1 Republic of Senegal United Nations PROBLEMS AND PROSPECTS FOR HYDROPOWER DEVELOPMENT IN AFRICA Prepared by E.A.K. Kalitsi Kalitsi and Associates, Ghana for The Workshop for African Energy Experts on Operationalizing the NGPAD Energy Initiative 2 4 June 2003 Novotel, Dakar, Senegal 1
2 Problems and Prospects for Hydropower Development in Africa E. A. K. Kalitsi Kalitsi and Associates, Ghana 1. INTRODUCTION Over 430 million people out of Africa s total population of 650 million people, live under conditions of endemic poverty (World Bank African Development Indicators, 1997). The roots of this situation are varied and numerous. The solutions that have been tried since the middle of the 20 th century by Africans with the support of their developmental partners such as the World Bank and other international development agencies, have been even more numerous albeit with very little success as Africa continues to stay poor and underdeveloped as we enter the 21 st century. The New Partnership for African Development (NEPAD) Initiative is a new approach for Africa s development initiated entirely by African leaders with a common shared vision and conviction of purpose and destiny to address the developmental problems of Africa. One of the major areas of focus for NEPAD is energy as a means of solving the problem of poverty. It is estimated that even though Africans constitute approximately 10% of the world s population, the total primary energy consumption of Africa is only about 3% of the total world primary energy consumption (BP Statistical Review of World Energy 2002). This, however, does not include fuels such as wood, peat and animal waste which constitutes the principal source of energy for Africans. Africans are therefore deprived of the use of commercial and efficient sources of energy, which play a significant role in the development process. The paradox of this situation is that Africa is endowed with significant energy resources, which have remained largely undeveloped. One of such sources of energy is hydropower, which currently supplies nearly 20% of the world s electricity. There is the general view that hydroelectricity is the renewable energy source par excellence, non-exhaustible, non-polluting, and more economically attractive than other options. Although the number of hydropower plants that can be built is finite, only a third of the sites classified world wide as economically feasible are tapped. (World Energy Assessment, Energy and the challenge of sustainability, 2000.) Hydropower plants emit much less greenhouse gas than do thermal plants. Greenhouse gas emissions of hydropower are caused by the decay of vegetation 2
3 in flooded areas and by the extensive use of cement in the dam construction. Unfortunately there are negative local impacts of the use of rivers, social as well as ecological, and these are gaining importance as people become aware of how those impacts affect living standards. Most renewable sources of energy including hydroelectricity generation are capital intensive but have lower operational costs than thermal and nuclear options. This initial cost is a serious barrier to rapid growth in energy use in developing countries where most of the untapped economic potential is located. 2. OBJECTIVES AND SUMMARY This paper examines the problems of hydropower development in Africa and focuses on designing concrete strategies and policies for the development of the hydro potential in Africa under the auspices of the NEPAD Initiative. The paper has 10 sections. The first section, Section 1, introduces the paper whilst this section, Section 2 provides the objectives of the paper and summarizes the contents of the remaining sections; Sections 3 to 10. Section 3 gives an overview of the African Power Sector in general. This section describes the spread of electricity generation and consumption in the sub regions of Africa. Section 4 presents the current status of hydropower development in Africa and identifies existing hydro production capacity which are operational on the continent and the contribution that this existing hydropower infrastructure makes in meeting the electricity needs of the various countries. Section 5 evaluates the potential contribution of hydropower to meeting the energy needs of Africa. It examines the potential of small hydropower and large hydropower resources in Africa. Section 6 looks at the development of hydro projects. In line with the regional nature of NEPAD, the potential sites are examined from a regional and sub regional perspective and include regional transmission projects, which are essential in the development of the generation projects. Section 7 examines the environmental and social concerns relating to hydropower development in Africa and identifies measures that can address these concerns. Section 8 discusses the process of procuring funding for hydropower projects implementation as well as the cost-effectiveness and viability of the projects. The section evaluates the availability of financing from multilateral institutions such as the World Bank and presents some experiences in the sourcing of funds from the Bank and other multilateral and bilateral institutions. Section 9 outlines concrete strategies and provides an Action Plan for the development of hydropower in Africa by NEPAD. The concluding section, Section 10, summarizes the major problems facing hydropower development in Africa as well as the proposed strategy to resolve the identified problems in order to achieve the NEPAD energy objectives. 3
4 3. OVERVIEW OF THE POWER SECTOR IN AFRICA Africa s power sector is dominated by a few countries, namely South Africa in Southern Africa, Egypt and Morocco in North Africa and Nigeria in West Africa. The northern and southern regions alone provide 82% of Africa s power generation. Five countries (Egypt, South Africa, Libya, Morocco and Algeria) provide the bulk of this. Other significant contributors are countries like Egypt, the Democratic Republic of Congo, Mozambique, Nigeria, Zambia, Morocco and Ghana each with installations of over a 1,000 MW. Africa s electricity consumption is expected to grow at a rate of 3.4% per year over the period 1999 to 2020, even though NEPAD is targeting an economic growth of 6% per annum, which would require higher growth rates in electricity supply. Fuel wood constitutes Sub Saharan Africa s principal source of energy. Only 10% of the population has access to electricity and in the rural areas only 7% of the population benefits from electricity services. Currently, the per capita consumption of electricity in Sub Saharan Africa is about 450 kwh as compared with about 600 kwh for South East Asia and the Pacific, about 1,300KWh for the Latin America and Caribbean and about 2,800 kwh for Europe and Central Asia. African countries are making serious efforts to increase access through various means including the linking of their power systems and the creation of power pools. Examples of these are the South African Power Pool, the proposed West African Power Pool and the Mediterranean Power Pool. The South African Power Pool (SAPP) was created in 1995, to link Southern African Development Community (SADC) member states into a single electricity grid. The national utilities currently participating in the SAPP are Angola's Empresa Nacional de Electricidade (ENE), the Botswana Power Corporation (BPC), the DRC's SNEL, the Lesotho Electricity Corporation (LEC), Malawi's Electricity Supply Commission (Escom), Mozambique's Electricidade de Mocambique (EDM), Namibia's NamPower, South Africa's Eskom, the Swaziland Electricity Board (SEB), Tanzania Electric Supply Company (Tanesco), Zambia's ZESCO, and Zimbabwe's ZESA. SAPP's coordination center is located in Harare, Zimbabwe. The power systems of Togo Benin and Ghana and La Cote d Ivoire are linked in an interconnected grid. Nigerian and Niger are also interconnected. A power pool is under consideration to link all the 14 ECOWAS countries, creating the West Africa Power Pool, In Northern Africa, a Mediterranean Power Pool is also planned to interconnect the power networks of North African countries with the Middle East & Southern Europe. 4
5 4. CURRENT STATUS OF HYDROPOWER IN AFRICA 4.1 Installed Capacity of Hydropower The total installed hydro capacity in Africa is about 20.3 GW with a total hydro production capability of about 76,000 GWh/year (2001 World Atlas and Industry Guide International Journal of Hydropower and Dams). As Table 4.1 shows, a comparison with the Gross theoretical hydropower potential of about 4,000,000 GWh/year indicates that the current production from hydropower plants in Africa is about 20% of the total potential. Table 4.1- Summary of African Hydropower Development Gross Theoretical Hydropower Potential (GWh/year) Technically feasible Hydropower Potential (GWh/year) Economically feasible Hydropower Potential (GWh/year) Installed hydro capacity (MW) Production from hydro plants (GWh/Year) Hydro capacity under construction (MW) Planned hydro capacity (MW) 4,000,000 1,750,000 1,000,000 20,300 76,000 >2,403 >60,000 Appendix A provides a detailed listing of the installed and potential hydro capacity in Africa. 4.2 Regional Distribution of Existing Hydropower Developments Of the total 20.3 GW of hydropower currently installed in Africa, about 23% is located in North Africa, 25% in West Africa and the remaining 51% located in South/Central/Eastern Africa. Countries with installed capacity of more than a 1,000 MW have a total installed capacity of about 13 GW comprising 65% of the total hydropower installed capacity of Africa. These countries are Egypt, the Democratic Republic of Congo, Mozambique, Nigeria, Zambia, Morocco and Ghana. The remaining 45 African countries account for 35% of the total installed hydro capacity. This is shown in Table 4.2 below: Table 4.2 -Countries with major hydropower developments Installed Capacity Country Subregion (MW) Egypt North Africa 2,810 Dem. Rep. of Congo Central Africa 2,440 Mozambique Southern Africa 2,180 Nigeria West Africa 1,938 Zambia Southern Africa 1,634 Morroco North Africa 1,205 Ghana West Africa 1,072 Total 13,279 5
