University, and employees responsible for this work should have an awareness of EHS regulations, permits, plans and UM policies. Projects that are designed by Facilities Management (FM) are assigned a FM Project Manager. I. Project Monitor - The Project Monitor is an approved industrial hygienist that is professionally insured, accredited in Maryland and qualified to provide asbestos and lead-based paint abatement project oversight. J. Site Inspector - The individual responsible for routine monitoring of Contractor activities on the site is the Site Inspector. For projects managed by FM, a Site Inspector is assigned to the Project. This individual routinely visits the site; monitors progress, identifies situations that do not comply with terms of the Contract; and works in tandem with the Project Manager and the Contractor to resolve those concerns. Page 4 FINAL 3/1/04
8 IV. Training UM Project Managers and Site Inspectors should obtain training about EHS topics relevant to the types of projects they are involved in managing. Training is available through DES and external sources including OSHA and MOSH. Training may include one or more of the following: a review of regulations that apply to the project; DES Fact Sheets ; online DES courses including ACM/LBP awareness, hazardous waste management, radioactive materials management, etc.; routinely scheduled face-to-face DES training including Natural Resource Permitting, Environmental Hazard and Safety Awareness related to Construction; blood-borne pathogen training; Hazard Communication training; and Spill Prevention Control and Countermeasure (oil spill response) training. DES course schedules are available at: apps/trainingclass/index.cfm. In addition to these sources, individuals may review DES published guidance manuals, procedures and plans available through the DES web site or request a training session from DES about one or more topics. OSHA and MOSH provide extensive information through their web sites and provide courses and workshops related to EHS and construction activities. V. Duties and Responsibilities A. University Project Managers shall: (1) Be knowledgeable concerning EHS items that occur on projects that the PM is responsible for and receive training that provides an awareness of EHS issues as appropriate. (2) Ensure that all planned projects involving new construction; changes in existing space use and occupancy; changes in floor plans; and installation or modification of building systems are reviewed and approved by DES at each design phase of the project to ensure compliance with applicable codes and permits. In addition, ensure that all projects involving the disturbance of land is evaluated by the Manager of Natural Resource Permitting to determine the need for environmental (natural resource) permits. For those projects described above, ensure final use and occupancy inspection is completed by DES before occupancy is permitted. It should be noted that some small projects may not require DES review and approval (i.e. painting, casement replacement, etc.). Project Managers should contact DES to determine the need for code review. (3) Ensure that pre-existing hazards at a UM work site (i.e. presence of asbestos, lead, contaminated soil, etc.) are communicated to the affected Contractor prior to the start of work. (4) Respond to EHS deficiencies identified by DES and other UM employees and work with the Contractor to eliminate the deficiencies. (5) Communicate observed or suspect EHS concerns to DES. (6) Immediately notify the DES Director if the Contractor fails to correct an identified imminent danger. Page 5 FINAL 3/1/04
9 (7) Note deficiencies and corrections in the project log and report instances of continued non-compliance to DES. Keep DES informed of the status and resolution of identified deficiencies. (8) Ensure that Contractors are following the EHS requirements specified in the contract. (9) Require that Contractors provide copies of EHS regulatory agency inspection and violation reports they may receive relative to the contracted work and the campus site they are working on. (10) Follow up on corrective actions for reported deficiencies from regulatory inspections. (11) In the event of an incident, ensure that Material Safety Data Sheets (MSDS s) are immediately available for all hazardous materials that will be used by Contractors on campus. (12) Ensure that all hazardous, biological or radioactive waste resulting from a project is processed through DES. These include wastes resulting from the demolition, renovation or removal of building and building components. Waste generated by the Contractor such as those from cleaning and degreasing, unused hazardous material products supplied by the Contractor, etc. are the sole responsibility of the Contractor. (13) Notify the Contractor of any observed or reported EHS concern, but do not prescribe corrective action at a Contractor-controlled site without specific authorization from the DES Director. (14) Ensure that UM specific information concerning topics such as lock-out/tag-out procedures and confined spaces are communicated to the Contractors as appropriate and as required by OSHA regulations. (15) As applicable, ensure Contractor submits completed Asbestos Abatement permit located on the DES web site: ( /asbabate.pdf) See Appendix B. At the conclusion of the work, notify the UM Project Manager and DES of actual ACM removed and remaining in the affected work area. (16) Coordinate the movement of any equipment/processes that must be relocated as a consequence of the work. B. DES Employees shall: (1) Provide EHS training for individuals assuming Project Manager and Site Inspector responsibilities. (2) Respond to complaints regarding Contractor activities that may impact the safety of UM employees and visitors, the campus environment, or that are deemed imminent dangers. (3) DES employees who observe an imminent danger shall inform Contractual personnel that the activity must be immediately stopped until appropriate corrective actions are implemented. The DES employee will immediately contact the UM Project Manager (or their supervisor, if the Project Manager is Page 6 FINAL 3/1/04
10 unavailable or unknown) to explain the circumstances of the work stoppage, and shall notify the DES Director in writing by the end of that business day. Notify the DES Director if the Contractor fails to correct an imminent danger. (4) When approved by the DES Director, contact the appropriate regulatory agency (e.g., MDE, MOSH) to report Contractor non-compliance, and provide support services to regulatory agency representatives as necessary. (5) Notify the Project Manager of any observed or reported EHS concern. (6) Not prescribe corrective action at a Contractor-controlled site without specific authorization from the DES Director. C. DES Director or Designee shall: (1) In the event an imminent danger exists at a construction site, determine the need to contact UM FM management, the Legal Office, and/or the appropriate regulatory agencies when Contractors fail to make sufficient efforts to correct imminent dangers. In the case of public/private partnerships, or other projects not directly managed by Facilities Management, written notice will be provided to the appropriate responsible parties, the UM Legal Office and the Associate Vice President of Administrative Affairs. Provide recommendations, as determined necessary, to the appropriate Project Manager and Procurement for discharge of Contractor from the contract. D. Site Inspectors shall: (1) Obtain necessary EHS awareness training to be aware of common environmental permit requirements and safety and environmental hazards associated with construction and renovation projects. (2) Inspect and monitor Contractor and subcontractor project activities to ensure contract compliance with EHS requirements. (3) Notify the Project Manager and the Contractor of any observed or reported EHS concern, but do not prescribe corrective action at a Contractor-controlled site without specific authorization from the DES Director. (4) Report uncorrected imminent dangers to the UM Project Manager and DES. E. Contractors and Subcontractors: (1) Comply with all EHS contract requirements as well as applicable federal, state, and local regulations. (2) Provide all safety and personal protective equipment (PPE) required to complete the contracted scope of work. PPE equipment must meet or exceed the requirements of the appropriate governmental regulatory agency. (3) In the event of an incident, ensure that copies of Material Safety Data Sheets are immediately available for all hazardous chemicals and products that will be brought onto campus. Page 7 FINAL 3/1/04
