From Legacy to Agile BBV System-Event, Bern Christof Zogg, Director Developer & Platform Group
|
|
- Francis Montgomery
- 8 years ago
- Views:
Transcription
1 From Legacy to Agile BBV System-Event, Bern Christof Zogg, Director Developer & Platform Group
2 Agenda Agile 15 Cloud Agility 20 Agile Tooling 5 Agenda
3 Chapter 1/3 Agile
4 Microsoft Product Release Cycles «Office 16»
5 Global Distributed Software Development The Visual Studio Team
6 Developer Division size (according to TFS) 3,659 Active users last 7 days 681,004 Total checkins 426,443 Work items 16,855,771 Source code files 15 Terabytes of data Stats from DevDiv TFS Server one divisional server instance out of 42 throughout the company
7 Product Cycle Pre 2005
8 Debt Crisis VS 2005 Bug 1 Deferral a common technique (see top line) Teams carry undone work (both functional and ility) Endgame hard to predict
9 The First Wave of Learning: VS 2008 First wave: address technical debt Second wave: amplify flow of value Third wave: reduce cycle time
10 Focus of Milestone for Quality Get Clean Understand our Debt Test Automation Product Code Bugs Test Case Bugs Test Infrastructure Bugs Put our Debt on the Table Cost our Debt Eliminate the Debt Stay Clean Measure our Quality Quickly & Consistently Anytime, Anywhere Quality earlier in the cycle Make life easier
11 2005 Debt vs Debt VS 2005 Beta 1 Product Bugs only VS 2008 Beta 1 ALL bug debt
12 Product Cycle Post 2005
13 The Second Wave of Learning: VS 2010 First wave: address technical debt Second wave: amplify flow of value Third wave: reduce cycle time
14 End-to-End Scenarios
15 Customer Value
16 The Third Wave of Learning: VS 2012 First wave: address technical debt Second wave: amplify flow of value Third wave: reduce cycle time
17 Real Users Matter!
18 Drastically improved cycle time Apr 04 M3 Jul 04 Beta 1 Dec 04 Beta2 Apr 05 Final Beta Jul 05 RC Oct 05 ENU Feb 06 RTM Jan 07 M3 Apr 07 Beta1 Jun 07 Final Beta Oct 07 Nov 07 RC ENU Jan 08 RTM Jan 09 M3 May 09 Beta 1 Oct 09 Final Beta Jan 10 RC Mar 10 ENU May 10 RTM 3 week sprints! Dec 10Jan Feb 11 11Apr 11 May Jun 11Jul 11Jul Jul Aug Sep 11 11Oct 11 Dec 11 Jan Jan 12Feb 12 Mar 12 Apr May 12Jun 12 Jul Aug 12 Sep 12 Sep 12Oct 12Nov 12Nov 12Dec 12Jan 13 P1 P2 P3 P4 P5 P6 P7P8P9 M3P10 P11 P12 P13P14 Beta P15 P16RCP17P18 RTMP18P18P18P18 VSU1 P18 P18 Dec 12 P18 Sep 11 P10 Dec 11 P10 Mar Apr 12 May 12 Jun 12 Jun 12Jul 12Aug 12Aug Sep 12 Oct 12 Nov 12 Nov 12 Dec 12Jan Jan P10 P10 P10 P10 P10 P10 P10 P10 P10 P10 P10 P10 P10 P10 P10
19 Chapter 2/3 Cloud Agiligy
20 TCO/Server Cloud Benefits for Managers Larger datacenters have almost 50% lower TCO per server Main Data Center Cost Buckets Server hardware costs (~45%) Facility & operations (~25%) Hardware labor costs (~15%) Power costs (~15%) Annual TCO/Server declines w/scale $5'000 $4'000 $3'000 $2'000 $1'000 $0 1k Server DC 100k Server DC Server Hardware Facility Hardware Operations Power
21 Cloud Benefits for Developers Development Software Evaluation Time to Market Testing Load Test Integration Test Deployment Instant Switching from Staging to Live Server Operations Unlimited scaling Pay per use
22 Data Center Top 10 # Name Location Company Size [m 2 ] #Football fields 1 Lakeside Technology Center Chicago Digital Realty 102' Metro Technology Center Atlanta Quality Technology 92' The NAP of the Americas Miami Terremark 69' NGD Europe Newport, Wales Next Generation Data 69' Microsoft Data Center Chicago 65' Microsoft Data Center Dublin 51' Phoenix ONE Phoenix i/o Data Centers 50' DuPONT FABROS CH1 Chicago DuPont Fabros 45' Microsoft Data Center San Antonio 43' Microsoft Data Center Quincy, Washington 43' Source: Data Center Knowledge.com
23 Dublin: the final frontier
24 1. Security
25 2. Reliability
26 3. Cost Efficiency
27 Microsoft Datacenter Evolution Datacenter Colocation Generation 1 San Antonio & Quincy Generation 2 Chicago & Dublin Generation 3 Modular Datacenter Generation Server Capacity ~2 PUE Rack Density and Deployment PUE Container & Pods Scalability and Sustainability PUE ITPAC Faster Time to Market PUE
28 4th Generation Data Center
29 Chapter 3/3 Agile Tooling
30 Requirements Management Project Management Analytics Version Control Customizable Processes Build Automation Test Case Management End-to-End Traceability Lab Management E X T E N S I B L E A P I s
31 Application Lifecycle Management
32 Agile Practices Source: SwissQ 2013
33 Agile Tools Source: SwissQ 2013
34 Project Dashboard
35 Product backlog
36 Product backlog - Kanban board
37 Sprint planning and execution
38 Thank you for your attention! Christof Zogg Director Developer & Platform Group Mobile: +41 (0) Fixnet: +41 (0) Twitter: Microstof Microsoft Schweiz Richtistrasse 3 CH-8304 Wallisellen
39
AT&T Global Network Client for Windows Product Support Matrix January 29, 2015
AT&T Global Network Client for Windows Product Support Matrix January 29, 2015 Product Support Matrix Following is the Product Support Matrix for the AT&T Global Network Client. See the AT&T Global Network
More informationMicrosoft Private Cloud
Microsoft Private Cloud Lorenz Wolf, Solution Specialist Datacenter, Microsoft SoftwareOne @ Au Premier Zürich - 22.03.2011 What is PRIVATE CLOUD Private Public Public Cloud Private Cloud shared resources.
More informationCOMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
More informationCOMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
More informationAnalysis One Code Desc. Transaction Amount. Fiscal Period
Analysis One Code Desc Transaction Amount Fiscal Period 57.63 Oct-12 12.13 Oct-12-38.90 Oct-12-773.00 Oct-12-800.00 Oct-12-187.00 Oct-12-82.00 Oct-12-82.00 Oct-12-110.00 Oct-12-1115.25 Oct-12-71.00 Oct-12-41.00
More informationCase 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138. Exhibit 8
Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138 Exhibit 8 Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 2 of 138 Domain Name: CELLULARVERISON.COM Updated Date: 12-dec-2007
More informationEnhanced Vessel Traffic Management System Booking Slots Available and Vessels Booked per Day From 12-JAN-2016 To 30-JUN-2017
From -JAN- To -JUN- -JAN- VIRP Page Period Period Period -JAN- 8 -JAN- 8 9 -JAN- 8 8 -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -FEB- : days
More informationACTIVE MICROSOFT CERTIFICATIONS:
Last Activity Recorded : May 30, 2014 Microsoft Certification ID : 375009 SUSANNE SCHNEIDER KAISERSTRASSE 53 REUTLINGEN, 72764 DE SUSANNE.SCHNEIDER@KIT-KOM.DE *Charter- Certification that was achieved
More informationACTIVITY BASED MODELING for DATA CENTER ENERGY EFFICIENCY PROJECTS. Paul Blevins Onsite Energy Corporation February 3, 2011
ACTIVITY BASED MODELING for DATA CENTER ENERGY EFFICIENCY PROJECTS Paul Blevins Onsite Energy Corporation February 3, 2011 Why DC s Are Growing: Communications Revolution Plus. Why DC s Are Growing: IT
More informationFY 2015 Schedule at a Glance
Coaching and Mentoring for Excellence Oct 21 23, 2014 $2,950 Residential Coaching and Mentoring for Excellence Apr 7 9, 2015 $2,400 Non-residential Coaching and Mentoring for Excellence May 27 29, 2015
More informationHow To Get A Certificate From Ms.Net For A Server Server
Last Activity Recorded : December 19, 2014 Microsoft Certification ID : 2665612 MARC GROTE Wittorfer Strasse 4 Bardowick, Lower Saxony 21357 DE grotem@it-training-grote.de ACTIVE MICROSOFT CERTIFICATIONS:
More information11:06. Transformation From People serving Structures to Networks serving People. Montag, 08. Dezember 2014
Transformation From People serving Structures to Networks serving People 11:06 Montag, 08. Dezember 2014 With People Wisdom of the crowd Preventive Autonomous Transreality Network Integrated Pretime Harald
More informationPowerSteering Product Roadmap Your Success Is Our Bottom Line
Drive strategy. Accelerate results. cloud-based program & portfolio management software PowerSteering Product Roadmap Your Success Is Our Bottom Line Jay Hoskins Director of Product Management PowerSteering
More informationACTIVE MICROSOFT CERTIFICATIONS:
Last Activity Recorded : August 04, 2011 Microsoft Certification ID : 483228 KENT NORDSTROM Asbergsvagen 27 Soderhamn, 82637 SW kent@xpservices.se ACTIVE MICROSOFT CERTIFICATIONS: Microsoft Certified Solutions
More informationARIS 9 Highlights and Outlook
ARIS 9 Highlights and Outlook Karl Wagner Senior Vice President ARIS R&D 2013 Software AG. All rights reserved. ARIS at a Glance 2M END FIRST BPA Solution 25 SUCCESS LEADER YEARS OF 10,000 CUSTOMERS USERS
More informationGlobal Foundation Services
Global Foundation Services Introduction I work in Global Foundations Services (GFS) Lead R&D for Microsoft s next-generation end-to-end solutions for the cloud infrastructure We take a long term view
More informationAshley Institute of Training Schedule of VET Tuition Fees 2015
Ashley Institute of Training Schedule of VET Fees Year of Study Group ID:DECE15G1 Total Course Fees $ 12,000 29-Aug- 17-Oct- 50 14-Sep- 0.167 blended various $2,000 CHC02 Best practice 24-Oct- 12-Dec-
More informationACTIVE MICROSOFT CERTIFICATIONS:
Last Activity Recorded : August 30, 2012 Microsoft Certification ID : 30999 BERT VAN HOVE BARON EMPAINLAAN 68 MECHELEN, 2800 BE bert@road2result.be ACTIVE MICROSOFT CERTIFICATIONS: Microsoft Certified
More informationCENTERPOINT ENERGY TEXARKANA SERVICE AREA GAS SUPPLY RATE (GSR) JULY 2015. Small Commercial Service (SCS-1) GSR
JULY 2015 Area (RS-1) GSR GSR (LCS-1) Texarkana Incorporated July-15 $0.50690/Ccf $0.45450/Ccf $0.00000/Ccf $2.85090/MMBtu $17.52070/MMBtu Texarkana Unincorporated July-15 $0.56370/Ccf $0.26110/Ccf $1.66900/Ccf
More informationAnatomy of an Enterprise Software Delivery Project
Chapter 2 Anatomy of an Enterprise Software Delivery Project Chapter Summary I present an example of a typical enterprise software delivery project. I examine its key characteristics and analyze specific
More informationCost effective methods of test environment management. Prabhu Meruga Director - Solution Engineering 16 th July SCQAA Irvine, CA
Cost effective methods of test environment management Prabhu Meruga Director - Solution Engineering 16 th July SCQAA Irvine, CA 2013 Agenda Basic complexity Dynamic needs for test environments Traditional
More informationData Center Technologies - A Case Study
Cloud Driver(s) Supply & Demand Side Private vs Public Clouds Consolidation Cloud economics will drive data center evolution Recommended reading THE HORSELESS CARRIAGE SYNDROME Backward Thinking THE HORSELESS
More informationSchools Interoperability Framework (SIF) Project Overview
Schools Interoperability Framework (SIF) Project Overview Agenda Introductions Quick review of past successes and challenges Overview of refined strategy Timeline Questions and answers 2 Review of Past
More informationRoles: Scrum Master & Project Manager
Roles: Scrum Master & Project Manager Scrum Master: Facilitate collaborative meetings Track team performance Remove impediments (Risk, Issue) Validate team alignment to Agile framework and scope Drive
More informationPowerSteering Hosting/Cloud Investments
Do the right work. Do the work right. cloud-based project, portfolio and work management software PowerSteering Hosting/Cloud Investments Sean Nathaniel, VP of Product Development 9/17/2013 How to Participate
More informationFive steps to Cloud Adoption. Laurent De Grauwe Sales Manager Datacenter
Five steps to Cloud Adoption Laurent De Grauwe Sales Manager Datacenter 1 How Microsoft defines cloud Microsoft You One consistent experience Service provider Why Microsoft and the cloud? Cloud services
More informationhttps://mcp.microsoft.com/authenticate/mcpcredentials.aspx
M r ic o o s f t e C t r if ic t a io n D I : 1 0 0 5 8 3 6 Seite 1 von 12 Microsoft Certified Professional Transcript Last Activity Recorded : March 15, 2011 UDO HEUSCHMANN ACTIVE MICROSOFT CERTIFICATIONS:
More informationComputing & Telecommunications Services Monthly Report March 2015
March 215 Monthly Report Computing & Telecommunications Services Monthly Report March 215 CaTS Help Desk (937) 775-4827 1-888-775-4827 25 Library Annex helpdesk@wright.edu www.wright.edu/cats/ Last Modified
More informationJeff Haby, P.E. Director Sewer System Improvements. September 15, 2015. Agenda
SAWS Sanitary Sewer Overflow Reduction Program Jeff Haby, P.E. Director Sewer System Improvements SA Military Engineers Meeting Agenda SAWS Overview Consent Decree CD Compliance Programs Program Transition
More information2015-16 BCOE Payroll Calendar. Monday Tuesday Wednesday Thursday Friday Jun 29 30 Jul 1 2 3. Full Force Calc
July 2015 CM Period 1501075 July 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 August 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
More information13.6 PRODUCT RELEASE AND ROADMAP UPDATE ERIC HARLESS SENIOR PRODUCT MANAGER
13.6 PRODUCT RELEASE AND ROADMAP UPDATE ERIC HARLESS SENIOR PRODUCT MANAGER AGENDA Introduction Release History and Features Overview - Disaster Recovery - Platform Support - Billing Integration - Performance
More informationBased on Chapter 11, Excel 2007 Dashboards & Reports (Alexander) and Create Dynamic Charts in Microsoft Office Excel 2007 and Beyond (Scheck)
Reporting Results: Part 2 Based on Chapter 11, Excel 2007 Dashboards & Reports (Alexander) and Create Dynamic Charts in Microsoft Office Excel 2007 and Beyond (Scheck) Bullet Graph (pp. 200 205, Alexander,
More informationCAFIS REPORT 2015.10
CAFIS REPORT 2015.10 INDEX Message CAFIS Inbound 03-06 07-08 CAFIS Arch 09-10 CAFIS Brain 11-12 CAFIS Global 13-14 What We Do 15-16 About CAFIS 17-18 Services for Member Stores 19-34 Services for Card
More informationAccident & Emergency Department Clinical Quality Indicators
Overview This dashboard presents our performance in the new A&E clinical quality indicators. These 8 indicators will allow you to see the quality of care being delivered by our A&E department, and reflect
More informationAPPROACHABLE ANALYTICS MAKING SENSE OF DATA
APPROACHABLE ANALYTICS MAKING SENSE OF DATA AGENDA SAS DELIVERS PROVEN SOLUTIONS THAT DRIVE INNOVATION AND IMPROVE PERFORMANCE. About SAS SAS Business Analytics Framework Approachable Analytics SAS for
More informationConsumer ID Theft Total Costs
Billions Consumer and Business Identity Theft Statistics Business identity (ID) theft is a growing crime and is a growing concern for state filing offices. Similar to consumer ID theft, after initially
More informationSingle-chip Cloud Computer A many-core research platform from Intel Labs
Single-chip Cloud Computer A many-core research platform from Intel Labs Compute evolving to Tera- Scale Entertainment, Learning Performance TIPS GIPS MIPS KIPS Multimedia Model- Based Apps 3D and Video
More informationEMR UPDATE ON TIME AND ON BUDGET CLINICAL TRANSFORMATION IMPLEMENTATION PLAN
EMR UPDATE ON TIME AND ON BUDGET CLINICAL TRANSFORMATION IMPLEMENTATION PLAN Testing and Build Stability View Only Scanning Interfaces Training Innovative Technology EMR UPDATE COMMUNICATION PLAN Essential
More informationUR Financials Project
UR Financials Project Demo Days February 2015 Agenda UR Financials Project Update January Close Progress Reporting Enhancements Training Update Workday Releases Communications Saving Filters Demonstration
More informationTransform your Datacenter
Transform your Datacenter Enterprise Media Solutions in the Cloud Guadalupe Casuso, Microsoft Marian Figueiras, Microsoft Olga Karpman, Microsoft Jose Luis Kryuff, Deltatre Alexis Castañares, Microsoft
More informationGrowth in the Cognitive Era Global Business Services Bridget van Kralingen
Growth in the Cognitive Era Global Business Services Bridget van Kralingen IBM Investor Briefing 2016 Senior Vice President, Global Business Services Global Business Services $17.2B $2.6B Revenue Mix 30%
More informationCity & County of San Francisco Permit & Project Tracking System
City & County of San Francisco Permit & Project Tracking System PPTS Sneak Preview March 20, 2013 Welcome & Opening Statements AGENDA 1. Opening Statements Department Directors 2. Project Background 3.
More informationLong Term Data Center Facilities Program
Long Term Data Center Facilities Program ISAC Briefing December 2012 Overview: The Long Term Data Center Facilities Program is an initiative of the approved data center strategic plan to consolidate Citizens
More informationSEO Presentation. Asenyo Inc.
SEO Presentation What is Search Engine Optimization? Search Engine Optimization (SEO) : PPC and Organic Results Pay Per Click Ads The means of achieving top search engine results without having to incur
More informationMicrosoft s Datacenter Best Practices. Darryl Chantry Datacenter Solutions Architect Worldwide Datacenter Center of Excellence
Microsoft s Datacenter Best Practices Darryl Chantry Datacenter Solutions Architect Worldwide Datacenter Center of Excellence We Are Unique in Our Comprehensive Approach Interactive entertainment Search/
More informationFabric-defined Datacenters at Cloud-scale. David Gauthier Sr. Director, Datacenter Architecture Microsoft Corporation
Fabric-defined Datacenters at Cloud-scale David Gauthier Sr. Director, Datacenter Architecture Microsoft Corporation 1 7+ billion worldwide queries each month 250+ million active users 400+ million active
More informationSAP NetWeaver Identity Management Experiences from an Implementation at Colgate-Palmolive Company
[ [ SAP NetWeaver Identity Management Experiences from an Implementation at Colgate-Palmolive Company Sarah Henriquez Senior Manager IT Risk Management, Colgate-Palmolive Kristian Lehment Product Manager
More informationNASDAQ DUBAI TRADING AND SETTLEMENT CALENDAR 2015. 1. On US Federal Reserve Holidays, no settlements will take place for USD.
NASDAQ Dubai Circular No. : 65/14 Date of Issue : December 22 nd 2014 Date of Expiry : Upon issue of replacement Circular NASDAQ DUBAI TRADING AND SETTLEMENT CALENDAR 2015 Issued pursuant to the NASDAQ
More informationBuilding an Effective Roadmap
Building an Effective Roadmap Jason Tanner Senior Consultant, Enthiosys Motivated from Within Thank you to our sponsors 2 Agenda What is an effective roadmap? What are roadmap benefits? Why do roadmaps
More informationACCESS Nursing Programs Session 1 Center Valley Campus Only 8 Weeks Academic Calendar 8 Weeks
Session 1 Academic Calendar August 24, 2015 to October 17, 2015 Tuesday / Thursday, 5:30 pm to 8:30 pm M/W T/TH T/W TH S Saturday lab as scheduled Classes Begin 24-Aug 25-Aug 25-Aug 27-Aug 29-Aug NU205
More informationACCESS Nursing Programs Session 1 Center Valley Campus Only 8 Weeks Academic Calendar 8 Weeks
Session 1 Academic Calendar August 24, 2015 to October 17, 2015 Tuesday / Thursday, 5:30 pm to 8:30 pm M/W T/TH T/W TH S Saturday lab as scheduled Classes Begin 24-Aug 25-Aug 25-Aug 27-Aug 29-Aug NU205
More informationSuccessfully Scaling an Agile Innovation Culture with Perforce
Successfully Scaling an Agile Innovation Culture with Perforce Steve Greene VP, Program Management Salesforce.com Mike Saha Sr. Manager, Release Engineering Salesforce.com Safe Harbor Safe harbor statement
More informationPega Texas Conference 2012 Department of Veterans Affairs. Terry Riffel, Director Financial Services Center October 26, 2012
Pega Texas Conference 2012 Department of Veterans Affairs Terry Riffel, Director Financial Services Center October 26, 2012 1 Agenda Pega Projects at the FSC Invoice Payment Processing System Healthcare
More informationCenters of Academic Excellence in Cyber Security (CAE-C) Knowledge Units Review
Centers of Academic Excellence in Cyber Security (CAE-C) Knowledge Units Review Review Process The Knowledge Unit (KU) Review Calendar divides the entire CAE-C KU list into 12 months for the purposes of
More informationChoosing a Cell Phone Plan-Verizon
Choosing a Cell Phone Plan-Verizon Investigating Linear Equations I n 2008, Verizon offered the following cell phone plans to consumers. (Source: www.verizon.com) Verizon: Nationwide Basic Monthly Anytime
More informationProposal to Reduce Opening Hours at the Revenues & Benefits Coventry Call Centre
Proposal to Reduce Opening Hours at the Revenues & Benefits Coventry Call Centre Proposal To change the opening hours of the Revenues & Benefits Call Centre to 9am until 5pm Monday to Friday with effect
More informationAchieving a Higher Level of Maintenance and Reliability to Help You Increase Uptime
Achieving a Higher Level of Maintenance and Reliability to Help You Increase Uptime Kris Dornan PlantPAx Device Integration Manager, Rockwell Automation Tim Burchell Regional Manager, Endress+Hauser PUBLIC
More informationDetailed guidance for employers
April 2015 3 Detailed guidance for employers Appendix A: Pay reference periods This document accompanies: Detailed guidance no. 3 Assessing the workforce Pay reference period calendars where the definition
More informationOptimizing IT costs with Cloud. Tarmo Tikerpäe Datacenter SSP Microsoft Corporation
Optimizing IT costs with Cloud Tarmo Tikerpäe Datacenter SSP Microsoft Corporation BENEFITS Speed Scale Economics Cloud Trend: 70% 2 weeks to deliver new services vs. 6-12 months with traditional solution
More informationIllinois Job Index. Jan 2012 Negative. Talking Points. Illinois Notes. Nation Notes. www.real.illinois.edu
Illinois Job Index Release Data Issue 01/31/2011 Jan 1990 / Dec 2011 2012.01 www.real.illinois.edu For November Illinois Job Index, the state and the Nation had positive job growth, the RMW had negative
More informationPTC Creo 2.0 Hardware Support Dell
PTC Creo 2.0 Hardware Support Dell Last updated: February 2, 2016 The Desktop Virtualization Environment Support Dell table displays at the end of this document, after the standard Creo certification table.
More informationEnterprise Resource Planning (ERP) Program: Overview and Status Update
Enterprise Resource Planning (ERP) Program: Overview and Status Update Human Resources (HR), Finance & Property Services (FPS), and Information Technology (IT) Departments For the Council Committee of
More informationBad Honnef 14.-15. September 2010. Reiner Schmitt. schmitt consulting. your license. our business
Bad Honnef 14.-15. September 2010 Reiner Schmitt schmitt consulting your license. our business Agenda 1. Responsibilities @ SAP AG 2. Motivation / Challenges for Software License & Asset 3. Transparency
More informationARIS 9ARIS 9.6 map and Future Directions Die nächste Generation des Geschäftsprozessmanagements
ARIS 9ARIS 9.6 map and Future Directions Die nächste Generation des Geschäftsprozessmanagements Dr. Katrina Simon ARIS Product Management 2014 Software AG. All rights reserved. ARIS @ Software AG 2M END
More informationDiscussion Outline. A. KPIs Defined. B. Why KPIs Matter. C. KPI Menu. D. Implementation. E. Example KPIs. F. Pitfalls
Discussion Outline A. KPIs Defined B. Why KPIs Matter C. KPI Menu D. Implementation E. Example KPIs F. Pitfalls 1 Key Performance Indicators (KPI s) Defined Periodic assessment of an organization, business
More informationEmployers Compliance with the Health Insurance Act Annual Report 2015
Employers Compliance with the Health Insurance Act Annual Report 2015 ea Health Council Health Council: Employers Compliance with the Health Insurance Act 1970 Annual Report 2015 Contact us: If you would
More informationCloud Computing. Investor/Analyst Day: Innovation & Technology. Chris Cartwright CEO Corporate & Financial Services. September 25, 2008 London
Chris Cartwright CEO Corporate & Financial Services Investor/Analyst Day: Innovation & Technology September 25, 2008 London 2 Agenda What is Cloud Computing Challenges and Vision Business Impact of Innovation
More informationVMware End User Computing
VMware End User Computing Overview 2014 VMware Inc. All rights reserved. Architecture for IT Any Device Business Mobility: Applications Devices Content Any Application Traditional Applications Modern,
More informationHet is een kleine stap naar een hybrid cloud
Het is een kleine stap naar een hybrid cloud Isabel Moll-Kranenburg Microsoft 14 jaar IT industrie 4 jaar Microsoft Cloud Private Private Cloud Meeting customers where they are The Microsoft Cloud Computing
More informationTeam Foundation Server
Team Foundation Server S. Adams. Dilbert. Available: http://dilbert.com Hans-Petter Halvorsen, M.Sc. Team Foundation Server (TFS) is an Application Lifecycle Management (ALM) system The Software Development
More informationP/T 2B: 2 nd Half of Term (8 weeks) Start: 25-AUG-2014 End: 19-OCT-2014 Start: 20-OCT-2014 End: 14-DEC-2014
2014-2015 SPECIAL TERM ACADEMIC CALENDAR FOR SCRANTON EDUCATION ONLINE (SEOL), MBA ONLINE, HUMAN RESOURCES ONLINE, NURSE ANESTHESIA and ERP PROGRAMS SPECIAL FALL 2014 TERM Key: P/T = Part of Term P/T Description
More informationP/T 2B: 2 nd Half of Term (8 weeks) Start: 26-AUG-2013 End: 20-OCT-2013 Start: 21-OCT-2013 End: 15-DEC-2013
2013-2014 SPECIAL TERM ACADEMIC CALENDAR FOR SCRANTON EDUCATION ONLINE (SEOL), MBA ONLINE, HUMAN RESOURCES ONLINE, NURSE ANESTHESIA and ERP PROGRAMS SPECIAL FALL 2013 TERM Key: P/T = Part of Term P/T Description
More informationAlexandria Overview. Sept 4, 2015
Alexandria Overview Sept 4, 2015 Alexandria 1U System Block Diagram SAS Interface Board Zoneboard Zoneboard I2C UART SAS to SATA I2C 12V AC Power Supply Power 60w Supply Seagate Confidential Alexandria
More informationPerformance Measures. First Quarter 2012
Performance Measures First Quarter 2012 1Q2012 Earn & Retain Community Trust 6 Performance Measures: Ridership Cost Efficiency (Cost per Revenue Hour) Cost Effectiveness (Cost per Passenger) Service Effectiveness
More informationThe proposed Project Phase work II is expected to be completed in July of 2008
REPORT TO THE CITY COUNCIL AGENDA ITEM NO. August 22, 2007 COUNCIL MEETING APPROVED BY FROM: BRUCE A. RUDD, Assistant City Manager DEPARTMENT DIRECTOR CITY MANAGER SUBJECT: ISD Network Migration Project
More informationP/T 2B: 2 nd Half of Term (8 weeks) Start: 24-AUG-2015 End: 18-OCT-2015 Start: 19-OCT-2015 End: 13-DEC-2015
2015-2016 SPECIAL TERM ACADEMIC CALENDAR For Scranton Education Online (SEOL), Masters of Business Administration Online, Masters of Accountancy Online, Health Administration Online, Health Informatics
More informationSecuring the Microsoft Cloud Infrastructure. Reto Häni Chief Security Officer Microsoft Western Europe MEET SWISS INFOSEC! 24.06.
Securing the Microsoft Cloud Infrastructure Reto Häni Chief Security Officer Microsoft Western Europe MEET SWISS INFOSEC! 24.06.2015 1 Certification & Security Reliance Microsoft s cloud environment Application
More information雲 端 運 算 願 景 與 實 現 馬 維 英 博 士 微 軟 亞 洲 研 究 院 常 務 副 院 長
雲 端 運 算 願 景 與 實 現 馬 維 英 博 士 微 軟 亞 洲 研 究 院 常 務 副 院 長 Important Aspects of the Cloud Software as a Service (SaaS) Platform as a Service (PaaS) Infrastructure as a Service (IaaS) Information and Knowledge
More information2016 Examina on dates
Please note the following informa on: The following exams are available throughout the year: Please click on the exam for which you wish to see the dates. When you have finished, you can select to return
More informationSubject to Change 1 As of 8/13/14
Atlanta Hawks Wed. 29-Oct-14 @ Toronto 7:30 PM Mon. 19-Jan-15 Detroit 2:30 PM Sat. 1-Nov-14 Indiana 7:30 PM Wed. 21-Jan-15 Indiana 7:30 PM Wed. 5-Nov-14 @ San Antonio 8:30 PM Fri. 23-Jan-15 Oklahoma City
More informationEnabling Envionmental Sustainability Through Cloud Computing
Enabling Envionmental Sustainability Through Cloud Computing Ray Pinto Senior Government Affairs Manager Sustainability Policy EMEA Microsoft Corporation SMART 2020 REPORT 40% of CO2 will removed by 2020
More informationPreparing Your Business for Magento 2.0
Preparing Your Business for Magento 2.0 William Harvey Director of Business Operations Magento Commerce How is Magento 2.0 different than 1.x? How is Magento 2.0 different than 1.x? New architecture Out-of-the-box
More informationVendor Management - Why it s So Important. Employee Benefits Task Force July 27-30, 2014 Hyatt Regency, Newport RI
Vendor Management - Why it s So Important Employee Benefits Task Force July 27-30, 2014 Hyatt Regency, Newport RI MEMBER OF PKF NORTH AMERICA, AN ASSOCIATION OF LEGALLY INDEPENDENT FIRMS 2010 Wolf & Company,
More information2015 Examination dates
Please note the following information: The following exams are available throughout the year: BULATS Paper-based: Please click on the exam for which you wish to see the dates. When you have finished, you
More informationCompleted and Current Projects
Completed and Current Projects This project list is updated regularly with the current status of each project and the milestones that have been achieved. You can see the latest information on each project
More informationRapid Consumption and Deployment of SAP Software as Virtual Appliances Using SAP Cloud Appliance Library
Rapid Consumption and Deployment of SAP Software as Virtual Appliances Using SAP Cloud Appliance Library Sanjay Kulkarni, Chief Expert, Solution Management, Virtualization & Cloud Management May 2013 Customer
More informationTrends in Global Capacity Availability and Trading. Bruce Girdlestone VP Network Trading Band-X
Trends in Global Capacity Availability and Trading Bruce Girdlestone VP Network Trading Band-X Topics The Trading of Bandwidth International Deployment of Capacity An imbalance in supply and demand A new
More informationAnalytic-Driven Quality Keys Success in Risk-Based Contracts. Ross Gustafson, Vice President Allina Performance Resources, Health Catalyst
Analytic-Driven Quality Keys Success in Risk-Based Contracts March 2 nd, 2016 Ross Gustafson, Vice President Allina Performance Resources, Health Catalyst Brian Rice, Vice President Network/ACO Integration,
More informationDeep Security/Intrusion Defense Firewall - IDS/IPS Coverage Statistics and Comparison
Deep Security/Intrusion Defense Firewall - IDS/IPS Trend Micro, Incorporated A technical brief summarizing vulnerability coverage provided by Deep Security and Intrusion Defense Firewall. The document
More informationHow to Obtain the Uptime, Security and Robust Connectivity Financial Services Firms
EXECUTIVE REPORT How to Obtain the Uptime, Security and Robust Connectivity Financial Services IT Service Management Framework & Interconnection for Financial Services The many different entities that
More informationAryzta Commercial Excellence (ACE) ACE Project Overview
Aryzta Commercial Excellence (ACE) ACE Project Overview ( Cloud for Customer, mobile BI, Product Catalogue ) Agenda Introduction to ARYZTA Overview of the Project: Background, Objectives and Key Business
More informationMay 2014 Texas School Bond Elections
May 2014 Texas School Bond Elections What are the individual districts needs? New facilities Renovations Technology Central facilities How much tax revenue can the district generate? Depends on district
More informationMoving your development to the Cloud using Visual Studio Online
Moving your development to the Cloud using Online Jakob Ehn Active Solution @jakobehn jakob@ehn.nu #devsum15 About //Me Senior Developer @ Active Solution ALM MVP http://geekswithblogs.net/jakob @jakobehn
More informationStorm Clouds Ahead? A risk analysis of Cloud Computing
Storm Clouds Ahead? A risk analysis of Cloud Computing Andy Bolton Chief Executive Officer, Capacitas Abstract Many organisations are now considering using 'Cloud Computing' offerings to meet their scalability
More informationpersonnel $ $ payroll claim
personnel $ $ claim payroll leave HR entrée by frontier e-hr ABOUT FRONTIER E-HR Frontier e-hr System enables more than 100,000 users in over 600 companies to streamline their HR operations, increase their
More informationCloud-Scale Datacenters
Cloud-Scale Datacenters Cloud-Scale Datacenters Page 1 Cloud-Scale Datacenters Delivering services at cloud-scale requires a radically different approach to designing, building, deploying, and operating
More informationNasdaq Dubai TRADING HOLIDAYS AND SETTLEMENT CALENDAR 2016 - REVISION For Equities Outsourced to the DFM (T+2)
Nasdaq Dubai Notice No : 68/15 Date of Issue : 17 December 2015 Date of Expiry : Upon issue of replacement Circular Nasdaq Dubai TRADING HOLIDAYS AND SETTLEMENT CALENDAR 2016 - REVISION For Equities Outsourced
More informationCommittee of the Whole. January 22, 2014
Committee of the Whole January 22, 2014 Drivers for 2003 IT Outsourcing Cost savings - privatization model ($2- $3MM/year) Cost avoidance Data center lease with County expiring ($3.5MM) Disaster recovery
More informationBenefits of Latest Innovations in Campus Planning
Exempt Employee Association 01/29/13 Agenda icat Objectives CedarCrestone Overview Project Scope and Timeline Project Methodology What is Changing and Your Involvement Change Management Overview Closing
More informationDeep Security Intrusion Detection & Prevention (IDS/IPS) Coverage Statistics and Comparison
Deep Security Intrusion Detection & Prevention (IDS/IPS) Trend Micro, Incorporated A technical brief summarizing vulnerability coverage provided by Deep Security. The document also outlines a comparison
More information