Glossary of CNH Model Contract for Round 1.2
|
|
|
- Emery White
- 10 years ago
- Views:
Transcription
1 Glossary of CNH Model Contract for MEI Market Note No. 210 Houston, September 24, 2015 Most of the technical vocabulary is carried over from Round 1.1 M OST OF THE TECHNICAL VOCABULARY from the model contract that served as the basis for the first public auction that was held by the Hydrocarbon Commission (CNH) on July 15, 2015, was carried over to the final model contract, dated August 25, 2015, to be used in the second auction scheduled for September 25 (see insert). From our database of more than 1,700 terms, we identified some three dozen terms or definitions that are new to the August 25 th version of the contract. Roughly 120 terms and definitions are common to both auctions. These terms are sorted by the respective auction and then alphabetically, and we have provided provisional English translations for each term (Table 1).. Looking into the substantive matters of the model contract, we continue to find problematic issues: 1) The contract should state categorically that the nuclear option of administrative rescission will not be applied in response to a single event (noting that BP did not lose its license on account of the Macondo accident). 2) At variance with the statement of Energy Minister Coldwell at an industry conference held in Mexico City on August 18 th, which was that operators will have the complete geological column included in their contracts, there are vertical restrictions in three of the blocks: Tecoalli B, Hokchi B and Nak. The presence of such limits will make qualified bidders hesitate to make offers. 3) The contract specifies that no property rights are conveyed by the contract (Art. 21.4). The contract does provide the contractor with the right to compensation for specified expenses and a share of the proceeds from production. Such benefits may be understood to be property rights in relation to mineral contracts. In Round 1.1, such rights belong to the Mexican State, but in (as if to clarify matters) they belong to the Mexican Nation. 4) Operators should be given freedom to report their discoveries in Mexico in physical units. 5) In Round 1.1, the government was embarrassed by the outcome that resulted from the absence of the provision for a technical tie (as happened with Block 7, where the difference between the bids was less than 1%). The definitions applicable to do not include this provision. George Baker Publisher [email protected] MEXICO ENERGY INTELLIGENCE ISSN Page 1 of 8
2 Ronda 1 2nd Convocatoria - Bases de la licitación CNH-R01-L02/2015 (Consorcio) Abandono () Abandonment Arbitraje Arbitration Costos Elegibles Eligible costs Costos Recuperables Recoverable costs Daños Preexistentes Preexisting environmental damage Derecho de Terminación Right of termination Etapa de Transición de Arranque Transitional start-up stage Etapa de Transición Final Final transition stage Evaluación de Impacto Social Social Impact Study Experto Independiente Independent expert Interés de Participación [Ronda 1.2] Participating interest (%) Límite de Recuperación de Costos [Ronda 1.2] limit of cost recovery Materiales Muebles Matériel (as distinct from real estate) Annex 10 Modelo de Garantía de Cumplimiento Model of a performance guarantee No Otorgamiento de Derechos de Propiedad [Ronda 1.2] Non-conveyance of property rights No Suspensión de Actividades Petroleras Non-suspension of oilfield operations Período Inicial de Evaluación [Ronda 1.2] Initial evaluation period Presupuesto Budget , Annex 4 Procedimientos de Contabilidad Accounting procedures Procura de Bienes y Servicios Procurement of goods and services Prórroga del Plazo del Contrato Extension of the contract period Prórroga del Programa de Trabajo Extention for period of Work Program Reglamento CNUDMI UN regulation for the resolution of international commercial disputes , 25.2, Rescisión administrativa [Ronda 1.2] Administrative rescission Subproductos By-products, co-products [email protected] 1
