1 Dronfield Henry Fanshawe School Policy No: S33 ICT Disaster Recovery Plan Revision No: 1 Date Issued: September 2012 Committee: Author: Statutory RDD Date Adopted: September 2012 Minute No: 12/20 Review Date: September 2015 The following are situations that would affect the functionality of the Dronfield Henry Fanshawe School network system and their proposed solution. Please note that backups are taken of all critical servers and data. Whole School Power Failure Chance of failure <0.5% Effect - Critical Should the school suffer a complete power failure then all the computers would shutdown. The servers have uninterruptible power supplies (UPS) and would shut themselves down automatically after 15 minutes. The UPS s would safely shutdown the servers resulting in no loss of server data. All data from the desktops which is not already saved to the servers would be lost. A whole school power failure would result in the closure of the school until the situation was resolved. Once the power was restored then all the servers would need manually restarting. Solution: There is no effective workaround to this problem. The school would need to liaise with the utilities power supplier to determine the seriousness of the problem and the downtime. Downtime Unknown Partial Power Failure A-Block Critical Chance of failure - <1% Effect - Critical A failure of the power supply to A-Block would result in the loss of the Server Room and all the main ICT suites. Solution: There is no effective workaround to this problem. The school would need to liaise with the utilities power supplier and school electrician to determine the seriousness of the problem and the downtime. Downtime - Unknown Partial Power Failure Server Room Serious Effect - Low A failure of power to the Server Room would result in the failure of the whole network due to the loss of the core switches.
2 Solution: The server room is powered from 2 different power distribution boards. Should the server room board fail then equipment can be changed to the secondary board. Downtime Max 2 Hours Failure of Core Switches Chance of failure - <0.5% Effect - None Both of the core switches has several redundancy features already built-in but it is still possible for them to fail totally. Solution: Each of the core switches has redundancy built in to the switch plus there are two switches per function. Failure of Room Switches Chance of failure - <1% Effect - Low Failure of room based switches would cause limited data loss. Solution: A room based switch is always held as a spare and used if required. Downtime 30 Minutes. Failure of Blade Enclosure, Virtual Connects and Power Supplies Chance of failure - <0.5% Effect Critical Total failure of the Blade Enclosure is very unlikely as the parts within it none moving and have multiple redundancy including 6 power supplies and 2 network controllers. However if the enclosure did fail then this would fail every server in the enclosure and restrict access to critical data. Solution: The Blade enclosure and its internal components are covered with a 5 year next working day warranty. Downtime Access to admin and curriculum data could be restored with 24 hours via the backup server located in F-Block. The main key service which would not be available would be the 200 thin clients located around school and they would be offline until the blade enclosure was restored (2 days). Failure of individual Blade Host Server (VMWare or Citrix) Chance of failure - <1% Effect None The servers are configured in an n+1 configuration meaning that there is always 1extra server available should one fail. Solution: Failure of a host will result in the resources on that server being shared among the other remaining servers. None Failure of SAN1 (VMWARE) Chance of failure - <0.1% Effect Low
3 SAN1 is a storage area network device with multiple redundant parts including redundant hard disks, power supplies and network connections. A failure of the SAN completely would result in some servers being unavailable depending on which servers were hosted on that SAN. Solution: Failure is unlikely and individual failure of redundant parts would have no effect. In the very unlikely failure of the SAN enclosure then some data would migrate automatically to SAN2 otherwise data would need to be restored from backup. The SAN enclosure is on a next day warranty and could be replaced. 48 hours Failure of SAN2 (VMWARE) Chance of failure - <0.1% Effect Low SAN2 is a storage area network device with multiple redundant parts including redundant hard disks, power supplies and network connections. A failure of the SAN completely would result in some servers being unavailable depending on which servers were hosted on that SAN. Solution: Failure is unlikely and individual failure of redundant parts would have no effect. In the very unlikely failure of the SAN enclosure then some data would migrate automatically to SAN1 otherwise data would need to be restored from backup. The SAN enclosure is on a next day warranty and could be replaced. 48 hours Failure of SAN2 (Citrix) Chance of failure - <0.1% Effect Low SAN3 is a storage area network device with multiple redundant parts including redundant hard disks, power supplies and network connections. A failure of the SAN completely would result in the loss of the Citrix environment and virtual desktops feeding the thin clients (10ZIGs). Solution: Failure is unlikely and individual failure of redundant parts would have no effect. In the very unlikely failure of the SAN enclosure then we would be reliant on a replacement enclosure being supplied by HP. The SAN enclosure is on a next day warranty and could be replaced. 48 hours Failure of Master Domain Controller (DHFS-V-DC01) Effect - Low The failure of the master domain controller would limit the issuing of DHCP IP addresses. Other domain controllers would take over other functionality such as DNS. Solution: DHCP would be installed on another domain controller. Fix master domain controller as soon as possible. Downtime 1 Hour Failure of Domain Controllers (DHFS-V-DC02, DHFS-V-DC03 and Backup) Effect - None The failure of a domain controller would have limited effect on functionality as the other DC s would take over its functions. We have enough domain controllers to continue working
