Market reference prices
|
|
|
- Jocelyn O’Brien’
- 9 years ago
- Views:
Transcription
1 Market reference prices CfD Expert Group workshop 27 September 2013
2 Agenda Introduction / aims of the session Quick overview ( ) Setting the intermittent reference price Setting the baseload reference price Reviewing the reference price process ( ) Reviewing the reference price trigger events ( ) Reviewing the reference price principles ( )
3 INTRODUCTIONS
4 Aims of the session Aim is to run through the approach to setting and amending market reference prices, building upon the approach set out in the draft CfD and accompanying EMR CfD Contract and Allocation Overview document By the end of the session, want to have a clear proposal on all outstanding questions, with an underpinning rationale Next steps will be to take these conclusions and develop legal drafting. This will then be shared with industry.
5 Supply and demand considerations The reference price is a measure of the average price of electricity But electricity is traded in different ways and over different periods Stakeholders have expressed concern that the CfD model should drive the same behaviours on the supply and demand side, (i.e. through both the reference price and the structure of the Supplier Obligation) The impact of the Supplier Obligation levy options on wholesale market liquidity has been considered: Initial view is that a shift to a unit cost fixed rate levy would not change suppliers incentives to achieve the reference price and therefore trade in the reference market However further views would be welcomed on the impact this type of levy could have on the wholesale market and liquidity, compared to other options
6 Baseload and intermittent generation Have developed two reference prices reflecting the different characteristics of baseload and intermittent generation Regulations will set out which technologies are to be treated as baseload and intermittent in the context of applying for and receiving a CfD This is linked to how strike prices have been calculated
7 SETTING THE INTERMITTENT REFERENCE PRICE
8 The intermittent reference price will be the GB day ahead hourly price If the Intermittent Indices have published a GB Day Ahead Hourly Price in relation to a Settlement Hour, then the Intermittent Market Reference Price for such Settlement Hour shall be expressed in /MWh and shall be such GB Day Ahead Hourly Price. (Clause 8.2 of the draft CfD) Intermittent Index means each of the APX Index and N2Ex Index or such other replacement or additional index or indices as is or are determined in accordance with this Agreement, and Intermittent Indices shall mean all such indices (Definitions of the draft CfD) Day ahead market coupling is part of the European Target Model. N2Ex and APX are developing an algorithm to give a single coupled price from both exchanges. Target date for go-live is November 2013.
9 The contract sets out fallback options where the GB price is not available Using the price quoted by both Intermittent Indices if it is the same: If the Day Ahead Hourly Price in /MWh for each Intermittent Index is the same, then the Intermittent Market Reference Price for the relevant Settlement Hour shall be expressed in /MWh and shall be such Day Ahead Hourly Price. (Clause 8.2 of the draft CfD) Using a volume-weighted average of the Intermittent Indices if the prices on the intermittent indices are different: If the Day Ahead Hourly Price in /MWh for each Intermittent Index is not the same, then the Intermittent Market Reference Price for the relevant Settlement Hour shall be expressed in /MWh and shall be calculated in accordance with the following formula: (Clause 8.3 of the draft CfD)
10 What happens in the case of technical failure of an auction platform? The following options are under consideration, and we would welcome views: The provisions under clause 8.3 of the contract suggest that the first resort would be to use the price from the other index, where this is available The market coupling arrangements themselves will have fallback arrangements in place to produce a price under market coupling we could simply adopt this Alternatively, an average price based on historic data could be used as a proxy which could be measured in different ways to make allowance for shape within each day / week / season As a last resort, the imbalance price could be used. However, this is a within-day price so does not represent the same market segment as day ahead. Questions: Which approach(es) should be adopted in the case of technical failure of an Intermittent Index? EMR Expert Group papers are not a statement of Government policy or policy intent
11 SETTING THE BASELOAD REFERENCE PRICE
12 Baseload reference price formula Baseload Market Reference Price = W j is the weight attributed to each Price Index (j), as determined from time to time (expressed as a decimal) and such that the sum of all weights for all Price Indices included in the Baseload Market Reference Price equals 1; j denotes the sum across the Price Indices (j); d denotes the sum across the Trading Days (d) included in the Reference Price Sample Period; BP j,d is, for each Price Index (j), the Baseload Contract Price quoted on Trading Day (d) in the Reference Price Sample Period for delivery throughout the Calculation EFA Season; BQ j,d is, for each Price Index (j), the quantity of power in MWh traded through the trades considered in determining BP j,d for the Trading Day (d); and N d is the number of Trading Days in the Reference Price Sample Period. EMR Expert Group papers are not a statement of Government policy or policy intent
13 The baseload reference price will be set on a season-ahead basis initially Previously stated preference for forward prices (ideally annual). Industry expressed concerns about low liquidity and basis risk, and the trading costs, of moving straight to a year ahead price. Disregarded the idea of using day ahead prices for baseload generation, due to distortion of trading incentives. Therefore plan to use season ahead price as an initial compromise: Shows adequate liquidity Reduces some of the concerns about clip sizes and costs associated with trading further forwards Still provides some incentives to schedule outages efficiently
14 Trade information will be drawn from N2Ex and LEBA Price sources: N2Ex UK Power Derivatives Seasonal Contract LEBA UK Power Season Ahead Contract The key benefit of these choices is that they are robust indices based on actual, verifiable trades. A consistent message we have received from industry is that the reference price should not be set based on any form of price assessment. This also avoids any double-counting of trades. Limitations are that there are limited volumes in N2Ex currently, and that this does not capture bilateral trades; although volumes of these are said to be small and inaccessible to anyone other than the counterparty, so arguably not a robust basis for setting the reference price. Alternative suggestions include creating a new index by placing a reporting requirement on all trades.
15 All trades each day will be volumeweighted to give a daily price This option has been selected because it: Captures more of the market volume Avoids distorting current trading patterns for this product, which show steady trading throughout the day Minimises gaming risks of setting the price based on a limited window. It was suggested that we should just use the windows where Ofgem s proposed Mandatory Market Maker is in operation, however: If there is significant trading in this window it will be reflected in the price anyway If significant volumes are still traded outside the window, it would be important to capture these to ensure the reference price is robust
16 The daily prices will then be averaged to give the reference price Averaging the daily prices means that volumes can be spread evenly to match the way the reference price is set. Some feedback suggested that this would give more weight to days with limited liquidity; however the alternative of volume weighting all trades in the reference price sample period would be almost impossible to hedge and therefore introduce significant risk for both generators and suppliers.
17 The reference price sample period will be every trading day in the season prior to delivery This period has been selected as it: Is simpler, as allows for continuous trading Lesser impact on market than forcing trading into a short time More robust price, as set over a longer period Some generators have concerns about clip size restrictions and trading costs; however analysis shows these are not likely to be prohibitive. Others raised concerns about prices not being set until immediately prior to delivery, and that this could cause problems with tariff-setting. However, on balance the view from generators is that this risk is manageable given daily averaging and the known approach to setting the price.
18 Questions on setting the baseload reference price Are further measures to avoid distortion required e.g. by not including days with less than a minimum volume of trades in the reference price calculation? Should any other price sources be considered for inclusion? Are there any circumstances in which price reporters may be required? The formula in the draft CfD contains a weighting factor to reflect the quality of trade information. Is this required? Should the CfD simply volume weight across all sources and disregard any price sources not deemed to be robust? Are there other circumstances in which this may be required e.g. to adjust for any gross bidding on exchanges? Are there any other outstanding concerns with setting the baseload reference price? EMR Expert Group papers are not a statement of Government policy or policy intent
19 REVIEWING THE REFERENCE PRICE: PROCESS
20 Reviewing the reference price: Trigger Over the period covered by the CfD, it is inevitable that the market will evolve so as to require amendment of the reference price so that it remains a fair price from both the generator and CfD Counterparty perspective. The CfD therefore needs to contain provisions to enable such amendment, in accordance with strict and known parameters. The reference price will be automatically reviewed once a year by the CfD Counterparty to assess whether any trigger events have occurred. Questions: Is this the right frequency? When should the review be conducted to minimise impact of any changes? How much notice is required ahead of implementing changes?
21 Reviewing the reference price: Review body Reviews will be conducted by the CfD Counterparty in line with the process set out in the contract. The Counterparty will be required to invite views from interested parties and consider these in reaching a determination. It may appoint independent expert advice to help determine the approach.
