NUCLEAR SUPPLY CHAIN SYMPOSIUM

Size: px
Start display at page:

Download "NUCLEAR SUPPLY CHAIN SYMPOSIUM"

Transcription

1 NUCLEAR SUPPLY CHAIN SYMPOSIUM Canadian Contracting Models Darryl J. Brown Gowling Lafleur Henderson LLP November 10, 2015 Suite First Canadian Place 100 King Street West Toronto, Ontario Canada M5X 1G5 Telephone (416) Facsimile (416)

2 Canadian Procurement/Construction Delivery Methods Various procurement/construction delivery methods exist to provide alternatives as to how risks and responsibilities are allocated for a project and how key factors such as time and price are addressed. Traditional Delivery Method: Design-Bid-Build Stipulated Price Cost Plus Unit Price Contemporary Delivery Methods: Construction Management (not-at-risk / at-risk) Design-Build P3 s

3 Overview of Design-Bid-Build Model Under this model the owner retains a design team/consultant such as an architect or engineer to design a project. Once plans are completed, the owner, usually through a call for bids (or, possibly sole-sourced negotiations), retains a contractor to construct the project. The owner, therefore, enters into two separate contracts: one with the design team/consultant and the other with the contractor. Each of the parties may subcontract with various other consultants, trades and suppliers in order to fulfill their obligations at each project stage.

4 Overview of Design-Bid-Build Model (cont d) Model s pricing structure may take 3 basic forms: Stipulated Price Cost Plus Unit Price Cost Plus Model also lends itself to more complex pricing structures Guaranteed Maximum Price (Fixed) Guaranteed Maximum Price with sharing of savings Target Price (margin and/or entire payment at risk above Target)

5 Considerations Design-Bid-Build Model In General: Structure is good for a risk-averse owner as risks do not flow back to the owner for construction or design defect issues they remain with the contractor and design team, respectively Owner must await completion of the design before commencing construction of the project - it cannot be fast tracked Owner is not fully aware of the price until tender which may delay financing arrangements, etc. Design consultant and contractor have the potential to be at odds with each other should problems arise - both could deny fault and engage in fingerpointing resulting in delay

6 Considerations Stipulated Price: Easier for a contractor to provide a fixed price due to the design being completed before pricing occurs Should result in fewer changes to the design thereby saving owner money Contractor absorbing greater risk, therefore, higher contingency No scrutiny of contractor s books/records

7 Considerations Cost Plus: Contractor must keep and disclose full and detailed accounts and records necessary to document cost Contractor s profits are tied to fees paid for all materials and services, therefore, potentially less incentive to be efficient Owner does not know the total cost of the construction project at the time of signing the contract Unit Price: Suitable for projects where the required materials can be easily identified but not the number of such items Owner does not know the total cost of the construction project at the time of signing the contract

8 Construction Management Method Similar in framework to traditional construction contract with the primary difference being that an owner retains a construction manager (or Owner self-performs) in place of the general contractor to provide project administration and technical services such as scheduling, budgeting, and material selection, but not to do any actual construction work No single contractor assumes responsibility for the entire project Construction manager may be at risk or not at risk

9 Considerations: CM Not-At-Risk Cost advantages exist in that there is limited risk to the construction manager whose fees should therefore be less Owner carries the risk of construction regarding scheduling and performance issues, etc. rather than the construction manager Model is suitable for moving construction along at a fast pace because procurement/construction can start before design is finalized Owner has better control over budget and schedule Costs can be saved given that contractors enter into contracts directly with the owner with no markup by a middleman Construction manager s experience may be looked to by the design team and they can work together Limited incentives for construction manager to aggressively seek cost savings Final cost of the design is not known to the owner until everything is in place Increased level of contractual complexity Owner may be found to be the constructor given that the owner is entering into several contracts with contractors

10 Considerations: CM At-Risk Similar to that of a Construction Manager Not-at-Risk model except that the risk of being found constructor now flows to the construction manager instead of the owner Cost savings reduced as construction manager bears increased risk

11 ONE MODEL DOES NOT FIT ALL Contract Delivery Models and Pricing Structures are becoming more complex to reflect the complexities of the scope of nuclear projects

12 EXAMPLE: Pricing Options Hybrid Pricing Options arising to deal with different aspects of EPC contracting 1. Engineering Majority of pricing fixed First of a kind risks or areas with significant unknowns (such as Inside the Vault) may require Target Price 2. Procurement Generally Fixed 3. Construction Variations of Fixed and Target Pricing to address allocation of risks and risk sharing for significant unknowns

13 STICKS & CARROTS (Risk-Sharing) A. STICKS Delay Liquidated Damages for failing to achieve milestones Escalating Loss of Margin or Entire Fee above Target Price B. CARROTS Bonus if cost savings below Target Price Bonus if milestone dates achieved

14 CONCLUSION The best Models allocate risks to the party best able to manage risk Goal: achieve a partnership where both parties have an opportunity to succeed

Design-Bid-Build v. Guaranteed Maximum Price Contracting: The Basics for Owner's Counsel

