1 Table of Contents PIPING Page 2.1 INTRODUCTION MATERIALS IN USE ABOVE OR BELOW GRADE INSTALLATION Buried Pipes Utilidor Construction PIPE MATERIAL SELECTION CRITERIA High Density Polyethylene (HDPE) Polyvinyl Chloride (PVC) Ductile Iron (Cement Lined) Steel (Cement Lined) UTILIDORS Boxed Utilidors Individually Insulated Pipes Pipe Pipe Support Lateral Pipe Movement on Supports Thermal Expansion/Contraction PIPE BEDDING Clean Sand Bedding Crushed Gravel Screened Pit Run Gravel Warning Tape CONNECTIONS TO STRUCTURES Flanges Differential Movement Connections FREEZE PROTECTION Polyurethane Pipe Installation Electric Heat Trace Water Heating Water Circulation Bleeding Water to Waste THAW RECOVERY Sewer Manholes/Access Vaults Sewer Access Portals Valved Nipples (50 mm) Pipe Draining Steam Thawing Hot Water Thawing Electric Thawing GOOD ENGINEERING PRACTICE Apr-04
2 2.10 PIPE TESTING Flushing Ball Test Video Inspection Pressure Test Leakage Tests Infiltration/Exfiltration Test Bacteriological Testing GOOD ENGINEERING PRACTICE Apr-04
3 2.0 PIPING 2.1 INTRODUCTION Municipal piping systems in Canada s North have a relatively short history. One of the earliest examples was a system using wood-stave pipe installed in Dawson City, Yukon in In the NWT and Nunavut, systems have only been in place for some 50 years 1948/49 in Yellowknife and during World War II in Norman Wells as part of the Canol pipeline. In the NWT and Nunavut, the piping systems developed in different ways in different areas. In the southern Mackenzie (Yellowknife, Hay River, Fort Simpson, etc.) buried pipes, similar to those in the south, have been in use since the first systems were installed and continue to be used to the present. The major changes have been to utilize modern pipe types and polyurethane insulation, as they became available. Prior to the availability of polyurethane insulation, there was little use of insulated pipes, although early Yellowknife pipes were surrounded by peat in an attempt to limit heat loss. More remote areas, such as Iqaluit, Rankin Inlet and Inuvik, initially utilized a mix of buried piping and above grade utilidors. The utilidors were initially insulated wood or metal framed structures containing not only water and sewer but also, in many cases, heating lines that conveyed high temperature hot water from a central heating plant for building heat. These utilidors had high maintenance costs and high heat loss. Current practice is to utilize separate insulated pipes, in both buried and utilidor applications, and to limit the use of utilidors to those areas of sensitive soil conditions. The major central heating plants in Iqaluit and Inuvik have been abandoned in favour of individual building heating systems. 2.2 MATERIALS IN USE A variety of pipe types have been used, including: Wood-stave Limited historical use in Yellowknife and Pine Point. No longer in use. Cast Iron No longer produced. Production ceased when ductile iron became available. Cast iron remains in use in Yellowknife and Hay River. Ductile Iron Currently used in Yellowknife and Rae Edzo for new construction. Corrugated Metal Pipe (CMP) for Storm Sewer Routinely installed for storm sewers and for drainage culverts. GOOD ENGINEERING PRACTICE 2-1 Apr-04
4 Corrugated Metal Pipe (CMP) for Sanitary Sewers Installed as sanitary sewers in Yellowknife from Maximum service life is 30 years due to significant corrosion. Photo 2.1 Corroded Corrugated Metal Pipe Asbestos Cement (both water and sewer) No longer manufactured for sale in Canada, due to health concerns for workers handling the pipe. Historical use in Edzo, Yellowknife (for services only), Inuvik and Iqaluit (in box utilidors), Fort Smith, Fort Simpson, Hay River. Welded Steel Utilidors in Norman Wells are unlined steel. More recent utilidors in Inuvik are cement-lined steel to limit interior corrosion. Lead (water services) There are significant health concerns with lead pipes and they are no longer used. One lead service, dating from approximately 1948, was recently found, and replaced, in Yellowknife. Copper (water services) Extensive use in water services in most communities. Polyvinyl Chloride (PVC) Available since the mid 1970s. Used for mains and sewer services in Fort Smith, Hay River, Fort Simpson and, in limited amounts, in Yellowknife. High Density Polyethylene (HDPE) In use as buried piping since the mid 1970s in Rae, Yellowknife (limited), Rankin Inlet, Iqaluit, Resolute Bay, Norman Wells, Inuvik (limited) and Fort McPherson. Limited use in utilidors in Rae and Fort McPherson. Kitec (composite aluminum tube between two layers of polyethylene) Although in common use in the south, Kitec is not currently used in the North. It has potential for future use. GOOD ENGINEERING PRACTICE 2-2 Apr-04
5 All of these pipes performed reasonably well in the areas they were installed. Major problems have been corrosion of CMP used for sewer mains in Yellowknife (approximately 30-year life span) and ovalling failure of thin-walled HDPE in older sewer systems. Currently only seven main types of pipe are in use in the North. See Table 2.1 below. Table 2.1: Pipe Materials in Use in Canada s North Pipe Material Water Main Sanitary Sewer Storm Sewer Sewer Service Water Service High Density Polyethylene (HDPE) Polyvinyl Chloride (PVC) Cement-Lined Ductile Iron (DI) Copper Cement-Lined Welded Steel Kitec Corrugated Metal Pipe (CMP) 2.3 ABOVE OR BELOW GRADE INSTALLATION The trend, since the late 1970s, has been to utilize buried pipes wherever possible. To this end, only two communities (Inuvik and Norman Wells) construct new above grade systems (utilidors). Norman Wells does, where possible and practical, utilize buried utilities. Inuvik s soil conditions preclude buried pipes, except for isolated areas. Recommendation Buried Pipes Buried pipes are the recommended alternative, where possible. Rationale Buried pipes are not subject to extremes of ambient temperature, do not disrupt lots and roadways and are not subject to vandalism. Figure 2.1 is a typical trumpet curve illustrating how temperature extremes reduce with depth below ground surface. GOOD ENGINEERING PRACTICE 2-3 Apr-04
