ROBOT SYSTEM FOR REMOVING ASBESTOS SPRAYED ON BEAMS
|
|
|
- Cecilia Waters
- 10 years ago
- Views:
Transcription
1 ROBOT SYSTEM FOR REMOVING ASBESTOS SPRAYED ON BEAMS Mitsunori Arai* and Haruo Hoshino Advanced Research Department R&D Institute, Takenaka Corp, Chiba, Japan * Corresponding author ([email protected]) ABSTRACT: At this time in Japan, buildings built about 40 to 50 years ago are aging, and demands for demolition or renewal are increasing. Asbestos materials were used in many parts, and for many purposes in these buildings. But now, using asbestos and asbestos containing materials is prohibited by law, because its toxicity has been confirmed around the world. Therefore all trace of asbestos must be removed safety and properly in advance of demolishing or renewing any old building. Works to scrape asbestos by human workers are very hard and dangerous. The workers have to wear protective suits and full facepiece powered air purifying respirator, and the working space must be completely isolated in order to prevent the leak of any asbestos fibers. We have developed a robot system for removing asbestos sprayed on steel beams or elsewhere to reduce manual work. This research and development was started in 2007, and the system has been evolved gradually through many experiments in our laboratory. The most recent robot system consists of a multi-dof manipulator mounted on a vehicle with a lifting platform, vacuum suction unit, and manipulator control unit. The tool for scraping asbestos is a rotary wire brush, which is driven by a strong electric motor, and is set on the end of the manipulator. The scraped and ground asbestos is automatically sucked into a special bag by air. We have tested this robot system on an actual demolition site. As a result, we have confirmed the practical problems and evaluated the efficiency. Keywords: Sprayed Asbestos, Robot System, Test On Site 1. INTRODUCTION Asbestos was used in a lot of buildings, for many purposes, from 1950 s to 2000 s in Japan. In recent years, the toxicity of asbestos has been widely recognized around the world. Today, it is prohibited to use asbestos in any industrial field by low. We must remove all asbestos firstly before reforming or demolishing the old buildings. Removal of asbestos is very hard, tough and dangerous for workers. It is also very expensive, because the workers have to wear protective suits and full facepiece powered air purifying respirator. The work space must be isolated and covered with polyethylene sheets in order to prevent the leak of asbestos. The work space is very hot, and it is hotter in the suites. Especially in summer, laborers can work for only one or two hours within the suits and the clothes and polyethylene sheets can be used only once. And these cause high cost. All of this means it is very expensive process. To counter these problems, we developed a robot system for removing asbestos sprayed on steel beams in order to reduce the hard and dangerous manual work. We tested and checked the movement of robot and packing equipment in our laboratory firstly, and as a next step we tried operating them on an actual demolition site. This research and development was conducted from 2007 to 2009 under a grant from NEDO (New Energy and Industrial Technology Development Organization, Japan). 2. OVERVIEW OF THE ROBOT SYSTEM 1409
2 tool for scraping special support mast 7-DOF manipulator vacuum suction hose cyclone separator (outside of isolated area) CRT vacuum suction & packing equipment cyclone controller blower robot vehicle TV cameras PC manual controller dust bag control unit for manipulator Fig. 1 Overview of the robot system This robot system was developed to reduce the amount of work carried out by human workers for the removal of asbestos. This robot system has the following several advantages. 1) efficiency and performance are equal to or superior to manual removal 2) by reducing the volume of stripped asbestos, the cost of disposal also can be reduced (the disposal cost of asbestos is proportional to the volume rather than mass, now in Japan). 3) every component of this system is manually portable and can be transported in a standard elevator. The most recent robot system consists of robot, vacuum suction and packing equipment and control unit as shown in figure mm and maximum capacity to load is 20kgf in strength. It holds a removing tool on the end of its 7th 3. ROBOT The robot consists of a manipulator, a vehicle mount aerial work platform, a tool, and cameras. The manipulator has 7-degrees of freedom (DOF) and is the latest one on the market. Its maximum moving width is Fig. 2 Photo of Robot witout covering 1410
