1 International Journal of Engineering Science Invention ISSN (Online): , ISSN (Print): Volume 3 Issue 7ǁ July 2014 ǁ PP Erratic Power Supply In Nigeria: Causes And Solutions A. C. Ohajianya 1, O. E. Abumere 2, I. O. Owate 2, E. Osarolube 2 1 (Department of Physics, Federal University of Technology, Owerri, Nigeria) 2 (Department of Physics, University of Port Harcourt, Port Harcourt, Nigeria) ABSTRACT : The erratic power supply in Nigeria is generally believed to be the bane of economic and industrial development in the Country. In this work, factors responsible for this erratic power supply were discussed. The factors include government s inconsistent and misguided power reform policies; inefficiency in power generation, transmission, distribution and consumption; and the incompetent work force of the energy companies. Recommendations towards solving the erratic power supply problem were proffered. One of the recommendations is the adoption of energy conservative policies such as policies to encourage shift from the use of energy inefficient electric devices like incandescent bulbs, old model refrigerators, computers and televisions, to the use of energy efficient LED bulbs, modern refrigerators, computers and televisions. Other recommendations include the immediate discontinuation of default or estimated billing system adopted by the power distribution companies; upgrading of power distribution and transmission equipment; and the immediate engagement of competent and qualified work force by the electric power companies. It was categorically stated that despite the general belief that the erratic power supply problem of Nigeria is as a result of the low power generation capacity of the Country, the major cause of this problem is energy wastage by consumers occasioned by the default or estimated billing system adopted by power distribution companies. KEYWORDS: Erratic power, Nigeria, Energy, LED bulb, Default billing, Estimated billing I. INTRODUCTION It is a widely acknowledged fact that erratic power supply in Nigeria is the bane of economic and industrial development in the country. With the abundant human and natural resources the country is blessed with, it becomes paradoxical that after one hundred years of existence and fifty-four years of independence, Nigeria is still not getting it right in terms of energy sufficiency. If the problem is only that the power is insufficient, it would have been a much more bearable situation but the major problem is that the power supply is erratic. Being erratic mean that the residents and companies requiring electricity cannot predict when this electric power from the national grid will be available for their consumption. In most situations erratic power supply can be equated to no power supply as the work the power is needed for, might have been done before the supply is made available or the power is interrupted before what it is to be used for, is gotten ready. Erratic power supply can also be equated to negative power in situations where the flip-flop nature of the supply causes damage to the equipment being powered. To understand and resolve the pathetic power supply situation in the country, it is pertinent we take a look at where we are coming from, where we are, and where we should be, then analyze the situations and propose how to move from where we are to where we should be. II. HISTORICAL DEVELOPMENT OF ELECTRIC POWER SUPPLY IN NIGERIA According to Ubi et al (2012), between the time electricity was introduced to Nigeria and the time Federal Government embarked on reform, three main periods are discernable. First, the period that predated the establishment of the Electricity Corporation of Nigeria (ECN) in 1950, which is characterized by isolated generation facilities with low rates of electrification. In this period, electricity supply in Nigeria was confined to a few urban areas and to mining centres. Some of the power plants constructed in this period include: [1] The Ijora, Lagos power plant built in 1898 by the colonial government under the jurisdiction of the public works department. Later, other plants were set up by native and municipal authorities. [2] The 2MW hydroelectric power plant at Kurra falls near Jos, constructed in 1925 by a privately owned company, the Nigeria Electricity Supply Company (NESCO). [3] The Sapele power plant owned by the African Timber and Plywood Limited, which became operational in [4] And the Shell development Company of Nigeria power plant operated at Bonny and Delta areas from The second phase is the period between the establishment of the Electricity Corporation of Nigeria (ECN) in 1950 and the establishment of National Electric Power Authority (NEPA) in Page
2 The need for co-ordination and integration of the operating plants necessitated the establishment of ECN through ordinance No.15 of The power and functions of the ECN were set out in sections 21, 29, 30 and 50 of the 1950 ordinance. A look at the provision of these sections reveals that ECN was charged with the responsibilities of electric power generation, transmission, distribution and sales throughout Nigeria. In addition, ECN was granted the power to acquire, hold and dispose-off lands for purpose of effective operation and actualization of the objectives of regular power supply. At the completion of the Niger Dam Hydroelectric project at Kanji in 1962, the Niger Dam Authority (NDA) was established leading to the existence of a parallel electricity body. The NDA was mandated to oversee the development of hydro electric facilities in Nigeria. The enabling Act charged NDA with the responsibility for constructing and maintaining dams and other projects on the river Niger and elsewhere in Nigeria. Its functions also included generating electricity by means of water power, improving navigation and promoting fisheries and irrigation. The third phase is the period after the establishment of the National Electricity Power Authority (NEPA). Owing to the then prevalent buck passing between ECN and NDA on intermittent power failure in Nigeria, the Federal Government decided to merge the two organizations into one body. To achieve this, the Federal Government appointed a Canadian firm of consultants to look into the technical details of the merger in The reports submitted by the consultants, induced the Federal Governments of Nigeria to establish the National Electric Power Authority (NEPA) through the amalgamation of ECN and NDA. Decree No. 24 of 1972 gave the necessary legal backing. The decree mandated NEPA to maintain an efficient, co-ordinated and economic system of electricity supply for all parts of the federation. NEPA thus became a government monopoly, responsible for the production, transmission and distribution of electricity to end consumers. It generated electricity from the following power stations: a. Ijora Thermal Power Station established in 1956 b. Afam Thermal Power Station established in 1962 c. Delta Thermal Power Station