6 Figure 2.1 Schematic Ground Temperature Trumpet Curve Utilidor Construction Utilidors (above grade construction) should only be contemplated where soil conditions preclude buried pipes. Installation above grade safeguards thaw-sensitive soils. Photo 2.2 Typical Utilidor - Inuvik GOOD ENGINEERING PRACTICE 2-4 Apr-04
7 2.4 PIPE MATERIAL SELECTION CRITERIA Selection of the pipe to use in a particular situation requires knowledge of the soil conditions on the project. The pipe selected should closely meet the needs of the project and the end user. The designers must recognize that the perfect all-purpose pipe does not exist. Selection criteria should include: Corrosion Resistance Where water is aggressive, corrosion of metal pipe interior walls can be substantial. Exterior corrosion, primarily on uninsulated pipes, may also be a concern if soils are aggressive. Roughness co-efficient (long term) A smooth pipe interior increases pipe capacity and decreases pump energy requirements. Soil Conditions Buried pipes generally rely on bedding for support. Loss of support can result in pipe collapse. Loss of support can also lead to movement of reaction blocks and separation of bell and spigot fittings. Beam Strength Where pipe must span between piles, (as in the case of utilidors) or areas of thaw-induced settlement, the pipe must have sufficient strength to carry the loads. Freeze-Back Forces Excessive pore water pressure trapped between the permafrost layer and winter frost layer can deform or collapse pipe. Potential Freeze Damage Pipes should, if freezing risk is high, be capable of being thawed and returned to service without loss of strength. Overall Cost Pipe selection should consider both the capital cost (purchase plus installation) and the long term operations and maintenance costs: (i) (ii) Capital Cost O & M Costs Purchase price. Special joining techniques add to installation costs and costs of future repairs. Purchase price is affected by the wall thickness of pipe that is selected. Designers must calculate the required wall thickness for each project. Where a municipality has standardized on one pipe type, using a different type increases their O & M costs and parts inventory. GOOD ENGINEERING PRACTICE 2-5 Apr-04
8 Recommendation High Density Polyethylene (HDPE) HDPE is preferred where there is a high risk of freezing..1 Minimum Wall Thickness A minimum DR (DR =diameter /wall thickness) of 17 is recommended. Rationale HDPE can normally be thawed and returned to service without damage to the pipe. It is corrosion resistant and not affected by extreme cold. HDPE is commonly used in areas of continuous permafrost such as Rankin Inlet, Iqaluit, Resolute Bay and Fort McPherson. Experience has shown a minimum dimension ratio of 17 is required to resist freeze-back forces where the pipe is in the active layer. (Reference Guidelines for the Investigation, Design, Construction and Remediation of Buried HDPE Sewer Systems in the Eastern Arctic, MACA, GNWT, March 1996). Photo 2.3 illustrates a collapsed pipe and ice in the space between the pipe and insulation. Photo 2.3 Collapsed HDPE Pipe GOOD ENGINEERING PRACTICE 2-6 Apr-04
9 .2 Butt-Fused Joints Thermal butt fusion provides leak-free joints with the same or higher strength than the pipe. Butt fusing does require a specialized machine and trained operators. Photo 2.4 Butt-Fused Joint.3 Electrofusion Joints Also provides leak-free joints by fusing on a coupler, but without needing special equipment. Designers should verify that the couplers are available in the size required before specifying, as the availability of couplers is increasing..4 Socket-Fused Joints Requires socket-fusion equipment, generally only used on small pipes (<50 mm sizes)..5 Reaction Blocking of Bends Not normally required. Concrete reaction blocks are not required as fused pipe takes up reaction forces at bends. GOOD ENGINEERING PRACTICE 2-7 Apr-04
10 2.4.2 Polyvinyl Chloride (PVC) PVC is preferred where soil conditions are competent to support the pipe. PVC is not subject to corrosion, is light, easy to install and similar in cost to HDPE. PVC is commonly used in Fort Smith, Hay River and Fort Simpson. PVC becomes brittle when exposed to extreme cold temperatures..1 Bell and Spigot Joints Recommended for underground use..2 Reaction Blocking of Bends.3 Joint Restraints Recommended where soil conditions will not or may not withstand reaction forces. For ease of installation. Allows some movement pipe to pipe at each bell. Required to transmit reaction forces to soil. Where thrust blocks can or may move, joint restraints are required to prevent bends and fittings separating from pipe. Figure 2.2 Joint Restraint Harness for PVC.4 Minimum Dimension Ratio A separate calculation is recommended for each installation. Changing soil conditions, depth of burial or service pressures may dictate different DR ratios. GOOD ENGINEERING PRACTICE 2-8 Apr-04
