Design Feature and Prototype Testing Methodology of DHIC s Nuclear I&C System
|
|
|
- Basil Malone
- 10 years ago
- Views:
Transcription
1 IAEA-CN-164-7S03 Design Feature and Prototype Testing Methodology of DHIC s Nuclear I&C System K.H. Kim, S.Y. Baeg, S.A. Kim, S.J. Lee, S.P. Yoon, C.Y Park Doosan Heavy Industries & Construction, Changwon, Republic of Korea Abstract. The DHIC has developed an I&C system for a nuclear power plant through a Korean Government R&D project since This I&C system was designed and implemented to be applied for the new 1400MW nuclear power plant of KHNP. This system s design is based on the class-1e PLC platform and the non-class1e DCS platform. The PPS, the ESF-CCS, the RCOPS, the QIAS-P/N, the PCS, the NPCS, the P-CCS and the NIMS were designed, implemented and tested. The R&D project has been developed under a systematic and guided QA plan, but it is not easy to be applied for a new NPP such as Shin-Ulchin #1&2. To resolve problems of the first-application concerns, a new idea of integrated performance testing was adopted. A main control room for a verification test facility was constructed and it has features of a compact, video-based man-machine interface. The MCR includes five operation consoles, a Large Display Panel. A test system for a verification test facility is implemented as similar as a control and protection system of SUN #1&2. Integration level tests such as a system test, an interface test, a MMI test, a system function/performance test, a failure mode test, a response time test, a network load test, an alarm test, a reactor power cutback system test, an unit load transient test and a scenario test were performed using the prototype test facilities. These kinds of testing can verify and pre-validate the integrated I&C system s performance and flexibility. It could offer an implementation training before construction and also minimize trial errors to be found in the site. 1. KOREAN NUCLEAR I&C SYSTEM DEVELOPMENT The DHIC(Doosan Heavy Industries & Construction) has developed an I&C(instrumentation and control) system for a nuclear power plant through a Korean Government R&D project since This I&C system was designed and implemented to be applied for the new 1400MW NPP(Nuclear Power Plants) of KHNP(Korea Hydro & Nuclear Power Co. Ltd.). This system s design is based on the class-1e PLC(Programmable Logic Controller) platform and the non-class-1e DCS(Distributed Control System) platform. The class 1E PLC s features are a high speed processing capability, a CPU redundancy, a safety data link for communication between safety channels, a safety data network for intra channel information communication and a redundant power module. Also, the communication speed of data link and network is up to 16M bps. PLC qualification tests such as an environmental, electromagnetic interference and a seismic testing were conducted. The safety evaluation report for the PLC topical report was issued by Korean nuclear regulatory institute. The non-class-1e DCS provides a redundant CPU/rack configuration, separated control and information networks and other necessary functions such as function blocks. The DCS s network for control and information is redundant and its communication speed is 100M bps. The speed of communication link between redundant CPU is up to 10M bps. The PPS(Plant Protection System), the ESF-CCS(Engineered Safety Feature-Component Control System), the RCOPS (Reactor Core Protection System) and the QIAS-P(Qualified Indication and Alarming System-P) were designed, implemented and tested. The PPS has a design feature of a fault tolerant system configuration which offers the system more safety and availability. The PPS has a capability of on-line periodic logic testing. All software life cycle activities in safety system were documented and verified in conformance with the IEEE Std.1074 and the IEEE Std The safety evaluation reports for the PPS, the ESF-CCS and the RCOPS topical report were issued by Korean nuclear regulatory institute. These systems meet the Defense in depth and diversity and have simpler
2 structures, superior abilities in maintenance and more advanced safety algorithms than previous systems used in Korea. The PCS(Power Control System), the P-CCS(Process-Component Control System), the NPCS(NSSS Process Control System), the NIMS(NSSS Integrity Monitoring System) and the non-safety grade monitoring system were also designed, implemented and tested. The PCS has a superior ability in a DC hold power supply and a maintenance capability in power controller than previous systems used in Korea. 2. VERIFICATION TEST FACILITY 2.1. Background of Verification Test Facility Construction The R&D project has been developed under a systematic and guided QA(Quality Assurance) plan, but it is not easy to be applied for a new NPP such as Shin-Ulchin #1&2. To resolve problems not because of technical facts but because of the first-application concerns, a new idea of integrated performance testing was adopted. For an application of the R&D project result, the DHIC and the Korean Nuclear Utility (KHNP) organized a task-force team to evaluate and apply for the new NPP construction. Not only for an evaluation of application to the new NPP but also for a pre-application of the developed system, an integrated verification test facility has been built. Several tests based on the KURD(Korean Utility Requirements Document) and site testing procedures are being carried. These kinds of testing can verify and pre-validate the integrated I&C system s performance and flexibility. It could offer an implementation training before construction and also minimize trial errors to be found in the site. Also, according to the requirements of KURD Chapter 10, the proven technology is supposed to be applied to I&C systems. Therefore, the new I&C systems should meet one of below requirements. 1) 3 years or 3, 000 Operating years as subsystem module in power plant 2) 3 years or 3, 000 operating years in other than power plant 3) prototype testing. Therefore new I&C systems are intended to meet the requirements of KURD Chapter 10 by prototype testing based on integrated verification test facility APR1400 Simulator The simulator developed by the KEPRI(Korea Electric Power Research Institute) for the Shin-Kori #3&4 had been used as APR1400 simulator for verification test facility. Some of the simulator codes were modified by the KEPRI, such as deletions of protection and control logics from original code for the verification test facility. The simulator developed using the WSC(Western Services Corporation) s 3KEYMASTER includes a reactor thermal & hydraulic power modeling, a reactor primary system and a reactor secondary system modeling. The 3KEYMASTER modeling tools are a comprehensive suite of high-fidelity, efficient, object-oriented graphical modeling ones and complete with numerical solution methods. These include a flow network modeling tool, an electrical network modeling tool, a logic and control tool, a relay tool and a component library. The APR1400 reactor kinetics modeling was developed using the RELAP5-RT which is the WSC's adaptation of the Idaho National Engineering and Environmental Laboratory's RELAP5 thermal-hydraulic codes to run in the 3KEYMASTER environment, in real-time mode with a graphical visualization Main Control Room The MCR(Main Control Room) for the verification test facility uses a compact, video-based MMI(Man-Machine Interface). The MCR includes five operation consoles, a LDP(Large Display Panel). Fig.1 is the main control room s picture of the performance test facility. The operator consoles designed to carry out plant operation by an operator include the Reactor operator(ro) console, the