established in 1966 d. Kanji Hydro Power Station established in 1968 e. Ogorode Thermal Power Station established in 1980 f. Jebba Hydro Power Station established in 1985 g. Lagos Thermal Power Station established in 1986 h. Shiroro Hydro Power Station established in All the power stations, distribution stations and substations were specially interlinked by a transmission network, the national grid. The whole output of electricity generated nationwide was collected in a pool at the national control center, Osogbo. From there, the electricity generated was redistributed to all parts of the federation. In order to obtain smooth transmission of the electricity generated at the different power stations, NEPA put in place a total of 11,000Kilometers of transmission lines nationwide. In the same vein, extensive distribution of transformers and other relevant facilities were installed to ensure an even distribution of electricity to all customers across the federation. Despite all these efforts, the situation of power supply in the country keeps worsening. This led the government to the current phase of reform which started with the formation of PHCN. The Electric Power Sector Reform Bill, signed into law on March 11, 2005, enabled private companies to participate in electricity generation, transmission, and distribution. The signing into law of the bill ushered the restructuring and the privatization of the electricity sector. The Act further provided for the establishment of the Nigeria Electricity Regulatory Commission (NERC) to monitor and regulate the power sector as it undergoes reform. The law also terminated the existence of the National Electricity power Authority and in its place, established the power Holding Company of Nigeria, which was issued a temporary license ( In accordance with the EPSR Act, the federal government duly incorporated and constituted the board of directors of PHCN as a public limited liability company mandated to take over all the assets and liabilities of NEPA. The Act also provided for the unbundling of PHCN into new business units comprising six generation companies, eleven distribution companies and one transmission company, which will be handed over to private sectors through outright core investor sales and concessions. Under the Act, PHCN was required to remain in existence for only eighteen months, following which its staff and other assets and liabilities were to be assigned to the new business units created from its unbundling. This process is currently ongoing. 52 Page
3 Electric power transmission and distribution losses (kwh) III. FACTORS RESPONSIBLE FOR ERRATIC POWER SUPPLY IN NIGERIA The factors that affect the efficiency and stability of power supply in any developing country/region can be classified as follows: government policy; economic factor; natural factor; society/community factor; effective energy management; skilled personnel; efficient technology and security factor (Oricha and Olarinoye, 2012). These factors can be broken down to the following factors believed to be responsible for the erratic power supply in Nigeria: 3.1 GOVERNMENT POLICY Government s inconsistent energy policies have been a major contributor to the Nigerian energy crisis. For instance, the government s policies for over fifty years now have been favoring monopoly in the power generation, transmission, distribution and sales. From the establishment of ECN in 1950 to the setting up of NEPA in 1972, the policy has been that of having an entity with full control of power generation and supply. If after these years, government is now bringing up policies to unbundle the power sector of the economy, then it is obvious that the earlier policies have not helped the system. 3.2 INEFFICIENCY IN POWER GENERATION, TRANSMISSION, DISTRIBUTION AND CONSUMPTION From the point of power generation in Nigeria, there is over fifty percent power loss. For instance, a study of Delta four power plants revealed a total average power generation of 30.5% out of the installed capacity (Oyem, 2013). This means that a total of 69.5% of power that would have come out of these four power plants and added to the national grid, is lost just at the point of generation. At the stage of transmission and distribution, a reasonable amount of power is also lost due to transmission lines and equipment that are grossly ill maintained or below capacity. According to the international Energy Agency report (2012), electric power transmission and distribution losses in Nigeria stood at 17.22% in 2010, and the maximum figure between 1971 and 2010 occurred in year 1981 where the loss stood at 49.27%. Figures 3.1 and 3.2 give a plot of electric power transmission and distribution losses in Nigeria from the year 1971 to 2010 in terms of total power loss and percentage loss of the total power generated, respectively, as extracted from IEA report (2012). At the point of consumption, majority of power consumers in Nigeria leave their electric devices ON even when they are not needed, because of the default billing method adopted by the power distribution companies. This results to great power loss to the system and also to the over loading of the transmission and distribution equipment. Year Fig. 3.1 Electric power transmission and distribution losses in Nigeria from the year 1971 to Page
4 Electric power transmission and distribution losses (% of PG) Year Fig. 3.2 Electric power transmission and distribution losses in Nigeria from the year 1971 to 2010 in terms of percentage loss of the total power generated 3.3 INCOMPETENT STAFF OF THE ENERGY COMPANIES This is a general Nigerian problem where companies especially government firms, employ workers not based on merit and competence but on favoritism and tribalism. Because of this, no government company in Nigeria that requires workers with professional and technical competence has ever succeeded. NEPA and PHCN had staff, majority of which were employed through the back door and therefore, the only thing they seemed to know was how to climb electric poles and cut cables. On November 5, 2013, Nigerians rejoiced as government handed over generation, transmission and distribution of electricity to private companies. At least Nigerians believed that with the private ownership of these companies, the companies would immediately hire competent staff that will work towards the growth and betterment of the system. But six months after, Nigerians from all walks of life continue to grumble that power supply has gone from bad to worse (Ukoko et al, 2014). These new companies still retain the old incompetent staff of NEPA and PHCN for reasons best known to them. IV. RECOMMENDATIONS TO SOLVING NIGERIAN ERRATIC POWER SUPPLY Having studied and analyzed the causes of erratic power supply in the Country, the following recommendations to solving the Nigerian erratic power supply are hereby made: 4.1 ADOPTION OF ENERGY CONSERVATIVE POLICIES Government should outlaw the use of electric