3 Totalidad del Contrato Totality of the Contract Annex 13 Uso Compartido de Infraestructura Shared use of infrastructure BASES DE LA LICITACIÓN CNH-R01-L03/ Abandono Abandonment Actividades Petroleras Life-cycle oil field actvities Agencia Agencia for Industrial Safety and Environmental Protection (ASEA) Almacenamiento Storage Año Year Año Contractual Contractual year Anti-corrupción Anti-corruption standard Aportación Anual Annual contribution , 2.2 Área Contractual Contractual Area Autoridad Gubernamental Government agency Barril Barril Bases de Licitación Auction documentation Cambio de Operador Change of operatorship Campo Field Caso Fortuito o Fuerza Mayor Force majeure Cesión Change of rights, obligations or ownership Conciliación Dispute resolution Condensados Condensates Contraprestación Payment (in cash or in kind) Contraprestación del Contratista Payment in kind to Contractor Contraprestación del Estado Cash payments to the State Contratista Contractor Contrato Contract [email protected] 2
4 Control Control Convocatoria Auction Costos Costs Cuenta Operativa Operating account Cuota Contractual para la Fase Exploratoria Fee payable during exploratory phase Derechos de Propiedad Property rights Descubrimiento Discovery , 6.1 Devolución Relinquishment Día Calendar day Día Hábil Working day Documentos Técnicos Technical documentation Dólares U.S. dollars Empresas Participantes Participating companies Evaluación Evaluation Extracción Production life-cycle of an oil well Fecha Efectiva Effective date of contract Fideicomiso de Abandono Escrow account for abandonment Filial Affiliate Fondo Oil Fund Garante Guarantee of corporate parent Garantía Corporativa Corporate guarantee Garantía de Cumplimiento Performance guarantee Garantía de Cumplimiento Inicial Guarantee of initial performance Garantía del Período Adicional Guarantee for additional period Gas Licuado de Petróleo LPG Gas Natural Natural gas Gas Natural Asociado Associated natural gas Gas Natural No Asociado Non-associated natural gas 3
5 Hidrocarburos Petroleum, natural gas, natural gas liquids and methane hidrates Hidrocarburos de Autoconsumo Hydrocarbons for self-use Hidrocarburos en el Subsuelo Hydrocarbons in the subsurface Hidrocarburos Netos Net (hydrocarbon) production Hidrocarburos Producidos Total hydrocarbons produced Idioma Contract language Incremento en el Programa Mínimo Increase in the minimum work commitment Incumplimiento del Programa Mínimo de Trabajo Non-compliance with Minimum Work Program Información pública Public information Información Técnica Technical information Instalaciones Facilities; infrastructure; installations Instalaciones de Comercialización Midstream infrastructure Instalaciones de Recolección Gathering lines (and related infrastructure) , 24 Interés de participación (%) [Ronda 1.1] Equity interest of participant (%) Inventario de Activos Inventory of materials Ley de Hidrocarburos Hydrocarbon Act of Materiales Matériel Mecanismo de Ajuste R Factor Mejores Prácticas de la Industria Best practices Mes Calendar month Metodología Methodology for measuring national content Modalidad Licencia License agreement , 5.4 Modificaciones al Plan de Desarrollo por Parte de la CNH CNH right to modify contractor development plan , 2.1, 4.1, Normatividad Aplicable Applicable legal dispositions 8, 9.2, [email protected] 4
6 Notificación de Continuación de Actividades Notification of continuation of activities Obligaciones de Carácter Fiscal Fiscal obligations Obstáculos a la Continuación de la Perforación Obstacles to the continuation of drilling , 2.5 Operador Operator Partes Parties [to a contract] Perforación de Pozos Well plan authorization Período Period of a month Período Adicional de Evaluación Additional period for appraisal Período de Desarrollo Development Period Período de Evaluación Evaluation period Período Inicial de Evaluación Initial Evaluation Period Persona Person (physical or corporate) Petróleo Crude oil Petrolíferos Refined products Petroquímicos Basic Petrochemicals (understood in Mexico as natural gas liquids) Plan de Desarrollo Development Plan Plan de Evaluación Evaluation Plan , Anex 5 Plan de Transición de Arranque Start-up Plan Plan de Transición por Terminación Contract Termination Plan Plazo Contract Period Pozo Well Precio Contractual Contract Price Primer Plazo Adicional 1st Additional Period Procedimientos de Contabilidad Accounting procedures Procesamiento de Gas Natural Natural gas processing Producción Comercial Regular Regular commercial production Programa de Administración de Riesgos Risk management program [email protected] 5
