MAINTENANCE CONTRACTING & OUTSOURCING
|
|
- Stewart Fitzgerald
- 8 years ago
- Views:
Transcription
1 Training Title MAINTENANCE CONTRACTING & OUTSOURCING Training Duration 5 days Training Dates & Venue REF RM040 Maintenance Contracting & Outsourcing Feb $4,250 Dubai, UAE Training will be held at any of the 5 star hotels. The exact venue will be informed once finalized. Training Fees 4,250 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch Training Certificate Define Management Consultancy & Training Certificate of course completion will be issued to all attendees. TRAINING OVERVIEW TRAINING DESCRIPTION Production capacity is ultimately a plant s most valuable asset. That capacity depends on a variety of factors, including employees, engineering, utilities, and machine uptime, not to mention management of materials inventory. Any dip in the quality of these will have an impact on production, and therefore profitability. The plant manager should see the contract organization as an extension of the maintenance department and manage the relationship as such. The contracted organization should realize the company they are working for is why they are in business and act as a partner. Prior to awarding a contract, clear expectations should be defined and agreed upon between plant personnel and the contracting organization. The agreement should cover fees, resources, methods, expected results, and how performance of the contractor will be measured. The performance indicators need to be established upfront, and the contractor should be evaluated against them on a regular, systematic basis, such as monthly.
2 A small steering committee consisting of key site and contractor management should jointly review the indicators periodically, in a conference call or physical meeting, and identify both good and subpar performance, developing and installing corrective action plans to resolve the latter. This training seminar will ensure that you understand how to decide rationally what maintenance activities to outsource and what not, how to select the best maintenance contractor and how to evaluate the delivered performance of all parties involved. You will understand the different contract types, get the most from your contracts, avoid the potential pitfalls and improve the performance of your assets. Maintenance contracts used in several branches will be discussed. You will have the opportunity to discuss the existing contracts used in your organization. Through a combination of formal lectures and group work, you will leave the seminar with the tools to improve your contracts and contract management. THIS TRAINING INTRODUCES PARTICIPANTS TO THE SKILLS AND KNOWLEDGE AREAS OF MAINTENANCE CONTRACTS & OUTSOURCING OF TODAY, SUCH AS: Understanding Outsourcing considerations Contracting types, incl. Service Level Agreements Key Performance Indicators to monitor performance Developing contracts the contracting cycle Continuous improvement and performance management: how to evaluate the performance with all parties involved TRAINING OBJECTIVES THE DELEGATES WILL: What kind of maintenance should or should not be contracted out and the reasons for choosing either option. Reasons to hire a contractor Understand how to decide rationally what maintenance activities to outsource and what not Learn the features, functions and benefits of lean maintenance contracts Understand the different types of maintenance contracts (incl. Service Level Agreements) and when/how to apply them Learn how to define service levels and monitor the contractor performance Establishing an appropriate tendering process Establishing an appropriate specification of requirements
3 Learn how to establishing an appropriate contract payment structure Learn how to implement an appropriate structure for the contract document Agreeing contract termination arrangements Recognize the pitfalls WHO SHOULD ATTEND? All professionals negotiating, managing and verifying maintenance contracts Teams who have been assigned the responsibility of establishing a maintenance contract will find it extremely useful to attend this seminar as a unit Anyone who wishes to update themselves on Maintenance Contracts & Outsourcing TRAINING OUTCOME At the end of the course participants will learn the principles of the centrifugal compressors and gas turbine. Familiarize the participants with various types of centrifugal compressor & gas turbine. Understand the operation principles of the centrifugal compressor and gas turbine. Learn the maintenance procedure of the centrifugal compressor and gas turbine. Discuss the troubleshooting and failure analysis of the centrifugal compressor and gas turbine. DAILY OUTLINE Day 1 - Outsourcing Considerations Introduction Contractors Skim Upside and downside contractors Introduction to program Asset management The business impact of maintenance Considerations in outsourcing maintenance what to outsource and what not? Using contractors Risks involved Safety performance Conflict between contractors Case study: Outsourcing maintenance activities Day 2 - Maintenance Contracts Maintenance contract types
4 Parties involved The tendering process modern ways of tendering Choosing the right contractor Agency labour Contractor Selection Contractor availability Awarding contracts Costing the service Selecting & Managing contracts Defining Key Performance Indicators to monitor the performance of all parties involved Use of Balanced Scorecard with performance contracts Day 3 - Developing the Maintenance Contract Vendor management The contracting cycle Assemble a team Assess, determine and specify the required service levels Writing the contract contents of a maintenance contract Interactive exercise: review some existing contracts Implementing contract management how to make it work (performance management) Periodic evaluation & improvement Day 4 - Reasons for Outsourcing Failure Expectations about availability, reliability and costs Ten Reasons for Outsourcing Failure Signs of Trouble Guidelines for Outsourcing Contracts How to Measure a Contractor's Performance Outsourced maintenance impacts production and profitability How the big companies manager look for maintenance Outsourced Outsourcing of Reliability or Maintenance? Day 5 Issue and Finalize Contract Development of a maintenance contract in groups Defining the requirements and service levels Develop the offer official definitions
5 maintenance services structure agreed services warranties or promises legal disputes provisions for terminating the contract Maintenance outsourcing example contract Selection criteria Exhibiting/ Presenting the bid Final the contract Evaluation of results Wrap-up Case Studies, Group Discussions, Last Day Review, Assessments will be carried out..
MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING
Training Title MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING Training Duration 5 days Training Date MV, HV and EHV Switchgear Testing & Commissioning 5 20 24 Apr $3,750 Dubai, UAE In any of the 5 star
More informationREFRACTORY INSPECTION CODE: INSTALLATION, INSPECTION, TESTING
Training Title REFRACTORY INSPECTION CODE: INSTALLATION, INSPECTION, TESTING Training Duration 5 days Training Venue and Dates Refractory Inspection Code: Installation, Inspection, Testing 5 30 Mar 3 Apr
More informationSTRATEGIC THINKING, PLANNING & GOAL SETTING
Training Title STRATEGIC THINKING, PLANNING & GOAL SETTING Training Duration 5 days Training Venue and Dates Strategic Thinking, Planning & Goal Setting 09-13 June $ 3,750 Riyadh, KSA In any of the 5 star
More informationPUMPS OPERATION, MAINTENANCE & TROUBLESHOOTING
Training Title PUMPS OPERATION, MAINTENANCE & TROUBLESHOOTING Training Duration 5 days Training Venue and Date Pumps Operation, Maintenance & Troubleshooting 5 24 28 Nov $3,750 In any of the 5 star hotels.
More informationBEARINGS, TYPES & SERVICEABILITY LIMITS, FAILURE MODES
Training Title BEARINGS, TYPES & SERVICEABILITY LIMITS, FAILURE MODES Training Duration and Dates 5 days training Bearings, Types and Serviceability Limits, Failure Modes 5 01 05 Sep $3,750 Abu Dhabi,
More informationChapter 2 INDUSTRIAL BUYING BEHAVIOUR: DECISION MAKING IN PURCHASING
Chapter 1 THE ROLE OF PURCHASING IN THE VALUE CHAIN The role and importance of the purchasing and supply function in the value chain. The difference between concepts such as ordering, buying, purchasing,
More informationMini MBA for Procurement Professionals
ISO 9001:2008 Certified ISO 29990:2010 Certified ISO 29990 Mini MBA for Procurement Professionals 18-22 July 2016, London 05 09 December 2016, London Tel: +971 4 4250700 Fax: +971 4 4250701 Email: info@glomacs.ae
More information2016 TRAINING PLAN MANAGEMENT TECHNICAL UPSTREAM & DOWNSTREAM TRAINING & CONSULTANCY SERVICES
2016 TRAINING PLAN MANAGEMENT TECHNICAL UPSTREAM & DOWNSTREAM TRAINING & CONSULTANCY SERVICES MANAGEMENT TRAINING & CONSULTANCY LIMITED TECHNICAL CONSULTANCY LIMITED, UK ACCREDITED CENTRE TO CONDUCT: Professional
More informationIT-Security Summit - 2004
IT-Security Summit - 2004 24 25 May, 2004 The Knowledge Village, Dubai Internet City, UAE Sponsorship, Marketing & Exhibition Opportunities For further information, or to reserve your Sponsorship Package/Exhibition
More informationExplanation of a Project and the Value of a Project Manager
Comprehensive Consulting Solutions, Inc. Bu siness Savvy. IT Smart. What is a Project and when is a Project Manager needed? White Paper Published: March 2001 (with revisions) Explanation of a Project and
More informationBusiness Process Management. How to Thrive During the Economic Downturn. 27-29 November 2016, Doha - Qatar ISO 29990
ISO 9001:2008 Certified ISO 29990:2010 Certified (Certificate No:1007049195) ISO 29990 (Certificate No: 1078694951) Business Process Management 27-29 November 2016, Doha - Qatar 05Jun16 The PMI Registered
More informationThe consultant found that the original contract s objective of modernizing the state s IT infrastructure has been largely achieved.