3 Turbine Operator and the Electric Operator (TO/EO) console, the Shift Supervisor(SS) console, the Shift Technical Advisor(STA) console. Each console is composed of four control workstations and other equipment necessary for the safe and reliable operation of the plant. The LDP is installed in front of the operation consoles. It provides the capability to display plant process alarms, SGA(System Group Alarm)/Important alarms, CFM(Critical Function Monitoring) alarms, PPS status information, and plant overview status information with fixed mimic displays. The MCR also includes a Safety Console that contains Mini-LDPs and Class 1E controls for all safety-related components independent of the operator consoles. It provides the dedicated Class 1E controls for selected safety-related and non-safety components/systems and a safety related monitoring capability, including the QIAS-N/P, minimized-ldp (mini-ldp), the T/G FPD(Flat Panel Display), the ESCM(ESF-CCS Soft Control Module), the PPS/RCOPS operator module independent of the DCS operator stations and the ESCMs located at the RO, the TO, the EO, the STA and the SS Consoles. Fig. 1. Main control room's picture of performance test facility The information available to the plant operation staff both on a real-time and historical basis is processed by the IPS(Information Processing System). The major functions of the IPS include plant wide data acquisition via network, validation of sensed parameters, the execution of NSSS/BOP application programs, the monitoring of plant safety and general status, the presentation of status and calculation results on the Information displays, the provision of logs, and the determination of alarm conditions. The function of the IPS is processed by the IPS server such as a database server, an alarm server, a application server, and a historical data storage/retrieval server Test System of Verification Test Facility The test system for the verification test facility is implemented as similar as the control and protection system of the SUN #1&2. The test system for the PPS, the N-PCS, the NIMS and the QIAS-P/N has almost the same cabinet volume as the SUN #1&2 system. For example, the PPS is implemented as 4 channels. The other test system such as the RCOPS, the ESF-CCS, the PCS and the P-CCS has less cabinet volume than that of SUN #1&2, but the critical function representing each system was implemented. The detailed test system volume is as follows. Item Safety System System Description Prototype Volume(Cabinet) Scope PPS 12 Fully(CH-A,BC&D) RCOPS 4 Partially(CH-C&D) ESF-CCS 8 Partially(Representative function)
4 Non-Safety System MCR Equipments QIAS-P&N 5 fully PCS 5 Partially (representative function) NPCS 7 Almost Fully P-CCS 6 Partially(representative function NIMS 4 Fully LDP(Large Display Panel) 14 Fully Consoles(Safety Console, RO/EO/TO,SS/STA Console) Servers(Database, HDSR, Alarm, Time, Computation) 6 Fully 13 Almost Fully Because the test system was manufactured to interface with a plant actuation device and a sensing device directly and the APR1400 simulator is a sole computer system, an interposing system called the I/O interface panel is needed to interface the test system with the APR1400 simulator. The simulator variables for test system are implemented in I/O interface panel using National Instruments s cfp module. The simulator variables for unimplemented test system are processed by Virtual I/O. 3. TESTING METHODOLOGY OF VERIFICATION TEST FACILITY The detailed test items via verification test facility are as follows: Test Electrical & Platform Function Test F.A.T. Integration Test (with APR1400 Plant Simulator) Long Term Reliability (with APR1400 Plant Simulator) Detailed Test Items Electrical Test & Redundancy Test Network Communication Test Controller & I/O Module Performance Test PLC Function Test/DCS Function Test System Applications Software Module Test System Test Failure Mode Test/Redundancy Test Interface Test /MMI Test System Function/Performance Test System Response Time Test Network Load Test Alarm Test Reactor Power Cutback System Test Unit Load Transient Test/Load Cycle Test Load Rejection Test Scenario Test Long Term Reliability Test 3.1. System Test The purpose of the system test is to verify the basic function of the implemented system after the integration of a hardware and a software. The system test is conducted via the I/O simulator which generated simulated inputs to test system and gather output signals generated from test system. The overview of the PPS system test, as an example of system test, is as follows: (1) Power energized status check of all modules inside cabinet. (2) Controller booting status check via controller LED lamp.
5 (3) Cabinet alarm function check such as power fail detecting, low temperature alarm, cabinet door open and fan fail alarm. (4) Bistable processor function check through simulated input signal from I/O simulator which would force bisable logic of PPS to generate bistable trip and operation bypass. (5) Coincidence processor function check through simulated input signal from I/O simulator which would force coincident logic of PPS to generate partial trip. (6) Operating bypass, trip channel bypass function and reactor trip and ESFAS initiation relay function test. (7) Response time test by measuring from the time at simulated signal input from I/O simulator to the occurrence time of reactor trip. Although detailed logic and interface signal of the other system is different from that of the PPS, the similar methods were applied to the other systems(the RCOPS, the ESF-CCS, the QIAS-P/N, the PCS, the NPCS, the P-CCS and the NIMS) for the system tests Interface Test The purpose of the interface test is to verify the interface function between the simulator s I/O interface panel and the individual system after the system test. The interface test is conducted via the simulator I/O interface panel which generated simulated inputs to test system and gather output signals from test system. The overview of PPS interface test, as an example, is as follows: (1) The signal from the simulator which would force PPS to generate reactor trip and ESFAS actuation is transferred to PPS via I/O interface panel by hardwire. For analog signal, we check if the difference, between the input value which displayed in the simulator s screen of process variable of plant and the measured value which is measured in PPS input analog module by measuring unit, dose not exceed the tolerance specified. For digital signal, we check if the simulator s signal used for operating bypass, trip channel bypass and setpoint reset logic is correctly transferred to PPS digital input module. (2) We checked if the PPS s signal generated by logic execution, such as reactor trip and ESFAS signal, is correctly transferred to the simulator via I/O interface panel. Although an interface signal of the other system is different from that of the PPS, similar methods were applied to the other systems(the RCOPS, the ESF-CCS, the QIAS-P/N, the PCS, the NPCS, the P-CCS and the NIMS) for the interface test MMI Test The purpose of the MMI test is to verify the interface and display function between the test system and the IPS. The overview of PPS MMI test, as an example, is as follows: (1) The PPS s signal which is generated by logic execution, such as reactor trip and ESFAS signal is transferred to IPS via channel gateway server. Channel gateway server is supplied to meet the requirement of channel isolation and electrical isolation between safety and non safety system. Channel isolation is achieved by unidirectional communication from safety system to non-safety system. We check if the PPS s signal is correctly transferred to MMI display in LDP. Although an interface signal of the other system is different from that of the PPS, similar were applied to the other systems(the RCOPS, the ESF-CCS, the QIAS-P/N, the PCS, the NPCS, the P-CCS and the NIMS) for the MMI test.