6 The countries with the highest developed hydro capacity are dispersed throughout the Africa region. There are 2 such countries in North Africa, 2 in West Africa, 1 in Central Africa and 2 in Southern Africa. The hydropower scheme in these countries are among the largest of such schemes in the world. Egypt s Aswan Dam on the Nile has the largest catchment area of any dam; the Kariba dam on the Zambezi River between Zambia and Zimbabwe currently has the world s largest reservoir capacity, at 180 billion cubic meters and the Akosombo dam has resulted in the formation of the world s largest reservoir in terms of surface area (8,500 square kilometers). These major hydropower developments in Africa were planned in the 1950 s as public sector projects to provide the basis for the industrialization and sustainable economic development of the countries involved. Traditionally, they have been developed as multi purpose schemes providing other benefits such as domestic and industrial water supply, protection against droughts and floods and irrigation. These non-power benefits have been made possible through the investment in hydropower development. For example, the Aswan High Dam, which was built in two phases between 1960 and 1970, has over the 32 years of operations, provided Egypt, with its water and energy needs, protected the Nile river course, improved navigation, preserved agriculture during periods of drought, thereby contributing significantly to the economic and social development of the people of Egypt. (Address by Professor Kader Asmal, Chair of WCD; Summary Report, Large Dams and their Alternative in Africa and Middle East; Experience and Lessons learned). The Akosombo Hydro Project, completed in 1965, provided all of Ghana s electricity needs until the mid-nineties. It has improved navigation, provided water for irrigation and increased fish yield among other benefits. Another hydropower development, the tri-nation Manantali project, built with the aim of providing water not only for energy but also for irrigation and navigation in Mali, Mauritania, Senegal. This project was to serve as an example of the benefits of cooperation among riparian countries in the planning and optimal development of hydro resources. But this project has stalled because of political problems among the sponsors. 4.3 Contribution of existing hydropower development to Africa s energy needs According to the BP Statistical Review of World Energy for 2002, out of Africa s total primary energy consumption of Million tonnes of oil equivalent (toe), hydroelectricity contributed only 18.3 Million toes, which was less than 10%. Figure 4.1 below indicates the contribution of different fuel sources to Africa s energy consumption for
7 Figure 4.1 Africa s Energy Consumption in % 7% 1% Oil 41% 32% Coal Natural Gas Hydroelectricity Nuclear Energy The total primary energy consumption of million toe does not include biomass mainly in the form of fuel wood, charcoal and animal dung which is the principal source of energy in Sub Saharan Africa as stated indicated in Section 3. Classification of Hydropower Plants Hydropower plants can be classified as large, medium and small, depending on the capacity of energy that can potentially be generated. Plants above 500 MW are generally considered large. Plants between 500MW and 10MW are considered medium sized. Below 10 MW they are considered small sized hydro plants. Small hydro plants are further classified as mini (500 kw to 10 MW) micro (10 kw to 500 kw) and pico (less than 10 kw). Figure 4.2 below illustrates this classification. Large Medium Small 500 MW 10 MW 500 kw 10 kw Mini Micro Pico Figure 4.2. Hydropower classification 4.4 Hydro Potential of Africa Of Africa s technically feasible hydropower potential of 1,750,000 GWh/year, only 7
8 4.3% has been exploited (2001 World Atlas and Industry Guide International Journal of Hydropower and Dams). Whereas China, India, and Brazil, also have large hydroelectric potentials, these potentials are matched by equally large power demands. But in the case of Africa, the location of hydro resources and the demand for power are poorly matched. In Africa, few have access, consumption level is low, industrial and commercial developments are practically non-existent. The result is a lack of demand for electricity to economically justify rapid exploitation of the vast hydro potential. The opportunity is therefore available for the development prospects of small hydro to be considered as a means of building up the demand for electricity in Africa. In 2001 out of a total installed hydroelectric capacity of about 20.3 GW, in Africa, only 0.3 GW were from small-scale plants (less than 10 MW). This is about 1.5% of total hydro installed capacity in Africa. For the world, as a whole small hydro capacity is 3.5% of total installed capacity. Africa therefore needs to examine further possibilities for exploiting its small hydro potential. 5. POTENTIAL CONTRIBUTION OF HYDROPOWER 5.1 Overview Hydropower promises enormous contribution to boosting the energy base of the continent. This stems from the fact that the continent has an abundance of hydro resources as shown in Section 4. Small hydropower potential constitutes an insignificant proportion of the technically feasible hydropower potential in Africa. They are however useful in supplying remote areas of the rural populations where it is established that they have competitive advantage over wind, solar and other sources of electricity. It is however the large hydropower resources, which would in fact be exploited economically to meet the bulk of Africa s demand for electricity. Where large hydro projects cross boundary lines or can service cross border markets they have to be looked at as regional projects. 5.2 Small Hydropower Because of its potential to service the energy needs of the dispersed rural population, small hydro cannot be ignored as an option for meeting part of the future energy needs of Africa. The capital requirements for small hydro are generally lower than for large scale hydro power development. The modular nature of small hydro technologies allow even the poorest countries to begin a phased energy investment programme that does not strain their national financial resources or draw funds from other basic needs. However, many utilities prefer to develop large hydro projects because they are considered easier to manage. Investments in hydro have therefore concentrated mainly on large hydro dams. 8
9 So in spite of the favorable prospects for small hydro, very little of it is developed. For example in Zambia, although the estimated potential for small hydro is 45 MW only about 4% is exploited. Ghana also has carried out a number of studies on small and mini hydro sites to establish their feasibility and develop policies on how to incorporate these into its energy mix. In a study by the Architectural and Engineering Services Corporation, (AESC) 14 sites studied were all adjudged to be economically viable. ACRES International who in 1991 reviewed the work of AESC and found that at least 6 out of the sites they reviewed were technically feasible and economically viable. But none of these sites in fact developed. Appendix B contains information on Ghana s experience and attempts to exploit small hydro resources. Significant effort has also been made by NGOs working with various stakeholders in Africa to demonstrate that small hydro can supply much needed energy to remote rural communities. Zimbabwe and Mozambique have some experience in this field and the main constraint identified have been financial management and particularly the tariff environment within which the projects have been developed.. A point of concern, however is that the cost of hydro generation based on micro hydro technology is prohibitive particularly for rural industries with low output due to low demand conditions. In both Zimbabwe and Mozambique it was observed that rather than look for appropriate means of supplying target communities across the country, there was a tendency to look to the grid as the only source of supply. This however tends to delay extension of electrical services to these rural communities. 5.3 Large Hydropower Planned hydropower capacity in Africa is about 60 GW, of which about 75% is within the INGA complex on the Congo River in the Democratic Republic of Congo (DR Congo). DR Congo has the highest potential for hydropower development with a technically feasible potential of 77,400 GWh/year, out of which only 7.5% has been developed. This and similar projects can best be developed as regional projects. The focus is therefore expected to be on large hydropower developments, which would be regional projects. To fully develop the potential of these regional projects would require establishing transmission grids in a phased manner to provide facilities for evacuation of the energy produced by the different hydropower plants as they come on line and also create the demand on the plants to accelerate their full utilization and expansion. These phased developments should lead, ultimately in the long term to an Africa wide transmission interconnected network. In the medium term sub-regional interconnected networks should be pursued aggressively. For example, out of the interconnected grid established between Benin, Togo, Ghana and La Côte d Ivoire to exploit the hydro resources of 9
10 Akosombo on a subregional basis, plans have now been made for a West African Power Pool (WAPP) to cover all 14 ECOWAS countries. NEPAD can stimulate the growth of the West African grid system by setting up arrangements to help in the management of the existing system and its extension to other countries in the sub-region. This way NEPAD can play an important role in bringing into being the WAPP. The WAPP will expand the power market for West Africa and create opportunites for major hydro power development to be undertaken. 6. DEVELOPMENT OF HYDROPOWER PROJECTS 6.1 Regional Generation Projects INGA The next tranche of the proposed development of the proposed INGA hydropower scheme involves an initial construction of a transmission line from the Democratic Republic of Congo (DRC) through the Southern Africa grid system to South Africa. Later stages envisage the development of a continental electricity grid backbone to include a transmission line running northwest, from INGA through Gabon, Cameroon and the West African countries into Morocco, through which surplus electricity can be exported to Europe. A third route conceived is a 3,500 kilometer transmission line from INGA to Egypt passing through Chad and Sudan. This line has a potential to supply the Middle East and Europe through Egypt. At present the hydro capacity planned by one study to be installed at Inga is about 43 GW, to be developed as a run of the river facility on the Congo River. NEPAD s short-term infrastructure plan includes the $5.5-million Grand Inga Integrator Study, to assess the viability of the project, which continues to be regarded as one of the most important projects necessary to develop Africa s economy. Other Generation Projects Although INGA in DRC and Cahora Bassa in Mozambique are significant existing regional generating facilities, several other projects, with a regional focus, are also being considered and developed. Namibia and Angola are considering the development of a hydroelectric facility on the Kunene (Cunene) River that would provide electricity to both countries. Two possible sites for the dam are being considered, Baynes and Epupa Falls. The proposed facility would have a generating capacity of about 360 megawatts (MW) and provide power to the Angolan, Namibian and South African grids. South Africa and Namibia are sharing in the potentials of the recently inaugurated Maguga Dam, Swaziland's largest public works project, which will 10