Design-Bid-Build v. Guaranteed Maximum Price Contracting: The Basics for Owner's Counsel Page 1 of 6 ALM Properties, Inc. Page printed from: New York Law Journal Back to Article Design-Bid-Build v. Guaranteed Maximum Price Contracting: The Basics for Owner's Counsel James E. Hughes New York

More information

Program Management for School Construction

Program Management for School Construction Program Management for School Construction Presented to: Pasadena Unified School District Board of Education January 13, 2009 Project Delivery Options Design Bid Build Design/Build Construction Management

More information

PROCUREMENT GUIDE: SELECTING A CONTRACTOR/PROJECT DEVELOPER

PROCUREMENT GUIDE: SELECTING A CONTRACTOR/PROJECT DEVELOPER PROCUREMENT GUIDE: SELECTING A CONTRACTOR/PROJECT DEVELOPER 1. Overview CHP project development and implementation are similar to many central plant construction projects or comprehensive energy conservation

More information

International Accounting Standard 11 Construction Contracts

International Accounting Standard 11 Construction Contracts International Accounting Standard 11 Construction Contracts Objective The objective of this Standard is to prescribe the accounting treatment of revenue and costs associated with construction contracts.

More information

How To Be A Construction Manager

How To Be A Construction Manager THE RISK IN CM AT-RISK BY WARNER STRANG INTRODUCTION The objective of professional construction managers should be to give their clients the best possible experience with design and construction, without

More information

School Construction Projects

School Construction Projects The process of educating young people seems to be continually developing. New insights regarding how students most effectively receive retain and gain understanding of information and principles affect

More information

Construction Contracts

Construction Contracts STATUTORY BOARD FINANCIAL REPORTING STANDARD SB-FRS 11 Construction Contracts This version of SB-FRS 11 does not include amendments that are effective for annual periods beginning after 1 January 2015.

More information

The programming, design

The programming, design Understanding Project Delivery for the Design and Construction of Public Buildings architecture The programming, design and construction of important public buildings require the coordinated efforts of

More information

Construction Delivery Methods for Texas school districts

Construction Delivery Methods for Texas school districts Construction Delivery Methods for Texas school districts Pfluger Associates Architects, P.L.L.C. ARCHITECTS / PLANNING CONSULTANTS History Prior to 1995, public school districts were required to utilize

More information

https://www.ofgem.gov.uk/publications-and-updates/ofto-build-providing-additional-flexibility-through-extendedframework

https://www.ofgem.gov.uk/publications-and-updates/ofto-build-providing-additional-flexibility-through-extendedframework All interested parties Direct Dial: 020 7901 1849 Email: transmissioncompetition@ofgem.gov.uk Date: 17 November 2015 Dear Colleague EPC Contract Principles for OFTO Build Tenders This letter provides guidance

More information

How To Manage A Contract

How To Manage A Contract Contract Management Checklist Preparation This section deals with laying good foundations before a contract is let. The contract should be actively managed. You should have a plan for doing this, which

More information

Sri Lanka Accounting Standard -LKAS 11. Construction Contracts

Sri Lanka Accounting Standard -LKAS 11. Construction Contracts Sri Lanka Accounting Standard -LKAS 11 Construction Contracts -405- Sri Lanka Accounting Standard -LKAS 11 Construction Contracts Sri Lanka Accounting Standard LKAS 11 Construction Contracts is set out

More information

MASTER AGREEMENT FOR PROJECT MANAGEMENT AND CONSTRUCTION MANAGEMENT SERVICES

MASTER AGREEMENT FOR PROJECT MANAGEMENT AND CONSTRUCTION MANAGEMENT SERVICES MASTER AGREEMENT FOR PROJECT MANAGEMENT AND CONSTRUCTION MANAGEMENT SERVICES THIS AGREEMENT is made and entered into this day of, 2007, by and between the University of Washington ( Owner ) and, ( Project

More information

CM/GC Guidelines FOR PUBLIC OWNERS. A Joint Publication Building Your Quality of Life. AGC Publication Number 2912 NASFA Publication Number F-3007

CM/GC Guidelines FOR PUBLIC OWNERS. A Joint Publication Building Your Quality of Life. AGC Publication Number 2912 NASFA Publication Number F-3007 CM/GC Guidelines FOR PUBLIC OWNERS AGC Publication Number 2912 NASFA Publication Number F-3007 A Joint Publication Building Your Quality of Life Building Your Quality of Life Nothing contained in this

More information

NEPAL ACCOUNTING STANDARDS ON CONSTRUCTION CONTRACTS

NEPAL ACCOUNTING STANDARDS ON CONSTRUCTION CONTRACTS NAS 13 NEPAL ACCOUNTING STANDARDS ON CONSTRUCTION CONTRACTS CONTENTS Paragraphs OBJECTIVE SCOPE 1 2 DEFINITIONS 3 6 COMBINING AND SEGMENTING CONSTRUCTION CONTRACTS 7 10 CONTRACT REVENUE 11 15 CONTRACT

More information

GOING PUBLIC IN CANADA

GOING PUBLIC IN CANADA GOING PUBLIC IN CANADA CASSELS BROCK IN BRIEF Canadian law firm of more than 200 lawyers based in Toronto and Vancouver focused on serving the transaction, advocacy and advisory needs of the country s