11 (4) Process all hazardous waste described under Section IV.B.16 through DES by calling (301) /2. All hazardous waste containers must be closed, labeled to identify the container contents and in good condition. State and federal regulations require the use of the federal Hazardous Waste Label. (5) Ensure the supervisor on-site is well trained on EHS activities and regulations in the performance of the work. (6) Be familiar with the contents of this guidance document as it applies to the contracted scope of work. (7) Provide a copy of the firm s safety and health program as an attachment to the bid proposal and/or acceptance of contract. (8) Notify DES when hot work is to be performed (welding, cutting, etc.) Appropriate permits should be obtained and filed with DES). This can be done through the DES web site ( (9) Review UM s lockout tagout procedures when working on UM controlled equipment and sites. (10) Provide all specified submittals for review as deliverable documents where required for asbestos and lead removal work (i.e. NESHAP notifications with Maryland, DES asbestos abatement permit, etc.). (11) If work is to be done in a confined space, check the UM inventory for special hazards via the DES web site described above. Contractor s should follow their Confined Space Entry program requirements. Notify Work Control ( ) when an entry is to be made. Forward a copy of completed permits to DES at 3115 Chesapeake Building, College Park, MD , or via fax ( ). VI. General UM Environmental, Health, and Safety Requirements The following information is provided to assist FM employees in recognizing hazards that may occur in conjunction with contractor projects; facilitate communications between FM and DES regarding construction EHS issues; and to minimize risks that construction activities may impose on UM employees, visitors and the campus environment. Project Managers, Site Inspectors and DES staff should identify EHS concerns to the Contractor, but not prescribe corrective actions. Contractors may be directed to government web sites or other generally recognized information services. A. Emergency Procedures (1) Reporting Emergencies: If a Contractor notices signs that may indicate a fire, gas/vapor release, downed electrical wires, releases to the environment, etc., the contractor shall call 911 or call the campus Police using one of the available campus emergency Blue phones. Provide the 911 operator with as much detail as possible, caller s name and the employer s name. Remain on the phone until the operator has verified Page 8 FINAL 3/1/04
12 the information. At this point, unless otherwise told, the Contractor should leave the area per their Emergency Response Guidelines and notify the Project Manager, Site Inspector, or DES immediately. (2) Contractor Responses: Upon hearing any alarms, the contractor should stop all work and evacuate as necessary. This includes ceasing all welding and burning activities, shutting off all equipment (electrical, motorized, and pneumatic), and extinguishing all sources of ignition. The Contractor supervisor or crew leader should take a head count to ensure that all contract personnel are accounted for. The Contractor personnel should remain within at a safe distance of the area they evacuated until the ALL CLEAR is announced and a UM employee has instructed them that they may return to work. (3) Obtaining Assistance for a Medical Emergency: If the contractor requires assistance for a Medical Emergency, it can be obtained by calling 911. When the person answers, the caller shall identify the area where assistance is needed, type of injury or accident, his/her name, and the company name. The caller should not hang up until all the information has been verified. (4) Accident/Incident Reporting: If a person is seriously injured or the Contractor becomes aware of a fire, explosion, fatality, or other serious incident, the Contractor should immediately notify Campus Police. The UM Project Manager and DES should then be immediately informed of the incident. Contractors are responsible for notifying MOSH in the event of a fatality or multiple injuries involving their employees. News releases should be coordinated with the UM Communications office on campus. B. Work Issues (1) Protection of Property: In accordance with the project contract, the Contractor will be held liable for all damage to personal and real property as a result of the contractor s negligence to provide appropriate protective measures. Page 9 FINAL 3/1/04
13 (2) Clean-Up: The Contractor shall keep the work area, specifically walking and working surfaces, clean and free from debris and trash which could cause slipping and tripping hazards. Tools, materials, dirt, lumber, concrete, metal, insulation, paper, etc. should be promptly cleared and disposed of by the Contractor. All debris should be disposed of each day off the campus or in a Contractor supplied dumpster. (3) Demolition: Preparatory Operations (a) Coordinate utility and mechanical service modifications with FM Work Control in advance of work. (b) Provide public pedestrian protections such as barrier fences and sidewalk sheds in accordance with local building code; and coordinate vehicle traffic control with campus police, subject to MUTCD (2000). (c) Identify potential hazardous material conditions at the site. When potential hazardous conditions are apparent or suspected, testing shall be performed and the hazard eliminated before demolition starts. Common hazardous material site conditions include (but are not necessarily limited to); asbestos-containing building materials (ACBMs), lead-based paint (LBP), polychlorinated biphenyls (PCBs) in lamp ballasts, mercury in fluorescent lamps and thermostats, microbial amplification reservoirs (molds, fungi, animal droppings), recoverable refrigerants, caustics, corrosives, metals, and petroleum products. (4) Asbestos and Lead-Based Paint (a) Asbestos-containing building materials and lead based paint coated substrates are located throughout UM buildings and present special management requirements. These materials are regulated by MOSH, OSHA, MDE and USEPA. An asbestos inventory is located on the DES web site and can be referenced to assist with asbestos identification. (b) An inspection of building materials for the presence of asbestos and lead hazards must be conducted prior to initiating renovation and demolition projects. Facilities Management-Operations &Maintenance (FM-O&M) manages On-Call contracts with several firms that can perform asbestos and lead-based paint surveys and abatement. DES recommends that Project Managers contact FM-O&M prior to renovation to arrange for survey and abatement work through these on-call firms. These firms have met specific qualifications of insurance, work and training through a competitive bid process and are familiar with UM procedures in this area. Page 10 FINAL 3/1/04
14 (c) Federal and state regulations require the identification and management of asbestos and lead-based paint prior to renovation or demolition. On larger projects, management by FM-O&M on-call abatement and Project Monitoring firms should be coordinated to precede the General Contractor s work. (d) All asbestos abatement projects must be overseen by a Project Monitor unless specifically directed otherwise by the Project Manager and approved by DES. The Project Monitor is an approved industrial hygiene firm that is professionally insured and qualified to provide abatement oversight. The Project Monitor must provide a scope of work that includes sampling protocols and the submission of a Project Monitoring Report for DES review. The report must include an executive summary of all project activities and verification that all required abatement submittals meet technical specifications. (e) Asbestos and lead-paint abatement contractor's final progress payment should be withheld by UM s Project Manager until DES completes review of the Project Monitoring Report. For large projects, it is recommended that FM s Project Manager withhold at least 20% of payments until DES completes review of the Project Monitoring Report. DES is available for consultation with Project Managers and Site Inspectors on all aspects of asbestos and lead-based paint related work. (5) Portable Ladders and Scaffolds: All walking/working surfaces including ladders and scaffolds that may be utilized by UM employees are subject to inspection by DES for compliance with OSHA regulations. (6) Site Access and Use: All sites must have controlled access to limit unauthorized individuals from entering the construction or renovation area. Large projects within a defined boundary, such as a new building site, must be fenced. Smaller sites within or in the vicinity of buildings must have temporary fencing, barricades, etc. subject to building code requirements. Building doors and roadways may not be blocked without the approval of the Project Manager or Site Inspector. The use of parking lot space must be pre-approved by Campus Parking. (7) Fall Protection: OSHA standards on fall protection must be followed. Major issues include: Page 11 FINAL 3/1/04
