1 The European Infrastructure Procurement Symposium 2012 Business Area: Early Contractor Involvement Dr. Konrad Spang Professor Chair of Project Management University of Kassel Germany
2 Definition: Early Contractor Involvement (ECI) Is an approach to use the knowledge of the contractor during the design phase 2
3 Practice ECI is used in: Australia in the Alliance contracting Client and Contractor form an Alliance and are responsible for planning and construction in one team Pain and gain is shared Australia, UK, Germany, Netherlands pure form of ECI 2-phase model, where client and contractor are responsible for planning and construction in one team in the first phase If both agree on a fixed price, the contractor gets the contract for the construction the USA in the Construction Management Model (CM) The Construction Manager advices the client in the designing and in the construction phase. 3
4 Advantages and disadvantages Advantages Higher cost certainty (joint design (client + contractor) Cost reduction (suggestions of the contractor) Higher schedule certainty (joint design (client + contractor) Faster project delivery (innovative suggestions of contractor Better knowledge exchange design and construction Higher design quality because of joint design Minor potential for conflicts because of joint design Optimization of the whole project because of innovative suggestions of the contractor Disadvantages: Maybe more expensive tender phase because of extra payment to the contractor Different interests (client contractor) in the design phase ( no independent consultant ) 4
5 ECI in Germany not possible, because of public regulations such as: Tendering Regulations for public projects (D, EU) Budgetary Regulations (Treasury) Legal approval process for public infrastructure projects And also important: Acceptance by the Ministry of Transport Acceptance by client organisations Acceptance by construction companies Alternative: incentives for optimization in the construction phase 5
6 Partnering Guideline for infrastructure projects in Germany Preamble Element 1: Clear project specifications Element 2: Processes and regulations for project changes Element 3: Fair risk handling Element 4: Joint data systems Element 5: Clear responsibilities Element 6: Conflict Management Element 7: Contractual incentive regulations 6
7 Element 7: Contractual incentive regulations Optimization after contract closure as a compensation for the missing early involvement of the contractors. Contractors can make suggestions for optimising the project If the suggested version is cheaper and the technical equality is proofed, client and contractor share the saved money (e.g. 50 / 50) If the quality of the suggested version is better, the contractor gets a bonus If the contractor can reduce the construction time, he gets a bonus In each case the client can reject suggestions if he doesn t want them 7
8 Element 7: Experiences Slight problems in the startup-phase unfamiliarity with the procedure begin construction and optimization at the same time Definition and the way to proof the equality is important Less conflicts (contractors need consent of client for their suggestions) Higher Quality could be achieved Currently savings of about 2.5 % 8
A GUIDELINE FOR PARTNERSHIP BETWEEN CLIENT AND CONTRACTOR IN INFRASTRUCTURE PROJECTS IN GERMANY
Management and Innovation for a Sustainable Built Environment ISBN: 9789052693958 20 23 June 2011, Amsterdam, The Netherlands A GUIDELINE FOR PARTNERSHIP BETWEEN CLIENT AND CONTRACTOR IN INFRASTRUCTURE
More informationHow to get value for money from service providers on major projects
How to get value for money from service providers on major projects Session Focus Contracting as a relationship Identifying win/win arrangements Procurement & Planning on major projects Understanding the
More informationClient Skills: Skills required by Government as the Construction Industry Client
