1 NHCRWA BOARD VISITS NORTHEAST WATER PURIFICATION PLANT If you have ever wondered what roughly $100 million will buy these days, there s a major construction project adjacent to Lake Houston that provides an excellent example of a $97.6 million capital expenditure. That s the price tag for the Northeast Water Purification System Project (NEWPS) currently under construction for the City of Houston that will supply wholesale treated surface water from the Lake to the City as well as to the North Harris County Regional Water Authority, Humble and numerous other local MUDs. Harris County has traditionally relied on groundwater drawn from a complex system of aquifers that occur at various depths throughout the state. By just about any standard, this has been some of the cheapest water in the country. Due in part to the rapid and sustained growth and development of the Houston area, this critical underground water supply is being depleted and the aquifer levels have dropped alarmingly -- as much as 200 feet in some areas. In some locations, this groundwater depletion has also caused significant subsidence of between 1 to 6 feet. In fact, we re taking water out of our aquifers about 10 times faster than they can recharge, and this is causing major problems in some of our local wells. There isn t a commodity on earth that can be taken so relentlessly without an opportunity to be replenished. Looking Ahead... More than 50 years ago, the City of Houston developed a long-range water supply plan that included the creation of man-made lakes and the confirmation of some important water rights in order to be able to meet steadily increasing demands for potable water. Houston s future role as the nation s top energy producer was already visible on the horizon, and this expansion would be accompanied by an influx of people and business development to support it. Reviewing Houston s aggressive plan to secure our water future takes us through some of the city s most dazzling peaks of economic growth and prosperity and some valleys, as well. At the end of WWII, recognizing its extremely favorable geographic and economic situation, the Houston Chamber of Commerce outlined a strategy designed to make Houston a great city as well as a big city. Its chairman, Jesse H. Jones, outlined the top three goals as: 1. Job creation (utilization of natural resources and diversification); 2. Expanding the Port of Houston; and 3. Providing a large, long-range and dependable supply of fresh water for domestic and industrial use. The emphasis during previous years of Houston s history (1836 to 1945) might have been on growth, but the Chamber recognized that in the future the emphasis had to be on the factors that would make this growth livable. In 1947, a study by the Chamber s Water Supply Committee confirmed the need for a proper and systematic development of groundwater resources, and urged financing, construction and expansion of the area s surface water storage and distribution facilities. In 1949, television came to Houston, and an ambitious annexation program approved by City Council was carried out. This increased the city limits from 74 square miles to 216 square miles (by adding roughly a two-mile belt around the city)...with an estimated population of 620,000. Oil companies began moving their headquarters to Houston in 1950 and the construction of the Texas Medical Center was well underway. The Galveston freeway opened and metropolitan Houston or Harris County passed the magic million mark in population. Construction finally got underway on the San Jacinto Dam project to provide Houston with a major source of surface water -- $20 million financed by
2 bond elections in 1944 and The project was designed to provide a dependable yield of 150 million gallons per day. The Lake Houston dam on the San Jacinto river, four miles north of Sheldon, was begun in 1951 and completed in It was originally built by the City of Houston for municipal, industrial, recreational, mining, and irrigation purposes. The east water purification plant was finished in 1954 and as it was reported by the City, The water was so clean there was hardly any need to treat it. There was widespread drought in 1953 that not only caused a dramatic decline in the number of livestock on the ranches in West Texas, but created serious water supply problems in more than 100 Texas towns. This drought experience -- and the firm conviction that an adequate water supply is essential to sustained economic growth and prosperity -- prompted the Chamber s Water Supply Committee to explore additional potential sources of future water supply that included the Colorado, Brazos, San Jacinto and Trinity Rivers. Water consumption consistently overran projections. In 1943, for example, the City s consultants forecast a demand of 268 million gallons of water per day by This demand was actually realized a little over 10 years later in The 1947 study confirmed that water supply is a complex matter, with legal, political and financial as well as engineering aspects. It was hard to imagine water becoming a priority need in an area with an average annual rainfall of about 50 inches and with what seemed to be an inexhaustible groundwater resource. The earlier leadership could also not anticipate the spiraling rise in per capita use of water -- for residential, industrial and agricultural purposes. And they didn t expect that aggressively drawing down the groundwater reserves would cause significant subsidence. In short, we took our water supplies completely for granted, and undervalued this finite natural resource, as well. In 1954, with the San Jacinto River project complete, the Water Supply Committee turned its attention to a conservation-storage project on the Trinity River, and proposals were taken before the Texas Legislature to create a Trinity River Authority to develop this stream for multiple purpose uses, and to preserve the rights to buy water from the Trinity River at reasonable rates negotiated through regular state agencies. By 1956, water supply was identified as Houston s number one problem by the Chamber s leadership and the Mayor, as well. Mayor Oscar Holcombe had a comprehensive study completed to