A new data-centre for the LHCb experiment
|
|
|
- Magdalen Bishop
- 10 years ago
- Views:
Transcription
1 A new data-centre for the LHCb experiment Loïc Brarda, Beat Jost, Daniel Lacarrère, Rolf Lindner, Niko Neufeld, Laurent Roy, Eric Thomas Physics Department CERN CH-1211 Geneva 23, Switzerland Computing in High Energy and Nuclear Physics, 2012 Niko Neufeld (CERN, Geneva, Switzerland) A new data-centre for the LHCb experiment CHEP / 31
2 Overview 1 The LHCb upgrade, its DAQ and the requirements DAQ Farm and data-centre 2 Implementation Options Brick and mortar Remote hosting Modular / Containerized data-centre Niko Neufeld (CERN, Geneva, Switzerland) A new data-centre for the LHCb experiment CHEP / 31
3 The LHCb upgrade, its DAQ and the requirements The LHCb upgrade Major upgrade of the entire experiment during LS2 (2017 to 2018) Freely adjustable low-level trigger allowing readout speeds between 40 MHz and 1 MHz Allows to readout the entire detector at bunch-crossing rate (40 MHz) Sustain a luminosity up to Niko Neufeld (CERN, Geneva, Switzerland) A new data-centre for the LHCb experiment CHEP / 31
4 Outline The LHCb upgrade, its DAQ and the requirements DAQ 1 The LHCb upgrade, its DAQ and the requirements DAQ Farm and data-centre 2 Implementation Options Brick and mortar Remote hosting Modular / Containerized data-centre Niko Neufeld (CERN, Geneva, Switzerland) A new data-centre for the LHCb experiment CHEP / 31
5 The LHCb upgrade, its DAQ and the requirements A 40 MHz DAQ DAQ Niko Neufeld (CERN, Geneva, Switzerland) A new data-centre for the LHCb experiment CHEP / 31
6 The LHCb upgrade, its DAQ and the requirements DAQ Data Acquisition Requirements # of input links DAQ bandwidth per input link 3.2Gbit/s average total event-size 100 kb total bandwidth for the DAQ 32 Tbit/s output bandwidth 2 Gigabyte/s The data produced by a bunch-crossing in the collsion need to be zero-suppressed directly on the detector to reduce the number of input links from the detector. Niko Neufeld (CERN, Geneva, Switzerland) A new data-centre for the LHCb experiment CHEP / 31
7 Outline The LHCb upgrade, its DAQ and the requirements Farm and data-centre 1 The LHCb upgrade, its DAQ and the requirements DAQ Farm and data-centre 2 Implementation Options Brick and mortar Remote hosting Modular / Containerized data-centre Niko Neufeld (CERN, Geneva, Switzerland) A new data-centre for the LHCb experiment CHEP / 31
8 The LHCb upgrade, its DAQ and the requirements Farm and data-centre Event Filter Farm requirements Capable of processing 30 Million events per second (out of 40 Million bunch-crossings) Scalable architecture (staged deployment) Houses up to 5000 dual-socket industry-standard servers Servers may be more general Compute Units (combination of servers and co-processor cards) A server is understood to be a dual-socket machine, with at least 1 GB of RAM per hardware-thread Niko Neufeld (CERN, Geneva, Switzerland) A new data-centre for the LHCb experiment CHEP / 31
9 The LHCb upgrade, its DAQ and the requirements Data centre requirements Farm and data-centre max # of servers 5000 max # of useful Us for servers 2500 number of Us for switches 2 Us for 36 servers Us for patch-panels per rack 3 depth of the racks min 1000 mm number of power feeds per rack 2 total usable IT power 2 MW minimum power per server 350 W low PUE long-term usefullness low cost (overall budget for the upgrade 50 MCHF) Niko Neufeld (CERN, Geneva, Switzerland) A new data-centre for the LHCb experiment CHEP / 31
10 The LHCb upgrade, its DAQ and the requirements Non-requirements Farm and data-centre Safe power Run servers from NFS root Short processing time neglible losses Detector (data-source) not on safe power either Storage racks in the data-centre are not required A small amount of onsite storage can be kept in an existing server-room Power-efficient CPUs optimize CPU per unit of money only CERN is a very large power-consumer so it gets good prices for electricity We can go for very high power-density in a rack Niko Neufeld (CERN, Geneva, Switzerland) A new data-centre for the LHCb experiment CHEP / 31