More information

Evaluating Project Delivery Options

Evaluating Project Delivery Options Evaluating Project Delivery Options Scot A. Bini Vice President, URS August 24, 2004 Design-Bid-Build Overview Design Build Construction Management at Risk Owner Representation Terminology Project Manager

More information

INDEX. bonded contract, 289 insureds, 243. misrepresentation, 291 obtaining, 242

INDEX. bonded contract, 289 insureds, 243. misrepresentation, 291 obtaining, 242 INDEX B non-conforming tender, 284 boiler and machinery insurance, performance bond 241 default by the obligee, 288 coverage, 243 failure to notify, 289 definition of the accident, 245 material variation

More information

Construction Contract Fundamentals. Baker Tilly refers to Baker Tilly Virchow Krause, LLP,

Construction Contract Fundamentals. Baker Tilly refers to Baker Tilly Virchow Krause, LLP, Construction Contract Fundamentals Baker Tilly refers to Baker Tilly Virchow Krause, LLP, an independently owned and managed member of Baker Tilly International. 2010 Baker Tilly Virchow Krause, LLP About

More information

Project Delivery Methods & Contract Types CSTM 102 Spring 2013

Project Delivery Methods & Contract Types CSTM 102 Spring 2013 Project Delivery Methods & Contract Types CSTM 102 Spring 2013 Schedule February 16- Building Information Modeling February 21- Midterm Review February 23- Midterm In the industry the term Pre-Construction

More information

Samantha Ip Clark Wilson LLP tel. 604.643.3172 ssi@cwilson.com D/RJR/682791.1

Samantha Ip Clark Wilson LLP tel. 604.643.3172 ssi@cwilson.com D/RJR/682791.1 by Samantha Ip Clark Wilson LLP tel. 604.643.3172 ssi@cwilson.com D/RJR/682791.1 TABLE OF CONTENTS A. INTRODUCTION...1 B. GENERAL INFORMATION ON THE TYPES OF LIABILITY INSURANCE...1 1. GENERAL LIABILITY

More information

The following Accounting Standards Interpretation (ASI) relates to AS 7. ASI 29 Turnover in case of Contractors

The following Accounting Standards Interpretation (ASI) relates to AS 7. ASI 29 Turnover in case of Contractors 108 Accounting Standard (AS) 7 (revised 2002) Construction Contracts Contents OBJECTIVE SCOPE Paragraph 1 DEFINITIONS 2-5 COMBINING AND SEGMENTING CONSTRUCTION CONTRACTS 6-9 CONTRACT REVENUE 10-14 CONTRACT

More information

C.A.S.H. WORKSHOP Planning for the Building Season: Exploring and Understanding Project Delivery Methods

C.A.S.H. WORKSHOP Planning for the Building Season: Exploring and Understanding Project Delivery Methods C.A.S.H. WORKSHOP Planning for the Building Season: Exploring and Understanding Project Delivery Methods Friday, December 3, 2010 9:00 a.m. to 3:00 p.m. Ontario Airport Radisson 2200 East Holt Boulevard

More information

REQUEST FOR PROPOSALS (RFP) - Construction Management Services. Germantown School District Office

REQUEST FOR PROPOSALS (RFP) - Construction Management Services. Germantown School District Office REQUEST FOR PROPOSALS (RFP) - Construction Management Services From: Germantown School District Project: Germantown School District Addition & Renovations to Rockfield Elementary School N132 W18473 Rockfield

More information

Nominated Subcontractors on International Projects: Approaches to Risk Allocation

Nominated Subcontractors on International Projects: Approaches to Risk Allocation Nominated Subcontractors on International Projects: Approaches to Risk Allocation September 5, 2005 (he following outline was used in a presentation to the Overseas Construction Association of Japan, Inc.

More information

Policy Number: 3-804 Policy Name: Professional Services and Construction Services Procurement

Policy Number: 3-804 Policy Name: Professional Services and Construction Services Procurement Page 1 3-804 Professional Services and Construction A. Project Delivery Methods 1. A university may procure design services, construction and construction services, as applicable, under any of the following

More information

Construction Contracts

Construction Contracts 65 Accounting Standard (AS) 7 Construction Contracts Contents OBJECTIVE SCOPE Paragraph 1 DEFINITIONS 2-5 COMBINING AND SEGMENTING CONSTRUCTION CONTRACTS 6-9 CONTRACT REVENUE 10-14 CONTRACT COSTS 15-20

More information

Revenue from contracts with customers The standard is final A comprehensive look at the new revenue model

Revenue from contracts with customers The standard is final A comprehensive look at the new revenue model Revenue from contracts with customers The standard is final A comprehensive look at the new revenue model No. US2014-01 (supplement) June 11, 2014 What s inside: Overview... 1 Defining the contract...