3 arm, and is mounted on the mast of vehicle in the horizontal position. This vehicle has a special support mast that was added to withstand the reaction force of the actions of the manipulator, and is controlled by a manual controller. This robot is connected to the control unit by power cables and signal cables, and can be controlled from the control unit. Between the tool and the manipulator arm, a pressure force sensor is specially incorporated. To feedback this sensor signal to the control unit, the manipulator can correct the slightest error in accuracy. a) case of 45 b) case of 90 Fig. 5 Comparison of movement area 3.1 TOOLS FOR REMOVING ASBESTOS We tested many kinds of tools for the effective removal of asbestos in our laboratory at an early stage of development. Those were a vibrating scraper, a rotary cutting edge, a rotary rubber brush, and other kinds of tools commonly used. As a result, we finally decided that the best tool is a rotary steel wire brush, because it can efficiently scrape any type of hard asbestos and is able to finish the job without leaving any trace of asbestos. The torque of the rotary wire brush is transmitted by a flexible shaft from a powerful motor anchored to the platform in order to get strong torque level. The tool is held at 45 inclination to the axis of the robot arm to reduce any blind spot in the moving range (shown in Fig.5). The volume of asbestos removed and crushed into powder by this wire brush is much less than that of asbestos scraped as blocks. It is very useful to decrease the costs of final disposal. Fig.3 Transport the torque from motor to tool Fig. 4 Rotary steel wire brush 4. VACUUM SUCTION AND PACKING EQUIP- MENT, AND CONTROL UNIT The asbestos scraped by this robot is carried through the tube by vacuum suction air to the cyclone separator, and asbestos are separated from air. Afterward asbestos is packed into a special bag. These operations are performed automatically by the machine. The operators only need to replace the bag when it is full. The manipulator moves following to the predetermined programs and it cannot move unless programmed to do so. The control unit memorizes the programs and sends control signals to the manipulator. This unit can be located outside of the isolated area. 1411
4 5. EXPERIMENT ON A DEMOLITION SITE We experimented with this robot system in an actual demolition site in We removed asbestos that had been sprayed on steel beams approximately 15m 2 in area. It took 9days. We understood the total time needed for the transform, sending in and reassembling of this robot system through decomposing it in the laboratory. All units set in the isolated area must be covered with nonwoven fabrics, and these covers have to be removed before the units are dismantled when works are finished. The surface of the floor of the isolated area must be covered with a double layer of polyethylene sheets as prescribed by Japanese standards but the sheets must be fitted tightly so as not hamper the tires of vehicle as they move over the sheets. We drew center lines on the sheets to mark the movement of the aerial work platform. 1) under face of upper flange 4)lower part of web 2) upper part of web 5) upper face of lower flange selected a scraping area 50mm in width (=width of brush), 800mm in length as one action of the manipulator, and planned to repeat the action once because the asbestos was so thick. The speed to move along the surface was set at 50mm/sec for complete removal because this was the first experiment at an actual site. Six main programs were made for remove the asbestos sprayed on the beams for one setting of the robot. 3) part between 1) and 2) 6) under face of lower flange Fig.7 Scraping range of each program Fig. 6 One of the plans of experiments & a sample of the beam 5.1 CONTROL PROGRAMS FOR SITE TEST We created the programs to run the manipulator accordingly by deciding the location to install the robot as well as the distance for the manipulator to move in one pass. This was done by carrying out a site investigation in advance. As the steel beams have some stiffeners and openings as shown in figure.6, we selected the parts which would be easiest for the removal of asbestos. We 6. RESULTS The total removal time was 1,290minutes (not including the time to assemble and disassemble the equipment) and the total area of the 13 places where the removal was carried out was 15.19m 2. The removal work was finished in very good quality. In this case, the sprayed asbestos had weak adhesion to the steel beams and thickness was greater than we expected. As we used a rotary brush for scraping thick asbestos we needed to repeat the actions again and again for the complete removal. The rotary brush can scrape thick asbestos little by little. If a hand scraper is used (e.g. a tool made of thin, flat metal plate and a handle), it may be more effective because the chunks of asbestos can be removed in a single operation. Such extended operating revealed new problems trouble in durability. These problems were the disconnecting of 1412
5 the flexible shaft, burst of the dust bag, and corruption of the brush cover. We recognized them as new problems to be solved. Fig. 8 Finished under surface of beam Fig. 9 Finished surface of the web and flanges 6.1 REMOVAL SPEED & EFFICIENCY The working time (1290 minutes) included several downtimes due to machine failure. The speed was 0.86m2/h that was obtained from dividing the entire area for the removal of asbestos by the time without periods of downtime. Furthermore, the total time includes the time to set the robot into the exact position. The average speed is 1.31m 2 /h calculated from the time without the set up time. This is only about half the speed of manual removal. This is because the thickness of the sprayed asbestos was so great that the scraping must be repeat three or more times in many cases. The best data is 2.38m 2 /h in speed, and recorded in the situation that the scraping was completed by only two processes. This is as fast as the speed of manual scraping. 