7 Programa de Trabajo [Ronda 1.2] Work program Programa Mínimo de Trabajo [Ronda 1.1] Minimal Work Program , 28.2 Propiedad intelectual del Contratista Intellectual property of contractor Propuesta Winning offer Prórroga Extension of contract period Pruebas de Formación Test well notification Puntos de Medición Measuring points Recolección Gathering Reconocimiento y Exploración Superficial Surface exploration Recuperación Avanzada Enhanced OIl Recovery Regalía Royalty Reglas de Mercado Market competition , 17 Renuncia del Contratista Voluntary termination of contract Annex 4, XI Reportes Reports (electronic filing) Rescisión Administrativa Administrative rescession Rescisión Contractual Contractual rescession Reservas Reserves Responsabilidad Solidaria Joint and several responsibility Secretaría de Hacienda Finance Ministry (SHCP) Segundo Plazo Adicional 2nd additional period Singular y Plural Singular or plural construction Sistema de Administración System of administration (of ASEA) Subcontratistas Subcontractors Trimestre Quarter year (3 months) Unidad de Trabajo Work Unit Unidades de Trabajo Work units Unificación Unitization (of contract areas) Valor Contractual de los Condensados Contract value of condensates [email protected] 6
8 Valor Contractual de los Hidrocarburos Contract value of hydrocarbons Valor Contractual del Gas Natural Contract value of natural gas Valor Contractual del Petróleo Contract value of crude oil Annex 4, 3.1 Verificación Verification (by Finance Ministry) Volúmenes de Hidrocarburos Producidos Contractor volumes 7
9 BAKER & ASSOCIATES,ENERGY CONSULTANTS Management consulting Industry, policy and regulatory reports A management briefing is available on the topics covered in this report. (832) (text/cell) Mailing Address: Box Houston TX To learn about our reporting, consult the title lists, by year or category, on or write to us at [email protected]
OPTIMIZACIÓN DE GENERACIÓN ELÉCTRICA Y EFICIENCIA ENERGÉTICA OGE&EE
PETROAMAZONAS EP OPTIMIZACIÓN DE GENERACIÓN ELÉCTRICA Y EFICIENCIA ENERGÉTICA OGE&EE SECTOR HIDROCARBUROSPROYECTOS Van Den Berg, Berend 15 1. PROJECT DISCRIPTION: Have you ever asked yourself the question
Mexico is living in very interesting times. With a new reform
Mexico s ongoing energy reform and infrastructure trends: new investment opportunities Julián J Garza C and Héctor Arangua L of Nader Hayaux & Goebel in Mexico City look at the possibilities opening up
ANNEX ON GENERAL RULES APPLICABLE TO (LIFE AND NON-LIFE) INSURERS OPERATING IN SPAIN UNDER FREEDOM TO PROVIDE SERVICES OR RIGHT OF ESTABLISHMENT
SECRETARÍA DE ESTADO, ANNEX ON GENERAL RULES APPLICABLE TO (LIFE AND NON-LIFE) INSURERS OPERATING IN SPAIN UNDER FREEDOM TO PROVIDE SERVICES OR RIGHT OF ESTABLISHMENT The list set out below is not exhaustive,
THE UNITED REPUBLIC OF TANZANIA MODEL PSA ADDENDUM FOR NATURAL GAS
THE UNITED REPUBLIC OF TANZANIA MODEL PSA ADDENDUM FOR NATURAL GAS Addendum to Existing PSA between GOT, TPDC and Contractor ABC For Deep sea Operations 1 MODEL PSA ADDENDUM FOR NATURAL GAS For Deep sea
Mexican Oil & Gas industry Investment opportunities post reform
Mexican Oil & Gas industry Investment opportunities post reform Eagle Ford Consortium Meeting January 29th 2014 Texas A&M International University Student Center Ballroom Laredo, Texas Antonio Juárez January
Mexico s Energy Reform. 2 LATAM Oil & Gas Summit
Mexico s Energy Reform 2 LATAM Oil & Gas Summit September 10th, 2014 Dirección Jurídica Why was the Energy Reform necessary? Because PEMEX had to be strengthened and it had to diversify its risks The inertial
This summary covers decrees containing secondary energy laws issued by the Federal Executive in the Official Gazette dated August 11 of this year.