Client Skills: Skills required by Government as the Construction Industry Client APCC MEMBER AUTHORITIES AS AT JULY 2002 Department of Public Works and Services New South Wales Building Commission Victoria
More informationThe refinancing of the Fazakerley PFI prison contract
Report by the Comptroller and Auditor General The Prison Service The refinancing of the Fazakerley PFI prison contract Ordered by the House of Commons to be printed 26 June 2000 LONDON: The Stationery
More informationDeveloping a Public-Private Partnership Framework: Policies and PPP Units
Note 4 May 2012 Developing a Public-Private Partnership Framework: Policies and PPP Units This note is the fourth in a series of notes on developing a comprehensive policy, legal, and institution framework
More informationKeeping Costs Under Control
Keeping Costs Under Control Project Management issues for Research Infrastructures John Womersley Science and Technology Facilities Council United Kingdom Research Infrastructures Large-scale Research
More informationProcurement Capability Standards
IPAA PROFESSIONAL CAPABILITIES PROJECT Procurement Capability Standards Definition Professional Role Procurement is the process of acquiring goods and/or services. It can include: identifying a procurement
More informationEnsuring regulatory compliance for small satellites through procurement and grant conditions
Ensuring regulatory compliance for small satellites through procurement and grant conditions ITU Symposium, Prague, 2-4 March 2015 Dr. Ingo Baumann & Dr. Oliver Heinrich Introduction and Overview ITU Symposium,
More informationGuaranteed Maximum Price contracts in Western Australia
Guaranteed Maximum Price contracts in Western Australia P. R. Davis 1, D. Stevenson 2 1 Curtin University of Technology Perth WA 2 Project Director INCOLL - Project Management Consultants Corresponding
More informationConnected Health market in Europe Health & Wellness @ Mobile World Congress 2015
European Connected Health Alliance Bringing Together the future of Health, Social Care & Wellness Connected Health market in Europe Health & Wellness @ Mobile World Congress 2015 www.echalliance.com /
More informationHow To Manage A Contract
Contract Management Checklist Preparation This section deals with laying good foundations before a contract is let. The contract should be actively managed. You should have a plan for doing this, which
More informationIntroduction. Evaluating Value for Money. Hans de Kievit Senior PPP Consultant. Projects: Auditing Public Private Partnerships; the work continues
Evaluating Value for Money Auditing Public Private Partnerships; the work continues Seminar for Supreme Audit Institutions 26 and 27 November 2012 The Hague, The Netherlands Introduction Hans de Kievit
More informationInfrastructure Procurement Options Guide
November 2010 Infrastructure Procurement Options Guide Sharing knowledge, developing leading practice and driving innovation to improve government infrastructure planning, delivery and management. Acknowledgements
More informationSchedule 11. The Transfer of Undertakings (Protection of Employment) Regulations 2006
Schedule 11 The Transfer of Undertakings (Protection of Employment) Regulations 2006 1 Definitions 1.1 In this Schedule 11 the following definitions apply: Contractor Personnel means any employee, worker,
More informationThe OECD Symposium on Agencies and Public Private Partnerships 6 th July 2006
The OECD Symposium on Agencies and Public Private Partnerships 6 th July 2006 John Fitzgerald Acting Deputy Secretary, Commercial Division Department of Treasury and Finance, Victoria, Australia Outline
More informationManagement & Leadership
Management & Leadership Overview The Management and Leadership qualifications aim to contribute to the skills, knowledge and overall performance of management and aid career progression. The qualifications