15 - Providing engineering controls as a primary protective mechanism. - Providing a Competent Person at the job site where fall hazards exist. - Providing personal protective equipment and training to protect employees from fall hazards where engineering controls are not feasible. (8) Contractor Tools and Equipment (including Manlifts) : All equipment brought to a project site by Contractors must be in safe operating condition. All guards must be in place, and meet or exceed all applicable governmental regulations (OSHA, EPA, DOT, etc). (9) Transfer of Flammable Liquids to Containers, Equipment, and Vehicles: All small quantities (5 gallons or less) of flammable liquids must be stored in an approved UL listed safety can in approved storage areas at the project site. Equipment refueling must be accomplished by using vehicles and hoses that are maintained, inspected and in good condition. All vehicle engines must be turned off during refueling activities. Using UM fuel pumps for refueling contractor equipment is prohibited. ABC rated fire extinguishers (10-lb. minimum) must be provided in the immediate area of the refueling and chemical storage areas. It is recommended that the transfer of flammable liquids from drums to small containers incorporate the use of grounding and bonding. (10) Electrical Safety/Lockout/Tagout Work on UM electrical systems is prohibited unless employees or groups have been given authorization by the Vice President of Facilities Management to work on these systems. These systems include premise wiring, wiring for connection to supply, installations of other outside conductors on the premises, installations of optical fiber cable where such installations are made along with electrical conductors and work around exposed energized parts. Groups currently holding authorization to work on UM electrical systems include; Facilities Maintenance, Residential Facilities, Dining Services and Contractors under their control. Additional authorizations will be reviewed and granted as appropriate. All work on electrical systems must be performed in a De-Energized state as required by OSHA unless employees have been authorized to work on systems live. Exceptions to the De-Energized rule may be made for work where it can be demonstrated that de-energizing introduces additional or increased hazards or when troubleshooting or maintenance can only be performed on a live system. Page 12 FINAL 3/1/04
16 Only authorized/qualified persons may work on electric circuit parts or equipment that have not been de-energized. Such persons shall be capable of working safely on energized circuits and shall be familiar with the proper use of special precautionary techniques, personal protective equipment, insulating and shielding materials and insulated tools. UM employees who are authorized to work on UM systems are the authorized University maintenance staff as and licensed electrical contractors and sub-contractors, working from designs that have been reviewed and approved by Facilities Management. For systems that are de-energized and subsequently locked and tagged out, UM personnel and UM contractors must inform each other of their respective lockout tag-out procedures and shall understand and comply with the applicable restrictions and prohibitions. UM employees are required to perform lockout tagout in accordance with the UM policy and program VI-14.00(A) UM Policy on Control of Hazardous Energy During Maintenance of Equipment. (11) Confined Space Entry: If a contractor is performing work that requires a confined space entry, the contractor must provide employees who are trained and qualified as required by 29 CFR (i.e. Authorized Entrants, Attendants, Entry Supervisor/Competent Person, Rescue and Emergency Services, etc.). DES has identified permit required and non-permit required confined spaces and associated hazards on its web site ( The UM Project Manager must inform the Contractor of identified confined spaces they may encounter as part of the project. Unless the project site is fenced and controlled by the contractor or subject to a public/private agreement, contractors must contact Work Control ( ), provide notification of a planned confined space entry and forward a copy of the contractor s Confined Space Entry Permit to the DES. If a confined space is to be added, demolished or altered, complete the confined space survey form and forward it to DES. (12) Excavation Safety: All excavations on UM property must be performed in accordance with applicable OSHA regulations (shored, sloped, shielded, barricaded, acceptable egress. etc.). The contractor is responsible for providing a Competent Person at every excavation site. This individual must be capable of identifying existing and predictable hazards in the surroundings or working conditions which are unsanitary, hazardous, or dangerous to employees, and who has the authorization to take prompt corrective measures to eliminate them. Also he/she must be able, through experience or training, to determine the suitability of equipment or materials used for support systems, shield systems, and other protective systems. Prior to starting the actual excavation, the contractor must Page 13 FINAL 3/1/04
17 ensure that all underground utility installations in the area (such as electrical, phone, gas, sewage, water, irrigation and fuel lines) have been identified. On the College Park campus, contact Work Control ( ) to request a utility marking. (13) Welding/Burning/Torch/Soldering: DES has an established hot work policy. No hot work is allowed without a permit. A copy of the policy may be obtained from the UM Project Manager or DES. A hot works permit can be completed online at the Department of Environmental Safety Homepage ( (14) Hazard Communication (HAZCOM) Standard: OSHA requires that contractors train their employees in basic chemical safety precautions and in precautions required for chemicals they work with, so as not to cause a hazard for themselves and others in the vicinity. UM expects that all contractors will comply with OSHA s HAZCOM Standard requirements. PM s must also ensure that contractors make MSDSs available for chemicals used in areas where UM faculty, students and staff may be exposed. (15) Personal Protective Equipment (PPE) and Hazard Signage: (a) Contractors must not create hazards for UM employees, students and visitors. Hazardous areas should be properly secured and signage should be posted to identify PPE required at the project site and hazards posed by site activities. (b) If non-contractor persons need to enter or pass directly through the work area, the contractor may be expected to provide appropriate Personal Protective Equipment (PPE) for such visitors at anytime. The PPE to be made available is dependent on the hazards posed by construction activities. Typically, hard hats and safety glasses are required. Safety equipment supplied and used by contractors is expected to comply with OSHA requirements. (16) Hazardous Materials: There are many hazardous materials at UM. These materials are typically found in laboratories in the form of chemicals, biological agents, and radioisotopes. Contractors must avoid creating an unsafe work environment or cause disruption of any lab activity when working in these areas. Page 14 FINAL 3/1/04