gadgets and devices that waste electric energy and encourage the use of models of these gadgets that save energy. For instance, a 10W LED electric bulb can give the same illumination as a 100w incandescent bulb. This means 90% energy saving. Also a 120W modern refrigerator can render the same service as a 600W older version of the fridge. Worldwide, nations are beginning to face up to the challenge of sustainable energy by re-evaluating the way energy is generated and utilized so that social, environmental and economic aims of sustainable development are supported. The benefits of energy efficiency upon the environment are self-evident and the economic benefits of improving energy efficiency have been well documented since the first oil crisis in early 1970 s. Many forward-thinking industrial and commercial concerns have already adopted energy efficiency as a key policy towards maximizing profits. Niger republic which relies partly on Nigeria for its electric energy supply, were able to achieve some level of high energy conservation and efficiency by the adoption of energy saving policy that mandated the consumers to shift from the use of incandescent bulbs to fluorescent lamps (Ruma et al, 2011). Also, Ghana adopted a similar policy whereby the government collaborated with product and sales companies, and asked residents to return their energy inefficient refrigerators for modern energy efficient ones at a good discount. Nigeria can adopt a similar policy and also outlaw the use of incandescent bulbs. The price of LED bulbs should be subsidized, as high price of these bulbs has been a major factor responsible for low use of the bulbs in Nigeria. The 54 Page
5 Government can withdraw the subsidy after sometime, when the people have gotten used to the new technology and have realized that one LED bulb can outlast ten incandescent bulbs. 4.2 IMMEDIATE DISCONTINUATION OF DEFAULT/ESTIMATED BILLING SYSTEM As a matter of urgency, the default billing system adopted by NEPA and is still used by the new power distribution companies, should be outlawed as it is stupid, criminal, exploitative and destructive. A billing system that charges the same amount of money on a consumer with ten LED bulbs of 10W each (= 100W), another consumer with ten 200W bulbs (= 2000W) and still a third consumer that did not use electric power in his house for the whole month either because the power transformer in his area was faulty or because the family travelled, should be condemned and discontinued. If this is not done because of the criminal nature of the billing system, let it be done because of the fact that it encourages power wastage and leads to breakdown of power distribution and transmission equipment 4.3 UPGRADE OF POWER DISTRIBUTION AND TRANSMISSION EQUIPMENT The new companies that took over electric power transmission and distribution business in Nigeria should embark on immediate upgrading of the power transmission and distribution infrastructures. More emphasis should be on distribution infrastructure now and then after ensuring that the equipment on ground can comfortably distribute the power currently being generated and the amount of power the generating companies intend to generate in the near future, then emphasis will now shift to power generation. 4.4 ENGAGEMENT OF COMPETENT AND QUALIFIED STAFF BY THE ELECTRIC POWER COMPANIES The new power generation, transmission and distribution companies should retain only the staff of NEPA and PHCN which they have tested and certified as qualified and competent, and dismiss all those that were engaged through the back door. They should then employ qualified and technically competent workforce to drive the new efficient and sustainable system. V. CONCLUSION It is widely believed that the problem of erratic power supply in Nigeria is as a result of low power generation capacity of the country. This is because Nigeria with a population of over 150 million has power generation capacity of around 3,600 megawatts out of the installed capacity of about 6,000 megawatts (PTFP, 2014). This is very low when compared to that of other countries like Brazil with a generation capacity of 100,000MWs of grid-based electric power for a population of 201 million people, South Africa which generates 40,000MW of electricity for 50million citizens, and even our neighboring Ghana which generates 2,111 megawatts for a population of 23.84million people. While it is true that Nigeria s power generation capacity is currently below what it should be, the low power generation capacity of Nigeria is not the cause of erratic power supply in the country. Low power generation should only result to not enough power available for consumption and not the power supply becoming erratic. The major cause of erratic power supply in Nigeria is energy wastage by consumers occasioned by default or estimated billing system adopted by power distribution companies. Other contributors include government misguided power reform policies, low standard and illmaintained transmission and distribution infrastructure; and the use of unqualified and technically incompetent work force by the power generation, transmission and distribution companies. These problems can be solved by adopting energy conservative policies like the use of LED bulbs and other energy saving electrical and electronic devices, immediate discontinuation of default/estimated billing system by the electricity distribution companies, upgrading of power distribution and transmission equipment, and the engagement of competent and qualified staff by the electric power companies. REFERENCES [1] IEA statistics OECD/IEA (2012) Energy Statistics and Balances of Non-OECD countries and Energy Statistics of OECD Countries and United Nations, Energy statistics yearbook, ( Retrieved : 3 rd May, [2] Oyem, I. L. (2003) Analysis of Nigeria Power Generation Sustainability through Natural Gas Supply, Journal of Innovative Research in Engineering and Sciences 4(1) ISSN: (print); ISSN: (online), (pp ). [3] Presidential Task force On Power (2014) Nigeria s Power Reform ( Retrieved: 3 rd May, [4] Ruma, M. M., El-ladan, A. H., Batagarawa, S. M., Abdullahi, U. S. (2011) The Need for Energy Efficiency in Nigeria: Taking The Footstep of Niger Republic Advances in Science and Technology, Vol. 5, No. 1S,( pp ) [5] Ubi, P. S., Effiom, L., Okon, E. O., Oduneka, A. E. (2012) An Econometric Analysis of the Determinants of Electricity Supply in Nigeria, International Journal of Business Administration, Vol.3, No.4 [6] Ukoko, J., Odogwu, T., Adenusi, O. (2014) Power Discos Still Fumbling Six Months After Daily Newswatch April 5, 2014 ( Retrieved: 3 rd May, [7] Retrieved : 25 th April, Page
INDEPENDENT POWER PLANTS: A VEHICLE FOR SUSTAINABLE ENERGY GENERATION IN NIGERIA
International Journal of Science, Environment and Technology, Vol. 3, No 5, 2014, 1706 1712 ISSN 2278-3687 (O) INDEPENDENT POWER PLANTS: A VEHICLE FOR SUSTAINABLE ENERGY GENERATION IN NIGERIA Kenechi V.
ENERGY CRISIS IN NIGERIA: TECHNICAL ISSUES AND SOLUTIONS. Engr. D.J. Obadote
ENERGY CRISIS IN NIGERIA: TECHNICAL ISSUES AND SOLUTIONS By Engr. D.J. Obadote B.Eng (Hons); M.Eng.; FCIM; MNSE; MNIEM; R.Eng. Principal Manager (Performance Management) Jebba Hydro Power Business Unit
Assessment of Nigeria power sub-sector and electricity generation projections
International Journal of Scientific & Engineering Research, Volume 2, Issue 11, November-2011 1 Assessment of Nigeria power sub-sector and electricity generation projections Engr. C. O. Osueke (Ph.D),
Nigeria s Power Privatisation Process: Learning Curves. Chijioke Okonkwo Senior Consultant June 2015
Nigeria s Power Privatisation Process: Learning Curves Chijioke Okonkwo Senior Consultant June 2015 Learning Curves from Structure and Process Adopted for the PHCN Privatisation OUTLINE Introduction Review
Overview of the Nigerian Electricity Industry (Roles, Responsibilities,
Overview of the Nigerian Electricity Industry (Roles, Responsibilities, Structure, Expectation) Presentation at the Nigeria Power Sector Investment Forum - Lagos, Dubai, London, New York and Johannesburg
The Nigeria Electric Power Sector (Opportunities and Challenges)
The Nigeria Electric Power Sector (Opportunities and Challenges) Onochie U.P 1, Egware H.O 2 and Eyakwanor T.O 3 1,3 National Centre for Energy and Environment Energy Commission of Nigeria, University
Comparison of Regression Model and Artificial Neural Network Model for the prediction of Electrical Power generated in Nigeria
Available online at www.pelagiaresearchlibrary.com Advances in Applied Science Research, 2011, 2 (5):329-339 ISSN: 0976-8610 CODEN (USA): AASRFC Comparison of Regression Model and Artificial Neural Network
SECTOR ASSESSMENT (SUMMARY): ENERGY 1. 1. Sector Performance, Problems, and Opportunities
Country Partnership Strategy: Bangladesh, 2011 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Power generation gap. Bangladesh endures long
Roland Berger Strategy Consultants. content Fresh thinking for decision makers
Roland Berger Strategy Consultants content Fresh thinking for decision makers Nigeria's power sector open for business A newly liberalized market welcomes new players Fundamental challenges persist and
Issues and Challenges of Ownership and Privatization of Power Stations in Nigeria'
Journal of Scientific Research & Reports 8(3): 1-8, 2015; Article no.jsrr.18296 ISSN: 2320-0227 SCIENCEDOMAIN international www.sciencedomain.org Issues and Challenges of Ownership and Privatization of
The current and future challenges of electricity market in Nigeria in the face of deregulation process
African Journal of Engineering Research Vol. 1(2), pp. 33-39, March 2013 Review The current and future challenges of electricity market in Nigeria in the face of deregulation process Titus Koledoye Olugbenga
Erratic Power Supply and Socio- Economic Development in Ado- Ekiti, Ekiti State, Nigeria
The International Journal Of Engineering And Science (IJES) Volume 3 Issue 6 Pages 57-60 2014 ISSN (e): 2319 1813 ISSN (p): 2319 1805 Erratic Power Supply and Socio- Economic Development in Ado- Ekiti,
Electricity Distribution Engineering and Geographic Information System (DeGIS).
Electricity Distribution Engineering and Geographic Information System (DeGIS). OLANIYI Saheed Salawudeen, Nigeria and USMAN Rashidat, Nigeria Key Words: GIS, Electricity Distribution, Geodatabase, Analysis,
MAJOR FACTORS AFFECTING ELECTRICITY GENERATION, TRANSMISSION AND DISTRIBUTION IN NIGERIA
MAJOR FACTORS AFFECTING ELECTRICITY GENERATION, TRANSMISSION AND DISTRIBUTION IN NIGERIA Sule, A. H. Department of Electrical Enginneering Hassan Usman Katsina Polytechnic, Katsina E-mail: [email protected]
RURAL ELECTRIFICATION INFRASTRUCTURE DEVELOPMENT IN NIGERIA USING ON-GRID AND OFF-GRID SOURCES
RURAL ELECTRIFICATION INFRASTRUCTURE DEVELOPMENT IN NIGERIA USING ON-GRID AND OFF-GRID SOURCES By Engr. Kelechi Eke MNSE, FMP, CFM PTP/O/NM, SPDC Industrial Area, Port-Harcourt, [email protected], Abstract:
Investment Brief for the Electricity Sector in Ghana
Investment Brief for the Electricity Sector in Ghana Overview Ghana s economy growth decelerated sharply to an estimated 4.2% in 2014, down from 7.4 % in 2013. Manufacturing and oil production from the
Assessment of Impact of Hydropower Dams Reservoir Outflow on the Downstream River Flood Regime Nigeria s Experience
Assessment of Impact of Hydropower Dams Reservoir Outflow on the Downstream River Flood Regime Nigeria s Experience David O. Olukanni 1 and Adebayo W. Salami 2 1 Department of Civil Engineering, Covenant
A Green Sector Overview
A Green Sector Overview Micro Hydro Electric Power Ontario's Waterpower Resources: Past and Present The first hydroelectric generator in Canada was installed near Ottawa, which was the first city in North
Secondly, those that are not on the grid yet, require that the grid be expanded to provide them with electricity services.
1 P a g e EXECUTIVE SUMMARY This white paper broadly explores customer relationship management (CRM) practices in the electricity distribution sector in Nigeria. It identifies some of the existing challenges
FIXED CHARGE: This is a cost that goes towards making the service available, including
ELECTRICITY BILL COMPONENTS FIXED CHARGE: This is a cost that goes towards making the service available, including installation and maintenance of poles, power lines and equipment, and 24-hour customer
Performance Analysis of Thermal Power Station: Case Study of Egbin Power Station, Nigeria
International Journal of Electronic and Electrical Engineering. ISSN 0974-2174 Volume 4, Number 3 (2011), pp. 281-289 International Research Publication House http://www.irphouse.com Performance Analysis
SECTOR ASSESSMENT (SUMMARY): ENERGY. 1. Sector Performance, Problems, and Opportunities
Country Operations Business Plan: Philippines, 2013 2015 SECTOR ASSESSMENT (SUMMARY): ENERGY 1. Sector Performance, Problems, and Opportunities 1. Challenges. Economic growth has been impeded in the Philippines
THE PRESIDENCY, BUREAU OF PUBLIC ENTERPRISES
THE PRESIDENCY, BUREAU OF PUBLIC ENTERPRISES POWER PRIVATIZATION:OBJECTIVES, CURRENT STATUS, PROSPECTS & CHALLENGES By Ibrahim Baba Gana Ag Director (Electric Power) BPE A Presentation to the Breakfast
Hon. Jemma Nunu Kumba Minister Ministry of Electricity and Water Resources Republic of South Sudan
Hon. Jemma Nunu Kumba Minister Ministry of Electricity and Water Resources Republic of South Sudan South Sudan Electricity Sector Investment Opportunities Introduction Status of electricity supply in South
Massachusetts Saving Electricity:
Commonwealth of Massachusetts Massachusetts Saving Electricity: A Summary of the Performance of Electric Efficiency Programs Funded by Ratepayers Between 2003 and 2005 Executive Office of Energy and Environmental
AN APPRAISAL OF PUBLIC ELECTRICITY PERFORMANCE AND ITS IMPLICATIONS ON ECONOMIC DEVELOPMENT IN NIGERIA
Sacha Journal of Environmental Studies Volume 5 Number 1 (2015) pp. 63-73 ISSN 2045-8479 (Print) ISSN 2045-8487 (Online) Publishers: Sacha & Diamond Publishers, England, UK. www.sachajournals.com Current
Issues and Challenges in the Nigerian Electricity Industry: Case of Benin Electricity Distribution Company
Issues and Challenges in the Nigerian Electricity Industry: Case of Benin Electricity Distribution Company Roland Uhunmwagho Kenneth E. Okedu * Department of Electrical Engineering, College of Engineering,
Asian Journal on Energy and Environment
As. J. Energy Env. 2005, 6(02), 139-144 Asian Journal on Energy and Environment ISSN 1513-4121 Available online at www.asian-energy-journal.info The Small Hydropower Project as the Important Renewable
Energy Situation in Egypt
Energy Situation in Egypt Egypt has traditionally been a net exporter of energy. Until the late 1990s, it exported oil, but oil production has declined from its peak in the early 1990s, and now roughly
SECTOR ASSESSMENT (SUMMARY): ENERGY 1
Country Partnership Strategy: Kazakhstan 2012 2016 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Overview. Oil accounts for about a quarter
Electricity market drivers
Daniel Assandri Head of Power Systems ABB (China) Ltd Electricity market drivers March 2008 Global T&D Market Drivers ABB Power Systems division - slide # 2 ABB s view on and market drivers The Americas
ALENA RAKAVA SUMMARY
ENERGY SECURITY OF BELARUS: STEREOTYPES, THREATS, TRENDS 1 ALENA RAKAVA SUMMARY The issue of energy security is on the agenda of many countries. However, the policy debate on energy security often focuses
THE DEMAND FOR RESIDENTIAL ELECTRICITY IN NIGERIA: A BOUND TESTING APPROACH
THE DEMAND FOR RESIDENTIAL ELECTRICITY IN NIGERIA: A BOUND TESTING APPROACH M. Adetunji Babatunde 1 M. Isa Shuaibu Department of Economics Department of Economics University of Ibadan, University of Ibadan,
Results of Electricity Sector Restructuring in Chile
Case Study From 1 Chile is a leader of the privatization movement in South America. In 1986, to meet the growing demand for energy, Chile began restructuring of the state-owned power sector. Before selling
HOW TO FUND BASIN MANAGEMENT PLANS? Invest in IWRM - it pays back!
HOW TO FUND BASIN MANAGEMENT PLANS? Invest in IWRM - it pays back! Jean-François DONZIER Permanent Technical Secretary of the International Network of Basin Organizations (INBO), General Manager of the
EFFECT OF GENERATOR USAGE ON SMALL SCALE BUSINESSES IN NIGERIA
EFFECT OF GENERATOR USAGE ON SMALL SCALE BUSINESSES IN NIGERIA Juliet Olorunwa Ikhuosho-Asikhia Bachelor s thesis May, 2014 Degree Programme in Environmental Engineering ABSTRACT Tampereen ammattikorkeakoulu
Republic of Zambia OPPORTUNITIES IN THE ENERGY SECTOR IN ZAMBIA
Republic of Zambia OPPORTUNITIES IN THE ENERGY SECTOR IN ZAMBIA Presentation Outline COUNTRY PROFILE KEY POWER SECTOR PLAYERS OVERVIEW OF THE ENERGY SECTOR IN ZAMBIA ZAMBIA ENERGY SITUATION PRESENTLY RESULT
SAMPLE TERMS OF REFERENCE FOR ELECTRICITY SECTOR PRIVATIZATION TRANSACTION ADVISORY SERVICES
SAMPLE TERMS OF REFERENCE FOR ELECTRICITY SECTOR PRIVATIZATION TRANSACTION ADVISORY SERVICES Table of Contents 1st. INTRODUCTION... 3 2nd. ELECTRICITY SECTOR BACKGROUND. 4 3rd. SCOPE OF WORK. 6 PHASE :
NIGERIA ELECTRICITY INDUSTRY: ISSUES, CHALLENGES AND SOLUTIONS
Covenant University 38th Public Lecture NIGERIA ELECTRICITY INDUSTRY: ISSUES, CHALLENGES AND SOLUTIONS Claudius A. Awosope, Ph.D Professor of Electrical and Electronics Engineering. Deputy Dean, School
Kyrgyzstan: Power Generation & Transmission
Kyrgyzstan: Power Generation & Transmission October, 2010 Author: Artyom Zozulinsky, Business & Commercial Assistant, US Embassy Bishkek Contents SUMMARY... 2 POWER SECTOR OVERVIEW... 2 Infrastructure...
Cost Reflective Tariffs: Balancing Commercial and Socio-economic Imperatives The MYTO Perspective
14th 15th May 2013 Cape Town, South Africa Cost Reflective Tariffs: Balancing Commercial and Socio-economic Imperatives The MYTO Perspective Sam Amadi, Ph.D Chairman/Chief Executive Officer Nigerian Electricity
Nigeria has tremendous energy resources in the form of abundant gas, water and mineral resources.
International Association for Energy Economics 29 Nigeria s Electricity Sector- Electricity and Gas Pricing Barriers By Prasad V.S.N. Tallapragada* Nigeria has tremendous energy resources in the form of
the sale of mercury to natives. According to Ofosu-Mensah the law was passed by the colonial
Index of Laws Mining Laws The Mercury Ordinance, 1933 The Mercury Ordinance was proclaimed by the government of the Gold Coast colony, banning the sale of mercury to natives. According to Ofosu-Mensah
Law of Mongolia on Concessions
Economic Policy Reform and Competitiveness Project April 2005 Ulaanbaatar, Mongolia This publication was produced for review by the United States Agency for International Development The views expressed
Electricity in Egypt
T: (+20) 2 3760 4592 F: (+20) 2 3760 4593 A: 16 Hussein Wassef Street, Messaha Square Dokki, Giza, Egypt 12311 www.ide.com.eg Electricity in Egypt Policy and Regulatory Reform November 2015 Electricity
Electric Energy Generation in Washington State. Key Findings from the Association of Washington Business
2014 Electric Energy Generation in Washington State Key Findings from the Association of Washington Business Washington s economy is built on abundant, reliable and affordable electric energy. Although
INDONESIA S COUNTRY REPORT ENCOURAGING CLEAN ENERGY INITIATIVE
DEWAN PERWAKILAN RAKYAT REPUBLIK INDONESIA INDONESIA S COUNTRY REPORT ENCOURAGING CLEAN ENERGY INITIATIVE As part of the international community, Indonesia shares its concern on the environment and development
THE NIGERIAN ELECTRICITY SUPPLY INDUSTRY: STATUS, CHALLENGES AND SOME WAYS FORWARD. Engr. (Dr) Moses Amadasun MNSE, MIEEE
THE NIGERIAN ELECTRICITY SUPPLY INDUSTRY: STATUS, CHALLENGES AND SOME WAYS FORWARD Engr. (Dr) Moses Amadasun MNSE, MIEEE Abstract: The present capacity of the Nigerian Electricity Supply Industry to provide
Solar Energy in Africa Experiences from Ghana
Solar Energy in Africa Experiences from Ghana AfricaSolar Conference 2015, 25 27 June 2015, Ouagadougou David A. Quansah Kwame Nkrumah University of Science and Technology (KNUST) Kumasi Ghana 26 June
1. EXECUTIVE SUMMARY AND KEY RECOMMENDATIONS
1. EXECUTIVE SUMMARY AND KEY RECOMMENDATIONS EXECUTIVE SUMMARY Energy policy in Greece has the potential to make a significant contribution to the country s economic recovery. Increasing competition and
Development of Public Private Partnerships (PPPs) in China
Development of Public Private Partnerships (PPPs) in China Dr Paul H K Ho Chairman, Quantity Surveying Division The Hong Kong Institute of Surveyors Associate Head, Division of Building Science and Technology
Overview of the IESO-Administered Markets. IESO Training. Updated: January, 2014. Public
Overview of the IESO-Administered Markets IESO Training Updated: January, 2014 Public Overview of the IESO-Administered Markets AN IESO TRAINING PUBLICATION This guide has been prepared to assist in the
Future Role of Distribution Companies Deployment of Smart Systems. Dr. Sam Amadi Chairman/CEO
NIGERIAN ELECTRICITY REGULATORY COMMISSION Future Role of Distribution Companies Deployment of Smart Systems Dr. Sam Amadi Chairman/CEO 6 th World Forum on Energy Regulation Tuesday, May 26, 2015 Istanbul
Macro- and Micro-Hydropower: An Option for Socioeconomic Development. Case Study Agbokim Waterfalls, Cross River State, Nigeria.