More informationBest Practice in Design of Public-Private Partnerships (PPPs) for Social Infrastructure, particularly in Health Care and Education
EMAIL contact@fosterinfrastructure.com WEB www.fosterinfrastructure.com Best Practice in Design of Public-Private Partnerships (PPPs) for Social Infrastructure, particularly in Health Care and Education
More informationProfessional Practice Commission: March 2013. Alternative Project Delivery Systems
Professional Practice Commission: March 2013 Alternative Project Delivery Systems UIA Accord Building project delivery systems. Definition Building project delivery systems are defined as the contractual
More informationREMUNERATION COMMITTEE
8 December 2015 REMUNERATION COMMITTEE References to the Committee shall mean the Remuneration Committee. References to the Board shall mean the Board of Directors. Reference to the Code shall mean The
More informationPartnership for Market Readiness PA5 Data Management Systems: Key issues and emerging findings
www.pwc.co.uk Partnership for Market Readiness PA5 : Key issues and emerging findings 13 th Preston Auditorium, The World Bank 1818 H Street, NW Washington, DC, USA Contents Introduction Our approach Early
More informationBEST PRACTICE GUIDE 6: ESTABLISHING CONTRACTS. RDTL MINISTRY OF FINANCE Procurement Service
RDTL MINISTRY OF FINANCE Procurement Service BEST PRACTICE GUIDE 6: ESTABLISHING CONTRACTS 1 RDTL Procurement Guidelines The Procurement Legal Regime Decree Law sets out new procurement processes which
More informationHow To Write New Government Construction Contracts
HUSSEY FRASER SOLICITORS 1. Objectives of new contracts 2. How objectives are to be achieved Risk Transfer Procedural / Information Burden 3. Termination Provisions 4. Collateral Warranties 5. Conclusion
More informationHow to Successfully Conduct Price Negotiations in Business Markets
Institute for Market-Oriented Management Competence in Research & Management Prof. Dr. Dr. h.c. mult. Christian Homburg, Prof. Dr. Sabine Kuester IMU Research Insights # 011 How to Successfully Conduct
More informationProcurement Routes. Curtin University of Technology
Procurement Routes An Overview Curtin University of Technology Overview of Principal Routes Traditional / conventional design led Design and construct Management (Fee) Traditional Client appoints consultants
More informationContract risk and assurance
Contract risk and assurance Delivering value from your key contracts and suppliers Maximise performance, confirm costs and gain assurance over your third party relationships and suppliers Performance Risk
More informationE U R O P E A N E C O N O M I C A R E A
E U R O P E A N E C O N O M I C A R E A S T A N D I N G C O M M I T T E E O F T H E E F T A S T A T E S Distribution: EEA EFTA 20 March 2012 SUBCOMMITTEE I ON THE FREE MOVEMENT OF GOODS EEA EFTA Comment
More information6.0 Procurement procedure 1 Infrastructure
Page 6-1 6.0 Procurement procedure 1 Infrastructure 6.1 Overview Introduction Procurement procedure 1 Infrastructure consists of four parts: guidelines for understanding the strategic context for the procurement
More informationLean in Public Sector Workshop
und Management im Baubetrieb Lean in Public Sector Workshop University of California,, Berkeley Prof. Dr.-Ing. Fritz Gehbauer, M.S. March 2009 Contents 1 Existing or Emerging Models in the Private Sector
More informationASSOCIATION OF INDEPENDENT SCHOOLS OF NSW BLOCK GRANT AUTHORITY GUIDE TO PROCUREMENT PROCESSES
ASSOCIATION OF INDEPENDENT SCHOOLS OF NSW BLOCK GRANT AUTHORITY GUIDE TO PROCUREMENT PROCESSES CAPITAL GRANTS PROGRAM / BUILDING GRANTS ASSISTANCE SCHEME Background Non government schools accepting the
More informationThe business case for lowest price tendering?
The business case for lowest price tendering? Health Warning. The use of lowest price tendering may seriously damage your financial health and reputation and may have undesirable and unexpected side effects.