4 Solution: Fix failed domain controller as soon as possible. Failure of Admin Server Effect - Medium The failure of the Admin server would cause loss of access to staff and admin based data. Solution: Give temporary access to the backup server until the Admin Server is fixed. Fix Admin server as soon as possible and restore data from backup server to Admin. Downtime 2 to 3 hours Failure of Storage Server Effect - Medium The failure of the Storage server would cause loss of access to student and curriculum based data. Solution: Give temporary access to the backup server until the Storage Server is fixed. Fix Storage server as soon as possible and restore data from backup server to Admin. Downtime 2 to 3 hours Failure of SQLServer s (SQLServer an SQLServer2) Chance of failure - <10% Effect - Low Loss of MIS system and eportal. Solution: There are 2 eportal servers and any failure would have limited effect as the other server could be used. The failed server would then be fixed as soon as possible Failure of SQLMain Effect - High Loss of SQL Database functionality including access to MIS, Exchequer and Opera Solution: Install SQL on another VM and restore the data for MIS, Exchequer and Opera. Downtime 1 Day Failure of Web Server Effect - Medium Loss of School Website and VLE. Solution: Create another VM and restore data from backup Downtime 1-2 days Failure of Anti-Virus server (DHFS-V-CTRL01)
5 Effect - None The failure of the Anti-virus server would result in the AV not being updated on the servers and machines in school. The machines would work with their current updates. Lack of AV updates for 1 day would be negligible. Solution: Recreate the VM and install Sophos. Failure of VM Management Server (DHFS-V-MGMT01) Effect - None This would result in loss of control of the 10zig thin clients Solution: We would recreate a new VM and reinstall the 10zig management software Failure of VMware Centre Server (DHFS-V-VC01) Effect Low (High) This would result in servers not being able to vmotion to another host. Failure of this server alone would not result in any downtime but a subsequent loss of a host would mean that a virtual server would not remain up Solution: Restore vcentre to another Host (migrate servers to remaining hosts) (0.5 days) Failure of Phone System server (DHFS-V-Unify) Effect High This would result in a loss of the internal phone system. Solution: Whilst the server is recovered any calls to the school would be redirected to a mobile phone in reception or a personal mobile associated with a DDI. Downtime 1 day Failure of Backup Server Effect Low The failure of the Backup server would not allow us to backup or recover data. Solution: Transfer operation of Backup server temporarily to another machine located in F-Block. Fix Backup server as soon as possible. Failure of Proxy Server Effect - Medium Should the Proxy Server fail then external access would be lost to the web site, intranet and VLE.
6 Solution: Temporarily install all data to another server. Fix Proxy server as soon as possible. Downtime 1 day Failure of Exchange Effect - High Loss of access. Solution: Either fix the Exchange server or copy functionality to another server. Restore backups if necessary Downtime 1-2 days Failure of Appserv1 Effect - Low Loss of access to student controlled assessment work and Impero. Solution: Fix the server and restore backups if necessary. Downtime 1 day Failure of Citrix Environment Servers Effect Medium Servers DHFS-V-CSG01 DHFS-V-CTX01 DHFS-V-CTXDS01 DHFS-V-DDC01 DHFS-V-DDC02 DHFS-V-FS01 DHFS-V-WI01 DHFS-V-WI02 NFS_03 The above servers control the Citrix environment. Although these servers do have some redundancy there are 2 servers whose failure would cause a total loss of access to virtual desktops. These are DHFS-V-CSG01 and NFS_03. Solution: Each of the servers can be reinstalled or restored from backup. NFS_03 holds the base images and this server would need to be recovered and the images restored. 1-2 Days Failure of Door Control Server (DHFS-V-DoorCtrl) Effect - Low The failure of the door control system would result in the door controllers failing to receive updates regarding user identities. The doors would continue to open based on their current data. Solution: The doors would continue to work or would be defaulted to open whilst school was in operation. Restore the server as quickly as possible. None