consider the feasibility of a dam and reservoir project on the Trinity River. A water rate increase to finance the project -- under Mayor Lewis Cutrer -- became a hot political issue, and the project dragged on until the election of Mayor Louie Welch. The City entered into a contract with the Trinity River Authority to build the dam and reservoir to insure the Houston area an adequate supply for the next 50 years. After years of wrangling, ground was broken for the Lake Livingston Dam in November The Chamber s president at the time, Mason G. Lockwood, heralded the agreement between the city and the Trinity River Authority as one of the most significant events of our time. The 1960 census showed that there were 1.24 million people in Harris County -- up 54 percent in just 10 years. This increase for Houston was approximately seven times the 8.2 percent average for the nation s other large cities. Houston s selection as home for NASA in 1961 and the inauguration of the manned flight space program put the city in the center of the world s stage. This decision came just one day after the city reached the 1 million population milestone. By the time the 1970 census rolled around, the City of Houston s population equalled 1.2 million -- the population for all of Harris County just a decade earlier. In 1974, the Chamber calculated that 55,000 new people were moving to Houston every year. By 1978, 539 energy companies had their headquarters here. Construction began on Lake Conroe in 1970,
3 to add another source of surface water for Houston on the West Fork of the San Jacinto River. The lake was completed in 1973, and soon enjoyed massive recreational development. The Harris Galveston Coastal Subsidence District was created by the Texas Legislature in 1975 to regulate and reduce the withdrawal of groundwater. By 1976, the District had begun the process of compiling hydrologic information on the Chicot and Evangeline aquifers, engineering planning information on water usage and water supply in Harris and Galveston Counties, and implementing regulatory procedures associated with the first groundwater regulatory plan. Their first District Plan was initially adopted in 1977, then revised in 1985 and again The latest District Regulatory Plan (1999 and revised in 2001) was developed for the period through the year 2030, with an overall goal to reduce groundwater withdrawal to no more than 20% of total water demand. This Plan establishes policy in the areas of groundwater regulation, permits and enforcement and establishes District regulatory areas and regulatory requirements for each area. Enter the HAWC... To help address the regional water supply issues, in 2000 the City of Houston created the Houston Area Water Corporation (HAWC) to develop the Northeast Water Purification System Plant at Lake Houston to provide wholesale treated surface water to the North Harris County Regional Water Authority, other water customers, as well as the City. The City issued a Request for Submittals to identify private sector companies to perform construction on the NEWPS and subsequently contracted with MWH to design, build and operate the plant. Other partners include: the City of Houston (Project Management); Locke Liddell & Sapp (Corporate Counsel); CH2MHILL (General Engineering Consultant); PBS&J (Owner Representative - Plant); Weston Solutions (Owner Representative - Pipeline); and A. O. Phillips (Diversity Consultant). Contract negotiations were completed in 2001 for the Service Agreement and Fixed Construction Price of $92,206,000 for the 40 million gallon a day water purification plant and a 10 mile-long water pipeline. HAWC will oversee the contract operation for 10 years, with the potential to extend the contract for two more 5-year terms. The plant has an initial capability of expanding to 80 mgd, and is designed for future expansion to 240 mgd by The plant s maximum construction expansion capacity is 430 mgd. The new water purification plant is situated on the west side of Lake Houston, and consists of a raw water intake; a water pump station to bring water into the plant from the Lake; the purification plant; chemical and ultra violet (UV) disinfection facilities; 10 million gallon ground storage tank; and a high-service pump station for transmitting the water out into the pipeline. Construction began in April NHCRWA Board Visit... By the end of June 2003 when the Board of Directors of the North Harris County Regional Water Authority visited the 240 acre site, 73 percent of the work on the project was in place within 53 percent of the contract schedule. Due to the cost of easement acquisition, the total project cost was increased to $97,609,686, with $13,733,000 allocated for development costs and $83,876,686 for construction. In addition to Board members Ron Graham, Len Sigler, Jim Pulliam, Al Rendl and Kelly Fessler, two of Houston s former Directors of Public Works -- Jimmie Schindewolf (now NHCRWA General Manager) and Tom Rolen (now the Authority s Engineering Manager) were present for the briefing and tour. Having been with the City when many of the historic water supply decisions were being made, their insight and observations added another dimension to the visit. Schindewolf commented that it was especially rewarding to visit the plant and to see a 20- year vision actually become a reality. Having been involved in the original purchase of the site all those years ago, it is truly exciting to see this historic project come online. MWH Constructors won the Association of General Contractors National Award for Safety Excellence for all of its sites including the NEWPS, which has had 528 days (as of the visit) with no lost time accidents. The project has over 80 subcontractors, a substantial portion of which are small, disadvantaged, women or minority contractors. On hand to conduct the briefing and tour for the Board were Todd Larson, P.E., Vice President and NEWPS Project Manager for MWH Constructors; Dominic G Benoba, P.E., NEWPS Project Manager for the HAWC/Chief of Operations/Chief Engineer, City of Houston Public Works Department; Fred Bauhof, P.E., HAWC General Engineering Consultant/Water Business Group Manager, CH2MHill; Doug Garnett,.