More informationISTITUTO SINDACALE PER LA COOPERAZIONE ALLO SVILUPPO
CALL FOR TENDER FOR THE SUB-CONTRACTING OF THE EXTERNAL EXPERTISE IN THE PROJECT ETUC INITIATIVE TO IMPLEMENT A EUROPEAN NETWORK OF ASSISTANCE FOR INTEGRATION OF MIGRANT WORKERS AND THEIR FAMILIES BACKGROUND
More informationGuide to Current Accounts
Guide to Current Accounts Guide to Current Accounts Banks and building societies can offer you a choice of current accounts, but not all of them are the same. Your preference for a current account can
More informationVerification of need. Assessment of options. Develop Procurement Strategy. Implement Procurement Strategy. Project Delivery. Post Project Review
Who should read this fact sheet? Many construction clients are not regular purchasers of construction work. This fact sheet is an introduction to construction procurement for occasional clients with a
More informationAlliance model in renovation projects, case Vuolukiventie 1
Alliance model in renovation projects, case Vuolukiventie 1 Teppo Salmikivi, Director of Properties University of Helsinki, Center for Properties and Facilities 8.11.2012 Center for Properties and Facilities
More informationPublic Procurements. Where rules are defined. Tirana May27-28, 2013. ADRIARadNet 2nd Meeting
Where rules are defined Tirana May27-28, 2013 1 Suggested manuals INTERACT Point Vienna Public procurement in IPA cross-border cooperation programmes with EU Member States in shared management - Version
More informationDevelopments in the Distribution, Pricing & Product Design of Personal Insurance. Adam Driussi
Developments in the Distribution, Pricing & Product Design of Personal Insurance Adam Driussi Overview Distribution Product Design & Pricing Distribution around the globe Direct Mixture Tied Agents Brokers
More informationNUCLEAR SUPPLY CHAIN SYMPOSIUM
NUCLEAR SUPPLY CHAIN SYMPOSIUM Canadian Contracting Models Darryl J. Brown Gowling Lafleur Henderson LLP November 10, 2015 Suite 1600 1 First Canadian Place 100 King Street West Toronto, Ontario Canada
More informationCROATIA - TURKEY Preparation Screening Bi-lateral meetings List of questions related to key acquis requirements
CROATIA - TURKEY Preparation Screening Bi-lateral meetings List of questions related to key acquis requirements Please describe the provisions in place, and envisaged. Please underline any problem or difficulty
More informationAN INSIDE VIEW FROM THE EU EXPERT GROUP ON CLOUD COMPUTING
AN INSIDE VIEW FROM THE EU EXPERT GROUP ON CLOUD COMPUTING 1. Overview and Background On 27 September 2012, the European Commission adopted a strategy for "Unleashing the potential of cloud computing in
More informationRecruitment Process Outsourcing (RPO)
Recruitment Process Outsourcing (RPO) Successful organisations need to proactively attract and retain high quality talent. When time is limited, outcomes are imperative and costs are a factor, outsourcing
More informationBuilding and Construction Procurement Guide Principles and Options
Building and Construction Procurement Guide Principles and Options Building and Construction Procurement Guide Principles and Options Information retrieval Austroads, 2014, Building and Construction Procurement
More informationHOW TO REDUCE CONFLICTS ON CONSTRUCTION PROJECTS
How to reduce conflicts on construction projects Slide: 1 / 12 HOW TO REDUCE CONFLICTS ON CONSTRUCTION PROJECTS DR. JUDIT GYULAY Head Of Department Department Of Construction Technology & Management Budapest
More informationPROCEDURE FS 1 PROCUREMENT POLICY
PROCEDURE FS 1 PROCUREMENT POLICY CONTENTS Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7 Section 8 Section 9 Section 10 Section 11 Section 12 Section 13 Appendix A Appendix B Appendix
More informationA Users Guide to the recast Late Payment Directive
DIRECTIVE 2011/7/EU ON COMBATING LATE PAYMENT IN COMMERCIAL TRANSACTIONS A Users Guide to the recast Late Payment Directive OCTOBER 2014) Contents Contents.2 Summary...3 Summary of new measures 4 What
More informationSteel procurement in major projects: Guidance on the application of social issues. Purpose
Steel procurement in major projects: Guidance on the application of social issues Purpose 1. This is a practical guide on how to incorporate social issues in major projects with a significant steel component.
