Country Operations Business Plan. Turkmenistan December 2014
|
|
|
- Coleen Daniels
- 9 years ago
- Views:
Transcription
1 Country Operations Business Plan December 2014 Turkmenistan This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011.
2 CURRENCY EQUIVALENTS (as of 10 November 2014) Currency unit Turkmen manat (TMT) TMT1.00 = $ $1.00 = TMT2.85 ABBREVIATIONS ADB Asian Development Bank CAREC Central Asia Regional Economic Cooperation COBP country operations business plan CPS country partnership strategy TA technical assistance NOTE In this report, $ refers to US dollars. Vice-President W. Zhang, Operations 1 Director General K. Gerhaeusser, Central and West Asia Department (CWRD) Team leader Team members P. Bozakov, Turkmenistan Resident Representative, CWRD S. Charyyev, Senior Country Coordination Officer, CWRD C. Espina, Senior Economics Officer, CWRD J. Hojanazarova, Senior Economics Officer, CWRD J. Liston, Principal Energy Specialist, CWRD D. S. Pyo, Lead Transport Specialist, CWRD In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
3 CONTENTS Page I. CONSISTENCY OF THE BUSINESS PLAN WITH THE COUNTRY PARTNERSHIP STRATEGY 1 II. INDICATIVE RESOURCE PARAMETERS 1 III. SUMMARY OF CHANGES TO LENDING AND NONLENDING PROGRAMS 1 APPENDIXES 1. Updated Interim Country Partnership Strategy Results Framework 3 2. Indicative Assistance Pipeline 4 3. Assistance Program for the Current Year 6
4
5 I. CONSISTENCY OF THE BUSINESS PLAN WITH THE COUNTRY PARTNERSHIP STRATEGY 1. There is no country partnership strategy (CPS) for Turkmenistan, and the first strategy, which will be presented as an interim CPS, has been in preparation in consultation with the government since The analytical work has been updated annually to keep the strategy current. This country operations business plan (COBP) for has been formulated in line with the draft interim CPS for Turkmenistan ( ). This strategy has identified energy and transport as priority areas for operations, with regional integration promulgated by the Central Asia Regional Economic Cooperation (CAREC). The COBP (i) stays focused on the abovementioned sectors to ensure continuity and alignment with the draft interim CPS, (ii) provides support for reform efforts through policy and advisory interventions, and (iii) takes into account key change drivers and outcomes derived from the recent midterm review of Strategy 2020 of the Asian Development Bank (ADB). 2. The COBP has been prepared in consultation with the Government of Turkmenistan between April and September The consultations confirmed the overall validity of the indicative assistance pipeline presented in the COBP. However, due to the specificities in the government s planning and decision-making processes, both lending and nonlending programs cover only 2 years, and include mostly standby projects subjected to case-by-case approval by the government. 1 The limited nature of envisaged operations would enable ADB to effectively implement the programs without putting unnecessary strains on the national capacities. II. INDICATIVE RESOURCE PARAMETERS 3. Turkmenistan is only eligible for financing from ADB s ordinary capital resources (OCR). The indicative country allocation for amounts to $104 million. The COBP s lending program emphasizes developing power generation facilities and transport infrastructure to facilitate regional trade and cooperation. A total of $210 million in investment projects is tentatively envisaged in respective sectors. Cofinancing will be actively sought, in consultation with the government, to fill any financing gap. 4. The nonlending program of an estimated $1 million will support project preparation, capacity development, and policy and advisory services. The latter are intended to facilitate financial sector reforms aimed at making financial services accessible to private sector agents. 5. With both lending and nonlending programs planned on a standby basis, the entire financing envelope is contingent on government commitment to mobilize ADB financing for each project. III. SUMMARY OF CHANGES TO LENDING AND NONLENDING PROGRAMS 6. This COBP differs from the one for in particular in the nonlending pipeline. Specific changes to the pipeline are summarized in paragraphs 7 8 and prompted largely by uncertainty about the timing of lending interventions. 7. Nonlending program. Two technical assistance (TA) projects, the $0.225 million TA for Preparation of Country Strategy and the $0.5 million TA for Energy Efficiency/Renewable 1 Except for the policy and advisory technical assistance (PATA) on Financial Sector Reforms approved in November 2014 scheduled for implementation in 2014/2015, Table A3.1.