11 Implementation Options The current farm Installed 100 m underground (UX85A) Accessible only by authorized personel under radiological supervision Reuses old detector-electronics racks (non standard posts, depth) Power and cooling limited to 500 kw Niko Neufeld (CERN, Geneva, Switzerland) A new data-centre for the LHCb experiment CHEP / 31
12 The current farm 2 Implementation Options Niko Neufeld (CERN, Geneva, Switzerland) A new data-centre for the LHCb experiment CHEP / 31
13 Outline Implementation Options Brick and mortar 1 The LHCb upgrade, its DAQ and the requirements DAQ Farm and data-centre 2 Implementation Options Brick and mortar Remote hosting Modular / Containerized data-centre Niko Neufeld (CERN, Geneva, Switzerland) A new data-centre for the LHCb experiment CHEP / 31
14 Implementation Options Brick and mortar A brick-and-mortar data-centre Is said to cost 10 M$ per MW of IT capacity [1] This figure assumes a commercial grade facility: full battery backup, fly-wheels, redundancy,... Niko Neufeld (CERN, Geneva, Switzerland) A new data-centre for the LHCb experiment CHEP / 31
15 Implementation Options Brick and mortar (Cost-)factors in our favour Site available with high-power feeds and cooling plant Industrial site - only standard safety and environmental constraints can be ugly and noisy as long as it is cheap Single-purpose ( customer ) facility - no security sensitive data only theft protection required Niko Neufeld (CERN, Geneva, Switzerland) A new data-centre for the LHCb experiment CHEP / 31
16 Implementation Options Brick and mortar The Point-8 site Niko Neufeld (CERN, Geneva, Switzerland) A new data-centre for the LHCb experiment CHEP / 31
17 Implementation Options Brick and mortar The first idea Collocated building with new control room and offices Utility feed from the basement Water-cooled racks (heat-exchanger doors) Niko Neufeld (CERN, Geneva, Switzerland) A new data-centre for the LHCb experiment CHEP / 31
18 Outline Implementation Options Remote hosting 1 The LHCb upgrade, its DAQ and the requirements DAQ Farm and data-centre 2 Implementation Options Brick and mortar Remote hosting Modular / Containerized data-centre Niko Neufeld (CERN, Geneva, Switzerland) A new data-centre for the LHCb experiment CHEP / 31
19 Implementation Options Remote hosting The first suggestion from management: remote hosting Main argument: limited life-time of LHCb experiment (about 10 years after 2017). Long-term interest of CERN Minor argument: done by CERN/IT, use the "Cloud" Actually 3 options 1 Remote hosting off the CERN site 2 Remote hosting on the CERN site in an existing centre 3 Remote hosting on the CERN site in a new centre much more expensive than on-site - won t discuss further Niko Neufeld (CERN, Geneva, Switzerland) A new data-centre for the LHCb experiment CHEP / 31
20 Implementation Options Remote hosting A technical aside: data-transport on a small number of fibres In both remote hosting options it is necessary to transport 32 Tbit/s over a very small number of fibres This is obvious for off-site hosting (cost of fibre / bandwidth rental) Considerations are based on 10 Gbit/s and 100 Gbit/s technologies Minimal number of fibre-pairs using e.g. LR4 (25 Gbit/s signalling) 1280 if only a single wave-length is used 400 lambdas and more can be multiplexed on a single fibre Niko Neufeld (CERN, Geneva, Switzerland) A new data-centre for the LHCb experiment CHEP / 31
21 Implementation Options Remote hosting Case-study on data-transport A detailed study with one major vendor has been done, assuming an active solution (where the individual 10 Gigabit lanes are fully monitored and managed, as opposed to passive multiplexing) Assumed about 10 km distance, direct connection No cost for fibre laying or rental Cost per 10 Gigabit is found to be 7000 USD for 2016 (including an aggressive price-compression per year) This includes redundancy and a failver within a few minutes Alternatives are using coloured interfaces at the output of the DAQ network (expensive) and passive multiplexing (DWDM) (difficult to manage) In any case privately such an infrastructure requires trained personel and has high maintenance costs unrealistic in our environment Niko Neufeld (CERN, Geneva, Switzerland) A new data-centre for the LHCb experiment CHEP / 31