18 The following precautions should be followed by the Contractor before working in a laboratory or hazardous material storage area. In addition, these guidelines apply to hazardous materials the Contractor brings and stores on a project site. (a) Advise the laboratory supervisor or primary researcher what work will be completed so appropriate precautions can be taken. (b) Avoid contact with any lab equipment left in the work area. (c) Material Safety Data Sheets for all chemical compounds used at the job site should be immediately available on-site or off-site. Contractors must be capable of providing a MSDS within 1 hour of an incident. Contractor employees should carefully read container caution labels and be able to provide information concerning the hazardous materials they are using or storing. (d) When using chemical compounds, especially odorous products, appropriate precautions should be followed as stated on container labels. As necessary, proper ventilation should be established prior to their use. The UM Project Manager may require modification of existing ventilation systems or restrict work to specific days/times to minimize occupant chemical exposure. (e) Containers of chemicals and hazardous materials brought on site by a Contractor must be stored indoors; labeled with the manufacturer s original label and remain closed, except when removing material from the container. The indoor area used for storage must be secure and not be located where a release could enter the environment, a sewer system or cause a hazard to other building activities. (f) Compressed gas cylinders should be clearly labeled to identify their contents and chained or otherwise secured to a fixed object, such as a wall, to prevent them from falling and releasing their contents. (g) The disposal of chemicals or hazardous materials via sinks, drains, ground disposal or by evaporation is prohibited. Nothing should be poured down building floor drains or storm drains including, but not limited to, chemicals, chlorinated water, detergents, glycols, and oils/fuels. (h) Portable fuel tanks at construction sites must be staged away from storm drains and any body of water. The tanks should be properly labeled and have secondary containment to contain any spills or leaks. (17) Hazardous and Regulated Waste: Page 15 FINAL 3/1/04
19 UM requires that materials or substances classified as hazardous or regulated waste be handled carefully and receive proper disposal. Examples include, but are not limited to: paints, thinners, glues, solvents, gas cylinders, cathode ray and television tubes, fluorescent or H.I.D. (high intensity discharge) lamps, lamp ballasts, batteries, ACM, LBP debris, oils/fuels, freon, glycols, corrosives, and CFCs. Shipments of hazardous and regulated waste must be processed through DES. Disposal costs for these materials will be charged back to the project. The University is only responsible for University generated waste. Hazardous waste generated by the contractor will be the contractor s responsibility and will not be processed by the University. Hazardous waste generated by contractors may not be stored on-site during construction and renovation projects, except ACM and LBP abatement projects. Storage related to these projects must be in a secured indoor area in containers or outdoors in a covered roll-off that are marked with the words Hazardous Waste and a description of the waste, and the date waste was first placed in the container. All containers must be in good condition and closed when waste is not being added to the container. (a) Fluorescent lamps and H.I.D. lamps are to be removed from fixtures with care and placed in special cartons provided by DES. Since these lamps contain mercury it is important that they are not broken, releasing toxic mercury dust and vapor into the environment. Coordinate the removal and disposal of these materials with DES. (b) Fluorescent lamp ballasts containing PCBs (polychlorinated biphenyls) must be removed from fixtures and placed in pails or drums for disposal by DES. (c) Batteries containing heavy metals must not be placed in University trash containers. DES collects these batteries for proper disposal or recycling. Batteries used by contractors are the contractor s responsibility and are to be removed from University premises when spent. (d) Asbestos removal from University buildings is considered regulated waste and is the responsibility of the asbestos abatement contractor to properly remove and dispose as required by their contract and applicable regulations. FM and DES coordinate the assessment and removal of asbestos in existing structures. (e) Lead-based paint removed from structures or their components is considered hazardous waste and must be properly disposed. Coordinate the disposal process, including manifesting and scheduling of any containers or roll-off dumpsters with DES (UM s controlled waste vendor requires at least 3 days advance notice to deliver a roll-off container). DES may assist in determining if paint or painted material contains lead and if it requires Page 16 FINAL 3/1/04
20 special handling or disposal as a hazardous waste. (f) Tritium gas-containing exit signs, when removed under renovation work, must be collected and disposed of properly. Contact DES to evaluate and assist with this process. (18) Spills and Releases: Regulatory agencies require containment and remediation of all spills or releases of hazardous materials, including fuels, oils and anti freeze. Contractors who spill, or detect a release, of a hazardous material on UM property must report it immediately to DES or the Campus Police. Clean-up costs resulting from a spill or release caused by a contractor are the contractor s responsibility. Depending on the substance and quantity, DES may notify regulatory agencies. Cleanup and restoration of the contaminated area must be performed to regulatory and UM acceptable levels. DES will coordinate analytical testing to determine the extent of the contamination and the acceptable cleanup level. DES, at its discretion, may elect to conduct the cleanup and charge associated costs to the project or allow the contractor to conduct the cleanup based on the material released and site conditions. If the contractor conducts the cleanup, proper documentation, including manifests, for the disposal of the hazardous material, contaminated soil, and any other materials contaminated during the spill or release must be provided to DES. (19) Natural Resources Permitting and Compliance Issues: Natural resources or environmental permits such as those for Sediment and Erosion Control, Storm Water Management, Forestation, or for work in Nontidal Wetlands or within 100-year Floodplains should be obtained prior to start of construction and should be reflected in the contract documents of the project. Natural resource permitting may take as long as one year and must be obtained prior to construction. It remains the responsibility of UM as the owner to insure that these regulations are complied with. If a Project Manager or any responsible person connected with the project observes work that violates environmental regulations, or fails to follow the contract or applicable permit requirements, this should be brought to the attention of the Contractor to correct. The deficiency should be noted in the project s log. If the Contractor fails to comply in a timely fashion, the incident should be brought to the attention of the Director of DES for further action. (20) Fire Protection/Life Safety: Page 17 FINAL 3/1/04
21 The following fire protection and life safety requirements apply to all construction sites: (a) Applicable Codes: All work must be performed in accordance with NFPA 1 (National Fire Prevention Code), NFPA 101 Life Safety Code and NFPA 241 (Standard for Construction, Demolition and Alterations). (b) Working Plans and Shop Drawings: A set of design drawings approved by DES must be on site at all times. For small projects, the Project Manager should contact DES Safety & Code Services ( ) to determine the need for drawings, plans, approvals and inspections. DES Safety & Code Services will generally provide expedited assistance and have limited requirements for such projects. (c) Fire Alarm Systems: Existing fire alarm systems must remain in service whenever a building is occupied. Outages in existing fire alarm systems should be kept to a minimum. All fire alarm system outages shall be scheduled through UM Operations and Maintenance Life Safety Systems at Once all fire alarm system work is completed, an acceptance test must be scheduled through Safety & Code Services at (d) Automatic Sprinkler Systems: Existing sprinkler systems must remain in service whenever the building is occupied. A sprinkler contractor licensed in the State of Maryland shall perform all modifications and additions to an existing sprinkler system. All sprinkler system outages shall be scheduled through UM Operations and Maintenance Life Safety Systems at Once all sprinkler system work is completed, a hydrostatic test must be scheduled through DES at DES approved shop drawings must be on site at all times for any sprinkler work performed by a Contractor. (e) Corridors/Exits: Corridors, stair enclosures and exits must remain clear at all times in occupied buildings. Storage is not permitted in corridors, stair enclosures and exits. (f) Gas Cylinders: All compressed gas cylinders must be transported, used and stored properly. All cylinders (full or empty) must be secured in place at all times. (g) Flammable and Combustible Liquids: Storage of flammable and combustible liquids must be in accordance with NFPA 30 (Flammable and Combustible Liquids Code). 18 FINAL 3/1/04