7. CONCLUSION Based on our previous estimates, in order to be cost effective, the removing speed of this robot system needs to be more than 4 times as fast as that of manual workers. But we unfortunately have not been able to achieve this on this field test. The moving speed of the manipulator along a beam was set at only 50mm/sec for complete removal because this was the first examination on an actual site. A maximum speed of 100mm/sec was only achieved in laboratory experiments. It may not be difficult to accelerate the action of manipulator. We planned for the tool to operate only on the forward path, under the condition that during the manipulator s return to the next starting point, the tool was not working. It should be able to allow the manipulator work on this return path by some remodeling to the control programs. A rotary wire brush was selected for scraping hardened solidified asbestos, but the actual asbestos we encountered was soft. The tool could not work well in this situation. In other cases where the asbestos is hard and the efficiency by manual workers is low, it should perform well enough. We believe we will be able to reduce the costs and to increase the efficiency more than the present system by taking these remodeling measures or applying the robot to specific situations. Finally, I will show some photos of experiment on the actual demolition site. Fig. 10 The robot is delivered to the site by a standard elevator 1413
6 Fig.11 Covering with nonwoven fabric Fig. 15 Scraped asbestos go into powder Fig. 12 Wrapping with polyethylene sheets Fig. 16 Control unit & monitoring with TV cameras Fig. 13 The robot is working REFERENCES [1] Haruo Hoshino, Keiju Kamoto, Masahiro Sugata et al., Development of Closed type High performance Robot for Processing of Sprayed Asbestos Materials, 10th Symposium of Construction Robotics in Japan (SCR), September 2,2008 [2] Keiju Kamoto, Haruo Hoshino, Seiichi Takeuchi et al., Development of Closed Removing Robot System of Sprayed Asbestos Materials, 17th Construction Robot Symposium in Japan, March 13, 2008 [3] Mitsunori Arai, Hoshino Haruo et al., Development of Closed type Robot for Removing and Recollection of Sprayed Asbestos Materials on Steel Beams, 12th Symposium of Construction Robotics in Japan (SCR), September 7,2010 Fig. 14 Scraping asbestos on the flange 1414
Industrial Robotics. Training Objective
Training Objective After watching the program and reviewing this printed material, the viewer will learn the basics of industrial robot technology and how robots are used in a variety of manufacturing
2100 AD 015 0009 Mirror Elevator Ball Nut Replacement Procedure
2100 AD 015 0009 Mirror Elevator Ball Nut Replacement Procedure Derek Guenther 1/28/2015 Rev. Purpose The purpose of this document is to describe the procedure necessary to replace one of the ball nuts
TopSky DLG Installation Manual
TopSky DLG Installation Manual Attention: Because after the compound materials solidify, there will be ammonia iris on the surface, which affect the bonding strength afterwards. Please polish with sandpaper
Static Electricity. A Health and Safety Guideline for Your Workplace. What Are Some Sources of Static Electricity? What is Static Electricity?
A Health and Safety Guideline for Your Workplace What is static electricity? What causes it? How is it hazardous? And, most importantly, how can it be controlled? All of these questions will be answered
all VAC LIFT ALL-VAC-LIFT Phone + 1.832.615.9110 4621 Redstart Street www.vac-lift.com Fax + 1.832.201.9101
ergonomic FORKLIFT vacuum ATTACHMENTs FOR ALL MATERIALS HANDLING FOR LIFTING METAL, WOOD, PLASTIC, STONE, CONCRETE, PAPER, AND MORE In Warehousing, Order Picking, Palletizing, Loading, Conveying, Production.
Asbestos Work Permit Procedures
These procedures are to be followed by all persons required to perform the following work: Handling, installation or removal of non-friable manufactured products known to contain asbestos provided no sanding,
Types of 3D Scanners and 3D Scanning Technologies.
Types of 3D Scanners and 3D Scanning Technologies. There are many types of 3D scanners and 3D scanning technologies. Some are ideal for short range scanning while others are better suited for mid or long
SPECIFICATIONS FOR BOON EDAM TOMSED MODEL TUT-65TMB
SPECIFICATIONS FOR BOON EDAM TOMSED MODEL TUT-65TMB PRODUCT DESCRIPTION: BOON EDAM TOMSED MODEL TUT-65TMB STAINLESS STEEL BARCODE SCANNING ELECTRONIC REGISTERING TURNSTILE SCOPE OF OPERATION: A. The TUT-65TMB
Load Limiter ULS-60 ULS-80 ULS-100 ULS-125. Table of Contents. Assembly Instructions Load Limiter ULS-60, -80, -100, -125
Load Limiter ULS-60 ULS-80 ULS-100 ULS-125 Version 2.0 Last revision November 2012 Dear customer, Thank you for the confidence that you have placed in our company by purchasing an IPR load limiter. Every
Manual piston sampler...m 11
SAMPLING Manual piston sampler...m 11 Screw sampler...prec 22...PREC 100 Slide sampler...pr 55 Rotative screw sampler...prv Piston sampler...p 11 Sampler on belt conveyor...pba Rotating cup sampler...pgr
GANTRY ROBOTIC CELL FOR AUTOMATIC STORAGE AND RETREIVAL SYSTEM
Advances in Production Engineering & Management 4 (2009) 4, 255-262 ISSN 1854-6250 Technical paper GANTRY ROBOTIC CELL FOR AUTOMATIC STORAGE AND RETREIVAL SYSTEM Ata, A., A.*; Elaryan, M.**; Gemaee, M.**;
Reaction Torque Sensor
Force 1 1 N m up to 1 000 1 000 N m Type 9329A 9389A These easy to install piezoelectric reaction torque sensors are particularly suitable for measuring rapidly changing torques at non-rotating shafts.