6 2 Energy, have been removed from the operational pipeline. The CAREC Maritime Transport Corridor Development Project, to be supported through a $0.5 million project preparation TA, has been renamed the CAREC Multimodal Transport Corridor Development Project and is now included in the nonlending program on a standby basis. 8. Lending program. The Afghanistan-Turkmenistan Regional Power Interconnection Project, set for 2014, has been moved to 2015 as a standby intervention. The change in the project s status is subject to the government s approval, as discussed above.
7 Appendix 1 3 Country Development Goals UPDATED INTERIM COUNTRY PARTNERSHIP STRATEGY RESULTS FRAMEWORK 1. Sustainable socioeconomic development with real growth targeted at the double-digit level. 2. Diversified economic structure and export base. 3. Strengthened regional cooperation and integration through hard and soft infrastructure. Sectors Selected by ADB Changes from CPS or Last COBP None Government Sector Objectives Sector Outcomes that ADB Contributes to and Indicators ADB Areas of Intervention ADB Indicative Resource Allocation in the Next Pipeline and Strategic Priorities Changes from CPS or Last COBP 1. Energy (2020 Core Area 1: Infrastructure, Core Area 3: Regional Cooperation and Integration) None Expand electricity production and export and upgrade power-generating units Increased electricity production Baseline: 20.1 TWh (2012) Target: 47.3 TWh (2020) Current value: 21.0 TWh (2013) Increased electricity exports Baseline: 2.69 TWh (2012) Target: TWh (2020) Current value: 2.88 TWh (2013) Electrical power generation Project management support $160 million, 76% of total lending envelope, and additional $140 million cofinancing, of which: ESG 100% RCI 100% 2. Transport (2020 Core Area 1: Infrastructure, Core Area 3: Regional Cooperation and Integration) None Sector outcome and indicators as well as intervention areas specified Develop transport networks integrated with those of the neighboring countries Increased freight traffic Baseline: million tons (2012) Target: million tons (2016) Current value: million tons (2013) Expanded railway network in operation National railways along prominent regional transport corridors, including multimodal Logistics enhancement Sector-wide institutional improvement $50 million, 24% of total lending envelope, and additional $50 million cofinancing, of which: ESG 100% RCI 100% Sector outcome and indicators as well as intervention areas specified Baseline: 3.2 thousand km (2012) Target: 4.0 thousand km (2016) Current value: 3.5 thousand km (2013) ADB = Asian Development Bank, COBP = country operations business plan, CPS = country partnership strategy, ESG = environmentally sustainable growth, km = kilometer, RCI = regional cooperation and integration, TWh = terawatt-hour. Sources: Program for Socioeconomic Development of Turkmenistan, , Turkmenistan Electricity Sector Development Concept, , and ADB estimates.
8 4 Appendix 2 INDICATIVE ASSISTANCE PIPELINE Table A2.1: Lending Products, Project/Program Name Sector Poverty Targeting Strategic Agendas and Drivers of Change Division Year of PPTA/ PDA Total OCR Cost ($ million) ADB ADF Loans Grants Total Gov t Cofinance 2015 Standby AFG-TKM Regional Power Interconnection ENE GI ESG, RCI CWEN TBD Total Standby CAREC Multimodal Transport Corridor Development TRA GI ESG, RCI CWTC TBD 50.0 Total ADB = Asian Development Bank, ADF = Asian Development Fund, AFG = Afghanistan, CAREC = Central Asia Regional Economic Cooperation, CWEN = Energy Division, CWTC = Transport and Communications Division, ENE = energy, ESG = environmentally sustainable growth, GI = general intervention, Gov t = government, OCR = ordinary capital resources, PPTA = project preparation technical assistance, RCI = regional cooperation and integration, TBD = to be determined, TKM = Turkmenistan. Source: Asian Development Bank.