22 Implementation Options Remote hosting Remote hosting off the CERN site Costs Renting the data-centre Power Renting of the data-path Data-transport Last point alone is significantly above budget Niko Neufeld (CERN, Geneva, Switzerland) A new data-centre for the LHCb experiment CHEP / 31
23 Implementation Options Remote hosting Remote hosting on the CERN site Assume that a large part (about 2 3 ) of the capacity of the computer centre 513 could be used Should fit easily within 10 km Can use multiplexing (expensive, see before) or install 10 Gigabit fibres (also expensive 12 MCHF according to a CERN internal estimate) Seems expensive in comparison to the next option Niko Neufeld (CERN, Geneva, Switzerland) A new data-centre for the LHCb experiment CHEP / 31
24 Outline Implementation Options Modular / Containerized data-centre 1 The LHCb upgrade, its DAQ and the requirements DAQ Farm and data-centre 2 Implementation Options Brick and mortar Remote hosting Modular / Containerized data-centre Niko Neufeld (CERN, Geneva, Switzerland) A new data-centre for the LHCb experiment CHEP / 31
25 Implementation Options Modular / Containerized data-centre The solution: modular data-centre Studying in detail various cooling solutions showed that to achieve a very low PUE < 1.2 the PUE must be the primary design criterion Constraints on building are conflict with co-use as office-building and control room hosting Niko Neufeld (CERN, Geneva, Switzerland) A new data-centre for the LHCb experiment CHEP / 31
26 Implementation Options Modular / Containerized data-centre Advantages of containerized solution Lowest PUE (when using free cooling) - optimised design with integrated control Ease of re-use at the CERN site Capital investment costs lower or at least not higher than brick and mortar Could be re-sold if no more need Separation of IT infrastructure and office-usage Ready to use - requires only power (and a foundation) Niko Neufeld (CERN, Geneva, Switzerland) A new data-centre for the LHCb experiment CHEP / 31
27 How it could look like Implementation Options Modular / Containerized data-centre Niko Neufeld (CERN, Geneva, Switzerland) A new data-centre for the LHCb experiment CHEP / 31
28 Implementation Options Modular / Containerized data-centre Results from prototype studies From discussions with two major providers we established: the feasibility (budget) vendor neutrality (for the servers) most likely no need for additional cooling according to latest ASHRAE recommendations [2] Niko Neufeld (CERN, Geneva, Switzerland) A new data-centre for the LHCb experiment CHEP / 31
29 Conclusion Summary Taking advantage of the special requirements for the LHCb event-filter farm a cost-effective hosting in on-site containers has been identified Other options are more expensive and often suffer from the need of a long-distance transport of a large amount of data Such a solution will offer the best PUE and can most likely operate without any additional cooling Niko Neufeld (CERN, Geneva, Switzerland) A new data-centre for the LHCb experiment CHEP / 31
30 Conclusion What s next? Start construction of new control-room and office-building next year Transfer LHCb CR at the end of LS1 Define final requirements for modular data-centre Competitive call for tender will be done in 2017 Niko Neufeld (CERN, Geneva, Switzerland) A new data-centre for the LHCb experiment CHEP / 31
31 For Further Reading I Appendix For Further Reading M. Bramfitt and H. Coles. Modular/Container Data Centers Procurement Guide: Optimizing for Energy Efficiency and Quick Deployment. [Online]. Available: the green grid. Updated Air-Side Free Cooling Maps: The Impact of ASHRAE 2011 Allowable Ranges, [Online]. /media/whitepapers/wp46updatedairsidefreecoolingmapstheimpactof Niko Neufeld (CERN, Geneva, Switzerland) A new data-centre for the LHCb experiment CHEP / 31
How To Build A Network For Storage Area Network (San)
White Paper Data Storage across the MAN by deploying a SAN over Dark Fiber by Pieter Panis, EuroFiber 1/7 1 Introduction The purpose of this document is to illustrate how a storage area network (SAN) can
ALWAYS ON GLOBALSWITCH.COM