Autonomous Mobile Robot-I
Autonomous Mobile Robot-I Sabastian, S.E and Ang, M. H. Jr. Department of Mechanical Engineering National University of Singapore 21 Lower Kent Ridge Road, Singapore 119077 ABSTRACT This report illustrates
FLEXIBLE CIRCUITS MANUFACTURING
IPC-DVD-37 FLEXIBLE CIRCUITS MANUFACTURING Below is a copy of the narration for DVD-37. The contents of this script were developed by a review group of industry experts and were based on the best available
Precision Miniature Load Cell. Models 8431, 8432 with Overload Protection
w Technical Product Information Precision Miniature Load Cell with Overload Protection 1. Introduction The load cells in the model 8431 and 8432 series are primarily designed for the measurement of force
Industrial Cutting Equipment. includes new Concrete Crusher
Industrial Cutting Equipment includes new Concrete Crusher LUKAS Industrial Cutting Equipment The demand for environmentally-friendly disposal and recycling of used or discarded products within highly
Asbestos Removal Procedures for Homeowners
Asbestos Removal Procedures for Homeowners How to Properly Remove Cement Asbestos-Board Siding (Single-Family, Owner-Occupied Residences Only) IMPORTANT: Read these procedures from start to finish, making
SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)
APPLICATIONS Process Industry Weak Acids Alkalies Compressed Air Pulp & Paper MODELS ASM - Flanged Connection OPTIONS Control Rods Oil & Gas Water & Waste Pump suction & discharge Sea water Chemical lines
THE MINISTRY OF ENVIRONMENTAL PROTECTION, PHYSICAL PLANNING AND CONSTRUCTION
THE MINISTRY OF ENVIRONMENTAL PROTECTION, PHYSICAL PLANNING AND CONSTRUCTION 1389 Pursuant to Article 104 paragraph 1 item 4 of the Waste Act (Official Gazette 178/04, 111/06), the Minister of Environmental
have been provided with information on whether they do or do not contain asbestos before starting work;
Health Effects of Asbestos If your work involves possible exposure to asbestos, you should: be aware of the risks from asbestos exposure; understand the importance of keeping exposure as low as possible;
Tube Control Measurement, Sorting Modular System for Glass Tube
Tube Control Measurement, Sorting Modular System for Glass Tube Tube Control is a modular designed system of settled instruments and modules. It comprises measuring instruments for the tube dimensions,
SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS
SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word
OLI. Oil level indicator
OLI Oil level indicator Oil level indicator Unexpected or accidental oil leakages may occur randomly along transformer s lifetime. Clear indication of oil level inside transformer tank and on load tap
Resurfacing Concrete. Page 1 of 5
Resurfacing Concrete Materials List QUIKRETE Concrete Resurfacer (No. 1131) (see calculator on page 5 for quantity needed) QUIKRETE Concrete and Stucco Wash (No. 8601) QUIKRETE Concrete Sealer (No. 8800)
The entire document shall be read and understood before proceeding with a test. ISTA 3B 2013 - Page 1 of 35
Packaged-Products for Less-Than-Truckload (LTL) Shipment ISTA 3 Series General Simulation Performance Test PROCEDURE VERSION DATE Last TECHNICAL Change: NOVEMBER 2012 Last EDITORIAL Change: JANUARY 2013
CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS
CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings,
EZ-Steer Assisted Steering System
EZ-Steer Assisted Steering System Installation Instructions Platform Kit P/N 53059-21 Case IH Puma 165 Puma 180 Puma 195 Puma 210 New Holland T7030 T7040 T7050 T7060 Revision A June 2007 Part Number 53345-21-EU2
BUTTERFLY SHOWER DOOR INSTALLATION INSTRUCTIONS
BUTTERFLY SHOWER DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings,
RAUFOSS EXPLOSIVE COMPRESSION FITTINGS
INSTRUCTION MANUAL FOR RAUFOSS EXPLOSIVE COMPRESSION FITTINGS Box 7 2831 Raufoss Norway Tlf.: +47 61 15 17 87 Fax: +47 61 15 25 56 25 January 2013, rev 2 Available on www.vpmetall.no Page 1 CONTENTS GENERAL
B Dinesh Prabhu, Asst. Professor, P E S College Engg., Mandya, KARNATAKA 1
Firing Order Every engine cylinder must fire once in every cycle. This requires that for a four-stroke fourcylinder engine the ignition system must fire for every 180 degrees of crank rotation. For a sixcylinder
DIAMOND Retractable Rodding Robot Model SPRAYROD-R
2004-12-21 2 1 (23) DIAMOND Retractable Rodding Robot Model SPRAYROD-R 2004-12-21 2 2 (23) Table of contents 1 TECHNICAL DESCRIPTION...4 1.1 MAIN DETAILS...5 1.2 COMPONENTS DESCRIPTION...5 1.2.1 Pneumatic
Robotics. DressPack Application Equipment & Accessories
Robotics DressPack Application Equipment & Accessories DressPacks The need for well integrated cable and hose packages on the robot, DressPacks, has made ABB develop flexible packages to support applications
PART 1 - INTRODUCTION...