9 Appendix 2 5 Table A2.2: Nonlending Products and Services, Assistance Name Sector Division Assistance Type ADB Amount Source ($'000) Sources of Funding Others Source Amount ($'000) Total ($'000) 2015 Standby CAREC Multimodal Transport Corridor Development TRA CWTC PPTA TASF Total ADB = Asian Development Bank, CAREC = Central Asia Regional Economic Cooperation, CWTC = Transport and Communications Division, PPTA = project preparation technical assistance, TASF = Technical Assistance Special Fund, TRA = transport. Source: Asian Development Bank.
10 6 Appendix 3 ASSISTANCE PROGRAM FOR THE CURRENT YEAR Table A3.1: Nonlending Products and Services, 2014 Assistance Type ADB Amount ($'000) Sources of Funding Others Amount ($'000) Assistance Name Sector Division Source Source Firm Turkmenistan: Financial Sector Reforms FIN CWPF PATA TASF Total ADB = Asian Development Bank, CWPF = Public Management, Financial Sector, and Trade Division, FIN = finance, PATA = policy and advisory technical assistance, TASF = Technical Assistance Special Fund. Source: Asian Development Bank. Total ($'000)
Country Operations Business Plan. Project Number: 26194. September 2012. Bhutan 2013 2015
Country Operations Business Plan Project Number: 26194 September 2012 Bhutan 2013 2015 CURRENCY EQUIVALENTS (as of 1 August 2012) Currency Unit ngultrum (Nu) Nu1.00 = $0.0180 $1.00 = Nu55.71 ABBREVIATIONS
Country Operations Business Plan. Project Number: 26194 August 2013. Samoa 2014 2016
Country Operations Business Plan Project Number: 26194 August 2013 Samoa 2014 2016 CURRENCY EQUIVALENTS (as of 11 August 2013) Currency Unit tala (ST) ST$1.00 = $0.4256 $1.00 = ST2.3496 ADB ADF GDP IMF
Country Operations Business Plan: Sri Lanka, 2016 2018
Board of Directors IN.276-15 21 August 2015 Country Operations Business Plan: Sri Lanka, 2016 2018 Attached for information is a paper on the above subject. For Inquiries: S. Widowati, Sri Lanka Resident
Regional Operations Business Plan. Project Number: 26194 October 2012. Pacific 2013 2015
Regional Operations Business Plan Project Number: 26194 October 2012 Pacific 2013 2015 ABBREVIATIONS ADB Asian Development Bank DMC developing member country ICT information and communication technology
How To Help The Poor
ICT in ADB Operations April 30th, 2014 Claudia Buentjen Principal Public Management Specialist Regional and Sustainable Development Department Seok Yong Yoon Senior Public Management Specialist (E-Governance)
Country Operations Business Plan. India 2016 2018. October 2015
Country Operations Business Plan October 2015 India 2016 2018 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (as 24 September
Technical Assistance Report. Project Number: 42532 December 2008. Public Debt and Risk Management Forum
Technical Assistance Report Project Number: 42532 December 2008 Public Debt and Risk Management Forum ABBREVIATIONS ADB ADF Asian Development Bank Asian Development Fund DMC PDRM SDR developing member
Faster Approach to Small Nonsovereign Transactions
Policy Paper March 2015 Faster Approach to Small Nonsovereign Transactions Distribution of the attached document is restricted until it has been approved by the Board of Directors. Following such approval,
TRANSPORT SECTOR ROADMAP AND THE INVESTMENT PROGRAM I. Roadmap
TRANSPORT SECTOR ROADMAP AND THE INVESTMENT PROGRAM I. Roadmap 1. Launched in 2008, the government s Afghanistan National Strategy (ANDS) is a Millennium Goals (MDGs) based action plan and road map for
How To Help The Republic Of The Maldives
Technical Assistance Report Project Number: 47150 Capacity Development Technical Assistance (CDTA) December 2013 Republic of the Maldives: Enhancing Tax Administration Capacity (Financed by the Japan Fund
Asia Pacific Public Electronic Procurement Network
Technical Assistance Report Project Number: 47192-001 Regional Capacity Development Technical Assistance (R-CDTA) December 2013 Asia Pacific Public Electronic Procurement Network (Cofinanced by the Republic