4 (Left to right, top down) Len Sigler, Jimmie Schindewolf,Tom Rolen, Ron Graham, Kelly Fessler, Jim Pulliam, Al Rendl, Fred Bauhof, Dominic G Benoba, Todd Larson, and Doug Garnett. P.E., HAWC Owner Representative-Pipeline, Project Manager, Weston Solutions; Trent Slovak, P.E., HAWC Owner Representative-Plant, Project Manager; and Gary Oradat, Deputy Director of Engineering, Construction, and Real Estate, City of Houston Public Works and Engineering Department. The Plant wil have appropriate levels of security measures to protect the facility. According to Gary Oradat, This facility will meet the needs of the Authority and the City of Houston for the foreseeable future. The new water purification plant is expected to be complete and in operation on June 15, 2004, and the Board anticipates another visit to the site as construction nears completion. Barbara Payne NHCRWA Communications Board member Al Rendl, 6 6 tall, stands in the 84 inch pipe with room to spare. Board members Sigler, Graham and Fessler, stand in front of the 10 million gallon water storage tank. The 84 inch pipe segments along Beltway 8.
5 The NHCRWA board members and consultant team members assemble in the relentless June sunshine to begin the tour. Gary Oradat (left) visited with Jimmie Schindewolf. (Left to right) Jimmie Schindewolf, Len Sigler, Jim Pulliam, Kelly Fessler, Ron Graham, Al Rendl, and Gary Ordat at the new Administration Bldg. Ultra Violet (UV) lamp bulbs are used for final disinfection in addition to chloramines. The reflective tape on the Board members safety vests glowed in the filter building s underground pipe gallery. Board members (left to right) Pulliam, Fessler, and Rendl joined Todd Larson (center) and Dominic G Benoba in treking over the construction site, muddied by recent heavy rains.
Facing The Challenges In Houston s Water System: Past, Present, and Future
Facing The Challenges In Houston s Water System: Past, Present, and Future Jun Chang, P.E. D.WRE Deputy Director Department of Public Works and Engineering Presented to HCEC February 17, 2012 Past Regulatory
ARIZONA DEPARTMENT OF WATER RESOURCES
ARIZONA DEPARTMENT OF WATER RESOURCES WATER MANAGEMENT REQUIREMENTS FOR SOLAR POWER PLANTS IN ARIZONA ADWR CONTACT: Jeff Tannler, Statewide Active Management Area Director Arizona Department of Water Resources
LDPCSD Water Supply Emergency Response Plan Status Update 2-4-15
LDPCSD Water Supply Emergency Response Plan Status Update 2-4-15 1 EMERGENCY OVERVIEW The Lake Don Pedro Community Services District (LDPCSD) provides domestic potable water service to 1450 connections
Plan Groundwater Procurement, Implementation and Costs, prepared for the Brazos River Authority, July 2005.
6 Conjunctive Use 6.1 Lake Granger Augmentation 6.1.1 Description of Option Rapid population growth and development in Williamson County require additional water supplies throughout the planning period.