ALWAYS ON GLOBALSWITCH.COM Data Centre Design Considerations Kelvin Fong Managing Director, Hong Kong ALWAYS ON GLOBALSWITCH.COM Agenda 1. Introduction to Global Switch 2. Customer Requirements 3. Development
THE WORLD S MOST EFFICIENT DATA CENTER
THE WORLD S MOST EFFICIENT DATA CENTER HP POD 240a Ed Turkel Manager, WW HPC Marketing Hyperscale Business Unit 2011 Hewlett-Packard Development Company, L.P. The information contained herein is subject
Datacentre South London Data sheet
Datacentre South London Data sheet Data sheet Datacentre South London Find us With 10 datacentres, over 4,500 racks and a 10Gb resilient core network between our datacentre locations, Pulsant has the infrastructure
European Code of Conduct for Data Centre. Presentation of the Awards 2016
European Code of Conduct for Data Centre Presentation of the Awards 2016 Paolo Bertoldi European Commission DG JRC Institute for Energy and Transport 1 The Code of Conduct for Data Centre Results European
Extended Distance SAN with MC/ServiceGuard Opens New Disaster Recovery Opportunities
Extended Distance SAN with MC/ServiceGuard Opens New Disaster Recovery Opportunities Joseph Algieri Senior Consultant Network Storage Solutions Hewlett-Packard Company Overview What is a SAN Extended distance
Datacentre Reading East 2 Data sheet
Datacentre Reading East 2 Data sheet Data sheet Datacentre Reading East 2 Find us With 10 datacentres, over 4,500 racks and a 10Gb resilient core network between our datacentre locations, Pulsant has the
Colocation Selection Guide. Workspace Technology Ltd
Colocation Selection Guide Workspace Technology Ltd Technology House 5 Emmanuel Court Reddicroft Sutton Coldfield West Midlands B72 1TJ Tel 0121 354 4894 Fax 0121 354 6447 www.workspace-technology.com
INTERNATIONAL TELECOMMUNICATION UNION SERIES L: CONSTRUCTION, INSTALLATION AND PROTECTION OF CABLES AND OTHER ELEMENTS OF OUTSIDE PLANT
INTERNATIONAL TELECOMMUNICATION UNION ITU-T L.52 TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU (05/2003) SERIES L: CONSTRUCTION, INSTALLATION AND PROTECTION OF CABLES AND OTHER ELEMENTS OF OUTSIDE PLANT
Introduction to Cloud Computing
Introduction to Cloud Computing Cloud Computing II (Qloud) 15 319, spring 2010 3 rd Lecture, Jan 19 th Majd F. Sakr Lecture Motivation Introduction to a Data center Understand the Cloud hardware in CMUQ
Eni Green Data Center - Specification
Eni Green Data Center - Specification Green IT Adopting the principles of sustainable development is one of the key missions in the field of information technology today. 2% of the world s CO2 emissions
A G U I D E T O C O - L O C A T I O N
A G U I D E T O C O - L O C A T I O N This tutorial will provide useful guide about what co-location is, how it is used, and even the entomology of the word itself. It will also explore Cloud computing
611 Tradewind Dr. Suite 100, Ancaster ON, L9G 4V5 (905) 304-1775 ext 244 [email protected]
Connecting To The Cloud Is Easier Than You Think Audcomp Cloud Services can bring your organization into the cloud. We provide a secure reliable medium to maximize your uptime, allowing you to focus on
Global Data Center & Colocation Facilities
Global Data Center & Colocation Facilities Managed Hosting & Storage Services Managed Servers Virtualization services Database Management Managed Storage and Back up Services Managed Load Balancing SaaS/IaaS
CEMEP UPS. The high environmental performance solution for power supply to high-availability data centers
CEMEP UPS The high environmental performance solution for power supply to high-availability data centers Exchanges of information and communication needs are growing at an exponential rate. That growth
Enabling an agile Data Centre in a (Fr)agile market
Enabling an agile Data Centre in a (Fr)agile market Phil Dodsworth Director, Data Centre Solutions 2008 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without
Overview of Green Energy Strategies and Techniques for Modern Data Centers
Overview of Green Energy Strategies and Techniques for Modern Data Centers Introduction Data centers ensure the operation of critical business IT equipment including servers, networking and storage devices.
GHG Protocol Product Life Cycle Accounting and Reporting Standard ICT Sector Guidance. Chapter 8: 8 Guide for assessing GHG emissions of Data Centers
GHG Protocol Product Life Cycle Accounting and Reporting Standard ICT Sector Guidance Chapter : Guide for assessing GHG emissions of Data Centers DRAFT March 0 Table of Contents GHG Protocol ICT Sector
UltraVMTM Dedicated Cloud Servers
UltraVMTM Dedicated Cloud Servers It s like a dedicated Server. But different. Document Version 201401 Revision Date 1st August 2014 Telephone Sales and Accounts 0800 915 8771 Technical Support 0161 232
Measuring Power in your Data Center: The Roadmap to your PUE and Carbon Footprint
Measuring Power in your Data Center: The Roadmap to your PUE and Carbon Footprint Energy usage in the data center Electricity Transformer/ UPS Air 10% Movement 12% Cooling 25% Lighting, etc. 3% IT Equipment
Automation's Modular Containerized Datacenter Solutions
SAFE Automation's Modular Containerized Datacenter Solutions Automation's SAFE (Secure, Autonomous, Flexible, Efficient) Modular Containerized Datacenter offers a fast, flexible and efficient solution
SYMMETRY PRODUCT OVERVIEW
ACCESS CONTROL The Symmetry Security Management Systems provides powerful integrated solutions for organizations requiring Access Control and Integrated Security. Solutions are available for organizations
Computing at the HL-LHC
Computing at the HL-LHC Predrag Buncic on behalf of the Trigger/DAQ/Offline/Computing Preparatory Group ALICE: Pierre Vande Vyvre, Thorsten Kollegger, Predrag Buncic; ATLAS: David Rousseau, Benedetto Gorini,
SYMMETRY. DATASHEET ACCESS CONTROL Product Overview
DATASHEET ACCESS CONTROL Product Overview SYMMETRY The AMAG Technology range of Security Management Systems provides powerful integrated solutions for organizations requiring Access Control and Integrated
Managed Services for Carriers and Service Providers
for Carriers and Service Providers Voipswitch Managed Services for Carriers and Service Voipswitch offers a hosted and managed infrastructure comprising its best-of-breed Class 5 softswitch together with
Network Attached Storage 300
Network Attached Storage 300 High performance, dual-engine NAS solution Overview The IBM Network Attached Storage 300 was designed to meet your storage requirements across many demanding environments.
Data Centre Stockholm II, Sweden Flexible, advanced and efficient by design.
Data Centre Stockholm II, Sweden Flexible, advanced and efficient by design. Equinix Telecity Kvastvägen 25-29 128 62 Sköndal Stockholm Sweden Tel: +46 (0) 8 799 3800 [email protected] www.telecitygroup.se
Zurich West Data Center
Zurich West Data Center Rely on the most advanced security Secure, advanced, innovative Our fourth and most advanced data center is a high-security location with a total of 10,000 sqm of usable data center
Grid Computing in Aachen
GEFÖRDERT VOM Grid Computing in Aachen III. Physikalisches Institut B Berichtswoche des Graduiertenkollegs Bad Honnef, 05.09.2008 Concept of Grid Computing Computing Grid; like the power grid, but for
The CMS openstack, opportunistic, overlay, online-cluster Cloud (CMSooooCloud)"
The CMS openstack, opportunistic, overlay, online-cluster Cloud (CMSooooCloud)" J.A. Coarasa " CERN, Geneva, Switzerland" for the CMS TriDAS group." " CHEP2013, 14-18 October 2013, Amsterdam, The Netherlands
Portable Energy Efficient Data Centre Solution
Portable Energy Efficient Data Centre Solution Workspace Technology Limited Technology House, PO BOX 11578, Sutton Coldfield West Midlands B72 1ZB Telephone: 0121 354 4894 Facsimile: 0121 354 6447 www.workspace-technology.com
ExaGrid Stress-free Backup Storage
Disk Backup with Data Deduplication ExaGrid Stress-free Backup Storage Axis Summit September 11, 2014 www.exagrid.com ExaGrid at a Glance Company Offices across North America, Europe, APAC Product Highly
EU Code of Conduct for Data Centre Efficiency
EU Code of Conduct for Data Centre Efficiency A Green Practice Accredited by British Computer Society (BCS) EU Code of Conduct for Data Centre Efficiency Local Organizer Practices in Data Centre Industry
Specialty Environment Design Mission Critical Facilities
Brian M. Medina PE Associate Brett M. Griffin PE, LEED AP Vice President Environmental Systems Design, Inc. Mission Critical Facilities Specialty Environment Design Mission Critical Facilities March 25,
Protect Data... in the Cloud
QUASICOM Private Cloud Backups with ExaGrid Deduplication Disk Arrays Martin Lui Senior Solution Consultant Quasicom Systems Limited Protect Data...... in the Cloud 1 Mobile Computing Users work with their
How To Run An Ultravm Cloud Server
It s like a dedicated server. But different. Turing House, Archway, Manchester, M15 5RL tel: 0161 232 0001 fax: 0161 232 9125 e: [email protected] www.melbourne.co.uk Meet UltraVM. It s quite different.
Fiscal Year 2015-16 Information Technology Request
PROGRAM PLAN STATUS and OIT BEST PRACTICES 2016-016 Approved Program Plan? N/A Date Approved: The university says that the project design follows best practices set forth by the datacenter equipment manufacturers
Moving Virtual Storage to the Cloud. Guidelines for Hosters Who Want to Enhance Their Cloud Offerings with Cloud Storage
Moving Virtual Storage to the Cloud Guidelines for Hosters Who Want to Enhance Their Cloud Offerings with Cloud Storage Table of Contents Overview... 1 Understanding the Storage Problem... 1 What Makes
Data Centre Basiglio, Milan Flexible, advanced and efficient by design.
Data Centre Basiglio, Milan Flexible, advanced and efficient by design. TelecityGroup Via Francesco Sforza 13 Milano 3 City 20080 Basiglio MI Italy Tel: +39 02 36679500 [email protected] www.telecitygroup.it
Cisco Prime Home 5.0 Minimum System Requirements (Standalone and High Availability)
White Paper Cisco Prime Home 5.0 Minimum System Requirements (Standalone and High Availability) White Paper July, 2012 2012 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public
T: 0344 875 4555 [email protected]
T: 0344 875 4555 [email protected] DATACENTRE UK INTRODUCTION Datacentre UK are specialist providers of energy efficient data centre and physical infrastructure solutions across the UK, Europe
Data Sheet Fujitsu PRIMERGY BX400 S1 Blade Server
Data Sheet Fujitsu PRIMERGY BX400 S1 Blade Server Blade Made Easy Fujitsu PRIMERGY BX Blade Servers provide a faster, simpler and lower-cost way to build and run an IT infrastructure in your midsize organization,
Perceptive Software Platform Services
Perceptive Software Platform Services CLOUD SOLUTIONS process and content management Perceptive Software Platform Services Perceptive Software process and content management systems have been deployed
When Does Colocation Become Competitive With The Public Cloud? WHITE PAPER SEPTEMBER 2014
When Does Colocation Become Competitive With The Public Cloud? WHITE PAPER SEPTEMBER 2014 Table of Contents Executive Summary... 2 Case Study: Amazon Ec2 Vs In-House Private Cloud... 3 Aim... 3 Participants...
Leveraging Embedded Fiber Optic Infrastructures for Scalable Broadband Services
JR RICHARDSON Engineering for the Masses [email protected] Leveraging Embedded Fiber Optic Infrastructures for Scalable Broadband Services Preface When telecommunications companies sell broadband access,
GAMATRONIC ELECTRONIC INDUSTRIES LTD.
GAMATRONIC GAMATRONIC ELECTRONIC INDUSTRIES LTD. History In house Activities International Awards Info-Tech 2012 Vendor Landscape Research WORLD REPRESENTATION Modular Solutions Single Phase Power Solutions
...DYNAMiC INTERNET SOLUTiONS >> Reg.No. 1995/020215/23
GamCo Managed Dedicated Virtual Hosting Business growth in the number of users, application and data has left many organisations with sprawling servers, storage and supporting infrastructure crammed into
AIRAH Presentation April 30 th 2014
Data Centre Cooling Strategies The Changing Landscape.. AIRAH Presentation April 30 th 2014 More Connections. More Devices. High Expectations 2 State of the Data Center, Emerson Network Power Redefining
When Does Colocation Become Competitive With The Public Cloud?
When Does Colocation Become Competitive With The Public Cloud? PLEXXI WHITE PAPER Affinity Networking for Data Centers and Clouds Table of Contents EXECUTIVE SUMMARY... 2 CASE STUDY: AMAZON EC2 vs IN-HOUSE
Maintaining HMI and SCADA Systems Through Computer Virtualization
Maintaining HMI and SCADA Systems Through Computer Virtualization Jon Reeser Systems Engineer PROFI-VISION Automation 1150 Glenlivet Drive Allentown, PA 18106 [email protected] Thomas Jankowski
Last time. Data Center as a Computer. Today. Data Center Construction (and management)
Last time Data Center Construction (and management) Johan Tordsson Department of Computing Science 1. Common (Web) application architectures N-tier applications Load Balancers Application Servers Databases
TotalStorage Network Attached Storage 300G Cost effective integration of NAS and LAN solutions
TotalStorage Network Attached Storage 300G Cost effective integration of NAS and LAN solutions Overview The new IBM TotalStorage Network Attached Storage 300G series is part of the overall IBM Storage
The new frontier of the DATA acquisition using 1 and 10 Gb/s Ethernet links. Filippo Costa on behalf of the ALICE DAQ group
The new frontier of the DATA acquisition using 1 and 10 Gb/s Ethernet links Filippo Costa on behalf of the ALICE DAQ group DATE software 2 DATE (ALICE Data Acquisition and Test Environment) ALICE is a
Every business owns precious data and every business should recognise the risk of losing their data. Natural Disaster
Every business owns precious data and every business should recognise the risk of losing their data Natural Disaster How do you secure your Data? A: Onsite backup & replication / inside your network B:
CHICAGO S PREMIERE DATA CENTER
CHICAGO S PREMIERE DATA CENTER White City collocation was founded in June, 2010 by a highly experienced industry executive in conjunction with several investment companies. The strategy of White City is
DOE Data Center Energy Efficiency Program
DOE Data Center Energy Efficiency Program Paul Scheihing U.S. Department of Energy Energy Efficiency and Renewable Energy April 2009 1 DOE Industrial Technologies Program Worki king to improve th e energy
Data Center Solutions - The Containerized Evolution
Data Center Solutions - The Containerized Evolution Power IT Cooling 7 th Green Connected World Tsikogias Thanassis Data Centers Solutions Architect, IT Business Athens 2015 1 We are the global specialist
Data Center Facility Basics
Data Center Facility Basics Ofer Lior, Spring 2015 Challenges in Modern Data Centers Management, Spring 2015 1 Information provided in these slides is for educational purposes only Challenges in Modern
Quick Reference Guide: Server Hosting
: Server Hosting TABLE OF CONTENTS GENERAL INFORMATION...2 CO-LOCATED SERVER HOSTING...3 DEDICATED SERVER HOSTING...3 MANAGED SERVER HOSTING...4 FREQUENTLY ASKED QUESTIONS...4 1. Will I have root/admin
Value Proposition for Data Centers
Value Proposition for Data Centers C ollocation or a trend of hosting customers servers at a provider s physical location has been steadily growing in the recent years due to its many benefits. The collocation
Colt Colocation Services. 2010 Colt Technology Services Group Limited. All rights reserved.
Colt Colocation Services 2010 Colt Technology Services Group Limited. All rights reserved. Award winning Colt Data Centre Solutions 2012: Modular Data Centre Solution of the year winner at 5 th Datacentre
Datacentre Maidenhead P1 Data sheet
Datacentre Maidenhead P1 Data sheet Data sheet Datacentre Maidenhead P1 Find us With 10 datacentres, over 4,500 racks and a 10Gb resilient core network between our datacentre locations, Pulsant has the
Case study; A sustainable Green Data Centre, fact or fiction?
Case study; A sustainable Green Data Centre, fact or fiction? Brian O Hora, BSc MBA MPM Networks & Infrastructure Manager Information Systems Services, Trinity College Dublin 200 Pearse Street Single UPS,
Intacore Managed IT Services
Intacore Managed IT Services Reduced downtime through Proactive Managed IT Services 2 SOLUTIONS TO SUIT BUSINESSES OF ALL SHAPES AND SIZES Intacore s managed IT services prides itself on building excellent
Moving Virtual Storage to the Cloud
Moving Virtual Storage to the Cloud White Paper Guidelines for Hosters Who Want to Enhance Their Cloud Offerings with Cloud Storage www.parallels.com Table of Contents Overview... 3 Understanding the Storage
Modular Data Centre. Flexible, scalable high performance modular data centre solutions. Data Centre Solutions...energy efficient by design
Data Centre Solutions...energy efficient by design Modular Data Centre Flexible, scalable high performance modular data centre solutions Creating an effective workspace environment The Modular Data Centre
ABOUT DISK BACKUP WITH DEDUPLICATION
Disk Backup with Data Deduplication ABOUT DISK BACKUP WITH DEDUPLICATION www.exagrid.com What appears to be simple & straightforward Built for Backup is often more complex & risky than you think. 2 Agenda
Top 8. Considerations for Choosing the Right Rack Power Distribution Unit to Fit Your Needs
Power design in data centers is getting substantial attention particularly by facilities and engineering personnel as organizations pursue constant improvements in reliability and energy efficiency. At
Infrastructure as a Service
Infrastructure as a Service Next Generation Data Center & Cloud Paul Chen [email protected] 2013 Csky Information All rights reserved. Changing More Users More Devices More Data >1 Billion More Netizen
Premium Data Centre Europe - 2012 Pricing, Business Model & Services
Premium Data Centre Europe - 2012 Pricing, Business Models & Services Premium Data Centre Europe - 2012 Pricing, Business Model & Services Table of Contents A list of figures used in this report 5 Methodology
The Mission Critical Data Center Understand Complexity Improve Performance
The Mission Critical Data Center Understand Complexity Improve Performance Communications Technology Forum Fall 2013 Department / Presenter / Date 1 Rittal IT Solutions The State of the Data Center Market
How To Host A Website On A Server At Zen Internet
Hosting Hosting Solutions Whether you need a reliable home for your website or a more bespoke solution, we ll provide you with technically superior hosting, backed by a personal approach to service and
Colocation, Cloud and Managed Services
Colocation, Cloud and Managed About Node4 At Node4 our growing team of passionate individuals are dedicated to delivering the most effective application of technology to optimise business performance.
Data Sheet Fujitsu PRIMERGY BX600 S3 Blade Server
Data Sheet Fujitsu PRIMERGY BX600 S3 Blade Server Advanced Blade Ecosystem the ideal platform for branch offices and mediumsized companies Fujitsu PRIMERGY BX Blade Servers meet all the requirements of
Green Computing: Datacentres
Green Computing: Datacentres Simin Nadjm-Tehrani Department of Computer and Information Science (IDA) Linköping University Sweden Many thanks to Jordi Cucurull For earlier versions of this course material
Case Study: Guaranteed efficiency through standardised data centres
Case Study: Guaranteed efficiency through standardised data centres Rittal / SEC Event / October 2014 1 Case Study: Guaranteed efficiency through standardised data centres Smart Energy Community Event
G-Cloud V Services Pricing Document Accenture IaaS Services
G-Cloud V Services Pricing Document Accenture IaaS Services 1 Table of contents 1. Pricing... 3 2. Contacts... 4 2 1. Pricing Accenture IaaS services are charged on a pay per use model. Consumption of
SAN TECHNICAL - DETAILS/ SPECIFICATIONS
SAN TECHNICAL - DETAILS/ SPECIFICATIONS Technical Details / Specifications for 25 -TB Usable capacity SAN Solution Item 1) SAN STORAGE HARDWARE : One No. S.N. Features Description Technical Compliance
Powerful Dedicated Servers
Powerful Dedicated Servers Our dedicated servers offer outstanding performance for even the most demanding of websites with the latest Intel & Dell technology combining unparalleled server specification,
Datacenter Efficiency
EXECUTIVE STRATEGY BRIEF Operating highly-efficient datacenters is imperative as more consumers and companies move to a cloud computing environment. With high energy costs and pressure to reduce carbon
Managing Data Center Growth Explore Your Options
Managing Growth Explore Your Options Managing Growth: Managing The increasing demand on data centers has forced many IT managers to look for new ways to manage data center growth, either by consolidating,
AIA Provider: Colorado Green Building Guild Provider Number: 50111120. Speaker: Geoff Overland
AIA Provider: Colorado Green Building Guild Provider Number: 50111120 Office Efficiency: Get Plugged In AIA Course Number: EW10.15.14 Speaker: Geoff Overland Credit(s) earned on completion of this course
Deploying F5 BIG-IP Virtual Editions in a Hyper-Converged Infrastructure
Deploying F5 BIG-IP Virtual Editions in a Hyper-Converged Infrastructure Justin Venezia Senior Solution Architect Paul Pindell Senior Solution Architect Contents The Challenge 3 What is a hyper-converged
Data Centre Services. JT First Tower Lane Data Centre Facility Product Description
JT First Tower Lane Data Centre Facility Product Description JT s Data Centre Hosting Service provides a secure computer room enviroment with protected incoming power supplies, state-of-the-art security