Republic of the Union of Myanmar: Support for Strengthening Public Debt Management
Technical Assistance Report Project Number: 47225 Capacity Development Technical Assistance (CDTA) December 2013 Republic of the Union of Myanmar: Support for Strengthening Public Debt Management The views
Islamic Republic of Afghanistan: Supporting the Inter-Ministerial Commission for Energy
Technical Assistance Report Project Number: 46347 Policy and Advisory Technical Assistance (PATA) February 2013 Islamic Republic of Afghanistan: Supporting the Inter-Ministerial Commission for Energy (Financed
People s Republic of China: Strategy and Transport Policy Study on Promoting Logistics Development in Rural Areas
Technical Assistance Report Project Number: 48022 Policy and Advisory Technical Assistance (PATA) August 2014 People s Republic of China: Strategy and Transport Policy Study on Promoting Logistics Development
OUTLINE TERMS OF REFERENCE FOR CONSULTANTS
OUTLINE TERMS OF REFERENCE FOR CONSULTANTS A. Introduction 1. A team of individual consultants will be engaged to support a range of activities under the Central Asia Regional Economic Cooperation (CAREC)
Republic of Tajikistan: Dushanbe-Kyrgyz Border Rehabilitation Project (Phase I)
Validation Report Reference Number: PCV: TAJ 2011-40 Project Number: 34569 Loan Number: 2062-TAJ December 2011 Republic of Tajikistan: Dushanbe-Kyrgyz Border Rehabilitation Project (Phase I) Independent
SECTOR ASSESSMENT (SUMMARY): ENERGY 1
Country Partnership Strategy: Uzbekistan 2012 2016 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. The energy sector underpins Uzbekistan s sustained
Papua New Guinea: Supporting Public Financial Management, Phase 2
Technical Assistance Report Project Number: 44379 012 Capacity Development Technical Assistance (CDTA) November 2012 Papua New Guinea: Supporting Public Financial Management, Phase 2 The views expressed
Uzbekistan 2012 2016. Country Partnership Strategy. August 2012
Country Partnership Strategy August 2012 Uzbekistan 2012 2016 This document is being disclosed to the public prior to Board consideration in accordance with ADB s Public Communications Policy (2011). Subject
Proposed Administration of Loans and Grants Kingdom of Cambodia: Rural Roads Improvement Project II
Additional Financing Project Number: 42334-017 Loan Number: 3151-CAM November 2015 Proposed Administration of Loans and Grants Kingdom of Cambodia: Rural Roads Improvement Project II Distribution of this
Supporting the Asian EXIM Banks Forum
Technical Assistance Report Project Number: 48430-001 Regional Capacity Development Technical Assistance (R-CDTA) October 2015 Supporting the Asian EXIM Banks Forum (Financed by the People s Republic of
SECTOR ASSESSMENT (SUMMARY): TRANSPORT, and INFORMATION AND COMMUNICATION TECHNOLOGY (ROAD TRANSPORT SUBSECTOR) 1
Country Partnership Strategy: Kazakhstan 2012 2016 SECTOR ASSESSMENT (SUMMARY): TRANSPORT, and INFORMATION AND COMMUNICATION TECHNOLOGY (ROAD TRANSPORT SUBSECTOR) 1 1. Sector Performance, Problems, and
Mongolia: Strengthening the Capacity of Judicial Training
Technical Assistance Report Project Number: 49189-001 Capacity Development Technical Assistance (CDTA) November 2015 Mongolia: Strengthening the Capacity of Judicial Training This document is being disclosed
Kingdom of Thailand: Strengthening Integrated Water and Flood Management Implementation
Technical Assistance Report Project Number: 46231 Policy and Advisory Technical Assistance (PATA) December 2012 Kingdom of Thailand: Strengthening Integrated Water and Flood Management Implementation (Financed
SECTOR ASSESSMENT (SUMMARY): ENERGY 1
Country Partnership Strategy: Kazakhstan 2012 2016 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Overview. Oil accounts for about a quarter