SERVING WITH SUCCESS WILLOWS WATER. Willows Water District 6930 South Holly Circle Centennial, Colorado 80112 303-770-8625 www.willowswater.
Willows Water District 6930 South Holly Circle Centennial, Colorado 80112 303-770-8625 www.willowswater.org WILLOWS WATER. SERVING WITH SUCCESS Willows office building is located at 6930 S. Holly Circle.
Roosevelt Water Conservation District ROOSEVELT WATER CONSERVATION DISTRICT
ROOSEVELT WATER CONSERVATION DISTRICT RESPONSE TO ARIZONA POWER AUTHORITY REQUEST FOR INFORMATION DATED SEPTEMBER 12, 2012 PRESENTED OCTOBER 24, 2012 RWCD is an irrigation district that was established
North San Jose Neighborhoods Planning Taskforce
North San Jose Neighborhoods Planning Taskforce Key Topics Water Supply Flooding Related Topics Storm Water Storm Sewer Sanitary Sewer Water Conservation Treatment Plant Water Background Responsible Agencies
A Long-Range Plan: Melbourne s Drinking Water Supply
April 2002 A Long-Range Plan: Melbourne s Drinking Water Supply The long-term water supply of South Brevard County must be dependable, flexible, and affordable. With those goals in mind, we continue to
LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN
1 AUGUST 2011 LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN KEY ELEMENTS OF THE PLAN: 1. Replace the existing unsafe Ragged Mountain dam with a new dam and raise the reservoir pool level initially
Water Utility Financial Plan and Rates Study
FINAL March 2015 Prepared for City of Fresno, California Water Utility Financial Plan and Rates Study Submitted by F I N A L Water Utility Financial Plan and Rates Study Prepared for City of Fresno, California
STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS. SECTION DESCRIPTION Page
STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS SECTION DESCRIPTION Page 1 Executive Summary / Brief History 2 2 Services Provided / Administration
Municipal Water District of Orange County. Regional Urban Water Management Plan
Municipal Water District of Orange County Regional Urban Water Management Plan Municipal Water District of Orange County Water Reliability Challenges and Solutions Matt Stone Associate General Manager
Maricopa Association of Governments. Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS. August 2001
Maricopa Association of Governments Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS August 2001 3033 NORTH 44TH STREET, SUITE 101 PHOENIX, ARIZONA 85018 (602) 263-9500 FAX (602) 265-1422 Technical
AQUIFER STORAGE RECOVERY
AQUIFER STORAGE RECOVERY This continuing education unit has been created to acquaint the reader with the topic of Aquifer Storage Recovery. The International School of Well Drilling gratefully acknowledges
Getting More Out of the Water We Have
Water Recycling and Reuse California has the potential to recycle enough water to meet 30-50% of the household water needs of our projected population growth. California Recycled Water Task Force Getting
Vista Ridge Water Transmission & Purchase Agreement
Vista Ridge Water Transmission & Purchase Agreement Doug Evanson Senior Vice President/Chief Financial Officer Rates Advisory Committee Concentric Sources of Supply Canyon Lake Trinity Aquifer CRWA Lake
Water Recycles poster
Water Recycles poster The "Water ReCycles" poster is designed for students of all ages. It shows the natural water cycle and humans influence on water resources. Raincloud illustration The raincloud in
Colorado Springs Utilities
CASE STUDY Colorado Springs Utilities A City Prepared for an Uncertain Future: Colorado Springs Utilities Balances Water Conservation and Revenue Stability In partnership with SUMMARY Colorado Springs
Addressing Declining Elevations in Lake Mead
Integrated Resource Planning Advisory Committee July 23, 2014 Addressing Declining Elevations in Lake Mead 1 Meeting Topics Drought update Attribute finalization Interbasin Cooperation Intake Pumping Station
CALIFORNIA AMERICAN WATER LOS ANGELES DISTRICT 2009 GENERAL RATE CASE CHAPTER: 1 INTRODUCTION AND SUMMARY OF APPLICATION
DISCUSSION OF INFORMATION PRESENTED IN THIS CHAPTER This chapter contains information regarding the operation of the Los Angeles District of California American Water as well as tables that summarize the
Public Opinions, Attitudes and Awareness Regarding Water in Colorado
Public Opinions, Attitudes and Awareness Regarding Water in Colorado Colorado Water Conservation Board FINAL REPORT Final Report July 22, 2013 Public Opinions, Attitudes and Awareness Regarding Water in
GROUNDWATER CONDITIONS