* This summary covers decrees containing secondary energy laws issued by the Federal Executive in the Official Gazette dated August 11 of this year. 2 Index The Mexican Petroleum Law..5 The Federal Electricity
PETRÓLEOS MEXICANOS (Exact name of registrant as specified in its charter)
Página 1 de 326 20-F 1 d20f.htm FORM 20-F UNITED STATES SECURITIES AND EXCHANGE COMMISSION WASHINGTON, D.C. 20549 FORM 20-F ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT
Titulación 1313.- Grado en Administración y Dirección de Empresas, Mención Creación y Dirección de Empresas, Itinerario Emprendedores.
Guía Docente Foundations of Market Research FICHA IDENTIFICATIVA Datos de la Asignatura Código 36267 Titulación 1313.- Grado en Administración y Dirección de Empresas, Mención Creación y Dirección de Empresas,
The named boxes in Spanish of the form are included in italics inside parentheses. MINISTERIO DE ECONOMÍA Y COMPETITIVIDAD
SECRETARÍA DE ESTADO DE COMERCIO DIRECCIÓN GENERAL DE COMERCIO E INVERSIONES S. G. DE COMERCIO INTERNACIONAL DE SERVICIOS E INVERSIONES This is a translation, from Spanish, of instructions for filling
Estrategias para la Reducción de Riesgos y Ciber Ataques
Estrategias para la Reducción de Riesgos y Ciber Ataques Luis Zamora Consultor en Tecnología 1 This document is for informational purposes. It is not a commitment to deliver any material, code, or functionality,
ICAO State Safety Programme (SSP) Introduction
State Safety Programme (SSP) Introduction Aerodrome Safety Management System (SMS) Implementation Workshop Activity of GREPECAS Project F1 Mexico City, Mexico, 18-21 March 2014 Eduardo Chacin Flight Safety
Energy Data and Information
Energy Data and Information Dr. Edgar Rangel-German Mexico-Alberta Regulatory Workshop Mexico City September 2015 1 Both the information and presentation that will be presented below are the sole responsibility
LICENSE CONTRACT MODEL ROUND 1: THIRD INVITATION TO BID, ONSHORE FIELDS. Bidding Process CNH-R01-C03/2015
LICENSE CONTRACT MODEL ROUND 1: THIRD INVITATION TO BID, ONSHORE FIELDS Bidding Process CNH-R01-C03/2015 May, 2015 Round 1 FIRST APPROACH 2 Round 1 NORTH REGION FIELDS 9 Contractual areas 9 Dry gas fields
INGENIERÍA DE EDIFICACIÓN BUILDING ENGINEERING (SUBJECT S LIST UPDATED IN APRIL, 2015)
INGENIERÍA DE EDIFICACIÓN BUILDING ENGINEERING (SUBJECT S LIST UPDATED IN APRIL, 2015) (E): Elective courses ALL LECTURES ARE TAUGHT IN SPANISH LANGUAGE CURSO CONSTRUCCIÓN I. HISTORIA, TIPOLOGÍAS Y FUND.