SECTOR ASSESSMENT (SUMMARY): AGRICULTURE AND NATURAL RESOURCES 1
Country Operations Business Plan: Philippines, 2013 2015 SECTOR ASSESSMENT (SUMMARY): AGRICULTURE AND NATURAL RESOURCES 1 A. Sector Performance, Problems, and Opportunities 1. Sector importance and growth
South Asia Operational Knowledge Working Paper Series. Funds Flow, Accounting, and Audit in India
South Asia Operational Knowledge Working Paper Series Funds Flow, Accounting, and Audit in India Srinivasan Janardanam No. 2 November 2013 ADB South Asia Operational Knowledge Working Paper Series Funds
Strengthening Project Preparation Capacity in Asia and the Pacific
Technical Assistance Report Project Number: 49407-001 Cluster Capacity Development Technical Assistance (C-CDTA) January 2016 Strengthening Project Preparation Capacity in Asia and the Pacific Distribution
Independent State of Samoa: Ports Development Master Plan
Technical Assistance Report Project Number: 47358-001 Policy and Advisory Technical Assistance (PATA) April 2015 Independent State of Samoa: Ports Development Master Plan The views expressed herein are
Greater Mekong Subregion Phnom Penh Plan for Development Management V
Technical Assistance Report Project Number: 46232-001 Regional Capacity Development Technical Assistance (R-CDTA) November 2012 Greater Mekong Subregion Phnom Penh Plan for Development Management V (Cofinanced
OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.
OM Section D14/BP Page 1 of 6 BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction MULTITRANCHE FINANCING FACILITY
ADB Consulting Opportunities. Vienna, Austria
ADB Consulting Opportunities Vienna, Austria 10-11 November 2015 Presented by: Walter Poick Director, Procurement Division 2 Operations Services and Financial Management Department Why pursue ADB-Financed
TECHNICAL ASSISTANCE (Uzbekistan: Second Small and Microfinance Development Project)
TECHNICAL ASSISTANCE (Uzbekistan: Second Small and Microfinance Development Project) A. Methodology and Key Activities 1. The Asian Development Bank (ADB) will engage a qualified team of consultants in
The Kingdom of Thailand: Capacity Building for the Neighbouring Countries Economic Development Cooperation Agency
Technical Assistance Report Project Number: 40137 December 2006 The Kingdom of Thailand: Capacity Building for the Neighbouring Countries Economic Development Cooperation Agency The views expressed herein
Mongolia: Strengthening the Health Insurance System
Technical Assistance Report Project Number: 47007 Capacity Development Technical Assistance (CDTA) September 2013 Mongolia: Strengthening the System (Financed by the Japan Fund for Poverty Reduction) The
Examples of Good Practice
Examples of Good Practice Cost Estimates and Financing Plans February 2015 Financial Management Unit Operations Services and Financial Management Department 1 TABLE OF CONTENTS 1 Introduction... 3 2 Investment
(Cofinanced by the Government of Sweden and Credit Suisse AG)
Technical Assistance Report Project Number: 46240 Regional Capacity Development Technical Assistance (R-CDTA) November 2013 Inclusive Business Support (Cofinanced by the Government of Sweden and Credit
SECTOR ASSESSMENT (SUMMARY): FINANCE 1. 1. Sector Performance, Problems, and Opportunities
Country Partnership Strategy: Bangladesh, 2011 2015 SECTOR ASSESSMENT (SUMMARY): FINANCE 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. The finance sector in Bangladesh is diverse,
Memorandum Independent Evaluation Department Independent Evaluation Division 1
Memorandum Independent Department Independent Division 1 Approach Project Performance Report of Railway Rehabilitation and Railway Modernization in Uzbekistan February 2010 Team Leader: David Dole, Senior
PROJECT PREPARATORY TECHNICAL ASSISTANCE
A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The Government of Azerbaijan, the Ministry of Transport and Baku Metro Company requested ADB to help improving its urban transport system and