7 Failure of Print Control Server (DHFS-V-PCUT) Effect - Low The print control server looks after all network printing in school. It s failure would result in loss of network printing Solution: Install Papercut on another virtual server and restore Papercut settings day Failure of Lightspeed Web Filter Chance of failure - <1% Effect - High Loss of secure internet. Internet access could be maintained but it would not be properly filtered. Solution: This is proprietary equipment and is under a 3 year next day replacement warranty. The school could run unfiltered but this could not be advisable. Downtime 1-2 days Failure of Router Chance of failure - <0.5% Effect Low Loss of internet and access. Solution: The main router is the property of KCOM and as such we have no control over repair times. We do have a backup ADSL line which could be used for access and is accessible behind the Lightspeed web filtering server so secure internet access could be maintained. but the service would be degraded. Fire in A-Block Chance of failure - <0.1% Effect Critical A fire in A-Block would be the most serious situation for the computer network as this is the location of the Server Room containing all the servers and core switches, and most of the major ICT suites. Solution: Although most of the equipment could be bought reasonably easily off the shelf the main problem would be redirecting fibre optic cabling. We would be able to get limited access to other buildings within 2-3 days but full access would be 7-14 days. Restoring the server room and ICT suites would be dependent on the level of destruction. The main delay would be restoring the infrastructure of the building. Downtime Unknown Fire in Other Blocks (Non A-Block) Serious Chance of failure - <0.1% Effect - High A fire in another building other than A-Block would require restoration of the infrastructure. Solution: Restore the building infrastructure as soon as possible. ICT equipment could be bought with 7 days. Cabling would take longer. Downtime Unknown
8
DeltaV Virtualization High Availability and Disaster Recovery
DeltaV Distributed Control System Whitepaper October 2014 DeltaV Virtualization High Availability and Disaster Recovery This document describes High Availiability and Disaster Recovery features supported
More informationTable of contents. Matching server virtualization with advanced storage virtualization
Matching server virtualization with advanced storage virtualization Using HP LeftHand SAN and VMware Infrastructure 3 for improved ease of use, reduced cost and complexity, increased availability, and
More informationSouth Colonie Central School District Server Virtualization and Disaster Recovery Plan
Server Virtualization and Disaster Recovery Plan Prepared by Lucid Solutions Group Table of Contents Executive Summary... 2 Disaster Recovery Overview... 2 Data Corruption, Accidental Deletion and Prevention...
More informationBackup and Redundancy
Backup and Redundancy White Paper NEC s UC for Business Backup and Redundancy allow businesses to operate with confidence, providing security for themselves and their customers. When a server goes down
More informationBACKUP STRATEGY AND DISASTER RECOVERY POLICY STATEMENT
TADCASTER GRAMMAR SCHOOL Toulston, Tadcaster, North Yorkshire. LS24 9NB BACKUP STRATEGY AND DISASTER RECOVERY POLICY STATEMENT Written by Steve South November 2003 Discussed with ICT Strategy Group January
More information1.1 In consultation with management, to identify against business objectives, issues of self-development and training.
London Fire Brigade is run by the London Fire and Emergency Planning Authority Fire Our vision To be a world class fire and rescue service for London, Londoners and visitors. Job Description JOB TITLE
More informationCLOUD SERVICE SCHEDULE Newcastle
CLOUD SERVICE SCHEDULE Newcastle 1 DEFINITIONS Defined terms in the Standard Terms and Conditions have the same meaning in this Service Schedule unless expressed to the contrary. In this Service Schedule,
More informationShared Machine Room / Service Opportunities. Bruce Campbell November, 2011
Shared Machine Room / Service Opportunities Bruce Campbell November, 2011 Overview / Motivation Efficiencies Disaster Recovery First a bit about servers/storage/backups/redundancy Example: Non redundant
More informationGuardian365. Managed IT Support Services Suite
Guardian365 Managed IT Support Services Suite What will you get from us? Award Winning Team Deloitte Best Managed Company in 2015. Ranked in the Top 3 globally for Best Managed Service Desk by the Service
More informationRe-Colocation. DataCenter. DataCenter Re-Colocation Service WhiteBook. AnchNet 2010.1
Service WhiteBook Service WhiteBook AnchNet 2010.1 DataCenter Re-Colocation Content 1. Overview... 3 2. Flow chart of data center Re-location... 4 3. Asset Inventory...4 3.1 Hardware asset inventory...4
More informationDISASTER RECOVERY WITH AWS
DISASTER RECOVERY WITH AWS Every company is vulnerable to a range of outages and disasters. From a common computer virus or network outage to a fire or flood these interruptions can wreak havoc on your
More informationIntroduction. Setup of Exchange in a VM. VMware Infrastructure
Introduction VMware Infrastructure is deployed in data centers for deploying mission critical applications. Deployment of Microsoft Exchange is a very important task for the IT staff. Email system is an
More informationDetermine dates with you telecom suppliers so that the new office is online before your move for both Phones and Data connections.
IT Office Move - Tips and Check List: Office IT Move Plan Introduction: If you are moving to a New Office and/or Data Center (Cloud), or if this is also a Colocation exercise please note this is a basic
More informationInformation Technology Department Annual Report
Information Technology Jeff Terry Beavercreek Township 12/31/ Department Overview Beavercreek Township s IT department is responsible for providing IT support as well as network Availability, Integrity,
More informationContents. Finance and Information Technology Directorate. Disaster Recovery Policy
Finance and Information Technology Directorate Contents 0. Revision History 1. Background 2. Risks 3. General Principles of Service Provision 4. Server Rooms 5. Local Area Network 6. Common Services 7.