11 2.4.3 Ductile Iron (Cement Lined) Ductile iron is preferred where there is thaw settlement potential and/or where pipe bedding support is marginal..1 Bell and Spigot Joints Recommended for underground use..2 Reaction Blocking of Bends.3 Joint Restraints Recommended where soil conditions will not or may not withstand reaction forces..4 Pressure Class Selection A separate calculation for each area is recommended..5 Conductivity Straps Ductile iron is a rigid pipe and can, at normal installation depth, withstand settlement forces and loss of bedding support. Typically used in Yellowknife where thawinduced settlement is common. For ease of installation. Allows some movement pipe to pipe at each bell. Required to transmit reaction forces to soil. Where thrust blocks can or may move, joint restraints are required to prevent bends and fitting separating from pipe. Changing soil conditions, depth of burial or service pressures may dictate different pressure classes Designers should verify the need for conductivity devices based on soil conditions at each site. Table 2.2: Buried Mains Pipe Comparison Attribute Ductile Iron PVC HDPE Corrosion Resistance Good if Cement Lined High Resistance High Resistance Retains Interior Smoothness Withstands Poor Bedding or Loss of Bedding Moderate if Cement Lined High Tolerance High Moderate Tolerance Beam Strength High Moderate Low Resists Ground Forces During Freeze-back Resists Damage When Contents are Frozen High Resistance Fails When Frozen Moderate Resistance Fails When Frozen High Low Tolerance Low to Moderate Resistance Depending on Pipe Wall Thickness Best, Can be Thawed and Returned to Service Ease of Installation Moderate Simplest Most Difficult Economical Purchase Price Highest Price Low Price Low Price GOOD ENGINEERING PRACTICE 2-9 Apr-04
12 2.4.4 Steel (Cement Lined) Welded steel is primarily used for utilidor piping..1 Welded or Flanged Joints.2 Expansion Loops and/or Fittings.3 Reaction Blocking of Bends Not required. Welded steel provides the beam strength necessary to span between pile supports on utilidors. Required to ensure utilidor pipe acts as a beam between pile supports. Temperature changes result in large length changes in pipe, which must be accommodated. Welded joints or flanged joints allow reaction forces to be taken up in the pipe. 2.5 UTILIDORS Utilidors, or above grade pipes, are generally used where the soils are sensitive to thawing, and trenching for buried pipe installation would create thaw settlement problems. Utilidors are disruptive as buildings must be above the utilidor to achieve gravity drainage, and roadways must cross over gravity sewers. Recommendation Boxed Utilidors Not recommended. Rationale Heat loss is a function of the insulated wall area, the level of insulation provided and the temperature gradient between the liquid in the pipe and the ambient temperature. The wall area is extensive in box utilidor construction. Photo 2.5 Old Box Utilidor in Iqaluit GOOD ENGINEERING PRACTICE 2-10 Apr-04
13 2.5.2 Individually Insulated Pipes Recommended. The wall area is minimized by insulating just the pipe. Photo 2.6 Recent Utilidor in Inuvik Using Individually Insulated Pipes Pipe Welded steel pipe is recommended for utilidors Pipe Support Pile supports are recommended Lateral Pipe Movement on Supports Pipe supports must allow lateral movement Thermal Expansion/Contraction Suitable expansion loops or expansion joints are recommended. Welded steel provides the continuous beam strength needed to span between supports. Piles spaced at approximately 6 m intervals provide sufficient support for welded steel utilidor piping. Properly installed piles are not subject to seasonal movement as would be surface-mounted supports. Thermal expansion and contraction forces should not be transmitted to the support piles. Thermally induced movements must be controlled. Generally, certain points are fixed so all expansion occurs toward the expansion loops or expansion joints. 2.6 PIPE BEDDING Buried pipes rely on the subgrade and the pipe bedding to withstand both the load of the backfill and, at shallow depths, the live load of vehicle traffic. Further, where pipes are installed in the active layer, the bedding must also work to resist freeze-back forces. Figure 2.3 indicates how pipe deformation mobilizes resistance of bedding material. Figure 2.4 shows a typical GNWT cross-section. Designers should refer to pipe sizing guidelines, GNWT and community standards for appropriate bedding configurations. GOOD ENGINEERING PRACTICE 2-11 Apr-04
14 Figure 2.3 Mobilization of Enveloping Soil through Pipe Deformation Figure 2.4 Typical GNWT Standard Trench Detail GOOD ENGINEERING PRACTICE 2-12 Apr-04
15 Recommendation Clean Sand Bedding Clean sand bedding is preferred Crushed Gravel Crushed gravel (maximum 25 mm) is an alternate to clean sand bedding Screened Pit Run Gravel Screened pit run gravel (maximum 25 mm) may be used as bedding material if sand or crush is not available Warning Tape Warning tape should be placed on top of the bedding. Rationale Sand provides the least potential damage to pipe insulation coating and is readily compacted around the pipes. Gravel is better suited to poor trench conditions. It is utilized where local sand sources are limited or nonexistent. In some communities, sand or crush may not be available. Tape identifies pipes in future excavations and minimizes damage. Water - Blue Sewer - Green Imprinted Wording: Caution: Buried Water (or Sewer) Below. 2.7 CONNECTIONS TO STRUCTURES Care must be taken in connecting pipes to buildings, manholes or access vaults as differential movement can damage the pipes. Recommendation Flanges Flanged connections should only be considered if the joint is supported by the structure or permafrost..1 Gaskets Gaskets shall be full face neoprene. Rationale Rigid flanges experience high stress loads when subjected to differential movements. They are prone to failure if not properly supported. Partial gaskets are difficult to install properly. Fabricreinforced gaskets do not seal properly on flat-faced flanges. GOOD ENGINEERING PRACTICE 2-13 Apr-04