More information

ACI Presentation January 2014. Owner s Protective Professional Indemnity. Ray Bustamante Managing Director

ACI Presentation January 2014. Owner s Protective Professional Indemnity. Ray Bustamante Managing Director ACI Presentation January 2014 Owner s Protective Professional Indemnity Ray Bustamante Managing Director I - Financial Risks to Owner from Design Errors on design/bid/build projects Owner implies warranty

More information

Checklist 26: How Owners Can Avoid Litigation on Construction Projects

Checklist 26: How Owners Can Avoid Litigation on Construction Projects Checklist 26: How Owners Can Avoid Litigation on Construction Projects While it is impossible to completely avoid litigation on construction projects, certain steps can be taken to minimize the potential

More information

How to get value for money from service providers on major projects

How to get value for money from service providers on major projects How to get value for money from service providers on major projects Session Focus Contracting as a relationship Identifying win/win arrangements Procurement & Planning on major projects Understanding the

More information

IAN J. HOUSTON. T 416.367.6111 F 416.361.2742 Toronto; IJHouston@blg.com http://ca.linkedin.com/pub/ianhouston/6/a2/10a EXECUTIVE SUMMARY

IAN J. HOUSTON. T 416.367.6111 F 416.361.2742 Toronto; IJHouston@blg.com http://ca.linkedin.com/pub/ianhouston/6/a2/10a EXECUTIVE SUMMARY IAN J. HOUSTON Partner T 416.367.6111 F 416.361.2742 Toronto; IJHouston@blg.com http://ca.linkedin.com/pub/ianhouston/6/a2/10a Infrastructure Construction Procurement Energy Mining Healthcare Capital Redevelopment,

More information

Recommended Best Practices for the Use of Construction Management/General Contractor on Highway and Transportation Projects in the Public Sector

Recommended Best Practices for the Use of Construction Management/General Contractor on Highway and Transportation Projects in the Public Sector Recommended Best Practices for the Use of Construction Management/General Contractor on Highway and Transportation Projects in the Public Sector Approved March 23, 2011 Purpose: While the traditional Design-Bid-Build

More information

Report on SELECTING THE BEST PROJECT DELIVERY METHOD USING THE ANALYTICAL HIERARCHY PROCESS (AHP)

Report on SELECTING THE BEST PROJECT DELIVERY METHOD USING THE ANALYTICAL HIERARCHY PROCESS (AHP) Report on SELECTING THE BEST PROJECT DELIVERY METHOD USING THE ANALYTICAL HIERARCHY PROCESS (AHP) Prepared for Dr. Soliman Almohawis CEM 520 Construction Contracting & Administration By Abdullah S. Alzouri

More information

INLAND REVENUE BOARD MALAYSIA CONSTRUCTION CONTRACTS

INLAND REVENUE BOARD MALAYSIA CONSTRUCTION CONTRACTS INLAND REVENUE BOARD MALAYSIA CONSTRUCTION CONTRACTS PUBLIC RULING NO. 2/2009 Translation from the original Bahasa Malaysia text DATE OF ISSUE : 22 MAY 2009 CONSTRUCTION CONTRACTS INLAND REVENUE BOARD

More information

ON-TIME AND ON-BUDGET: KEY ISSUES IN NEGOTIATING CONSTRUCTION CONTRACTS

ON-TIME AND ON-BUDGET: KEY ISSUES IN NEGOTIATING CONSTRUCTION CONTRACTS ON-TIME AND ON-BUDGET: KEY ISSUES IN NEGOTIATING CONSTRUCTION CONTRACTS ACC REAL ESTATE COMMITTEE PRESENTATION SEPTEMBER 17, 2009 SEAN T. BOULGER, ESQ. WILMER CUTLER PICKERING HALE AND DORR LLP I. Introduction

More information

Verification of need. Assessment of options. Develop Procurement Strategy. Implement Procurement Strategy. Project Delivery. Post Project Review

Verification of need. Assessment of options. Develop Procurement Strategy. Implement Procurement Strategy. Project Delivery. Post Project Review Who should read this fact sheet? Many construction clients are not regular purchasers of construction work. This fact sheet is an introduction to construction procurement for occasional clients with a

More information

Professional Practice Commission: March 2013. Alternative Project Delivery Systems

Professional Practice Commission: March 2013. Alternative Project Delivery Systems Professional Practice Commission: March 2013 Alternative Project Delivery Systems UIA Accord Building project delivery systems. Definition Building project delivery systems are defined as the contractual

More information

How To Account For Construction Contracts In Hong Kong Kongsong Accounting Standard 11

How To Account For Construction Contracts In Hong Kong Kongsong Accounting Standard 11 HKAS 11 Issued October 2004Revised March 2010 Hong Kong Accounting Standard 11 Construction Contracts COPYRIGHT Copyright 2011 Hong Kong Institute of Certified Public Accountants This Hong Kong Financial

More information

Schedule Acceleration Techniques Using a CM

Schedule Acceleration Techniques Using a CM College of Engineering Schedule Acceleration Techniques Using a CM By PI: Dr. Jesús M. de la Garza, Vecellio Professor Graduate Student: Ms. Daniela Escobar Hidrobo Final Report September 1, 2006 Invent

More information

photos.com Cost, Quality and Accountability Public Tendering versus Self-Performance for Municipal Infrastructure Delivery in Canada

photos.com Cost, Quality and Accountability Public Tendering versus Self-Performance for Municipal Infrastructure Delivery in Canada photos.com Cost, Quality and Accountability Public Tendering versus Self-Performance for Municipal Infrastructure Delivery in Canada For more than 200 years and with few exceptions, Canada s municipal