MEMORANDUM TO: FROM: SUBJECT: Members of the Joint Legislative Audit and Review Commission Mark Gribbin; Principal Analyst for Ongoing Oversight and Fiscal Analysis Consultant s review of the state s central
More informationGharbeya Water and Wastewater Company - Background
Gharbeya Water and Wastewater Company - Background The Gharbeya company is located in the Delta Population: 4,170,000 Water coverage: 90% Water accounts: 730,000 Wastewater coverage: 35% Wastewater accounts:
More informationThe Plan Category. Middle East Academy For Training & Consulting. Training Plan 2016. Public Relations. Leadership and Management. Sales and Marketing
Middle East Academy For Training & Consulting ل د للتدريب واإلستشارات Training Plan 2016 The plan contains about Eighteen specialty specialty contain all the programs listed. Each program contains three
More informationProcurement & Supply Chain Management
New Skills. New Thinking Procurement & Supply Chain Management Supply Chain Effectiveness Audit - Implementing lean processes in your supply chain 20 September 2012 Auckland 24 September 2012 Wellington
More informationCentre of Excellence. OH&S MS AWARENESS COURSE & OH&S MS INTERNAL AUDITOR COURSE (BASED ON OHSAS 18001:2007) Duration : 3 Days
Centre of Excellence in Quality Training & Certification In association with Etisalat Services Holding (ESH) Quality, Etisalat Academy brings you OH&S MS INTERNAL AUDITOR COURSE (BASED ON OHSAS 18001:2007)
More informationPM: Project, Contract & Procurement Management
www.unihouse.com.jo Course Title PM: Project, Contract & Procurement Other Titles Project Estimating & Budgeting 4 Project Planning, Scheduling & Cost Control Planning, Organising and Controlling Projects
More informationEngineering and Construction Contract Management Certificate Program (ECCM Workshops 1, 2, 3, 4, 5, 6) Certified Program
Engineering and Construction Contract Management Certificate Program (ECCM Workshops 1, 2, 3, 4, 5, 6) Certified Program 458 برنامج إدارة العقود الھندسية وعقود التشييد المتكامل معتمد عالميا 10 October
More informationSri Lanka Accounting Standard -LKAS 11. Construction Contracts
Sri Lanka Accounting Standard -LKAS 11 Construction Contracts -405- Sri Lanka Accounting Standard -LKAS 11 Construction Contracts Sri Lanka Accounting Standard LKAS 11 Construction Contracts is set out
More informationInternational Accounting Standard 11 Construction Contracts
International Accounting Standard 11 Construction Contracts Objective The objective of this Standard is to prescribe the accounting treatment of revenue and costs associated with construction contracts.
More informationProject Finance in the Oil and Gas Industry
Book early and SAVE 10% www.clariontraining.com/energy A three-day practical applied training course for Oil and Gas Industry Professionals Get to grips with financial and economic techniques, sources
More informationM&LE17 Outsource business processes 1
M&LE17 Overview Outsource business processes What this Unit is about This Unit is about outsourcing business processes which are not part of your organisation s core competencies. It covers the outsourcing
More informationEffective Project Kick-off Meetings
Effective Project Kick-off Meetings Purpose: Understand how, when and why to conduct a project kickoff meeting Audience: Project managers and team members Learning Objectives: Identify and assemble the
More informationConstruction Contracts
STATUTORY BOARD FINANCIAL REPORTING STANDARD SB-FRS 11 Construction Contracts This version of SB-FRS 11 does not include amendments that are effective for annual periods beginning after 1 January 2015.
More informationTHE SECURITY CONSULTANT S ROLE IN HELPING YOU SELECT, PURCHASE, AND INSTALL AN ACCESS CONTROL SYSTEM
1 Steve Keller is a security consultant specializing in museums, cultural institutions and historic sites with headquarters at 555 Granada Blvd. Suite G-3 Ormond Beach, Florida 32174 Tel. (386) 673-5034
More informationGlobal Leaders in Fire Engineering. Company Overview. Finding simple solutions to complex problems.