Macro- and Micro-Hydropower: An Option for Socioeconomic Development. Case Study Agbokim Waterfalls, Cross River State, Nigeria. R. Uhunmwangho, Ph.D. and E.K. Okedu Department of Electrical/Electronic
INTERNATIONAL ENERGY AGENCY. UpcomingIEA Publications
INTERNATIONAL ENERGY AGENCY UpcomingIEA Publications March 2009 2009 Spring Energy Policies of Luxembourg: 2008 Review Luxembourg has reformed its energy policies since the last IEA in-depth review in
Development in Egypt. Egyptian Electricity Holding Company - EEHC
Wind Power Development in Egypt Introduction In Egypt, the high reliance on increasingly scarce of the availability of conventional energy resources (crude oil & natural gas) is becoming a cause for concern,
Renewable Electricity Policy Guidelines
FEDERAL MINISTRY OF POWER AND STEEL FEDERAL REPUBLIC OF NIGERIA Renewable Electricity Policy Guidelines December 2006 Chatti Plaza, 6 Sapele Street, Garki II Abuja Tel/Fax: +234 9 234 8525 Email: [email protected]
Energy Audit of a Brewery A Case Study of Vitamalt Nig. Plc, Agbara
Energy and Power Engineering, 212, 4, 137-143 http://dx.doi.org/1.4236/epe.212.4319 Published Online May 212 (http://www.scirp.org/journal/epe) 137 Energy Audit of a Brewery A Case Study of Vitamalt Nig.
A Guide to the Nigerian Power Sector. December 2013
A Guide to the Nigerian Power Sector December 2013 Contacts For information on any aspect of the Nigerian Power Sector, please ask your usual contact at KPMG who will be happy to assist. Alternatively,
Glossary of Terms Avoided Cost - Backfeed - Backup Generator - Backup Power - Base Rate or Fixed Charge Baseload Generation (Baseload Plant) -
Glossary of Terms Avoided Cost - The incremental cost Flint Energies would pay for the next kilowatt-hour of power in the open marketplace for energy. Flint Energies Board of Directors sets this Avoided
SPANISH EXPERIENCE IN RENEWABLE ENERGY AND ENERGY EFFICIENCY. Anton Garcia Diaz Economic Bureau of the Prime Minister
SPANISH EXPERIENCE IN RENEWABLE ENERGY AND ENERGY EFFICIENCY Anton Garcia Diaz Economic Bureau of the Prime Minister «Symposium on Strengthening Sino-Spain cooperation in multiple Fields» New Energy Cooperation
The World Bank FPD Note No. 6 April 1994
Privatesector P U B L I C P O L I C Y F O R T H E The World Bank FPD Note No. 6 April 1994 Solar energy answer to rural power in Africa Robert van der Plas In Kenya, more rural households get their electricity
Electric Power Industry Restructuring In Nigeria
Electric Industry Restructuring In Nigeria Oseweuba Valentine Okoro Abstract: This paper presented a general overview of Electric power generation in Nigeria, with a special focus on the restructuring
2009 Energy Policy. Background
2009 Energy Policy Background The citizens of Fort Collins created the municipal electric utility in 1935. In 1973, Fort Collins joined with Estes Park, Longmont and Loveland to create Platte River Power
We are working hard to help Ontario businesses manage their electricity costs.
Ontario Minister of Energy Meets with Chamber Network, Addresses Key Concerns In August 2015, the Ontario Chamber of Commerce released Empowering Ontario, a comprehensive report that takes a look at the
Regulatory Environment and Electricity Tariff Design in Nigeria. Nigerian Electricity Regulatory Commission June, 2013
Regulatory Environment and Electricity Tariff Design in Nigeria By Nigerian Electricity Regulatory Commission June, 2013 Outline Functions of the Commission Tariff Regulation in Nigeria Methodology of
NEW COMMERCIAL Rates. Understanding the. Commercial Customers
Understanding the NEW COMMERCIAL Rates The Austin City Council increased Austin Energy s base rates, which pay for operations and maintenance, for the first time in 18 years. The new rates, which amount
Siemens Answers for DoD Installations
FOB Solutions for Energy & Water Renewables: Solar, Wind, Waste to Energy Power Generation, Transmission & Distribution Port & Airfield Infrastructure & Logistics Smart Grids & Micro Grids Water & Waste
Crisis of Electrical Energy in Pakistan and Future guideline for Policy makers
International Journal of Basic & Applied Sciences IJBAS-IJENS Vol:09 No:09 11 Crisis of Electrical Energy in Pakistan and Future guideline for Policy makers Sifat Shah, M.K. L. Bhatti COMSATS Institute
Pathways from Stagnation in the West African Electricity Sector. Patrick Gilmartin Master of Law & Diplomacy, 2013
Pathways from Stagnation in the West African Electricity Sector Patrick Gilmartin Master of Law & Diplomacy, 2013 1 Introduction Countries with low per-capita electricity consumption are poorer than those
Developing Estonian energy policy hand in hand with EU energy packages
Developing Estonian energy policy hand in hand with EU energy packages Einari Kisel Secretary General of Energy of the Estonian Ministry of Economic Affairs and Communications 2008 will go down in history
The function of a power station is to deliver
CHAPTER CHAPTER 3 Variable Load on Power Stations 3.1 Structure of Electric Power System 3.2 Variable Load on Power Station 3.3 Load Curves 3.4 Important Terms and Factors 3.5 Units Generated per Annum