More informationPPP Motivations and Challenges for the Public Sector Why (not) and how
European PPP Expertise Centre European PPP Expertise Centre PPP Motivations and Challenges for the Public Sector Why (not) and how October 2015 PPP Motivations and Challenges for the Public Sector Why
More informationHealth and Care Professions Council 18 October 2012
Health and Care Professions Council 18 October 2012 Indemnity Cover Arrangements as a Condition of Registration Introduction 1. In the coming months, the Council will need to address the issue of mandatory
More informationChief Executive. Board. Over 500,000. Up to 500,000
10. SUMMARY OF FINANCIAL DELEGATED LIMITS s Business Cases The introduction or discontinuance of any significant activity or operation not already approved within the Business Plan. This includes outsourcing
More informationEUROPEAN COMPARISON OF ECONOMIC INCENTIVES IN OCCUPATIONAL SAFETY AND HEALTH
EUROPEAN COMPARISON OF ECONOMIC INCENTIVES IN OCCUPATIONAL SAFETY AND HEALTH Elsler, D. European Agency for Safety and Health at Work, E 48009 Bilbao E-mail: elsler@osha.europa.eu Economic incentives aim
More informationMay 2013. Grafton Group. Clinical contracting considerations
May 2013 Grafton Group Clinical contracting considerations Grafton Group The Grafton Group is a group of nine CCGs comprising Cumbria, North East Lincolnshire, Leeds South and East, Principia Rushcliffe,
More informationInternational Students' Attitudes to Postgraduate Study in Australia and New Zealand Survey 2013
International Students' Attitudes to Postgraduate Study in Australia and New Zealand Survey 2013 Introduction Working with StudyOptions, our survey aimed to find out potential postgraduate students' attitudes
More informationWHERE SAVERS COME FIRST. (Issue 3) BEST ISA PROVIDER BEST SAVINGS ACCOUNT PROVIDER
WHERE SAVERS COME FIRST (Issue 3) BEST ISA PROVIDER BEST SAVINGS ACCOUNT PROVIDER The Financial Services Authority is the independent Financial Services regulator. It requires us, BM Savings, a division
More informationCONTRACTOR PERFORMANCE SYSTEM PROCEDURAL DOCUMENT. Revision date: May 25, 2015
CONTRACTOR PERFORMANCE SYSTEM PROCEDURAL DOCUMENT Revision date: May 25, 2015 Table of Contents 1. DEFINITIONS... 3 2. PURPOSE... 3 3. PROJECT EVALUATORS... 3 4. PROJECT EVALUATION FORMS... 3 5. FREQUENCY
More informationRDTL Procurement Best Practice Guide 7: Managing Contracts. RDTL MINISTRY OF FINANCE Procurement Service BEST PRACTICE GUIDE 7: MANAGING CONTRACTS
RDTL MINISTRY OF FINANCE Procurement Service BEST PRACTICE GUIDE 7: MANAGING CONTRACTS 1 RDTL Procurement Guidelines The Procurement Legal Regime Decree Law sets out new procurement processes which must
More informationVOLUNTARY CONTRACT NOTICE FOR UPCOMING PROCUREMENT PROCEDURE DEADLINE EXTENDED TO 26 OCTOBER
VOLUNTARY CONTRACT NOTICE FOR UPCOMING PROCUREMENT PROCEDURE PROVISION OF MEDICAL SERVICES WITH REGARD TO OCCUPATIONAL SAFETY AND HEALTH DEADLINE EXTENDED TO 26 OCTOBER (REFERENCE NUMBER: PRO-001265) Title:
More informationProcurement Performance model
Procurement Performance model The Procurement Performance Model develops key questions as reference pointers for auditors evaluating the performance of the procurement function in public sector bodies.
More informationDo not remove this if sending to pagerunnerr Page Title. Strategic Highways Company Outline for the Framework Document
Do not remove this if sending to pagerunnerr Page Title Strategic Highways Company Outline for the Framework Document Introduction Purpose of this note The Framework Document is a key part of the governance
More informationModule 1 Diploma of Project Management
Module 1 Diploma of Project Management Project Management Fundamentals in association with This two day course takes participants through all aspects of Project Management and provides in depth examination
More informationUNSOLICITED PROPOSALS
UNSOLICITED PROPOSALS GUIDE FOR SUBMISSION AND ASSESSMENT January 2012 CONTENTS 1 PREMIER S STATEMENT 3 2 INTRODUCTION 3 3 GUIDING PRINCIPLES 5 3.1 OPTIMISE OUTCOMES 5 3.2 ASSESSMENT CRITERIA 5 3.3 PROBITY
More informationFostering RE deployment
Fostering RE deployment Lessons learnt from IEA-RETD Dr. Matthew Kennedy IEA-RETD Chair Supporting deployment of low-carbon technologies in the ETC and SEMED regions Istanbul, Turkey, 15-16 June 2015 Background
More informationPlease send your responses via email, to: PFIevidence@hmtreasury.gsi.gov.uk. Respondent details. Mark Redhead. Head of Policy
REFORM OF THE PRIVATE FINANCE INITIATIVE RESPONSE Please send your responses via email, to: PFIevidence@hmtreasury.gsi.gov.uk The deadline for responses is Friday 10 February 2012. Respondent details Your
More informationCommercial Management/Quantity Surveying
Commercial Management/Quantity Surveying To exhibit knowledge of all civil engineering contracts, but also to support and recommend strategies to the other members of the construction team. It involves
More informationOpen Source Certification GmbH LINUX Professional Institute (LPI) CENTRAL EUROPE CERTIFIED SOLUTION PROVIDER Agreement
This agreement is made between: (hereafter, Partner ) and: Open Source Certification GmbH, LPI Central Europe, Karthäuserstraße 8, 34117 Kassel, Germany, (hereafter, LPI CE ) The parties agree to the following:
More informationDemand Oriented Innovation Policy
Demand Oriented Innovation Policy Presentation at the Six Countries Programme INNOVATION AND PROCUREMENT WORKSHOP Manchester, November 16, 2005 Jakob Edler for jakob.edler@isi.fraunhofer.de Structure Definition
More informationAdvisory Note - October 2005. Disclosure and management of conflict of interest for advisers
Advisory Note - October 2005 Disclosure and management of conflict of interest for advisers The Secretary Department of Treasury and Finance 1 Treasury Place, Melbourne Victoria 3002 Australia Telephone:
More informationIntroduction from the Chair - Michael Burnett
OECD International Transport Forum Roundtable: Public-Private Partnerships for Transport Infrastructure Renegotiations - How to approach them and economic outcomes, George Mason University, Washington
More informationPerformance Concept in Buildings
A COORDINATOR'S VISION by George Ang and Leo Hendriks George Ang and Leo Hendriks have taken over the leadership of W60 and were introduced to readers earlier. Here they set out their vision of the Performance
More informationPOLICY CONTRACT MANAGEMENT POLICY POLICY STATEMENT
POLICY CONTRACT MANAGEMENT POLICY POLICY STATEMENT The intent of this policy is to establish a University-wide governance structure for managing contracts and other legally binding documents. The Policy
More informationThe Debt Management Office
The Debt Management Office Based on a client presentation October 2010 1 Outline The Debt Management Office Different institutional arrangements Internal organisation and operation Building a DMO What
More informationProfessional Standards Capability Program
Procurement Title of document Professional - Avante Garde Capability 18pt, 80% Standard black Professional Standards Capability Program VERSION 1 5 th Feb 2014 IPAA PROCUREMENT PROFESSIONAL CAPABILITY
More informationHow To Run A Hospital Trust
Southend University Hospital NHS Foundation Trust Scheme of Financial Delegation Approved August 2012 CONTENTS SECTION TITLE PAGE 1 INTRODUCTION 4 2 DEFINITIONS 5 3 BUDGETARY MANAGEMENT 7 3.1 APPROVAL
More informationProvisional Measures for Construction Project Management
Provisional Measures for Construction Project Management Article 1 Article 2 Purpose and Basis This Provisional Measure is promulgated in accordance with relevant Chinese laws and administrative regulations
More informationNATIONAL COMPETENCY STANDARDS FOR QUANTITY SURVEYORS - CONSTRUCTION ECONOMISTS
NATIONAL COMPETENCY STANDARDS FOR QUANTITY SURVEYORS - CONSTRUCTION ECONOMISTS THE AUSTRALIAN INSTITUTE OF QUANTITY SURVEYORS THE AUSTRALIAN INSTITUTE OF QUANTITY SURVEYORS NATIONAL COMPETENCY STANDARDS
