Government response: EMR consultation on BSC subsidiary documents
|
|
|
- Percival Hampton
- 10 years ago
- Views:
Transcription
1 Government response: EMR consultation on BSC subsidiary documents June 2014
2
3 Crown copyright 2014 Copyright in the typographical arrangement and design rests with the Crown. This publication (excluding logos) may be re-used free of charge in any format or medium provided that it is re-used accurately and not used in a misleading context. The material must be acknowledged as crown copyright and the title of the publication specified. For further information, contact: Electricity Market Reform Programme Team 4 th Floor, Area A Department of Energy and Climate Change 3 Whitehall Place London SW1A 2AW Telephone: [email protected] The consultation can be found on DECC s website: Published by the Department of Energy and Climate Change
4 Contents Government Response: EMR Consultation on BSC subsidiary documents... 1 Contents... 4 Introduction... 5 Consultation Overview... 5 Powers to modify industry codes, agreements and licences... 5 Components of EMR... 6 Consultation Responses... 8 BSCP11: Trading Disputes... 8 BSCP15: Balancing Mechanism (BM) Unit registration... 9 BSCP27: Technical Assurance of Half Hourly Metering Systems for Settlement Purpose BSCP503: Half Hourly Data Aggregation for SVA Metering Systems Registered In SMRS BSCP508: Supplier Volume Allocation Agent BSCP509: Changes to Market Domain Data Settlement Administration Agent (SAA) Service Description Supplier Volume Allocation(SVA) Data Catalogue Volume 1 & Volume NETA Interface Definition and Design (IDD) Part NETA Interface Definition and Design (IDD) Part Supplier Volume Allocation Agent (SVAA) and Settlement Administration Agent (SAA) User Requirements Specifications (URS) Annex A: List of Respondents... 17
5 Introduction Consultation Overview 1. In April 2014, the Government ran a four week consultation 1 which sought views on consequential changes to Balancing and Settlement Code (BSC) subsidiary documents and other configurable items required as a result of the implementation of Electricity Market Reform. This consultation was in addition to a previous four week consultation run in January on consequential changes to industry codes and licences The consultation period closed on 7 May 2014 and the Government received eight responses. We have considered the responses and this document lays out a summary of the decisions the Government has taken since the consultation. Powers to modify industry codes, agreements and licences 3. Under sections 26 and 37 of the Energy Act the Secretary of State has discretionary powers to modify licence conditions, documents maintained in accordance with licence conditions, and agreements that give effect to a document so maintained, for the purpose of giving effect to the EMR mechanisms. 4. The Secretary of State is using these powers to direct the changes to the BSC subsidiary documents and other configurable items maintained in accordance with the BSC. 5. The Government worked closely with its delivery partners Ofgem, National Grid and ELEXON, along with relevant code administrators, to assess which existing industry documents required consequential amendments
6 Components of EMR 6. EMR will create two key mechanisms Contracts for Difference (CfDs) and the Capacity Market (CM). These mechanisms will ensure that low carbon and reliable electricity generation is an attractive investment opportunity. The CfD will provide longterm revenue stabilisation to incentivise cost-effective investment in low-carbon generation. The CM will provide a steady payment to reliable forms of capacity (both demand and supply) to ensure there is enough to meet demand, while minimising costs. 7. The Energy Act 2013 also provides for the introduction of a scheme to support independent renewable generators secure a route-to-market under the CFD. In February 2014 we consulted on the Offtaker of Last Resort (OLR) 4. This will ensure that eligible renewable generators have access to a Backstop Power Purchase Agreement on specified terms with a credit worthy offtaker. By ensuring a route-to-market for the generator s power, the OLR has the potential to make lenders more comfortable accepting alternative routes-to-market for independent renewable generator projects, such as shorter-term contracting strategies. This should reduce the cost of investment in renewable electricity, boosting competition amongst both generators and offtakers, and lowering costs to consumers. 8. Ofgem is also taking measures to improve wholesale market liquidity 5 which will facilitate market entry by offering a reliable route to market, enabling increased competition. 9. We have also announced measures to aid the reduction of electricity demand and 20 million will be made available to pilot Electricity Demand Reduction 6, which will begin shortly. 10. To maintain investor confidence as these reforms are taken forward the Government has put in place arrangements to support the transition from the current Renewables Obligation to the Contracts for Difference, and to allow for early investment decisions to be made under the FID Enabling process 7. These reforms are already starting to deliver investment in electricity infrastructure. The support provided through the FID Enabling for Renewables process, will provide private sector investment in renewable electricity generation of up to 12 billion by
7 Introduction 11. EMR is on track to be implemented in In April 2014 the Government published the Contracts for Difference Implementation Plan 8, and in December last year the Government published the Capacity Market Implementation Plan 9. These documents provide potential participants with details of the key implementation activities and milestones and their indicative dates. The first CfDs are expected to be allocated this year. It is also expected that the first Capacity Market capacity auction will be run in December Finally, for further details on EMR see the document Implementing Electricity Market Reform (EMR.) 8 df 9 ntation_plan_final.pdf 7
8 Consultation Responses BSCP11: Trading Disputes 5 responses 1 Do you agree with the proposed modifications to the BSC Procedure 11? If not, please explain why, and what alternatives would you suggest? 13. Of the five responses that were received to this question, three agreed with the approach laid out in the consultation. One respondent suggested a minor drafting change which was accepted. A further respondent noted that some disputes may have no impact on CfD or CM Settlement and suggested that only issues which might have an impact on CfD or CM Settlement should be notified to the CfD Counterparty and the CM Settlement Body. The respondent also noted that most disputes will have an impact on the Supplier Obligation side of EMR arrangements. 14. The changes set out in the consultation will remain. In addition, we have included timings for the BSCCo to notify disputes to the CfD Counterparty and CM Settlement Body so that it is clear when the BSCCo will do this, and what will be sent. With regard to the dispute process, the BSCCo will have no visibility of what sites or Meter Point Administration Numbers (MPANs) are part of the EMR arrangements. For the BSCCo to handle this process would mean additional costs. It is the role of the CfD Counterparty and CM Settlement Body to enforce their metering policy, and they will check if any BSC disputes are associated with EMR sites. Additionally, it is correct that any changes to BSC metered volumes as a result of a dispute will flow through to EMR Settlement via the reconciliation runs. 8
9 Consultation Responses BSCP15: Balancing Mechanism (BM) Unit registration 3 responses 2 Do you agree with the proposed modifications to BSC Procedure 15? If not, please explain why and what alternatives would you suggest? 15. Of the three responses to this question, one agreed with the proposed change. One questioned the reduction in the timescale for notification of registration of additional BMUs from 30 days to 15 days and one respondent noted concerns over the naming conventions and the impact of Additional BM Units for EMR on SAA-I014 (a BSC settlement data flow). They also asked for clarification of the Additional BM Unit registration process for the new arrangements. Clarification was also asked for on the use of the terms CfD/CM and EMR Settlement Services Provider. 16. The changes will remain as proposed in the consultation. The BSCCo will be allowed to register new Additional BM Unit on behalf of suppliers and Additional BM Units will need to follow a new naming convention. 17. There will be a new naming convention applied to the BMU Id, and BMU name filed (see proposed text in BSCP15 4.1), which states a naming convention must be adhered to. ELEXON recently consulted on this naming convention. 18. The use of the CfD/CM and EMR Settlement Services Provider are all new BSC defined Terms. EMR Settlement Services Provider means both the CfD and CM Settlement Services Providers. We have removed reference to the CM Settlement Services provider from BSCP15 sections 3.18 to 3.20 because Additional BM Units are no longer a CM metering option. 19. There is no intention to exclude inactive Additional BM Units from the BSC Settlement data flows. Participants may wish to use this data for reporting and monitoring purposes. 20. This change to the registration timetable stems from the desire to make the Additional BM Unit registration process as fast and streamlined as possible. The change in timescales is proposed to be applied to EMR and non-emr Additional BM Unit registrations to maintain consistency. 9
10 BSCP27: Technical Assurance of Half Hourly Metering Systems for Settlement Purpose 8 responses 3 Do you agree with the proposed modifications to the BSC Procedure 27? If not, please explain why, and what alternatives would you suggest? 21. Half of the respondents to this question agreed with the approach. One respondent thought that the impact would be limited. Of the remaining three respondents, issues raised were similar to those in Question 1, that the BSCCo does not know which BSC non-compliances have an impact EMR. 22. The changes set out in the consultation will remain. In addition, we have added timings for the BSCCo to notify non-compliances to the CfD Counterparty and CM Settlement Body so that it is clear when the BSCCo will do this, and what will be sent. The CfD Counterparty and the CM Settlement Body will be notified of metering non-compliances. The Government will, though, consider if and how the CfD Counterparty and the CM Settlement Body should notify ELEXON of any BSC metering non-compliances of which they become aware. BSCP503: Half Hourly Data Aggregation for SVA Metering Systems Registered In SMRS 6 responses 4 Do you agree with the proposed modifications to the BSC Procedure 503? If not, please explain why, and what alternatives would you suggest? 23. Of the six respondents to this question, two disagreed, two agreed and two did not express strong opinions, but raised technical concerns. Queries raised in response to this question mainly centred on the use of dummy flow identifiers, clarification on how the volumes are calculated, and the role of the CM Settlement Services Provider, including whether the CM Settlement Services Provider will administer the registration, testing, approval and status of DSR CMU s. 10
11 Consultation Responses 24. The Half Hourly Data Aggregator (HHDA) volumes will use boundary data adjusted for Line Loss Factors (LLFs) to allow for losses between the site and the Distribution Network Boundary (losses on the distribution network). If the D0036 was missing from the Half Hourly Data Collector (HHDC), the HHDA should use the estimation methods in BSCP503 Appendix 4.3, para 1(c), as it currently does. 25. The CM Settlement Services Provider will not be the primary entity to administer the registration, testing, approval and status of DSR CMU s. The Delivery Body will be heavily involved in this process too. The CM Settlement Services Provider will have some limited involvement in registrations, testing and approval. 26. In relation to paragraph 3.6.1, Processing Supplier Instructions for the CM, the timing has been amended from as required to Within 1 WD of valid request from Capacity Provider. 27. The Government will change the name of the data flows to remove reference to DSR because the flows will also be used by CM SVA registered generators. There are changes to sections 3.4.2, 3.6 and 4.4 of BSCP503 that insert placeholder references in square brackets in relation to flow number information. It is intended that the BSC administrator will replace the placeholders through its implementation process as is normal practice for BSC changes. 28. Aside from this clarification, the changes will remain as set out in the consultation and will reflect the Government s Capacity Market metering policy. BSCP508: Supplier Volume Allocation Agent 5 responses 5 Do you agree with the proposed modifications to the BSC Procedure 508? If not, please explain why, and what alternatives would you suggest? 29. Of the five responses, two agreed with the proposed approach. Of these, one respondent questioned the definition of Gross demand, and two suggested a minor drafting change which was accepted. Three of the five respondents raised questions about timings of new data flows and recipients of new data flows. 11
12 30. Paragraph of BSCP508 defines how to calculate gross demand. The Government will look to review and define the term Gross Demand more clearly. The Government does not currently plan to change the drafting on data flows to Suppliers as it would require further system and document changes, impacting the BSC and Suppliers Systems. The Government is confident that Suppliers should be able to reconcile the EMR data it receives from the EMR Settlement Services Provider using data it already receives from the BSC. BSCP509: Changes to Market Domain Data 6 responses 6 Do you agree with the proposed modifications to the BSC Procedure 509? If not, please explain why, and what alternatives would you suggest? 31. Four of the six respondents agreed with the proposed changes. One respondent suggested minor drafting changes and these have been accepted. The final respondent requested clarification on timings and the naming convention. In particular, the respondent noted that paragraph 3.6 on page 17 does not make a distinction between Additional BM Units for EMR and non-emr Additional BM Units, and asked if it is the intention that both would be able to use the fast track process. They also suggested a more auditable reference to the naming convention would be preferable than referring to the website. 32. It is the intention that both Additional BM Units for EMR and non-emr Additional BM Units would be able to use the fast-track system. The response to Question 2 lays out the rationale behind the Additional BM Unit registration timetable. 33. Introducing a new reference for the naming convention would not be consistent with how the other existing BM Unit naming conventions are defined 34. The policy will, therefore, remain as stated in the consultation document and reflect the CfD and CM metering policy. It allows BSCCo to register Additional BM Units in the Market Domain Database. 12
13 Consultation Responses Settlement Administration Agent (SAA) Service Description 5 responses 7 Do you agree with the proposed modifications to the SAA Service Description? If not, please explain why, and what alternatives would you suggest? 35. Three of the five responses to this question agreed with the proposal. One respondent queried the lack of provision for the reporting of Energy Intensive Industries (EIIs). The final respondent requested clarification on the relationship between "BM Unit SVA Gross Demand" provided by the SVAA to the SAA and the "BM Unit Gross Demand" to be reported by SAA to the EMR Agent. They also asked if EMR agents receive all information they require on Balancing Actions and non-delivery, which cause measured volumes to be different to that which would otherwise occur, from the SAA-I014 data file. Further clarification was asked for on paragraph 4.1.6, including which Settlement Report is required. Additionally, one respondent noted that the SAA-I014 reports are referred to elsewhere and queried whether the EMR Agents will get the combined SAA- I014 flow, or the individual party flows. 36. The calculation of BM Unit SVA Gross Demand is described in the SVAA URS. It does include both line losses and GSP Group Correction. The EMR Settlement Services Provider will receive data on balancing actions from the SAA-I014, and also new interfaces from the System Operator, as provided for in the Capacity Market Rules. 37. The Settlement Report referred to is the SAA-I014 sub flow 2 Settlement Report described in The Government will provide amended wording with an appropriate cross-reference added. 38. The Government will also tighten up the wording where necessary to ensure clear definitions are provided for: BM Unit SVA Gross Demand received by SAA from SVAA; BM Unit CVA Gross Demand calculated by SAA; and TLM-Adjusted BM Unit Gross Demand which is calculated by SAA and sent to the EMR Settlement Agent. 39. The Government will check sign conventions and propose tightened-up wording if necessary. 40. The Government consulted on its EIIs policy in July and August 2013 and is currently considering the responses. We will publish the response in due course. 13
14 41. Aside from the amendments above, the changes proposed in the consultation will remain. These support the provision of data to the CfD Settlement Services Provider and the CM Settlement Services Provider. Supplier Volume Allocation(SVA) Data Catalogue Volume 1 & Volume 2 5 responses 8 Do you agree with the proposed modifications to the SVA Data Catalogue Volume 1 and Volume 2? If not, please explain why, and what alternatives would you suggest? 42. Three of the five respondents agreed with the approach proposed in the consultation. As with Question 7, one respondent queried the lack of provision for the reporting of EIIs volumes. A further respondent agreed with the approach for SVA Data Catalogue Volume 1, but queried the reported values for SVA Data Catalogue Volume See answer to Question 7 for the response the query about EIIs. The Government will check sign conventions and propose tightened-up wording if necessary. Otherwise, the changes will remain as laid out in the consultation. NETA Interface Definition and Design (IDD) Part 1 4 responses 9 Do you agree with the proposed modifications to the NETA Interface Definition and Design Part 1? If not, please explain why, and what alternatives would you suggest? 44. Two of the four responses to this question agreed with the approach laid out in the consultation. One respondent thought it would be beneficial to stipulate the inclusion of active Additional BM Units only in SAA-I014. Clarification was sought on whether the 14
15 Consultation Responses EMR Settlement Services Provider covers both the CfD and CM Settlement Agents in connection with SAA-I014 reporting. 45. EMR Settlement Services Provider is intended to cover both terms (CfD and CM Settlement Agents) in connection with SAA-I014 reporting. ELEXON is looking into proposing some clarification in the document of how non-active Additional BM Units are reported to address this comment. NETA Interface Definition and Design (IDD) Part 2 5 responses 10 Do you agree with the proposed modifications to the NETA Interface Definition and Design Part 2? If not, please explain why, and what alternatives would you suggest? 46. Two of the five responses to this question agreed with the proposed approach in the consultation. As with previous questions, one respondent questioned the lack of provision for the reporting of EII volumes. Also, as in the response to Question 9, one respondent thought it would be beneficial to stipulate the inclusion of active Additional BM Units only in SAA-I014. One of the respondents raised concerns over the potential costs of using XML Schema. This respondent also sought clarification on the frequency that data would be transferred from the SVAA. The respondent also asked whether Trading Unit and Transmission Loss Multiplier associated with the BM Unit would be required for EMR settlement. It was noted that for audit, query and dispute purposes, it would be desirable to include information on the GSP Group (where applicable) and the SAA run number. 47. The cost of developing the software changes for EMR (including any cost to create an XML schema) is being funded by DECC, not BSC Parties. There is currently no proposal to extend the use of XML to these interfaces and any such proposal would be assessed under normal BSC change processes. 48. Reports will be produced in accordance with the SVAA calendar, as with all other SVAA output files. Data is provided by SVAA at GSP level and adjusted to notional balancing point by SAA. 15
16 49. As noted above, we are looking into proposing some clarification in the document of how non-active Additional BM Units are reported to address this comment. Some participants may want visibility of the inactive Additional BM Units in the SAA-I We are confident that both SVAA and SAA keep appropriate records of what data has been processed to produce EMR data and that this will be available for audit, query and dispute purposes. Supplier Volume Allocation Agent (SVAA) and Settlement Administration Agent (SAA) User Requirements Specifications (URS) 5 responses 11 Do you agree with the proposed modifications to the Supplier Volume Allocation Agent User Requirements Specifications (URS)? If not, please explain why, and what alternatives would you suggest? 51. Three of the five respondents to this question agreed with the approach. The remaining two respondents provided detailed and technical comments, particularly on sections and One respondent asked for clarification on "corrected Active Import half hourly consumption and line loss values for each BM Unit" and the Consumption Component Classes (CCC). 53. Taking on board the comments in response to this question, the Government will improve the drafting of this section to bring it in-line with the BSC style. We will also clarify exactly which CCCs are included. 54. The rest of the changes laid out in the consultation will remain. The modifications support the provision of data to the CfD Settlement Services Provider and the CM Settlement Services Provider. 16
17 Annex A: List of Respondents EDF EON IMServ/Schneider Electric/Invensys National Grid Electricity Transmission RWE NPower Scottish Power SSE TMA Data Management 17
18 Crown copyright D/199 Department of Energy & Climate Change 3 Whitehall Place London SW1A 2HD
EMR: Consultation on Balancing and Settlement Code subsidiary documents
EMR: Consultation on Balancing and Settlement Code subsidiary documents URN: 14D/108 April 2014 Department of Energy and Climate Change 3 Whitehall Place London SW1A 2AW Telephone: 0300 068 4000 Website:
Government response: EMR consultation on industry code and licence modifications
Government response: EMR consultation on industry code and licence modifications June 2014 Crown copyright 2014 Copyright in the typographical arrangement and design rests with the Crown. This publication
EMR: Consultation on industry code and licence modifications
EMR: Consultation on industry code and licence modifications January 2014 Department of Energy and Climate Change 3 Whitehall Place London SW1A 2AW Telephone: 0300 068 4000 Website: https://www.gov.uk/government/organisations/department-of-energy-climate-change
Provide an overview of why and how BM Units are used for EMR settlement; Describe the differences between BM Units for SVA and CVA EMR Assets; and
Guidance REGISTRATION of BM UNITS for EMR Introduction This guidance reflects ELEXON s understanding of DECC s policy, the BSC and BSCP changes for EMR. This document should not be interpreted as DECC
PUBLIC WP25 EMR Aggregation Rules. EMR Working Practice
PUBLIC WP25 EMR Aggregation Rules EMR Working Practice EMR Settlement Limited Version 3.0 24 November 2015 Amendment Record Version Date Description of Changes Changes Included Consultation Refs 1.0 27
Questions raised on committee updates in EMR
Item Raised Question ELEXON Response by: 1 ISG153 Re: Creation of Subsidiary Company for EMR work What will it cost ELEXON to create the new subsidiary company? What happened to the subsidiary that was
PUBLIC Calculation of Supplier Demand for EMR Charging. EMRS Guidance
PUBLIC Calculation of Supplier Demand for EMR Charging EMR Settlement Ltd Version 1.0 06 August 2015 CONTENTS Change Amendment Record 3 1. Introduction 4 2. Purpose 4 3. Why is this important? 4 4. What
Contract for Difference for non-uk Renewable Electricity Projects
Contract for Difference for non-uk Renewable Electricity Projects August 2014 Crown copyright 2014 URN 14D/291 You may re-use this information (not including logos) free of charge in any format or medium,
Electricity Market Reform: Consultation on Proposals for Implementation
Electricity Market Reform: Consultation on Proposals for Implementation October 2013 2 Electricity Market Reform: Consultation on Proposals for Implementation Presented to Parliament by the Secretary of
Electricity Market Reform:
Electricity Market Reform: Consultation on Low Carbon Contracts Company s and Electricity Settlements Company s operational costs 2015/16 Government Response January 2015 Crown copyright 2015 URN 15D/001
Low Carbon Contracts Company and Electricity Settlements Company operational costs 2016/17
Low Carbon Contracts Company and Electricity Settlements Company operational costs 2016/17 Consultation on the operational cost levies November 2015 Department of Energy and Climate Change 3 Whitehall
PUBLIC. Response to consultation on EMR data flows
PUBLIC Response to consultation on 28 April 2014 CONTENTS INTRODUCTION... 3 1. Background... 3 2. ELEXON s proposal to the CfD Counterparty... 3 RECOMMENDATION TO DECC ON MECHANISMS FOR PARTIES TO EXCHANGE
Electricity Market Reform: Update on Terms for the Contract for Difference
Electricity Market Reform: Update on Terms for the Contract for Difference December 2013 2 Department of Energy and Climate Change 3 Whitehall Place London SW1A 2AW Telephone: 0300 068 4000 Website: www.decc.gov.uk
How To Write The Energy Bill
Implementing Electricity Market Reform (EMR) Finalised policy positions for implementation of EMR June 2014 Crown copyright 2014 URN 14D/221 You may re-use this information (not including logos) free of
EXPLANATORY MEMORANDUM TO THE CONTRACTS FOR DIFFERENCE (ELECTRICITY SUPPLIER OBLIGATIONS) REGULATIONS 2014. 2014 No. [XXXX]
EXPLANATORY MEMORANDUM TO THE CONTRACTS FOR DIFFERENCE (ELECTRICITY SUPPLIER OBLIGATIONS) REGULATIONS 2014 2014 No. [XXXX] 1. This explanatory memorandum has been prepared by the Department for Energy
Report on the EMR Delivery Body s performance of its functions in relation to the Capacity Market
Report on the EMR Delivery Body s performance of its functions in relation to Report Publication date: 19 June 2015 Team: EMR Team Contact: Sujitra Krishnanandan; Matthew Pearson Tel: 020 3263 9832; 020
This seeks to define Contracts for Difference (CfDs) and their relevance to energy related development in Copeland.
Contracts for Difference and Electricity Market Reform LEAD OFFICER: REPORT AUTHOR: John Groves Denice Gallen Summary and Recommendation: This seeks to define Contracts for Difference (CfDs) and their
Investing in renewable technologies CfD contract terms and strike prices
Investing in renewable technologies CfD contract terms and strike prices December 2013 Crown copyright 2013 You may re-use this information (not including logos) free of charge in any format or medium,
Eligibility for an exemption from the costs of Contracts for Difference updated cost estimates
Electricity Market Reform Eligibility for an exemption from the costs of Contracts for Difference updated cost estimates AUGUST 2013 1. In examining the consultation currently open on eligibility for an
Capacity Market DSR Workshop Tuesday 22 March 2016
Capacity Market DSR Workshop Tuesday 22 March 2016 Capacity Market: DSR Workshop Agenda 22 March 2016 Agenda Presenter 13:30 13:40 Introductions 13:40 14:00 Overview of the DSR Test Process What needs
Balancing and Settlement Code BSC PROCEDURE CLEARING, INVOICING AND PAYMENT BSCP301. Version 16.0. Date: 25 June 2015
Balancing and Settlement Code BSC PROCEDURE CLEARING, INVOICING AND PAYMENT BSCP301 Version 16.0 Date: 25 June 2015 Balancing and Settlement Code Page 1 of 46 25 June 2015 BSCP301 relating to CLEARING,
The Gas and Electricity Regulated Providers (Redress Scheme) Order 2008. Consultation Document
The Gas and Electricity Regulated Providers (Redress Scheme) Order 2008 Consultation Document URN 13D/305 07 January 2014 2 The Gas and Electricity Regulated Providers (redress scheme) Order 2008 Department
2014 No. 0000 ELECTRICITY. The Contracts for Difference (Standard Terms) Regulations 2014
Draft Regulations laid before Parliament under section 6(8) of the Energy Act 2013, for approval by resolution of each House of Parliament. D R A F T S T A T U T O R Y I N S T R U M E N T S 2014 No. 0000
Annex B: Strike price methodology July 2013
July 2013 URN 13D/189 Contents Introduction... 3 Overview of methodology for deriving a CfD strike price... 3 Strike Prices during the cross-over period with the RO (2014/15 2016/17)... 4 Comparison of
Energy Act 2013 CHAPTER 32. Explanatory Notes have been produced to assist in the understanding of this Act and are available separately
Energy Act 2013 CHAPTER 32 Explanatory Notes have been produced to assist in the understanding of this Act and are available separately Energy Act 2013 CHAPTER 32 CONTENTS PART 1 DECARBONISATION 1 Decarbonisation
Dear Colleague, Summary
System Operators, Transmission and Transportation System Owners, Generators, Shippers, Suppliers, Customers, Investors and other interested parties Date: 20 December 2013 Dear Colleague, Consultation on
Electricity Market Reform: policy overview
Electricity Market Reform: policy overview November 2012 2 ELECTRICITY MARKET REFORM: POLICY OVERVIEW Presented to Parliament by the Secretary of State for Energy and Climate Change by Command of Her Majesty
Fixed + Protect Electricity supply contracts explained for large business customers
Fixed + Protect Electricity supply contracts explained for large business customers 2/7 Fixed + Protect explained We fix your unit price, with a generous tolerance on how much your electricity use can
Electricity market reform: policy overview
Electricity market reform: policy overview May 2012 Contents Introduction... 3 Electricity Market Reform... 6 The Move to EMR... 21 Costs and Benefits of EMR... 24 EMR in the Devolved Administrations...
a description of the various categories of embedded generators
Guidance Embedded Generation This document provides: a description of the various categories of embedded generators an outline of the types of bilateral agreements that owners/lead Parties of embedded
CFD Supplier Workshop Ruth Herbert Low Carbon Contracts Company
CFD Supplier Workshop Ruth Herbert Low Carbon Contracts Company 25 November 2014 AGENDA CFD SUPPLIER WORKSHOP 25 November Timing Session Delivery partner 09.30 Welcome and Introduction Low Carbon Contracts
How To Register A Power Plant On The Em Delivery Body Website
EMR Company Registration and User Management Guidance document for EMR participants User Support Guide for EMR Company Registration and User Management 02 nd July 2015 National Grid Electricity Transmission
Annex A Feed-in Tariff with Contracts for Difference: Operational Framework
Annex A Feed-in Tariff with Contracts for Difference: Operational Framework November 2012 Contents Executive Summary... 5 Document Overview... 9 1. Introduction... 10 The Energy Bill: The Legal Framework
PUBLIC WP42 - Supplier CFD Credit Cover. EMRS Working Practice
PUBLIC WP42 - Supplier CFD Credit Cover EMRS Working Practice EMR Settlement Ltd Version 3.0 18 January 2016 Amendment Record Version Date Description of Changes Changes Included Consultation Refs 2.0
Introduction to EMR for New Suppliers. Wednesday 22 July 2015
Introduction to EMR for New Suppliers Wednesday 22 July 2015 Health & Safety 2 Introduction to EMR for New Suppliers 22 July 2015 Welcome What we will cover? Agenda Time Welcome 9.30 Overview of EMR 9.40
Opening the CfD support scheme to non-uk renewables projects
Opening the CfD support scheme to non-uk renewables projects European Commission workshop, Brussels, 5 November 2014 Agenda 1. What is the CfD support scheme? 2. What may be the benefits of opening the
Supplier Implementation Event. Tuesday 27 January 2015
Supplier Implementation Event Tuesday 27 January 2015 Health & Safety 2 Supplier Implementation Event - 27 January 2015 What we will cover? Agenda Time Lead Introduction 9.30 LCCC, ESC and EMRS What do
Fixed + Protect Electricity supply contracts explained for large business customers
Fixed + Protect Electricity supply contracts explained for large business customers 2/7 Fixed + Protect explained We fix your unit price, with a generous tolerance on how much your electricity use can
EMR Capacity Market Implementation Coordination Workshop
EMR Capacity Market Implementation Coordination Workshop Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight
Smart Metering Implementation Programme
Smart Metering Implementation Programme Foundation Smart Market The Government s final response to the consultation on the Foundation Smart Market 24 July 2013 Department of Energy and Climate Change 3
ANNEX B FEED-IN TARIFF WITH CONTRACTS FOR DIFFERENCE: DRAFT OPERATIONAL FRAMEWORK
ANNEX B FEED-IN TARIFF WITH CONTRACTS FOR DIFFERENCE: DRAFT OPERATIONAL FRAMEWORK 1 CONTENTS Introduction...3 Section A Price Setting...8 Section B CfD Allocation... 18 Section C CfD Terms Pre Commissioning...
Redlined BSCP71 text for CP1430 Clarification to the ECVA/MVRN processes
Redlined BSCP71 text for CP1430 Clarification to the ECVA/MVRN processes This CP proposes changes to Sections 2.2, 3.11, 3.12, 4.6, and 4.12 of BSCP71. We have redlined these changes against Version 13.0.
Contracts for Difference Round Guidance
30th June 2014 Contracts for Difference Round Guidance Contracts for Difference Allocation Round 1 2014 CFD Round Guidance 3 rd October 2014 National Grid Delivery Body Page 1 CFD Allocation Round Guidance
Fixed + Peace of Mind Electricity supply contracts explained for large business customers
Fixed + Peace of Mind Electricity supply contracts explained for large business customers 2/7 Fixed + Peace of Mind explained This contract guarantees your unit price will stay fixed in all but exceptional
Market reference prices
Market reference prices CfD Expert Group workshop 27 September 2013 Agenda Introduction / aims of the session Quick overview (10.00 11.30) Setting the intermittent reference price Setting the baseload
Making CfDs work for renewable generators
Making CfDs work for renewable generators This is in two parts. 1 st a brief introduction to the Green Power Auction Market. 2 nd gives more detail on the structure and follows on. We consider this a critical
WP35-CM Applicant /Capacity Provider Credit Cover Process
PUBLIC WP35-CM Applicant /Capacity Provider Working Practice EMR Settlement Limited Version 5.0 17 August 2015 WP35-CM APPLICANT /CAPACITY PROVIDER CREDIT COVER PROCESS CONTENTS Change Amendment Record
G8 - Contracts for Difference Metering
PUBLIC G8 - Contracts for Difference Metering EMRS Guidance EMR Settlement Limited Version 1.0 12 October 2015 CONTENTS Change Amendment Record...4 1. Introduction...5 2. Purpose...5 3. What is the Electrical
Guidance to the Air Ambulance Charities Grant Scheme. A grant to cover the VAT costs on aviation fuel 2014 15
Guidance to the Air Ambulance Charities Grant Scheme A grant to cover the VAT costs on aviation fuel 2014 15 March 2015 Title: Guidance to the air ambulance charities grant scheme Author: Finance & NHS
BSC Qualification Service Provider s Approach to the (Re)-Qualification Service
BSC Qualification Service Provider s Approach to the (Re)-Qualification Service For the year ending 30 September 2016 Contents 1. Introduction... 3 2. Responsibilities... 3 3. Overview of Qualification
Our Services for Partners
Our Services for Partners ElectraLink as the central body providing the infrastructure for the British retail electricity industry can provide unique services to support Partner s projects with utility
npower EMR Explained Session The Energy Event 10 th & 11 th September 2013
npower EMR Explained Session The Energy Event 10 th & 11 th September 2013 Welcome Chris Billing, Head of Indirect Sales, npower Agenda > 13.30 Welcome & introduction Chris Billing EMR Pulse Survey Results
Duncan Burt Head of Commercial Operation National Grid. The Office of Gas and Electricity Markets 9 Millbank London SW1P 3GE
National Grid House Warwick Technology Park Gallows Hill, Warwick CV34 6DA The Office of Gas and Electricity Markets 9 Millbank London SW1P 3GE 16 June 2015 Duncan Burt Head of Commercial Operation National
DATED 1 JUNE 1998. The DISTRIBUTION BUSINESSes as named herein. - and - The SUPPLIERs as named herein. - and - Elexon Limited (as the BSC Agent)
DATED 1 JUNE 1998 The DISTRIBUTION BUSINESSes as named herein - and - The SUPPLIERs as named herein - and - Elexon Limited (as the BSC Agent) - and - MRA Service Company Limited MASTER REGISTRATION AGREEMENT
Contracts for Difference - the new support regime for low carbon generation
Contracts for Difference - the new support regime for low carbon generation James Taylor Raj Bavishi 11 November 2014 UK Incentive Regimes Small scale Feed in Tariffs and the Renewables Obligations have
Synergies and Conflicts of Interest arising from the Great Britain System Operator delivering Electricity Market Reform
Synergies and Conflicts of Interest arising from the Great Britain System Operator delivering Electricity Market Reform Final report URN: 13D/088 Department of Energy and Climate Change 3 Whitehall Place
The UK Electricity Market Reform and the Capacity Market
The UK Electricity Market Reform and the Capacity Market Neil Bush, Head Energy Economist University Paris-Dauphine Tuesday 16 th April, 2013 Overview 1 Rationale for Electricity Market Reform 2 Why have
UK-London: IT services: consulting, software development, Internet and support 2011/S 165-273114 CONTRACT NOTICE. Services
1/6 This notice in TED website: http://ted.europa.eu/udl?uri=ted:notice:273114-2011:text:en:html UK-London: IT services: consulting, software development, Internet and support 2011/S 165-273114 CONTRACT
Electricity Settlements Company Ltd Framework Document
Electricity Settlements Company Ltd Framework Document This framework document has been drawn up by the Department of Energy and Climate Change in consultation with the Electricity Settlements Company.
Electricity Market Reform: Proposals for Implementation
EMR Programme Team Department of Energy & Climate Change 4 th Floor Area D 3 Whitehall Place London SW1A 2AW 23 rd December 2013 Dear Sirs, Electricity Market Reform: Proposals for Implementation I am
ELECTRICITY GENERATION, DISTRIBUTION AND SUPPLY LICENCE EXEMPTIONS FREQUENTLY ASKED QUESTIONS (FAQS)
ELECTRICITY GENERATION, DISTRIBUTION AND SUPPLY LICENCE EXEMPTIONS FREQUENTLY ASKED QUESTIONS (FAQS) June 2013 ELECTRICITY GENERATION, DISTRIBUTION AND SUPPLY LICENCE EXEMPTIONS _ FAQS Electricity Generation,