11 benefit all three nations. The Maguga Dam, the fourth largest in Southern Africa, will provide much needed irrigation water for agricultural schemes, create employment in tourism initiatives centered around the fresh water lake, and provide power from a hydroelectric plant. It would lessen Swaziland's dependency on South Africa, where 90% of the country's electricity is imported from. The Kafue Gorge Lower (KGL) hydroelectric station, south of the Zambian capital Lusaka, is expected to have a capacity of 750 MW. The Zambian Government plans to export the vast majority of the power produced to Zimbabwe, Botswana and DRC. KGL, which is expected to cost $500 million, will be the second-largest generating facility in Zambia. The Kafue Gorge Upper power plant currently has a generation capacity of 900 MW. Construction of the Kafue Gorge lower plant is currently planned to start in mid 2003 and take five to seven years to complete. In West Africa, the Bui Hydro plant is at an advanced stage of project preparation and is expected to add MW to the existing power system. When completed it is expected to provide power to Burkina Faso, Togo and La Cote d Ivoire A 250MW private hydroelectric power plant project is planned to be built at the Bujagali site, Jinja, in Uganda. The Bujagali power station requires an estimated investment of $530 million. Construction of the plant began in January 2003 and is scheduled to take 44 months to complete. The power generated will be sold to neighbouring countries. In Malawi, a new hydropower development, the $130-million Kapichira Hydro- Electric Plant was commissioned in The 64 MW plant is connected to the national power grid. An additional 64 MW is expected to be added. 6.2 Regional Transmission Projects As pointed out earlier, associated with these large hydropower projects are transmission interconnections necessary to evacuate the electricity to consumers across sub-regions. A significant SAPP accomplishment was the completion of the Matimba-Insukamini interconnector linking Eskom and ZESA in October This interconnection initiated the first linkage of system operations between the northern and southern electrical systems in the Southern Africa region. The northern system is primarily composed of ZESA (Zimbabwe), ZESCO (Zambia) and SNEL (DRC), while the southern system is primarily Eskom (South Africa), BPC (Botswana) and Nampower (Namibia). The effect of the interconnections is that countries are able to source electricity in bulk at cheaper prices and then redistribute it nationally. Plans to connect the power grids of Angola, Malawi, and Tanzania with other SAPP member grids are in varying stages of development. Zambia and the DRC are to upgrade their current 220-kilovolt regional interconnection to a much higher transmission level to allow other SADC countries to tap INGA's energy supplies. Zambia's Copperbelt Energy Corporation (CEC) and DRC's SNEL will undertake upgrading the project that 11
12 includes construction of a new 220-kV line between Chingola in Zambia and Karavia near the southern DRC city of Lubumbashi. In addition to the new transmission line, the two countries also plan to repair the existing 220-kV line to significantly raise the amount of hydropower that can be transmitted from DRC to Southern African countries. In July 2000, the Motraco power supply project was completed. The 400-kV line crosses Swaziland and links Arnot via Barberton and Komatiport to Maputo, supplying power to BHP Billiton's Mozal Aluminum smelters. The project is a joint-venture between EDM, Eskom, and SEB. The 400-KV line also provides additional capacity to Swaziland. The Zambia-Tanzania Interconnection Project involves construction of 420 miles (700 kilometers - km) of 330-kV transmission line, 360 miles (600 km) on the Zambian side and about 60 miles (100 km) on the Tanzanian side. The proposed line will be able to supply up to 200 MW of power at an estimated cost of $153 million. Namibia's and Botswana's electricity utilities, NamPower and BPC, have agreed to build a cross-border transmission line of 150-mile (250-km), 132-KV overhead transmission line. The line is scheduled to be completed by September A 220-kV transmission line is being built between Windhoek in Namibia and Walvis Bay in South Africa scheduled for completion this year. In August 2002, Eskom announced it was undertaking a feasibility study on a $1-billion project to build a power transmission network to connect the power grids of several of its Southern African neighbors. The study would determine the viability of building an integrated power grid linking Angola, the DRC, Namibia and South Africa. In West Africa there are plans to develop the 230 km 330-kV Aboadze - Volta transmission line to connect Ghana s Takoradi Thermal Power Plant in the west of the country to the main load center of Accra-Tema in the east. This line will serve as a principal component of the proposed West African grid network, which will run from Nigeria to Cote d Ivoire. It would eventually cover all ECOWAS countries and will form the basis for the West African Power Pool. 7. SOCIAL AND ENVIRONMNETAL ISSUES RELATING TO HYDRO- POWER The construction of dams to create reservoirs for hydropower developments always results in changes in the natural ecosystem of the area within which the river is located. To ensure that these projects are beneficial to society, it is important to assess and manage the social and environmental impacts of such developments. 12
13 7.1 Environmental and Social Issues Environmental issues that arise with the development of hydropower projects are many and varied. These issues need to be carefully examined, studied and dealt with in order to ensure the viability and sustainability of the project. In Ghana, significant environmental and social issues were faced with the development of the Akosombo Lake on the Volta River for hydropower generation and other multi-purpose uses. The creation of the Lake and the regulation of the floodwaters of the Volta River brought in its wake numerous negative impacts on the lives of the communities living upstream and downstream. The major impact was socio-economic arising from the dislocation and resettlement of about 80,000 people from about 740 villages. Different ethnic groups with a wide linguistic diversity lived within the flood basin. This tremendously compounded the problems of resettlement. The resettlement effort also represented a formidable and physically challenging task due to the nature of the basin that was inundated. The basin was not only large; it was isolated, difficult to access and had minimal infrastructure. The basin was also unhealthy with insect-borne diseases like malaria, river blindness, and sleeping sickness and water borne diseases like bilharzia. Incidence of some of the water borne diseases like bilharzia and hookworm increased. A positive health impact, which arose from the development of the Akosombo Reservoir is the eradication of river blindness caused by the simulium fly, associated with fast flowing water. Other positive impacts are the creation of opportunities for development of extensive navigation on the reservoir and the explosion of fishing activities. 7.2 Mitigating Environmental and Social Concerns In order to properly mitigate the environmental and social concerns of hydropower developments, the following lessons learnt from the Akosombo hydropower development in Ghana should be applied. Need for Continuous Planning and Assessment There is a need for detailed and extensive studies during the planning phase long before implementation time. These studies will have to be intensified during implementation and the results used to modify the plans. With environmental data gathered before and during construction and filling stage, it was possible to plan mitigation and eradication measures, to monitor and assess changes in the ecosystem. Such planning should not be static but be adjusted as new conditions arise. In spite of initial and environmental and social studies before start of construction when it came to actual implementation the information available was found to be inadequate. This is how VRA found itself compelled to provide its dislocated people with uniform core houses not related to the value of their properties affected; or failing to clear from the reservoir areas tree stumps scattered all over the lake creating serious hazards to navigation or failure to provide for settlers and riparian communities to share in the benefits of electricity. The lesson here is that there is need for continuous planning and evaluation in 13
14 order to implement a satisfactory program to mitigate any negative effect of hydropower developments. Need for Post Implementation Monitoring One observation today is that over 30 years after relocation, the settler population, adjacent communities in which the settlers were relocated and downstream communities in the lower Volta, are, by and large dissatisfied. During project development, efforts were made to enhance public awareness in the project and involve local communities in aspects, which affect them. These were done partly through discussions at the legislature, at special purpose committees, incorporating as many stakeholders and interested participants as possible, and through public education campaigns in the local communities. In spite of all these preparations and efforts, people relocated still feel that they have not been adequately provided for. They feel that urban communities and industries have taken more of the project benefits in the form of cheap electricity while they the locals are left with the bane of public health problems, and inadequate compensation. Some have suffered reduced farm incomes and others reduced fishing incomes. Resettlement Time is a critical factor in the development of river basins. Policies for resettlement and compensation should be developed well ahead of dam construction. All persons adversely affected by the formation of the reservoir should be properly and appropriately compensated in cash and in kind. The resettlement costs should cover all inundated properties including houses, farms and public facilities and a well-archived evidence of compensation maintained. In addition, all land encumbered for resettlement should be appropriately compensated and proper legal title is given to each individual resettled family for houses allocated and farmlands. This is essential to prevent and minimize post construction claims and also to avoid later conflicts between the host communities and the settlers as the experience of the Akosombo and Kpong projects show. The lessons learnt in handling the social impact of Akosombo and Kpong hydro projects will be applied in planning for the Bui Hydro project. People directly affected who should be targets of intensive consultation, detailed planning of mitigative and improvement measures should be the following: communities to be displaced by the project, communities in the watershed areas and the riparian communities and communities downstream of the dams. Environmental Impact With regards to the environments, Hydropower is a globally benign renewable energy. It is green energy when compared with the fast growing fossil fuel now being built to supply the bulk of the electricity demand over the next twenty or so years. Hydro plants do not produce the large quantities of green house gases which caused global warming and major climatic changes. Hydro projects on the other hand affect local ecosystem. It is important that every effort is made to cause only a minimum change in the existing bio-diversity. Programmes should 14
15 therefore be developed to ensure effective mitigation of environmental effects. Environmental costs should always be factored into costs of producing power and reflect in the price of electricity. Currently, as part of the Volta Development, considerable resources are deployed for the clearing of tree stumps in the lake, maintenance of a dredger to cut a channel through sandbars at the estuary and physical clearing of weeds on the Kpong head pond to name a few on-going programmes. Opportunities are created to offset some of the environmental disturbances. Tropical reservoirs create conditions for waterborne diseases such as bilhazia to increase. Irrigation, urban water supply navigation, fishing and other development activities can contribute to improve the lives of affected comminites. Afforestation To protect the integrity of the lake, measures should be taken to check deforestation by protecting the original forests. In the case of the Bui Project, this is of extreme importance since the lake to be formed will be located in a protected environment. VRA already has considerable experience in addressing afforestation problems due to ongoing work in combating these problems on the Volta Lake. A number of measures currently employed by VRA are the planting of tress and the construction of fire belts. One of the lessons learned is that after implementation there is a tendency for Developer s fatigue to set in. Once people were relocated and power started to be produced, the enthusiasm which characterized the initial socio-economic activity waned when this should have been the time for such activities to have been accelerated. The developmental objectives are funded on the basis of economic and financial cost benefit analyses but these do not adequately incorporate social and environmental implications. Every effort should be made to widen the cost and benefit studies. The other factor is that the beneficiaries of the development activities are not necessarily the same as those communities, which are immediately affected. For example, the benefits of electricity and irrigation may go to urban communities and industries whereas it is the local community which gets exposure to bilharzia and whose livelihoods are disrupted. Modern thinking is that those who sacrifice must be fully compensated by those who benefit. Since it is not easy to fully define these costs and the distribution of the benefits, it is better to err on the side of generosity to the local communities. To achieve this calls for a continuous assessment on the sharing of benefits and assessment of costs. 15
16 8. PROCURING FUNDS FOR IMPLEMENTING HYDROPOWER PROJECTS 8.1 Trends in Financing for Hydropower Hydropower projects in Africa over the last half-century have been undertaken with public financing supported by loans raised from multilateral and bilateral public sources. The World Bank has featured very prominently in this effort. The World Bank contributed significantly to financing the Akosombo Hydropower Development in Ghana, the Kainj Hydropower Plant in Nigeria and the Owen Falls in Uganda. Today, there is a severe shortage of public finance for power development both at the level of African Governments and from the World Bank and other multilateral and bilateral aid agencies, which had supported hydro dam development in the past. This position has led to an increased interest in contribution of private sector finance to hydropower development. This contribution may take the form of loans raised from commercial banks and other private financing agencies or equity investment by private entrepreneurs in power development. IFC for instance after 1990, approved financing for several private hydroelectric projects between in developing countries. Africa, however, has attracted very little interest from private financiers in hydropower development. Both the World Bank and the bilateral agencies have established policies to encourage participation of private sector finance in the power sector of Africa. But the risks normally associated with hydropower are such that in the context of Africa they pose challenges which deter private capital. These risks include technical, economic, commercial, environmental and social risks associated with hydro development. Other risks include: Hydrological uncertainties, High upfront capital investments which often require long gestation periods, The risks of cost overruns and time slippage, Negative public perception about hydro projects in general. 8.2 Current Challenges facing Hydropower Financing Financing for hydropower projects have to contend with the following challenges: Competition with other development projects, such as projects for health and education etc. Impact on macroeconomic situation Political challenges Regulatory Challenges 16
17 Negative perception arising from population displacement and destruction of agricultural lands, insects, animals major changes in the Destruction of the ecosystem and the change in the biodiversity, 9. STRATEGIES AND ACTION PLAN TO MEET NEPAD INITIATIVE ON ENERGY 9.1 Role of Hydropower in Africa s Energy Policy Given the significant hydropower potential identified above, the role of regional hydropower is to reduce cost of electric power and provide a sustainable source of electricity. An example is the development of INGA to provide substantial backbone to electricity capacity in Africa at cost levels substantially low and competitive. This will in turn stimulate industrial developments and help reduce poverty. Another role is the use of small hydro developments to extend electricity service and increase electricity access to remote areas whilst at the same time building an industrial base and technical skills for small and medium scale industries. 9.2 Short Term Action Plan Will require proper policy framework, pricing, tariff environment, Improving the technical and managerial capabilities of the institutions Objectives Need to improve existing hydro capacity Advance the development of the regional projects identified Action Plan Establish a Committee on Hydro Power Development, which will have Task Forces to carry out the following functions: 1. Map out the existing facilities and identify opportunities for improving their performance. 2. Identify centers of excellence within each sub region, which serve as training centers for sharing of experience. 3. Work with Regional Economic Commissions (REC) and appropriate institutions at the national level to undertake the necessary tasks in the project development process. Part of the tasks should be: o Advancement of Identified Regional Projects, namely Mepanda-Uncua Hydro Power Plant and Grand Inga Integrator (establishment of Project Development Task Force to work with RECs, sub-regional power pools and multilateral funding agencies including regional/sub-regional banks like AfDB and SADB) o Finance Facilitation of Country Projects including Improvement of Existing Facilities. As part of this, half-yearly forum of Utilities and Project Developers can be organised in collaboration with UPDEA and AfDB. 17
18 o Policy Development at Sub-Regional Levels (establishment of Policy Development Task Force to work with national energy policy agencies, RECs, sub-regional/regional networks of energy experts and the initiatives developed as part of the World Summit on Sustainable Development (WSSD) o Establishment of the proposed African Regional Energy Commission (AFREC) to institutionalize actions mentioned above 9.3 Medium to Long Term Strategies and Action Specific Objectives Implement identified projects ( Inga, Mepanda Uncua, etc) Identify and implement other regional project Build capacity for small and medium hydro project Actions Operationalise AFREC, within which the hydro committee would operate, to continue implementation of the short term actions and the following medium to long term actions, 1. work with key organizations especially the RECs and national energy agencies to harmonize regulatory frame works and establish power pools; 2. Work with the RECs and appropriate institutions at the national level to undertake the tasks necessary to implement the projects identified; these tasks would include detailed engineering design, preparation of tender documents, construction and commissioning. 3. set up a fund to facilitate the development of small to medium hydro projects to which corporate entities could apply. 4. publish an annual of hydro power projects in Africa, which would provide information on new projects, status of on-going works 5. Support and collaborate with hydro power research centers and networks. 10. SUMMARY/CONCLUSION In summary, this paper has identified the main problems facing hydropower development in Africa as: Lack of finance Low access of the population to electricity Given the low demand for electricity in Africa today, and the lack of access there are bright prospects for the development of hydropower. A summary of the concrete strategies developed to support actions that will enhance access and Attract finance into the country include: In the short term, the rehabilitation and operational improvement of existing hydro projects by NEPAD through a Committee on Hydropower Development In the long term it is proposed that NEPAD works closely with country Regional Energy Commissions. 18
19 APPENDIX A Data on the Hydropower Situation in Africa Gross Theoretical Hydropower Potential (GWh/year) Technically feasible Hydropower Potential (GWh/year) Economically feasible Hydropower Potential (GWh/year) Installed hydro capacity (MW) Production from hydro plants (GWh/Year) Source: World Atlas on Hydropower and Dams Percentage of electricity produced from hydro Hydro capacity under construction (MW) Planned hydro capacity (MW) Country Algeria 12, (p-s) Angola 150,000 90,000 65, , <16,500 Benin 1,676 < Botswana Burkina Faso >600 n/a Burundi >6000 >1500 1, Cameroon 294, , , , Central African Republic 2, Chad > Comoros n/a Congo >50, > Congo, DR 1,397, ,000 <419,210 2,440 5, ,000 Cote d'ivoire 46,000 >12,400 12, , Egypt >50,000 50,000 2,810 11, Equatorial Guinea n/a Eritrea n/a Ethiopia 650, , , Gabon >80,000 80,000 32, n/a Gambia Ghana 10,600 1,072 5, Guinea 26,000 19,400 14, Guinea-Bissau Kenya >30,000 8, , n/a Lesotho n/a n/a n/a Liberia 11, Libya Madagascar 321, ,000 49, Malawi 6, Mali > * 52 Mauritania * n/a Mauritius Morocco 4,700 4,000 1,205 2, p-s Mozambique 50,000 37,647 31,717 2,180 11, ,000 Namibia 9,000 >8645 8, Niger 1,300 1, Nigeria 42,750 32,450 29,800 1,938 6, ,850 Reunion n/a Rwanda Sao Tome and Principe Senegal 4,250 2, * - Seychelles Sierra Leone 6, n/a Somalia South Africa n/a n/a Sudan 19,000 1, , Swaziland 3, n/a Tanzania 39,447 20,000 1, , >1000 Togo 1, n/a Tunisia 1, Uganda >17,500 (>2000MW) 276 1, Zambia 52,460 28,753 11,000 1,674 7, >2000 Zimbabwe 18,500 17, , >800 Total 4,000,000 1,750,000 1,000,000 20,300 76,000 >2,403 >60,000 n/a= data not available (but greater than zero); p-s=pump storage 19
20 APPENDIX B -- Ghana Small Scale Hydro Until late 1997 and early 1998, virtually all of Ghana s electricity was produced from two hydro dams at Akosombo and Kpong, which have a combined installed capacity of 1,072 MW. It is estimated that Ghana may have the potential for additional 2,000 MW of hydropower.1 About 1,205 MW of this total is expected to be produced from proven large hydro sources while the rest will come from medium to small hydro plants.2 According to Odai [1999], about 70 SHP sites have been identified in Ghana. Appendix 2 contains a list all identified SHP sites in Ghana. Preliminary studies to assess the SHP potential of Ghana began in 1979 under the auspices of the then Architectural Engineering Services Corporation (AESC) now AESL.3 About 40 potential small hydro sites were identified based on analysis of available data including topographical sheets. Later, under a Ghana- India Technical Co-operation Agreement, funds were released for the development of the first pilot SHP schemes at a site near Likpe-Kukurantumi on the Dayi River, in the Volta Region. Unfortunately, this project was never completed. Then in 1982, the Government of Ghana issued new guidelines for the energy sector. This included plans to develop SHP schemes up to 500kW to provide decentralised electric power to isolated rural communities. To achieve this objective, the Ministry of Fuel and Power (as it was then called, now MME) commissioned AESC to carry out a systematic assessment of SHP potential in selected regions in Ghana. The selected regions were those that did not feature in the medium term plans for extending the national electricity grid. In December 1985 and December 1986, the AESC, in collaboration with the Technical Division of the then Ministry of Fuel and Power, completed interim reports on Phase I and Phase II of the micro-hydro component of the Ghana Energy Project. The two phases cover an assessment of 14 potential SHP sites, markets for the power to be generated, preliminary layouts and sketches, as well as cost and benefit estimates. Following the AESC studies, ACRES International, in under the National Electrification Planning Study (NEPS), carried out another study, which covered the following areas: A review of the studies undertaken by AESC. This review included analysis of basic data (hydrology, plant parameters, layouts) as well as the assessment of the feasibility and attractiveness of the considered sites; An economic assessment of three representative projects; An extrapolation of the representative projects in order to assess the small hydro 1 Ampofo, K. (1998) 2 Akuffo, F. O. (1998) 3 AESL stands for Architectural Engineering Services Limited. 20
21 potential of Ghana; Development of a work plan for the future comprehensive inventory of Ghana s small hydro potential; and An outline of technical and technological problems related to investigations, engineering construction, and operation & maintenance (O&M) of SHP projects in Ghana. ACRES International investigated 16 small hydro sites in their study 14 of them were carried over from Phase II of the AESC study and two sites were newly identified. Table B.1 contains characteristics and potential output of SHP sites studied in Ghana while Figure B.1shows the location of studied SHP sites. Table B.1: Studied Mini-Hydro Sites No Mini-hydro Project River Heads (Gross) (m) Installed Capacity (kw) Potential Output Site (MW h) 1 Wli Falls Nuboi ,747 2 Nuboi River Nuboi downstream of Wli Fall 3a Tsatsadu Falls I Tsatsadu (Falls only) 3b Tsatsadu Falls II Tsatsadu (rapids below falls) 3c Tsatsadu Falls I+II Tsatsadu Menusu Menu Ahamansu Wawa Dodi Papase Wawa Asuboe Wawa Sanwu Falls Sanwu a Nworannae Falls A Nworannae b Nworannae Falls B Nworannae Randall Falls Pumpum at 21
22 11 Fuller Falls Oyoko Kokuma Falls Edam Nkoranza Fia Maaban Kwasu Buomfoum Falls Ongwam Wurudu Falls A (falls Wurudu a only) 16 Wurudu Falls B (falls Wurudu b & lower rapids) 17 Likpe-Kukurantumi Dayi (V/R) Sources: ACRES (1991)) & Ampofo (1998) 22
23 Bolgatanga Pwalugu (50M W) Wa Koulbi (68M W) White Volta Kulpawn (70M W) Ntereso (64M W) Lanka (95M W) Jambito (55M W) Tamale Juale (100M W) Bui (200M W) R andallfalls Fuller Falls Kokum a Falls Asuboe Dodi P apase A ham ansu M enusu Nkoranza Lake Volta Tsatsadu Falls Sunyani Boum foum Falls WliFalls NuboiD/S of Wli Nworainnae Falls Sanwu Falls Tano Asuaso (25M W) Sodukrom (17M W) Jomuro (17M W) Tanoso M aaban Falls Kojokrom (30M W) Hemang (75M W) Kumasi Pra Sekondi - Takoradi Awisam (50M W) Abatumesu (50M W) W u rudu Falls Cape Coast Akosombo Dam Kpong Koforidua Dam Accra Volta Legend Investigated Mini Hydro Sites Potential Medium Hydro sites Regional Capitals Figure B.1 Map of Ghana Showing Identified Medium and Small Hydro Sites The number of potential viable and implementable sites was then estimated for several scenarios minimal (cautious), maximal (optimistic) and medium. Under 23
24 these assumptions, the small hydro potential of Ghana was assessed as contained in Table B.2 below. Table B.2: Estimated Small Hydro Potential of Ghana Scenario Typical SHP Unit Project Minimum Medium Maximum Number of Plants envisaged SHP Plants Sized for Supplying Isolated Consumers Installed Capacity kw Potential Output MWh/yr ,000 Output absorbed by MWh/yr Isolated consumers Savings in diesel fuel 10 6 L/yr SHP Plants Sized for Connection into Grid Installed Capacity Of which: firm kw kw Output MWh/yr Of which firm 1 MWh/yr (to local consumers) Secondary MWh/yr Savings in fuel t/yr Conventional fuel (6000 cal/g) Source: ACRES International,
25 When considered as simple run-of-river projects, sized to provide power to rural communities not connected to the national grid, the aggregate SHP potential of Ghana was estimated to be around 1.2 MW installed capacity for the minimum scenario and 4 MW installed capacity for maximum scenario. However, this installed capacity could be increased considerably if the SHP plants could be connected to the national electrical grid, which would absorb the excess energy output. Under this scheme, the SHP potential of Ghana, for the same sites, was estimated to be around 4 MW installed capacity for the minimum scenario and 14 MW installed capacity for the maximum case scenario. Based on this assessment, ACRES International [1991] described the SHP potential of Ghana as modest. They concluded inter alia that the development of small hydro in Ghana could only have a marginal effect on the overall fuel and energy balance of Ghana. They however pointed out that the SHP technology could play a very important role in widening the implementation of rural electrification programmes thereby accelerating the incorporation of otherwise isolated communities into the mainstream of economic and social development. 25
Republic of Zambia OPPORTUNITIES IN THE ENERGY SECTOR IN ZAMBIA
Republic of Zambia OPPORTUNITIES IN THE ENERGY SECTOR IN ZAMBIA Presentation Outline COUNTRY PROFILE KEY POWER SECTOR PLAYERS OVERVIEW OF THE ENERGY SECTOR IN ZAMBIA ZAMBIA ENERGY SITUATION PRESENTLY RESULT
UNFCCC initiatives: CDM and DNA Help Desks, the CDM Loan Scheme, Regional Collaboration Centres
UNFCCC initiatives: CDM and DNA Help Desks, the CDM Loan Scheme, Regional Collaboration Centres Africa Carbon Forum 03 July 2013 - Abidjan, Côte d Ivoire Ms. Flordeliza Andres Programme Officer, UNFCCC
Global Fuel Economy Initiative Africa Auto Club Event Discussion and Background Paper Venue TBA. Draft not for circulation
Global Fuel Economy Initiative Africa Auto Club Event Discussion and Background Paper Venue TBA Draft not for circulation Launched on March 4, 2009 by the United Nations Environment Programme (UNEP), the
In 2003, African heads of state made a commitment to
Issue Note November 213 No. 22 Trends in Public Agricultural Expenditures in Africa Samuel Benin and Bingxin Yu 1 In 23, African heads of state made a commitment to invest percent of their total national
IMPLICATIONS OF OVERLAPPING MEMBERSHIP ON THE EXPECTED GAINS FROM ACCELERATED PROGRAM FOR ECONOMIC INTEGRATION (APEI)
IMPLICATIONS OF OVERLAPPING MEMBERSHIP ON THE EXPECTED GAINS FROM ACCELERATED PROGRAM FOR ECONOMIC INTEGRATION (APEI) ABSTRACT In September 2012, five like-minded and reform oriented countries namely Malawi,
AIO Life Seminar Abidjan - Côte d Ivoire
AIO Life Seminar Abidjan - Côte d Ivoire Life Insurance Market Survey of Selected African Countries Bertus Thomas Africa Committee of the Actuarial Society of South Africa Agenda SECTION 1 SURVEY OBJECTIVE
Corporate Overview Creating Business Advantage
Corporate Overview Creating Business Advantage 14 April 2013 Agenda The power of the group Our achievements Quick facts African regulatory environment Portfolio of offerings Creating value in Africa African
country profiles WHO regions
country profiles WHO regions AFR AMR EMR EUR SEAR WPR Algeria Total population: 37 63 aged years and older (+): 73% in urban areas: 66% Income group (World Bank): Upper middle income 196 196 197 197 198
Manufacturing & Reproducing Magnetic & Optical Media Africa Report
Brochure More information from http://www.researchandmarkets.com/reports/3520587/ Manufacturing & Reproducing Magnetic & Optical Media Africa Report Description: MANUFACTURING & REPRODUCING MAGNETIC &
DEFINITION OF THE CHILD: THE INTERNATIONAL/REGIONAL LEGAL FRAMEWORK. The African Charter on the Rights and Welfare of the Child, 1990
DEFINITION OF THE CHILD: THE INTERNATIONAL/REGIONAL LEGAL FRAMEWORK Article 2: Definition of a Child The African Charter on the Rights and Welfare of the Child, 1990 For tile purposes of this Charter.
WHO Global Health Expenditure Atlas
WHO Global Health Expenditure Atlas September 214 WHO Library Cataloguing-in-Publication Data WHO global health expenditure atlas. 1.Health expenditures statistics and numerical data. 2.Health systems
Financing Education for All in Sub Saharan Africa: Progress and Prospects
Financing Education for All in Sub Saharan Africa: Progress and Prospects Albert Motivans Education for All Working Group Paris, 3 February 211 1 Improving the coverage and quality of education finance
Japan s Initiative on Infrastructure Development in Africa and TICAD Process Fifth Ministerial Meeting NEPAD-OECD Africa Investment Initiative
Japan s Initiative on Infrastructure Development in Africa and TICAD Process Fifth Ministerial Meeting NEPAD-OECD Africa Investment Initiative Kei YOSHIZAWA Deputy Director,Office for TICAD Process Japan
The Africa Infrastructure
AIDI May 2016 www.afdb.org Chief Economist Complex Table of Contents 1. Introduction and Background 1. Introduction and Background 2. The AIDI 2016 Highlights 3. Main Results 4. Conclusions References
Libreville Declaration on Health and Environment in Africa
Libreville Declaration on Health and Environment in Africa Libreville, 29 August 2008 REPUBLIQUE GABONAISE World Health Organization Regional Office for Africa Libreville Declaration on Health and Environment
A Snapshot of Drinking Water and Sanitation in Africa 2012 Update
A Snapshot of Drinking Water and Sanitation in 1 Update A regional perspective based on new data from the WHO/UNICEF Joint Monitoring Programme for Water Supply and Sanitation UNICEF/NYHQ8-46/Harneis,
United Nations Development Programme United Nations Institute for Training and Research
UNDP RBA and UNITAR supporting the strategic development priorities of Africa As we approach the New Year, it is important to reflect on what has been achieved. Throughout 011, UNITAR has worked in close
BADEA EXPORT FINANCING SCHEME (BEFS) GUIDELINES
BADEA EXPORT FINANCING SCHEME (BEFS) GUIDELINES 1 P.O. Box 5925 Jeddah 21432 Kingdom of Saudi Arabia Telephone: 636 1400 Telex: 601137-601407 ISDB SJ Facsimile: 636 6871 Jeddah (IDB) Facsimile: 637 1064
THE STATE OF MOBILE ADVERTISING
AFRICA THE STATE OF MOBILE ADVERTISING Africa is a land of contrasts. It is the world s second-largest continent (after Asia), and home to the second-largest population yet it only outpaces Antarctica
Quote Reference. Underwriting Terms. Premium Currency USD. Payment Frequency. Quotation Validity BUPA AFRICA PROPOSAL.
Quote Reference Family Quote 2013 Underwriting Terms BUPA AFRICA PROPOSAL Full Medical Underwriting and/or Continuous PreviousMedical Exclusions Premium Currency USD Payment Frequency One annual payment
PROCEEDINGS KIGALI 3-4 NOVEMBRE,
PROCEEDINGS KIGALI 3-4 NOVEMBRE, 2005 The 7 th Conference of Ministers Responsible for Animal Resources was held in the conference room of Intercontinental hotel - Kigali (Rwanda) from 3 rd to 4 th November
People and Demography
PART 1The setting PART 1 People and Demography The population of all Africa was estimated at 802.5 million people in 2000 and it rose to 1 010.3 million inhabitants in 2010, which means an average annual
REQUEST FOR EXPRESSIONS OF INTEREST (Individual Consultant) AFRICAN DEVELOPMENT BANK (AfDB) Energy, Environment and Climate Change Department (ONEC)
REQUEST FOR EXPRESSIONS OF INTEREST (Individual Consultant) AFRICAN DEVELOPMENT BANK (AfDB) Energy, Environment and Climate Change Department (ONEC) CIF Climate Finance Officer The African Development
IAEA's Tools and Capacity Building for Energy Planning in Africa
's Tools and Capacity Building for Energy Planning in Africa IRENA-ECREEE Workshop on Energy Planning 10-12 December 2012, Abidjan, Cote D Ivoire Mario TOT Planning and Economic Studies Section Department
Eligibility List 2015
The Global Fund adopted an allocation-based approach for funding programs against HIV/AIDS, TB and malaria in 2013. The Global Fund policy states that countries can receive allocation only if their components
Assessing Progress in Africa toward the Millennium Development Goals, 2011
North Africa, on the other hand, has made the greatest progress by improving the lives of 8.7 million, or 34.9 percent, slum dwellers (UN-Habitat, 2010). At the country level, the trend shows that of the
A TEACHER FOR EVERY CHILD: Projecting Global Teacher Needs from 2015 to 2030
A TEACHER FOR EVERY CHILD: Projecting Global Teacher Needs from 2015 to 2030 UIS FACT SHEET OCTOBER 2013, No.27 According to new global projections from the UNESCO Institute for Statistics, chronic shortages
FFEM Fonds Français pour l Environnement Mondial French Global Environment Facility. PROGRAMME PETITES INITIATIVES Small-Scale Initiatives PROGRAMME
FFEM Fonds Français pour l Environnement Mondial French Global Environment Facility PROGRAMME PETITES INITIATIVES Small-Scale Initiatives PROGRAMME RULES AND CRITERIA 1. PROGRAMME OUTLINE The French Global
Watermarks: Indicators of Irrigation Sector Performance in Africa
BACKGROUND PAPER 4 (PHASE II) Watermarks: Indicators of Irrigation Sector Performance in Africa SUMMARY Mark Svendsen, Mandy Ewing, and Siwa Msangi International Food Policy Research Institute DECEMBER
Managing the nexus for a low carbon future. Prof Mike Muller Wits P&DM, NPC, DBSA
Managing the nexus for a low carbon future Prof Mike Muller Wits P&DM, NPC, DBSA Outline Context, low carbon for what, for whom? Origins of current water-energy-food nexus Linkages of nexus to low carbon
Distance to frontier
Doing Business 2013 Fact Sheet: Sub-Saharan Africa Of the 50 economies making the most improvement in business regulation for domestic firms since 2005, 17 are in Sub-Saharan Africa. From June 2011 to
Countries Ranked by Per Capita Income A. IBRD Only 1 Category iv (over $7,185)
Page 1 of 5 Note: This OP 3.10, Annex C replaces the version dated September 2013. The revised terms are effective for all loans that are approved on or after July 1, 2014. Countries Ranked by Per Capita
Goal 6: Combat HIV, AIDS, malaria, and other major diseases
The adolescent birth rate is highest in Niger, Chad, Mali, and Mozambique, which are among the poorest countries on the continent. In these countries early marriage is common and the proportion of girls
www.pwc.ie Africa Business Forum December 2014
www.pwc.ie Africa Business Forum December 2014 Welcome Colm O Callaghan Director, Ireland Africa Business Forum December 2014 2 Agenda Speaker Topic Colm O Callaghan, Ireland Welcome address Tim Morgan,
Pensions Core Course Mark Dorfman The World Bank. March 7, 2014
PENSION PATTERNS & REFORM CHALLENGES IN SUB-SAHARAN AFRICA Pensions Core Course Mark Dorfman The World Bank Slide 1 Organization 1. Design summary 2. Challenges 3. Design reform principles 4. A process
Over 620 million Africans are living without the benefits of an electricity connection, a situation that
Level : Africa s progress in the energy sector Over 620 million Africans are living without the benefits of an electricity connection, a situation that limits both their quality of life and their livelihood
Doing Business 2015 Fact Sheet: Sub-Saharan Africa
Doing Business 2015 Fact Sheet: Sub-Saharan Africa Thirty-five of 47 economies in Sub-Saharan Africa implemented at least one regulatory reform making it easier to do business in the year from June 1,
African Elephant (Loxondonta africana)
African Elephant (Loxondonta africana) Further Details on Data Used for the Global Assessment For the 2004 assessment, current generation data were obtained from the African Elephant Status Report 2002
Geneva, 17-19 March 2009 COUNTRY REPORT: MALAWI
CONFÉRENCE DES NATIONS UNIES SUR LE COMMERCE ET LE DÉVELOPPEMENT UNITED NATIONS CONFERENCE ON TRADE AND DEVELOPMENT Multi-Year Expert Meeting on Services, Development and Trade: The Regulatory and Institutional
STATEMENT. H.E Mr. Hassan Younes Minister of Electricity and Energy. Egypt. Session of the Commission. on Sustainable Development
EGYPT The Permanent Mission of Egypt to the United Nations New York 11,J1,y-.e,, ' t' e.h 1 l r.5/ 1 (S.J1 STATEMENT By H.E Mr. Hassan Younes Minister of Electricity and Energy Egypt The 14`h Session of
Africa and the infrastructure sector: SACE new business solutions. AFDB Tunisi, 8-9 march 2010
Africa and the infrastructure sector: SACE new business solutions AFDB Tunisi, 8-9 march 2010 Titolo presentazione Index Business Areas Africa Programme SACE 2 Business Areas Are you an exporter wanting
Frequently Asked Questions (FAQs) on Hydropower
Frequently Asked Questions (FAQs) on Hydropower What are the advantages of Hydropower? A renewable source of energy - saves scarce fuel reserves. Non-polluting and hence environment friendly. Long life
Africa-China trading relationship
-China trading relationship tralac has been monitoring the trading relationship between and China for several years. This brief provides a synopsis of the latest -China trade data and an evaluation of
Proforma Cost for international UN Volunteers for UN Partner Agencies for 2016. International UN Volunteers (12 months)
Proforma Cost for international UN Volunteers for UN Partner Agencies for 2016 Country Of Assignment International UN Volunteers (12 months) International UN Youth Volunteers (12 months) University Volunteers
UNAIDS 2013 AIDS by the numbers
UNAIDS 2013 AIDS by the numbers 33 % decrease in new HIV infections since 2001 29 % decrease in AIDS-related deaths (adults and children) since 2005 52 % decrease in new HIV infections in children since
THE ROLE OF BIG DATA/ MOBILE PHONE DATA IN DESIGNING PRODUCTS TO PROMOTE FINANCIAL INCLUSION
THE ROLE OF BIG DATA/ MOBILE PHONE DATA IN DESIGNING PRODUCTS TO PROMOTE FINANCIAL INCLUSION Joseph Nketsiah GM, Risk Management Division, HFC BANK www.hfcbank.com.gh 1 Using customer data for marketing
The Trade Finance Bank for Africa
The Role of Afreximbank and of IFG Africa Chapter in the development of Factoring in Africa By Chairperson, Africa Chapter. B.O. Oramah and Executive Vice-President (AFREXIMBANK) Presentation at the First
Presentation to 38th General Assembly of FANAF Ouagadougou, 17-21 February 2014. Thierry Tanoh- Group CEO
Presentation to 38th General Assembly of FANAF Ouagadougou, 17-21 February 2014 Thierry Tanoh- Group CEO Contents Global Demographics Africa Market Size & Growth Drivers Key players & Competitive Landscape
EdM ZESA Eskom. Transaction Advisory Services for the
EdM ZESA Eskom Transaction Advisory Services for the MO-ZI-SA TRANSMISSION PROJECT Terms of Reference for the consulting services for Feasibility Studies up to Financial Close 11 December 2014 TOR_MOZISA-11
DEMOGRAPHIC AND SOCIOECONOMIC DETERMINANTS OF SCHOOL ATTENDANCE: AN ANALYSIS OF HOUSEHOLD SURVEY DATA
BACKGROUND PAPER FOR FIXING THE BROKEN PROMISE OF EDUCATION FOR ALL DEMOGRAPHIC AND SOCIOECONOMIC DETERMINANTS OF SCHOOL ATTENDANCE: AN ANALYSIS OF HOUSEHOLD SURVEY DATA By Hiroyuki Hattori, UNICEF This
Africa s external and intra-regional trade
Africa s external and intra-regional trade Dr Edward George Head of Soft Commodities Research, Ecobank Euromoney Global Commodities Finance Conference, Geneva, 5 June 2013 Section 1 Africa s external trade
Re/insurance in sub- Saharan Africa. Gearing up for strong growth Dr. Kurt Karl, Head of Economic Research & Consulting, Swiss Re
Re/insurance in sub- Saharan Africa Gearing up for strong growth Dr. Kurt Karl, Head of Economic Research & Consulting, Swiss Re Agenda Macroeconomic environment and outlook Insurance market development
ADF-13 Mid Term Review: Progress on the African Development Bank Group s Gender Agenda
ADF-13 Mid Term Review: Progress on the African Development Bank Group s Gender Agenda Investing in Gender Equality for Africa s Transformation The AfDB Group Ten-Year Strategy Twin Objectives: Inclusive
Appendix A. Crisis Indicators and Infrastructure Lending
Appendix A. Crisis Indicators and Infrastructure Lending APPENDIX A Table A.1. Crisis Indicators (Case Study Countries) Country % as Share of GDP Share of in Bank Crisis Severity Score (principal factor
EXPLORER HEALTH PLAN. Product Summary From 1 September 2013. bupa-intl.com. Insured by Working with Brokered by
EXPLORER HEALTH PLAN Product Summary From 1 September 2013 bupa-intl.com Insured by Working with Brokered by ABOUT BUPA AND JUBILEE ABOUT ABOUT BUPA BUPA, AND JUBILEE AND JUBILEE JUBILEE AND JWS GLOBAL
REQUEST FOR EXPRESSIONS OF INTEREST
REQUEST FOR EXPRESSIONS OF INTEREST AFRICAN DEVELOPMENT BANK CIF coordination Unit Environment and Climate Change Division (ONEC.3) E-mail: [email protected] Expressions of interest are being requested
The Effective Vaccine Management Initiative Past, Present and Future
EVM setting a standard for the vaccine supply chain The Effective Vaccine Management Initiative Past, Present and Future Paul Colrain TechNet meeting Dakar, Senegal, February 2013 February 2013 TechNet
This note provides additional information to understand the Debt Relief statistics reported in the GPEX Tables.
Technical Note 3 Debt Relief This note provides additional information to understand the Debt Relief statistics reported in the GPEX Tables. Introduction 1. Debt is a major development issue. There is
MDRI HIPC. heavily indebted poor countries initiative. To provide additional support to HIPCs to reach the MDGs.
Goal To ensure deep, broad and fast debt relief and thereby contribute toward growth, poverty reduction, and debt sustainability in the poorest, most heavily indebted countries. HIPC heavily indebted poor
Carbon Markets and Africa: A Quick Fact Sheet for Journalists
Carbon Markets and Africa: A Quick Fact Sheet for Journalists What is Climate Change? Climate change typically refers to the threat to our ecosystems and climatic conditions stemming from the release of
Pendulum Business Loan Brokers L.L.C.
BUSINESS BROKERS DEVELOPING COMPONENT PART MANUFACTURING PARTNERSHIPS METAL PLASTIC ELECTRICAL Business Brokers Three (3) Component Part Manufacturing Partnerships Categories Hiram R. Davis Corporate Secretary
BRIEFING NOTE 1 THE LANDSCAPE OF MICROINSURANCE IN AFRICA. 1. Counting the microinsured in Africa. 2. So how many are covered by microinsurance?
BRIEFING NOTE 1 Microinsurance Innovation Facility THE LANDSCAPE OF MICROINSURANCE IN AFRICA 1. Counting the microinsured in Africa In various forms microinsurance has been available to some low-income
Table 5: HIV/AIDS statistics for Africa (excluding North Africa), 2001 and 2009
Table 5: HIV/AIDS statistics for Africa (excluding North Africa), 2001 and 2009 Year People living with HIV (million) People newly infected with HIV (million) Children living with HIV (million) AIDS-related
G4S Africa. Andy Baker Regional President. G4S Africa
Andy Baker Regional President G4S Africa 1 Macro-economic environment Over the last decade, six of the world s 10 fastest growing economies were in Africa. This is forecast to continue.. Diversity across
How To Calculate The Cost Of A Road Accident In Africa
ND CA EVELOPMEN T S ND PP FO AF RIC F EM ENT AF RI A LO D UN BANQ UE INE DE DEVE EN T EM PP A IC FR LO AIN DE DEVE Market Brief Statistics Department, June 2013, AfDB Chief Economist Complex www.afdb.org
(EORE) Considerations May 2012
ECOWAS OBSERVATORY FOR RENEWABLE ENERGY & ENERGY EFFICIENCY (EORE) Considerations May 2012 1 Foundation of ECREEE The Ouagadougou Declaration from 12 November 2007 highlighted the need for a regional RE&EE
Social protection and poverty reduction
Social protection and poverty reduction Despite the positive economic growth path projected for Africa, the possibility of further global shocks coupled with persistent risks for households make proactive
Exploring the links between water and economic growth
Exploring the links between water and economic growth A report prepared for HSBC by Frontier Economics: Executive Summary June 2012 June 2012 The water challenge Population and economic growth are putting
Theme II: CREATING, PROMOTING AND SUSTAINING AN INNOVATIVE ENVIRONMENT: Funding, Tax and Other Incentives for Promoting Innovation
Theme II: CREATING, PROMOTING AND SUSTAINING AN INNOVATIVE ENVIRONMENT: Funding, Tax and Other Incentives for Promoting Innovation African Conference on the Strategic Importance of Intellectual Property
Electricity Generation from Renewable Energy in Sri Lanka: Future Directions
Electricity Generation from Renewable Energy in Sri Lanka: Future Directions Presented by M.M.C. Ferdinando, Secretary, Ministry of Power and Energy R.J. Gunawardana, Additional General Manager (Transmission),
The applicants can submit the eligibility form from 07/01/2016 to 07/02/2016. For additional information, please contact: contact@seed-foundation.
SEED Foundation s 2016 call for proposals for pilot projects in favor of an innovative agricultural development aims at answering this question: how to encourage small structures with limited capacities
KIGALI DECLARATION ON THE DEVELOPMENT OF AN EQUITABLE INFORMATION SOCIETY IN AFRICA
KIGALI DECLARATION ON THE DEVELOPMENT OF AN EQUITABLE INFORMATION SOCIETY IN AFRICA We, the Representatives of the African Parliaments to the Kigali International Conference Recalling the commitment of
The African Union Education Outlook Report: Early Childhood Development: A Continental Perspective
The African Union Education Outlook Report: Early Childhood Development: A Continental Perspective Early childhood is defined as the period from birth to eight years old. This early period is considered
Indian Lines of Credit: An Instrument to Enhance India-Africa Partnership. November 22, 2011 New Delhi
Indian Lines of Credit: An Instrument to Enhance India-Africa Partnership November 22, 2011 New Delhi 2 Exim Bank of India SETUPBYANACTOFPARLIAMENTINSEPTEMBER1981 WHOLLY OWNED BY GOVERNMENT OF INDIA COMMENCED
Migration and Development in Africa: Implications for Data Collection and Research
Migration and Development in Africa: Implications for Data Collection and Research Marzia Rango Migration Research Division IOM UN DESA workshop on strengthening the collection and use of migration data
South. Africa. Energy Equity. Environment. Ami Diner Rina Nazarov Jay Segal Daniel Serrano
South Energy Equity Africa Environment Ami Diner Rina Nazarov Jay Segal Daniel Serrano Macro & Micro Analysis Electricity Service OUTLINE Sanitation Service Water Service Strategic Solution Macroeconomic
MEMORANDUM OF UNDERSTANDING
MEMORANDUM OF UNDERSTANDING between CAFRAD (African Training and Research Centre in Administration for Development) and EUCLID (Euclid University) in connection with Cooperation to further their mutual
Affordable Housing Finance New market development in Africa
1 Affordable Housing Finance New market development in Africa Kecia Rust Tuesday, 29 May 2012 Housing Finance in Emerging Markets 5 th Global Housing Finance Conference: Providing Shelter Creating Jobs
ARSO President Forum. Introduction. ARSO Presidents.
ARSO President Forum Introduction The African Organisation for Standardisation, formerly the African Regional Organisation for Standardisation (ARSO) traces its genesis to the unfolding events and the
Sub-Saharan Africa Power Trends Power disruption in Africa
Sub-Saharan Africa Power Trends Power disruption in Africa Preface This report is a summary of the consolidated point of view of the Deloitte power leaders across Africa, backed by research. We are delighted
Hon. Jemma Nunu Kumba Minister Ministry of Electricity and Water Resources Republic of South Sudan
Hon. Jemma Nunu Kumba Minister Ministry of Electricity and Water Resources Republic of South Sudan South Sudan Electricity Sector Investment Opportunities Introduction Status of electricity supply in South
Sage HR Africa World-class HR & Payroll software and services
World-class HR & Payroll software and services Introduction Sage HR Africa About us Who are we? Sage HR Africa is a developer, implementer and support provider of HR and payroll management software and
PRIORITY AREAS FOR SOCIAL DEVELOPMENT PERSPECTIVES FROM AFRICA EUNICE G. KAMWENDO UNDP REGIONAL BUREAU FOR AFRICA
PRIORITY AREAS FOR SOCIAL DEVELOPMENT PERSPECTIVES FROM AFRICA EUNICE G. KAMWENDO UNDP REGIONAL BUREAU FOR AFRICA Outline Reflections on social Development in Africa along the following 4 pillars: Growth
Population below the poverty line Rural % Population below $1 a day % Urban % Urban % Survey year. National %
2.7 International the the Afghanistan.................... Albania 2002 29.6 19.8 25.4...... 2002 a
Secured Transactions and Collateral Registries: A Global Perspective Access to Finance, IFC
Secured Transactions and Collateral Registries: A Global Perspective Access to Finance, IFC 5 th Financial Infrastructure and Risk Management Training, Rabat, Morocco, September 2014 Alejandro Alvarez
Hydroelectric power and development in Argentina
Hydroelectric power and development in Argentina Gustavo Alberto Devoto ENTE NACIONAL REGULADOR DE LA ELECTRICIDAD Avda. Madero 1020 8 floor Buenos Aires - ARGENTINA [email protected] Abstract: A description
SECTOR ASSESSMENT (SUMMARY): ENERGY 1
Country Partnership Strategy: Kazakhstan 2012 2016 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Overview. Oil accounts for about a quarter
Tanzania: Lower Kihansi Hydropower Station. 23065 / Hydropower plants
Tanzania: Lower Kihansi Hydropower Station Ex post evaluation OECD sector BMZ project ID 1996 66 108 Project-executing agency Consultant - 23065 / Hydropower plants Tanzanian Electricity Supply Company
RENEWABLE ENERGY FINANCING. Challenges, Opportunities & prospects The Ecobank experience. Sunkanmi Olowo
RENEWABLE ENERGY FINANCING Challenges, Opportunities & prospects The Ecobank experience Sunkanmi Olowo Slide 1 The Pan African Bank Incorporated 1985, Nigerian operation since 1989 Leading pan-african
UNHCR, United Nations High Commissioner for Refugees
Belgium 22 Jul 1953 r 08 Apr 1969 a Belize 27 Jun 1990 a 27 Jun 1990 a Benin 04 Apr 1962 s 06 Jul 1970 a Bolivia 09 Feb 1982 a 09 Feb 1982 a Bosnia and Herzegovina 01 Sep 1993 s 01 Sep 1993 s Botswana
SECTOR ASSESSMENT (SUMMARY): ENERGY 1. 1. Sector Performance, Problems, and Opportunities
Country Partnership Strategy: Bangladesh, 2011 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Power generation gap. Bangladesh endures long