6 3.4. System Function/Performance Test The purpose of system s function and performance test is to verify the function and performance of each system through the simulator. The overview of the PPS function and performance test, as an example, is as follows: (1) The signal from the simulator is transferred to PPS via I/O interface panel. The output signal generated by PPS logic execution, in accordance with input conditions from the simulator, is transferred to the simulator. Various PPS logics such as setpoint change logic, bistable logic, coincidence logic, operating bypass logic and trip channel bypass logic were tested. Although detailed logic and interface signal of the other system is different from that of the PPS, the similar methods were applied to the other systems(the RCOPS, the ESF-CCS, the QIAS-P/N, the PCS, the NPCS, the P-CCS and the NIMS) for the system s function and performance test Failure Mode Test The purpose of failure mode test is to verify if the failure during forced simulated condition, such as a removal of card in operating normally, is detected, the symptoms due to the failure is generated in the system the same as defined in each system s failure mode effect and analysis and the system is restored after an elimination of the failure. The forced simulated condition includes the removal and the restoration of a main circuit breaker, a main power supply module, a power module of each rack, a PLC s central processing module, a PLC s communication module, a PLC input module, a PLC output module and another module in cabinet Response Time Test The response time test between the safety/non-safety systems and the MCR display consoles was accomplished. The response time test among the safety/non-safety systems which includes the sections between the DCS Group Controller s (NPCS) input and the DCS Loop Controller s (P-CCS) output, and between the ESF-CCS Loop Controller s input and the DCS Loop Controller s (P-CCS) output was also accomplished. To measure the response time precisely, a dedicated measuring computer was used. The computer captures the time of the input signal from the simulator and then the time of the display output in the consoles using the USB type data acquisition device. The computer calculates the difference of times Network Load Test Network load data include two categories of data. One is the IPS data which is communicated between a server and a console for the periodic and the non-periodic data, and the other is the DCS data which is communicated among controllers for the control and the information data. The basic network load data includes the data from the PPS/ESF-CCS/RCOPS/QIAS-P of the safety system, the data from the PCS/NPCS/P-CCS of the non-safety system and the data from the APR1400 simulator. These data have been already enrolled in the IPS Server as the 61,000 tags. The data flow is divided into four sections. The first is from the above systems to the server, the second is from the server to the console, the third is from the console to the FPD to display the tag data, and the last is from the console to the server to request the logging data. We have verified that the measured response time of a tag for the response time satisfied the requirement. For the virtual network load in addition to the basic network load, the virtual controllers are set up in ten computers, and each computer generates the virtual network load of the maximum ten controllers individually. The data flow is similar to that above the basic network load test case. We have also verified that the measured response time of tag for the response time satisfied the requirement.
7 3.8. Alarm Test The purpose of the alarm test is to verify whether the alarm generated from the individual I&C system are displayed on the basic alarm list over the operator consoles screen through the IPS alarm server. During the alarm test, major check point is the response time between an occurrence of an alarm and an alarm generating condition, the blinking function on the basic alarm list window, the alarm sound, the alarm acknowledge function and the withdrawal of an alarm after removal of an alarm generating condition. We have also checked the alarm display functions such as the Priority Alarm / Unacknowledged Alarm / System Base Alarm / Chronological Alarm on the basic alarm list Reactor Power Cutback System Test The reactor power cutback system test, which is similar as the plant performance test at a plant startup stage, is to verify the functions of overall plant control systems in case 2 of 3 main feedwater pumps are failed at 70% and 95% of reactor power. The RPCS test procedures at 70% of reactor power are as follows: (1) Two(2) main feedwater pumps are forced to trip by manual control at APR1400 simulator. (2) It is checked if RPCS generate signals for TBN setback and TBN load increase without dropping of CEA. (3) It is checked if TBV(Turbine Bypass Valve) is opened by SBCS(Steam Bypass Control System) automatically and MSSV(Main Steam Safety Valve) and MSADV(Main Steam Atmosphere Discharge Valve) is not opened. (4) It is checked if setpoint of PPCS(Pressurizer Pressure Control System) and PPCS(Pressurizer Level Control System) keep up and PSV(Pressurizer Safety Valve) is not opened. (5) It is checked if CEA is inserted by RRS(Reactor Regulation System) to regulate reactor power. (6) It is checked if main feedwater is increased by FWCS (Feedwater Control System) and there is no initiation of RPS trip and ESF-CCS actuation Unit Load Transient Test The unit load transient test, which is similar as the performance test at plant start-up stage, is to verify that NSSS(Nuclear Steam Supply System) can accommodate 10% of step change from 50%, 100% reactor power and 5% per minute of a ramp change. The test procedures at 50% of a normal power are as follows: (1) Turbine load is forced to decrease to 40% by manual control at APR1400 simulator. (2) It is checked if CEA is inserted. (3) It is checked if there is no initiation of RPS trip and ESF-CCS actuation and all PSVs is not opened. (4) Turbine load is decreased to 25% as 5% per minute. (5) Repeat step (2) and step (3). (6) Turbine load is increased to 40% as 5% per minute. (7) It is checked if CEA is withdrawn. (8) Repeat step (3). (9) Turbine load is increased to 50% from 40%. (10) Repeat step (7) and step (8) Scenario Test The Purpose of the scenario test is to verify the inter-system operations more clearly between the control system, the protection system and the MCR equipments, combined as a package of the individual tests. One case of various scenario tests, as an example, is as follows:
8 Step 1: 100 % reactor power Step 2 : CEA manual operation Step 3: Automatic load following operation (100% - >90%->100%) Step 4: operation under failure of 2 out of 3 main feed-water pumps Step 5: Reactor trip caused by PZR low pressure Step 6: Check operation log To maintain 100% reactor power under 100% power condition of APR1400 simulator. Check if operator manually insert/withdraw CEA by Soft-control of console at 100% reactor power. Check if automatic load following operation work, while changing TBN load to 100% 80% 100%. Check if CEA insertion status is displayed on LDP, and the parameters for PZR & SG are displayed on LDP. Two main feedwater pumps are forced to trip by manual control at 100% reactor power. Check if if RPCS work well and the other main feed-water pump overcome the failed condition. To Simulate low pressure condition caused by PZR spray valve failed as stuck-opened. Check if there is initiation of Reactor Protection System which generates reactor trip alarm at LDP. To check the time and sequence of events through Historical Data Storage & Retrieval Server(HDSR Server) during scenario test. 4. CONCLUSION The fully digitalized nuclear I&C system was developed. The Licensing (topical reports of the PLC, the PPS, the ESF-CCS and the RCOPS reviewed by KINS) was completed. The full scope of the digitalized integrated verification test facility was constructed and the verification test has been completed. We want to propose the DHIC s prototype testing methodology for a method to meet the proven technology requirement. The evaluation of the application to the SUN #1&2 project has been completed. The DHIC has closed the contract with the KHNP for the SUN #1&2 Project. ACKNOWLEDGEMENTS The Nuclear I&C system development and the construction of the verification test facility was supported by Korean Government R&D programs such as the KNICS R&D program by the Ministry of Education, Science and Technology and the NUTECH-2012 R&D program by the Ministry of Knowledge Economy. REFERENCES [1] Korean Utility Requirements Document, CHAPTER 10, Man-Machine Interface Systems, Korea Electric Power Corporation [2] System Function/Performance Test Report of PPS, Doosan Heavy Industries & Construction, 2008 [3] Response Time Test Report of Verification Test Facility, Doosan Heavy Industries & Construction, 2009 [4] Network Load Test Report of Verification Test Facility, Doosan Heavy Industries & Construction, 2009 [5] Alarm Test Report of Verification Test Facility, Doosan Heavy Industries & Construction, 2009 [6] Reactor Power Cutback System Test Report of Verification Test Facility, Doosan Heavy Industries & Construction, 2009
9 [7] Unit Load Transient Test Report of Verification Test Facility, Doosan Heavy Industries & Construction, 2009
Development and Application of POSAFE-Q PLC Platform
Development and Application of POSAFE-Q PLC Platform MyeongKyun Lee a, SeungWhan Song a, DongHwa Yun a a POSCO ICT Co. R&D center, Korea Techno-complex 126-16, 5-ka, Anam-dong, Sungbuk, Seoul, Republic
231 XA9744368 REACTOR ALARM SYSTEM DEVELOPMENT AND APPLICATION ISSUES. J.E. Drexler, G.O. Oicese INVAP S.E. Argentina
21 XA974468 REACTOR ALARM SYSTEM DEVELOPMENT AND APPLICATION ISSUES J.E. Drexler, G.O. Oicese INVAP S.E. Argentina ASTRACT The new hardware and software technologies, and the need in research reactors
AN APPLICATION STUDY FOR THE CLASS IE DIGITAL CONTROL AND
- 39 - AN APPLICATION STUDY FOR THE CLASS IE DIGITAL CONTROL AND MONITORING SYSTEM m,,,.,.., HIROYUKIFUKUMITSU Nuclear Power Plant Department, EISC MITSUBISHI ELECTRIC CORPORATION Kobe, Japan XA9846493
AN ANALYSIS OF TECHNICAL SECURITY CONTROL REQUIREMENTS FOR DIGITAL I&C SYSTEMS IN NUCLEAR POWER PLANTS
http://dx.doi.org/10.5516/net.04.2012.091 AN ANALYSIS OF TECHNICAL SECURITY CONTROL REQUIREMENTS FOR DIGITAL I&C SYSTEMS IN NUCLEAR POWER PLANTS JAE-GU SONG *, JUNG-WOON LEE, GEE-YONG PARK, KEE-CHOON KWON,
7.0 Instrumentation and Controls
7.0 Instrumentation and Controls 7.1 Introduction Chapter 7 describes the instrumentation and controls (I&C) systems for the U.S. EPR. The description of the I&C systems includes system classifications,
REMOTE MONITORING AND CONTROL OF THE KAKKONDA GEOTHERMAL POWER PLANTS
REMOTE MONITORING AND CONTROL OF THE KAKKONDA GEOTHERMAL POWER PLANTS Shinji Nishikawa 1, Toshiyuki Takahashi 1, Takeshi Koi 1, and Katsuyoshi Yamada 2 1 Toshiba Corporation Power Systems & Services Company,
Emulated Digital Control System Validation in Nuclear Power Plant Training Simulators
Digital Control System Validation in Nuclear Power Training s Gregory W. Silvaggio Westinghouse Electric Company LLC [email protected] Keywords: Validation, nuclear, digital control systems Abstract
RADIATION MONITORING SYSTEMS
RADIATION MONITORING SYSTEMS Area monitors Process monitors In-line, Adjacent-to-Line monitors Local/remote processors, Data Acquisition Systems NUPIC Certified, NRC Approved Vendor Wide Range Sensitivity
AP1000 European 18. Human Factors Engineering Design Control Document
18.2 Human Factors Engineering Program Management The purpose of this section is to describe the goals of the AP1000 human factors engineering program, the technical program to accomplish these goals,
Application of FPGA-based Safety Controller for Implementation of NPPs I&C Systems Vladimir Sklyar, Technical Director
Application of FPGA-based Safety Controller for Implementation of NPPs I&C Systems Vladimir Sklyar, Technical Director Seminar FPGA-based I&C Systems in Nuclear Applications February 4, 2015, Energiforsk,
Safety Requirements Specification Guideline
Safety Requirements Specification Comments on this report are gratefully received by Johan Hedberg at SP Swedish National Testing and Research Institute mailto:[email protected] -1- Summary Safety Requirement