Table of Contents PART 1 - INTRODUCTION... 3 1.1 General... 3 1.2 Sensor Features... 3 1.3 Sensor Specifications (CDE-45P)... 4 Figure 1-1 CDE-45P Sensor Dimensions (standard, convertible style)... 4 PART
Front axle components, overview
just a test. Front axle components, overview 40-1 General Information Load bearing components and parts of the suspension must not be welded or straightened. Vehicles without drive axle must not be moved,
Ningbo Yinzhou Keao Prototyping & Mould Factory Services include : CNC machining prototypes,
Ningbo Yinzhou Keao Prototyping & Mould Factory Services include : CNC machining prototypes, STEREOLITHOGRAPHY (SLA) Selective Laser Sintering (SLS) RTV MOLDING AND CAST URETHANE PROTOTYPES Tel : +86 574
12. REAR WHEEL/BRAKE/SUSPENSION
12 12 12-0 SERVICE INFORMATION... 12-1 REAR BRAKE... 12-5 TROUBLESHOOTING... 12-2 REAR SHOCK ABSORBER... 12-8 REAR WHEEL... 12-3 REAR FORK... 12-9 SERVICE INFORMATION GENERAL INSTRUCTIONS When installing
Asbestos. from the Home. Removing. Read this booklet for:
Removing Asbestos from the Home Read this booklet for: steps and care you should take if your home has asbestos-containing material (ACM) advice about protective gear. How to get ACM removed from your
Char-Lynn Hydraulic Motor. Repair Information. 10 000 Series. October, 1997
Char-Lynn Hydraulic Motor October, 1997 Repair Information Geroler Motor Two Speed 001 27 Retainer inside bore of valve plate bearingless motors only 4 15 16 3 6 35 Parts Drawing 25 2 2 1 19 17 36 40 47
Make Your Own Hypertufa Container. Supplies. The recipe. by Michelle Gervais
1 Make Your Own Hypertufa Container Hypertufa looks like stone but weighs less and takes whatever shape you want by Michelle Gervais Containers made from hypertufa are wonderful for displaying rock-garden
Lecture slides on rolling By: Dr H N Dhakal Lecturer in Mechanical and Marine Engineering, School of Engineering, University of Plymouth
Lecture slides on rolling By: Dr H N Dhakal Lecturer in Mechanical and Marine Engineering, School of Engineering, University of Plymouth Bulk deformation forming (rolling) Rolling is the process of reducing
POSEIDON 2-29, 2-25 & 2-22 POSEIDON 2-29, 2-25 & 2-22 XT
POSEION 2-29, 2-25 & 2-22 POSEION 2-29, 2-25 & 2-22 XT Repair Manual Index A. Safety precautions 3 B. Technical data 4 C. Structure 5-6. Service / Repair 7-23 E. Tools 24 F. Function 25-26 G. Electric
Heater Replacement Procedure
Heater Replacement Procedure Oil Diffusion Pump Model ULK-10A ULK-14A Components Division, ULVAC, Inc. http://www.ulvac.co.jp/ Preface We thank you very much for purchasing our product. This manual describes
Bill of Materials: Line Follower: A Zippy Robot That Senses Where to Go PART NO. 2170783
Line Follower: A Zippy Robot That Senses Where to Go PART NO. 2170783 This kit has the parts you'll need with the exception of a few craft items sold separately to make a line-following cart. It uses a
Design of a Robotic Arm with Gripper & End Effector for Spot Welding
Universal Journal of Mechanical Engineering 1(3): 92-97, 2013 DOI: 10.13189/ujme.2013.010303 http://www.hrpub.org Design of a Robotic Arm with Gripper & End Effector for Spot Welding Puran Singh *, Anil
Section 5: Machine Overview
Section 5: Machine Overview Machine Floor Plan Machine Specifications Sequence of Operation Theory of Operation Sensor Location Floor Plan 2007 Douglas Machine Inc. 5.1 Machine Floor Plan Figure 5.1: Machine
Product teardown. Dr. Tarek A. Tutunji
Product teardown Dr. Tarek A. Tutunji Product Teardown The process of taking apart a product to understand how it is made and how it works A product teardown process is a formal approach to learning about
S&W Race Cars and Components, Inc.