22 (h) Fire Extinguishers: At least one fire extinguisher must be provided in plain sight on each floor for each construction area. (i) Smoking: Smoking is not permitted in the buildings at any time. (j) Final Occupancy: Occupancy is not permitted until a final occupancy inspection is completed by DES. C. Small Projects FM routinely conducts small projects with the use of internal and Contractor resources. Small projects involve minor activities such as the replacement or installation of carpeting, ceiling tiles, walls, dividers, cubicles, small equipment, etc. FM will assign a Project Manager who may also be the Site Inspector. For such projects, Project Managers must: (1) Obtain the necessary EHS awareness training to be familiar with the environmental and safety issues involved with the specific project they intend to manage. (2) Contact Safety and Code Services (301) to determine the need for drawings, plans, approvals and inspections; as well as a predemolition hazardous material abatement survey. (3) Contact Facilities Management if the project impacts existing building utility systems. (4) If a Contractor will perform all or a portion of the work, ensure the project contract requires the Contractor to comply with all applicable federal, State and local environmental and safety regulations and requirements. (5) Adhere to all fire and life safety guidelines in this document. (6) Adhere to all other applicable guidelines in this document based on the nature and scope of the project. VII. Regulatory Requirements and Information The EHS regulations that apply to construction and renovation activities on campus are numerous and constantly undergo modifications and additions by the regulatory agencies. For projects managed by FM, DES reviews and comments on draft specifications and design drawings to identify applicable EHS regulatory requirements and environmental permitting issues. Environmental permitting may take as long as one year and must be obtained prior to construction. It is advised that the Natural Resource Permitting Manager and the Environmental Affairs unit be consulted during the project planning stage to determine applicable environmental permitting requirements, schedules and fees. Several sources of regulatory information are available to Project Managers and Site Inspectors. These include: 19 FINAL 3/1/04
23 A. Several topic specific Fact Sheets prepared by DES that identify applicable regulatory citations and summarize key requirements. The Fact Sheets are typically 2 to 3 pages in length and are available at: Appendix C is a printout of the web page as of August 2002 and lists the available Fact Sheets. The Fact Sheets are updated annually. B. Federal OSHA s web site ( also has summaries of individual EHS topics related to construction as well as online training. Appendix D is a printout of the above-described web page as of August C. Maryland OSH also provides regulatory information and provides a listing of available seminars on its web page, which may be found at: Appendix E is a printout of the web page as of August VIII. Public/Private Partnership Projects The University is increasingly developing projects through public/private Memoranda of Understanding (MOU). The MOU establishes the contractual terms and conditions for the project and will place responsibility for EHS compliance on the private developer. Ultimately, the private developer s contractors and subcontractors will be responsible for the safety of their employees and compliance with OSHA requirements. DES will support the project by providing Fire Marshal services. Therefore, they must approve project design drawings, conduct inspections and perform testing. The Fire Protection/Life Safety requirements previously described will apply to public/private partnerships. The developer and its contractors must also obtain required environmental permits and comply with applicable environmental regulations and permit requirements. In the event a UM employee observes an imminent danger as defined in Section II of this document, they should notify the DES Director and the UM Legal office. IX. Regulatory Agency Inspections Contractor sites are subject to inspection by safety and environmental regulatory agencies for compliance with applicable regulations and permit conditions. In all cases, the contractor should immediately inform the Project Manager if a regulatory agency conducts a site visit; provide the results of the inspection and the schedule of corrective actions the contractor will take to remedy deficiencies, as applicable. In the event of an environmental regulatory inspection, the Project Manager should notify the Manager of Natural Resource Permitting ( ) regarding the conduct of natural resource inspections (i.e. sediment/erosion control, wetlands, forestation, floodplains); the DES Environmental Compliance Manager ( ) regarding the conduct of other environmental inspections (i.e. stormwater discharges, regulated and hazardous waste, air quality, spill/releases); and the 20 FINAL 3/1/04
24 Assistant Director of Occupational Safety and Health ( ) for safety related inspections (MOSH/OSHA). Construction sites are also subject to fire protection and life safety inspections by the DES Fire Marshals. The Fire Marshal should notify the UM Project Manager of any significant deficiencies observed during inspections and testing. Public/private developments are subject to the terms of the MOU. The Fire Marshal will directly notify the developer and contractor of any deficiencies identified during inspection and testing activities. The contractor should immediately notify the DES Environmental Compliance Manager ( ) of any identified environmental deficiency that may impact the campus environment including air, water or soil; or the off campus environment through air dispersion, surface or subsurface migration or campus utilities. 21 FINAL 3/1/04
25 APPENDIX A DES SUBJECT SPECIFIC CONTACTS 22 FINAL 3/1/04
26 APPENDIX B ASBESTOS PERMIT 23 FINAL 3/1/04
27 APPENDIX C DES ENVIRONMENTAL HEALTH AND SAFETY FACT SHEETS 24 FINAL 3/1/04
28 APPENDIX D FEDERAL OSHA WEB PAGE 25 FINAL 3/1/04
29 APPENDIX E MARYLAND OSH WEB PAGE 26 FINAL 3/1/04
ENVIRONMENTAL HEALTH & SAFETY/RISK MANAGEMENT Contractor Management (including Sub-Contractors)
ENVIRONMENTAL HEALTH & SAFETY/RISK MANAGEMENT Contractor Management (including Sub-Contractors) Contractors have the responsibility to ensure the health and safety of their workers and that their work
Millersville University - Office Of Environmental Health & Safety Scope & Application
Confined Space Entry Millersville University - Office Of Environmental Health & Safety Scope & Application The Confined Space Entry (CSE) program applies to the safe working practices for entering and
SAFETY AND HEALTH PROGRAM
PROGRAM NUMBER NO. PAGES 05-005 10 REVISION ISSUE DATE Revision 2 11/1/2005 SAFETY AND HEALTH PROGRAM Confined Space Entry 1.0 INTRODUCTION Confined Space Entry is a serious workplace hazard, capable of
Policies and Procedures Manual Waste Management Plan Policy No. 06:04:00 Page 1 of 12
Page 1 of 12 Revision Responsibility: Director of Facility Services and Safety Responsible Executive Officer: Vice President for Financial & Administrative Services Source / Reference: Tennessee Division
ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR 1910.252 WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600
OSHA REGULATION: 9 CFR 90.5 WELDING, CUTTING, AND BRAZING ( HOT WORK ) A. POLICY. This procedure follows requirements set forth in 9 CFR 90.5.. This policy applies to all Hot Work operations being done
DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES 2.01
2.01 GENERAL This section contains general compliance and safety planning information to be used by design professionals and contractors in the design and construction of University facilities. The criteria
UNIVERSITY OF TOLEDO
UNIVERSITY OF TOLEDO SUBJECT: INTERIM LIFE SAFETY MEASURES AND INFECTION Procedure No: LS-08-008 CONTROL PROCEDURE STATEMENT Interim life safety and infection control measures will be implemented to protect
COLUMBUS STATE COMMUNITY COLLEGE EMPLOYEE SAFETY MANUAL