GROUNDWATER CONDITIONS IN THE NORTHERN SACRAMENTO VALLEY LOCAL MANAGEMENT OF WATER RESOURCES IN THE NORTHERN SACRAMENTO VALLEY MEETING DECEMBER 16, 2011 KELLY STATON, SENIOR ENGINEERING GEOLOGIST, GROUNDWATER
MINUTES WEST HARRIS COUNTY REGIONAL WATER AUTHORITY. November 12, 2014
MINUTES WEST HARRIS COUNTY REGIONAL WATER AUTHORITY November 12, 2014 The Board of Directors (the Board ) of the West Harris County Regional Water Authority (the Authority ) met in regular session, open
3.6.1 Existing Conditions - Police, Fire, Ambulance, Water, Sewer, & Solid Waste
3.6 3.6.1 Existing Conditions - Police, Fire, Ambulance, Water, Sewer, & Solid Waste Police Protection The Clarkstown Police Department provides police protection services to properties within the 40 square
Foothill Municipal Water District Recycled Water Project
Foothill Municipal Water District Recycled Water Project Update to Incorporate a Watershed Approach Introduction This paper will describe the Foothill Municipal Water District (FMWD) Recycled Water Project,
4 Water supply description
4 Water supply description A description of the drinking-water system is equally applicable to large utilities with piped distribution systems, piped and non-piped community supplies, including handpumps
EMERGENCY STORAGE PROJECT
EMERGENCY STORAGE PROJECT San Vicente Pipeline San Vicente Pumping Facilities San Vicente Interconnect Pipeline San Vicente Dam Raise Carryover Storage Project Briefing Summary DATE: May 21, 2008 ORGANIZATION:
CITY OF BEVERLY HILLS URBAN WATER MANAGEMENT PLAN
2005 URBAN WATER MANAGEMENT PLAN Mayor Linda J. Briskman Vice Mayor Stephen P. Webb City Council Jimmy Delshad Frank M. Fenton Barry Brucker City Manager Roderick J. Wood Director of Public Works David
Update on Aquifer Storage and Recovery
Update on Aquifer Storage and Recovery Dean Powell Bureau Chief Water Supply Bureau Governing Board Workshop September 2013 Objectives Discuss the basics of aquifer storage and recovery (ASR) technology
Industrial Water Use in the United States. U.S. Department of the Interior U.S. Geological Survey
Industrial Water Use in the United States Methods, Status, t and Trends U.S. Department of the Interior U.S. Geological Survey Water withdrawals by category Livestock Self-Supplied Supplied Domestic Public
San Francisco Water Powe Sewer Services of the San Francisco Public Utilities Commission
San Francisco Water Powe Sewer Services of the San Francisco Public Utilities Commission 525 Golden Gate Avenue, 13th Floor San Francisco, CA 94102 T 415.554.3155 F 415.554.3161 TTY 415.554.3488 January
Increasing water availability through juniper control.
Tim Deboodt, OSU Crook County Extension Agent 498 SE Lynn Blvd. Prineville, OR 97754 541-447-6228 [email protected] Increasing water availability through juniper control. Throughout the region
345 kv Brazos Valley Connection Project FAQs
345 kv Brazos Valley Connection Project FAQs Overview 1. Who is CenterPoint Energy Houston Electric, LLC? CenterPoint Energy Houston Electric, LLC (CenterPoint Energy) is an electric utility that maintains
RESTRICTING GROUNDWATER WITHDRAWALS TO PROTECT WATER RESOURCES: ECONOMIC IMPACT ASSESSMENT
CHAPTER 14 RESTRICTING GROUNDWATER WITHDRAWALS TO PROTECT WATER RESOURCES: ECONOMIC IMPACT ASSESSMENT Grace Johns and Lisa A. McDonald Economic analysis methods have been used in Florida to identify positive
Tokyo Waterworks supports the capital of Tokyo
Tokyo Waterworks supports the capital of Tokyo Tokyo, the Japanese capital, is the largest city in Japan with a population of about 13.16 million, which is about 10% of the country s entire population
BP Texas City Refinery
BP Texas City Refinery ENVIRONMENTAL STATEMENT FOR YEAR 2010 (Review of Y2009 Performance) Introduction Recognizing the complex nature of petroleum refining operations and to ensure that we meet our stated
CHECKLIST FOR FILING AN APPLICATION FOR A GROUND AND/OR SURFACE WATER WITHDRAWAL PROJECT IN THE DELAWARE RIVER BASIN
CHECKLIST FOR FILING AN APPLICATION FOR A GROUND AND/OR SURFACE WATER WITHDRAWAL PROJECT IN THE DELAWARE RIVER BASIN PLEASE COMPLETE CHECKLIST AND ENCLOSE WITH THE APPLICATION. If you need assistance,
5. Environmental Analysis
5.11 The potential for adverse impacts on utilities and service systems was evaluated based on information concerning current service levels and the ability of the service providers to accommodate the
SPECIAL USE PERMIT 22-01. JCSA Groundwater Treatment Facility Staff Report for the November 5, 2001, Planning Commission Public Hearing
SPECIAL USE PERMIT 22-01. JCSA Groundwater Treatment Facility Staff Report for the November 5, 2001, Planning Commission Public Hearing This report is prepared by the James City County Planning Division
Ring s Reflections. by Bob Ring. Tucson s Waterworld
Ring s Reflections by Bob Ring Tucson s Waterworld For the last three thousand years, Tucson s waterways (rivers, streams, creeks, etc.) ran freely much of the time and were a reliable source of water
660 Utility Supply Comprehensive Plan Section 660
661 660 Comprehensive Plan Section 660 ELECTRIC SUPPLY THE PAST Early in 1901, Owensboro Municipal Utilities (OMU) began service to the Owensboro incorporated areas and has been Owensboro's major supplier
Irving Flood Control District SECTION III
Irving Flood Control District SECTION III Flood Protection for the Valley Ranch Community 2013 ANNUAL REPORT Addressing the 5 Ws of IFCD 3 WHO, WHAT, WHEN, WHERE & WHY A LETTER FROM THE PRESIDENT Who oversees
Introduction to Rainwater Harvesting. Department of Biological and Agricultural Engineering Texas A&M University
Introduction to Rainwater Harvesting Department of Biological and Agricultural Engineering Texas A&M University Rainfall in your watershed What is a watershed? An area of land that drains to a common point
City of Fort Collins Water Supply and Demand Management Policy
City of Fort Collins Water Supply and Demand Management Policy The City of Fort Collins Water Supply and Demand Management Policy provides a foundational framework for water supply and demand management
City of Bakersfield Public Works Department Sewer System Management Plan December 2014
City of Bakersfield Public Works Department Sewer System Management Plan December 2014 C:\Users\hmayberry\Desktop\SEWER SYSTEM MANAGEMENT PLAN 2014.doc 1 Sewer System Management Plan Index: Section 1 Goals
Physical Stock Accounts for Water 1
Physical Stock Accounts for Water 1 Environmental accounting Statistics New Zealand is working with a number of government and other agencies to produce a range of statistical measures regarding the natural
General Frost-Freeze FAQs
General Frost-Freeze FAQs Groundwater Pumping: 1) Why do farmers use water to protect their crops during frost-freeze events? a. During frost-freeze events, farmers spray water onto their crops to protect
NEVADA CITY WASTEWATER TREATMENT INQUIRY
NEVADA CITY WASTEWATER TREATMENT INQUIRY REASON FOR INVESTIGATION The 2003-2004 Grand Jury investigated the status of wastewater treatment in unincorporated Nevada County. This year, the Grand Jury investigated
Land Use Assumptions Plan for Water Supply, Water Service and Wastewater Service
San Antonio Water System 2014 2023 Land Use Assumptions Plan for Water Supply, Water Service and Wastewater Service DRAFT May 2013 Land Use Assumptions Plan Chapter 395 of the Texas Local Government Code
DIRECT POTABLE REUSE: A PATH FORWARD:
DIRECT POTABLE REUSE: A PATH FORWARD: 2012 WATER REUSE CONFERENCE Boise, ID April 17, 2012 George Tchobanoglous Professor Emeritus of Civil and Environmental Engineering Department of Civil and Environmental
City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007
City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007 1/12/2007 1 Briefing Purpose Provide update on Wastewater Collection Activities
I. INTRODUCTION B. A. PURPOSE
System Plan Introduction A. The Mission of the San Antonio Parks and Recreation Department is to develop and maintain a balanced, safe, and easily accessible system of exceptional parks, recreational facilities
Industrial Water Use and Reuse Workshop
Follow the Water Chemical Manufacturing Recycle/Reuse Opportunities and Solutions Industrial Water Use and Reuse Workshop International Society for Water Solutions Gená Leathers [email protected] May
Colorado River Commission of Nevada. Presentation for Water Education Foundation March 11, 2015
Colorado River Commission of Nevada Presentation for Water Education Foundation March 11, 2015 State agency established to manage Nevada s allocation of Colorado River water resources and hydroelectric
Brushy Creek Municipal Utility District (the District) Brushy Bend Waterline Replacement Project Community Meeting February 6, 2014
Brushy Creek Municipal Utility District (the District) Brushy Bend Waterline Replacement Project Community Meeting February 6, 2014 Recap of Question & Answer Session Sorted by topic not necessarily in
Town of Yorktown Comprehensive Plan 8. INFRASTRUCTURE
Town of Yorktown Comprehensive Plan 8. INFRASTRUCTURE 8. Infrastructure 8.1 VISION STATEMENT Infrastructure is a basic building block of the community essential for the health, safety, and welfare of residents.