More informationInventarisatie toepassing EU btw-regelgeving op hoveniersdiensten
Inventarisatie toepassing EU btw-regelgeving op hoveniersdiensten Governments can stimulate citizens to contribute to ecological, social and economic goals. By using a reduced VAT-rate for private gardening
More informationExpenditure on Health Care in the UK: A Review of the Issues
Expenditure on Health Care in the UK: A Review of the Issues Carol Propper Department of Economics and CMPO, University of Bristol NIERC 25 April 2001 1 Expenditure on health care in the UK: The facts
More information1.040 Project Management
MIT OpenCourseWare http://ocw.mit.edu 1.040 Project Management Spring 2009 For information about citing these materials or our Terms of Use, visit: http://ocw.mit.edu/terms. Project Organization Project
More informationGUIDE FOR USING THE FRAMEWORK AGREEMENT FOR: Executive Recruitment APUC REFERENCE: BA-PFB015
GUIDE FOR USING THE FRAMEWORK AGREEMENT FOR: Executive Recruitment APUC REFERENCE: BA-PFB015 Contract period 11/06/2012 to 10/06/2015 With 1 year option to extend Awarded by APUC, and open to: 1 TABLE
More informationCapability Statement. www.agonisgroup.com.au
www.agonisgroup.com.au Our team s superior methods stem from our extensive construction management experience, challenging the accepted and maintaining flexibility in our approach. Page 2 Agonis Group
More informationLPI Approved Training Partner (LPI ATP) Program Agreement
The following agreement is herewith concluded between: - hereinafter Partner - and Open Source Certification GmbH, LPI Central Europe, Karthäuserstraße 8, 34117 Kassel, Germany, (hereafter, LPI CE ) Preamble
More information4. We understand this to mean that each provider state will need to ensure indemnity arrangements are in place to cover healthcare provided in that
Medical Defence Union response to consultation on European Commission s proposals for Directive on the application of patients rights in cross-border healthcare Introduction 1. The Medical Defence Union
More informationAchieving Excellence in Construction. A manager s checklist. Construction projects
Achieving Excellence in Construction A manager s checklist Construction projects Construction projects A manager s checklist This document outlines the key questions that a Senior Responsible Owner (SRO)
More informationoperating under private management, but with payments from the public to the private partner much higher than initially contracted.
BEST PRACTICE UNECE PPP Newsletter Issue 3 PPP hospitals and the Portuguese experience Mr. Rui Sousa Monteiro, Senior Economist PPP Unit, Parpública SA, Portugal Mr. Rui Sousa Monteiro is one of the region
More informationGeneral Conditions of Purchase (as of March 2002) Abbr.: AEB 03-2002 of the Salzgitter Bauelemente GmbH, Salzgitter
General Conditions of Purchase (as of March 2002) Abbr.: AEB 03-2002 of the Salzgitter Bauelemente GmbH, Salzgitter 1. Area of validity (1) The present conditions shall apply to all supplies and services
More informationChapter 1 Introduction to Contract Management and Administration
Chapter 1 Introduction to Contract Management and Administration Definitions What is Contract Management? Contract management is the process that ensures both parties to a contract fully understand their
More informationNEC Users Group Workshop Defined Cost
NEC Users Group Workshop Defined Cost Ian.Heaphy@turntown.com; July 2014 Turner & Townsend plc July 14 making the difference Introduction Practicalities in assessing of Defined Cost & Disallowed Cost Assumption
More informationState or Market? International Experiences with Outsourcing and Public-Private Partnership
State or Market? International Experiences with Outsourcing and Public-Private Partnership IZA/World Bank/OECD Conference on Activation and Employment Support Policies 2012/04/30-2012/05/01 Bahcesehir
More informationAnnex 2C International comparisons of gas and electricity prices
Annex 2C International comparisons of gas and electricity prices Wholesale gas prices in the UK have risen between 23 and 24. This has caused industrial and domestic gas prices to increase and the gap
More informationBENVGPM5: The Procurement of Construction, Engineering and Professional Services (David Coles)
Enterprise-based Modules for MSc Construction Economics & Management BENVGPM3: Managing the enterprise-project relationship BENVGPM5: The Procurement of Construction, Engineering and Professional Services
More informationCONTRACT MANAGEMENT FRAMEWORK
CONTRACT MANAGEMENT FRAMEWORK August 2010 Page 1 of 20 Table of contents 1 Introduction to the CMF... 3 1.1 Purpose and scope of the CMF... 3 1.2 Importance of contract management... 4 1.3 Managing contracts...
More informationDigital broadcasting and online content delivery
Digital broadcasting and online content delivery John McInnes Webb Henderson LLP 13 th Global Symposium for Regulators 4th Generation regulation: driving digital communications ahead Warsaw, Poland, 3-5
More informationData transfers in the Cloud
Data transfers in the Cloud Rapporteur: Emmanuelle Bartoli Meeting date: 28 th March 2014 1 The purpose of this document is to explore options for how contracts between Cloud providers and consumers and
More informationChannel Four Television Corporation
Channel Four Television Corporation Remuneration Committee Terms of Reference Updated: February 2013 P Carter Page 1 Remuneration Committee Purpose: The Corporation through the Remuneration Committee deals
More informationTrends in Non-Competitive and Single Source Procurements
Trends in Non-Competitive and Single Source Procurements Definition Single source procurement is defined as procurement that takes place after soliciting with only one supplier. While single sourcing can
More informationInsurance Europe response to the EC consultation on the re-launch of the Common Consolidated Corporate Tax Base (CCCTB)
Position Paper Insurance Europe response to the EC consultation on the re-launch of the Common Consolidated Corporate Tax Base (CCCTB) Our reference: Referring to: ECO-TAX-15-165 Date: 6 January 2016 European
More informationFinancial Services Guide (FSG)
Authorised for distribution by: Eastwoods Wealth Management Pty Ltd trading as Beyond Bank Australia Wealth Management ABN 17 008 167 002 Australian Financial Services Licensee 237853 62 The Parade, Norwood
More informationShtokman Development AG
Shtokman Development AG Integrated Development of the Shtokman Gas- Condensate Field. Phase 1 SDAG Standard EPC Contract. Main Principles. EPC Contracts What is an EPC contract? - Contract for Engineering,
More information2do Congreso Latinoamericano «BIM LATAM 2015» BIM: Estrategia gubernamental de implementación en el Reino Unido y la Comunidad Europea.
2do Congreso Latinoamericano «BIM LATAM 2015» 11 de noviembre de 2015 BIM: Estrategia gubernamental de implementación en el Reino Unido y la Comunidad Europea Adam Matthews Head of Europe & International
More information1 Executive Summary 3 1.1 Physical deliverability of the plan 3 1.2 Commercial deliverability 3. 2 Confidentiality note 6
Contents 1 Executive Summary 3 1.1 Physical deliverability of the plan 3 1.2 Commercial deliverability 3 2 Confidentiality note 6 This annex has been updated to reflect UK Power Networks March 2014 business
More informationElectricity Settlements Company Ltd Framework Document
Electricity Settlements Company Ltd Framework Document This framework document has been drawn up by the Department of Energy and Climate Change in consultation with the Electricity Settlements Company.
More informationThird EU Health Programme 2014-2020
Third EU Health Programme 2014-2020 Procurement and Service contracts Dirk MEUSEL European Commission Health, Agriculture and Food (Chafea) Luxembourg Overview Major differences of service contracts to
More information