Analytical Approach for Cost Estimation of Low Head Small Hydro Power Schemes
Analytical Approach for Cost Estimation of Low Head Small Hydro Power Schemes S.K. Singal and R.P. Saini Alternate Hydro Energy Centre, Indian Institute of Technology, Roorkee, India Email : [email protected]
SECTOR ASSESSMENT (SUMMARY): ENERGY 1
Country Partnership Strategy: Uzbekistan 2012 2016 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. The energy sector underpins Uzbekistan s sustained
HYDRO POWER RESOURCES NIGERIA MR. ISMAILA HALIRU ZARMA, SCIENTIFIC OFFICER, ENERGY COMMISSION OF NIGERIA
HYDRO POWER RESOURCES IN NIGERIA By MR. ISMAILA HALIRU ZARMA, SCIENTIFIC OFFICER, ENERGY COMMISSION OF NIGERIA Being a country position paper presented at 2 nd Hydro Power for Today Conference International
Technical and vocational education, a tool for national development in Nigeria
International Letters of Social and Humanistic Sciences Vol. 14 (2014) pp 53-59 Online: 2012-10-29 (2014) SciPress Ltd., Switzerland doi:10.18052/www.scipress.com/ilshs.14.53 Technical and vocational education,
Matching Electricity Supply with Demand in Nigeria
32 Fourth Quarter 2008 Matching Electricity Supply with Demand in Nigeria By A. S. Sambo* Introduction Electricity plays a very important role in the socio-economic and technological development of every
Renewable Energy Strategy for 2020 and Regulatory Framework. Eng. Hatem Amer Egyptian Electric Regulatory and Consumer Protection Agency
Renewable Energy Strategy for 2020 and Regulatory Framework Eng. Hatem Amer Egyptian Electric Regulatory and Consumer Protection Agency Objectives of the Agency Regulate, supervise, and control all matters
National Electricity Policy 03-Feb-2005
National Electricity Policy 03-Feb-2005 Under the provisions of section 3(1) of the Electricity Act, 2003, the Central Government is required to prepare the National Electricity Policy for development
DRAFT KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE. No. 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015
DRAFT 31.3.2015 KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015 The Kerala State Electricity Regulatory Commission hereby publishes
Overview of the Electricity Sector in Egypt
Overview of the Electricity Sector in Egypt Milan 22-23 October - 2 nd Capacity building Reporting methodologies: how to collect data and monitor regulated entities Salma Hussien Osman Egypt ERA www.egyptera.org
Pico Power: A Boon for Rural Electrification
Advance in Electronic and Electric Engineering. ISSN 2231-1297, Volume 3, Number 7 (2013), pp. 865-872 Research India Publications http://www.ripublication.com/aeee.htm Pico Power: A Boon for Rural Electrification
P R O F I L E A N D C U R I C U L U M V I T A E
1 P R O F I L E A N D C U R I C U L U M V I T A E OF BENJAMIN EZRA DIKKI BSc, MBA, ACS Page 1 of 15 PROFILE OF BENJAMIN EZRA DIKKI, B.Sc, MBA, ACS 2 Benjamin Ezra Dikki was appointed Acting Director General
THE TURKISH RENEWABLE ENERGY LAW: STILL HUNGRY I. INTRODUCTION
THE TURKISH RENEWABLE ENERGY LAW: STILL HUNGRY By Mehtap Yildirim Öztürk and Çagdas Evrim Ergün ε Turkey has recently enacted its first renewable energy law, namely Law No. 5346 Concerning the Use of Renewable
GRID CONNECTION Introduction Technical The grid Electricity production
GRID CONNECTION Introduction It was in London in 1882 that the Edison Company first produced electricity centrally that could be delivered to customers via a distribution network or grid. Since then electricity
Tufts Consulting Group: Macedonian Energy
March 2010 CENTER FOR EMERGING MARKETS ENTERPRISES STUDENT RESEARCH SERIES Tufts Consulting Group: Macedonian Energy An Executive Summary Opportunity In the more than 18 years since its independence from
DIVISION D ELECTRICITY, GAS, WATER AND WASTE SERVICES
The Electricity, Gas, Water and Waste Services Division comprises units engaged in the provision of electricity; gas through mains systems; water; drainage; and sewage services. This division also includes
Addressing the U.S. Department of Defense Mission Assurance Concerns and Renewable Energy Mandates
Addressing the U.S. Department of Defense Mission Assurance Concerns and Renewable Energy Mandates Rick Tempchin Executive Director, Retail Energy Services Edison Electric Institute NARUC International
The Alberta Electricity Market Frequently Asked Questions
The Alberta Electricity Market Frequently Asked Questions NOTE: Responses have been gathered from the official websites and public materials of the Government of Alberta, Alberta Utilities Commission,
ELECTRICITY SUPPLY/ TRADE LICENSE KORLEA INVEST A.S
Hamdi Mramori Street, No 1 Prishtina 10000 Kosovo Tel: +381 (0) 38 247 615 ext. 103 Fax: +381 (0) 38 247 620 e-mail: [email protected] www.ero-ks.org ELECTRICITY SUPPLY/ TRADE LICENSE GRANTED TO: KORLEA
MICRO-GRIDS FOR RURAL ELECTRIFICATION Case Study from Zambia on the Zengamina Micro-Hydro Power Grid
MICRO-GRIDS FOR RURAL ELECTRIFICATION Case Study from Zambia on the Zengamina Micro-Hydro Power Grid Presentation by Energy Regulation Board, Zambia 79 th IEC General Assembly Workshop for Industrialising