LIFECYCLE MANAGEMENT OF UTILITY ASSETS A PRACTICAL APPROACH
LIFECYCLE MANAGEMENT OF UTILITY ASSETS A PRACTICAL APPROACH Dr. Petros Kolovopoulos (Hydro-Comp Enterprises Ltd, Cyprus), Dr Dinos Constantinides (Hydro-Comp Enterprises Ltd, Cyprus) Key words: Asset Management,
Freshwater Resources and Water Pollution
Visualizing Environmental Science Freshwater Resources and Water Pollution Chapter 10 Copyright The Importance of Water Life on Earth would be impossible without water All living organisms contain water
Each icon on this map represents the physical location of a station.
ABBOTSFORD SCHOOL DISTRICT: GREEN TOUR TOMORROW S SUSTAINABLE SOLUTIONS TODAY Welcome to the Abbotsford School District: Green Tour. Our goal is to create an interactive learning experience for visitors
CITY OF ORANGE PROPOSED INCREASE OF WATER RATES AND CHARGES FREQUENTLY ASKED QUESTIONS (FAQ) REGARDING ORANGE S PROPOSED WATER RATES AND CHARGES
CITY OF ORANGE PROPOSED INCREASE OF WATER RATES AND CHARGES On Tuesday March 27, 2012, the Orange City Council will hold a public hearing to consider a rate adjustment for water service rates and charges.
Town of New Castle Utility Department Introduction
Town of New Castle Utility Department Introduction Town of New Castle Utility Department Mission Statement Our commitment is to ensure that our customers receive high quality water and wastewater treatment
American Society of Civil Engineers
American Society of Civil Engineers America s drinking water systems face an annual shortfall of at least $11 billion to replace aging facilities that are near the end of their useful lives and to comply
The Bathtub Ring. Shrinking Lake Mead: Impacts on Water Supply, Hydropower, Recreation and the Environment
University of Colorado Law School Colorado Law Scholarly Commons Books, Reports, and Studies Getches-Wilkinson Center for Natural Resources, Energy, and the Environment 2015 The Bathtub Ring. Shrinking
CITY OF POMPANO BEACH Broward County, Florida
RESOLUTION NO. 2015-399 CITY OF POMPANO BEACH Broward County, Florida A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF POMPANO BEACH, FLORIDA, OPPOSING THE OIL DRILLING PERMIT APPLICATION SUBMITTED BY
1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance
Ex-ante Evaluation 1. Name of the Project Country: India Project: Goa Water Supply and Sewerage Project (Loan Agreement: 09/14/2007; Loan Amount: 22,806 million yen; Borrower: The President of India )
City of Inglewood Well No. 2 Rehabilitation. City of Inglewood Thomas Lee
City of Inglewood Well No. 2 Rehabilitation City of Inglewood Thomas Lee Project Location (Photos and location maps of the project) Project Description The City of Inglewood (City)receives its annual potable
Stacey Harrington, M.S, R.E.H.S. Napa County Environmental Management Coordinator
Stacey Harrington, M.S, R.E.H.S. Napa County Environmental Management Coordinator How many people view the Napa County regions: How groundwater management folks see Napa County Brief History During the