Combined Cycle Control Overview
Combined Cycle Control Overview Introduction The Combined Cycle (CC) solution provides for the control and monitoring of a typical CC power plant in a cost effective, preengineered package. Basic Architecture
OROT RABIN POWER STATION UNITS 1-4. 4 x 350 MW
ISRAEL ELECTRIC OROT RABIN POWER STATION UNITS 1-4 4 x 350 MW COAL BOILER CONVERSION TO LOW NO X NATURAL GAS AND COAL FIRING BY PRIMARY AND SECONDARY MEASURES INSTALLATION Replacing the Burner Management
Alain Nifenecker - General Electric Manager Controls Engineering
GE Energy Benefits of Integrating a Single Plant-Wide Control System Into a Standard Plant Design Philosophy Authors: Luis Cerrada Duque - Empresarios Agrupados Director of I&C Department Charles Weidner
Cyber Security Design Methodology for Nuclear Power Control & Protection Systems. By Majed Al Breiki Senior Instrumentation & Control Manager (ENEC)
Cyber Security Design Methodology for Nuclear Power Control & Protection Systems By Majed Al Breiki Senior Instrumentation & Control Manager (ENEC) 1. INTRODUCTION In today s world, cyber security is one
A Test Bed for Digital I&C and Cyber Security for NPPs
Submitted for publication. Author copy -- do not redistribute. A Test Bed for Digital I&C and Cyber Security for NPPs Yongkyu AN, Calogero SOLLIMA, and Rizwan-uddin Department of Nuclear, Plasma, and Radiological
A Proposed Integration of Hierarchical Mobile IP based Networks in SCADA Systems
, pp. 49-56 http://dx.doi.org/10.14257/ijsh.2013.7.5.05 A Proposed Integration of Hierarchical Mobile IP based Networks in SCADA Systems Minkyu Choi 1 and Ronnie D. Caytiles 2 1 Security Engineering Research
Nuclear Power Plant Electrical Power Supply System Requirements
1 Nuclear Power Plant Electrical Power Supply System Requirements Željko Jurković, Krško NPP, [email protected] Abstract Various regulations and standards require from electrical power system of the
New-generation Integrated Monitoring and Control System
Hitachi Review Vol. 54 (05), No. 3 145 New-generation Integrated Monitoring and Control System Shigeru Takahashi Satoru Shimizu Takaaki Sekiai OVERVIEW: Hitachi delivered a new-generation integrated monitoring
The Bayesian Network Methodology for Industrial Control System with Digital Technology
, pp.157-161 http://dx.doi.org/10.14257/astl.2013.42.37 The Bayesian Network Methodology for Industrial Control System with Digital Technology Jinsoo Shin 1, Hanseong Son 2, Soongohn Kim 2, and Gyunyoung
Testing Automated Manufacturing Processes
Testing Automated Manufacturing Processes (PLC based architecture) 1 ❶ Introduction. ❷ Regulations. ❸ CSV Automated Manufacturing Systems. ❹ PLCs Validation Methodology / Approach. ❺ Testing. ❻ Controls
Technical Training Module ( 30 Days)
Annexure - I Technical Training Module ( 30 Days) Section 1 : Programmable Logic Controller (PLC) 1. Introduction to Programmable Logic Controller - A Brief History, Need and advantages of PLC, PLC configuration,
MDEP Generic Common Position No DICWG 02
MDEP Generic Common Position No DICWG 02 Related to: Digital Instrumentation and Controls Working Group activities COMMON POSITION ON SOFTWARE TOOLS FOR THE DEVELOPMENT OF SOFTWARE FOR SAFETY SYSTEMS 1
SECTION 16926 CONTROL SOFTWARE
SECTION 16926 CONTROL SOFTWARE PART 1 GENERAL 1.01 SUMMARY: A. Contractor shall furnish a complete control software package for the Red River Wastewater Treatment Plant and the Northeast Wastewater Treatment
The Business case for monitoring points... PCM architecture...
The Business case for monitoring points... Points Condition Monitoring (PCM) measures key parameters related to the performance of switch machines and turnouts in real time at every movement. Intelligent
Cyber Security Evaluation of the Wireless Communication for the Mobile Safeguard Systems in uclear Power Plants
Cyber Security Evaluation of the Wireless Communication for the Mobile Safeguard Systems in uclear Power Plants Sooill Lee a*, Yong Sik Kim a, Song Hae Ye a a Central Research Institute, Korea Hydro and
The Role of Automation Systems in Management of Change
The Role of Automation Systems in Management of Change Similar to changing lanes in an automobile in a winter storm, with change enters risk. Everyone has most likely experienced that feeling of changing
WordPerfect Document Compare Summary
WordPerfect Document Compare Summary Original document: P:\RG 1.206 draft\c.iii.5.wpd Revised document: @PFDesktop\:MyComputer\C:\Documents and Settings\dlc3.NRCDOMAIN\Application Data\NRC\ADAMSDesktop\Cache\ML0706300310.wpd
Research Institute (KAERI) 989-111 Daedeok-daero, Yuseong-gu, Daejeon, Republic of Korea 305-353
, pp.233-242 http://dx.doi.org/10.14257/ijseia.2014.8.4.24 Methods of Software Qualification for a Safety-grade Optical Modem to be used Core Protection Calculator (CPC) in Korea Standard Nuclear Power
Product Description Full Voltage Starting Electric Fire Pump Controllers FTA1000
Product Description Full Voltage Starting Electric Fire Pump Controllers FTA1000 Description Firetrol FTA1000 Full Voltage Fire Pump Controllers are intended for use with electric motor driven fi re pumps
Kevin Kochirka, ABB Turbine Automation, June 29, 2016. Flexible turbine control retrofits Webinar
Kevin Kochirka, ABB Turbine Automation, June 29, 2016 Flexible turbine control retrofits Webinar Welcome Speaker introduction Kevin Kochirka Sr. Applications Engineer with ABB Inc. [email protected]
AN AUTOMATIC MAINTENANCE SYSTEM FOR NUCLEAR POWER PLANTS INSTRUMENTATION
AN AUTOMATIC MAINTENANCE SYSTEM FOR NUCLEAR POWER PLANTS INSTRUMENTATION Bárbara Álvarez, Andrés Iborra, *Carlos Fernández Universidad Politécnica de Cartagena, Dpto. Tecnología Electrónica Campus Muralla
SCADA. The Heart of an Energy Management System. Presented by: Doug Van Slyke SCADA Specialist
SCADA The Heart of an Energy Management System Presented by: Doug Van Slyke SCADA Specialist What is SCADA/EMS? SCADA: Supervisory Control and Data Acquisition Retrieves data and alarms from remote sites
Announcement of a new IAEA Co-ordinated Research Programme (CRP)