More information

Appendix 18 NEC3 Options

Appendix 18 NEC3 Options Appendix 18 NEC3 Options December 2007 Page 449 Appendix 18 NEC3 Options NEC3 Main Options There are six main options as set out below. The Contractor carries the greatest risk under options A and B, and

More information

ASSOCIATION OF INDEPENDENT SCHOOLS OF NSW BLOCK GRANT AUTHORITY GUIDE TO PROCUREMENT PROCESSES

ASSOCIATION OF INDEPENDENT SCHOOLS OF NSW BLOCK GRANT AUTHORITY GUIDE TO PROCUREMENT PROCESSES ASSOCIATION OF INDEPENDENT SCHOOLS OF NSW BLOCK GRANT AUTHORITY GUIDE TO PROCUREMENT PROCESSES CAPITAL GRANTS PROGRAM / BUILDING GRANTS ASSISTANCE SCHEME Background Non government schools accepting the

More information

TRANSFERRING RISKS IN CONSTRUCTION CONTRACTS

TRANSFERRING RISKS IN CONSTRUCTION CONTRACTS TRANSFERRING RISKS IN CONSTRUCTION CONTRACTS Bryan S. Shapiro, QC I. INTRODUCTION Risk and conflict are inherent characteristics of the construction industry. Conflict usually results from the allocation

More information

Applicability / Objective

Applicability / Objective By Rakesh Agarwal Applicability / Objective APPLICABILITY: applicable to all contracts entered into on or after 1-4-2003 and is mandatory in nature from that date. Based on AS 7 (Construction Contracts)

More information

Canterbury Park Pool Chamber Replacement

Canterbury Park Pool Chamber Replacement Requirement Request For Quotation To provide services, equipment and materials to replace the Concrete Pool Service & Drainage vault at the Canterbury Park Pool located at 2185 Arch Street, Ottawa, ON

More information

Contracting Practices in Mega Projects

Contracting Practices in Mega Projects CEM 520 Term Paper Contracting Practices in Mega Projects EPC and EPCM A L I A B D U L L A H A L - S A L E M 2 0 0 3 4 2 5 1 0 Outline Introduction Types of Contracts Contracting Strategies The Difference

More information

Construction Liens in Ontario

Construction Liens in Ontario Construction Liens in Ontario Neil S. Abbott Gowling Lafleur Henderson LLP Jeffrey A. Armel Goldman Sloan Nash & Haber LLP Joseph Cosentino Goodmans LLP Robert J. Kennaley McLauchlin & Associates Jennifer

More information

GOVERNMENT OF MALAYSIA

GOVERNMENT OF MALAYSIA GOVERNMENT OF MALAYSIA Malaysian Public Sector Accounting Standards MPSAS 11 Construction Contracts March 2015 MPSAS 11 Construction Contracts Acknowledgment The Malaysian Public Sector Accounting Standard

More information

Bankruptcy and Restructuring

Bankruptcy and Restructuring doing business in Canada 102 p Bankruptcy and Restructuring 1. Legislation and Court System The Canadian bankruptcy and insolvency regime is divided between the federal and provincial levels of government

More information

A Guide to Buying E-learning Services

A Guide to Buying E-learning Services A Guide to Buying E-learning Services Table of Contents Introduction:...2 Step One: Understand your Goals...2 Step Two: Research the Marketplace...3 Step Three: Narrow the Field...3 Step Four: Formal Documentation...4

More information

Building Capital Projects in Tough Times John Lynch, State of Washington

Building Capital Projects in Tough Times John Lynch, State of Washington Building Capital Projects in Tough Times John Lynch, State of Washington Published as a joint effort of the National Association of State Facilities Administrators (NASFA) and the Associated General Contractors

More information

STANDARD CONTRACT PROVISIONS ROADS

STANDARD CONTRACT PROVISIONS ROADS STANDARD CONTRACT PROVISIONS ROADS Volume 3 MINOR WORKS CONTRACT SYSTEM (MW) MANUAL FOR MINOR WORKS CONTRACTS Standard Contract Provisions Roads Volume 3 Department of Transport and Main Roads for Minor

More information

Business Area: Early Contractor Involvement

Business Area: Early Contractor Involvement The European Infrastructure Procurement Symposium 2012 Business Area: Early Contractor Involvement Dr. Konrad Spang Professor Chair of Project Management University of Kassel Germany Definition: Early

More information

Construction Contracts

Construction Contracts Compiled Accounting Standard AASB 111 Construction Contracts This compiled Standard applies to annual reporting periods beginning on or after 1 January 2009 that end on or after 30 June 2009. Early application

More information

ACCOUNTING FOR CONSTRUCTION CONTRACT AS7 (Revised-2002) Applied in accounting for construction contracts in the financial statements of contractors.