More informationEMC Data Domain Management Center
EMC Data Domain Management Center Version 1.1 Initial Configuration Guide 302-000-071 REV 04 Copyright 2012-2015 EMC Corporation. All rights reserved. Published in USA. Published June, 2015 EMC believes
More informationSynology Disaster Recovery Deployment Guide Document ID
Document ID Syno_UsersGuide_DisasterRecovery_20111114 Table of Contents Chapter 1: Dual Server Disaster Recovery Plan Back up Primary Server's Configurations... 5 Synchronize Data between Primary and Backup
More informationNutanix Tech Note. Failure Analysis. 2013 All Rights Reserved, Nutanix Corporation
Nutanix Tech Note Failure Analysis A Failure Analysis of Storage System Architectures Nutanix Scale-out v. Legacy Designs Types of data to be protected Any examination of storage system failure scenarios
More informationChabot Las Positas Community College District
Chabot Las Positas Community College District Information Technology Services Disaster Recovery Plan Supplement to August 1, 2014 Plan (General Version) Note: Selected charts and tables are blanked out
More informationACME Enterprises IT Infrastructure Assessment
Prepared for ACME Enterprises March 25, 2014 Table of Contents Executive Summary...2 Introduction...2 Background...2 Scope of IT Assessment...2 Findings...2 Detailed Findings for Key Areas Reviewed...3
More informationSagari Ltd. Service Catalogue and Service Level Agreement For Outsource IT Services
Sagari Ltd Service Catalogue and Service Level Agreement For Outsource IT Services Managed Services Service Level Agreement 1 Introduction This Service Catalogue and Service Level Agreement (SLA) constitutes
More informationWhatsUp Gold v16.3 Installation and Configuration Guide
WhatsUp Gold v16.3 Installation and Configuration Guide Contents Installing and Configuring WhatsUp Gold using WhatsUp Setup Installation Overview... 1 Overview... 1 Security considerations... 2 Standard
More information1. Management Application (or Console), including Deferred Processor & Encryption Key 2. Database 3. Website
This document answers the question: What are the disaster recovery steps for Enterprise Random Password Manager (ERPM) and how can the solution be made highly available? Disaster Recovery Preparation As
More informationAljex Software, Inc. Business Continuity & Disaster Recovery Plan. Last Updated: June 16, 2009
Business Continuity & Disaster Recovery Plan Last Updated: June 16, 2009 Business Continuity & Disaster Recovery Plan Page 2 of 6 Table of Contents Introduction... 3 Business Continuity... 3 Employee Structure...
More informationWestek Technology Snapshot and HA iscsi Replication Suite
Westek Technology Snapshot and HA iscsi Replication Suite Westek s Power iscsi models have feature options to provide both time stamped snapshots of your data; and real time block level data replication
More informationHP Data Protector software Zero Downtime Backup and Instant Recovery. Data sheet
HP Data Protector software Zero Downtime Backup and Instant Recovery Data sheet Business uninterrupted with HP Data Protector Zero Downtime Backup and Instant Recovery software With today s increasing
More informationINFRASTRUCTURE AS A SERVICE (IAAS) SERVICE SCHEDULE Australia
INFRASTRUCTURE AS A SERVICE (IAAS) SERVICE SCHEDULE Australia 1 DEFINITIONS Capitalised terms in this Service Schedule not otherwise defined here have the meaning given in the Standard Terms and Conditions:
More informationVDI Best Practices with Citrix XenDesktop. www.gtcsystems.com
VDI Best Practices with Citrix XenDesktop Mission Statement: No More IT Infrastructure Headaches Because we provide the: People Process Technology To Help our clients PLAN BUILD MANAGE The IT Infrastructure
More informationServer Virtualization with VMWare
Server Virtualization with VMware Information Technology Server Virtualization with VMWare A look at server virtualization, what it is and why it should be considered. By Alex Dewar, Head of IT & IM Solutions,
More informationNOTICE ADDENDUM NO. TWO (2) JULY 8, 2011 CITY OF RIVIERA BEACH BID NO 308-11 SERVER VIRTULIZATION/SAN PROJECT
NOTICE ADDENDUM NO. TWO (2) JULY 8, 2011 CITY OF RIVIERA BEACH BID NO 308-11 SERVER VIRTULIZATION/SAN PROJECT TO ALL PROPOSERS ON THE ABOVE PROJECT: PLEASE NOTE CONTENTS HEREIN AND AFFIX (PASTE OR STAPLE)
More informationInformation Services hosted services and costs
Information Services hosted services and costs 1. Overview Information Services (I.S.) has provided a popular hosting service for specialized departmental servers for many years. Servers hosted by I.S.
More informationInstant Recovery for VMware
NETBACKUP 7.6 FEATURE BRIEFING INSTANT RECOVERY FOR VMWARE NetBackup 7.6 Feature Briefing Instant Recovery for VMware Version number: 1.0 Issue date: 2 nd August 2013 This document describes a feature
More informationIT Discovery / Assessment Report Conducted on: DATE (MM/DD/YYY) HERE On-site Discovery By: AOS ENGINEER NAME Assessment Document By: AOS ENGINEER NAME
IT Discovery / Assessment Report Conducted on: DATE (MM/DD/YYY) HERE On-site Discovery By: AOS ENGINEER NAME Assessment Document By: AOS ENGINEER NAME For: CLIENT NAME HERE CLIENT ADDRESS HERE 1. Current
More informationBME CLEARING s Business Continuity Policy
BME CLEARING s Business Continuity Policy Contents 1. Introduction 1 2. General goals of the Continuity Policy 1 3. Scope of BME CLEARING s Business Continuity Policy 1 4. Recovery strategies 2 5. Distribution
More informationDisaster Recovery & Business Continuity Plan for ICT Services
Dartmoor National Park Authority Disaster Recovery & Business Continuity Plan for ICT Services August 2010 This document is copyright to Dartmoor National Park Authority and should not be used or adapted
More informationAdvanced VMware Training
Goals: Demonstrate VMware Fault Tolerance in action Demonstrate Host Profile Usage How to quickly deploy and configure several vsphere servers Discuss Storage vmotion use cases Demonstrate vcenter Server
More informationSmall Business Server Part 1
Small Business Server Part 1 Presented by : Robert Crane BE MBA MCP director@ciaops.com Computer Information Agency http://www.ciaops.com Agenda Week 1 What is SBS / Setup Week 2 Using & configuring SBS
More informationQuorum DR Report. Top 4 Types of Disasters: 55% Hardware Failure 22% Human Error 18% Software Failure 5% Natural Disasters
SAP High Availability in virtualized environments running on Windows Server 2012 Hyper-V Part 1: Overview Introduction Almost everyone is talking about virtualization and cloud computing these days. This
More informationComplete Storage and Data Protection Architecture for VMware vsphere
Complete Storage and Data Protection Architecture for VMware vsphere Executive Summary The cost savings and agility benefits of server virtualization are well proven, accounting for its rapid adoption.
More informationBest practices for operational excellence (SharePoint Server 2010)
Best practices for operational excellence (SharePoint Server 2010) Published: May 12, 2011 Microsoft SharePoint Server 2010 is used for a broad set of applications and solutions, either stand-alone or
More informationServer Virtualization A Game-Changer For SMB Customers
Whitepaper Server Virtualization A Game-Changer For SMB Customers Introduction Everyone in the IT world has heard of server virtualization, and some stunning achievements by datacenter and Enterprise customers
More informationCLOUD SERVICE SCHEDULE
CLOUD SERVICE SCHEDULE 1 DEFINITIONS Defined terms in the Standard Terms and Conditions have the same meaning in this Service Schedule unless expressed to the contrary. In this Service Schedule, unless
More informationAbout Backing Up a Cisco Unity System
CHAPTER 4 Introduction This chapter describes in general terms backing up a Cisco Unity system. When you back up a Cisco Unity server (and one or more Exchange servers) you need to consider the same issues
More informationUsing Emergency Restore to recover the vcenter Server has the following benefits as compared to the above methods:
Executive Summary This document provides certain best practices with regards to the Emergency Restore feature in vsphere Data Protection 5.5 release. It also describes the methods and processes to be used
More informationContract # 04-06. Accepted on: March 29, 2005. Starling Systems. 711 S. Capitol Way, Suite 301 Olympia, WA 98501
Disaster Recovery Plan Starling Systems Deliverable #15 - Draft I Contract # 04-06 Accepted on: March 29, 2005 Starling Systems 711 S. Capitol Way, Suite 301 Olympia, WA 98501 DISASTER RECOVERY PLAN TABLE
More informationEMC Integrated Infrastructure for VMware
EMC Integrated Infrastructure for VMware Enabled by EMC Celerra NS-120 Reference Architecture EMC Global Solutions Centers EMC Corporation Corporate Headquarters Hopkinton MA 01748-9103 1.508.435.1000
More informatione Shandor Simon Director, Networking Services Latin School of Chicago
Lessons Learned about Consolidation, Virtualization at and Disaster Recovery e Shandor Simon Director, Networking Services Latin School of Chicago Agenda The Latin School of Chicago Why redundancy and
More informationABB Technology Days Fall 2013 System 800xA Server and Client Virtualization. ABB Inc 3BSE074389 en. October 29, 2013 Slide 1
ABB Technology Days Fall 2013 System 800xA Server and Client ization October 29, 2013 Slide 1 System 800xA ization Customers specify it Customers harmonize with IT Training environments Lower cost of ownership
More informationQuick Setup Guide. 2 System requirements and licensing. 2011 Kerio Technologies s.r.o. All rights reserved.
Kerio Control VMware Virtual Appliance Quick Setup Guide 2011 Kerio Technologies s.r.o. All rights reserved. This document provides detailed description on installation and basic configuration of the Kerio
More informationOverview... 2. Customer Login... 2. Main Page... 2. VM Management... 4. Creation... 4 Editing a Virtual Machine... 6
July 2013 Contents Overview... 2 Customer Login... 2 Main Page... 2 VM Management... 4 Creation... 4 Editing a Virtual Machine... 6 Disk Management... 7 Deletion... 7 Power On / Off... 8 Network Management...
More informationIntroduction to Microsoft Small Business Server
Summary The aim of this article is to present some basic information about Small Business Server 2003 and how it can fit in with your business. Topics What is Small Business Server? (also known as SBS)
More informationCustomized Cloud Solution
Customized Cloud Solution (Overall Cloud Performance Expectations) Last Updated: June 5, 2012 Prepared by: Polleo Systems, Inc. Notice of Confidentiality: The enclosed material is proprietary to Polleo
More informationHigh Availability and Disaster Recovery Solutions for Perforce
High Availability and Disaster Recovery Solutions for Perforce This paper provides strategies for achieving high Perforce server availability and minimizing data loss in the event of a disaster. Perforce
More informationTechnical Paper. Leveraging VMware Software to Provide Failover Protection for the Platform for SAS Business Analytics April 2011
Technical Paper Leveraging VMware Software to Provide Failover Protection for the Platform for SAS Business Analytics April 2011 Table of Contents About this Document... 3 Introduction... 4 What is Failover?...
More informationBelgacom Group Carrier & Wholesale Solutions. ICT to drive Your Business. Hosting Solutions. Datacenter Services
Belgacom Group Carrier & Wholesale Solutions ICT to drive Your Business Hosting Solutions Agenda Vision on our Why outsourcing Shared Hosting Virtual dedicated Hosting Dedicated Hosting What / Why virtualization?
More informationPOSITION DESCRIPTION
Organisation Division St. John s Regional College St. John s Regional College, established in 1958, is a catholic college providing secondary education to boys and girls in the parishes located in the
More informationSource-Connect Network Configuration Last updated May 2009
Source-Connect Network Configuration Last updated May 2009 For further support: Chicago: +1 312 706 5555 London: +44 20 7193 3700 support@source-elements.com This document is designed to assist IT/Network
More informationInternet Redundancy How To. Version 8.0.0
Internet Redundancy How To Version 8.0.0 Table of Contents 1. Introduction... 1 1.1. 1.2. 1.3. 1.4. About this Document... Examples used in this Guide... Documentation Sources... About the AXS GUARD...
More informationModification after decommission of AX100 SAN (RVN00-FILEDR) 1.2 26/3/2009 Deputy IT Operations Manager
Information Management & Technology Document No: AWP/ IT/LP/ITOPS-009 Title: AWP IT Backup Strategy and Procedure Version: 2.0 Date: 06/04/2009 Author: IT Operations Manager Distribution List: IMT Operations
More informationPOLICY NAME IT DISASTER RECOVERY POLICY AND PLAN POLICY NUMBER POLICY FILE REFERENCE 3/3/6 DATE OF ADOPTION REVIEW OR AMENDMENT DATES
POLICY NAME IT DISASTER RECOVERY POLICY AND PLAN POLICY NUMBER P6 POLICY FILE REFERENCE 3/3/6 DATE OF ADOPTION REVIEW OR AMENDMENT DATES C O N T E N T S INTRODUCTION SECTION 1 DISASTER PREVENTION AND RECOVERY
More informationDISASTER RECOVERY PLAN FOR MKHAMBATHINI MUNICIPALITY
DISASTER RECOVERY PLAN FOR MKHAMBATHINI MUNICIPALITY 1 Document Approval This document has been endorsed and approved by Council. Chairperson of the Council Date Document Version Control Name Status Version
More informationAPPENDIX 7. ICT Disaster Recovery Plan
APPENDIX 7 ICT Disaster Recovery Plan This policy was approved and ratified by the Governing Body of Cox Green School on 15 th October 2013 Signed: Chair of Governors Date: Ratified: Oct 2013 Review: Sep
More informationHigh Availability Solution
s 9 160 Desigo Insight High Availability Solution HA-300 HA-500 The High Availability Solution (HA) provides increased reliability and security for our building control technology: Uninterrupted monitoring
More informationAPPENDIX 7. ICT Disaster Recovery Plan
APPENDIX 7 ICT Disaster Recovery Plan This policy was approved and ratified by the Governing Body of Cox Green School on 20 th October 2015 Signed: Chair of Governors Date: Version Authorisation Approval
More informationNetIQ Advanced Authentication Framework. Maintenance Guide. Version 5.1.0
NetIQ Advanced Authentication Framework Maintenance Guide Version 5.1.0 Table of Contents 1 Table of Contents 2 Introduction 3 About This Document 3 Purposes of Maintenance 3 Difficulties of Maintenance
More informationTalentLink Disaster Recovery & Service Continuity
Technical Services Briefing Document TalentLink Disaster Recovery & Service Continuity Version 1.2 (January 2012) Contents Overview Planning for Service Continuity Disaster Recovery Process Business Continuity
More informationApplication Note: Failover with Double- Take Availability and the Scale HC3 Cluster. Version 2.0
Application Note: Failover with Double- Take Availability and the Scale HC3 Cluster Version 2.0 Table of Contents Introduction... 2 About Double-Take Availability... 2 About Scale Computing s HC3 Cluster...