COLUMBUS STATE COMMUNITY COLLEGE EMPLOYEE SAFETY MANUAL HAZARDOUS MATERIAL MANAGEMENT Effective October 15, 1995 Page 1 of 4 Updated August, 2008 Revised August, 2009 A. Columbus State Community College
Safety and Health Resource Manual. Sample Permit-Required Confined Space Written Program
Sample Permit-Required Confined Space Written Program Purpose The purpose of this document is to communicate Employer s compliance with MIOSHA s requirements for a permit-required confined space entry
CONFINED SPACE POLICY
UNIVERSITY OF ALASKA FAIRBANKS SAFETY SYSTEM POLICY AND PROCEDURE DOCUMENT NUMBER: 804 ISSUE DATE: SEPTEMBER 1996 SUBJECT: Confined Space Policy CONFINED SPACE POLICY PURPOSE: The purpose of this policy
Independent Contractor Policy
Independent Contractor Policy This Policy has been implemented to prevent accidents and personal injuries. It is not intended to be entirely inclusive. It is the responsibility of the Independent Contractor
UNIVERSITY OF KENTUCKY CONFINED SPACE PROGRAM
SCOPE AND APPLICATION: The University of Kentucky has developed a written policy for safe entry into confined spaces. The University recognizes that certain environmental conditions within confined spaces
BOSTON COLLEGE ENVIRONMENTAL HEALTH AND SAFETY LABORATORY GUIDE FOR RENOVATIONS, REMODELS, MOVES AND TERMINATIONS
BOSTON COLLEGE ENVIRONMENTAL HEALTH AND SAFETY LABORATORY GUIDE FOR RENOVATIONS, REMODELS, MOVES AND TERMINATIONS I. Policy for Termination of Laboratory Use of Hazardous Materials The Principal Investigator
Notes. Material 1. Appropriate Flammable Liquids
29 CFR 1910.106 Flammable Materials Flammable Liquids Preparation 1. Read Applicable Background information and related Company Policy Chapter. 2. Make Copies of this Lesson Plan for Personnel 3. Make
ENVIRONMENTAL HEALTH AND SAFETY HAZARDOUS MATERIALS MANAGEMENT PLAN
ENVIRONMENTAL HEALTH AND SAFETY HAZARDOUS MATERIALS MANAGEMENT PLAN November 2011 University of Northern Colorado Hazardous Materials Management Plan I. General II. III. IV. Responsibilities Definition
Table of Contents Introduction How to Use This Manual How to Do a Facility Audit
Table of Contents Introduction How to Use This Manual How to Do a Facility Audit OSHA Plant Safety Audit Checklist: Self-Inspection Types of Hazards Addressing the Hazards in Your Work Area Safety and
1. Organization and Management of UNR Safety Programs
WRITTEN WORKPLACE SAFETY PLAN University of Nevada, Reno 1. Organization and Management of UNR Safety Programs Administrative Responsibilities Final responsibility for maintenance of campus safety and
Safety, Health, and Environmental (SHE) Program Visitor Awareness Training (SHE 101V)
Marshall Space Flight Center Safety, Health, & Environmental (SHE) Program Safety, Health, and Environmental (SHE) Program Visitor Awareness Training (SHE 101V) SHE 101V Presented By: MSFC Industrial Safety
Overview of the OSHA Confined Spaces in Construction Final Rule
Labor, Safety & Health Policy National Association of Home Builders Overview of the OSHA Confined Spaces in Construction Final Rule On May 4, 2015 the U.S. Occupational Safety and Health Administration
Confined Space Plan Prepared by: Environmental Health and Safety Office October, 2014
Confined Space Plan Prepared by: October, 2014 Table of Contents Table of Contents... i Acronyms... ii 1.0 Introduction... 1-1 1.1 Purpose... 1-1 1.2 Scope... 1-1 2.0 Roles and Responsibilities... 2-2
ASBESTOS MANAGEMENT PROGRAM
ASBESTOS MANAGEMENT PROGRAM September 2015 Asbestos Management Program Table of Contents I. Purpose II. III. IV. Definitions Identification of Asbestos Asbestos Sampling V. Notification and Labeling VI.
STCC Contractor/Vendor Rules and Regulations
STCC Contractor/Vendor Rules and Regulations STCC maintains specific rules and regulations that apply to all contractors and vendors who perform work or provide services. It is the responsibility of the
Enviro Safety Products Resource Center. OSHA Checklist for General Industry
Enviro Safety Products Resource Center OSHA Checklist for General Industry The Occupational Safety and Health Administration (OSHA) require many standards to be met by businesses and industries. OSHA sets
Pollution Incident Response Management Plan
Pollution Incident Response Management Plan POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN 1. Introduction This Pollution Incident Response Management Plan (PIRMP) has been prepared to describe the processes
WORKING IN CONFINED SPACES GUIDELINES
WORKING IN CONFINED SPACES GUIDELINES Contents 1 Introduction... 2 2 Scope... 2 3 Definitions... 2 4 Responsibilities... 3 4.1 Permit Authoriser... 3 4.2 Permit Receiver... 3 4.3 Responsible UOW Officer...
Clarkson University Environmental Health & Safety Program Overview
Clarkson University Environmental Health & Safety Program Overview Mission Clarkson University is committed to maintaining a safe living, learning, and working environment and to furnishing a workplace
V. ENVIRONMENTAL IMPACT ANALYSIS E. Hazardous Materials
E. HAZARDOUS MATERIALS An Environmental Site Assessment Phase I Update was performed on the subject properties by California Environmental Inc. in March 2000 1. This report is included in Appendix E of
Hobart and William Smith Colleges. Environmental, Health and Safety Program
Hobart and William Smith Colleges Geneva, New York Environmental, Health and Safety Program Copies of the EHS Program: 1. Human Resources Office 2. Office of the President (Provost) 3. Campus Safety Office
Fire Alarm and Protection Impairment Policy and Procedures
1.0 Policy Statement The University of New Haven has developed a Fire Alarm and Protection Impairment Plan in accordance with the National Fire Protection Associations (NFPA) codes. Specific codes referenced
Laboratory Safety and Environmental Health Assessment Program
Laboratory Safety and Environmental Health Assessment Program Principal Investigators and Faculty are vital to the success of safety and environmental compliance programs in Colorado School of Mines research
Hazardous Waste Determination and Management Plan
Hazardous Waste Determination and Management Plan Prepared By: Triumvirate Environmental Developed: November 2014 Updated: Program Approval Associate Vice President of Public Safety & Administrative Services
University of Pittsburgh Safety Manual. EH&S Guideline Number: 01-007 ASBESTOS
Page 1 of 5 The inhalation of asbestos fibers in excess amounts can lead to chronic lung disease. Our knowledge of these health effects comes from studies of workers exposed routinely to high concentrations
Facilities management Contractor Safety Guideline
TABLE OF CONTENTS 1. POLICY...2 2. PURPOSE...2 3. SCOPE...2 4. DEFINITIONS...2 5. FACILITIES MANAGEMENT CONSTRUCTION PROJECTS...3 5.1. GENERAL...3 5.2. JOB START SAFETY MEETING PREPARATION...3 5.3. GENERAL
British Columbia Institute of Technology. BCIT Safety Manual ASBESTOS MANAGEMENT
BCIT Safety Manual Contents 1. Purpose... 3 2. Definitions... 3 2.1 Asbestos... 3 2.2 Asbestos Containing Material (ACM)... 3 2.3 Friable Material... 3 2.4 Low Risk Work Activity... 3 2.5 Moderate Risk
FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST
FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST Date of Inspection: Conducted by: Location: Reviewed by: Date of Review: Comments or additional corrective action taken as a result
CONSTRUCTION SAFETY POLICY
California Institute of Technology CONSTRUCTION SAFETY POLICY Caltech Environment, Health, and Safety Office 1200 E. California Blvd., M/C 25-6 Pasadena, CA 91125 Phone: 626.395.6727 Fax: 626.577.6028
Division of Public Health Administrative Manual
PURPOSE To establish a protocol for the development of a written Division of Public Health Hazard Communications Program at each applicable office or laboratory workplace and to assure that employees are
Wellesley College Asbestos Management Program
Wellesley College Asbestos Management Program Table of Contents Page Policy 2 Impacts of Asbestos Containing Materials (ACM)... 3 Compliance... 3 Objectives... 4 Operational Controls Standard Operating
READ FIRST. Confined Space Entry Procedure. San José State University Environmental Health and Safety. Confined Space Entry Procedure
READ FIRST 1. The purpose of a is to save lives by controlling the inherent hazards of a confined space prior to entry. a. If possible, avoid entering a confined space. Every consideration should be given
Safety Manual Title: Spill Prevention & Response Review Date: 6/1/2014
Operation s Purpose The purpose of this plan is to document spill prevention and response requirements. Each Elkhorn Construction, Inc. jobsite will develop a spill prevention and response plan based on
2013 CONSTRUCTION CONTRACTOR CATALOGUE ECATTS. Copyright ECATTS. All Rights Reserved.
2013 CONSTRUCTION CONTRACTOR CATALOGUE ECATTS Copyright ECATTS. All Rights Reserved. TABLE OF CONTENTS Introduction Course Descriptions Construction Contractors... 5 Air/Emissions Asbestos Drinking Water
SPILL PREVENTION, CONTROL, AND COUNTER MEASURES PLAN (SPCC)
SPILL PREVENTION, CONTROL, AND COUNTER MEASURES PLAN (SPCC) UNIVERSITY RISK MANAGEMENT Occupational and Health Programs 19 Hagood Avenue, Suite 908 Charleston SC 29425 843-792-3604 Revised: June 2015 Spill
SUBJECT: Effective Date: Procedure Number: Contractor Environmental Management. 09/03/13 emp11 Procedures
SUBJECT: Effective Date: Procedure Number: Contractor Environmental Management 09/03/13 emp11 Procedures APPLICABILITY/ACCOUNTABILITY: Supersedes: Page Of EMS Procedure-011 1 11 Responsible Authority:
ASBESTOS MANAGEMENT PROGRAM
ASBESTOS MANAGEMENT PROGRAM Prepared By: Triumvirate Environmental Program Approval Developed: August 2011 Updated: June 2015 Associate Vice President of Public Safety & Administrative Services Date Associate
Contractor Safety Management
1.0 Introduction Memorial University will ensure that a diligent contractor management process is established. This procedure establishes requirements for contract administration and oversight of contractor
Model Safety Program
Model Safety Program DATE: SUBJECT: Contractor Safety Verification Program REGULATORY STANDARD: OSHA 29 CFR RESPONSIBILITY: The, is solely responsible for all facets of this program and has full authority
Confined Space Air Monitoring
November 2008 Vol. 26. No. 3 Confined Space Air Monitoring Scott Shinn, C.I.H. Scott Shinn is a Certified Industrial Hygienist with 3M OH&ESD Technical Service and Regulatory Affairs. Summary Over the
Appendix N Framework Spill Prevention, Containment, and Countermeasures Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702
Appendix N Framework Spill Prevention, Containment, and Countermeasures Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702 November 2011 TABLE OF CONTENTS 1.0 PURPOSE... 1 2.0 RESPONSIBILITY
Spill Clean-up. Flammable Liquids Liquids with flash points below 100 degrees Fahrenheit.
SUNY Cortland-Environmental Health and Safety Office Spill Clean-up Inception Date : June 16, 2010 Latest Revision/Review Date: July 15, 2015 Last Review/Revision Date: April 30, 2014 Contents I. Introduction
SPILL PREVENTION AND RESPONSE PLAN TEMPLATE FOR BUSINESSES IN DAYTON S SOURCE WATER PROTECTION AREA
SPILL PREVENTION AND RESPONSE PLAN TEMPLATE FOR BUSINESSES IN DAYTON S SOURCE WATER PROTECTION AREA Regulated Substance Management: All Regulated Substances, including chemical wastes, are to be managed
WORKSAFE VICTORIA A HEALTH AND SAFETY SELF-ASSESSMENT CHECKLIST FOR SMALL BUSINESS
Aug 2013 WORKSAFE VICTORIA A HEALTH AND SAFETY SELF-ASSESSMENT CHECKLIST FOR SMALL BUSINESS As a small business operator, you need to be aware of your health and safety responsibilities, and identify risks
BP WIND ENERGY POLICIES AND PROCEDURES
BP WIND ENERGY POLICIES AND PROCEDURES Document Control Details 1.0 Purpose/Scope 1.1 This procedure provides the minimum requirements to be followed for the storage of flammable or combustible materials
APPENDIX O. Spill Prevention and Emergency Response Plan. G3 Terminal Vancouver Port Metro Vancouver Project Permit Application APPENDIX O
APPENDIX O Spill Prevention and Emergency Response Plan APPENDIX O G3 Terminal Vancouver Port Metro Vancouver Project Permit Application G3 TERMINAL VANCOUVER: PORT METRO VANCOUVER SPILL PREVENTION AND
UDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES
UDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES February 2014 The plan contained in the following pages was developed in part from UDOT Construction Division s Safety and Health Manual,
EMS Environmental Emergency Response Plan EXAMPLE
Page 1 of 11 EMS Environmental Emergency Response Plan EXAMPLE Page 2 of 11 ENVIRONMENTAL EMERGENCY RESPONSE PLAN TABLE OF CONTENTS INTRODUCTION EMERGENCY SPILLS/DISCOVERY POLICIES AND GUIDING PRINCIPLES
File: Spill Response Plan for Hazard Chemicals and Mercury Spills. Orig. Date: 12/01/2005 Review Date: January Review Date: March 2010
File: Spill Response Plan for Hazard Chemicals and Mercury Spills Orig. Date: 12/01/2005 Review Date: January Review Date: March 2010 OSHA: 1910.120 EPA: 40CFR 112.7 Messiah College Spill Response Policy
APPENDIX G Materials Storage and Handling Guidelines
APPENDIX G Materials Storage and Handling Guidelines 1.0 INTRODUCTION Operations at Austin-Bergstrom International Airport (ABIA) comprise several different industrial activities including aircraft, ground
Contractor Safety Program Office of Environmental Health and Safety University of Toronto
Office of Environmental Health and Safety Table of Contents Overview... 3 Program Objectives... 3 University Health and Safety Policy... 4 Environmental, Health and Safety Mission Statement... 4 Roles
SAFETY TRAINING CLASSES & SERVICES LIST
SAFETY TRAINING CLASSES & SERVICES LIST CUSTOM CLASS ROOM TRAINING AVAILABLE, BACKED WITH ON-SITE SUPPORT SAFETY, TRAINING COURSES OFFERED BY OUR CERTIFIED ELITE RISK CONTROL TEAM: EM 385-1-1 (Military)
Hazardous Waste Compliance Awareness For Faculty and Staff
Hazardous Waste Compliance Awareness For Faculty and Staff Important information for campus employees generating, handling or storing hazardous waste I. Hazardous Waste A. Materials being used for their
FUELING AND FUEL STORAGE
FUELING AND FUEL STORAGE BENCHMARK Implement spill prevention measures whenever fuel is handled or stored. Report, minimize, contain and clean up spills that do occur. FUELING BMPS Spills of diesel, oil,
HSE Requirements for Contractors
PROJECT DEFINITION AND CONTACTS Project Title: Kodak is obligated to identify any known and potential Health, Safety, and Environmental (HSE) hazards to individuals who might be affected by them. This
TEMPORARY EMPLOYEES SAFETY PROCEDURES
TEMPORARY EMPLOYEES SAFETY PROCEDURES Temporary Agencies will ensure that any temporary employee sent to work at Modern will have received and understand the General Safety Rules. GENERAL SAFETY RULES
General Confined Space Awareness
Confined Spaces General Confined Space Awareness Confined spaces can be found in many industrial settings, from steel mills to paper mills, from shipyards to farms, and from public utilities to the construction
Flammable and Combustible Liquids. Slide 1 (of 23)
Flammable and Combustible Liquids Slide 1 (of 23) Introduction The two primary hazards associated with flammable and combustible liquids are explosion and fire Safe handling and storage of flammable liquids
Contingency Plan. Facility Name
Contingency Plan Facility Name This plan is reviewed annually and amended whenever changes occur that will significantly affect the ability of this facility to respond to an emergency situation. This includes
Installation Instructions for Alarm Module Kit A043F059
Instruction Sheet 07-2013 Installation Instructions for Alarm Module Kit A043F059 1 Introduction The information contained within is based on information available at the time of going to print. In line
PITTSBURG TANK AND TOWER CO., INC.