Report on Proposed Mexico Model Contract and Bid Conditions for First Shallow Water Bid Round
Report on Proposed Mexico Model Contract and Bid Conditions for First Shallow Water Bid Round December 15, 2014 Dr. Pedro van Meurs J. Jay Park, Q.C. Report on Proposed Mexico Model Contract and Bid Conditions
Namibia. Koep & Partners. Introduction
Koep & Partners Introduction Key legislation and regulatory structure Once largely ignored by international oil and gas companies, has in recent times been called one of the last frontiers of oil and gas
Por qué ExecuTrain? Por qué ExecuTrain? Modalidad de servicio
Por qué ExecuTrain? ExecuTrain es un proveedor de entrenamiento corporativo a nivel internacional y líder mundial en la capacitación empresarial. Contamos con 22 años y más de 62 mil personas capacitadas
Round 1. Invitations to bid for hydrocarbon exploration and extraction contracts in Mexico
Round 1 Invitations to bid for hydrocarbon exploration and extraction contracts in Mexico Invitations to bid for hydrocarbon exploration and extraction contracts in Mexico Reforms made in the energy sector
The named boxes in Spanish of the form are included in italics inside parentheses. MINISTERIO DE ECONOMÍA Y COMPETITIVIDAD
SECRETARÍA DE ESTADO DE COMERCIO DIRECCIÓN GENERAL DE COMERCIO E INVERSIONES S. G. DE COMERCIO INTERNACIONAL DE SERVICIOS E INVERSIONES This is a translation, from Spanish, of instructions for filling
LBWN ALQUILAR CON OPCIÓN A COMPRAR
LBWN ALQUILAR CON OPCIÓN A COMPRAR BENEFICIOS PARA LA COMUNIDAD LBWN Alquilar con Opción a Comprar es una iniciativa de desarrollo de $5.8 millones que convertirá 24 foreclosures en viviendas unifamiliares
» Competitiveness» Quality productivity» Improvement and continuity
Our business isn t selling, is to good service MR Our Mission Our Organization is to be a regional leader in the supply and service of Specialized Technical and Administrative companies in the oil sector,
Range of studies: List of Courses Taught in Spanish CURSO 2014 15
Course Title (English) Course Title (Spanish) Degree Year Semester Caracter Speciality Code ECTS Calculus for Infomatics Cálculo para la Computación BCE BSE BCSE 1st 1st Comp. Subjet 101 6 Discrete Mathematics
Explorando Oportunidades Juntos Juntos
Nelson H. Balido, Chairman and CEO Infocast - Houston November 2014 The Energy Council of the Americas (ECOTA) is the leading bi-national nonprofit organization comprised of public and private entities
MEXICAN ENERGY REFORMS
MEXICAN ENERGY REFORMS JOHNS HOPKINS UNIVERSITY School of Advanced International Studies Dr. Francisco Barnés de Castro Comisión Reguladora de Energía Abril 29, 2014 1. Brief history of the energy industry
Accounting of the reserves exploration and extraction contracts
Accounting of the reserves exploration and extraction contracts Accounting of the reserves exploration and extraction contracts In December 2013, the Mexican government amended its Constitution, effectively
Consejo Mundial de Energía Foro Biregional de América del Norte y de América Latina y el Caribe
Consejo Mundial de Energía Foro Biregional de América del Norte y de América Latina y el Caribe JUNIO DE 2006 Disclaimer Safe harbor statement under the Private Securities Litigation Reform Act of 1995:
Annex C. Accounting and Financial Procedures
TRANSLATION Annex C Accounting and Financial Procedures XX XXX 20XX TRANSLATION Annex C Accounting and Financial Procedures The present Annex is an integral part of the Production Sharing Agreement dated,
UNIVERSIDAD LOYOLA ANDALUCÍA
UNIVERSIDAD LOYOLA ANDALUCÍA CAMPUS CORDOBA 2 ND SEMESTER / SPRING SEMESTER LIST OF AVAILABLE SUBJECTS Here you will find the academic offer available in each Bachelor s degree programme (Campus Cordoba):
English Financial Terms / Términos Financieros Español
PUBLIC BALANCE SHEET BALANCE PÚBLICO ASSETS ACTIVO 1. CASH AND BALANCES WITH CENTRAL BANKS 1. CAJA Y DEPÓSITOS EN BANCOS CENTRALES 2. FINANCIAL ASSETS HELD FOR TRADING 2. CARTERA DE NEGOCIACIÓN 2. 1. Loans
Project G3: Development of quality specifications applicable to the AIM digital environment (SAM) (Presented by the Secretariat) Summary
International Civil Aviation Organization SAM/AIM/3-WP/05 South American Regional Office 28/02/12 Third Multilateral Meeting of the SAM Region for the Transition of AIS to AIM (SAM/AIM/3) Lima, Peru, 12
Latin America Oil & Gas Handbook
Latin America Oil & Gas Handbook 2012 Latin America Oil & Gas Handbook - 2012 Materials in this booklet are general comments only, and should not be offered as advice on any particular matter and should
Abdelly & Associés. Key legislation and regulatory structure. Introduction
Abdelly & Associés Introduction s current proven reserves are approximately 838m barrels, of which 51 per cent is oil and 49 per cent is gas. Approximately two-thirds of s proven gas reserves are located
Environmental Policy (English Version)
Example #1 Environmental Policy (English Version) ABC Farms commits to meet all environmental rules and regulations in the swine industry and to strive to protect our environment through sound management
A set of indicators for waste management programs
2011 2nd International Conference on Environmental Engineering and Applications IPCBEE vol.17 (2011) (2011) IACSIT Press, Singapore A set of indicators for waste management programs Carolina Armijo 1,
Invitation to Bid. For. Suriname International Competitive Bid Round 2013
Invitation to Bid For Suriname International Competitive Bid Round 2013 Paramaribo, 28 January 2013 Table of Content Contents 1. Introduction... 4 2. Formal Bid Submission... 5 3. Calendar of Events...
MILLER AND LENTS, LTD.
MILLER AND LENTS, LTD. INTRODUCTION HISTORY Miller and Lents, Ltd., a United States Corporation chartered under the laws of the State of Delaware, is an oil and gas consulting firm offering services and
VACANCY ANNOUNCEMENT # 06/10/67 POSITION: PROPERTY BOOK ASSISTANT (PROGRAM ASSISTANT), FSN-8 (OR); FP-6,(EFM/MOH/NOR)
VACANCY ANNOUNCEMENT # 06/10/67 POSITION: PROPERTY BOOK ASSISTANT (PROGRAM ASSISTANT), FSN-8 (OR); FP-6,(EFM/MOH/NOR) Open to: All Interested Candidates Opening Date: October 5, 2006 Closing Date: October
Work Instruction (Instruccion de Trabajo) Wistron InfoComm (Texas) Corp.
Effective Date: 8/1/2011 Page 1 of 6 Description: (Descripción) 1.0 Purpose (Objetivo) 2.0 Scope (Alcance) 3.0 Fixture List (Lista de Materiales) 4.0 Activities (Actividades) Prepared By: Daniel Flores
ISBA/11/C/4. Consejo. Autoridad Internacional de los Fondos Marinos. Nota del Secretario General *0541771*
Autoridad Internacional de los Fondos Marinos Consejo Distr. general 12 de julio de 2005 Español Original: inglés ISBA/11/C/4 Undécimo período de sesiones Kingston (Jamaica) 15 a 26 de agosto de 2005 Elección
DIPLOMADO EN BASE DE DATOS
DIPLOMADO EN BASE DE DATOS OBJETIVOS Preparan al Estudiante en el uso de las tecnologías de base de datos OLTP y OLAP, con conocimientos generales en todas las bases de datos y especialización en SQL server
OFFICE OF COMMON INTEREST COMMUNITY OMBUDSMAN CIC#: DEPARTMENT OF JUSTICE
RETURN THIS FORM TO: FOR OFFICIAL USE: (Devuelva Este Formulario a): (Para Uso Oficial) OFFICE OF COMMON INTEREST COMMUNITY OMBUDSMAN CIC#: DEPARTMENT OF JUSTICE (Caso No) STATE OF DELAWARE Investigator:
WSFCCA MEMBERSHIP and ACCIDENTAL/MEDICAL APPLICATION 2013-2014
WSFCCA MEMBERSHIP and ACCIDENTAL/MEDICAL APPLICATION 2013-2014 Christine Price, President 425-774- 9439 Lorri Hope, Treasurer & Membership 509-627- 1692 Email: [email protected] www.wsfcca.com Washington
Enrollment Forms Packet (EFP)
Enrollment Forms Packet (EFP) Please review the information below. Based on your student(s) grade and applicable circumstances, you are required to submit documentation in order to complete this step in
Corporate Income Tax
LESSON 5 Corporate Income Tax 1 Outline 1. Introduction. 2. Differences between the accounting value and the tax value of assets, liabilities, revenues and expenses. 3. Current tax. 4. Deferred tax and
September 20,2011 Clarification of the Functionality for the Service Provider Module Please see at the bottom a summary of these detail.