More informationI Product description for serverloft Dedicated Servers
SERVERS FOR PROS I Product description for serverloft Dedicated Servers, Version 1.2-EN, as of September 1, 2011 , Version 1.2-EN, as of September 1, 2011 1. Introduction With its product Dedicated Server,
More informationLab 5 Explicit Proxy Performance, Load Balancing & Redundancy
Lab 5 Explicit Proxy Performance, Load Balancing & Redundancy Objectives The purpose of this lab is to demonstrate both high availability and performance using virtual IPs coupled with DNS round robin
More informationMAKING YOUR VIRTUAL INFRASTUCTURE NON-STOP Making availability efficient with Veritas products
TECHNOLOGY REVIEW MAKING YOUR VIRTUAL INFRASTUCTURE NON-STOP Making availability efficient with Veritas products AUGUST 2015 All businesses have a core set of applications and services that are critical
More informationSolutions as a Service N.Konstantinidis Technical Director - MNG
Med Nautilus Greece Connected World April 10, 2014 Solutions as a Service N.Konstantinidis Technical Director - MNG MedNautilus Greece Solutions as a Service 2014 SINCE 2002 Data Center Physical Colocation
More informationEMC AVAMAR INTEGRATION WITH EMC DATA DOMAIN SYSTEMS
EMC AVAMAR INTEGRATION WITH EMC DATA DOMAIN SYSTEMS A Detailed Review ABSTRACT This white paper highlights integration features implemented in EMC Avamar with EMC Data Domain deduplication storage systems
More informationAvailability and Disaster Recovery: Basic Principles
Availability and Disaster Recovery: Basic Principles by Chuck Petch, WVS Senior Technical Writer At first glance availability and recovery may seem like opposites. Availability involves designing computer
More informationActive Directory Infrastructure Design Document
Active Directory Infrastructure Design Document Written By Sainath KEV Microsoft MVP Directory Services Microsoft Author TechNet Magazine, Microsoft Operations Framework Microsoft Speaker - Singapore Document
More informationVilliers High School ICT Department Job Description
Villiers High School ICT Department Job Description Position Title: Responsible To: Salary: IT Manager Head of ICT (Curriculum) TBC General Function The IT Manager is responsible for ensuring the school
More informationCurriculum Network Support
Curriculum Network Support Name of Service Curriculum Network Support Service Provider Job Title of Manager Team Address User Support Lead ICT User Support Team 42 New Union Street, Coventry, West Midlands,
More informationActiveImage Protector 3.5 for Hyper-V with SHR. User Guide - Back up Hyper-V Server 2012 R2 host and
ActiveImage Protector 3.5 for Hyper-V with SHR User Guide - Back up Hyper-V Server 2012 R2 host and restore individual virtual machines 2 nd Edition July 7, 2014 Copyright NetJapan, Inc. All Rights Reserved.
More informationVirtually Effortless Backup for VMware Environments
A White Paper ly Effortless for Environments Abstract: and disaster recovery (DR) strategies protect data from corruption and failures and ensure that if these types of events occur, companies aren t forced
More informationManaged Services Overview Servers, Exchange, Help Desk, and Citrix Infrastructures
Overview Servers, Exchange, Help Desk, and Citrix Infrastructures Prepared By: Envision Information Technologies Last Modified: Thursday, August 28, 2014 Table of Contents Table of Contents... 2 EIT Contacts...