ACCOUNTING FOR CONSTRUCTION CONTRACT AS7 (Revised-2002) Applied in accounting for construction contracts in the financial statements of contractors. ACCOUNTING FOR CONSTRUCTION CONTRACT AS7 (Revised-2002) 1) Applicability of the Standard Applied in accounting for construction contracts in the financial statements of contractors. Where a Construction

More information

Document Comparison. AIA Documents A134 2009 and A131CMc 2003

Document Comparison. AIA Documents A134 2009 and A131CMc 2003 Document Comparison AIA Documents A134 2009 and A131CMc 2003 AIA Document A134 2009 is in the right-hand column. Corresponding sections of AIA Document A131 CMc 2003 are in the left-hand column. Sections

More information

Contract risk and assurance

Contract risk and assurance Contract risk and assurance Delivering value from your key contracts and suppliers Maximise performance, confirm costs and gain assurance over your third party relationships and suppliers Performance Risk

More information

CONSTRUCTION & DESIGN AGREEMENTS FOR OWNERS. Presented by ALEXANDER F. FERRINI, III

CONSTRUCTION & DESIGN AGREEMENTS FOR OWNERS. Presented by ALEXANDER F. FERRINI, III CONSTRUCTION & DESIGN AGREEMENTS FOR OWNERS Basics for Projects of All Sizes Presented by ALEXANDER F. FERRINI, III Why do I need an agreement? Why do I need an agreement? Why do I need an agreement? Design

More information

TLHAMATSI AFRICA PROJECTS CONSTRUCTION MANAGEMENT PRESENTATION. PRESENTED BY: BAKANG MOENG info@tlhamatsi.co.za

TLHAMATSI AFRICA PROJECTS CONSTRUCTION MANAGEMENT PRESENTATION. PRESENTED BY: BAKANG MOENG info@tlhamatsi.co.za TLHAMATSI AFRICA PROJECTS CONSTRUCTION MANAGEMENT PRESENTATION PRESENTED BY: BAKANG MOENG info@tlhamatsi.co.za CONSTRUCTION MANAGEMENT - DEFINED Act of managing the construction process Contractual arrangement

More information

AGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES BETWEEN THE REGENTS OF THE UNIVERSITY OF MICHIGAN AND

AGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES BETWEEN THE REGENTS OF THE UNIVERSITY OF MICHIGAN AND AGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES BETWEEN THE REGENTS OF THE UNIVERSITY OF MICHIGAN AND FORM DATE: January 31, 2014 TABLE OF CONTENTS PART 1. INDUCEMENT; BASIC AGREEMENT... 1 1.1. Inducement....

More information

Equipment leasing for agriculture

Equipment leasing for agriculture Business Financial Services Equipment leasing for agriculture The fast and flexible way to equip your business What is equipment leasing? n Leasing is a financing alternative that allows you to update

More information

Working Capital Analysis

Working Capital Analysis Working Capital Analysis Keep cash flowing with the working capital calculator This module helps you assess the effectiveness of your working capital cycle and its impact on cash flow. Working capital

More information

An Oracle White Paper June 2009. Successfully Managing Contract Risk by Forming Win-Win Relationships

An Oracle White Paper June 2009. Successfully Managing Contract Risk by Forming Win-Win Relationships An Oracle White Paper June 2009 Successfully Managing Contract Risk by Forming Win-Win Relationships Executive Overview This white paper identifies some of the risks involved with contract project work

More information

Strategies for optimizing your inventory management

Strategies for optimizing your inventory management Part of the Deloitte working capital series Make your working capital work for you Strategies for optimizing your inventory management The Deloitte working capital series Strategies for optimizing your

More information

Oregon Public Contracting Coalition Guide to CM/GC Contracting

Oregon Public Contracting Coalition Guide to CM/GC Contracting NOTE: REFERENCES TO ORS 279 AND BOLI REGULATIONS CONTAINED HEREIN DO NOT REFLECT ANY CHANGES OCCURING SUBSEQUENT TO THE PUBLICATION DATE. THE USER OF THIS DOCUMENT IS RESPONSIBLE FOR USING REGULATIONS

More information

4.3 Project Construction

4.3 Project Construction 4.3 Project Construction 4.3.1 Contract Management Contract management practices may vary depending on the type of construction delivery method (e.g. Design-Bid-Build, Stipulated Sum, Construction Management).

More information

Consultancy Services Proposal

Consultancy Services Proposal Consultancy Services Proposal August, 2007 ISO 9001 : 2000 CERTIFIED www.genivar.com 5858 Côte-des-Neiges Rd, 4 th Floor, Montreal, Quebec, Canada, H3S 1Z1 Telephone: (1) 514 340-0046 Fax: (1) 514 340-2847

More information

STANDARD FORM OF AGREEMENT BETWEEN OWNER AND DESIGN- BUILDER - LUMP SUM

STANDARD FORM OF AGREEMENT BETWEEN OWNER AND DESIGN- BUILDER - LUMP SUM DC STANDARD FORM OF AGREEMENT BETWEEN OWNER AND DESIGN- BUILDER - LUMP SUM Document No. 525 Second Edition, 2010 Design-Build Institute of America Washington, Design-Build Institute of America - Contract

More information

effectively structuring and managing design-build projects 2. factors involved in selecting the form of contract design-bid-build / stipulated price

effectively structuring and managing design-build projects 2. factors involved in selecting the form of contract design-bid-build / stipulated price construction November 25, 2009 effectively structuring and managing design-build projects 1. introduction While design-build has become a particularly popular method of project delivery over the past several

More information

ATTACHMENT A. Ozarks Technical Community College Pre-Established Criteria for Construction Management and Design Build Construction Projects