Announcement of a new IAEA Co-ordinated Research Programme (CRP) 1. Title of Co-ordinated Research Programme Design and engineering aspects of the robustness of digital instrumentation and control (I&C)
Recent Technologies in Nuclear Power Plant Supervisory and Control Systems
Hitachi Review Vol. 49 (2000), No. 2 61 Recent Technologies in Nuclear Power Plant Supervisory and Control Systems Toshiharu Yamamori Takashi Ichikawa Satoshi Kawaguchi Hiroyuki Honma OVERVIEW: Supervisory
Programming Logic controllers
Programming Logic controllers Programmable Logic Controller (PLC) is a microprocessor based system that uses programmable memory to store instructions and implement functions such as logic, sequencing,
SOLARPACES: Development of an integrated solar thermal power plant training simulator
SOLARPACES: Development of an integrated solar thermal power plant training simulator Achaz von Arnim 1 and Ralf Wiesenberg 2 1 Dipl.Ing., Business Unit Energy E F IE ST BD, Business Development CSP, Siemens
ORC TURBOGENERATOR TYPE CHP - Organic Rankine Cycle Turbogenerator fed by thermal oil, for the combined production of electric energy and heat -
Doc. : 08C00031_e Date : 10.02.2009 Page : 1 / 9 ORC TURBOGENERATOR TYPE CHP - Organic Rankine Cycle Turbogenerator fed by thermal oil, for the combined production of electric - (Preliminary) Doc. : 08C00031_e
Fire Protection Program Of Chashma Nuclear Power Generating Station Pakistan Atomic Energy Commission 5/28/2015 1
Fire Protection Program Of Chashma Nuclear Power Generating Station Pakistan Atomic Energy Commission 5/28/2015 1 Nuclear Power in Pakistan Nuclear Power Plants Capacity (MWe) Year of Commissioning In
How To Write A Cyber Security Risk Analysis Model For Research Reactor
MODEL BASED CYBER SECURITY ANALYSIS FOR RESEARCH REACTOR PROTECTION SYSTEM JINSOO SHIN, RAHMAN KHALIL UR, GYUNYOUNG HEO Kyung Hee University, Seogyeong-daero, Giheung-gu, Gyeonggi-do, 446-701, Republic
Pressurized Water Reactor B&W Technology Crosstraining Course Manual. Chapter 9.0. Integrated Control System
Pressurized Water Reactor B&W Technology Crosstraining Course Manual Chapter 9.0 Integrated Control System TABLE OF CONTENTS 9.0 INTEGRATED CONTROL SYSTEM... 1 9.1 Introduction... 1 9.2 General Description...
New Remote Intelligent Gateway and Secure Socket Layer Validation Procedure
New Remote Intelligent Gateway and Secure Socket Layer Validation Procedure Page 1 of 29 REVISION HISTORY REVCAISON NO. DATE DESCRIPTION 1.0 12/5/2001 Initial release of document 2.0 5/25/2007 Revised
www.klmtechgroup.com TABLE OF CONTENT
Page : 1 of 13 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 2 REFERENCES
A CYBER SECURITY RISK ASSESSMENT FOR THE DESIGN OF I&C SYSTEMS IN NUCLEAR POWER PLANTS
http://dx.doi.org/10.5516/net.04.2011.065 A CYBER SECURITY RISK ASSESSMENT FOR THE DESIGN OF I&C SYSTEMS IN NUCLEAR POWER PLANTS JAE-GU SONG, JUNG-WOON LEE *, CHEOL-KWON LEE, KEE-CHOON KWON, and DONG-YOUNG
Dynamic Behavior of BWR
Massachusetts Institute of Technology Department of Nuclear Science and Engineering 22.06 Engineering of Nuclear Systems Dynamic Behavior of BWR 1 The control system of the BWR controls the reactor pressure,
NEW GENERATION PROGRAMMABLE AUTOMATION CONTROLLER
NEW GENERATION PROGRAMMABLE AUTOMATION CONTROLLER NEW GENERATION PROGRAMMABLE AUTOMATION CONTROLLER Understanding what a PAC is starts from the understanding of PLC. A PLC is a Programmable Logic while
Control of Boiler Operation using PLC SCADA
Control of Boiler Operation using PLC SCADA K. Gowri Shankar Abstract This paper outlines the various stages of operation involved in the conversion of a manually operated boiler towards a fully automated
DCS Data and communication server
8 58 PLD.TOWER PLD.RACK VISONIK DCS Data and communication server PLD.TOWER PLD.RACK Data and communication servers (DCS) are used as management stations in building automation and control (BAC). With
EUROTHERM MASTER COMMUNICATIONS 5000 Series with Master Communications for unsurpassed access to process data everywhere
EUROTHERM MASTER COMMUNICATIONS 5000 Series with Master Communications for unsurpassed access to process data everywhere CONNECTIONS MADE EASY The 5180V, 5100V and 5000B now all support Modbus Master Communications
SECTION 13421 PROGRAMMABLE LOGIC CONTROLLERS AND COMPUTER CONTROL SYSTEM PART 1 GENERAL. 1.01 Summary. A. Section Includes:
SECTION 13421 PROGRAMMABLE LOGIC CONTROLLERS AND COMPUTER CONTROL SYSTEM PART 1 GENERAL 1.01 Summary A. Section Includes: 1. The ISS shall furnish all labor, materials, equipment, services and incidentals
Verification of Safety for Reinstalled Class-1E Cable in Shin-Kori Unit 3
ID 90019 Verification of Safety for Reinstalled Class-1E in Shin-Kori Unit 3 Sang-Hwa Lee, Hong-seok Jang, Young-sik Cho Korea Institute of Nuclear Safety 62, Gwahak-ro, Yuseong-gu, Daejeon 305-338, Korea
Latest Power Plant Control System
Hitachi Review Vol. 52 (2003), No. 2 101 Latest Power Plant Control System Takashi Kamei Takashi Tomura Yoichi Kato OVERVIEW: Along with advances in system component technologies, modern state-of-the-art
OPERATIONS CAPITAL. The Operations Capital program for the test years is divided into two categories:
Filed: September 0, 00 EB-00-0 Tab Schedule Page of OPERATIONS CAPITAL.0 INTRODUCTION Operations Capital funds enhancements and replacements to the facilities required to operate the Hydro One Transmission
2. System Based Design Descriptions and ITAAC AP1000 Design Control Document
2.3.2 Chemical and Volume Control System Design Description The chemical and volume control system (CVS) provides reactor coolant system (RCS) purification, RCS inventory control and makeup, chemical shim
RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION
07-12 - 1 / 4 KEPCO/KHNP RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION APR1400 Design Certification Korea Electric Power Corporation / Korea Hydro & Nuclear Power Co., LTD Docket No. 52-046 RAI No.: 356-7881
A Methodology for Safety Critical Software Systems Planning
A Methodology for Safety Critical Software Systems Planning EHAB SHAFEI 1, IBRAHIM F. MOAWAD 2, HANY SALLAM 1, ZAKI TAHA 3, MOSTAFA AREF 3 1 Operation Safety and Human Factors Department, 2 Information
D. Infrared scanning reports with pictures printed in a final report with any deficiencies and actions taken to rectify.
SECTION 263354 STATIC UPS TESTING AND COMMISSIONING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes 1. System start-up services. 2. Battery charging. 3. Load bank testing. 4. Battery load testing. 5.
UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION WASHINGTON, DC 20555-0001. June 16, 2011
UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION WASHINGTON, DC 20555-0001 June 16, 2011 NRC INFORMATION NOTICE 2011-12: REACTOR TRIPS RESULTING FROM WATER INTRUSION INTO
Rosemount Analytical s X-STREAM XE Web-Browser Interface Takes Process Analysis to the Next Level
Solutions for the Process Industries Rosemount Analytical s -STREAM E Web-Browser Interface Takes Process Analysis to the Next Level The -Stream E takes process gas analysis to the level of ease of use
Government Degree on the Safety of Nuclear Power Plants 717/2013
Translation from Finnish. Legally binding only in Finnish and Swedish. Ministry of Employment and the Economy, Finland Government Degree on the Safety of Nuclear Power Plants 717/2013 Chapter 1 Scope and
Version: 1.0 Latest Edition: 2006-08-24. Guideline
Management of Comments on this report are gratefully received by Johan Hedberg at SP Swedish National Testing and Research Institute mailto:[email protected] Quoting of this report is allowed but please
Selecting Sensors for Safety Instrumented Systems per IEC 61511 (ISA 84.00.01 2004)
Selecting Sensors for Safety Instrumented Systems per IEC 61511 (ISA 84.00.01 2004) Dale Perry Worldwide Pressure Marketing Manager Emerson Process Management Rosemount Division Chanhassen, MN 55317 USA
System integration oriented data center. planning. In terms of ATEN's eco Sensors DCIM solution
System integration oriented data center planning In terms of ATEN's eco Sensors DCIM solution 1. Introduction The reliability of an enterprise data center servicing either external or internal clients
Design and Implementation of SCADA System Based Power Distribution for Primary Substation ( Monitoring System)
Design and Implementation of SCADA System Based Power Distribution for Primary Substation ( Monitoring System) Aye Min Zaw 1, Hla Myo Tun 2 Department of Electronic Engineering, Mandalay Technological
Safety & Automation System (SAS) - How the Safety and the Automation Systems finally come together as an HMI
Safety & Automation System (SAS) - How the Safety and the Automation Systems finally come together as an HMI By Ian Nimmo President User Centered Design Services Inc. Abstract Today we have clear guidelines
Hardware safety integrity Guideline
Hardware safety integrity Comments on this report are gratefully received by Johan Hedberg at SP Swedish National Testing and Research Institute mailto:[email protected] Quoting of this report is allowed
US-APWR Human Performance Monitoring Implementation Plan
US-APWR Human Performance Monitoring Implementation Plan April 2010 2010 Mitsubishi Heavy Industries, Ltd. All Rights Reserved US-APWR Human Performance MonitQring Implementation Plan Plan MUAP-10014 (RO)
Liebert GXT MT+ CX UPS, 1000VA - 3000VA Intelligent, Reliable UPS Protection. AC Power for Business-Critical Continuity
Liebert GXT MT+ CX UPS, 1000VA - 3000VA Intelligent, Reliable UPS Protection AC Power for Business-Critical Continuity Liebert GXT MT+ CX UPS, 1000VA -3000VA Intelligent, Reliable UPS Protection Liebert
Real Time Test Bed Development for Power System Operation, Control and Cyber Security
1 Real Time Test Bed Development for Power System Operation, Control and Cyber Security Ram Mohan Reddi, Student Member, IEEE, and Anurag K Srivastava, Senior Member, IEEE Abstract--With ongoing smart
SuperIOr Controller. Digital Dynamics, Inc., 2014 All Rights Reserved. Patent Pending. Rev: 5-16-14 1
SuperIOr Controller The SuperIOr Controller is a game changer in the world of high speed embedded control. The system combines incredible speed of both control and communication with revolutionary configurable
SECTION 13XXX CONTROL DESCRIPTION (DICP Models 02-412NC, 412, 622, 826, 1030)
PART 1 - GENERAL SECTION 13XXX CONTROL DESCRIPTION (DICP Models 02-412NC, 412, 622, 826, 1030) 1.01 SUMMARY This section describes the operation and control of a drip irrigation system. The major components
water is cooled in a secondary cooling control tasks: use of seawater. Treatment of the seawater formation of algal vegetation.
for the start-up and shut-down procedures in the case of longer standstills. The diesel exhaust is fed into two turbochargers. A portion of the exhaust gases can be utilized in a waste-heat boiler producing
How To Build A Rockwell Library Of Process Objects
Rockwell Automation Library of Process Objects Reducing Development Time Features and Benefits Process objects for a range of field devices and functions Standards-based display elements with consistent
Efficient servicing. Easy maintenance. High level of uptime.
Efficient servicing. Easy maintenance. High level of uptime. At LEVEL we believe that efficient servicing, easy maintenance and a high level of uptime must be given top priority when developing products
Bristol ControlWave Redundant Control
October 19, 2007 - Page 1 Bristol ControlWave Redundant Control Redundant systems are offered for critical processes and harsh applications that require maximum operational readiness and system availability.
Turbine Controls Update
Turbine Controls Update David Cicconi, Business Development Manager Emerson Process Management Power & Water Solutions Define Project Scope and Objectives Address obsolescence Best solution for new operational
Easy and efficient asset management for your business
Easy and efficient asset management for your business PERFORMANCE MADE SMARTER Featuring Monitoring of process values Diagnostics Device programming Simulation of process values TEMPERATURE I.S. INTERFACES
RIG Acceptance Test (RAT) Procedures
RIG Acceptance Test (RAT) Procedures RIG Acceptance Test (RAT) Procedure 0 Print Date 2 /20/2007 REVISION HISTORY REVISON NO. DATE DESCRIPTION 1.0 Initial Release 0 Update Logo and Links i RIG Acceptance
Conventional Fire Detection and Extinguishant Control System Specification
Conventional Fire Detection and Extinguishant Control System Specification Page 1 of 9 Scope Furnish a complete 24VDC Conventional, electrically supervised, combined fire detection and extinguishant release
How to read this guide
How to read this guide The following shows the symbols used in this Quick start guide with descriptions and examples. Symbol Description Example P oint Reference Caution [ ] This symbol explains information
Configurable Events for APC Network Management Card
Configurable s for APC Network Management Card Table of Contents Silcon DP300E Series 3 Smart-UPS / Matrix 7 Symmetra 9 Symmetra 3-Phase 13 Environmental Monitor 21 Configurable s for APC Network Management
Configuring Alarms & Relays in the Enhanced Transformer Advantage
Configuring s & Relays in the Enhanced Transformer Advantage The Transformer Advantage product family offers a variety of relay options. Some choices are made when the Advantage is specified and ordered.
SHORT TRAINING COURSES
Post Office Box SR 95, Spintex Road, Ghana Tel: +233 302 812680, Fax: +233 302 814709 E mail: [email protected] Website: www.automationghana.com SHORT TRAINING COURSES Equipping industries with
ngenieros Ingenieros Asociados De Control S.L.
ngenieros sociados de ontrol 1 Company founded in 1985 to serve commercial and technical assistance in the fields of instrumentation, control and installation for all types of industries. We offer top
Logic solver application software and operator interface
Logic solver application software and operator interface By RJ Perry, Control Systems Consultant Correctly implemented and structured functional logic, together with operator interface displays, can improve
Products and solutions for pumping, irrigation and piping
Products and solutions for pumping, irrigation and piping 100% electricity www.lovatoelectric.com Tra dition and Innovation LOVATO Electric S.p.A. - Bergamo - Italy Since 1922 The first LOVATO Electric
DC Cook Plant Process Computer Replacement Project
DC Cook Plant Process Computer Replacement Project 2013 Scientech User s Symposium Robert Ammon / Scientech Greg Mashak / DC Cook August 2013 Project Organizations DC Cook (Utility) Hurst Technology (Utility
Safety controls, alarms, and interlocks as IPLs
Safety controls, alarms, and interlocks as IPLs Angela E. Summers, Ph.D., P.E. SIS-TECH Solutions 12621 Featherwood Dr. Suite 120, Houston, TX 77034 Keywords: safety controls, alarms, interlocks, SIS,
Introduction To SCADA and Telemetry
Introduction To SCADA and Telemetry Joe Mullaney Senior I&C Engineer MSE Technology Applications, Inc. Tetragenics Division [email protected] Overview Definitions What is SCADA? What is Telemetry?
Cyber Security Considerations in the Development of I&C Systems for Nuclear Power Plants
Cyber Security Considerations in the Development of I&C Systems for Nuclear Power Plants Jung-Woon Lee, Cheol-Kwon Lee, Jae-Gu Song, and Dong-Young Lee I&C and HF Research Division, Korea Atomic Energy
Indoor / Outdoor Antenna
z300 High Precision NTP Time Server Indoor / Outdoor Antenna High Precision NTP Time Server with PoE (Indoor or Outdoor use) synchronized by GPS Revision 4 ZTI / 1 boulevard d'armor / BP 20254 / 22302
T-BOXN12R. First steps with T-BOXN12R. You can make it wireless. Date: 2004-07-16 Version 1.0
T-BOXN12R You can make it wireless First steps with T-BOXN12R Date: 2004-07-16 Version 1.0 Content 1. Purpose of this document... 3 2. T-BoxN12R overview... 4 3. First step... 5 3.1. Preparing your workshop
ABB PSPS Erich Steinmann; Generator control-2013
ABB PSPS Erich Steinmann; Generator control-2013 GENERATOR CONTROL THE MODULAR SOLUTION FOR GENERATORS To make sure that power is efficiently converted into electric energy, it is necessary to supervise
McAfee Data Loss Prevention
Hardware Guide Revision B McAfee Data Loss Prevention 1650, 3650, 4400, 5500 This guide describes the features and capabilities of McAfee Data Loss Prevention (McAfee DLP) appliances to help you to manage
How To Run A Factory I/O On A Microsoft Gpu 2.5 (Sdk) On A Computer Or Microsoft Powerbook 2.3 (Powerpoint) On An Android Computer Or Macbook 2 (Powerstation) On
User Guide November 19, 2014 Contents 3 Welcome 3 What Is FACTORY I/O 3 How Does It Work 4 I/O Drivers: Connecting To External Technologies 5 System Requirements 6 Run Mode And Edit Mode 7 Controls 8 Cameras
New Supervisory Control and Data Acquisition (SCADA) Based Fault Isolation System for Low Voltage Distribution Systems
International Conference on Computer and Communication Engineering (ICCCE 2010), 11-13 May 2010, Kuala Lumpur, Malaysia New Supervisory Control and Data Acquisition (SCADA) Based Fault Isolation System
ELECTROTECHNIQUE IEC INTERNATIONALE 61508-3 INTERNATIONAL ELECTROTECHNICAL
61508-3 ª IEC: 1997 1 Version 12.0 05/12/97 COMMISSION CEI ELECTROTECHNIQUE IEC INTERNATIONALE 61508-3 INTERNATIONAL ELECTROTECHNICAL COMMISSION Functional safety of electrical/electronic/ programmable
TEMON 8-C. Doc. N MO-0370-ING TEMPERATURE MONITOR DEVICE TYPE TEMON 8-C OPERATION MANUAL. Microener - Copyright 2010 FW 2.2 Date 01.12.2008 Rev.
TEMPERATURE MONITOR DEVICE TYPE TEMON 8-C OPERATION MANUAL Microener - Copyright 2010 FW 2.2 Date 01.12.2008 Rev. 0 1. Generality 3 2. Introduction 3 3. Accessories and Options 3 4. Installation 3 5. Connection