September 20,2011 Clarification of the Functionality for the Service Provider Module Please see at the bottom a summary of these detail. The MY PROFILE should have the following concepts: The first should
KNOWLEDGE MANAGEMENT AT ECOPETROL
KNOWLEDGE MANAGEMENT AT ECOPETROL A CONTINUES JOURNEY Oscar Javier Guerra Perdomo Unit Head of Knowledge Management and Innovation Strategy ECOPETROL S.A. [email protected] More than half of
EXPERIENCE IN THE SELECTION OF KEY PERFORMANCE INDICATORS IN STATIC EQUIPMENT MAINTENANCE
TECHNICAL REPORT DT-13001 Pag. 1 de 15 EXPERIENCE IN THE SELECTION OF KEY PERFORMANCE INDICATORS IN STATIC EQUIPMENT MAINTENANCE Integrity Assessment Services Maracaibo State Zulia Venezuela April 2013
Alfredo Ramos. Partner, Corporate
Alfredo Ramos Partner, Corporate Alfredo Ramos is an experienced energy/international project development attorney, and former in-house counsel, focused primarily on serving the energy industry and business
PETRÓLEOS MEXICANOS (Exact name of registrant as specified in its charter)
20-F 1 d715090d20f.htm FORM 20-F UNITED STATES SECURITIES AND EXCHANGE COMMISSION WASHINGTON, D.C. 20549 FORM 20-F ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 for
How To Improve Public Sector Performance
STRENGTHENING PUBLIC REVENUE AND EXPENDITURE MANAGEMENT TO ENHANCE SERVICE DELIVERY EXECUTIVE SUMMARY Message 1. Public service delivery is hindered by low tax collection and inefficient expenditure at
Public Financial Statements. Unofficial English Translation Template
BALANCE CONSOLIDADO PÚBLICO PUBLIC CONSOLIDATED BALANCE SHEET ACTIVO ASSETS 1. CAJA Y DEPÓSITOS EN BANCOS CENTRALES 1. CASH AND BALANCES WITH CENTRAL BANKS 2. CARTERA DE NEGOCIACIÓN 2. FINANCIAL ASSETS
CUSTOMER ENGAGEMENT & COMMERCE PORQUE EL CAMINO & EL RESULTADO IMPORTAN
CUSTOMER ENGAGEMENT & COMMERCE PORQUE EL CAMINO & EL RESULTADO IMPORTAN NAME TITLE 2011 SAP AG. All rights reserved. 1 QUÉ SIGNIFICA CUSTOMER ENGAGEMENT AND COMMERCE? RELACIONARNOS CON NUESTROS CLIENTES
International Petroleum Exploration and Exploitation Agreements: Legal, Economic and Policy Aspects (2nd ed. 2009)
International Petroleum Exploration and Exploitation Agreements: Legal, Economic and Policy Aspects (2nd ed. 2009) An updated and expanded edition of Keith W. Blinn, Claude v Duval, Honore Le Leuch and
VII Programa marco de Euratom Programa de trabajo 2013
VII Programa marco de Euratom Programa de trabajo 2013 E. González (CIEMAT) National Contact Point for EURATOM Fission (Nuclear Fission, Safety and Radiation Protection) Sede central del CSIC 12 de septiembre
ENERGY REFORM. Strengthen the stewardship of the State as the owner of the oil and gas, and as regulator of the oil industry.
I. The Objectives of the Reform. The bill being submitted by the Federal Executive for the consideration of the Congress of the Union, proposes that Constitutional Article 27 return to state what President
Mexico s Energy Reform A Game Changer in the Nation s History
December 2013 David Enríquez Senior Partner Oil & Gas Maritime Mexico s Energy Reform A Game Changer in the Nation s History I BACKGROUND AND PARLIAMENTARY WORK A 3 PROPOSALS Contract model Concession
BALANCE DUE 10/25/2007 $500.00 STATEMENT DATE BALANCE DUE $500.00 PLEASE DETACH AND RETURN TOP PORTION WITH YOUR PAYMENT
R E M I T T O : IF PAYING BY MASTERCARD, DISCOVER, VISA, OR AMERICAN EXPRESS, FILL OUT BELOW: XYZ Orthopaedics STATEMENT DATE BALANCE DUE 10/25/2007 $500.00 BALANCE DUE $500.00 ACCOUNT NUMBER 1111122222
Commercial Invoice. Terms and Conditions of Delivery and Payment (incoterms)
SELLER/SHIPPER (Name, Full Address, Country) Commercial Invoice Invoice Date and Number Customer Order Number CONSIGNEE (Name, Full Address, Country) Tax Identification Number (EIN) Other References Buyer
PA (Process. Areas) Ex - KPAs
PA (Process Areas) Ex - KPAs CMMI Content: : Representación n etapas Level 5 Optimizing Focus Continuous Process Improvement Process Areas Organizational Innovation and Deployment Causal Analysis and Resolution
Challenges and Outlook in Procurement VANESSA AGUIRRE PEMEX PROCUREMENT INTERNATIONAL
Challenges and Outlook in Procurement VANESSA AGUIRRE PEMEX PROCUREMENT INTERNATIONAL Content Context International Best Practices Procurement Division PPI (1) Statical yearbook 2013 (2) DCO PEMEX PEMEX
UNIVERSIDAD LOYOLA ANDALUCÍA
UNIVERSIDAD LOYOLA ANDALUCÍA CAMPUS CORDOBA ACMIC YEAR 2015-2016 LIST OF AVAILABLE SUBJECTS Here you will find the academic offer available in each Bachelor s degree programme (Campus Cordoba): - BACHELOR
METHANE EMISSIONS. ECOPETROL-EPA COLLABORATION Global Methane Initiative
METHANE EMISSIONS ECOPETROL-EPA COLLABORATION Global Methane Initiative SUPERINTENDENCIA DE OPERACIONES DE MARES INSTITUTO COLOMBIANO DEL PETRÓLEO ENVIRONMENTAL PROTECTION AGENCY (EPA) MARCH 2013 COMPANY
Tanzania. Rex Attorneys. Introduction
Rex Attorneys Introduction Key legislation and regulatory structure s upstream oil and gas sector is currently enjoying a boom experienced elsewhere in East Africa following major discoveries of natural
MEFF Sociedad Rectora de Productos Derivados, S.A. (Sociedad Unipersonal)
MEFF Sociedad Rectora de Productos Derivados, S.A. (Sociedad Unipersonal) Financial Statements and Management Report for the financial year ended 31 December 2012, together with the Auditors Report Translation
Round One was defined according to the following criteria: The potential to increase oil and gas production in the short term.
As part of the implementation stage of the Energy Reform, on August 13th, 2014, the Mexican Government revealed a first estimate of the areas and fields that will be tendered in the coming months for private
ISSAI 1220. Control de calidad en una auditoría de estados financieros. Directriz de auditoría financiera
Las Normas Internacionales de las Entidades Fiscalizadoras Superiores (ISSAI) son emitidas por la Organización Internacional de Entidades Fiscalizadoras Superiores (INTOSAI). Para más información visite
Guía Docente Fiscalidad de la empresa/business Tax
Guía Docente Fiscalidad de la empresa/business Tax FICHA IDENTIFICATIVA Datos de la Asignatura Código 36275 Titulación 1313.- Grado en Administración y Dirección de Empresas, Mención Creación y Dirección