PITTSBURG TANK AND TOWER CO., INC. HEALTH, SAFETY & ENVIROMENTAL PROGRAM INDEX 1.SAFETY POLICY & MANAGEMENT RESPONSIBILITIES - Safety Policy - Administrative Duties * Top Management * Safety Director *
TEXAS TECH UNIVERSITY HAZARDOUS WASTE PROGRAM DEPARTMENT OF ENVIRONMENTAL HEALTH AND SAFETY
TEXAS TECH UNIVERSITY HAZARDOUS WASTE PROGRAM DEPARTMENT OF ENVIRONMENTAL HEALTH AND SAFETY 1 TABLE OF CONTENTS I II III IV V VI VII INTRODUCTION CHEMICAL HAZARDOUS WASTE 1. Definition 2. Characteristics
OSHA 3825-09 2015. Protecting Construction Workers in Confined Spaces: Small Entity Compliance Guide
OSHA 3825-09 2015 Protecting Construction Workers in Confined Spaces: Small Entity Compliance Guide Occupational Safety and Health Act of 1970 To assure safe and healthful working conditions for working
CHEMICAL SPILL MANAGEMENT GUIDELINES
WHS Unit CHEMICAL SPILL MANAGEMENT GUIDELINES Contents 1 Purpose... 2 2 Scope... 2 3 Definitions... 2 4 Roles and Responsibilities... 2 5 General... 2 6 Defining Major or Minor Spill... 3 7 Major Spill
Office of Research Facilities Development and Operations Contractor Safety Policy
Office of Research Facilities Development and Operations Contractor Safety Policy The National Institutes of Health (NIH) is committed to providing a safe environment for everyone who enters the NIH campus.
810. Health and Safety Policy
Adopted: May 14, 2012 Model Policy 810 Revised: June 22, 2015 Orig. 2012. 810. Health and Safety Policy I. PURPOSE The Windom School District strives to provide a safe, healthy work and educational environment
Safe Operating Procedure
Safe Operating Procedure (Revised 07/09) HOT WORK PERMIT OPERATIONS (For assistance, please contact EHS at (402) 472-4925, or visit our web site at http://ehs.unl.edu/) Authority In recognition of the
OSU INSTITUTE OF TECHNOLOGY POLICY & PROCEDURES
Hazardous Communications 5-001 FACILITY MANAGEMENT July 2014 INTRODUCTION AND GENERAL STATEMENT 1.01 OSU Institute of Technology (OSUIT) recognizes that its employees have both a right and need to know
APPENDIX 7-B. Hazardous Materials Management Plan
S TAR-ORION S OUTH D IAMOND P ROJECT E NVIRONMENTAL I MPACT A SSESSMENT APPENDIX 7-B Hazardous Materials Management Plan SX03733 Section 6.0 1.1.1 Hazardous Materials Management Plan 1.1.1.1 Introduction
J. J. KELLER S 5-MINUTE WORKPLACE SAFETY TALKS
Acrylonitrile Air Contaminants How Much Is Too Much? Air Contaminants Standard Alcohol- and Drug-Free Workplace Anhydrous Ammonia Refrigeration Units Asbestos Automated External Defibrillators (AEDs) Behavior-Based
Confined Space Entry Safety Program
Facilities Operations and Development Environmental Health and Safety 1314 Kinnear Road #106 Columbus, OH 43212-1168 614-292-1284 Phone 614-292-6404 Fax www.ehs.osu.edu Confined Space Entry Safety Program
Injury and Illness Prevention Plan (IIPP) University of Nebraska-Lincoln
Environmental Health and Safety Injury and Illness Prevention Plan (IIPP) University of Nebraska-Lincoln Revised March 2011 UNL Environmental Health and Safety 3630 East Campus Loop Lincoln, Nebraska 68583-0824
ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1
KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 PART 1 - GENERAL 1.01 RELATED DOCUMENTS: SECTION 16050 A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1
SILICON VALLEY CLEAN WATER. May 2015
SILICON VALLEY CLEAN WATER May 2015 Slug Discharge Control and Spill Containment Guidelines This document was revised and used with the permission of the Los Angeles County Sanitation District, Industrial
SUB-CONTRACTOR/VENDOR PRE-QUALIFICATION QUESTIONNAIRE
Page 1 of 7 SUB-CONTRACTOR/VENDOR PRE-QUALIFICATION QUESTIONNAIRE GENERAL INFORMATION 1. Company Name/Contractors License No.: Telephone: SIC(s): Street Address: Mailing Address: 2. Officers: Years With
CONFINED SPACE ENTRY (PROJECT STANDARDS AND SPECIFICATIONS) KLM Technology Group
Page : 1 of 34 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENTS Purpose 2 Scope
H-0123 Contractor Safety Program
H-0123 Contractor Safety Program SUBJECT: Contractor Safety H-0123 REVISION NO: 4 REFERENCES: 29 CFR190 29CFR1926 CP-04-201 Contract Labor CP-04-215 Contract Services CP-28-111 Badging P&P 40-19 CP-04-107
Number Northern Arizona University Facility Services Section Page. Effective April 1, 2011
Facility Services Section Page Recharge Services, Maintenance and Construction PURPOSE 1 of 6 The purpose of this policy is to set forth standards for chargeable services for maintenance and construction
RADIOACTIVE WASTE MANAGEMENT PLAN
RADIOACTIVE WASTE MANAGEMENT PLAN Copies of this plan will be made available to all members of the campus community with the potential to generate radioactive waste. Contents I. Purpose II. Regulatory
ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR 1910.1200 HAZARD COMMUNICATION SECTION: 1700 REVISION DATE: 2/3/2012 REVISION: 4 NUMBER:
OSHA REGULATION: 29 CFR 90.200 HAZARD COMMUNICATION 700 : DATE: /3/200 DATE: 2/3/202 A. POLICY. This procedure follows requirements set forth in 29 CFR 90.200. 2. It is the policy of Alvernia University
Asbestos Management & Abatement
Asbestos Management & Abatement Latest revised date: October 29, 2012 Page 1 of 18 1.0 LEGAL & LEGISLATIVE REQUIREMENTS This standard provides guidance to meeting the minimum requirements of the Act &
NATURAL GAS EMERGENCY PROCEDURES AND ACCIDENT PREVENTION
NATURAL GAS EMERGENCY PROCEDURES AND ACCIDENT PREVENTION Fire and Life-Safety Group (FLS) I. EMERGENCY PROCEDURES The emergency procedures for natural gas emergencies are similar to that for fire emergencies.
SAFETY GUIDANCE MATERIAL
SAFETY GUIDANCE MATERIAL SAFETY MANAGEMENT MONDAY MARCH 23,GUIDANCE 2015 This safety resource was written for the scrap industry by the scrap industry and was developed to assist you in making your scrap
Sample Hazard Communications Program for Spray Polyurethane Foam Applications
Sample Hazard Communications Program for Spray Polyurethane Foam Applications Sample Hazard Communication Program for Spray Polyurethane Foam Applications Introduction This sample Hazard Communication