S&W Race Cars and Components, Inc. 11 Mennonite Church Road Spring City, PA 19475 TECH & INFORMATION: 610-948-7303 ORDERS: 1-800-523-3353 OFFICE FAX: 610-948-7342 E-Z INFO FAX 610-792-1234 CAUTION!!! -
Multibend-Center RAS 79.22-2 / RAS 79.26-2
RAS Reinhardt Maschinenbau GmbH High-tech perfection! If you want to produce complex sheet metal parts regardless of batch size, with incredible throughput, total flexibility, amazing accuracy, and total
Practical Alignment Tools and Techniques
Practical Alignment Tools and Techniques Bruce Lehmann Sr. Engineer, Thin Kerf Technologies Inc Accurate sawing requires attention to proper alignment and maintenance. Alignment is critical to modem sawmills
TruBend: More. bending. freedom. Machine Tools / Power Tools Laser Technology / Electronics Medical Technology
TruBend: More bending freedom Machine Tools / Power Tools Laser Technology / Electronics Medical Technology Precise bending. More flexible than ever before. The TRUMPF Group is one of the world s leading
Solstice/Sky Water Pump Replacement
Solstice/Sky Water Pump Replacement The water pump on the Solstice/Sky is starting to need replacement on some vehicles. This guide will help in replacing the water pump while the engine is still in the
CHAPTER 4 4 NUMERICAL ANALYSIS
41 CHAPTER 4 4 NUMERICAL ANALYSIS Simulation is a powerful tool that engineers use to predict the result of a phenomenon or to simulate the working situation in which a part or machine will perform in
Procurement Specification for a High Security Lift Arm Barrier (HSLAB) EB950 CR Armstrong High Security Lift Arm Barrier
Procurement Specification for a High Security Lift Arm Barrier (HSLAB) EB950 CR Armstrong High Security Lift Arm Barrier A. Requirement This document is to be used to specify the physical and operational
CG-1171-20 PTFE Diaphragm Liquid Transfer Pump
3800 N. Mill Road Vineland, NJ 08360 Phone: 800.843.1794 Fax: 800.922.4361 CG-1171-20 PTFE Diaphragm Liquid Transfer Pump This is the safety alert symbol. It is used to alert you to potential personal
A D D E N D U M # 3 QUESTIONS FROM BIDDERS: DATE: November 5, 2012. All Bidders. Jenne dos Santos, CBI Consulting Inc. City of Chelsea, MA
Page 1 of 10, Addendum No. 3 Temporary Garage Structure City of Chelsea, MA November 5, 2012 CBI Job No.: 12055-A A D D E N D U M # 3 DATE: November 5, 2012 TO: FROM: PROJECT: All Bidders Jenne dos Santos,
Facts about Asbestos. Council policy
Facts about Asbestos Winchester City Council has produced this leaflet to give its tenants advice and information about the possible presence of asbestos in and around their homes. Its content gives general
1.1 DIMENSIONS AND WEIGHT PAG. 2 1.2 LOAD CENTRE FOR LIFTING PAG. 2 1.3 STORAGE CONDITIONS PAG. 2
TRANSPORT AND INSTALLATION. DIMENSIONS AND WEIGHT PAG.. LOAD CENTRE FOR LIFTING PAG..3 STORAGE CONDITIONS PAG. STARTING. INSTALLATION PAG.. SPACE REQUIREMENTS PAG. 3.3 ELECTRIC CONNECTION PAG. 3 3 DESCRIPTION
CONTROL METHODS. There are five ways to control the release of asbestos fibers:
Control Methods CONTROL METHODS When asbestos containing materials are found in a building, the owner must decide which method or methods will be used to deal with the asbestos. The decision will be based
DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H
DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H Soil Drainage Mat with Built-In Protection Layer POLYGUARD DRAINAGE MATS are three-part prefabricated geocomposite drain consisting of a
MONDOATHENS BASKETBALL SET (Reference PK110)
MONDOATHENS BASKETBALL SET (Reference PK110) DESCRIPTION The MONDOATHENS backstop unit is mainly designed for multi-sports pavilions and installations where the highest-level basketball competitions are
TRANS-05, Torque Tube Removal, Rebuilding, and Installation
TRANS-05, Torque Tube Removal, Rebuilding, and Installation Tools Metric Wrench Set Metric Socket Set Jack Stands (6 minimum) Floor Jack 8mm Cheesehead socket (also referred to as 12 point internal socket
Bringing good things ahead
Bringing good things ahead Whatever your logistic needs, we can offer a conveyor solution. Our flexible systems primary and secondary packaging for single and multi packages, can transport your goods from
Procedures for Cutting and Handling of Asbestos Cement Pipe. City of Richmond Public Works Operations
Procedures for Cutting and Handling of Asbestos Cement Pipe City of Richmond Public Works Operations Version 2.0 Updates to: November 1995 Procedures Prepared by: AMEC Earth & Environmental a division
Cleaning of floor coverings. Vacuum Cleaners Brush-Type Vacuum Cleaners Spray Extractors Single Disc Machines Cleaning Machines - Cleanser
Cleaning of floor coverings Vacuum Cleaners Brush-Type Vacuum Cleaners Spray Extractors Single Disc Machines Cleaning Machines - Cleanser 135 7 Cleaning of floor coverings Vacuum Cleaners for Everyday
50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance
02/15 Labko GRP cesspools Instructions for installation, operation and maintenance Reliable solutions Wastewater treatment systems Contents 1 LABKO CESSPOOLS... 3 1.1 GENERAL... 3 1.2 IMPORTANT TO KNOW
2003 ACCORD - Automatic Transmission Removal
2003 ACCORD - Automatic Transmission Removal Special Tools Required Engine support hanger, A and Reds AAR-T-12566 Engine hanger balancer bar VSB02C000019 Front subframe adapter VSB02C000016 These special
Z-Truck (Vertical Moving) Z-truck Flag. Y-Truck (Horizontal Moving) FIGURE 1: VIEW OF THE Z-TRUCK. Flexshaft Assembly
Replacing the Cover Micro-Switch To remove and replace the Cover Micro-Switch you will need the following tools: #2 Phillips screwdriver (magnetic tip preferred) #1 Phillips screwdriver (magnetic tip preferred)
ATTIX 30, 40 & 50 WHY COMPROMISE. Easy handling and easy maintenance
ATTIX 30, 40 & 50 WHY COMPROMISE Easy handling and easy maintenance The perfect solution for professionals on the move The ATTIX 30 is the new and compact generation of the ATTIX range - representing a
Submitted By: Submitted To: XYZ ABCD ******** Mechatronics
Submitted To: ABCD Submitted By: XYZ ******** Mechatronics END EFFECTORS In robotics, an end effector is the device at the end of a robotic arm, designed to interact with the environment. The exact nature
Hand Gestures Remote Controlled Robotic Arm
Advance in Electronic and Electric Engineering. ISSN 2231-1297, Volume 3, Number 5 (2013), pp. 601-606 Research India Publications http://www.ripublication.com/aeee.htm Hand Gestures Remote Controlled
MAGNETIC CARD READER DESIGN KIT TECHNICAL SPECIFICATION
MAGNETIC CARD READER DESIGN KIT TECHNICAL SPECIFICATION Part Number: 99821002 Rev 21 FEBRUARY 2011 REGISTERED TO ISO 9001:2008 1710 Apollo Court Seal Beach, CA 90740 Phone: (562) 546-6400 FAX: (562) 546-6301
Electrical Solutions for Motors & Generators
1 Electrical Solutions for Motors & Generators Solutions & Services for motors & generators Electrical solutions for Power Transfer Graphite -> Brushes manufactured from plates: Graphite / carbon components
Belt Tensioning Methods for Small Package Conveyors What s the best solution?
Belt Tensioning Methods for Small Package Conveyors What s the best solution? Industrial White Paper By: Michael A. Hosch, P.E. Dorner Mfg. Corp. 975 Cottonwood Avenue Hartland, WI 53029 USA Phone: 800
Guide for Installation and Maintenance of MacroAir (ME Series) High Volume Low Speed Fans
Guide for Installation and Maintenance of MacroAir (ME Series) High Volume Low Speed Fans Version 9.0 April 2014 1 Delivery: Upon receipt of fans, thoroughly inspect units for any damage sustained during
UNIT 7 Crane safety. Engineering CASE STUDY. Cambridge English for. Professional English. Part 1. Part 2
Professional English Cambridge English for Engineering CASE STUDY Part 1 Read the extract from a handbook about crane safety. Then discuss the questions about the underlined keywords with a partner. When
TRIMMING TECH 150. IVD In vitro diagnostic-medical device. General information. Technical datasheet Trimmingtech150
IVD In vitro diagnostic-medical device CND code: W0202059016 - CIVAB code: TRIMMING TECH 150 General information Type of instrument: Aspirated hood for histology. Model: Trimming Tech 150. Code: Description:
Hanson Building Products. precast basement solutions
Hanson Building Products precast basement solutions Hanson Building Products Basement Systems Add an extra dimension and combine the inherent flexible, structural and waterproof properties of concrete
BUILDING MATERIALS, Wood, Laminated (Page 1 of 3) Viz.: Rafters; Arches; Beams; Joists; Timbers or Planks, structural or roof.
BUILDING MATERIALS, Wood, Laminated (Page 1 of 3) Viz.: Rafters; Arches; Beams; Joists; Timbers or Planks, structural or roof. 1155 & 4155 LCL: Applies to all freight in less than container load quantities.
Les Produits MURPHCO Ltée
DESCRIPTION The Murphco support clamp is an assembly made entirely of stainless steel and conceived for all sleeved roof drains. The Murphco Support Clamp is compatible with all types of Murphco* copper
Digitization of Old Maps Using Deskan Express 5.0
Dražen Tutić *, Miljenko Lapaine ** Digitization of Old Maps Using Deskan Express 5.0 Keywords: digitization; scanner; scanning; old maps; Deskan Express 5.0. Summary The Faculty of Geodesy, University
Worldwide network in over 40 countries.
Worldwide network in over 40 countries. April 2012 56 rue de Neuilly 93136 Noisy le Sec Cedex - France Tel : +33 (0)1 49 42 72 95 Fax : +33 (0)1 48 44 00 02 E-mail : [email protected] PTC s vibrodrivers
»Product» Safety Warning
C1200 Installation Instructions 2007-2016 Chevy/GM 1500 2/4wd 2" Strut Spacer Lift Read and understand all instructions and warnings prior to installation of product and operation of vehicle. Zone Offroad
Filter Aid Filtration
Filter Aid Filtration Filtration is the separation of solids from liquids by forcing the liquid to flow through a porous medium and depositing the solids on the medium. A filter aid (finely divided material
Welding of Plastics. Amit Mukund Joshi. (B.E Mechanical, A.M.I.Prod.E)
Welding of Plastics Amit Mukund Joshi (B.E Mechanical, A.M.I.Prod.E) Introduction Mechanical fasteners, adhesives, and welding processes can all be employed to form joints between engineering plastics.
DO NOT attempt to repair hub and wheel bearing assembly.
Page 1 of 6 HUB & WHEEL BEARINGS (WITH PULSE VACUUM HUBLOCK) DO NOT attempt to repair hub and wheel bearing assembly. Removal DO NOT remove hub lock assembly by prying on hub lock legs. This can crack
Good Boards = Results
Section 2: Printed Circuit Board Fabrication & Solderability Good Boards = Results Board fabrication is one aspect of the electronics production industry that SMT assembly engineers often know little about.
PaLLe t trucks Lifting carts t r g in t if L 2435 6815 6836 6856 6842
l i f t i n g c a r t s Lifting carts The prograe for lifting, transporting and storage From the classical forklift trolley to the machine lifter, from furniture dollies to a chassis with 24 tons load
UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS
UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS: Carefully read these instructions before installing your new air-conditioner. AUSTRALIAN AUTOMOTIVE AIR AL00500054E 1 Table
Sense it! Connect it! Bus it! Solve it! EncoderS
Sense it! Connect it! Bus it! Solve it! EncoderS Incremental encoders Incremental encoders use electrical pulses to measure rotation speed or position. The dual-channel incremental encoders of the Ri series,
Offering more. Series 3000 www.ripack.com
Offering more Series 3000 SAFE Prevent any burn risks and work in complete safety. With its unique, patented cold nozzle system, the gun remains cool during use. PRACTICAL Large, solid hanger ring. FAST
GOODYEAR COMMERCIAL TIRE SYSTEMS TIRE CASING RETREAD AND REPAIR MANUAL FOR ECDII AND DURASEAL TECHNOLOGY
GOODYEAR COMMERCIAL TIRE SYSTEMS TIRE CASING RETREAD AND REPAIR MANUAL FOR ECDII AND DURASEAL TECHNOLOGY 31721gytrk_DuraRepManual2.indd 1 6/23/08 2:07:25 PM TABLE OF CONTENTS Introduction...................................................................
SAFE REMOVAL AND DISPOSAL OF ASBESTOS CEMENT BUILDING PRODUCTS
SAFE REMOVAL AND DISPOSAL OF ASBESTOS CEMENT BUILDING PRODUCTS Within the City of Mandurah many dwellings exist with asbestos cement building products. When removing the asbestos, concerns may be raised
James M. Pleasants Company
James M. Pleasants Company SUBMITTAL DATA GAINESVILLE MECHANICAL DECEMBER 20, 2013 PROJECT: GSU: J-183 HUMANITIES LAW BLDG. QUOTE NO:12116 ENGINEER: STEVENS & WILKINSON GASKETED PLATE HEAT EXCHANGER Tag:
Q&A Session for Advanced Ball Screws 102: Troubleshooting for Design Engineers
Q&A Session for Advanced Ball Screws 102: Troubleshooting for Design Engineers Topic: Noise Q: Is there a way to predict/calculate noise on a ball screw? A: No, there is no way to calculate the noise of
Company DUOL. Dušan Olaj CEO
Company DUOL Company DUOL has been active on the market since 1992 and throughout this period Duol has successfully attained the position of one of the most significant suppliers of fabric structures.
2008 ACCORD - Front Knuckle/Hub/Wheel Bearing Replacement (page 18-13)
2008 ACCORD - Front Knuckle/Hub/Wheel Bearing Replacement (page 18-13) Exploded View Special Tools Required Ball joint remover, 28 mm 07MAC-SL0A202 Hub dis/assembly tool 07GAF-SD40100 Bearing driver attachment,
FIBER OPENING AND BLENDING. AUTEFA Solutions leads the way
FIBER OPENING AND BLENDING AUTEFA Solutions leads the way AUTEFA SOLUTIONS Experience, Know-How and Competence in Nonwoven Technology AUTEFA Solutions leads the way AUTEFA Solutions represents companies