16 2.7.2 Differential Movement Connections Pipe connections should allow movement of the pipe relative to the structure..1 PVC or Ductile Iron Two couplings or bell-andspigot joints are recommended. Relative movement of buried objects is common and connections must allow this movement without pipe damage. Two joints allow full differential movement without stressing adjacent pipe. Figure 2.5 Differential Movement Connection.2 High Density Polyethylene One coupling with a stainless steel insert is generally sufficient. HDPE is a flexible pipe and thus, together with one coupling, generally allows necessary movement. A stainless steel insert approximately 60% of the coupling length is used to ensure the coupling, when tightened, compresses the coupling seal. If the insert is not used, the flexible HDPE deforms and the coupling seal does not compress properly. Photo 2.7 Couplers on HDPE Pipe GOOD ENGINEERING PRACTICE 2-14 Apr-04
17 2.8 FREEZE PROTECTION Unless piping can be installed below the seasonal frost line, some form of freeze protection is mandatory. Designers must undertake a cost benefit analysis to determine the appropriate thickness of insulation for a particular application. Such analysis should compare the capital cost of the installation to the cost of heating the water over a 20-year life span. Freeze protection includes both passive protection (insulation) and active protection (electric heat trace, water heating, circulation and bleeding to waste). Recommendation Polyurethane Pipe Installation Factory-applied polyurethane is recommended for both buried and above grade pipes Electric Heat Trace Heat trace is not recommended for general use as a freeze protection device..1 Maximum Sheath Temperature Maximum sheath temperature must be controlled by proper cable selection..2 Constant Wattage Heat Trace Not recommended..3 Self-limiting Heat Trace Recommended..4 Replacement Provision The heat trace should be in a channel or tube..5 Control A control system for operation and, on non-metallic pipe, for high limit shutdown is recommended. Rationale Polyurethane is closed-cell insulation, which effectively reduces heat loss from mains. It is suitable for buried and above grade uses, provided it is properly sealed. See also Section 13.0 Insulation. Power costs are high in the North and power consumption makes general use of heat trace cost prohibitive. Replacement on failure is generally expensive. Some heat trace can generate higher temperatures than HDPE and PVC can withstand. Applies a constant wattage along the cable, regardless of the temperature. The wattage applied decreases as temperature increases (i.e., colder areas get more heat, warmer areas less heat). If the heat trace is in a channel or tube, it can normally be easily replaced by exposing both ends. When it is directly applied to the pipe, under the insulation, replacement is very difficult. The heat trace should be shut off when the heated pipe is above the desired temperature to conserve power. High limit shutdown is required to protect non-metallic pipes. Caution is required during system design as sensors monitor only one point, which may not be the point of most extreme temperatures on the pipe. GOOD ENGINEERING PRACTICE 2-15 Apr-04
18 2.8.3 Water Heating It is generally necessary to raise the water temperature prior to entering the mains..1 Water Temperature Calculation must be done to determine the extent of water heating required Water Circulation Piped potable water systems should be designed such that water is continually moving in each pipe and returning to the pumphouse..1 Circulation Rate Calculation must be done to determine optimum circulation rate Bleeding Water to Waste Bleeding water as a means of freeze protection is strongly discouraged. Water at the source is generally near 0ºC in the winter and must be heated for treatment and/or to account for heat loss in storage or mains. Designers must determine what heat loss is occurring in storage and in the main system. They must also determine the factor of safety the maintainers require prior to sizing boilers, storage insulation, pipe insulation, circulation rates, etc. Circulation allows monitoring of the return water temperature and adjustment of the water heat to maintain desired system and return temperatures. The circulation rate must be set to obtain the most costeffective balance between pumping energy required and water heating required. Bleeding water is generally uneconomic considering the costs of obtaining, treating, heating, pumping and delivering water. It also increases the costs associated with transporting the sewage to treatment facilities and treatment of higher sewage volumes. 2.9 THAW RECOVERY A means of readily accessing water and sewer mains is required so that recovery of a frozen main is practical, as in the case of HDPE pipe. Recommendation Sewer Manholes/Access Vaults Sewer manholes and/or access vaults are generally spaced no more than 100 m apart. Rationale This maximum spacing is determined by the maximum length that the thawing machines, sewer cleaning or rodding apparatus available in the community can accommodate. GOOD ENGINEERING PRACTICE 2-16 Apr-04
19 2.9.2 Sewer Access Portals Access portals are recommended on long runs of sewers or forcemains when manholes or vaults are not required..1 Where the main is under pressure, portals should only be used on HDPE mains. Portals provide a means to introduce thawing and cleaning devices. Maximum spacing is generally the same as for sewer manholes/access vaults. Liquid in the top of the portal stub can freeze, damaging PVC or metal mains. Figure 2.6 Sewer Portal Schematic Photo 2.8 Sewer Portal GOOD ENGINEERING PRACTICE 2-17 Apr-04
20 Valved Nipples (50 mm) Where access vaults or water manholes are utilized, 45 valved nipples are recommended. Valved nipples allow the insertion of a thawing device. The 45 angle is required to divert the device down the pipe Pipe Draining All pipes are to be graded to drain to access points Steam Thawing Recommended for metal pipes only Hot Water Thawing Recommended for HDPE and PVC pipes Electric Thawing Recommended only if the equipment is approved for use by Canadian Electrical Code. Figure 2.7 Valve Nipple Schematic When a portion of the system is out of service for repair or a main is frozen, adjacent mains may have to be drained to prevent freezing. Steam can damage HDPE and PVC pipes. The temperature of hot water is low enough to be safe for use on HDPE and PVC pipe. Welding machines can easily thaw metal lines, but can cause electrical fires or damage in other buildings besides the unit being thawed PIPE TESTING A comprehensive testing program should be specified for all installations. Designers must be aware that different procedures exist for different pipe types, and must specify the correct procedures for the pipe type selected. Recommendation Flushing Recommended for all new installations at a minimum of 0.75 m/sec or by power flusher. Rationale Removes sand, gravel and construction debris. Scouring velocity (i.e., greater than 0.75 m/sec) is required to move material Ball Test Recommended for all new sewer mains. Drawing a ball with a diameter of 80% of the pipe diameter reveals deformed pipe or construction debris blockage. Normally done if video inspection equipment is not available. GOOD ENGINEERING PRACTICE 2-18 Apr-04
21 Video Inspection Recommended for new sewer mains Pressure Test All pressure pipes should be tested to AWWA standards and to manufacturer s standards Leakage Tests All pressure pipes should be subjected to a sustained period of leakage tests to AWWA standards and to the manufacturer s recommendations Infiltration/Exfiltration Test Gravity pipes should be tested for rates of infiltration or exfiltration Bacteriological Testing All potable water mains and services must be chlorinated in accordance with AWWA C651. Bacteriological testing must be undertaken to prove there are no total or faecal coliforms present prior to the watermain being placed in service. Video inspection, after flushing, can determine grade problems, pipe deformation, service penetrations and the presence of debris, which can cause blockages. Video inspection can also reveal infiltration problems. Pressure testing, generally to 1,000 kpa or 1.5 times the pressure rating of the pipe, reveals defective joints, pipe or fittings. Testing pressure must be limited to the rating of valves and fittings. Sustained leakage tests, primarily on bell and spigot joints, are required to ensure leakage is within allowable limits. Gravity pipes do not generally have fittings to allow pressure tests. Infiltration/exfiltration tests are required to ensure all joints and service saddles are properly sealed. No water from potable water mains can be considered safe for human consumption until it can be demonstrated that the water complies with current Health Regulations and the Guidelines for Canadian Drinking Water Quality. GOOD ENGINEERING PRACTICE 2-19 Apr-04
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials
WATER MAIN CONSTRUCTION TECHNIQUES DEPARTMENT OF PUBLIC WORKS WATER & WASTEWATER DIVISION
WATER MAIN CONSTRUCTION TECHNIQUES Overview Water Main - Materials Specifications Installation Future? Water Main Materials Material Types There are various material types used for water mains, these include:
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant
SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE
SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE PART 1: GENERAL 1.01 SECTION INCLUDES PVC pressure pipe and fabricated fittings in nominal sizes 4-inches through 12-inches with cast iron pipe equivalent
BEST PRACTICE GUIDELINES FOR CULVERT LINER SELECTION
BEST PRACTICE GUIDELINES FOR CULVERT LINER SELECTION GENERAL Rehabilitation of culverts with pipe liners is one of several methods available for extending the life of an existing culvert. It is often cost
Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe
Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe 1. GENERAL The following supplemental sewer main specifications are intended to address the installation of high-density polyethylene
SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.
SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price
EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines
EXHIBIT "A Technical Specifications for Water and Sewer Service Lines Water and Sewer Line Bedding and Backfill: Drawings show cross-section of trench, pipe laid on top of 6" min. bedding material, bedding
SECTION 603 SANITARY SEWER FORCE MAINS
SECTION 603 SANITARY SEWER FORCE MAINS 1. GENERAL Pipelines for sanitary sewer force main systems shall conform to the following specifications and shall be installed at the locations indicated on the
SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.
The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:
DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES
SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing
SANITARY SEWER SPECIFICATIONS
SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,
Native InDesign 2890 SaniTite Brochure 1/8" 100 300 CMYK April 17, 07
Sanitary Sewer Pipe Tough pipe for a tough environment SaniTite Sanitary Sewer Pipe delivers the features that engineers, contractors and municipalities demand durability, performance, handling, toughness
SECTION 02401 - SANITARY SEWER PIPE
PART 1 - GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for furnishing and installing sanitary sewer pipe, in accordance with
SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE
6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction
The Manitoba Water Services Board SECTION 027030 Standard Construction Specifications September 2013 Page 1 of 21
September 2013 Page 1 of 21 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the construction of sewers including: the supply and installation of pipe, saddles, tees,
MS-3/2009 HDPE (High Density Polyethylene) Pipe and Fittings Specification for Buried Potable Water
MS-3/2009 HDPE (High Density Polyethylene) Pipe and Fittings Specification for Buried Potable Water 105 Decker Court, Suite 825, Irving, TX 75062 P: 469-499-1044 F: 469-499-1063 www.plasticpipe.org HDPE
SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING
SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent
SECTION 02630 STORM DRAINAGE SYSTEM
SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE
1.3.2 Method of construction and restoration of existing water service connections. This shall include:
1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting
Wastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
The Most Advanced Name in Drainage Systems. Sanitary Sewer Pipe
The Most Advanced Name in Drainage Systems Sanitary Sewer Pipe SaniTite Sanitary Sewer Pipe delivers the features that engineers, contractors and municipalities demand durability, performance, handling,
SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.
SUBDRAINS AND FOOTING DRAIN COLLECTORS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subdrains B. Subdrain Cleanouts and Outlets C. Footing Drain Collectors D. Storm Sewer Service and Connections 1.02 DESCRIPTION
08003-1 WATER SERVICE 2
08003_Mar08_2011.pdf Page 1 of 7 INDEX Page 08003-1 WATER SERVICE 2 1.1 Pipe 2 1.1.1 Copper 2 1.1.2 Polyethylene 2 1.2 Valves and Fittings 2 1.2.1 Main Stops 3 1.2.2 Curb Stops 3 1.2.3 Curb Box 3 1.2.4
DISTRIBUTION PIPING MATERIALS: BUILDING HYDRONIC SYSTEM MANAGEMENT. Jim Riley, Texas A&M University February 10, 2015
DISTRIBUTION PIPING MATERIALS: BUILDING HYDRONIC SYSTEM MANAGEMENT Jim Riley, Texas A&M University February 10, 2015 Piping at Texas A&M 2 History of Distribution Piping at Texas A&M Concrete reinforced
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit
Chapter 7 Plumbing Connections
Chapter 7 Plumbing Connections 7-1 General All plumbing equipment and installations must be designed, constructed, and installed in accordance with this code and where not specific, to the applicable provisions
SECTION 221413 FACILITY STORM DRAINAGE PIPING
SECTION 221413 FACILITY STORM DRAINAGE PIPING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01
CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS
CCU Engineering Specifications Section 003300 Effective Date: Nov. 1st, 2011 Page 1 of 5 PRECAST CONCRETE PRODUCTS PART 1 - GENERAL The following specification is intended for use for the design, selection
High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines
High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines Jeff Schell General Manager United Pipeline Middle East, Inc. Introduction HDPE Liners A cost effective and environmentally beneficial
Prepare a drainage system layout and specification notes for a low- rise building.
STUDENT MATERIALS Prepare a drainage system layout and specification notes for a low- Outcome 1 - rise building. In this outcome you will study the technology of below and above ground drainage systems.
San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS
ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by
SECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
Specifications for Residential Property Owners Connection to New Public Sewer
Specifications for Residential Property Owners Connection to New Public Sewer Spalding Tract property owners are required to connect to the community sewer system when construction is complete and the
LEE S SUMMIT USES PIPE BURSTING TO BROADEN ITS ASSET MANAGEMENT TOOLBOX AND REHABILITATE POTABLE WATER DISTRIBUTION SYSTEM
North American Society for Trenchless Technology (NASTT) No-Dig Show 2010 Chicago, Illinois May 2-7, 2010 Paper D-4-02 LEE S SUMMIT USES PIPE BURSTING TO BROADEN ITS ASSET MANAGEMENT TOOLBOX AND REHABILITATE
SECTION 724 PIPE CULVERTS
SECTION 724 PIPE CULVERTS 724.1 Description. This work shall consist of providing pipe or pipe arch of the diameter or shape designated, laid upon a firm bed and backfilled as specified. Where appropriate
SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER
Village of Shorewood, Wisconsin SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Prepared By: Thomas A. Zoulek, P.E., LEED A.P. Vice President Mid City Plumbing & Heating
Section 02702 SEWER PIPE INSTALLATION AND TESTING
PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete
The surface roughness of the polyurethane lining is 10 times lower than cement-lined pipes.