More informationSoftverski definirani data centri - 2. dio
Softverski definirani data centri - 2. dio Vmware NSX To Deliver a Software Defined Data Center Implementation Automated Operational Model Programmatically Create, Snapshot, Store, Move, Delete, Restore
More informationwww.cadline.co.uk www.midastechnology.co.uk Page 1 of 5
Page 1 of 5 Support Are you confident that you have all eventualities covered and that your current IT support provider can handle all of your issues? Are you frustrated with your application supplier
More informationVirtualization: Benefits & Pitfalls. Matt Liebowitz, Kraft Kennedy Tim Garner, Aderant Mike Lombardi, Vertigrate Sergey Polak, Ropes & Gray LLP
Virtualization: Benefits & Pitfalls Matt Liebowitz, Kraft Kennedy Tim Garner, Aderant Mike Lombardi, Vertigrate Sergey Polak, Ropes & Gray LLP Who are we? Matt Liebowitz High level virtualization benefits/pitfalls
More informationServer Virtualization and Consolidation
Server Virtualization and Consolidation An Ideal cost effective solution to maximize your Return on Investment of your organization's hardware infrastructure It is quit evident today that Business owners,
More informationVMWARE VSPHERE 5.0 WITH ESXI AND VCENTER
VMWARE VSPHERE 5.0 WITH ESXI AND VCENTER CORPORATE COLLEGE SEMINAR SERIES Date: April 15-19 Presented by: Lone Star Corporate College Format: Location: Classroom instruction 8 a.m.-5 p.m. (five-day session)
More informationMcAfee Endpoint Encryption Hot Backup Implementation
McAfee Endpoint Encryption Hot Backup Implementation 1 Endpoint Encryption Hot Backup Implementation Planning, Implementing and Managing SafeBoot Enterprise Systems SafeBoot Hot Backup Implementation Having
More informationCA ARCserve Family r15
CA ARCserve Family r15 Rami Nasser EMEA Principal Consultant, Technical Sales Rami.Nasser@ca.com The ARCserve Family More than Backup The only solution that: Gives customers control over their changing
More informationXenClient Enterprise Synchronizer Migration
XenClient Enterprise Synchronizer Migration Applicability This document is applicable to XenClient Synchronizer version 5.1. The information in this document also applies to earlier versions of XenClient,
More informationUpgrade to Webtrends Analytics 8.7: Best Practices
Technical Best Practices 8.7 Software Upgrade Upgrade to Webtrends Analytics 8.7: Best Practices Version 3 Webtrends Analytics is a powerful application that must be installed on a dedicated computer.
More informationAudit4 Installation Requirements
Audit4 version 8.1+ 2015 Copyright 2012 S4S Pty Ltd Audit4 Support Matrix 2015 The following table provides details on the operating system and database engine support for Audit4 as at March 2015. Operating
More informationVirtualization, Business Continuation Plan & Disaster Recovery for EMS -By Ramanj Pamidi San Diego Gas & Electric
Virtualization, Business Continuation Plan & Disaster Recovery for EMS -By Ramanj Pamidi San Diego Gas & Electric 2001 San Diego Gas and Electric. All copyright and trademark rights reserved. Importance
More informationHIGH AVAILABILITY STRATEGIES
An InterSystems Technology Guide One Memorial Drive, Cambridge, MA 02142, USA Tel: +1.617.621.0600 Fax: +1.617.494.1631 http://www.intersystems.com HIGH AVAILABILITY STRATEGIES HA Strategies for InterSystems
More informationHigh Availability with Windows Server 2012 Release Candidate
High Availability with Windows Server 2012 Release Candidate Windows Server 2012 Release Candidate (RC) delivers innovative new capabilities that enable you to build dynamic storage and availability solutions
More informationVirtual Web Appliance Setup Guide
Virtual Web Appliance Setup Guide 2 Sophos Installing a Virtual Appliance Installing a Virtual Appliance This guide describes the procedures for installing a Virtual Web Appliance. If you are installing
More informationPlanning, Implementing and Managing SafeBoot Enterprise Systems
Off s a f e b o o t h o t b a c k u p d e s i g n Overview Having a single physical server for your SafeBoot enterprise is obviously risky, and even if regular backups are taken delays can occur in user
More informationHow To Backup A Virtualized Environment
Disk-based Backup for Virtualized Environment via Infortrend EonStor DS, ESVA, EonNAS 3000 / 5000 and Veeam Backup and Replication Application Note Abstract The document describes, as an example the usage
More informationCVE-401/CVA-500 FastTrack
CVE-401/CVA-500 FastTrack Description The CVE-400-1I Engineering a Citrix Virtualization Solution course teaches Citrix engineers how to plan for and perform the tasks necessary to successfully integrate
More informationInformix Dynamic Server May 2007. Availability Solutions with Informix Dynamic Server 11
Informix Dynamic Server May 2007 Availability Solutions with Informix Dynamic Server 11 1 Availability Solutions with IBM Informix Dynamic Server 11.10 Madison Pruet Ajay Gupta The addition of Multi-node
More informationProven Technical and Management skills over a career spanning more than 10 years. Brunswick Vic 3056 Australia
Resume: Michael McNab Systems Administrator and Web Support Proven Technical and Management skills over a career spanning more than 10 years Name: Address: Phone: Email Address: Website: Michael McNab
More informationb. Contact for contract issues/requests (Including billing)
1. Responsibilities of the customer a. Appointed contact(s) The customer is required to provide a named contact with E-Mail address and phone contact for each of the following roles (they can be the same
More informationVM backup is the new standard fare
VM backup is the new standard fare The right answer to backup and restore these hundreds of VMs Andreas Neufert System Engineer Contents Introduction 3 Starting situation as a central theme of this document
More information