22 Reviewing the reference price: Types of review process Mechanistic process: The Counterparty will conduct this in accordance with set parameters in the contract This would apply following certain specified objective trigger events (these are set out in a later slide) Principles-based process: The Counterparty will conduct the review in accordance with set principles in the contract (see later slide) This would apply in the case of a very limited number of trigger events for which it is unfeasible to provide a mechanistic change process e.g. market splitting Questions: How long should be allowed for each process?
23 Reviewing the reference price: Generator input Under both review processes generators (and other interested parties) would be notified of the review and have the opportunity to present evidence on the issues under consideration. Parties to the contract would also be able to dispute whether or not the process had been properly followed in line with the standard dispute resolution procedures in the contract, subject to a threshold of 25% of CfD holders. Disputes on a mechanistic process would lead to a binding determination; disputes on a principled-based process could only lead to a requirement to re-run the review, ensuring the principles were fully considered. Questions: What should be the threshold for considering disputes? EMR Expert Group papers are not a statement of Government policy or policy intent
24 Reviewing the reference price: Process map 1. Trigger event occurs / time for regular review Counterparty s decision, but generators can notify that they believe a trigger event has occurred and the decision whether or not to initiate a review can be disputed 2. Counterparty announces review: - On website for all interested parties - Specific notification to affected generators 3. Interested parties have opportunity to input evidence on the issues under consideration e.g. can provide evidence that an index meets the quality standard and minimum volumes so should be included as a price source 6. Generators can dispute whether a change to the reference price has been made in accordance with the mechanistic or principles-based process (as applicable) - Through the disputes procedure - However, this would be subject to a threshold, as for change control 5. Counterparty sets out proposal on reference price - On website for all interested parties - Specific notification to affected generators - Together with outline of evidence considered 4. Counterparty conducts review following the metrics set out in the contract e.g. assessing new prices sources, whether market conditions allow a move to year ahead for baseload plant etc. 7. Determination of dispute For mechanistic processes: binding decision on the correct answer For principles-based processes: can either uphold outcome or require rerun of process 8. Otherwise proposal implemented on all parties through amendments to each affected contract, after appropriate formal notification 9. Amendment takes effect from next Reference Price Sample Period following issue of the notice. This change would also apply to any new CfDs issued.
25 REVIEWING THE REFERENCE PRICE: TRIGGER EVENTS
26 Trigger events Volumes / weight of the market changes Assessment of the robustness of a price source changes Market conditions allow a change to a year-ahead reference price for baseload generation Market splitting / coupling makes the reference price inappropriate New regulations make the reference price inappropriate Each of these will be examined in turn, to consider what it means and how it can be objectively assessed (where possible). The first two would be captured under the mechanistic review process. The other trigger events would require a principles-based review.
27 Trigger events: Volumes / weight of the market changes Any change to the indices comprising the GB day ahead price will be incorporated into the contract The GB day ahead price will continue to be used for the intermittent reference price as long as this represents [liquidity measure] All sources regulated by the FCA / compliant with the FOA guidelines would be included in the baseload reference price, subject to meeting a [minimum volume threshold] Questions: What liquidity measures should be used for the intermittent price? What volume threshold should be used for the baseload price? How should these be measured? Should there be a maximum number of price sources?
28 Trigger events: Assessment of the robustness of a price source changes Assessed against the following criteria (developed from a range of recent initiatives to improve the robustness of indices): Provision of data to be used for the index is: Accurate, Complete, Capable of audit (parties keep records), Methodology for deriving the index or benchmark is robust, documented and does not include judgement (i.e. Is deterministic) Methodology is subject to change control that protects against conflicts of interest (e.g. through an oversight committee) Procedures exist in data providers and the index / benchmark to manage conflicts of interest and confidentiality The index is subject to external audit against its methodology including a sample of data from data providers.
29 Trigger events: Market conditions allow a change to a year-ahead baseload reference price A year ahead reference price could be set in various ways: Annual products from April Average price for the next two seasons (summer and winter) Calendar yearly products (i.e. from January) The reference price sample period would be [each day in the year ahead of delivery] The reference price would have to have sufficient liquidity: So that CfD volumes would not dominate [Other metrics: minimum number / volume of trades, bid-offer spread, number of participants?] Questions: What should the sample period be for a year-ahead price? What liquidity metrics should be in place before changing? Should any other factors be considered before changing? EMR Expert Group papers are not a statement of Government policy or policy intent
30 Trigger events: Market coupling / splitting / regulations make the reference price inappropriate Market coupling / splitting This is intended to cover situations where there are changes to the wholesale electricity market in which CfD generators are trading Regulations This is intended to cover, for example, regulations which are introduced that affect the way benchmarks are set
31 REVIEWING THE REFERENCE PRICE: PRINCIPLED REVIEW
32 Principles to determine the reference price where a change cannot be prescribed in advance The reference price should reflect the price that a generator could reasonably expect to achieve through trading in the market (i.e. market price not PPA price) The indice(s) from which the reference price is drawn must be sufficiently liquid to have confidence that it is a robust representation of market prices The reference price should avoid undue interference with price signals that incentivise efficient operation Subject to the above, for UK plant, the reference price should relate to the market into which the power is physically delivered Any changes must allow enough time for affected parties to amend their processes if required EMR Expert Group papers are not a statement of Government policy or policy intent
33 Questions on the principles Should these be quantified to reduce uncertainty? If so, what metrics can be used for each principle? Should any other principles be added?
Wholesale power market liquidity: consultation on a Secure and Promote licence condition
Promoting choice and value for all gas and electricity customers Wholesale power market liquidity: consultation on a Secure and Promote Consultation Reference: 163/12 Contact: Phil Slarks, Senior Economist
Electricity Market Reform: Update on Terms for the Contract for Difference
Electricity Market Reform: Update on Terms for the Contract for Difference December 2013 2 Department of Energy and Climate Change 3 Whitehall Place London SW1A 2AW Telephone: 0300 068 4000 Website: www.decc.gov.uk
Making CfDs work for renewable generators
Making CfDs work for renewable generators This is in two parts. 1 st a brief introduction to the Green Power Auction Market. 2 nd gives more detail on the structure and follows on. We consider this a critical
This seeks to define Contracts for Difference (CfDs) and their relevance to energy related development in Copeland.
Contracts for Difference and Electricity Market Reform LEAD OFFICER: REPORT AUTHOR: John Groves Denice Gallen Summary and Recommendation: This seeks to define Contracts for Difference (CfDs) and their
EMR: Consultation on Balancing and Settlement Code subsidiary documents
EMR: Consultation on Balancing and Settlement Code subsidiary documents URN: 14D/108 April 2014 Department of Energy and Climate Change 3 Whitehall Place London SW1A 2AW Telephone: 0300 068 4000 Website:
Disclaimer: All costs contained within this report are indicative and based on latest market information. 16 th March 2015
Disclaimer: All costs contained within this report are indicative and based on latest market information 16 th March 2015 FD SUMMARY The make up of the electricity bill is changing, with non-commodity
Liquidity Secure and Promote - Monitoring update
Liquidity Secure and Promote - Monitoring update Yasmin Valji 27/10/15 Reminder: Structure of the intervention For objective 1 (availability of products to support hedging): Secure fair trading terms for
Response by NIE Energy (PPB)
NIE Energy Limited Power Procurement Business (PPB) Review of K factors & Supply Margins and Tariff Structure Review Consultation Paper CER-09-093 Response by NIE Energy (PPB) 11 September 2009. Introduction
Regulatory Briefing. Capital Markets Day. 17 October 2013
Regulatory Briefing Capital Markets Day 17 October 2013 Agenda Andrew Koss Director of Strategy Damien Speight Head Trader Renewables Obligation Contracts for Difference Levy Control Framework Capacity
A new electricity market for Northern Ireland and Ireland from 2016 - Integrated Single Electricity Market (I-SEM)
A new electricity market for Northern Ireland and Ireland from 2016 - Integrated Single Electricity Market (I-SEM) Non-technical summary High level design Draft Decision Paper SEM -14-047 June 2014 1 INTRODUCTION
Annex B: Strike price methodology July 2013
July 2013 URN 13D/189 Contents Introduction... 3 Overview of methodology for deriving a CfD strike price... 3 Strike Prices during the cross-over period with the RO (2014/15 2016/17)... 4 Comparison of
ANNEX B FEED-IN TARIFF WITH CONTRACTS FOR DIFFERENCE: DRAFT OPERATIONAL FRAMEWORK
ANNEX B FEED-IN TARIFF WITH CONTRACTS FOR DIFFERENCE: DRAFT OPERATIONAL FRAMEWORK 1 CONTENTS Introduction...3 Section A Price Setting...8 Section B CfD Allocation... 18 Section C CfD Terms Pre Commissioning...