Report and Recommendation of the President to the Board of Directors
Report and Recommendation of the President to the Board of Directors Project Number: 48281-001 November 2014 Proposed Loan China Gas Holdings Limited Natural Gas for Land and River Transportation Project
SECTOR ASSESSMENT (SUMMARY): MICRO, SMALL AND MEDIUM-SIZED ENTERPRISE DEVELOPMENT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities
Small Business and Entrepreneurship Development Project (RRP UZB 42007-014) SECTOR ASSESSMENT (SUMMARY): MICRO, SMALL AND MEDIUM-SIZED ENTERPRISE DEVELOPMENT 1 Sector Road Map 1. Sector Performance, Problems,
China Railways Development, Financing and Challenges
China Railways Development, Financing and Challenges Zhang, Jianping Depart. of Development & Planning Ministry of Railway, P. R. China March 31, 2006 Transport Forum, World Bank 1. Current Situation of
SECTOR ASSESMENT (SUMMARY): EDUCATION 1
Country Partnership Strategy: Viet Nam, 2012 2015 SECTOR ASSESMENT (SUMMARY): EDUCATION 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Country context. In Viet Nam, education is
OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.
OM Section J1/BP Page 1 of 3 OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction PROJECT
PAI 5.08 Revised in June 2011 Page 2 of 8
Project Administration Instructions PAI 5.08 Page 1 of 8 PROJECT PERFORMANCE MONITORING A. Introduction 1. This project administration instruction (PAI) describes how the performance of ADB financed and
Technical Assistance Report. Project Number: 38281 December 2005. Technical Assistance Republic of the Philippines: Debt and Risk Management Project
Technical Assistance Report Project Number: 38281 December 2005 Technical Assistance Republic of the Philippines: Debt and Risk Management Project CURRENCY EQUIVALENTS (as of 24 November 2005) Currency
Thailand s Logistics
Thailand s Logistics Over the past fourteen years, overall international trade with Thailand has grown 340% and manufacturing trade 370%; this growth, aided in part by the nation s bilateral trade agreements
SECTOR ASSESSMENT (SUMMARY): ENERGY. 1. Sector Performance, Problems, and Opportunities
Country Operations Business Plan: Philippines, 2013 2015 SECTOR ASSESSMENT (SUMMARY): ENERGY 1. Sector Performance, Problems, and Opportunities 1. Challenges. Economic growth has been impeded in the Philippines
SECTOR ASSESSMENT (SUMMARY): BRICK 1
Financing Brick Kiln Efficiency Improvement Project (RRP BAN 45273) SECTOR ASSESSMENT (SUMMARY): BRICK 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. The brick sector in Bangladesh
Uzbekistan: Railway Rehabilitation Project and Railway Modernization Project
Performance Evaluation Report Reference Number: PPE: UZB 2010-63 Project Numbers: 30457 and 30506 Loan Numbers: 1631 and 1773 December 2010 Uzbekistan: Railway Rehabilitation Project and Railway Modernization
SECTOR ASSESSMENT (SUMMARY): MICRO, SMALL, AND MEDIUM-SIZED ENTERPRISE DEVELOPMENT
Women s Entrepreneurship Support Sector Development Program (RRP ARM 45230) SECTOR ASSESSMENT (SUMMARY): MICRO, SMALL, AND MEDIUM-SIZED ENTERPRISE DEVELOPMENT A. Overview 1. Significance of micro, small,
MINISTRY OF TRANSPORT AND COMMUNICATIONS OF KYRGYZ REPUBLIC. CAREC Transport Corridor 1 (Bishkek-Torugart Road) Project 3
MINISTRY OF TRANSPORT AND COMMUNICATIONS OF KYRGYZ REPUBLIC CAREC Transport Corridor 1 (Bishkek-Torugart Road) Project 3 financed by the Asian Development Bank under Loan 2755-KGZ (SF) TERMS OF REFERENCE
Business Opportunities Seminar
Business Opportunities Seminar In Finland, Norway, Denmark, Ireland and The Netherlands (22 29 September 2015) Presented by: Rustam Abdukayumov Senior Procurement Specialist Operations Services and Financial
Report and Recommendation of the President to the Board of Directors
Report and Recommendation of the President to the Board of Directors Project Number: 49200-001 September 2015 Proposed Loan Yingda International Leasing Healthcare Finance in Underdeveloped Regions (People
Terms of Reference Independent Completion Report (ICR) for ADB Infrastructure Technical Assistance
Terms of Reference Independent Completion Report (ICR) for ADB Infrastructure Technical Assistance Background Program overview Timor-Leste has critical infrastructure needs given the widespread destruction
Mainstreaming Road Safety in ADB Operations: Draft Action Plan
Mainstreaming Road Safety in ADB Operations: Draft Action Plan Oleg Tonkonojenkov South Asia Department Asian Development Bank Road Safety Problem Road traffic crashes will become the fifth leading cause
CDIA Strategy and Action Plan for Pro-poor Urban Infrastructure Development 2011-2012. July 2011 Final Version CDIA
CDIA Strategy and Action Plan for Pro-poor Urban Infrastructure Development 2011-2012 July 2011 Final Version CDIA Cities Development Initiative for Asia TABLE OF CONTENTS TABLE OF CONTENTS... I ACRONYMS...
New JICA Guidelines for Project Evaluation First Edition. Japan International Cooperation Agency (JICA) Evaluation Department
New JICA Guidelines for Project Evaluation First Edition Japan International Cooperation Agency (JICA) Evaluation Department June 2010 Contents 1 OVERVIEW OF AID EVALUATION AND JICA'S PROJECT EVALUATION...
Nepal: Preparation of the Agricultural Development Strategy
Technical Assistance Report Project Number: 43447 Policy and Advisory Technical Assistance (PATA) December 2010 Nepal: Preparation of the Agricultural Development Strategy (Cofinanced by the International
Republic of the Philippines: Strengthening Evaluation and Fiscal Cost Management of Public Private Partnerships
Technical Assistance Report Project Number: 47230-001 Capacity Development Technical Assistance (CDTA) April 2014 Republic of the Philippines: Strengthening Evaluation and Fiscal Cost Management of Public
SECTOR ASSESSMENT (SUMMARY): EDUCATION 1
Country Partnership Strategy: Bangladesh, 2011 2015 SECTOR ASSESSMENT (SUMMARY): EDUCATION 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Bangladesh has made considerable progress
Project Administration Manual. Project Number: 45094 Loans: LXXXX March 2012. Democratic Republic of Timor-Leste: Road Network Upgrading Project
Project Administration Manual Project Number: 45094 Loans: LXXXX March 2012 Democratic Republic of Timor-Leste: Road Network Upgrading Project Contents ABBREVIATIONS I. PROJECT DESCRIPTION 1 II. IMPLEMENTATION
OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.
Page 1 of 4 OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. FINANCIAL MANAGEMENT, COST ESTIMATES, FINANCIAL
SECTOR ASSESSMENT (SUMMARY): MICRO, SMALL, AND MEDIUM-SIZED ENTERPRISES. 1. Sector Performance, Problems, and Opportunities
Inclusive Micro, Small, and Medium-Sized Enterprises Development Project (RRP MLD 43566) SECTOR ASSESSMENT (SUMMARY): MICRO, SMALL, AND MEDIUM-SIZED ENTERPRISES Sector Road Map 1. Sector Performance, Problems,
SECTOR ASSESSMENT (SUMMARY): ENERGY 1. 1. Sector Performance, Problems, and Opportunities
Country Partnership Strategy: Bangladesh, 2011 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Power generation gap. Bangladesh endures long
Business Opportunities Fair
Business Opportunities Fair Increasing Consulting Capability in ADB s Developing Member Countries March 2-3 2011 Hamid Sharif Principal Director Central Operations Services Office Asian Development Bank
Technical Assistance Consultant s Report
Technical Assistance Consultant s Report Project Number: 45280 June 2012 Socialist Republic of Viet Nam: Support to Improve Portfolio Performance and Aid Effectiveness (Financed by ADB s Technical Assistance
ii. Project Finance Specialist (national consultant; 9 person-months; intermittent).
1 ADDITIONAL CONSULTANTS FOR THE PUBLIC PRIVATE PARTNERSHIP CENTER AND THE DEPARTMENT OF FINANCE 1. Expansion of the PPP Center s consultant pool is proposed to strengthen PPP Center s capacity in thematic
ASIAN DEVELOPMENT BANK Operations Evaluation Department
ASIAN DEVELOPMENT BANK Operations Evaluation Department VALIDATION OF THE COUNTRY STRATEGY AND PROGRAM COMPLETION REPORT FOR REPUBLIC OF THE MALDIVES In this electronic file, the report is followed by
Technical Assistance Disbursement Handbook
Technical Assistance Disbursement Handbook May 2010 All rights reserved. Published 2010. Printed in the Philippines. ISBN 978-971-561-856-4 Publication Stock No. TIM090804 The views expressed in this book
BERMUDA MONETARY AUTHORITY
BERMUDA MONETARY AUTHORITY BANKS AND DEPOSIT COMPANIES ACT 1999 THE BERMUDA MONETARY AUTHORITY S RELATIONSHIP WITH AUDITORS AND REPORTING ACCOUNTANTS OF BANKS AND DEPOSIT COMPANIES DECEMBER 2012 Table
Papua New Guinea: Microfinance and Employment Project
Validation Report Reference Number: PVR 211 Project Number: 32472 Loan Number: 1768 December 2012 Papua New Guinea: Microfinance and Employment Project Independent Evaluation Department ABBREVIATIONS AusAID
PROCEDURES FOR ENVIRONMENTAL AND SOCIAL APPRAISAL AND MONITORING OF INVESTMENT PROJECTS
PROCEDURES FOR ENVIRONMENTAL AND SOCIAL APPRAISAL AND MONITORING OF INVESTMENT PROJECTS Approved 10 July 2015 CONTENTS 1. INTRODUCTION 1 2. OVERVIEW OF THE ENVIRONMENTAL AND SOCIAL APPRAISAL AND MONITORING
People s Republic of Bangladesh: Strengthening Results-Based Monitoring and Evaluation Project
Technical Assistance Report Project Number: 39469 December 2006 People s Republic of Bangladesh: Strengthening Results-Based Monitoring and Evaluation Project (Financed by the Japan Special Fund) The views
Guidelines for Preparing Performance Evaluation Reports for Public Sector Operations
Guidelines for Preparing Performance Evaluation Reports for Public Sector Operations January 2006 Operations Evaluation Department Asian Development Bank ABBREVIATIONS ADB Asian Development Bank EIRR economic
Loan and Administration of Cofinancing Republic of Uzbekistan: Talimarjan Power Project
Project Administration Manual Project Number: 43151 Loan Numbers: L2629 (OCR), L2630 (ADF), L8244 (JICA) Updated 2 June 2010 Loan and Administration of Cofinancing Republic of Uzbekistan: Talimarjan Power
National Trade and Transport Facilitation Monitoring Mechanism (TTFMM)
National Trade and Transport Facilitation Monitoring Mechanism (TTFMM) Dr. Somnuk Keretho Director Institute for IT Innovation Kasetsart University, Thailand Supported by Dr Tengfei Wang Economic Affairs
Kyrgyz Republic: Implementing the e-procurement System
Technical Assistance Report Project Number: 46397-001 Capacity Development Technical Assistance (CDTA) December 2012 Kyrgyz Republic: Implementing the e-procurement System The views expressed herein are
International Education Export Sector: Cover Paper
OFFICE OF THE MINSTER FOR TERTIARY EDUCATION, SKILLS AND EMPLOYMENT OFFICE OF THE MINSTER OF IMMIGRATION The Chair Cabinet Economic Growth and Infrastructure Committee International Education Export Sector:
