UC Davis - RFP Questions for Perioperative Services Supply Chain Redesign Services. 1. How long is the project implementation estimated to be?
|
|
|
- Benedict Lloyd
- 9 years ago
- Views:
Transcription
1 UC Davis - RFP Questions for Perioperative Services Supply Chain Redesign Services 1. How long is the project implementation estimated to be? The Infor/Lawson project timeline is approximately 18 months go live planned for spring The Perioperative Services Supply Chain redesign is a part of ERP readiness. 2. What if anything has been done on the project thus far? Kaizen team consisting of supply chain analysts, central processing technicians, operating room nurses, and materials coordinators have completed the labeling standardization, and are embarking upon supply storage optimization in the operating rooms. 3. Are there any processes that have been mapped thus far? Some of the process maps are completed but there is more to be done. 4. What, if anything, has been tried in the area of organizational change management to date? Change management is a component of the Perioperative Services Supply Chain Redesign, and the group has taken Kizen approach to this. 5. Is training the existing team or stakeholders important to UC Davis health system as part of an organizational change management program Yes. We will need training material detailing the impact on the existing workflows but we will lead it internally. 6. Is there a vendor that UC Davis has already used in this area that will be competing for this work? Not that we are aware. 7. For us to complete, how important is it to have an office and field services representatives in northern California? Preferred but not required 8. Since we are privately-held we tend not to disclose our financial status (because much of that information will become public) is it required that we do so to compete for this business or can we provide statements from a financial institution such as Dunn & Bradstreet that certifies our excellent financial standing over our 21 year history?
2 We will accept statements. 9. Given the OCM nature of this scope of work, there really aren t products associated with our work, can you please advise on how we should answer this? Please answer where your services can relate. 10. How much weighting will the evaluation committee place on having already completed work for the University of California system? The scoring is done based on cost per quality points. UC experience will be looked at favorably during the quality scoring. 11. (somewhat related to number 1 above), we have similar clients in Texas and Illinois, how important is it that we have relevant clients within California? Preferred but not required 12. Are you able to provide the current implementation roadmap which outlines the key milestones/tasks of the Infor Cloudsuite System Implementation? (Referencing Screening Question 10.a.) This will be shared with the selected partner. 13. Can you please clarify Engagement Deliverable 1.f? Would UCDHS consider working with a subcontractor for direct support of inventory redesign execution (e.g. for physical labor support)? (Referencing Engagement Deliverables 1.f.) Yes 14. Can you please clarify Engagement Deliverable 1.e. Identify supply (bin/shelf) storage and quantities between OR supply room and PODs? (Referencing Engagement Deliverables 1.e.) Currently, there is a main supply room where cases are picked and excess inventory is stored. There are additional supply carts located in surgical pods, and shared amongst 8-10 operating rooms. We are looking for help identifying quantity and optimum location for storage between the main supply room and surgical pod storage. 15. Are consigned inventories/vendor managed inventories considered in scope for this engagement? (Referencing Engagement Deliverables 1.d.)
3 Yes 16. Has UCDHS already defined any measures of success for this project? (Referencing Engagement Deliverables 1.g.) No. We would like help in identifying the KPIs. 17. Are any other departments (e.g. Cardiology, Radiology) considered in scope for any of the activities or deliverables outlined in this document? Can you please confirm the three major departments exploring conversion to perpetual inventories? (Referencing Screening Question 5) No. Only Perioperative Services. 18. Has UCDHS completed the vendor master cleanse? (General Question) In process. 19. The RFP title might be interpreted to imply a focus on the organizational change management component of the services requested. The RFP calls out services that include organizational and process redesign and inventory optimization as well as change management. Please characterize the importance of change management (interpreted to address elements such as sponsorship, stakeholder alignment, communications, training, and the like) in relation to organizational and process redesign and inventory optimization. Our objective in requesting this information is to align our staffing with the importance UCDHS places on these various elements. The components of change management are critical to maintaining and sustaining process improvement initiatives for the perioperative services supply chain. We have a strong alignment of executive sponsors stakeholders. To that extent, we are requesting assistance in communication, training and process changes. 20. Please list the Infor Cloudsuite Healthcare Procure-to-Pay modules in scope. a. Requisition b. Procurement c. Contracts d. Inventory e. Receiving f. Accounts Payable 21. The Infor modules support a set of leading practices. Will UCDHS revise its processes to conform to these leading practices or are there circumstances when UCDHS would
4 not? Where the same processes is employed in the operating room and surgical centers within scope, will UCDHS adopt the same standard process in all? It is the organization s intent to conform to best in class/standard processes. 22. Has or does UCDHS plan to engage a system integrator to configure the Infor Cloudsuite Healthcare Procure-to-Pay modules? If so, please describe how UCDHS envisions the division of responsibility for organizational and process redesign and inventory optimization between the system integrator and the consultant selected to perform the services described in this RFP? We have selected Infor/Lawson as the implementation partner. Responsibilities as described in the RFP are specific to the Perioperative Services Supply Chain process redesign. The UCDHS team will serve as the medium between Infor/Lawson and the engagement partner selected through this RFP. 23. Please provide a copy of the high-level implementation plan for the Infor modules at UCDHS referenced in the Overview (page 7). Will be shared with the selected partner. 24. Please describe your expectations regarding the content of the post-implementation Audit Report noted as item 5 of Scope (page 7). We would like to measure ongoing effectiveness of the processes post implementation. To that extent, our expectation is for the engagement partner to create a tool that will help the organization audit the overall impact and sustainment. 25. Please provide an organization chart or description of the Infor project implementation team. Scope of the RFP is specific the Perioperative Supply Chain redesign. See the attached organization chart. 26. Please provide an organization chart of the UCDHS s change management organization, if any. None currently exist. 27. Which positions would be assigned to this project, if any, and at what level of FTE commitment?
5 1.0 FTE Inventory Optimization Manager 1.0 FTE Inventory Analyst There will be other SME from perioperative services assigned, as needed. 28. Please provide an organization chart of each of the organizations impacted by this work. Work is confined to perioperative services which includes the Main Operating room. See attached organization chart. 29. Question 4 of the Qualification Statement (page 17) states: Provide gross revenue figures for 2014 and percentage growth from for total company revenue, revenue associated with health care information systems, and revenue for the products included in your response. Are information systems vendors such as Infor eligible to respond to this RFP? What are the components UCDHS anticipates will be included in revenue associated with health care information system (e.g., hardware and software license revenue, configuration services, change management services)? Anyone interested in eligible to respond. Intent is to understand your healthcare business please respond as you deem appropriate. 30. Question 1 of the Screening Questions (page 18) states: Provide a brief description of prior experience in business process redesign for OR inventory fulfillment, PAR optimization, migration to periodic (inventory), consignment supplies and EMR integrations. Does UCDHS anticipate a brief description for each of these or for the group as a whole? Please respond as you deem appropriate. 31. Please identify the number of users impacted by the implementation program: Users of the modules by sub-process by location (if collocated as the centralized group, please confirm). The RFP is specific to perioperative services so impact is confined to a group. 32. It is noted that the Purchasing Department is centralized. Is that across all Supply Chain Departments? When did the centralization occur? In other words, is there a standard set of processes and procedures that are used across the board (assume based on RFP that policies are consistent in line with the State Board of Regents)? The RFP is specific to UCDHS and its perioperative services division.
6 33. What are the tools that are currently used to support these impacted business processes. There is mention of manual processes and hard copy. Is any technology currently being used consistently? No 34. Which automated change management tools, if any, does UCDHS employ on an ongoing basis (e.g., for communication, training, assessment). Does UCDHS have a strong preference for using these tools? No 35. What current supply chain functions are performed by Supply Chain personnel, by SPD, and by Perioperative personnel? Requisitioning Periop Purchasing Periop Receiving SCD/Periop Case cart assembly SPD Inventory management Periop Inventory and restock of core storage areas Periop/SCD Restocking of suites Periop 36. Where are common OR supplies predominately stored? SPD and OR Core 37. Is any automation currently used for the periodic inventory system (e.g., Pyxis machines, ParEx, etc.)? No 38. What records or reports will be available to determine usage of supplies? PO history and potentially manual inventory sheets. 39. Are any other Infor CloudSuite Healthcare modules being implemented besides Supply Chain, such as Enterprise Asset Management, Analytics for Healthcare or Mobile Supply Chain Management? Mobile Supply Chain only 40. What are the existing procurement and financial systems? Will CloudSuite be integrated or interfaced with them? Kuali. Yes it will be interfaced.
7 41. Is an item master module included in the Infor CloudSuite Healthcare? Yes 42. What perioperative processes are now manual and paper-based? Inventory Management 43. What surgical information system(s) is/are now in place? Are preference cards automated? Are pick lists automated? Is there an interface with the ORIS with Infor CloudSuite Healthcare technology? Epic Optime has automated preference cards and pick lists. The integration is planned. 44. Describe current process for procedure card management for managing and updating procedure cards and pick lists for surgical cases. Preference cards are not in scope. 45. Can you share current operational supply chain metrics? Namely: Number of cases picked / day, per week Unknown Case picking completeness / accuracy rate Unknown # of distinct areas where supplies are stored within periop services: 8 Number and dollar of case cart returns per day: not available Number of product related OR suite delays : not available Number of stock outs not available Percentage rush orders / total number of replenishment orders per month: not available Number of preference cards - Unknown Inventory turnover rates (by category A, B, C) at various sites. Not available Perioperative customer satisfaction level over time: Not available This information could be research if needed for the awarded vendor 46. When evaluating potential consultants, is experience with Infor Cloudsuite: a) Nice to have but similar experience is acceptable b) Strongly preferred and could sway the evaluation c) Essential Don t bid without it A Nice to have. 47. When evaluating potential consultants, is experience with OR supply chain processes: a) Nice to have but similar experience is acceptable b) Strongly preferred and could sway the evaluation c) Essential Don t bid without it C Essential
8 48. Will UCDHS dedicate any staff to the Redesign project? If so, how many and in what capacity? Please see # Is it UCDHS preference to have this project be consultant-driven (i.e. consulting team interviews staff and does all project work) or staff-driven (i.e. consultants lead an internal team through all phases of redesign)? Staff driven. 50. On page 7 there is reference to the contract period running concurrently with the Infor Cloudsuite ERP project implementation. Are there specific dates set yet for the implementation? Spring Is the Infor implementation only for Procure-to-Pay (P2P) modules or is it a broader ERP implementation? Procure-to-Pay only. 52. Is there requirement for specific Infor Cloudsuite P2P knowledge / expertise? No, but nice to have. 53. Will process changes focus on best supporting Infor tool capabilities or should we focus on leading practices? Leading practice 54. Will UC Davis require end user training services (i.e., video or demand, instructor-led courses, end user self-study guides)? Yes
Bid/Proposal No. P15/9888 Business Intelligence Management
Answers to Vendor Questions Questions are in black, Answers are in red 1. Who is the Executive Sponsor(s) for this project Information not available at this time 2. Will PCC provide the selected consultant
How To Implement An Enterprise Resource Planning Program
ERP Implementation Program Key phases of ERP implementation: Analysis of the company existing or designing new business process descriptions Inventory of the company s existing formal workflows or designing
Improvements Across the Continuum of Care at a National Top 10 Academic Medical Center
Improvements Across the Continuum of Care at a National Top 10 Academic Medical Center A national top 10 academic medical center and leader in healthcare innovation engaged Tefen to improve the efficiency
ADDENDUM #1 to RFP 15-014754-BC ENTERPRISE RESOURCE PLANNING SYSTEM Q & A
1 Is there a consulting company helping with selection process? No, UCDHS hired a consulting firm to assist with the development of the Functional and Technical requirements for the RFP 2 May we separate
ADDENDUM #1 TO RFP #16-608794-cs Facilities Project Management Software
ADDENDUM #1 TO RFP #16-608794-cs Facilities Project Management Software DATE OF RELEASE OF ADDENDUM #1: 3/17/16 1. In the RFP Proposed Schedule of Events, the submission deadline is March 31, 2016. Will
ATTACHMENT II - WRITTEN PROPOSAL RESPONSE AND GUIDELINES
ATTACHMENT II - WRITTEN PROPOSAL RESPONSE AND GUIDELINES RFP#CON2014-18 Attachments I through VI from the Response Teams will be evaluated and scored (1000 points total) in accordance with the criteria
Questions and Answers to RFP 15-589557-bc for Call Center consulting
Questions and Answers to RFP 15-589557-bc for Call Center consulting It is mentioned in Section XI; Tier 1 of the proposal that the vendor will not be able to modify staffing once the proposal is submitted
automating the OR supply chain at Memorial Hermann Healthcare System implementing point-of-use automation for the operating room
REPRINT OCTOBER 2010 healthcare financial management association www.hfma.org Mitch Work automating the OR supply chain at Memorial Hermann Healthcare System implementing point-of-use automation for the
Interorganizational Systems, ERPs and CRM
Interorganizational Systems, ERPs and CRM Athens University of Economics and Business Department of Management Science and Technology ISTLab/ Wireless Research Center George M. Giaglis [email protected]
RESEARCH NOTE NETSUITE S IMPACT ON MANUFACTURING COMPANY PERFORMANCE
Document K59 RESEARCH NOTE NETSUITE S IMPACT ON MANUFACTURING COMPANY PERFORMANCE THE BOTTOM LINE When Nucleus analysts investigated the use of NetSuite by manufacturers, they found these companies were
A Privacy Officer s Guide to Providing Enterprise De-Identification Services. Phase I
IT Management Advisory A Privacy Officer s Guide to Providing Enterprise De-Identification Services Ki Consulting has helped several large healthcare organizations to establish de-identification services
Chapter 3. OR Inventory Optimization
Chapter 3. OR Inventory Optimization Contents Chapter 3. OR Inventory Optimization 3-1 Chapter at a Glance 3-3 3.1 UNDERSTANDING OR INVENTORY OPTIMIZATION 3-4 What is OR inventory optimization? 3-4 Where
Performance Audit Concurrent Review: ERP Pre-Solicitation
Performance Audit Concurrent Review: ERP Pre-Solicitation April 2002 City Auditor s Office City of Kansas City, Missouri 24-2001 April 10, 2002 Honorable Mayor and Members of the City Council: We conducted
Request For Information. Telecom System Management and Billing Software
Request For Information Telecom System Management and Billing Software RFI #15-558683-cs Date Issued: 4/1/15 Due Date: 4/15/15 Submitted by the University of California Davis Health System This RFI is
OBIEE 11g Pre-Built Dashboards from Oracle Courtesy: Oracle OBIEE 11g Deployment on Vision Demo Data FINANCIALS
FINANCIALS General Ledger The General Ledger module provides insight into key financial areas of performance, including balance sheet, cash flow, budget vs. actual, working capital, liquidity. Dashboard
Sterile Processing University, LLC MODULE 25: INVENTORY CONTROL & MANAGEMENT [Ambulatory Surgery]
Sterile Processing University, LLC MODULE 25: INVENTORY CONTROL & MANAGEMENT [Ambulatory Surgery] Copyright Sterile Processing University, LLC 2012 All Rights Reserved. This material may not be copied
Supply Chain Management System Project Strategy
Supply Chain Management System Project Strategy Agenda It Introduction ti &Purpose Vision Goals Success Factors Objectives Introduction & Purpose Over the past several months members of the Advisory committee,
MNLARS Project Audit Checklist
Audit Checklist The following provides a detailed checklist to assist the audit team in reviewing the health of a project. Relevance (at this time) How relevant is this attribute to this project or audit?
Lawrence Livermore National Laboratory
Lawrence Livermore National Laboratory Supply Chain Management Department Attention: To All Offerors June 16, 2016 Subject: Request for Proposal (RFP) Number B617524 Lawrence Livermore National Security,
integrate 2: Business Process Redesign
Nevada System of Higher Education integrate 2: Business Process Redesign Executive Summary TABLE OF CONTENTS I. BACKGROUND AND OBJECTIVES 2 II. METHODOLOGY AND APPROACH 3 III. PROJECT OUTCOMES 5 IV. MAJOR
UC San Diego Commodity Strategy and Spend Analysis
UC San Diego Commodity Strategy and Spend Analysis October 6, 2008 Gayle Ta and Bob Neuhard Topics Commodity Strategy Commodity Analysis Strategy Development Key Performance Indicators and Metrics Executive
Clinical Supply Chain Management Optimization
Clinical Supply Chain Management Optimization WSHMMA Conference April 24, 2008 Bremerton, Washington Presented by Jamie C. Kowalski Vice President, Business Development Owens & Minor, Inc The Perfect Storm
Scope of Work Microsoft Infrastructure Upgrade
Introduction Scope of Work Microsoft Infrastructure Upgrade The University of Texas M. D. Anderson Cancer Center (M. D. Anderson) in Houston, Texas, celebrating six decades of Making Cancer History, is
Commercial Software Licensing
Commercial Software Licensing CHAPTER 11: Software Prepared by DoD ESI January 2013 Chapter Overview The government uses three primary agreement types for services: Fixed Price (FP). T&M (Time and Materials).
ASHP Professional Development Section Advisory Group. Professional Development Opportunities for Informatics Pharmacists
ASHP Professional Development Section Advisory Group Professional Development Opportunities for Informatics Pharmacists Introduction Many opportunities exist to help informatics pharmacists gain the knowledge
Appendix B Department of Information Resources Deliverables-Based Information Technology Services (DBITS) Contract Support Plan
Department of Information Resources Deliverables-Based Information Technology Services (DBITS) Vendor must provide a plan that describes the Vendor s ability and strategy for promoting and supporting the
The SME Engagement Handbook
The SME Engagement Handbook The purpose of this document is to help microbusinesses and small to medium enterprises ( SMEs ) interact more effectively when bidding to supply goods or services to larger
Project Audit & Review Checklist. The following provides a detailed checklist to assist the PPO with reviewing the health of a project:
Project Audit & Review Checklist The following provides a detailed checklist to assist the PPO with reviewing the health of a project: Relevance (at this time) Theory & Practice (How relevant is this attribute
Review of IDR Inventory Control Processes and Implementation of Procedures to Minimize Future Discrepancies. Submitted by Karen Young
Review of IDR Inventory Control Processes and Implementation of Procedures to Minimize Future Discrepancies Submitted by Karen Young A case study presentation from the ASQ Healthcare Division: www.asq.org/health.
REQUEST FOR PROPOSAL (RFP) ELECTRONIC HEALTH RECORD SYSTEM (EHRS) ON DEMAND TECHNICAL SERVICES RFP #OPS14-004. September 29, 2014
REQUEST FOR PROPOSAL (RFP) ELECTRONIC HEALTH RECORD SYSTEM (EHRS) ON DEMAND TECHNICAL SERVICES RFP #OPS14-004 September 29, 2014 QUESTIONS/STATEMENTS AND ANSWERS 1. Question(s)/Statement(s): Is this RFP
CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF FEBRUARY 17, 2015
EXTRACT FROM COUNCIL MEETING MINUTES OF FEBRUARY 17, 2015 Item 3, Report No. 5, of the Finance, Administration and Audit Committee, which was adopted without amendment by the Council of the City of Vaughan
Registered trademark of Visa International Service Association, Visa Canada is a licensed user. Registered trademark of Visa Canada Association.
To obtain more information about the Visa Procure-to-Pay Best Practices or to obtain a copy of the complete Best Practices study, including the Performance Gauge and ROI Tool, please contact your VISA
New Jersey Transportation Authority (NJTA) Request For Proposal And Optional PeopleSoft Financial System
January 14, 2010 TO ALL PROPOSERS: RE: Request for Proposal New Jersey Turnpike Authority The Upgrade and Enhancement of the PeopleSoft Financial System And Optional PeopleSoft Financial System for South
Enterprise Scheduler Rev. 0 Bid #24078582. Scope of Work
Scope of Work I. Scope of Solicitation II. Instructions to Offerors III. Scope of Work / Specifications IV. Terms and Conditions - Special V. Appendices to Scope of Work (if required) VI. Bidding Schedule
TECHNOLOGY SOLUTIONS FOR THE INTERNAL AUDITOR
TECHNOLOGY SOLUTIONS FOR THE INTERNAL AUDITOR (BUY VS BUILD) APRIL 17, 2015 LEVERAGING TECHNOLOGY FOR AUDIT Utilizing Software to Administrate Audit Process 40% 35% 30% 37% Tools Leveraged 32% 36% Yes
Diagram. Microsoft Dynamics Sure Step Methodology
Diagram Microsoft Dynamics Sure Step Methodology Designed to enable you to better serve your customers by helping reduce their Microsoft Dynamics total cost of ownership, the Sure Step Methodology can
Data Conversion Best Practices
WHITE PAPER Data Conversion Best Practices Thomas Maher and Laura Bloemer Senior Healthcare Consultants Hayes Management WHITE PAPER: Data Conversion Best Practices Background Many healthcare organizations
Practitioner Certificate Software Asset Management Syllabus. Version 2.0
Practitioner Certificate Software Asset Management Syllabus Version 2.0 June 2010 Practitioner Certificate in Software Asset Management The ISEB Practitioner Certificate in Software Asset Management (SAM)
Planning an ERP Implementation Project @ Small and Medium Enterprises
Planning an ERP Implementation Project @ Small and Medium Enterprises 27 th Regional WIRC Conference 31 August 2012 Table of Contents What is an SME and ERP Why an ERP for the SME segment Assessing the
California Community Clinics EHR Assessment and Readiness
How do you know if your clinic is ready for an electronic health record? Successful transition from paper-based charts to an electronic health record (EHR) requires organization-wide commitment, significant
The Benefits of a Successful Value Analysis Program WellStar Health System
The Benefits of a Successful Value Analysis Program WellStar Health System Tony Trupiano, VP Supply Chain Michael O Toole, Director Value Analysis Carla Stephens, Value Analysis Facilitator Bindi Shah,
RFP-00118 ADDENDUM NO. 1
INTERNAL SERVICES DEPARTMENT PROCUREMENT MANAGEMENT SERVICES 111 NW 1 ST Street Suite 1300 Miami, Florida 33128-1974 Telephone: 305-375-4725 Fax: (305) 375-5688 RFP-00118 ADDENDUM NO. 1 DATE: March 26,
REQUEST FOR EXPRESSIONS OF INTEREST 4643 EOI
4643 EOI REQUEST FOR EXPRESSIONS OF INTEREST 4643 EOI 4643 EOI - FUNCTIONAL CONSULTANT TO LEAD THE IMPLEMENTATION OF THE PURCHASE REQUISITION MODULE IN THE PEOPLESOFT 9.0 FINANCIALS AND SUPPLY CHAIN PRODUCT.
CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP)
Michigan Department Of Transportation 5100B (05/13) CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP) Page 1 of 2 REQUISITION NUMBER DUE DATE TIME DUE MDOT PROJECT MANAGER JOB
MSD Supply Chain Programme Strategy Workshop
MSD Supply Chain Programme Strategy Workshop Day 2 APPENDIX Accenture Development Partnerships Benchmarking MSD s Current Operating Supply Chain Capability 1.0 Planning 2.0 Procurement 3.0 Delivery 4.0
How To Know How To Perform Well In An Organizational Change Management Project
BEST PRACTICES SURVEY: AGGREGATE FINDINGS REPORT Organizational Change Management: Effective Strategies to Drive Implementation Success November 2007 Table Of Contents Program Background and Study Objectives...
ENTERPRISE MANAGEMENT AND SUPPORT IN THE TELECOMMUNICATIONS INDUSTRY
ENTERPRISE MANAGEMENT AND SUPPORT IN THE TELECOMMUNICATIONS INDUSTRY The Telecommunications Industry Companies in the telecommunications industry face a number of challenges as market saturation, slow
OE PROJECT CHARTER TEMPLATE
PROJECT : BearBuy Implementation PREPARED BY: Vanessa Wong and Jon Conhaim DATE (MM/DD/YYYY): 07/23/2011 PROJECT CHARTER VERSION HISTORY VERSION DATE COMMENTS (DRAFT, SIGNED, REVISED CURRENT STATUS) (MM/DD/YYYY)
Project Knowledge Areas
From Houston S: The Project Manager s Guide to Health Information Technology Implementation. Chicago: HIMSS; 2011; pp 27 39. This book is available on the HIMSS online bookstore at www. himss.org/store.
SOLUTIONS MICROSOFT DYNAMICS GP 2010. Business Ready Licensing Product Module Guide
SOLUTIONS MICROSOFT DYNAMICS GP 2010 Business Ready Licensing Product Module Guide Business Ready Licensing for Microsoft Dynamics GP 2010 Microsoft Dynamics business management solutions are designed
Department of Administration Portfolio Management System 1.3 June 30, 2010
E 06/ 30/ 2010 EX AM PL 1. 3 06/ 28/ 2010 06/ 24/ 2010 06/ 23/ 2010 06/ 15/ 2010 06/ 18/ 2010 Portfolio System 1.3 June 30, 2010 Contents Section 1. Project Overview... 1 1.1 Project Description... 1 1.2
SECTION I PROJECT SUMMARY (TRW)
SECTION I PROJECT SUMMARY (TRW) Table I Summary Agency/Department Information TRW Information Executive Sponsor: Cynthia Lorenzo Received Date: Managers: Ron McCranie/Andy Loveland Status Meeting Date:
The Financial Planning Analysis and Reporting System (FPARS) Project: Implementation Status Update
STAFF REPORT ACTION REQUIRED The Financial Planning Analysis and Reporting System (FPARS) Project: Implementation Status Update Date: March 24, 2014 To: From: Wards: Reference Number: Government Management
Memorandum. Date: 11.27.13 RE: Citizens Advisory Committee December 4, 2013
Memorandum Date: 11.27.13 RE: Citizens Advisory Committee December 4, 2013 To: From: Subject: Summary Citizens Advisory Committee Cynthia Fong Deputy Director for Finance and Administration ACTION Adopt
White Paper February 2009. IBM Cognos Supply Chain Analytics
White Paper February 2009 IBM Cognos Supply Chain Analytics 2 Contents 5 Business problems Perform cross-functional analysis of key supply chain processes 5 Business drivers Supplier Relationship Management
NetSuite Essentials. Course Description. Key Objectives
NetSuite Essentials Key Objectives How do I: Configure NetSuite to meet business requirements? Determine user roles and permissions? Customize the user interface to align with business needs? Plan for
RFP# 064-1415 DATA WAREHOUSE AND PERFORMANCE DATA DASHBOARD. ADDENDUM No. 2 Final Questions and Answers
SPECIAL ADMINISTRATIVE BOARD OF THE TRANSITIONAL SCHOOL DISTRICT OF THE CITY OF ST. LOUIS Purchasing Department 801 North 11th Street Saint Louis, Missouri 63101 RFP# 064-1415 DATA WAREHOUSE AND PERFORMANCE
City of Palo Alto (ID # 1521) Finance Committee Staff Report
City of Palo Alto Finance Committee Staff Report Report Type: Meeting Date: 4/19/2011 Summary Title: SAP Enterprise Resource Planning Assessment Title: Post-Implementation SAP Enterprise Resource Planning
Best Practices In Vendor Selection & Contracting
Choosing The Right EHR For You: Best Practices In Vendor Selection & Contracting Presented By: Joseph Naughton-Travers, Ed.M., Senior Associate, OPEN MINDS Sponsored by ADVIX Presented On: February 26,
Enterprise Resource Planning Presentation to the Joint Legislative Oversight Committee on Information Technology.
Enterprise Resource Planning Presentation to the Joint Legislative Oversight Committee on Information Technology December 18, 2014 Enterprise Resource Planning (ERP) definition ERP is a business system
Fixed Scope Offering for. Oracle Taleo EE Saas Implementation
Fixed Scope Offering for Oracle Taleo EE Saas Implementation Agenda Company Profile Business Challenges Business Objectives Solution Proposal Scope Modules and Functionalities Implementation Approach Project
NCOE whitepaper Master Data Deployment and Management in a Global ERP Implementation
NCOE whitepaper Master Data Deployment and Management in a Global ERP Implementation Market Offering: Package(s): Oracle Authors: Rick Olson, Luke Tay Date: January 13, 2012 Contents Executive summary
Chapter 5. Project Management
Chapter 5. Project Management Contents Chapter 5. Project Management 5-1 Chapter at a Glance 5-3 5.1 UNDERSTANDING PROJECT MANAGEMENT 5-4 What is project management? 5-4 Why is project management important?
Building the business case for ITAM
Building the business case for ITAM Executive summary An ITAM Review reader asked: What data do I need to collect to show the value of my ITAM practice? This article attempts to answer that question, from
Dallas IIA Chapter / ISACA N. Texas Chapter. January 7, 2010
Dallas IIA Chapter / ISACA N. Texas Chapter Auditing Tuesday, October Project 20, 2009 Management Controls January 7, 2010 Table of Contents Contents Page # Project Management Office Overview 3 Aligning
Optimizing medication workflow, accuracy, and management. RxWorks Suite
Optimizing medication workflow, accuracy, and management RxWorks Suite Optimizing medication workflow, accuracy, and management Improving patient safety is a critical initiative in healthcare. Medication
Attachment G - Required Response Format for ERP Implementation Service Providers
Page 1 of 5 Attachment G - Required Response Format for ERP Implementation Service Providers A. Transmittal Letter The Transmittal Letter must address the following topics: 1. Summary of Ability and Willingness
ecms Document Management Request for Proposal: Questions & Responses
The State Bar of California ecms Document Management Request for Proposal: Questions & Responses August 6, 2015 1. What do you consider to be the top three critical success factors for this project? i.e.,
ERP Systems: Audit and Control Risks
ERP Systems: Audit and Control Risks Jennifer Hahn Deloitte & Touche ISACA Spring Conference April 26, 1999 Session Learning Objectives At the end of this session, the participant should be able to: Understand
Development, Acquisition, Implementation, and Maintenance of Application Systems
Development, Acquisition, Implementation, and Maintenance of Application Systems Part of a series of notes to help Centers review their own Center internal management processes from the point of view of
December 2014 Report No. 15-017. An Audit Report on The Telecommunications Managed Services Contract at the Health and Human Services Commission
John Keel, CPA State Auditor An Audit Report on The Telecommunications Managed Services Contract at the Health and Human Services Commission Report No. 15-017 An Audit Report on The Telecommunications
Request for Expressions of Interest On a contract to perform: Renewal of Information Technology Strategic Plan 2013-2018
Request for Expressions of Interest On a contract to perform: Renewal of Information Technology Strategic Plan 2013-2018 for City of Pitt Meadows Table of Contents Table of Contents... 2 General Information...
Request for Service. Business and Technical Consulting Services Senior Business Analyst OntarioMD EMR Physician Dashboard
Request for Service Business and Technical Consulting Services Senior Business Analyst OntarioMD EMR Physician Dashboard RFS Number: 2015-11 Issued: October 29, 2015 Closing Date: November 12, 2015 at
QUESTIONS AND RESPONSES FOR: RFP: Patient Centered Medical Home Consultant
February 8, 2013 QUESTIONS AND RESPONSES FOR: RFP: Patient Centered Medical Home Consultant 1. Where do the two clinics (internal medicine and pediatrics) currently stand with respect to the six NCQA/PCMH
September 2005 Report No. 06-009
An Audit Report on The Health and Human Services Commission s Consolidation of Administrative Support Functions Report No. 06-009 John Keel, CPA State Auditor An Audit Report on The Health and Human Services
Corrected Form: Revised Attachment 7B Cost Proposal Distribution Exhibits A1 and A2 Attached
ADDENDUM #1 RFP: 500 16 Design Build Maintenance & Operations Complex The following changes to the Request for Proposal and clarifications are provided based on questions received and must be added/considered
Iowa State University Proposal for HR-01 ISU HR Operating Model
Iowa State University Proposal for HR-01 ISU HR Operating Model Overview: Iowa State University proposes undertaking the HR-01 ISU HR Operating Model business case to transform the quality, manner and
ITSM Process Description
ITSM Process Description Office of Information Technology Incident Management 1 Table of Contents Table of Contents 1. Introduction 2. Incident Management Goals, Objectives, CSFs and KPIs 3. Incident Management
Lean Six Sigma Process Results in Lean Approach to Inventory Management, Driving Nursing Satisfaction and Supply Cost Reduction
Lean Six Sigma Process Results in Lean Approach to Inventory Management, Driving Nursing Satisfaction and Supply Cost Reduction Friday, January 23, 2015 Matthew Brennan Director, Supply and Logistics Penn
Overview of EAM Services. A Fully Integrated Global EAM Service Provider
A Fully Integrated Global EAM Service Provider Table of Contents Strategy & Process Services Overview... p. 3 Asset Reliability Services Overview... p. 4 Systems & Technology Services Overview... p. 7
REQUEST. Q.) Will RFP? A.) Yes. page 6, it. explain? the study to A.) The study. this time.
REQUEST FOR PROPOSALS #66-160020 SB University of North Carolina at Charlotte Purchasing Department Reese Building, 3 rd Floor 9201 University City Boulevard Charlotte, North Carolina 28223-0001 Issue
ADDENDUM ACKNOWLEDGEMENT FORM RFI# 2014-02 ADDENDUM #1
Proposal No: RFI# 2014-02 ADDENDUM ACKNOWLEDGEMENT FORM RFI# 2014-02 ADDENDUM #1 TALLAHASSEE COMMUNITY COLLEGE 444 Appleyard Drive Tallahassee, Florida 32304-2895 850.201.8520 www.tcc.fl.edu Proposal Title:
Cisco Unified Communications Predeployment, Deployment, and Postdeployment Service Bundle
Cisco Unified Communications Predeployment, Deployment, and Postdeployment Service Bundle Successfully deploy a secure, resilient Cisco Unified Communications solution, accelerating business advantage.
City of Oakland RFP for Fleet Management System
City of Oakland RFP for Fleet Management System Part 1. Answers to questions received before the pre-proposal meeting (July 17, 2003) but after 11:30 am on July 16, 2003 Note: Time constraints did not
How To Improve Your Business
ACHIEVING OPERATIONAL EXCELLENCE AND CUSTOMER INTIMACY: ENTERPRISE APPLICATIONS Content How do enterprise systems help businesses achieve operational excellence? How do supply chain management systems
Quick Guide to Asset Management Planning An ITtoolkit.com White Paper
Technology asset management is essential to the delivery of the IT management vision and all its service components. In order to plan related policies and procedures, seven (7) key operational elements
Request for Information (RFI) for a. Ticket Tracking System for Provider Network Data Systems RFI # 16320
Request for Information (RFI) for a Ticket Tracking System for Provider Network Data Systems RFI # 16320 July 21, 2015 New York State of Health Corning Tower, Empire State Plaza, Room 2580 Albany, NY 12237
EHR Readiness Assessment
EHR Assessment Overview This tool is designed to help physicians assess where they are in their readiness to implement an EHR. With a more accurate portrait of their readiness, their practice will be better