ATTACHMENT A. Ozarks Technical Community College Pre-Established Criteria for Construction Management and Design Build Construction Projects Ozarks Technical Community College Pre-Established Criteria for Construction Management and Design Build Construction Projects Pursuant to Revised Statute of Missouri Section 8.250(3), Ozarks Technical

More information

Best Practices and Trends in Design-Build and Construction Management at-risk from The Municipal Water and Wastewater Design-Build Handbook

Best Practices and Trends in Design-Build and Construction Management at-risk from The Municipal Water and Wastewater Design-Build Handbook Best Practices and Trends in Design-Build and Construction Management at-risk from The Municipal Water and Wastewater Design-Build Handbook Water Design-Build Council March 31, 2011 Kansas City, MO Presentation

More information

Seattle Public Schools The Office of Internal Audit

Seattle Public Schools The Office of Internal Audit seaonly Seattle Public Schools The Office of Internal Audit Capital Internal Audit Report Issue Date: June 16, 2015 Introduction and Background Executive Summary This report contains the results of our

More information

How Owners Should Deal With Changes During Construction And When Claims Are Made After Completion

How Owners Should Deal With Changes During Construction And When Claims Are Made After Completion How Owners Should Deal With Changes During Construction And When Claims Are Made After Completion Presented By: MDCSystems and Duane Morris LLP 1 Featured Speakers: Robert C. McCue, P.E., President MDCSystems

More information

Construction Management vs. General Contractor Method of Contracting POINTS OF VALUE OF THE CONSTRUCTION MANAGEMENT METHOD

Construction Management vs. General Contractor Method of Contracting POINTS OF VALUE OF THE CONSTRUCTION MANAGEMENT METHOD Construction Management vs. General Contractor Method of Contracting POINTS OF VALUE OF THE CONSTRUCTION MANAGEMENT METHOD In an effort to take advantage of our opportunity to discuss with the Owner the

More information

Goals of the Unit. spm - 2014 adolfo villafiorita - introduction to software project management

Goals of the Unit. spm - 2014 adolfo villafiorita - introduction to software project management Project Pricing Goals of the Unit Understanding what are the main factors determining project and project outputs price Learn some strategies to determine price Understanding in more details the procurement

More information

Auditor General Procurement Processes Review - Bid Bonds/Performance Bonds

Auditor General Procurement Processes Review - Bid Bonds/Performance Bonds STAFF REPORT June 22, 2005 To: From: Subject: Administration Committee Deputy City Manager and Chief Financial Officer Auditor General Procurement Processes Review - Bid Bonds/Performance Bonds Purpose:

More information

The Consultant is a person or an entity engaged by the Client or the Architect to provide services supplementary to those provided by the Architect.

The Consultant is a person or an entity engaged by the Client or the Architect to provide services supplementary to those provided by the Architect. Definitions Additional Services Additional Services are those professional services which are not contemplated at the time of execution of the contract and therefore cannot be identified then as being

More information

PROFESSIONAL LIABILITY INSURANCE COVERAGE

PROFESSIONAL LIABILITY INSURANCE COVERAGE Management Advisory 2002,Victor O. Schinnerer & Company, Inc. The information presented here is for risk management guidance. It is not legal advice nor should it be construed to be a determination on

More information

Commercial Management/Quantity Surveying

Commercial Management/Quantity Surveying Commercial Management/Quantity Surveying To exhibit knowledge of all civil engineering contracts, but also to support and recommend strategies to the other members of the construction team. It involves

More information

Amajor benefit of Monte-Carlo schedule analysis is to

Amajor benefit of Monte-Carlo schedule analysis is to 2005 AACE International Transactions RISK.10 The Benefits of Monte- Carlo Schedule Analysis Mr. Jason Verschoor, P.Eng. Amajor benefit of Monte-Carlo schedule analysis is to expose underlying risks to

More information

Shtokman Development AG

Shtokman Development AG Shtokman Development AG Integrated Development of the Shtokman Gas- Condensate Field. Phase 1 SDAG Standard EPC Contract. Main Principles. EPC Contracts What is an EPC contract? - Contract for Engineering,

More information

Comparative Study on Quality Assurance of Construction Project in Taiwan and Japan

Comparative Study on Quality Assurance of Construction Project in Taiwan and Japan Comparative Study on Quality Assurance of Project in Taiwan and Japan Tsung Chieh, T. National Yunlin University of Science & Technology, Taiwan (email: tctsai@ce.yuntech.edu.tw) Furusaka, S. Kyoto University,

More information

2.3.9 Construction Procurement

2.3.9 Construction Procurement 2.3 Management of the Project 2.3.9 Construction Procurement 2.3.9 Canadian Handbook of Practice for Architects Introduction Obtaining Bids Open Competitive Bids (or Public Tender Call) Invited Competitive

More information

Agenda item: Environment & Community Safety Decision meeting

Agenda item: Environment & Community Safety Decision meeting Title of meeting: Agenda item: Environment & Community Safety Decision meeting Date of meeting: 14 th November 2014 Subject: Report by: Wards affected: Key decision: Full Council decision: Waste Disposal

More information

INSE 6230 Total Quality Project Management

INSE 6230 Total Quality Project Management Total Quality Project Management Lecture 9 Project Procurement Management Procurement means acquiring goods and/or services from an outside source Other terms include purchasing and outsourcing Offshoring

More information

Kentucky Department of Education Version of Document A312 2010

Kentucky Department of Education Version of Document A312 2010 Kentucky Department of Education Version of Document A312 2010 Performance Bond CONTRACTOR: (Name, legal status and address) SURETY: (Name, legal status and principal place of business) OWNER: (Name, legal

More information

Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at http://www.leanconstruction.org/usage.

Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at http://www.leanconstruction.org/usage. Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at http://www.leanconstruction.org/usage.pdf when using this file. Thank you. James Evans, Albert Risk Management

More information

What s so Progressive about Progressive Design-Build? Mark Alpert, PE, DBIA CH2MHill & Peter Tunnicliffe, PE, DBIA CDM

What s so Progressive about Progressive Design-Build? Mark Alpert, PE, DBIA CH2MHill & Peter Tunnicliffe, PE, DBIA CDM What s so Progressive about Progressive Design-Build? Mark Alpert, PE, DBIA CH2MHill & Peter Tunnicliffe, PE, DBIA CDM Progressive design-build: A better way? Discussion topics: What is progressive design-build?

More information

ARCHITECTS AND ENGINEERS PROFESSIONAL LIABILITY INSURANCE By Bruce H. Schoumacher

ARCHITECTS AND ENGINEERS PROFESSIONAL LIABILITY INSURANCE By Bruce H. Schoumacher Querrey Harrow When Results Count. SM www.querrey.com Copyright 2005 Querrey & Harrow, Ltd. All Rights Reserved. ARCHITECTS AND ENGINEERS PROFESSIONAL LIABILITY INSURANCE By Bruce H. Schoumacher Architects

More information

AXA Insurance v. Ani-Wall Concrete Forming Coverage for Faulty Concrete

AXA Insurance v. Ani-Wall Concrete Forming Coverage for Faulty Concrete AXA Insurance v. Ani-Wall Concrete Forming Coverage for Faulty Concrete Thomas J. Donnelly THOMAS GOLD PETTINGILL LLP MARCH 2009 AXA Insurance v. Ani-Wall Concrete Forming Coverage for Faulty Concrete

More information

Public-Private Partnerships Forum PPP Law, Structures and Contracting

Public-Private Partnerships Forum PPP Law, Structures and Contracting Public-Private Partnerships Forum PPP Law, Structures and Contracting AGC California Fall Conference 2010 Hyatt Grand Champions, Indian Wells November 4, 2010 MAKING IT HAPPEN. Overview California PPP

More information

Public Health Services - The Cost of Doing Data Centre Project in Ontario, Canada

Public Health Services - The Cost of Doing Data Centre Project in Ontario, Canada VALUE FOR MONEY ASSESSMENT MINISTRY OF GOVERNMENT SERVICES NEW DATA CENTRE - PAGE 1 - - PAGE 2 - - PAGE 3 - - PAGE 4 - Table of Contents Summary...6 Project description...8 Competitive selection process

More information

CHAPTER 2 CONTRACT STRATEGY

CHAPTER 2 CONTRACT STRATEGY CHAPTER 2 CONTRACT STRATEGY At the early stage of a project and once a project manager is selected, the main issue that faces the owner is to decide on the contract strategy that best suits the project

More information

NZQA registered unit standard 25872 version 2 Page 1 of 5. Develop and implement a project plan to deliver on an Infrastructure works contract

NZQA registered unit standard 25872 version 2 Page 1 of 5. Develop and implement a project plan to deliver on an Infrastructure works contract Page 1 of 5 Title Develop and implement a project plan to deliver on an Infrastructure works contract Level 5 Credits 15 Purpose People credited with this unit standard are able to: explain relationship

More information

Procurement Strategy and Contract Selection

Procurement Strategy and Contract Selection GUIDELINE Capital Works Management Framework Procurement Strategy and Contract Selection The suite of Capital Works Management Framework documents is available online www.hpw.qld.gov.au: The Capital Works

More information

Risk in Construction

Risk in Construction Risk in Construction Market Research prepared for June 2014 In association with the Chartered Institution of Civil Engineering Surveyors, The Institution of Civil Engineers and the UK s leading Design

More information

private finance initiative

private finance initiative private finance initiative Lessons Learned We recently held a series of PFI Roundtable Discussions in collaboration with Trowers & Hamlins LLP. Finance managers from throughout the UK were invited to share

More information

Project Management Institute. Construction. Extension to. A Guide to the Project Management Body of Knowledge. PMBOK Guide 2000 Edition.

Project Management Institute. Construction. Extension to. A Guide to the Project Management Body of Knowledge. PMBOK Guide 2000 Edition. Project Management Institute Construction Extension to A Guide to the Project Management Body of Knowledge PMBOK Guide 2000 Edition Provisional Construction Extension to A Guide to the Project Management

More information

How Projects Go Wrong

How Projects Go Wrong How Projects Go Wrong How Projects Go Wrong So, you ve commenced your project the strategic direction is well documented, the operational plan prioritises the plan and critical resources, and the project

More information