Company Overview Finding simple solutions to complex problems. ON M9B 6H7 AB T2H 1Z9 339941 From our offices in,, and, we serve our national and international clients by providing cost-effective solutions
More informationOCCUPATIONAL STANDARD (For use in the development of supply chain related job descriptions, performance evaluations, career development plans, etc.
OCCUPATIONAL STANDARD (For use in the development of supply chain related job descriptions, performance evaluations, career development plans, etc.) Description of Position (As defined by the CSCSC Stakeholder
More informationRef: S 9/21/05. 22 December 2011. To Heads of Departments / Offices
Ref: S 9/21/05 22 December 2011 To Heads of Departments / Offices Department of Public Expenditure & Reform Circular 15/2011: Mechanism to monitor compliance with employment law in outsourced operations
More informationADVANCED HR MANAGEMENT SYSTEM
Training Title ADVANCED HR MANAGEMENT SYSTEM Training Duration 10 days Training Venue and Dates Advanced HR Management System 10 01 12 December $7,000 Dubai, UAE Training will be held at any of the 5 star
More informationSpecification Senior Procurement & Contracts Manager
IDM UID Q99XVQ VERSION CREATED ON / VERSION / STATUS 17 Feb 2015 / 1.0 / Approved EXTERNAL REFERENCE Technical Specification Specification Senior Procurement & Contracts Manager Specification for the Senior
More informationCITY OF BONITA SPRINGS, FLORIDA RFP # 14-019
CITY OF BONITA SPRINGS, FLORIDA RFP # 14-019 Pursuant to Florida Statutes, Chapter 287, The City of Bonita Springs hereinafter referred to as the City, will accept sealed Responses for Qualifications and
More informationContract and Vendor Management Guide
Contents 1. Guidelines for managing contracts and vendors... 2 1.1. Purpose and scope... 2 1.2. Introduction... 2 2. Contract and Vendor Management 2.1. Levels of management/segmentation... 3 2.2. Supplier
More informationCUSTOMER RELATIONSHIP MANAGEMENT
EB-00-00 Exhibit F Filed: 00 Aug Page of CUSTOMER SERVICES 0 CUSTOMER RELATIONSHIP MANAGEMENT Customer Relationship Management ( CRM ) provides services to approximately,000 customers supported by THESL
More informationFunctional Area Systems Production / Operation Systems
ACS-1803 Introduction to Information Systems Instructor: Kerry Augustine Functional Area Systems Production / Operation Systems Lecture Outline 5, Part 2 ACS-1803 Introduction to Information Systems Examples:
More information26/10/2015. Functional Area Systems Production / Operation Systems. Examples: Functional Area Info Systems. Functional Area Information Systems
ACS-1803 Introduction to Information Systems Instructor: Kerry Augustine Functional Area Systems Production / Operation Systems Lecture Outline 5, Part 2 ACS-1803 Introduction to Information Systems Examples:
More informationProject Management Professional (PMP) Examination Preparatory Course
Project Management Professional (PMP) 05-09 September 2016 Vietnam 14-SEP-15 This course is Designed, Developed, and will be Delivered under ISO 29990:2010 Standards Project Management Professional (PMP)
More informationMinimizing risk and maximizing your chances of success with ERP
STRATEGIC BUSINESS SERVICES WHITEPAPER Minimizing risk and maximizing your chances of success with ERP (how to become one of the 26.2%) The Wall Street Journal published an article stating that 73.8% of
More informationQualifying the Lead. Getting the Most from the First Contact. What is a Lead Form, and Why Use One?
Getting the Most from the First Contact Here s the key point: If the customer does not recognize any difference between you and the competition, they will buy on price! The separation from your competition
More informationVMWARE VSPHERE 5.0 WITH ESXI AND VCENTER
VMWARE VSPHERE 5.0 WITH ESXI AND VCENTER CORPORATE COLLEGE SEMINAR SERIES Date: April 15-19 Presented by: Lone Star Corporate College Format: Location: Classroom instruction 8 a.m.-5 p.m. (five-day session)
More informationNEPAL ACCOUNTING STANDARDS ON CONSTRUCTION CONTRACTS
NAS 13 NEPAL ACCOUNTING STANDARDS ON CONSTRUCTION CONTRACTS CONTENTS Paragraphs OBJECTIVE SCOPE 1 2 DEFINITIONS 3 6 COMBINING AND SEGMENTING CONSTRUCTION CONTRACTS 7 10 CONTRACT REVENUE 11 15 CONTRACT
More information4.09. Ontario Power Generation Acquisition of Goods and Services. Chapter 4 Section. Background. Follow-up on VFM Section 3.09, 2006 Annual Report
Chapter 4 Section 4.09 Ontario Power Generation Acquisition of Goods and Services Follow-up on VFM Section 3.09, 2006 Annual Report Background As part of the reorganization of Ontario Hydro, Ontario Power
More informationProcess Instrumentation Training Europe. Instrumentation training capabilities
Process Instrumentation Training Europe Instrumentation training capabilities Empower your Staff Striving to optimize plant operation, reduce start-up time, plant down time and even reduce spares inventory?
More informationRequest for Proposal (RFP) Event Management Services. For. Project Management Institute Ottawa Valley Outaouais Chapter (PMI OVOC)
Request for Proposal (RFP) Event Management Services For Project Management Institute Ottawa Valley Outaouais Chapter (PMI OVOC) Project Management Institute Ottawa Valley Outaouais Chapter Page 1 SECTION
More informationRequest for Proposal. MPAO Data Center Virtualization
Request for Proposal MPAO Data Center Virtualization Maldives Pension Administration Office (MPAO) is accepting bids for supply, installation, configuration and Support for MPAO Data Center Virtualization.
More informationBusiness Logistics Specialist Position Description
Specialist Position Description March 23, 2015 MIT Specialist Position Description March 23, 2015 Page i Table of Contents General Characteristics... 1 Career Path... 2 Explanation of Proficiency Level
More informationCONTRACT MANAGEMENT COURSES
CONTRACT MANAGEMENT COURSES Principles and Practices Administration of Commercial Contracts Commercial Applications Risk Management in the Sourcing Environment TM Principles and Practices Identify contract
More informationThe Law Firm of Katzman Garfinkel
The Law Firm of Katzman Garfinkel is pleased to provide a comprehensive roster of State-approved educational courses for board members, association owners and managers. All courses are offered at our offices
More informationContract Management The Mavericks Won t Like This!
Contract Management The Mavericks Won t Like This! Keith Wallis How Much Did That Project Cost? Real Life Example Original contract amount $500K Variations scope changes not visible Total variations =
More informationSALES & MARKETING Public Training Courses. training solutions for Forward-looking organisations. Forward-thinking. www.anderson-hr.
LEADER IN KNOWLEDGE TRANSFER Forward-thinking training solutions for Forward-looking organisations ANDERSON is a global provider of training, learning and development solutions for organisations and individuals.
More informationREQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT PROFESSIONAL SERVICES. Part I: Qualifications Information
REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT PROFESSIONAL SERVICES A. General Information Part I: Qualifications Information The Tacoma School District is soliciting Qualifications for onsite
More informationManagement and Leadership for Engineering and Technical Professionals Specialized Studies Program
Management and Leadership for Engineering and Technical Professionals Specialized Studies Program OVERVIEW Technically competent engineering and information technologies professionals face new challenges
More informationClient Relationship Management Building B2B business. Event Management and Promotion e-marketing and e-commerce
Adeel Ahmed MBA Marketing USA BBA Information Technology USA Professional Profile Professional manager with a broad-based background in marketing. Over 13-years of track record in strategic market planning,
More informationState/Regional Meeting and Webinar Planning Guide
State/Regional Meeting and Webinar Planning Guide TABLE OF CONTENTS Planning a State/Regional Meeting 3 Expectations for AFA State/Regional Meetings 3 Sample State/Regional Meeting Timeline 4 Sample State/Regional
More informationP2 Performance Management
Pillar P P2 Performance Management Instructions to candidates Specimen Examination Paper You are allowed three hours to answer this question paper. You are allowed 20 minutes reading time before the examination
More informationUnit standards for Master Installation Electrician (Hazardous/specialised areas)
Unit standards for Master Installation Electrician (Hazardous/specialised areas) Test, inspect and complete a certificate of compliance for an electrical installation in a hazardous area Test and inspect
More informationKEY RESPONSIBILITIES:
1. TITLE: FIELD MAINTENANCE MANAGER 2. CLASSIFICATION: SENIOR EXECUTIVE OFFICER (SEO) 3. DEPARTMENT: OPERATIONS 4. POSITION OBJECTIVES: 4.1. Objectives of Position: 4.1.1. To manage and provide direction
More informationCITY OF MEDICINE HAT PROFESSIONAL PRACTICE MANAGEMENT PLAN
CITY OF MEDICINE HAT PROFESSIONAL PRACTICE MANAGEMENT PLAN Table of Contents 1. INTRODUCTION... 2 1.1. Foreword... 2 1.2. Objectives of Professional Practice Management Plan... 2 1.3. Statement on Ethics...
More informationGE M&R SERVICE LEVEL REQUIREMENTS
GE M&R SERVICE LEVEL REQUIREMENTS GE M&R SERVICE LEVEL REQUIREMENTS GIANT EAGLE WARRANTY, MAINTENANCE AND REPAIR SERVICE LEVEL REQUIREMENTS PART 1 - GENERAL 1.01 WARRANTY A. Warranty repairs and replacements
More informationQuestions To Ask. Instant Issue Providers. Thorough Research Yields Best Solution for Your Institution PAYMENT SOLUTIONS
12 Questions To Ask Instant Issue Providers Thorough Research Yields Best Solution for Your Institution PAYMENT SOLUTIONS Credit and debit card instant issuance has become an important differentiator for
More informationOnline CPD Tracking System User Manual
Online CPD Tracking System User Manual Table of Contents Overview... 1 Courses and Seminars... 4 Participation... 6 Presentations, Papers, and Research... 8 CPD Summary... 9 Personal Information... 11
More informationTHE DELTON GROUP MANPOWER TRAINING CONSULTANCY SHORT COURSE PROGRAMME TOPICS LISTING
THE DELTON GROUP MANPOWER TRAINING CONSULTANCY SHORT COURSE PROGRAMME TOPICS LISTING Delton Short Course Programmes English Language Technical English Language English Language for the Oil Industry Oil
More information360 Service Portfolio. The complete service offering from Alfa Laval
360 Service Portfolio The complete service offering from Alfa Laval Evaluate Order Request for quotation Receive Start Up Maintenance Monitoring Support Improvements Our life-cycle approach Alfa Laval
More informationProject Quality Management
Project Quality Management 22-24 May 2016 Qatar 19-OCT-15 This course is Designed, Developed, and will be Delivered under ISO 29990:2010 Standards Project Quality Management Why Choose this Course? What
More informationRoadmap for outsourcing
Roadmap for outsourcing Chemical industry www.groenewout.com Supply chain management Assets & facilities Sourcing Customer Warehousing & distribution Manufacturing GW ref. 9026X021/vBr/ version 2.0 Transportation
More informationEstablishing Commissioning Costs
Establishing Commissioning Costs Portland Energy Conservation, Inc. (PECI) 9/12/00; Revised 02/14/02 The following summarizes the latest information on commissioning costs taking into account costing studies
More informationAN OVERVIEW OF THE CONTRACT SURETY BOND CLAIMS PROCESS
The Associated General Contractors of America 333 John Carlyle Street Suite 200 Alexandria, VA 22314 AN OVERVIEW OF THE CONTRACT SURETY BOND CLAIMS PROCESS Developed by the Associated General Contractors
More informationThe following Accounting Standards Interpretation (ASI) relates to AS 7. ASI 29 Turnover in case of Contractors
108 Accounting Standard (AS) 7 (revised 2002) Construction Contracts Contents OBJECTIVE SCOPE Paragraph 1 DEFINITIONS 2-5 COMBINING AND SEGMENTING CONSTRUCTION CONTRACTS 6-9 CONTRACT REVENUE 10-14 CONTRACT
More informationINTER-PARLIAMENTARY UNION
INTER-PARLIAMENTARY UNION 5, CHEMIN DU POMMIER CASE POSTALE 330 1218 LE GRAND-SACONNEX / GENÈVE (SUISSE) TELEPHONE (41.22) 919 41 50 - FAX (41.22) 919 41 60 - E-MAIL postbox@mail.ipu.org TELEGRAPHIC ADDRESS
More informationStatement of Procurement Conduct
Statement of Procurement Conduct December 2014 Copyright of Western Power Any use of this material except in accordance with a written agreement with Western Power is prohibited. Introduction Western Power
More informationRev: Issue 4 Rev 4 Quality Manual AOP0101 Date: 10/07/13. Quality Manual. CBT Technology, Inc. 358 North Street Randolph, MA 02368
Quality Manual CBT Technology, Inc. 358 North Street Randolph, MA 02368 Issue 4 Revision 4 Note: updates are in italics Page 1 of 18 1.0 Scope and Exclusions Scope This Quality Manual contains policies
More informationExam Results. IT 4823 Information Security Administration. Project Management for Information Security. Introduction. Project Planning Considerations
Exam Results 90+ 7 IT 4823 Information Security Administration November 14 Implementing Security Copyright 2005 by Bob Brown 80-89 70-79 < 70 Questions 1, 5, 9, and 16 came from exam 1. Questions 6 and
More informationVALUE NEGOTIATION AND CONFLICT MANAGEMENT. 10 12 March 2015
VALUE NEGOTIATION AND CONFLICT MANAGEMENT 10 12 March 2015 Introduction Negotiation, influencing and conflict management are critical skills in all dimensions of life and society. In particular, public
More informationEXHIBIT A. NPS Dispute & Claim Consultant Scope of Work
EXHIBIT A NPS Dispute & Claim Consultant Scope of Work Scope Date Region HQ Project No Location Sub Account The Contract Administrator for this Contract will be: Jeff Wassenaar Project Development Branch
More informationPRACTICAL PUMP TECHNOLOGY:
PRACTICAL PUMP TECHNOLOGY: Selection, Applications, Operation, Troubleshooting, and Maintenance INTRODUCTION This seminar will provide a comprehensive understanding of the various types of reciprocating,
More informationSoftware License Agreements
TE C H TOOL S Number Three Contractors know contracts except when it comes to software contracts, otherwise known as license agreements. And, like many contracts written by one party for the protection
More informationCopyright 2014 Thomas Trappler All Rights Reserved
1 Cloud Computing Risk Mitigation 2 Cloud Computing Risk Mitigation http://www.flickr.com/photos/61056899@n06/5751301741/sizes/l/in/photostream/ As with the adoption of any IT solution, The adoption of
More information_experience the commitment TM. Seek service, not just servers
The complete cloud Creating and preserving cloud savings, security and service quality transition planning and service management ABOUT THIS PAPER Creating and preserving cloud infrastructure savings,
More informationPRE-QUALIFICATION ANNOUNCEMENT
Warsaw March 9, 2011 PRE-QUALIFICATION ANNOUNCEMENT The contracting authority 00-526 Warsaw, ul. Krucza 24/26, Poland Website: www.elektrowniapolnoc.pl Contact person: Mr. Marek Obuchowicz E-mail: info@elektrowniapolnoc.pl
More informationR.F.P. Assembly of First Nations Health & Social Development Secretariat
R.F.P. Assembly of First Nations Health & Social Development Secretariat National First Nations Health Policy Forum tentatively to be held November 7-9, 2011. Table of Contents 1. Contacts and Procedures
More informationThe Six Deadly ERP Sins
The Six Deadly ERP Sins Summary: This white paper is a collection of observations by Manoeuvre based on our experience in the field of Enterprise Resource Planning (ERP) system implementations. The target
More informationUse event management software to manage a conventions and incentives industry project
Use event management software to manage a conventions and incentives industry project 25861 version 1 Page 1 of 5 Level 4 Credits 5 Purpose People credited with this unit standard are able to: demonstrate
More informationRevision: 3. Author: J McGuire Department: Company. Category: Contract Management. Appr. Signature: CONTENTS 1.0 PURPOSE... 1 2.0 SCOPE...
POLICY Title: QAL Contract Management Policy Policy No: P801.001 Issue: 2 Revision: 3 Operative Date: 10/11/2009 Author: J McGuire Department: Company Sect./Classification: Company Category: Contract Management
More informationConstruction Contracts
65 Accounting Standard (AS) 7 Construction Contracts Contents OBJECTIVE SCOPE Paragraph 1 DEFINITIONS 2-5 COMBINING AND SEGMENTING CONSTRUCTION CONTRACTS 6-9 CONTRACT REVENUE 10-14 CONTRACT COSTS 15-20
More informationIntroducing Telapprise
Introducing Telapprise Translating Telecom Chaos into Streamlined Efficiency 1 Telecom Industry Experts Industry leading consulting expertise and TEM experience Proven methodology for significant savings
More information2014 ERP REPORT. A Panorama Consulting Solutions Research Report
2014 ERP REPORT A Panorama Consulting Solutions Research Report Copyright 2014 Panorama Consulting Solutions. All rights reserved. No unauthorized reproduction without the author s written consent. All
More informationWarranty & GAP Overview. QBE Insurance Europe Limited (Dubai Branch)
Warranty & GAP Overview QBE Insurance Europe Limited (Dubai Branch) QBE Product Solutions Extended Warranty Return to Invoice (RTI) Financial GAP Protects your vehicle against mechanical and electrical
More informationContract Provisions. 1. Party Names: Is each party clearly identified by official legal name? department, center or program name.
The Purchasing Office at SMC has created this checklist to assist District employees with key points to consider when presenting contracts for final processing. The checklist outlines important provisions
More informationTelecom Expense Management Options Internal versus Outsourcing Return on Investment View
Telecom Expense Management Options Internal versus Outsourcing Return on Investment View By Todd Calman, President - Tariff Affiliates, Inc. There are over 6,000 cell phone plans in the US and over 1,000
More informationArticle: Nuts & Bolts of Modern Wrap-Up Liability Insurance by Theodore L. Senet, Esq.
Article: Nuts & Bolts of Modern Wrap-Up Liability Insurance by Theodore L. Senet, Esq. After years of hard learned lessons, your company has finally mastered the purchasing of insurance for your construction
More informationElevator Service Preventive or Predictive
www.wipro.com Elevator Service Preventive or Predictive Market Differentiation Through Remote Monitoring Data and a Predictive Service Program Russell Gray Sr. Consultant, Business Process Group Aftermarket
More informationAGREEMENT AMERICAN TRANSLATORS ASSOCIATION GUIDE TO A TRANSLATION SERVICES AGREEMENT
THE FOLLOWING GUIDE DOES NOT RESTRICT ANYONE FROM CONTRACTING FOR SERVICES ON TERMS AND CONDITIONS DIFFERENT FROM THOSE BELOW. THE USE OF ANY CLAUSE IS STRICTLY VOLUNTARY. NEITHER THE AMERICAN TRANSLATORS
More informationHere s how to develop
Here s how to develop Section Your 1 Contractual Relationships Career and Skills in Civil Construction Specialist Civil Construction Management and Project Management Training Online + Company Training
More informationHospitality Services Service Level Standards
Hospitality Services Service Level Standards Contents 1. Introduction and Purpose 2. Customer Promise 3. Definition of Services 4. Performance Tracking and Reporting 5. Complaints Management 6. Training
More informationNORWEGIAN PROJECT MANAGEMENT PRINCIPLES APPLIED IN THE JURONG ROCK CAVERN PROJECT
NORWEGIAN PROJECT MANAGEMENT PRINCIPLES APPLIED IN THE JURONG ROCK CAVERN PROJECT FINN FAGERVIK 1, PETTER PLASSBAK 1 and TEO TIONG YONG 2 1 Sintef-Tritech-Multiconsult (STM) Consortium, Singapore E-mail:ff@multiconsult.no
More informationINFORMATION TECHNOLOGY Public Training Courses
LEADER IN KNOWLEDGE TRANSFER Forward-thinking training solutions for Forward-looking organisations ANDERSON is a global provider of training, learning and development solutions for organisations and individuals.
More informationcase study: IT governance and IT steering committee
case study: governance and steering committee transforms organizations to deliver competitive advantages The growing demand for alternative energy sources is voiced daily in the media, echoing the opinions
More informationsteps TO IMPROVING VENDOR PERFORMANCE
7 steps TO IMPROVING VENDOR PERFORMANCE ABOUT CONNANCE, INC. Connance is the industry s premier source of predictive analytic technology solutions that enable healthcare providers to optimize financial
More informationAUS. Professional Development Courses. American University of Sharjah. American University of Sharjah. Office of Enrollment Management
American University of Sharjah AUS Office of Enrollment Management Testing and Professional Development Center Professional Development Courses 2008 November 2 6, 2008 About AUS-AMIDEAST Professional Development
More informationThe complete guide to client-referral seminars
The complete guide to client-referral seminars Your business growth will be tied to how successful you are at three specific activities: 1. Client referrals 2. Client appreciation events 3. Client seminars
More informationINSE 6230 Total Quality Project Management
Total Quality Project Management Lecture 9 Project Procurement Management Procurement means acquiring goods and/or services from an outside source Other terms include purchasing and outsourcing Offshoring
More information