The UK Electricity Market Reform and the Capacity Market
The UK Electricity Market Reform and the Capacity Market Neil Bush, Head Energy Economist University Paris-Dauphine Tuesday 16 th April, 2013 Overview 1 Rationale for Electricity Market Reform 2 Why have
Annex A Feed-in Tariff with Contracts for Difference: Operational Framework
Annex A Feed-in Tariff with Contracts for Difference: Operational Framework November 2012 Contents Executive Summary... 5 Document Overview... 9 1. Introduction... 10 The Energy Bill: The Legal Framework
Government response: EMR consultation on BSC subsidiary documents
Government response: EMR consultation on BSC subsidiary documents June 2014 Crown copyright 2014 Copyright in the typographical arrangement and design rests with the Crown. This publication (excluding
Data Communications Company (DCC) price control guidance: process and procedures
Guidance document Contact: Tricia Quinn, Senior Economist Publication date: 27 July 2015 Team: Smarter Metering Email: [email protected] Overview: The Data and Communications Company (DCC) is required
Government response: EMR consultation on industry code and licence modifications
Government response: EMR consultation on industry code and licence modifications June 2014 Crown copyright 2014 Copyright in the typographical arrangement and design rests with the Crown. This publication
AGCS Gas Clearing and Settlement AG
Annex to the General Terms and Conditions of the Balance Group Coordinator (GTC BGC) Balancing energy management in the Eastern distribution area V 5.0 Annex Balancing energy management Version 5.0 Page
Investing in renewable technologies CfD contract terms and strike prices
Investing in renewable technologies CfD contract terms and strike prices December 2013 Crown copyright 2013 You may re-use this information (not including logos) free of charge in any format or medium,
Contracts for Difference - the new support regime for low carbon generation
Contracts for Difference - the new support regime for low carbon generation James Taylor Raj Bavishi 11 November 2014 UK Incentive Regimes Small scale Feed in Tariffs and the Renewables Obligations have
Contracts for Difference Round Guidance
30th June 2014 Contracts for Difference Round Guidance Contracts for Difference Allocation Round 1 2014 CFD Round Guidance 3 rd October 2014 National Grid Delivery Body Page 1 CFD Allocation Round Guidance
EMR: Consultation on industry code and licence modifications
EMR: Consultation on industry code and licence modifications January 2014 Department of Energy and Climate Change 3 Whitehall Place London SW1A 2AW Telephone: 0300 068 4000 Website: https://www.gov.uk/government/organisations/department-of-energy-climate-change
Supplier Implementation Event. Tuesday 27 January 2015
Supplier Implementation Event Tuesday 27 January 2015 Health & Safety 2 Supplier Implementation Event - 27 January 2015 What we will cover? Agenda Time Lead Introduction 9.30 LCCC, ESC and EMRS What do
EXPLANATORY MEMORANDUM TO THE CONTRACTS FOR DIFFERENCE (ELECTRICITY SUPPLIER OBLIGATIONS) REGULATIONS 2014. 2014 No. [XXXX]
EXPLANATORY MEMORANDUM TO THE CONTRACTS FOR DIFFERENCE (ELECTRICITY SUPPLIER OBLIGATIONS) REGULATIONS 2014 2014 No. [XXXX] 1. This explanatory memorandum has been prepared by the Department for Energy
DELEGATED REGULATION (EU)
RTS 15: Draft regulatory technical standards on market making, market making agreements and marking making schemes COMMISSION DELEGATED REGULATION (EU) No /.. of [date] supplementing Directive 2014/65/EU
IRISH TAKEOVER PANEL CONSULTATION PAPER DISCLOSURE OF DEALINGS AND INTERESTS IN DERIVATIVES AND OPTIONS PROPOSALS TO AMEND THE TAKEOVER RULES
IRISH TAKEOVER PANEL CONSULTATION PAPER DISCLOSURE OF DEALINGS AND INTERESTS IN DERIVATIVES AND OPTIONS PROPOSALS TO AMEND THE TAKEOVER RULES 30 July 2008 Contents Page A. Introduction 4 B. Amendments
EMR Capacity Market Implementation Coordination Workshop
EMR Capacity Market Implementation Coordination Workshop Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight
Electricity Market Reform:
Electricity Market Reform: Consultation on Low Carbon Contracts Company s and Electricity Settlements Company s operational costs 2015/16 Government Response January 2015 Crown copyright 2015 URN 15D/001
Regulatory Standards of Governance and Financial Management
Regulatory Standards of Governance and Financial Management 5. Regulatory Standards of Governance and Financial Management Introduction 5.1. This section sets out our Regulatory Standards of Governance
Electricity market reform: policy overview
Electricity market reform: policy overview May 2012 Contents Introduction... 3 Electricity Market Reform... 6 The Move to EMR... 21 Costs and Benefits of EMR... 24 EMR in the Devolved Administrations...
npower EMR Explained Session The Energy Event 10 th & 11 th September 2013
npower EMR Explained Session The Energy Event 10 th & 11 th September 2013 Welcome Chris Billing, Head of Indirect Sales, npower Agenda > 13.30 Welcome & introduction Chris Billing EMR Pulse Survey Results
BEST EXECUTION AND ORDER HANDLING POLICY
BEST EXECUTION AND ORDER HANDLING POLICY 1. Introduction 1.1. This Summary Best Execution and Order Handling Policy ( the Policy ) is provided to you (our Client or prospective Client) in accordance with
Electricity Market Reform: Consultation on Proposals for Implementation
Electricity Market Reform: Consultation on Proposals for Implementation October 2013 2 Electricity Market Reform: Consultation on Proposals for Implementation Presented to Parliament by the Secretary of
Different types of electricity markets modelled using PLEXOS Integrated Energy Model The UK Balancing Market example
Different types of electricity markets modelled using PLEXOS Integrated Energy Model The UK Balancing Market example Peny Panagiotakopoulou, Senior Power Systems Consultant, Energy Exemplar Europe Overview
Electricity Market Reform: policy overview
Electricity Market Reform: policy overview November 2012 2 ELECTRICITY MARKET REFORM: POLICY OVERVIEW Presented to Parliament by the Secretary of State for Energy and Climate Change by Command of Her Majesty
Market Procedure: Settlement VERSION 3. Market Procedure: Settlement V3 Page 1 of 24
Settlement VERSION 3 Settlement V3 Page 1 of 24 ELECTRICITY INDUSTRY ACT 2004 ELECTRICITY INDUSTRY (WHOLESALE ELECTRICITY MARKET) REGULATIONS 2004 WHOLESALE ELECTRICITY MARKET RULES COMMENCEMENT: This
Reliability Options in Ireland and Northern Ireland Obligations and Penalties
Reliability Options in Ireland and Northern Ireland Obligations and Penalties European Commission Technical Working Group on Energy: Subgroup on generation adequacy 14 April, Brussels Background Single
Single Electricity Market (SEM) and interaction with EMIR. Central Bank of Ireland
Single Electricity Market (SEM) and interaction with EMIR Central Bank of Ireland 11 th July 2014 About EAI Overview of SEM and its Participants The market is a gross mandatory pool and consists of generators
Hargreaves Lansdown Spread Betting/ Hargreaves Lansdown CFDs Trade & Order Execution Policy
/ Hargreaves Lansdown CFDs Trade & Order Execution Policy Effective from: 1st November 2007 www.hlmarkets.co.uk Telephone: 0117 988 9915 1 Trade & Order Execution Policy 1. Introduction This policy explains
OFF-TAKE UNDER THE CFD - BUSINESS AS NORMAL? Electricity Market Reform: Edging Towards Delivery 24 September 2014
OFF-TAKE UNDER THE CFD - BUSINESS AS NORMAL? Electricity Market Reform: Edging Towards Delivery 24 September 2014 Statkraft providing Pure Energy Statkraft is Europe s largest generator of renewable energy
Opening the CfD support scheme to non-uk renewables projects
Opening the CfD support scheme to non-uk renewables projects European Commission workshop, Brussels, 5 November 2014 Agenda 1. What is the CfD support scheme? 2. What may be the benefits of opening the
ELECTRICITY MARKET REFORM (EMR) & THE ENERGY BILL INENCO OVERVIEW
ELECTRICITY MARKET REFORM (EMR) & THE ENERGY BILL INENCO OVERVIEW February 2014 ELECTRICITY MARKET REFORM (EMR) & THE ENERGY BILL The Energy Bill is the government s flagship energy policy. There have
CAPACITY MECHANISMS IN EU POWER MARKETS
CAPACITY MECHANISMS IN EU POWER MARKETS Can we progress to bilateral energy options? Simon Bradbury Ultimately, European renewable targets mean that prices and dispatch patterns will be dictated by wind
Financial Settlement Strategy
Financial Settlement Strategy We are seeking stakeholders views on the questions set out in this consultation document. If you have any comments on the paper please contact: [email protected]
IMPACT OF GB S ELECTRICITY MARKET REFORM ON INTERCONNECTIONS, CONSEQUENCES ON NORDIC MARKET Michel Martin, 3 April 2014
IMPACT OF GB S ELECTRICITY MARKET REFORM ON INTERCONNECTIONS, CONSEQUENCES ON NORDIC MARKET Michel Martin, 3 April 2014 PÖYRY MANAGEMENT CONSULTING ENERGY Pöyry offices (c) grafikdienst.com Pöyry Management
Industrial & Commercial Energy Snapshot Methodology
Industrial & Commercial Energy Snapshot Methodology Introduction 01 The Heren Index - General Definitions 01 NBP Price Assessments - General Definitions 01 NBP Price Assessments - Definitions of Periods
Annex Hungary Effective as of 4 th January 2016. MTS Hungary is a Multilateral Trading Facility operated by EuroMTS Limited
Annex Hungary Effective as of 4 th January 2016 MTS Hungary is a Multilateral Trading Facility operated by EuroMTS Limited Contents MTS Hungary Annex 1.0 General Provisions 4 5.0 Clearing and settlement
Contract for Difference for non-uk Renewable Electricity Projects
Contract for Difference for non-uk Renewable Electricity Projects August 2014 Crown copyright 2014 URN 14D/291 You may re-use this information (not including logos) free of charge in any format or medium,
CFD Disclosure Document - Next Generation Platform (DD)
CMC Markets NZ Limited CFD Disclosure Document - Next Generation Platform (DD) 28 July 2013 Company Registration Number 1705324 Table of contents Table of contents 1 Important information 6 1.1 About this
Duncan Burt Head of Commercial Operation National Grid. The Office of Gas and Electricity Markets 9 Millbank London SW1P 3GE
National Grid House Warwick Technology Park Gallows Hill, Warwick CV34 6DA The Office of Gas and Electricity Markets 9 Millbank London SW1P 3GE 16 June 2015 Duncan Burt Head of Commercial Operation National
Consultation on Global Settlement in the SEM for Northern Ireland
Consultation on Global Settlement in the SEM for Northern Ireland 1 Table of Contents 1. Purpose of this Paper... 3 2. Introduction... 3 3. Background... 5 4. Residual Volume... 6 5. Drivers for Change...
ABOUT ELECTRICITY MARKETS. Power Markets and Trade in South Asia: Opportunities for Nepal
ABOUT ELECTRICITY MARKETS Power Markets and Trade in South Asia: Opportunities for Nepal February 14-15, 2011 Models can be classified based on different structural characteristics. Model 1 Model 2 Model
Report on the EMR Delivery Body s performance of its functions in relation to the Capacity Market
Report on the EMR Delivery Body s performance of its functions in relation to Report Publication date: 19 June 2015 Team: EMR Team Contact: Sujitra Krishnanandan; Matthew Pearson Tel: 020 3263 9832; 020
BOARD CHARTER. Its objectives are to: provide strategic guidance for the Company and effective oversight of management;
BOARD CHARTER Objectives The Board is ultimately responsible for the oversight and review of the management, operations and overall corporate governance of the Company. Its objectives are to: provide strategic
Global Settlement the Residual Meter Volume Interval Proportion
Global Settlement the Residual Meter Volume Interval Proportion DOCUMENT Consultation Paper TYPE: REFERENCE: CER 11/079 DATE PUBLISHED: CLOSING DATE: RESPONSES TO: 29 th April 2011 26 th May 2011 [email protected]
Goldman Sachs s Standard Spot Foreign Exchange Terms of Dealing
Goldman Sachs s Standard Spot Foreign Exchange Terms of Dealing Although Goldman Sachs ( GS or the Firm ) believes its spot FX practices are well-known to its counterparties, the purpose of this letter
Proposed guidance for firms outsourcing to the cloud and other third-party IT services
Guidance consultation 15/6 Proposed guidance for firms outsourcing to the cloud and other third-party IT services November 2015 1. Introduction and consultation 1.1 The purpose of this draft guidance is
Disclosure of CfDs concerns for corporate issuers. slaughter and may. January 2008
Disclosure of CfDs concerns for corporate issuers slaughter and may January 2008 contents 1. Introduction 1 2. The Failings of the Current Regime 1 3. The FSA Options 2 4. Option 2 3 5. Concerns with Option
ASX Corporate Governance Council
ASX Corporate Governance Council Principles of Good Corporate Governance and Best Practice Recommendations March 2003 Foreword The ASX Corporate Governance Council was formed on 15 August 2002, bringing
How To Create A Power Market In European Power Markets
THEMA Report 2011-15 ISBN no. 978-82-93150-07-7 Market design and the use of FTRs and CfDs A report prepared for Energy Norway September 2011 CONTENT 1 SUMMARY AND CONCLUSIONS...3 2 INTRODUCTION...4 3
Risk and Audit Committee Terms of Reference. 16 June 2016
Risk and Audit Committee Terms of Reference 16 June 2016 Risk and Audit Committee Terms of Reference BHP Billiton Limited and BHP Billiton Plc Approved by the Boards of BHP Billiton Limited and BHP Billiton
DISCLOSURE OF CONTRACTS FOR DIFFERENCES
DISCLOSURE OF CONTRACTS FOR DIFFERENCES The United Kingdom Financial Services Authority ("FSA") has recently announced that its regime for disclosure of major shareholdings will be expanded to include
PUBLIC. Response to consultation on EMR data flows
PUBLIC Response to consultation on 28 April 2014 CONTENTS INTRODUCTION... 3 1. Background... 3 2. ELEXON s proposal to the CfD Counterparty... 3 RECOMMENDATION TO DECC ON MECHANISMS FOR PARTIES TO EXCHANGE
EAI Response to ISEM Draft Decision
EAI Response to ISEM Draft Decision SEM-14-045 Electricity Association of Ireland Markets Committee Status: Submitted Date: 25 th July 2014 127 Baggot Street Lower Dublin 2 EU Transparency Register No:
1 Organization of the Regulated Unofficial Market (Open Market) on the Frankfurt Stock Exchange for the Trading with Structured Products
of the Scoach Europa AG for the Trading with Structured Products in the Regulated Unofficial Market On the FWB Frankfurt Stock Exchange (Frankfurter Wertpapierbörse) First Part: General Provisions 2 1
Corporate Governance Regulations
Corporate Governance Regulations Contents Part 1: Preliminary Provisions Article 1: Preamble... Article 2: Definitions... Part 2: Rights of Shareholders and the General Assembly Article 3: General Rights
Shropshire Highways Draft Asset Management and Communications Strategy and Implications of Department for Transport Incentivised funding
Committee and Date Cabinet 14 th October 2015 Shropshire Highways Draft Asset Management and Communications Strategy and Implications of Department for Transport Incentivised funding Responsible Officer
Low Carbon Contracts Company and Electricity Settlements Company operational costs 2016/17
Low Carbon Contracts Company and Electricity Settlements Company operational costs 2016/17 Consultation on the operational cost levies November 2015 Department of Energy and Climate Change 3 Whitehall