QUALITY INSIDE When it comes to long life piping for drinking water, sewage, industrial water or gas, there is one name that continues to lead the way - ECOPUR by vonroll. Delivering precision-engineered
TG 105 ALLOWABLE PIPE SIZE, CLASS AND MATERIALS FOR WATER MAINS TECHNICAL GUIDELINE. Manager Asset Management SOUTH AUSTRALIAN WATER CORPORATION
TG 105 SOUTH AUSTRALIAN WATER CORPORATION TECHNICAL GUIDELINE ALLOWABLE PIPE SIZE, CLASS AND MATERIALS FOR WATER MAINS Issued by: Manager Asset Management Issue Date: SA WATER 2007 This document is copyright
SECTION 3 SANITARY SEWER DESIGN
SECTION 3 SANITARY SEWER DESIGN 3.1 GENERAL DESIGN CRITERIA 3.1.1 Requirement for Sanitary Sewer 3.1.2 Design Approval 3.1.3 IEPA Permit Required 3.1.4 Differentiation Between Public and Private Sanitary
The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
Section 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
Storm Sewer Trenchless Upgrade Alternatives and Recommendations
Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for
A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.
PART 1 GENERAL 1.1 SCOPE A. This item shall include the work necessary for the installation of storm sewer line construction. B. Reference Section 3800 Trenching and Backfill and the General Conditions,
June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL
7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown
Sewer Rehabilitation Design Requirements
Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Sewer Rehabilitation Design Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared
SECTION 15125 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION
SECTION 15125 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION PART 1 GENERAL.01 SECTION INCLUDES Furnishing and installing 4 inch through 16 inch high density
SECTION 9.02 BUILDING SUBSURFACE DRAINS (PERIMETER, ETC.)
CHAPTER 9 SEWER / STORM DRAIN / IRRIGATION LINES SECTION 9.01 GENERAL This section covers the requirements for piping materials and installation of Lehi City sewer, storm drainage and irrigation collection
UNDERGROUND INFRASTRUCTURE SPECIALISTS TABLE OF CONTENTS
U UNDERGROUND INFRASTRUCTURE SPECIALISTS TABLE OF CONTENTS 3. COMPANY PROFILE A growing company excelling in the fields of infrastructure repair and maintenance. 6. MANDREL TESTING Individually approved
Sewer Water Pipeline Replacement with CERTA LOK RESTRAINED JOINT PVC PIPE
1.0 GENERAL 1.1 DESCRIPTION This section addresses the procedures to be employed for pipe bursting existing water/sewer pipelines, as identified on the drawings, and replacing with new Restrained Joint
SECTION 15105 DUCTILE IRON PIPE AND FITTINGS
SECTION 15105 DUCTILE IRON PIPE AND FITTINGS PART 1 GENERAL.01 COORDINATION OF WORK Connection to existing pipelines may require shutdown of Owner facilities. Closely coordinate construction work and connections
SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS
SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS PART 1: GENERAL 1.01 COORDINATION OF WORK Connection to existing pipelines may require shutdown of AW facilities. Closely coordinate construction work
53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:
Division 53: Slip-Lining of Existing Sewer Line 53.01 GENERAL: This section includes all labor, materials, transportation, equipment necessary to rehabilitate by means of Instituform deteriorated sections
SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.
SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings
SECTION 02732 BUILDING SEWERS. B. Connection of building sanitary drainage system to municipal sewers.
SECTION 02732 BUILDING SEWERS PART 1 GENERAL 1.01 SECTION INCLUDES A. Lateral piping, fittings, and accessories. B. Connection of building sanitary drainage system to municipal sewers. 1.02 REGULATORY
Beacon Hill Sewer District Standard Specifications
Beacon Hill Sewer District Standard Specifications Residential Gravity Side Sewer Including Design Criteria and Standard Construction Drawings Residential Gravity Side Sewer Design Criteria 1. Provisions
SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE
SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel
District Cooling Best Practices Piping Systems
District Cooling Best Practices Piping Systems International District Cooling Conference January 14-17, 2007 Abu Dhabi, United Arab Emirates Bryan Kleist Agenda Chiller Water Piping Materials Pipe Insulation
PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE
REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0
Section C-1 Pipes and Fittings
Section C-1 Pipes and Fittings C1.00 Work Included The work under this Division of the Specifications shall include all labor, materials, and equipment necessary to furnish and install all piping, pipelines,
DUCTILE IRON PIPE FOR WASTEWATER APPLICATIONS
DUCTILE IRON PIPE FOR WASTEWATER APPLICATIONS DUCTILE IRON PIPE FOR WASTEWATER APPLICATIONS The 1972 AMENDMENTS to Public Law 92-500 (the Clean Water Act) established the federal government s largest domestic
Module 3: Sewer Material Lecture 3: Sewer Material
Module 3: Sewer Material Lecture 3: Sewer Material [NPTEL, IIT Kharagpur, Prof. M.M.Ghangrekar, Department of Civil Engineering Page 1 3.0 SEWER MATERIAL 3.1 Important Factors Considered for Selecting
Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer
Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer The user may choose to adopt part or all of this Model Specification; however, the user should ensure that all parts
Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology
2007 Pumper & Cleaner Environmental Expo International Wednesday February 7, 2007 Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology What is Cured-In-Place Pipe (CIPP)
STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY
STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY Approved and adopted as Official Document Number 800576 this 10th day of December, 1980 Donald R. Boyd, P.E., Director Water
Appendix A: Acceptable pipe and fitting materials
Watercare Services Limited Water and Code of Practice Content from the NZS 4404:2010 Land development and subdivision infrastructure has been reproduced for use in the Infrastructure Design s Manual for
32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.
SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and
Township of Enniskillen. Asset Management Plan
Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing
X Planning X Quality X Maintenance & Operations
Delaware Department of Transportation Division of Transportation Solutions Design Guidance Memorandum Memorandum Number 1-20 Revised 1. Road Design Manual 2. Bridge Design Manual 3. Utilities Design Manual
Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY
Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY Policy: This policy will replace all previous policies regarding the selection of pipe material for cross drains, drive pipe, drop pipe, storm
Meeting the Challenge of Pipeline Emergency Repair
Meeting the Challenge of Pipeline Emergency Repair Michael R. McReynolds, PE, SE 1 Tao Peng, PE, SE 2 ABSTRACTS The Metropolitan Water District of Southern California (MWD) is the nation s largest provider
San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS
ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located
Pipeline Replacement using Relining
Pipeline Replacement using Relining Mark Heathcote, March 2006 Relining of old pipeline systems is becoming an increasingly attractive option to asset owners and operators as an effective alternative to
SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD
SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD 21.01 SCOPE: It is the intent of the Specification to define the approved methods and materials
DIVISION 4300 STORM DRAINAGE
DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES
MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT
Record MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT Abandoned Gravity Private Combined Gravity Private Foul Gravity Private Surface Water Gravity Public Combined Gravity Public Foul Gravity Public
Ontario Electrical Safety Code - Info Sheet
Ontario Electrical Safety Code - Info Sheet The following are the Code requirements and explanatory material for buried electrical wiring that are applicable to most residential applications. 12-012 Underground
OAR52 A-1 (September, 1981)
APPENDIX A SEWER PIPELINES (1) MINIMUM REQUIREMENTS FOR SEWER - PIPELINES (a) Capacity: Sewers shall be of such diameter as to pass without overflow, bypass, or back flow onto damageable property of a
Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development
7 SPECIFICATIONS There is currently no Irish specification for construction of drainage works, or water supply works. There are several publications that give guidance on drainage works, such as the Building
SEWERS FOR ADOPTION 6 PIPE MATERIALS TABLE AND CONDITIONS OF USE VERSION 4 March 09
SEWERS FOR ADOPTION 6 PIPE MATERIALS TABLE AND CONDITIONS OF USE VERSION 4 March 09 Foul and Storm Lateral Drains (100 & 150 mm Diameters) Pumped Storage General Exceptions General Exceptions General Exceptions
STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS
STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for cleaning and lining existing cast iron and ductile iron water mains
LIFELINE PIPELINE RESTORATION AND SEISMIC MITIGATION
LIFELINE PIPELINE RESTORATION AND SEISMIC MITIGATION Le Val LUND 1 And P E M ASCE 2 SUMMARY A number of methods are discussed which can be used for lifeline pipeline rehabilitation and improving the seismic
CLEANING, INSPECTION, AND TESTING OF SEWERS
CLEANING, INSPECTION, AND TESTING OF SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Cleaning, Inspecting, and Testing Sanitary Sewers B. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and
SECTION 02700 SEWERAGE AND DRAINAGE PART 1 - GENERAL 1.01 RELATED DOCUMENTS
SECTION 02700 SEWERAGE AND DRAINAGE PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including the General and Supplementary Conditions and Division 1 Specification
SECTION 02612 NONREINFORCED CONCRETE SEWER PIPE
SECTION 02612 PART 1 GENERAL 1.1 SUMMARY A. Section Includes: Furnishing and installing nonreinforced concrete sewer pipe. Provide concrete sewer pipe less than 12 inches in diameter, and in other sizes
SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or
INDEX. Sec. No. Items Page Nos.
INDEX Sec. No. Items Page Nos. 1. Types of Pipe............... MSSP- 2 2. Concrete Pipe............... MSSP- 2 thru MSSP-3 3. ABS and PVC Truss Pipe............... MSSP- 3 4. ABS and PVC Solid Wall Pipe...............
SECTION 5: SANITARY SEWER SYSTEM DESIGN
SECTION 5: SANITARY SEWER SYSTEM DESIGN 5.01 GENERAL Sanitary sewer improvements shall be designed to serve the ultimate level of City development as defined in the General Plan and the Wastewater Facilities
LS 2540 SEWER LATERALS AND INSPECTION TEES
LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal
SECTION 1 GENERAL REQUIREMENTS
Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)
SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer
Module 3 : Sewer Material. Lecture 3 : Sewer Material
1 P age Module 3 : Sewer Material Lecture 3 : Sewer Material 2 P age 3.1 Important Factors Considered for Selecting Material for Sewer Following factors should be considered before selecting material for
ENGINEERED SOLUTIONS. A2 Liner Pipe for Trenchless Technology
ENGINEERED SOLUTIONS A2 Liner Pipe for Trenchless Technology A2 Liner Pipe Restores Deteriorated Sewers Cost-Effective Rehabilitation The increasing rate of sanitary and storm sewer deterioration requires
TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe
TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TN 5.14 February 2010 Introduction It may be at times necessary, in an aging infrastructure, to rehabilitate drainage and sanitary lines
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary