1 City of Crescent City Water Enterprise Fund September 16, 2013

2 Provide overview of City s Water System Recap Capital Improvement Plan Provide update on System s Financial Status June 30, 2013 Update for Propose 5-Year Financial Plan Present Results of Rate Study

3 Propose 5-Year Customer Rate Structure Schedule Public Hearing to Consider Rates Direct Notice for Hearing Set Procedures for Receiving/Tabulating Protests Introduce Rate Ordinance

4 City provides service to 14,000 customers Original system tanks, pipelines, equipment in place since 1950 Current Replacement value is $60 million System requires ongoing maintenance and replacement to protect investment and prevent equipment failures

5

6 Ranney Collector Well (1958) Chlorination Building (1958) Elevated Tank (1958) Washington Storage Reservoir (2000) Amador Storage Reservoir (1982) Transmission Mains (1958 & 2000) Distribution Mains ( ) SCADA (1999)

7 Constructed 1958 Last Inspected 2008 Needs Re-Inspecting Every 7 to 10 years

8

9

10

11

12

13

14 Constructed in million Gallon Reservoir Currently only needed for Emergency Storage and Fire Flows

15 Constructed in million Gallon Reservoir Currently only needed only for Emergency Storage and Fire flows

16

17

18

19 FY 12/13 Perform Water Tank Inspections Estimated cost $10,000 Water System Security Estimated cost $25,000 (Grant $12,500) FY 13/14 Develop Water SCADA Master Plan Estimated cost $30,000 Annually Replace Valves and 600 LF of Water Mains Estimated cost $ 50,000

20 FY 14/15 Repair & Paint Amador & Washington Tanks and Facilities Estimated cost $597,287 Elevated Tank Repair, OSHA and Seismic Upgrade Estimated cost $530,450 Annually Replace Valves and 600 LF of Water Mains Estimated cost $ 51,500

21 FY 15/16 Install New SCADA System Estimated cost $ 163,909 Remote Read Metering System (Phase 1 of 3) Estimated cost $ 437,091 Install 7500 LF of 24 From Prison to Elevated Tank Estimated cost $1,016,236 Annually Replace Valves and 600 LF of Water Mains Estimated cost $ 53,045 FY 16/17 Remote Read Metering System(Phase 2 of 3) Estimated cost $ 450,204 Annually Replace Valves and 600 LF of Water Mains Estimated cost $ 54,636

22 FY 17/18 12 Transmission Main Loop (4000 LF, Railroad Ave to Northcrest Dr.) Estimated cost $579,637 Remote Read Metering System(Phase 3 of 3) Estimated cost $ 463,710 Annually Replace Valves and 600 LF of Water Mains Estimated cost $ 56,275 Total Estimated 5 Year Capital Improvement Cost $4,569,880

23 Revenue Draft Public Works Water Capital Improvement Program Financial Summary Date: 9/16/13 Updated for Rate Study Description FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 Revenue Total EMPG Grant $ 12,500 $ 12,500 Total $ 12,500 Expenses Water FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 Total Sub Total $ 35,000 80,900 $ 1,179,237 $ 1,670,281 $ 504,840 $ 1,099,622 $ 4,569,880 Water CIP Total Cash Flow Analysis FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 Total Yearly Total $ 22,500 $ 80,900 $ 1,179,237 $ 1,670,281 $ 504,840 $ 1,099,622 $ 4,557,380

24 $4.5 million program approved July 2013 Major projects include: Annual Replacement of Valves and Water Mains Repair and painting of Washington and Amador Tanks Elevated tank repair, OSHA/Seismic upgrade Install SCADA monitoring system Expand pipe capacity from prison to elevated tank Install remote meter reading system Extend transmission loop (Railroad to Northcrest) Current cash flow does not support projects

25 Water Enterprise Fund administers system $14 million capital assets are 42% depreciated $7 million State loan at 0% interest, ½ paid System has incurred annual deficits of $300,000-$500,000/year for several years June 2013 operating reserve $295,000 Without action, reserves will be depleted in current fiscal year

26 Water Fund Revenue/Expense History 2,500,000 2,000,000 1,500,000 1,000, ,000 - FYE 2010 FYE 2011 FYE 2012 FYE 2013 FYE 2014 Projected Revenue Actual Expense Actual

27 adopted budget deficit $(417,000) current projection $(649,000) Critical Capital Projects deferred until cash flow is restored Without action, unrestricted cash expected to be depleted in January Without action, state loan will likely default in January Any delays will require a larger rate increase

28 Financial Plan Objectives: Stabilize cash flow Build 90-day operating reserve (future years) Restore coverage for existing debt Set stage for new debt financing Provide cash flow for CIP program Begin contributing to a CIP replacement reserve (future years)

29 City engaged consultant to develop 5-Year Plan A Rate Study is used to break down Financial Plan revenue requirements into customer rates Five-year rates have been proposed to build long-term financial stability into system Five-year rates best position system as a good credit risk to qualify for new debt financing Long-term capital financing smoothes customer rate impact 5-Year Plan has been completed and is ready for City Council consideration

30 City contracted with Willdan Financial Services Consultant is a recognized expert in field City staff teamed closely with consultant in preparing and reviewing data, estimates, and projections Company representatives are here to present their report and proposed rate structure

31 Willdan Financial Services

32 City Council Presentation Water Rate Study Results C R E S C E N T C I T Y C A L I F O R N I A September 16, 2013

33 Agenda Purpose of the Rate Study Rate Study Approach Data Reviewed Key Assumptions Results Questions Presentation to the City of Crescent City Water Rate Study 2

34 Purpose of the Rate Study

35 Purpose of the Rate Study Evaluate sufficiency of the existing water revenue stream to: Provide funding for future operating / capital expenses Maintain / build minimum reserve levels Meet legal obligations associated with outstanding debt Develop rates and charges which will generate sufficient revenue / meet cost of service standards (Prop 218) Presentation to the City of Crescent City Water Rate Study 4

36 Rate Study Approach

37 Rate Study Approach Planning Project Initiation & Management Data Collection & Assessment Confirmation of Goals and Objectives Frequent Communication Analysis Rate Setting & Financial Plan Customer Statistics System Revenue Requirements Integration of Capital Improvement Plan Multi-year Financing Analysis Alternatives Analyses Communication Written Summary Report Public Presentations Adopted Rates & Financial Plan Presentation to the City of Crescent City Water Rate Study 6

38 Data Reviewed

39 Data Reviewed Audited FY 12 Financial Report Historical revenues / expenses FY 13 actual and FY 14 budgeted revenues / expenses Capital Improvement Plan Outstanding loan agreements Customer billing data Presentation to the City of Crescent City Water Rate Study 8

40 Key Assumptions

41 No Growth in customer base Fund Balance Reserves Key Assumptions Build a 90-day Operating Reserve Maintain Debt Service $350,000 Build a Capital Reserve of $450,000 (~10% of CIP) New debt to fund portion of CIP Inflationary (3%) cost escalation factor Pelican Bay Prison water rate updated per terms of contract Increased from $0.758 per CCF to $2.07 per CCF Debt service coverage: Build to at least 1.00x for existing water loan Maintain 1.25x for new debt Presentation to the City of Crescent City Water Rate Study 10

42 Results

43 Estimated Beginning Fund Balances Estimated FY 14 Beginning Fund Balances Operating Reserves $295,000 Debt Service Reserve $350,000 Capital Reserve $0 Presentation to the City of Crescent City Water Rate Study 12

44 Results Existing Rates

45 Projected Cash Flow Performance Existing Rates $3,500,000 $3,000,000 $2,500,000 $2,000,000 Total Sources Total Uses $1,500,000 $1,000,000 $500,000 $- FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 Presentation to the City of Crescent City Water Rate Study 14

46 Projected Operating Reserves Existing Rates Projected Year End Operating Reserves $1,000,000 $- $(1,000,000) $295k Fund Balance $(2,000,000) $(3,000,000) $(4,000,000) $(5,000,000) FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 Projected Year End Operating Reserves $295,333 $(317,270) $(1,061,775) $(2,223,571) $(3,450,757) $(4,788,943) Presentation to the City of Crescent City Water Rate Study 15

47 Results Proposed Rates

48 Projected Cash Flow Performance Proposed Rates $3,500,000 $3,000,000 $2,500,000 $2,000,000 $1,500,000 $1,000,000 Total Sources Total Uses $500,000 $- FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 Presentation to the City of Crescent City Water Rate Study 17

49 Projected Operating Reserves Proposed Rates Projected Year End Operating Reserves $500, Days of O&M 94 Days of O&M 94 Days of O&M $400,000 $300,000 $200, Days of O&M 61 Days of O&M $100,000 $- Projected Year End Operating Reserves 10 Days of O&M FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 $295,333 $44,730 $279,225 $423,429 $459,243 $475,057 Presentation to the City of Crescent City Water Rate Study 18

50 Proposed Rates Monthly Fixed Charges Proposed Rates - Monthly Fixed Charges (Includes 500 Cubic Feet of Monthly Usage) Service Type FY 2014 FY 2015 FY 2016 FY 2017 FY /4" Meter $ $ $ $ $ " Meter $ $ $ $ $ /2" Meter $ $ $ $ $ " Meter $ $ $ $ $ " Meter $ $ $ $ $ " Meter $ $ $ $ $ " Meter $ $ $ $ $ Fire Service 4" Meter $ 8.72 $ $ $ $ Fire Service 6" Meter $ $ $ $ $ Fire Service 8" Meter $ $ $ $ $ Fire Service 10" Meter $ $ $ $ $ Bertsch, Churchtree, Meadowbrook $ $ $ $ $ Presentation to the City of Crescent City Water Rate Study 19

51 Proposed Rates Monthly Flow Charges per CCF Proposed Rates Flow Charge per CCF Service Type FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 All Water Flow Above 500 Cubic Feet (Excluding Fire Service) $ 1.70 $ 2.10 $ 2.46 $ 2.54 $ 2.62 Fire Service $ - $ - $ - $ - $ - Presentation to the City of Crescent City Water Rate Study 20

52 Customer Impact of Proposed Rates ¾ City 600 Cubic Ft per Month $30.00 Monthly Water Bill $25.00 $20.00 $15.00 $10.00 $5.00 $- Current Proposed Proposed Proposed Proposed Proposed Bill FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 Monthly Water Bill $10.26 $16.42 $20.21 $23.65 $24.37 $25.11 $ Change $6.16 $3.79 $3.44 $0.72 $0.74 % Change 60% 23% 17% 3% 3% Presentation to the City of Crescent City Water Rate Study 21

53 Customer Impact of Proposed Rates ¾ City 700 Cubic Ft per Month $30.00 Monthly Water Bill $25.00 $20.00 $15.00 $10.00 $5.00 $- Current Proposed Proposed Proposed Proposed Proposed Bill FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 Monthly Water Bill $11.32 $18.12 $22.31 $26.11 $26.91 $27.73 $ Change $6.80 $4.19 $3.80 $0.80 $0.82 % Change 60% 23% 17% 3% 3% Presentation to the City of Crescent City Water Rate Study 22

54 $80.00 $70.00 $60.00 $50.00 $40.00 $30.00 $20.00 $10.00 $- Crescent City - Current Regional Water Bill Comparison ¾ Meter with 1,000 Cubic Feet of Monthly Flow Crescent City - Proposed Dec. 5, 2013 City of Gold Beach, OR City of Brookings, OR Monthly Water Bill City of Fortuna City of Florence, OR City of Arcata Humboldt CSD City of Yreka City of Rio Dell City of Eureka City of Fort Bragg Monthly Water Bill $14.50 $23.22 $24.76 $34.05 $34.44 $34.99 $36.76 $39.10 $45.33 $46.18 $49.95 $69.29 $72.10 City of Willits Presentation to the City of Crescent City Water Rate Study 23

55 CITY COUNCIL QUESTIONS Presentation to the City of Crescent City Water Rate Study 24

56 Receive Public Comment Approve Resolution : Schedule Public Hearing Direct Notice of the Hearing Approve Resolution : Procedures for Receiving/Tabulating Protests Waive full reading, introduce rate ordinance Ordinance No. 777

57

58 Approve Resolution : Schedule Public Hearing Direct Notice of the Hearing Approve Resolution : Procedures for Receiving/Tabulating Protests Waive full reading, introduce rate ordinance Ordinance No. 777

WATER AND WASTEWATER UTILITY RATE STUDY CITY OF

WATER AND WASTEWATER UTILITY RATE STUDY CITY OF WATER AND WASTEWATER UTILITY RATE STUDY CITY OF MAY 2013 WATER AND WASTEWATER UTILITY RATE STUDY FOR CITY OF YREKA 701 4 TH STREET YREKA, CA 96097 JOB NO. 69.39 MAY 2013 PREPARED BY: TABLE OF CONTENTS

More information

BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK

BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD Re Application of the Philadelphia Water Department for Increased Rates and Related Charges Fiscal Years 2017-2018 DIRECT TESTIMONY OF STEPHEN

More information

WHAT DO YOU KNOW? HOW TO GET THE BEST INFORMATION OUT OF YOUR SYSTEM AND THE FOLKS THAT RUN IT.

WHAT DO YOU KNOW? HOW TO GET THE BEST INFORMATION OUT OF YOUR SYSTEM AND THE FOLKS THAT RUN IT. WHAT DO YOU KNOW? HOW TO GET THE BEST INFORMATION OUT OF YOUR SYSTEM AND THE FOLKS THAT RUN IT. ABSTRACT Steve Shoaf, City Of Asheville Nicholas Dierkes, Brown and Caldwell Understanding how well our Utilities

More information

REPORT ON FINANCIAL PLAN, COST OF SERVICE AND RATES WATER AND SEWER OPERATING FUND

REPORT ON FINANCIAL PLAN, COST OF SERVICE AND RATES WATER AND SEWER OPERATING FUND REPORT ON FINANCIAL PLAN, COST OF SERVICE AND RATES WATER AND SEWER OPERATING FUND Harford County, Maryland APRIL 2016 Black & Veatch Holding Company 2011. All rights reserved. Harford County Report on

More information

City of Sacramento Annual Continuing Disclosure Report Fiscal Year 2013/14

City of Sacramento Annual Continuing Disclosure Report Fiscal Year 2013/14 City of Sacramento Annual Continuing Disclosure Report Fiscal Year 2013/14 Issue City of Sacramento Water Revenue Bonds, Series 2013 Par $215,195,000 Issued March 28, 2013 CUSIP Numbers 786089FX5 786089GV8

More information

Vista Ridge Water Transmission & Purchase Agreement

Vista Ridge Water Transmission & Purchase Agreement Vista Ridge Water Transmission & Purchase Agreement Doug Evanson Senior Vice President/Chief Financial Officer Rates Advisory Committee Concentric Sources of Supply Canyon Lake Trinity Aquifer CRWA Lake

More information

Sanitary Sewer Master Plan

Sanitary Sewer Master Plan , Illinois Sanitary Sewer Master Plan EXECUTIVE SUMMARY Prepared by September 9, 2010 1670 South Taylorville Road Decatur, Illinois 62521 www.bgmengineering.com Sanitary Sewer Master Plan A. SCOPE OF STUDY

More information

1 What, Why and How? Best Management Practice: BMP D: Create a Long- Term Financial Plan. Meaning of Terms

1 What, Why and How? Best Management Practice: BMP D: Create a Long- Term Financial Plan. Meaning of Terms Best Management Practice: BMP D: Create a Long- Term Financial Plan 1 What, Why and How? What is a long- term financial plan? A long- term financial plan estimates what your revenues and expenses will

More information

State Debt and Lease-Purchase Financing February 9 & 10, 2016 Appropriations Committee Hearings JLBC

State Debt and Lease-Purchase Financing February 9 & 10, 2016 Appropriations Committee Hearings JLBC State Debt and Lease-Purchase Financing February 9 & 10, 2016 Appropriations Committee Hearings Statute Requires to Annually Report on State Debt and Other Obligations Outstanding principal on State debt,

More information

7.2.0 Appropriate Level of Fund Balance

7.2.0 Appropriate Level of Fund Balance NUMBER PRACTICES AGENDA DATES 2.9.0 Capitalization of Fixed Assets 11/14/2007 2.11.0 Investment Management 11/14/2007 2.13.0 Capital Expenditure 11/14/2007 2.14.0 Debt Service Payment Settlement 11/14/2007

More information

Water Utility Financial Plan and Rates Study

Water Utility Financial Plan and Rates Study FINAL March 2015 Prepared for City of Fresno, California Water Utility Financial Plan and Rates Study Submitted by F I N A L Water Utility Financial Plan and Rates Study Prepared for City of Fresno, California

More information

WSSC Ad-Hoc Committee on Large Diameter Water Mains. November 22, 2013

WSSC Ad-Hoc Committee on Large Diameter Water Mains. November 22, 2013 WSSC Ad-Hoc Committee on Large Diameter Water Mains November 22, 2013 Purpose: To Gain an Understanding of WSSC s Current Approach to Prioritizing PCCP Inspections and Repairs 2 PCCP Inspection Prioritization

More information

Water Utility Strategic Planning From Concept to Implementation

Water Utility Strategic Planning From Concept to Implementation Water Utility Strategic Planning From Concept to Implementation May 7, 2009 HDR Engineering, Inc. Presentation Overview Why Bother? Topics Administration, Customer Service, and Intradepartmental Master

More information

2015 ANNUAL OPERATING AND FINANCIAL PLAN

2015 ANNUAL OPERATING AND FINANCIAL PLAN 2015 ANNUAL OPERATING AND FINANCIAL PLAN TABLE OF CONTENTS 2015 ANNUAL OPERATING AND FINANCIAL PLAN Executive Summary... 3 Summary... 7 Revenue and Expenditure Overview... 15 2015 Enterprise Financial

More information

Financial Plan 10 C H A P T E R 3 INTRODUCTION PAST FINANCIAL PERFORMANCE COMPARATIVE FINANCIAL STATEMENTS

Financial Plan 10 C H A P T E R 3 INTRODUCTION PAST FINANCIAL PERFORMANCE COMPARATIVE FINANCIAL STATEMENTS Financial Plan 10 C H A P T E R 3 INTRODUCTION This chapter was prepared by FCS GROUP to provide a financial program that allows the water utility to remain financially viable during the planning period.

More information

City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP

City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP PROJECT ESTIMATED COST ESTIMATED COUNCIL IDENTIFIED FUNDING SOURCES STRATEGIC COMPLETION INITIATIVES FM 2351/Beamer

More information

B.S. in Environmental Engineering, minor in Chemistry, Oregon State University, Corvallis, Oregon, 2001

B.S. in Environmental Engineering, minor in Chemistry, Oregon State University, Corvallis, Oregon, 2001 Gregory M. Hall, PE, QSD/QSP Project Engineer Oscar Larson & Associates REGISTRATION: EDUCATION: Civil Engineer #73260, California B.S. in Environmental Engineering, minor in Chemistry, Oregon State University,

More information

a. Water and Wastewater Financial Business Plan and Water & Sewer Rate Recommendations Summary Presentation.

a. Water and Wastewater Financial Business Plan and Water & Sewer Rate Recommendations Summary Presentation. WORK SESSION April 22, 2014 City Commission Room, 700 N. Jefferson, Junction City KS 66441 1. 7:00 P.M. - CALL TO ORDER 2. SPECIAL PRESENTATIONS: Mayor Michael Ryan Vice Mayor Mick McCallister Commissioner

More information

Moulton Niguel Water District Long Range Financial Plan Report

Moulton Niguel Water District Long Range Financial Plan Report Moulton Niguel Water District Long Range Financial Plan Report 2014 Long Range Financial Plan Report Table of Contents Executive Summary... 2 1 Introduction... 3 2 District Strategic Goals & Policies...

More information

Task F: Financial Plan

Task F: Financial Plan Task F: Financial Plan Comprehensive Water Master Plan DWSD Contract No. CS-1278 Final Report For Submittal to Detroit Water and Sewerage Department June 2004 IN ASSOCIATION WITH CDM Task F: Financial

More information

Finance: Capital Planning and Budgeting for Small Water Systems

Finance: Capital Planning and Budgeting for Small Water Systems Finance: Capital Planning and Budgeting for Small Water Systems Shadi Eskaf eskaf@sog.unc.edu 919-962-2785 Environmental Finance Center at UNC School of Government Water System Management and Operations

More information

Drinking Water Quality Management System Financial Plan Number 047-101 O.Reg. 453/07

Drinking Water Quality Management System Financial Plan Number 047-101 O.Reg. 453/07 Drinking Water Quality Management System Financial Plan Number 047-101 O.Reg. 453/07 TABLE OF CONTENTS TABLE OF Contents... 2 1. INTRODUCTION... 4 1.1 MUNICIPAL DRINKING WATER LICENSING PROGRAM... 4 1.2

More information

Financial Assessments (FA)

Financial Assessments (FA) Financial Assessments (FA) For water systems (wastewater) Populations of less than 10,000 Any recommendations are voluntary No charge for assessment FA Process DEQ reviews financial and legal documents

More information

360 CMR: MASSACHUSETTS WATER RESOURCES AUTHORITY 360 CMR 12.00: LEAK DETECTION REGULATIONS

360 CMR: MASSACHUSETTS WATER RESOURCES AUTHORITY 360 CMR 12.00: LEAK DETECTION REGULATIONS 360 CMR 12.00: LEAK DETECTION REGULATIONS Section 12.01: Preamble 12.02: Effective Date 12.03: Definitions 12.04: Applicability of Leak Detection and Repair Program 12.05: Minimum Frequency 12.06: Methods

More information

COLONIAS INFRASTRUCTURE BOARD COLONIAS INFRASTRUCTURE PROJECT FUND PROJECT SELECTION AND MANAGEMENT POLICIES

COLONIAS INFRASTRUCTURE BOARD COLONIAS INFRASTRUCTURE PROJECT FUND PROJECT SELECTION AND MANAGEMENT POLICIES COLONIAS INFRASTRUCTURE BOARD COLONIAS INFRASTRUCTURE PROJECT FUND PROJECT SELECTION AND MANAGEMENT POLICIES I. PURPOSE The purpose of the Colonias Infrastructure Board is to help address inadequate infrastructure

More information

Many directors of public enterprises

Many directors of public enterprises Management & Careers The Finance Director s Role in Helping Public Enterprises Look their Best By Bryan A. Mantz Finance directors of public enterprises face special challenges; developing expertise in

More information

Financial Plan. Section 10. 10.1 Introduction. 10.2 Past Financial Performance. 10.2.1 Comparative Financial Statement

Financial Plan. Section 10. 10.1 Introduction. 10.2 Past Financial Performance. 10.2.1 Comparative Financial Statement Financial Plan 10.1 Introduction This chapter has been prepared by FCS Group to provide a financial program that identifies for the City of Yelm (City) the revenue required for the sewer utility to remain

More information

Proposed Annual Operating Budget Fiscal Year 2016. July 13, 2015

Proposed Annual Operating Budget Fiscal Year 2016. July 13, 2015 Proposed Annual Operating Budget Fiscal Year 2016 July 13, 2015 Budget Overview Ed Bielarski, General Manager Budget Highlights Agenda David Richardson, Interim Chief Financial Officer Proposed Budget

More information

Funding the Vision: Investing in Safe, Reliable Service

Funding the Vision: Investing in Safe, Reliable Service Funding the Vision: Investing in Safe, Reliable Service KUB Financial Plan Executive Summary Fiscal Year 2015 Table of Contents Funding The Vision: Investing in Safe, Reliable Service 1 KUB Proposed Fiscal

More information

Austin Water Utility Joint Committee on AWU s Financial Plan

Austin Water Utility Joint Committee on AWU s Financial Plan Austin Water Utility Joint Committee on AWU s Financial Plan May 7, 2014 1 New Forecast Options Requested by Large Volume Representative Dan Wilcox 4/23/2014 2 Forecast Option #9 Assumptions Spread the

More information

Financial and Business Metrics Report as of August 31, 2015

Financial and Business Metrics Report as of August 31, 2015 Financial and Business Metrics Report as of August 31, 2015 Sammamish Plateau Water and Sewer District will provide safe, efficient, and reliable AS OF water MARCH and sewer 31, 2007 services by being

More information

Conservatively, we estimate that the workout facility at City Hall is used 150 times per month. (Schatz)

Conservatively, we estimate that the workout facility at City Hall is used 150 times per month. (Schatz) Agenda Questions/Answers 11/05/2014 City Council Meeting I.1. Approve the 10/16/2014 Cash Disbursements of $12,046,416.35. Chirico: Item I-1 page 22 North East multi regional Please explain the purpose

More information

Division of Water Resource Management Report: A-1112DEP-058

Division of Water Resource Management Report: A-1112DEP-058 Review of Revenues and Expenditures for the City of Apalachicola Clean Water State Revolving Fund Debt Purchase Agreement Division of Water Resource Management Report: A-1112DEP-058 Office of Inspector

More information

BOROUGH OF AMBLER. COMMITTEE MEETING June 2, 2015. ***Mr. Pasceri, Council President Will discuss the Council Ward 2 vacancy and resume process.

BOROUGH OF AMBLER. COMMITTEE MEETING June 2, 2015. ***Mr. Pasceri, Council President Will discuss the Council Ward 2 vacancy and resume process. BOROUGH OF AMBLER COMMITTEE MEETING June 2, 2015 ***Mr. Pasceri, Council President Will discuss the Council Ward 2 vacancy and resume process. PUBLIC SAFETY PARKS & RECREATION PUBLIC UTILITIES FINANCE

More information

The Town of Fort Frances

The Town of Fort Frances The Town of Fort Frances Long-Term Capital Financial Plan POLICY Resolution Number: 391 (Consent) 12/09 SECTION ADMINISTRATION AND FINANCE NEW: December 2009 REVISED: Supercedes Resolution No. Policy Number:

More information

Effective Operations Performance Management

Effective Operations Performance Management Passion for Improving Performance Effective Operations Performance Management Presented by: Doug Spiers P.E., Esq. Vice President 11/17/10 Strategic Framework for Success Total Quality Management or TQM

More information

WATER DIVISION OF THE CITY OF ST. LOUIS, MISSOURI (An Enterprise Fund of the City of St. Louis, Missouri)

WATER DIVISION OF THE CITY OF ST. LOUIS, MISSOURI (An Enterprise Fund of the City of St. Louis, Missouri) Basic Financial Statements and Supplementary Information (With Independent Auditors Report Thereon) Table of Contents Page Independent Auditors Report 1 Management s Discussion and Analysis Unaudited 3

More information

Build America. Water Revenue Debt Total Year

Build America. Water Revenue Debt Total Year DEBT SERVICE The city has four types of debt currently outstanding. Two general obligation bonds secured by the city s authority to levy property taxes; A Build America Bond (BAB) for transportation projects

More information

Utility Financial Management Plan

Utility Financial Management Plan Utility Financial Management Plan Presented by: Bill Meyer, Interim Utilities Director & Michael Burton, President Andrew Burnham, Senior Vice President Compliance with Council Priorities Ecological Stewardship

More information

TOWN OF EUREKA LINCOLN COUNTY, MONTANA. Fiscal Year Ended June 30, 2014 AUDIT REPORT. Denning, Downey & Associates, P.C. CERTIFIED PUBLIC ACCOUNTANTS

TOWN OF EUREKA LINCOLN COUNTY, MONTANA. Fiscal Year Ended June 30, 2014 AUDIT REPORT. Denning, Downey & Associates, P.C. CERTIFIED PUBLIC ACCOUNTANTS Fiscal Year Ended June 30, 2014 AUDIT REPORT Denning, Downey & Associates, P.C. CERTIFIED PUBLIC ACCOUNTANTS Fiscal Year Ended June 30, 2014 TABLE OF CONTENTS Organization 1 Management Discussion and Analysis

More information

Agenda Cover Memorandum

Agenda Cover Memorandum Agenda Cover Memorandum Meeting Date: June 11, 2012 Item Title: Action Requested: Approval For discussion Feedback requested For your information Staff Contact: Allison Stutts Phone Number: 847-318-5216

More information

BOARD OF COUNTY COMMISSIONERS OKALOOSA COUNTY, FLORIDA DEPARTMENT/PROGRAM: WATER & SEWER ENTERPRISE FUND/WATER OPERATIONS

BOARD OF COUNTY COMMISSIONERS OKALOOSA COUNTY, FLORIDA DEPARTMENT/PROGRAM: WATER & SEWER ENTERPRISE FUND/WATER OPERATIONS WATER AND SEWER BOARD OF COUNTY COMMISSIONERS OKALOOSA COUNTY, FLORIDA SERVICE AREA: PHYSICAL ENVIRONMENT DEPARTMENT/PROGRAM: WATER & SEWER ENTERPRISE FUND/WATER OPERATIONS PROGRAM DESCRIPTION: This program

More information

City of Dallas Budgeting for Outcomes:

City of Dallas Budgeting for Outcomes: City of Dallas Budgeting for Outcomes: FY 2006-07 07 Annual Budget Recommended by Mary K. Suhm, City Manager Presented to the Dallas City Council August 14, 2006 Overview: Review Status of Budgeting For

More information

September 23, 2004. CGI Insurance Business Services Atlantic Division

September 23, 2004. CGI Insurance Business Services Atlantic Division September 23, 2004 CGI Insurance Business Services Atlantic Division CGI Atlantic Division Former IAO Purchased by CGI January 2003 Engineering, Inspection, and Database Services Administers Fire Underwriters

More information

Kansas City s Overflow Control Program

Kansas City s Overflow Control Program Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater

More information

TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion

TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion Project Overview Sanitary Sewer System 2 Town of Surfside Project Overview Potable Water System 3 Town of Surfside Project Overview Storm Water

More information

March 14, 2014. RE: Regional Wastewater Reclamation Department Fiscal Year 2014 Financial Plan

March 14, 2014. RE: Regional Wastewater Reclamation Department Fiscal Year 2014 Financial Plan REGIONAL WASTEWATER RECLAMATION ADVISORY COMMITTEE 201 NORTH STONE AVENUE TUCSON, ARIZONA 857011207 March 14, 2014 The Honorable Chair and Members Pima County Board of Supervisors 130 West Congress Street,

More information

The Borough Council hereby ordains:

The Borough Council hereby ordains: AN ORDINANCE OF THE BOROUGH DEFINING AND ESTABLISHING RATES AND REGULATIONS FOR WATER AND SEWER SERVICE TO PROPERTIES AND ESTABLISHMENTS THEREIN; REQUIRING AND REGULATING CONNECTIONS TO THE WATER AND SEWER

More information

Regulations for Determination of Pipeline Tariff for Natural Gas Pipelines

Regulations for Determination of Pipeline Tariff for Natural Gas Pipelines Draft Regulations for Determination of Pipeline Tariff for Natural Gas Pipelines Petroleum & Natural Gas Regulatory Board, New Delhi November 29, 2007 Reader may please note that this document is the property

More information

BUDGET GLOSSARY. Alluvial Aquifer or Alluvium. The shallow aquifer underlying the Santa Clara River which runs through the Santa Clarita Valley.

BUDGET GLOSSARY. Alluvial Aquifer or Alluvium. The shallow aquifer underlying the Santa Clara River which runs through the Santa Clarita Valley. BUDGET GLOSSARY Accounts Receivable. SCWD extends credit to customers in the normal course of operations. Management deems at least 99% of all accounts receivable as collectible at fiscal year end. Accrual

More information

WERF STRATEGIC ASSET MANAGEMENT CASE STUDY

WERF STRATEGIC ASSET MANAGEMENT CASE STUDY WERF STRATEGIC ASSET MANAGEMENT CASE STUDY Seattle Public Utilities Takes Aim at Critical Assets Using Risk- Based Decision Making and Strategic Asset Management Plans What does asset failure mean to your

More information

Design Criteria & Service Goals

Design Criteria & Service Goals 4.1 Design Life of Improvements The design life of a water system component is sometimes referred to as its useful life or service life. The selection of a design life is a matter of judgment based on

More information

April 2014 FC 154/5. Hundred and Fifty-fourth Session. Rome, 26-30 May 2014

April 2014 FC 154/5. Hundred and Fifty-fourth Session. Rome, 26-30 May 2014 April 2014 FC 154/5 E FINANCE COMMITTEE Hundred and Fifty-fourth Session Rome, 26-30 May 2014 Review of the levels of the Working Capital Fund and the Special Reserve Account Queries on the substantive

More information

Project Scoping Document. Sherman Terrace Condominium Association Proposed Water Main Replacement Project

Project Scoping Document. Sherman Terrace Condominium Association Proposed Water Main Replacement Project PROJECT SCOPING Project Manager: Project Information: Dennis Cawley, PE Sherman Terrace Condo Assoc. WM Rehab DOCUMENT Draft: 01/27/09 Department: Section: Revised: Madison Water Utility Engineering Approved:

More information

City of Mt. Angel. Comprehensive Financial Management Policies

City of Mt. Angel. Comprehensive Financial Management Policies City of Mt. Angel Comprehensive Financial Management Policies May 2014 Table of Contents Section Description Page I. Purpose... 3 II. Objectives... 3 III. Management of Fiscal Policy... 4 IV. Accounting,

More information

Bridges of America - The Orlando Bridge, Inc. Orlando, Florida Financial Statements and Supplemental Information Year Ended June 30, 2011

Bridges of America - The Orlando Bridge, Inc. Orlando, Florida Financial Statements and Supplemental Information Year Ended June 30, 2011 Bridges of America - The Orlando Bridge, Inc. Orlando, Florida Financial Statements and Supplemental Information Year Ended June 30, 2011 Table of Contents Page Independent Auditor s Report 1 Financial

More information

Bridges of America - The Turning Point Bridge, Inc. Orlando, Florida

Bridges of America - The Turning Point Bridge, Inc. Orlando, Florida Bridges of America - The Turning Point Bridge, Inc. Orlando, Florida Financial Statements and Supplementary Information Year Ended June 30, 2014 Table of Contents Page Independent Auditor s Report 1 Financial

More information

Water and Wastewater Challenges for San Antonio 2013

Water and Wastewater Challenges for San Antonio 2013 Water and Wastewater Challenges for San Antonio 2013 Kelley Neumann, P. E. Senior Vice President / Strategic Resources September 11, 2013 San Antonio Women s Chamber of Commerce Water Operations Growth

More information

June 23, 2014 BY CERTIFIED MAIL. Dr. Wilma Mishoe, Interim President Wilberforce University 1055 North Bickett Road Wilberforce, OH 45384-1001

June 23, 2014 BY CERTIFIED MAIL. Dr. Wilma Mishoe, Interim President Wilberforce University 1055 North Bickett Road Wilberforce, OH 45384-1001 June 23, 2014 BY CERTIFIED MAIL Dr. Wilma Mishoe, Interim President Wilberforce University 1055 North Bickett Road Wilberforce, OH 45384-1001 Dear President Mishoe: This letter is formal notification of

More information

Municipality of Strathroy-Caradoc

Municipality of Strathroy-Caradoc Municipality of Strathroy-Caradoc Drinking Water Quality Management Standard OPERATIONAL PLAN Version 3 November 15, 2013 DRINKING WATER QUALITY MANAGEMENT STANDARD OPERATIONAL PLAN Table Of Contents PART

More information

REVIEW OF YEAR-END CLOSING PROCEDURES

REVIEW OF YEAR-END CLOSING PROCEDURES REVIEW OF YEAR-END CLOSING PROCEDURES 2014 Municipal Clerk s Institute Presented by; Magda Nelson, Lead Fiscal Accounting Officer LOCAL GOVERNMENT SERVICES BUREAU Procedures We Will Review Perform closing

More information

Bridges of America - The Jacksonville Bridge, Inc. Orlando, Florida

Bridges of America - The Jacksonville Bridge, Inc. Orlando, Florida Bridges of America - The Jacksonville Bridge, Inc. Orlando, Florida Financial Statements and Supplemental Information Year Ended June 30, 2010 Contents Page Independent Auditor s Report 1 Financial Statements

More information

STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS. SECTION DESCRIPTION Page

STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS. SECTION DESCRIPTION Page STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS SECTION DESCRIPTION Page 1 Executive Summary / Brief History 2 2 Services Provided / Administration

More information

CALIFORNIA HEALTH FACILITIES FINANCING AUTHORITY THE HELP II PROGRAM EXECUTIVE SUMMARY

CALIFORNIA HEALTH FACILITIES FINANCING AUTHORITY THE HELP II PROGRAM EXECUTIVE SUMMARY CALIFORNIA HEALTH FACILITIES FINANCING AUTHORITY THE HELP II PROGRAM EXECUTIVE SUMMARY Applicant: Bloss Memorial Healthcare District Amount Requested: $427,500 ( BMHCD ) Requested Loan Term: 5 years 3605

More information

2015 Calendar Year. Residential Accounts. Residential Accounts. Department of Water Resources (DWR) Rates & Fees

2015 Calendar Year. Residential Accounts. Residential Accounts. Department of Water Resources (DWR) Rates & Fees Rates & Fees Residential Accounts Residential Accounts 2015 Calendar Year Initial Charges New Construction or Irrigation 3 Base Meter 2 Account Activation Fee System Development Charge 1 Size Meter Fee

More information

STATE OF INDIANA. November 14, 2011. Board of Directors Foster Parent Services, Inc. 3798 W. Co. Road 500 S. Vallonia, IN 47281

STATE OF INDIANA. November 14, 2011. Board of Directors Foster Parent Services, Inc. 3798 W. Co. Road 500 S. Vallonia, IN 47281 ` STATE OF INDIANA AN EQUAL OPPORTUNITY EMPLOYER STATE BOARD OF ACCOUNTS 302 WEST WASHINGTON STREET ROOM E418 INDIANAPOLIS, INDIANA 46204-2769 Telephone: (317) 232-2513 Fax: (317) 232-4711 Web Site: www.in.gov/sboa

More information

STAFF REPORT. DATE: May 11, 2010. City Council. Robert A. Clarke, Interim Public Works Director Sue Gedestad, Assistant Public Works Director

STAFF REPORT. DATE: May 11, 2010. City Council. Robert A. Clarke, Interim Public Works Director Sue Gedestad, Assistant Public Works Director STAFF REPORT DATE: May 11, 2010 TO: FROM: City Council Robert A. Clarke, Interim Public Works Director Sue Gedestad, Assistant Public Works Director SUBJECT: Water and Sanitary Sewer Rate Approval and

More information

THE SANITARY SEWER SYSTEM

THE SANITARY SEWER SYSTEM THE SANITARY SEWER SYSTEM The Water Services Department is responsible for the planning and construction of sewers, pump stations, and treatment facilities serving Kansas City and certain surrounding areas.

More information

Economic Criteria for Justification of Capex for Growth of APA Gas Networks

Economic Criteria for Justification of Capex for Growth of APA Gas Networks APA GAS DISTRIBUTION TECHNICAL POLICY Economic Criteria for Justification of Capex for Growth of APA Gas Networks Policy Owner: Manager Commercial Gas Networks Policy review period- annually JULY 2010

More information

Financial Planning: A Guide for Water and Wastewater Systems

Financial Planning: A Guide for Water and Wastewater Systems Financial Planning: A Guide for Water and Wastewater Systems Rural Community Assistance Corporation www.rcac.org Funded by the State of New Mexico Department of Finance and Administration and the New Mexico

More information

City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007

City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007 City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007 1/12/2007 1 Briefing Purpose Provide update on Wastewater Collection Activities

More information

Billy Cobb, Jr. Columbus Water Works October 23, 2015

Billy Cobb, Jr. Columbus Water Works October 23, 2015 Billy Cobb, Jr. Columbus Water Works October 23, 2015 Agenda 1. A Little About CWW 2. Sustainability 3. The Importance of Planning 4. CWW Planning 5. CWW Planning Implementation Columbus Water Works Provides

More information

California Solar Initiative (CSI) Thermal Program Metering Installation Guide

California Solar Initiative (CSI) Thermal Program Metering Installation Guide California Solar Initiative (CSI) Thermal Program Metering Installation Guide Purpose: The purpose of this metering installation guide is to provide participating eligible contractors in the CSI-Thermal

More information

Financial Statements Years Ended September 30, 2012 and 2011. LB&B Associates Inc.

Financial Statements Years Ended September 30, 2012 and 2011. LB&B Associates Inc. Financial Statements Years Ended September 30, 2012 and 2011 LB&B Associates Inc. LB&B Associates Inc. Contents Page Report of Independent Auditors 1 Financial Statements Balance Sheets 2 Statements of

More information

THE INSURANCE POLICY: SIMPLIFIED!

THE INSURANCE POLICY: SIMPLIFIED! THE INSURANCE POLICY: SIMPLIFIED! INSURANCE CONTRACT: COMMERCIAL PROPERTY AND BUSINESS INCOME The insurance policy is a contract and as such, is governed by its conditions, provisions, and exclusions.

More information

ARTICLE IV. PRIVATE WASTE COLLECTORS/CONTRACTORS

ARTICLE IV. PRIVATE WASTE COLLECTORS/CONTRACTORS CHAPTER 90 SOLID WASTE ARTICLE IV. PRIVATE WASTE COLLECTORS/CONTRACTORS DIVISION 3. FRANCHISE Sec. 90-221. Required; fees. For a period of one year after the signing of a franchise agreement with the city,

More information

SANTA MONICA COMMUNITY COLLEGE DISTRICT 2015-2016 PROPOSED ADOPTED BUDGET NARRATIVE

SANTA MONICA COMMUNITY COLLEGE DISTRICT 2015-2016 PROPOSED ADOPTED BUDGET NARRATIVE SANTA MONICA COMMUNITY COLLEGE DISTRICT 2015-2016 PROPOSED ADOPTED BUDGET NARRATIVE The Santa Monica Community College District Proposed Adopted Budget for fiscal year 2015-2016 is comprised of the following

More information

Sullivan County Jail: Cost Analysis of Boarding Out vs. Building New

Sullivan County Jail: Cost Analysis of Boarding Out vs. Building New Sullivan County Jail: Cost Analysis of Boarding Out vs. Building New Two options are available to address the issue of the Jail: Boarding out prisoners to neighboring County Jails OR Construction of a

More information

BASE PERMIT FEE x.80 = PLAN CHECK FEE*: $ BASE PERMIT FEE x.10 = MECHANICAL INSPECTION FEE: $ BASE PERMIT FEE x.12 = ENERGY CODE REVIEW FEE: $

BASE PERMIT FEE x.80 = PLAN CHECK FEE*: $ BASE PERMIT FEE x.10 = MECHANICAL INSPECTION FEE: $ BASE PERMIT FEE x.12 = ENERGY CODE REVIEW FEE: $ Development Services Department A. Building Permit Fees For New Construction, Tenant Improvements and Residential Remodels For Production Homes See Page 2 TOTAL VALUATION (Materials and Labor) FEE $1 to

More information

Part 1 Revenue Requirements and Cost of Service

Part 1 Revenue Requirements and Cost of Service GFOAT 2014 Spring Institute / April 14, 2014 When in Drought! Utility Rate Making Part 1 Revenue Requirements and Cost of Service Presenters Chris Ekrut, MPA, CAPM Matthew Garrett, MBA, CGFO Copyright

More information

Repaired 24 Mainline Leaks

Repaired 24 Mainline Leaks Agenda 1. Improvements & Repairs within the last year 2. Capital Improvement Project Update 3. Status of Water Supply & the Drought 4. Website Updates 5. Questions? 1 Repaired 24 Mainline Leaks Majority

More information

PUBLIC WORKS TECHNICAL BULLETIN 420-46-2 30 SEPTEMBER 1993 PROCEDURE TO DETECT WATER DISTRIBUTION SYSTEM LEAKS

PUBLIC WORKS TECHNICAL BULLETIN 420-46-2 30 SEPTEMBER 1993 PROCEDURE TO DETECT WATER DISTRIBUTION SYSTEM LEAKS PUBLIC WORKS TECHNICAL BULLETIN 420-46-2 30 SEPTEMBER 1993 PROCEDURE TO DETECT WATER DISTRIBUTION SYSTEM LEAKS Public Works Technical Bulletins are published by the U.S. Army Center for Public Works, Ft.

More information

Sample Business Application - How to Apply For a Colorado Water Project

Sample Business Application - How to Apply For a Colorado Water Project COLORADO WATER RESOURCES AND POWER DEVELOPMENT AUTHORITY WATER REVENUE BONDS PROGRAM LOAN APPLICATION A. Applicant (Governmental Entity) I. GENERAL INFORMATION Name Phone # Address Fax # B. Designated

More information

Bridges of America - The Orlando Bridge, Inc. Orlando, Florida

Bridges of America - The Orlando Bridge, Inc. Orlando, Florida Bridges of America - The Orlando Bridge, Inc. Orlando, Florida Financial Statements and Supplemental Information Year Ended June 30, 2010 Contents Page Independent Auditor s Report 1 Financial Statements

More information

City of Sacramento, California Department of Utilities. March 2011

City of Sacramento, California Department of Utilities. March 2011 Department of Utilities Utility Rate Study March 2011 March, 2011 page i TABLE OF CONTENTS EXECUTIVE SUMMARY... 3 SECTION I: INTRODUCTION... 13 SECTION II: FINANCIAL POLICIES... 15 A. Defining Revenue

More information

Multi Year Budget Plan Development

Multi Year Budget Plan Development Finance & Administration Committee Information Item III-B October 13, 2011 Multi Year Budget Plan Development Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

2007 Operating Budget 2007-2016 Capital Budget 2007 Proposed Water and Wastewater Service Rate

2007 Operating Budget 2007-2016 Capital Budget 2007 Proposed Water and Wastewater Service Rate 2007 Operating Budget 2007-2016 Capital Budget 2007 Proposed Water and Wastewater Service Rate Toronto City Council February 1 5, 2007 Multi-Year Toronto Water Business Plan was approved by Council February

More information

Why Do Balance Sheets Matter? Rodney Christopher

Why Do Balance Sheets Matter? Rodney Christopher Grantmakers in the Arts GIAreader Ideas and Information on Arts and Culture Vol. 22 No. 1, Spring 2011 Why Do Balance Sheets Matter? Rodney Christopher Reprinted from the Grantmakers in the Arts Reader,

More information

Budget Fiscal Year 2010-2011

Budget Fiscal Year 2010-2011 Budget Fiscal Year 2010-2011 To protect, provide, & preserve Table of Contents Executive Summary...1 Consolidated Budget Combined Statement of Receipts and Expenditures...7 Water Enterprise Statement of

More information

Spectra Energy Reports Third Quarter 2007 Results

Spectra Energy Reports Third Quarter 2007 Results Media: Molly Boyd (713) 627-5923 (713) 627-4747 (24-hour media line) Analysts: John Arensdorf (713) 627-4600 Date: November 6, 2007 Spectra Energy Reports Third Quarter 2007 Results Third quarter ongoing

More information

ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING

ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING 1.0 General 1.1 The work covered by this section consists of providing all labor, equipment, material and supplies, insurance, accessories, tools, transportation,

More information

DEBT MANAGEMENT POLICY

DEBT MANAGEMENT POLICY DEBT MANAGEMENT POLICY This policy sets forth the principles that will govern the use of debt to finance University capital projects and assigns responsibilities for the management of University debt.

More information

WHITE CLOUD AREA FIRE DEPARTMENT JOINT BUILDING AUTHORITY NEWAYGO COUNTY, MICHIGAN ANNUAL FINANCIAL REPORT YEAR ENDED DECEMBER 31, 2013

WHITE CLOUD AREA FIRE DEPARTMENT JOINT BUILDING AUTHORITY NEWAYGO COUNTY, MICHIGAN ANNUAL FINANCIAL REPORT YEAR ENDED DECEMBER 31, 2013 WHITE CLOUD AREA FIRE DEPARTMENT JOINT BUILDING AUTHORITY NEWAYGO COUNTY, MICHIGAN ANNUAL FINANCIAL REPORT YEAR ENDED DECEMBER 31, 2013 TABLE OF CONTENTS INDEPENDENT AUDITOR'S REPORT 1 MANAGEMENT S DISCUSSION

More information

Overview of Program Management Services and Proposed CIP FY2012-17

Overview of Program Management Services and Proposed CIP FY2012-17 Finance & Administration Committee Item III-A January 13, 2010 Overview of Program Management Services and Proposed CIP FY2012-17 Page 3 of 64 Washington Metropolitan Area Transit Authority Board Action/Information

More information

The Five Claims Milestones

The Five Claims Milestones The Five Claims Milestones Every claim filed by one of our customers moves through what we call the five claims milestones. Some move quickly, with only a brief stopover at each step; others may take days

More information

REPORT FOR CONSIDERATION

REPORT FOR CONSIDERATION Main Office: 155 George Street, Prince George, BC V2L 1P8 Telephone: (250) 960-4400 / Fax: (250) 563-7520 Toll Free: 1-800-667-1959 / http://www.rdffg.bc.ca REPORT FOR CONSIDERATION TO: Chairman and Directors

More information

Disclosure of Customer Rights and Company Policies

Disclosure of Customer Rights and Company Policies May 8, 2013 Disclosure of Customer Rights and Company Policies Qualifications The Company operates in the State of New Jersey (depending upon geographic area) under the name AmeriGas Propane ( AmeriGas

More information

Chemical Feed System Operation and Design Considerations

Chemical Feed System Operation and Design Considerations PNWS AWWA MAY 7, 2014 EUGENE, OREGON Chemical Feed System Operation and Design Considerations Kevin Batridge Lake Oswego Tigard Water Partnership Austin Peters MWH Global Chemical Delivery and Storage

More information

Five Year Financial Plan

Five Year Financial Plan The Five Year Financial Plan is a forecast of revenues and expenditures that begins with the adopted annual budget for the upcoming fiscal year (FY16) and continues for four additional years (through FY20).

More information

SANITARY SEWER MASTER PLAN

SANITARY SEWER MASTER PLAN SANITARY SEWER MASTER PLAN PREPARED FOR: VILLAGE OF GALENA, OHIO PREPARED BY: POGGEMEYER DESIGN GROUP, INC. 1168 NORTH MAIN STREET BOWLING GREEN, OHIO 43402 JOB NO. 3550-030 MARCH, 2006 TABLE OF CONTENTS

More information