EAI Response to ISEM Draft Decision
|
|
|
- Pamela Welch
- 9 years ago
- Views:
Transcription
1 EAI Response to ISEM Draft Decision SEM Electricity Association of Ireland Markets Committee Status: Submitted Date: 25 th July Baggot Street Lower Dublin 2 EU Transparency Register No:
2 The Electricity Association of Ireland (EAI) is the trade association for the electricity industry on the island of Ireland, including generation, supply and distribution system operators. It is the local member of Eurelectric, the sector association representing the electricity industry at European level. EAI aims to contribute to the development of a sustainable and competitive electricity market on the island of Ireland. We believe this will be achieved through cost-reflective pricing and a stable investment environment within a framework of best-practice regulatory governance. Electricity Association of Ireland Tel: Introduction 2
3 Introduction EAI welcomes the opportunity to respond to this consultation. The decision emanating from this consultation will fundamentally determine the future electricity market design (encompassing energy trading arrangements and capacity remuneration) which will have enduring consequences for market participants and consumers on the island of Ireland. It is therefore crucially important that industry is afforded the opportunity to input to the detailed design as any inefficiency and (perceived) risk inherent in the market design will inevitably increase costs to the consumer. The draft decision paper offers a broad outline of the energy trading arrangements and the capacity remuneration mechanism (CRM) that is proposed to replace the current market design (SEM) at the end of A plethora of fundamentally important issues and questions are reserved for the detailed design phase which, according to the project plan published in February 2013, is to be completed by February For example important detail beyond the high level proposal for Reliability Options (ROs) needs to be established such as what type of product bidders will sell in an RO and measures linking the RO to the physical delivery of capacity, which will be necessary if the ROs are to solve the missing money problem and ensure capacity adequacy. More generally the CRM design must be carefully tailored to suit all-island market conditions and, if auction-based, will require appropriate lead times and transitional arrangements. Equally fundamental to the detailed design phase are: effective measures to promote liquidity in all trading timeframes; the development of a market power mitigation strategy; comprehensive testing of Euphemia and its performance, and the development of real time arrangements for energy trading among other matters. Resolving these issues is not a trivial exercise that can be accelerated. With the project already about five months behind schedule the detailed design phase is likely to be compressed by a factor of two. EAI therefore strongly urges the SEM Committee to carefully review the original timetable for the ISEM project as published in February 2013 and consider the continued feasibility of this given the magnitude and nature of the work that remains to be completed. If an extended timetable is necessary it would be advisable to reach such a determination at this stage of the process to facilitate a more considered and consultative detailed design phase. It is essential that an updated project plan is published without delay allocating sufficient time for: Robust and inclusive EUPHEMIA testing Genuine industry consultation in detailed design Participant IT procurement and readiness The remainder of the EAI response addresses the EU context and the issues of liquidity, balancing market design and capacity remuneration. 3
4 Target Model Compliance Timelines It is now possible that CACM will not be agreed before the end of 2014 which will have a knock on effect on the timeline for agreement of the balancing and forwards network codes. Furthermore, whilst progress has been made in the introduction of a European Day Ahead Market (DAM), the project to introduce a common intraday market (IDM) has been beset by delay and may not be finalised by This should be considered in the context of ISEM timelines. It would also be prudent for the RAs to consider the need for contingency arrangements to market coupling via Euphemia if testing deems such arrangements necessary. 1 Fall back arrangements for Intraday markets eg SEM-GB intraday coupling pending completion of EU IDM should also be considered in the detailed design. An assessment of the potential for periodic ID auctions should also be carried out. Timelines must allow for a transitory phase for the CRM (based on the current mechanism) so as not to radically undermine existing investments in SEM. The RAs argue that compliance (with the target model) is a necessary but not sufficient condition of market design and that the ISEM project offers the opportunity to improve on aspects of the current market design. The RAs and market participants have mutual objectives of enhancing incentives for efficient interconnector trading as well as the procurement of energy, capacity and services at an optimum price for the consumer. The market must additionally adequately remunerate and incentivise the provision of energy, capacity and services. In this context, we welcome the commitments to work on improving forwards market liquidity, introduce mandatory balancing participation and the retention of a capacity remuneration mechanism. EAI also welcomes the recognition of the need to remunerate non-energy services. Detailed Design The draft decision paper proposes that a number of important issues will be resolved at the detailed design phase. It is imperative that sufficient time and resources be devoted to this important stage of the process. EAI would welcome publication of a detailed scope and updated timelines for the detailed design phase alongside proposals for industry involvement at the earliest opportunity. Industry expertise will be especially important during the technical detailed design phase and has proven instrumental in the past eg during SEM design and the UK CRM. The draft decision flags important issues such as the suitability of the EUPHEMIA algorithm that will require industry input to test and determine. Such testing should include dynamic modelling of potential generator bidding strategies in ISEM using Euphemia offer formats to provide evidential support for the hypothesis stated in the draft decision that generators will learn how to bid to achieve a consistently efficient outcome. Such modelling should also reveal the extent to which feasible scheduling will result from Euphemia that does not require significant TSO intervention in the dispatch market. Finally, we urge the RAs to carry out a more robust overall CBA to ensure that the ultimate decisions are in the best interests of the consumer and market participants and deliver against their stated objectives. 1 Which may for e.g. be through amending the Euphemia algorithm to cater for ISEM specific needs 4
5 Liquidity in ISEM A key objective of the new market design is the creation of a sufficiently liquid forwards market to allow producers and suppliers the opportunity to hedge their day to day commercial risks. The RAs propose exclusive trading in DAM and IDM and financial trading in forwards market only with financial trading rights for the trading of interconnector capacity to improve liquidity in the forwards market. We suggest that the issue of forward liquidity which is heavily influenced by liquidity in subsequent timeframes, be given priority during the detailed design process, and would stress that forward contracting would normally start up to months in advance of real time with some retail customers wishing to contract 3 years out. Therefore it is important to get this component of the market working early. Balancing Market With regard to the balancing mechanism and the choice between single and dual pricing the decision paper has reached conclusions on this without sufficient robust consideration of the alternatives and their impacts or justification for the choice. The objectives of the BM must be made clear to the market and alternatives for balancing market (and imbalance) pricing should be afforded due consideration. Recent GB experience on this issue is instructive in this regard. While balancing responsibility is required and accepted, a move away from the SEM socialised balancing regime requires due consideration of the alternatives and impacts and be justified for a market of our size. The high level objective of this part of the market is to incentivise accurate forecasting at the Day Ahead Stage and requires a certain amount of learning by doing in the respective markets. Portfolio bidding should be an option for demand and all variable renewables providers irrespective of size. Finally, the incentivisation of commercial and competitive aggregation should be prioritised over development of a last resort option. Proposed CRM Reliability Option EAI welcomes the proposal to complement the energy trading arrangements with a capacity remuneration mechanism. Greater clarity on the objectives of a CRM in the context of the RAs stated preference for a reliability option would however be welcome. In order to provide certainty to investors in the intervening period between the phasing out of the current CRM and the introduction of a replacement, EAI proposes that a transition mechanism be progressed with the current regime as the starting point. EAI is disappointed by the decision to move away from the current capacity mechanism as this has been thought to work well in the current SEM and is well understood. EAI believes that the current approach might still be the appropriate solution for capacity adequacy requirements in SEM. At a high level, EAI believes that the chosen CRM must be physically backed a financial only mechanism is not conducive to capacity adequacy and opens up potential financial regulation costs.. We would further urge the access to the mechanism for importers be contingent on reciprocal access for ISEM market participants in the importers respective capacity markets. EAI confines its comments hereafter to the proposed RO mechanism. The experience to date of Reliability Options in markets such as Columbia and New England should inform design 5
6 considerations in SEM. ISO-NE is currently undertaking significant change to the capacity product under its CRM after Its quantity based mechanism proved to be inadequate, resulting in boom-bust prices and under capacity after its introduction four years ago. Under the changes it is proposed to replace the Installed capacity requirement with a sloped demand curve and reference it s the Costs of a New Entrant(CONE) against a CCGT from a. On top of the Capacity Base Payment market participants will now receive a Capacity Performance Payment (or penalty) for delivering on their obligation. These are just some examples of the many issues involved in designing an RO and without an insight into the detail it is difficult to assess how effective an RO may be in delivering against our stated objectives for a CPM. Conclusion The detailed design process will determine the compatibility between the HLD and some of the underlying assumptions/objectives. It is imperative that the detailed design phase (and consequently the ISEM timetable) is not overly compressed. The technical and commercial expertise of industry will be a crucial input to a design which delivers on its objectives. In this response we have highlighted a number of the key issues of process and substance for industry on the island. We would welcome further opportunity for discussion of the issues highlighted this response and publication of the detailed design scope at the earliest opportunity. Electricity Association of Ireland, 25 th of July
A new electricity market for Northern Ireland and Ireland from 2016 - Integrated Single Electricity Market (I-SEM)
A new electricity market for Northern Ireland and Ireland from 2016 - Integrated Single Electricity Market (I-SEM) Non-technical summary High level design Draft Decision Paper SEM -14-047 June 2014 1 INTRODUCTION
Reliability Options in Ireland and Northern Ireland Obligations and Penalties
Reliability Options in Ireland and Northern Ireland Obligations and Penalties European Commission Technical Working Group on Energy: Subgroup on generation adequacy 14 April, Brussels Background Single
SINGLE ELECTRICITY MARKET COMMITTEE
SINGLE ELECTRICITY MARKET COMMITTEE Integrated Single Electricity Market (I-SEM) SEM Committee Decision on High Level Design Impact Assessment SEM-14-085b 17 September 2014 Table of Contents 1 SUMMARY...
CAPACITY MECHANISMS IN EU POWER MARKETS
CAPACITY MECHANISMS IN EU POWER MARKETS Can we progress to bilateral energy options? Simon Bradbury Ultimately, European renewable targets mean that prices and dispatch patterns will be dictated by wind
EURELECTRIC presentation. EURELECTRIC contribution to a reference model for European capacity markets. DG COMP workshop 30 June 2015
EURELECTRIC presentation EURELECTRIC contribution to a reference model for European capacity markets DG COMP workshop 30 June 2015 EURELECTRIC believes that energy, flexibility and capacity are all needed
ESRI Research Note. The Irish Electricity Market: New Regulation to Preserve Competition Valeria di Cosmo and Muireann Á. Lynch
ESRI Research Note The Irish Electricity Market: New Regulation to Preserve Competition Valeria di Cosmo and Muireann Á. Lynch Research Notes are short papers on focused research issues. They are subject
VALUING FLEXIBILITY 20 May 2014 Florence Forum Stephen Woodhouse, Director, Pöyry Management Consulting
VALUING FLEXIBILITY 20 May 2014 Florence Forum Stephen Woodhouse, Director, Pöyry Management Consulting THE NEED FOR FLEXIBILITY IS GROWING With new forms of generation. prices and dispatch patterns will
Response by NIE Energy (PPB)
NIE Energy Limited Power Procurement Business (PPB) Review of K factors & Supply Margins and Tariff Structure Review Consultation Paper CER-09-093 Response by NIE Energy (PPB) 11 September 2009. Introduction
Single Electricity Market (SEM) and interaction with EMIR. Central Bank of Ireland
Single Electricity Market (SEM) and interaction with EMIR Central Bank of Ireland 11 th July 2014 About EAI Overview of SEM and its Participants The market is a gross mandatory pool and consists of generators
Progress on market reform: EMR, the I-SEM and the TEM
Progress on market reform: EMR, the I-SEM and the TEM David Newbery Electricity Market Reform Belfast 28 th March 2014 http://www.eprg.group.cam.ac.uk 1 Disclaimer Although I am an independent member of
The Capacity Remuneration Mechanism in the SEM Prepared for Viridian
The Capacity Remuneration Mechanism in the SEM Prepared for Viridian 4 April 2014 Project Team Graham Shuttleworth George Anstey Matthew Mair Peer Review Jonathan Falk NERA Economic Consulting 15 Stratford
Forward Risk-Hedging Products PC_2012_E_13
Answer to public consultation Petteri Haveri 26.10.2012 1(5) Agency for the cooperation of energy regulators [email protected] Forward Risk-Hedging Products PC_2012_E_13 The Finnish Energy
Specific amendments to the Capacity Allocation and Congestion Management Network Code
Annex: Specific amendments to the Capacity Allocation and Congestion Management Network Code I. Amendments with respect to entry into force and application The Network Code defines deadlines for several
The UK Electricity Market Reform and the Capacity Market
The UK Electricity Market Reform and the Capacity Market Neil Bush, Head Energy Economist University Paris-Dauphine Tuesday 16 th April, 2013 Overview 1 Rationale for Electricity Market Reform 2 Why have
Electricity market reform: policy overview
Electricity market reform: policy overview May 2012 Contents Introduction... 3 Electricity Market Reform... 6 The Move to EMR... 21 Costs and Benefits of EMR... 24 EMR in the Devolved Administrations...
Electricity Market Reform: Proposals for Implementation
EMR Programme Team Department of Energy & Climate Change 4 th Floor Area D 3 Whitehall Place London SW1A 2AW 23 rd December 2013 Dear Sirs, Electricity Market Reform: Proposals for Implementation I am
The participation of non-generation activities in the GB Capacity Market. Department for Energy & Climate Change
The participation of non-generation activities in the GB Capacity Market Department for Energy & Climate Change 22 January 2015 Presentation today 1 Environmental & Energy Aid Guidelines and nongeneration
Duncan Burt Head of Commercial Operation National Grid. The Office of Gas and Electricity Markets 9 Millbank London SW1P 3GE
National Grid House Warwick Technology Park Gallows Hill, Warwick CV34 6DA The Office of Gas and Electricity Markets 9 Millbank London SW1P 3GE 16 June 2015 Duncan Burt Head of Commercial Operation National
Harmonisation of electricity generation transmission tariffs. A EURELECTRIC contribution to ACER s scoping exercise
Harmonisation of electricity generation transmission tariffs A EURELECTRIC contribution to ACER s scoping exercise December 2015 EURELECTRIC is the voice of the electricity industry in Europe. We speak
Gaelectric Holdings Plc
Gaelectric Holdings Plc Response Paper to: Consultation on Transition from the NIRO to CfDs and Grace Periods 14/04/2015 Public 1 INTRODUCTION Gaelectric Holdings Plc (Gaelectric) welcomes the opportunity
AER Issues Paper Tariff Structure Statement Proposals Victorian Electricity Distribution Network Service Providers
20 January 2016 Australian Energy Regulator GPO Box 520 Melbourne VIC 3001 Via email: [email protected] AER Issues Paper Tariff Structure Statement Proposals Victorian Electricity Distribution Network
ABOUT ELECTRICITY MARKETS. Power Markets and Trade in South Asia: Opportunities for Nepal
ABOUT ELECTRICITY MARKETS Power Markets and Trade in South Asia: Opportunities for Nepal February 14-15, 2011 Models can be classified based on different structural characteristics. Model 1 Model 2 Model
Consultation: Auditing and ethical standards
Consultation Financial Reporting Council December 2014 Consultation: Auditing and ethical standards Implementation of the EU Audit Directive and Audit Regulation The FRC is responsible for promoting high
market design policy paper
market design policy paper 15 September 2014 1 introduction Ensuring economic growth, jobs, secure coverage of basic needs at an affordable and competitive price, and sustainable use of limited resources
Understanding the Capacity Market
Understanding the Capacity Market The Capacity Market What is The Capacity Market? The Capacity Market is a mechanism introduced by the Government to ensure that electricity supply continues to meet demand
Response to direct consultation questions
Consultation on proposals for the levels of banded support under the Renewables Obligation for the period 2013-17 and the Renewables Obligation (Scotland) Order 2011 Response by RenewableUK RenewableUK
Before turning to detailed remarks on the questions for consultation, we would like to draw EBA s attention to our key issues and concerns.
Frankfurt am Main 16 August 2013 BVI s position on the Draft Regulatory Technical Standards on the determination of the overall exposure to a client or a group of connected clients in respect of transactions
Data Communications Company (DCC) price control guidance: process and procedures
Guidance document Contact: Tricia Quinn, Senior Economist Publication date: 27 July 2015 Team: Smarter Metering Email: [email protected] Overview: The Data and Communications Company (DCC) is required
Measurement of Banks Exposure to Interest Rate Risk and Principles for the Management of Interest Rate Risk respectively.
INTEREST RATE RISK IN THE BANKING BOOK Over the past decade the Basel Committee on Banking Supervision (the Basel Committee) has released a number of consultative documents discussing the management and
Wholesale power market liquidity: consultation on a Secure and Promote licence condition
Promoting choice and value for all gas and electricity customers Wholesale power market liquidity: consultation on a Secure and Promote Consultation Reference: 163/12 Contact: Phil Slarks, Senior Economist
15 April 2011 Re: Expansion of the Victorian Energy Efficiency Target
Mr Anthony Williamson Principal Policy Officer, Energy Sector Development Division Department of Primary Industries Email: [email protected] 15 April 2011 Re: Expansion of the Victorian
Irish Tax Institute. Response to OECD Discussion Draft: Make Dispute Resolution Mechanisms More Effective
Irish Tax Institute Response to OECD Discussion Draft: Make Dispute Resolution Mechanisms More Effective January 2015 About the Irish Tax Institute The Irish Tax Institute is the leading representative
PROJECT MANAGEMENT FRAMEWORK
PROJECT MANAGEMENT FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Executive Assistant to
Single Electricity Market. Principles of Dispatch and the Design of the Market Schedule in the Trading and Settlement Code
Single Electricity Market Principles of Dispatch and the Design of the Market Schedule in the Trading and Settlement Code SEM Committee Decision Paper 26 th August 2011 SEM-11-062 EXCECUTIVE SUMMARY The
Options for coordinating different capacity mechanisms
Options for coordinating different capacity mechanisms Håkan Feuk, Chair of EURELECTRIC Working Group on Wholesale Market Design Brussels, 12 December 2013 Generation adequacy measures have clear cross-border
Market reference prices
Market reference prices CfD Expert Group workshop 27 September 2013 Agenda Introduction / aims of the session Quick overview (10.00 11.30) Setting the intermittent reference price Setting the baseload
Insurance Europe response to Joint Committee consultation on guidelines for cross-selling practices
Insurance Europe response to Joint Committee consultation on guidelines for cross-selling practices Our reference: COB-DIS-15-038 Date: 20 March 2015 Contact person: Arthur Hilliard, Policy Advisor, Conduct
GUIDANCE NOTE FOR DEPOSIT-TAKERS. Operational Risk Management. March 2012
GUIDANCE NOTE FOR DEPOSIT-TAKERS Operational Risk Management March 2012 Version 1.0 Contents Page No 1 Introduction 2 2 Overview 3 Operational risk - fundamental principles and governance 3 Fundamental
EXPLANATORY MEMORANDUM TO THE CONTRACTS FOR DIFFERENCE (ELECTRICITY SUPPLIER OBLIGATIONS) REGULATIONS 2014. 2014 No. [XXXX]
EXPLANATORY MEMORANDUM TO THE CONTRACTS FOR DIFFERENCE (ELECTRICITY SUPPLIER OBLIGATIONS) REGULATIONS 2014 2014 No. [XXXX] 1. This explanatory memorandum has been prepared by the Department for Energy
European Commission Public Consultation on GENERATION ADEQUACY, CAPACITY MECHANISMS AND THE INTERNAL MARKET IN ELECTRICITY
February 2013 European Commission Public Consultation on GENERATION ADEQUACY, CAPACITY MECHANISMS AND THE INTERNAL MARKET IN ELECTRICITY Reply from NASDAQ OMX The NASDAQ OMX Group, Inc. delivers trading,
BUSINESS RULES FOR CHAPTER VII DAILY IMBALANCE CHARGES
BUSINESS RULES FOR CHAPTER VII DAILY IMBALANCE CHARGES 1. General 1.1. The TSO shall publish its imbalance charge methodology and update it accordingly as any changes are made. This methodology must contain:
Power Trading and Retail System. empowering. smarter trading. across the energy value chain. Smart energy. Powering progress
Power Trading and Retail System empowering smarter trading across the energy value chain Smart energy. Powering progress In today s turbulent and increasingly complex energy markets, Atos Worldgrid PTRS
Contract for Difference for non-uk Renewable Electricity Projects
Contract for Difference for non-uk Renewable Electricity Projects August 2014 Crown copyright 2014 URN 14D/291 You may re-use this information (not including logos) free of charge in any format or medium,
Energy Networks Association. Electricity Demand Side Response Working Group. Demand Side Response Shared Services Framework Concept Paper
Energy Networks Association Electricity Demand Side Response Working Group Demand Side Response Shared Services Framework Concept Paper For Industry Consultation Contents Executive Summary 3 1 Demand Side
Regulatory Reform of the International Education Sector and the Student Immigration Regime. Policy Statement
Regulatory Reform of the International Education Sector and the Student Immigration Regime Policy Statement September 2014 1. INTRODUCTION 1.1 Ireland has a strong reputation for delivery of high quality
Financial Services Authority. FSA CP13/7: High-level proposals for an FCA regime for consumer credit. A Response by Credit Action
Financial Services Authority FSA CP13/7: High-level proposals for an FCA regime for consumer credit A Response by Credit Action Background Credit Action is a national financial capability charity (registered
Final Draft Guidance on Audit Committees
Guidance Corporate Governance April 2016 Final Draft Guidance on Audit Committees The FRC is responsible for promoting high quality corporate governance and reporting to foster investment. We set the UK
EUROPEAN COMMISSION. Brussels, 23.7.2014 C (2014) 5083 final. State aid SA.35980 (2014/N-2) United Kingdom Electricity market reform Capacity market
EUROPEAN COMMISSION Brussels, 23.7.2014 C (2014) 5083 final In the published version of this decision, some information has been omitted, pursuant to articles 24 and 25 of Council Regulation (EC) No 659/1999
Investing in the Infrastructure for Energy Markets
Investing in the Infrastructure for Energy Markets Executive Summary: The European Commission, energy ministers and energy regulatory authorities have recognised that, if the European electricity and gas
EC consultation on FX Financial Instruments. ECO-INV-14-079 Date: 9 May 2014. Contact person: Ecofin department E-mail: mihai@insuranceeurope.
Response to consultation on FX Financial Instruments Position Paper Our reference: Referring to: ECO-INV-14-079 Date: 9 May 2014 EC consultation on FX Financial Instruments Contact person: Ecofin department
CLICK TO OPEN FOOD AUTHENTICITY FIVE STEPS TO HELP PROTECT YOUR BUSINESS FROM FOOD FRAUD
CLICK TO OPEN FOOD AUTHENTICITY FIVE STEPS TO HELP PROTECT YOUR BUSINESS FROM FOOD FRAUD Click on tabs below FOOD AUTHENTICITY FIVE STEPS TO HELP PROTECT YOUR BUSINESS FROM FOOD FRAUD Food and drink manufacturers
CESR Consultation Paper Standardisation and exchange trading of OTC derivatives FBF S RESPONSE
16th August 2010 CESR Consultation Paper Standardisation and exchange trading of OTC derivatives FBF S RESPONSE General remarks: The French Banking Federation (FBF) represents the interests of the banking
BUSINESS REGULATION BENCHMARKING: PLANNING, ZONING AND DEVELOPMENT ASSESSMENTS
42/120 Collins Street GPO Box 1472 Telephone +613 8664 2664 Melbourne 3000 Melbourne 3001 Facsimile +613 8664 2666 www.bca.com.au 31 August 2010 Ms Christine Underwood Business Regulation Benchmarking
UK renewable energy an update
UK renewable energy an update 30 October 2014 Robert Hull, Managing Director Renewable energy key challenges 1 2 3 Costs to Climate change: Risks to security consumers: decarbonising of supply: short affordability
Legislation to encourage medical innovation a consultation. British Medical Association response. Executive Summary
Legislation to encourage medical innovation a consultation British Medical Association response Executive Summary This consultation is about proposed primary legislation to liberate doctors from perceived
EBA final draft Regulatory Technical Standards
EBA/RTS/2014/11 18 July 2014 EBA final draft Regulatory Technical Standards on the content of recovery plans under Article 5(10) of Directive 2014/59/EU establishing a framework for the recovery and resolution
SCOPING TOWARDS POTENTIAL HARMONISATION OF ELECTRICITY
SCOPING TOWARDS POTENTIAL HARMONISATION OF ELECTRICITY TRANSMISSION TARIFF STRUCTURES AGENCY FOR COOPERATION OF ENERGY REGULATORS (ACER) JUNE 2015 DRAFT FINAL REPORT Prepared by: Cambridge Economic Policy
What next for UK auctions of renewable Contracts for Difference?
What next for UK auctions of renewable Contracts for Difference? In February we saw the results of the first competitive auction for Contracts for Difference (CfDs), the primary support mechanism for incentivising
Part One: Introduction to Partnerships Victoria contract management... 1
June 2003 The diverse nature of Partnerships Victoria projects requires a diverse range of contract management strategies to manage a wide variety of risks that differ in likelihood and severity from one
6.0 Procurement procedure 1 Infrastructure
Page 6-1 6.0 Procurement procedure 1 Infrastructure 6.1 Overview Introduction Procurement procedure 1 Infrastructure consists of four parts: guidelines for understanding the strategic context for the procurement
FINANCIAL REPORTING COUNCIL AN UPDATE FOR DIRECTORS OF LISTED COMPANIES: GOING CONCERN AND LIQUIDITY RISK
FINANCIAL REPORTING COUNCIL AN UPDATE FOR DIRECTORS OF LISTED COMPANIES: GOING CONCERN AND LIQUIDITY RISK NOVEMBER 2008 Contents Page One Introduction 1 Two Accounting requirements with respect to going
HARLOW COUNCIL PERFORMANCE MANAGEMENT FRAMEWORK
HARLOW COUNCIL PERFORMANCE MANAGEMENT FRAMEWORK July 2013 1 P age Contents Page 1.0 Definition 3 2.0 Context 3 3.0 Purpose and aim of the policy 4 4.0 Policy Statement 4 5.0 Framework for Performance Management
Brevan Howard Asset Management LLP Pillar 3 Disclosures. Brevan Howard (2014). All Rights Reserved.
Brevan Howard Asset Management LLP Brevan Howard (2014). All Rights Reserved. Regulatory Context The following disclosures are provided pursuant to the Pillar 3 disclosure rules as laid out by the Financial
Annex A Feed-in Tariff with Contracts for Difference: Operational Framework
Annex A Feed-in Tariff with Contracts for Difference: Operational Framework November 2012 Contents Executive Summary... 5 Document Overview... 9 1. Introduction... 10 The Energy Bill: The Legal Framework
The Role of Mortgage Insurance under the New Global Regulatory Frameworks
The Role of Mortgage Insurance under the New Global Regulatory Frameworks By Anna Whittingham Regulatory Analyst, Genworth Financial Mortgage Insurance Europe Summary and Overview The introduction of fundamental
Protecting clients' financial interests. Response by the Council of Mortgage Lenders to the Solicitors Regulation Authority discussion paper
Protecting clients' financial interests Response by the Council of Mortgage Lenders to the Solicitors Regulation Authority discussion paper Introduction 1. The CML is the representative body for the first
UK-London: IT services: consulting, software development, Internet and support 2011/S 165-273114 CONTRACT NOTICE. Services
1/6 This notice in TED website: http://ted.europa.eu/udl?uri=ted:notice:273114-2011:text:en:html UK-London: IT services: consulting, software development, Internet and support 2011/S 165-273114 CONTRACT
FSB NI response to Consultation on Strategic Planning Policy Statement for Northern Ireland (Draft)
FSB NI response to Consultation on Strategic Planning Policy Statement for Northern Ireland (Draft) April 2014 FSB response to the Consultation on the Strategic Planning Policy Statement for Northern Ireland
Liquidity Secure and Promote - Monitoring update
Liquidity Secure and Promote - Monitoring update Yasmin Valji 27/10/15 Reminder: Structure of the intervention For objective 1 (availability of products to support hedging): Secure fair trading terms for
FOR USE WITH PPP PROJECTS 1 SAMPLE GUIDELINES FOR PRE-QUALIFICATION AND COMPETITIVE BIDDING PROCESS 2
FOR USE WITH PPP PROJECTS 1 SAMPLE GUIDELINES FOR PRE-QUALIFICATION AND COMPETITIVE BIDDING PROCESS 2 1. PRE-QUALIFICATION 1.1 The requirements for pre-qualifications will be reasonable and efficient and