Methods of risk identification in companies investment projects

Size: px
Start display at page:

Download "Methods of risk identification in companies investment projects"

Transcription

1 Methods of risk identification in companies investment projects Piotr Tworek 1 Abstract The paper addresses the issues of risk identification as a separate stage, which forms an integral part of any risk management process. In particular, the author focuses on risk identification methods, which are used by companies that run investment projects. In this paper, the author draws attention to the applicability of some of these methods, based e.g. on his own experience, gained from business practice. When formulating his conclusions, he also draws on the risk management research, conducted in 25, out of 100, leading construction and assembly companies in Poland. Key words Risk, risk identification, risk management, construction industry. Introduction Looking at an entire risk management process in investment projects (planned and implemented by companies), one can see that a critical stage in this process is the stage of risk identification. At this stage, potential risks and their sources are identified. Any mistakes or errors, i.e. a failure to spot risks at an early stage of an investment project (investment planning), may lead to serious consequences at the project implementation and operation stages. Furthermore, a failure to identify some risk sources at the risk identification stage may result in incorrect risk quantification and a wrong risk response plan. Managers in companies and, in particular, risk managers and project managers have to possess appropriate methodological background in this respect. They need to know what types of methods and tools may be used, depending on a specific situation, i.e. the type of an identified risk. The paper deals exclusively with the methodological aspects of risk identification in investment projects carried out by companies. It aims, in particular, at discussing such methods and techniques, which could be most useful in business practice. The empirical illustration are the results of the research, carried out by the author in 25, out of 100, leading construction and assembly companies in Poland. The research was conducted in the third quarter of 2009, within the framework of an individual research project carried out at the Department of Investments and Real-Estate, the University of Economics in Katowice, using the basic research methods, such as a questionnaire and a personal interview. The paper mainly consists of theoretical deliberations, and the problems discussed here are presented in a synthetic way. 1 Piotr Tworek, Ph.D., The University of Economics in Katowice, Faculty of Finance and Insurance, Department of Investments and Real-Estate, 1 Maja 50 Street, Katowice (Poland), piotr.tworek@ae.katowice.pl

2 1. Risk identification in an investment project a methodical approach In general, risk identification consists in identification of risk sources and specific forms of risks in companies. As emphasised by K. Jajuga ( ) an entity s risk management involves making decisions and taking measures by the entity, in order to reach an acceptable risk level [1]. According to the International Risk Management Institute in Dallas ( ) risk identification is perhaps the most crucial part of the risk management process because an exposure that is not identified can t be properly managed [2]. Referring to project risk management, R.M. Wideman defines risk identification as ( ) the process of systematically identifying all possible risk events which may impact on a project [3]. This definition is clearly the most accurate representation of the risk identification concept, in terms of risk management in an investment project. Risk identification, however, irrespective of an area or a company s profile, always has to be looked upon as a separate process, in which a number of appropriate methods, techniques and tools are used. Also, the extent to which specific risk identification methods can be applied will vary, depending on a situation and needs. In some companies, one set of methods will prove more useful, in other companies another one. It should be emphasised, however, that a risk identification process, no matter what circumstances and company profiles, will constitute an essential and, at the same time, initial stage of risk management. The general risk management concept is illustrated in a figure 1. Figure 1: The Risk Management Structure RISK IDENTIFICATION RISK CLASSIFICATION RISK ANALYSIS RISK ATTITUDE RISK RESPONSE Source: [4]. As you can see, the figure 1 shows the stages of a risk management process. According to PMBOK Guide (Project Management Institute in Newtown), the risk identification process is composed of six stages phases, i.e. risk management planning, risk identification, qualitative risk analysis, quantitative risk analysis, risk response planning, risk monitoring and risk control [5]. Summing up, ( ) risk management is a cyclical process that must be repeated regularly during the course of a project [6], and risk identification constitutes the basic, first and initial stage in the entire risk management process. Risk identification, just like the entire risk management process, should be carried out continuously (i.e. throughout the entire lifecycle of an investment project) and in various dimensions, in various sections, from various perspectives and in various areas as this ensures that the most comprehensive list of potential risks a given investment project is exposed to can be compiled [7]. An essential thing at this stage is to evaluate co-occurrence of specific risks and their relationships, so that

3 the entire portfolio of risks can be managed, instead of a single one at a time [8]. The most important thing is that risk identification creates the right database for any further steps related to the risk analysis [9]. It should be noted that the literature of the subject contains numerous similar concepts and approaches i.e. one can come across the concepts and approaches, which differ significantly from the concept illustrated by the figure 1. No matter how risk identification is understood and defined, one should remember about three vital aspects, namely: there are many different risk identification methods, which can be freely used in practice, depending on a situation and needs; risk identification methods have both their strengths and their weaknesses; particular methods, techniques and tools bring various effects. In practice, there s a wide spectrum of methods which companies may apply to identify risks. The Project Management Institute in Newtown, in its publication most often mentions a document review, information collection methods, check lists, an assumption analysis, diagram-based techniques [5]. The Risk Management Institute in London, however, lists the following risk identification methods: ( ) brainstorming, questionnaires, business studies which look at each business process and describe both the internal processes and external factors which can influence those processes, industry benchmarking, scenario analysis, risk assessment workshops, incident investigation, auditing and inspection, HAZOP (Hazard & Operability Studies) [10]. (Due to the fact that these methods are well-known and thoroughly-discussed in the scientific literature, the paper doesn t provide their detailed descriptions.) As you can see, there s a wide range of methods and ways of risk identification in investment projects, and various advantages and disadvantages demonstrated by these methods should always be taken into account when using them in corporate practice. The strengths and weaknesses of some of them are described in a table 1. Technique Strengths Weaknesses Assumptions & Constraints Analysis Brainstorming Cause and Effect (Ishikawa) Diagrams Simple structured approach Can be based on assumptions & constraints already listed in project charter Generates project specific risks Allows all participants to speak their mind and contribute to the discussion Can involve all key stakeholders Creative generation of ideas Visual representation of project promotes structured thinking Implicit/hidden assumptions or constraints are often missed Requires attendance of key stakeholders at a workshop, therefore can be difficult to arrange and expensive Prone to Groupthink and other group dynamics May produce biased results if dominated by a strong person (often management) Often not well facilitated Generates non-risks and duplicates, requires filtering Diagram can quickly become over-complex CSFs for Effective Application Requires a comprehensive list of assumptions & constraints Attendance of representative group of stakeholders Commitment to honesty Preparation Good facilitation Use of structure (e.g. categories or RBS) Effective selection of critical impacts (e.g. by use of sensitivity analysis)

4 Check lists Delphi technique Document review FMEA/Fault Tree Analysis Force Field Analysis Industry knowledge base Influence diagrams Interviews Captures previous experience Present detailed list of risks Captures input from technical experts Removes sources of bias Exposes detailed projectspecific risks Requires no specialist tools Structured approach, well understood by engineers Produces an estimate of overall reliability using quantitative tools Good tool support Creates deep understanding of factors that affect project objectives Captures previous experience Allows benchmarking against external organizations Exposes key risk drivers Can generate counterintuitive insights not available through other techniques Addresses risks in detail Generates engagement of stakeholders Check list can grow to become unwieldy Risks not on the list will be missed Often only includes threats, misses opportunities Limited to technical risks Dependent on actual expertise of experts May take longer time than available due to iterations of the experts inputs Limited to risks contained in project documentation Focuses on threats not so useful for opportunities Requires expert tool not generally available to those except experts Time-consuming and complex technique Usually only applied to a single objective, so does not provide whole-project view Limited to what has previously happened Excludes project-specific risks Requires disciplined thinking Not always easy to determine appropriate structure Time consuming Raises non-risks, concerns, issues, worries etc, so requires filtering Regular maintenance is required Use of structure can assist (e.g. RBS) Effective facilitation Careful selection of experts Clear definition of scope Understanding of relevance of prior experience Detailed description of the area being assessed Statistically accurate data on fault probabilities for many events Prioritized objectives Access to relevant information Identify key areas to address Good interviewing and questioning skills Environment of trust, openness, confidentiality Preparation Open relationship between interviewer and interviewee

5 Nominal Group Technique Encourages and allows all participants to contribute Allows for different levels of competence in common language To a large extent, autodocumenting Provides ideal base for affinity diagramming (grouping by risk categories for use in the Risk Breakdown Structure and Root Cause Analysis) Can lead to frustration in dominant members who feel it is moving slowly Good briefing of all participant in the technique Strict facilitation Post-project reviews/lessons learned/historical Information Prompt Lists Questionnaire Risk Breakdown structure (RBS) Root-Cause Analysis Leverages previous experience Prevents making the same mistakes or missing the same opportunities twice Enhances the Organizational Process Assets Ensures coverage of all types of risk Stimulates creativity Encourages broad thinking to the identify risks Offers a framework for other risk identification techniques such as brainstorming Ensures coverage of all types of risk Test for blind spots or omissions Allows identification of additional, dependent risks Allows the organization to identify risks that may be related because of their common root causes Basis for development of pre-emptive and comprehensive responses Can serve to reduce apparent complexity Limited to those risks that have occurred previously Information is frequently incomplete: details of past risks may not include details of successful resolution; ineffective strategies are rarely documented Creative generation of ideas Well structured project lessons learned database Participation of previous project team members (ideally including the project manager) Topic can be too high level Choice of list relevant to the project and its environment Success depends on the quality of the questions Limited to the topics covered by the questions Can be a simple reformatting of a checklist None Most risk management techniques are organized by individual risk. This organization is not conducive to identifying the root causes Can oversimplify and hide existence of other potential causes There may be no valid strategy available for addressing the root cause once it has been identified Clear and unambiguous questions Detailed briefing of respondents Requires a comprehensive RBS, often tailored to the project Ability to identify if a risk is an outcome of a more fundamental cause Willingness by management to accept and address the root cause rather than adopting partial workarounds

6 SWOT Analysis System Dynamics WSS Review Ensures equal focus on both threats and opportunities Offers a structured approach to identify threats and opportunities Focus on internal (organizational strengths and weaknesses) and external (opportunities and threats) Exposes unexpected interrelations between project elements (feedback and feed-forward loops) Can generate counterintuitive through other techniques Produces overall impacts of all included events and risks Ensures all elements of the project scope are considered Provides for risks related to different levels of detail (from high-level to those related to individual work packages) Table 1: Techniques, examples and templates for identifying risks Source: [11]. Focuses on internally generated risks arising from organizational strengths and weaknesses, excludes external risks Tends to produce highlevel generic risks, not project-specific Requires specialized software and expertise to build models Focuses on impacts but difficult to include the concept of probability Excludes external risk or those not specifically related to WBS elements Good facilitation Strict adherence to the technique, to avoid confusing the four SWOT perspectives (i.e. between Strengths and Opportunities, or between Weaknesses and Threats) Understanding of feedback Competence in applying tools and understanding their output Quality of the system model Accuracy of input data collected for the specific project Good WBS From among the methods enumerated in the table 1, brainstorming is particularly popular among companies in Poland. As emphasised by R. Mulcahy ( ) it can be used in risk identification or for other project management issues [12]. Brainstorming belongs to the information collection techniques and involves team work of the people who deal with planning and implementation of an investment project. It s comfortable as it usually doesn t require a long preparation time before a discussion aimed at finding a solution to a specific problem can be held. Another popular technique is a SWOT analysis, which may be applied in any types of entities which carry out investment projects. Many companies in Poland also use check lists. They are created in companies and largely based on historical data, as well as the knowledge gained from execution of similar investment projects in the past. Summing up, practically every method listed in the table 1, to a lower or higher extent, is used in business practice. The leading construction and assembly companies in Poland, for example, use brainstorming as the key risk identification method. The research findings in this respect are presented in a figure 2.

7 Figure 2: Risk identification methods in construction companies in Poland survey research Source: Author s own elaboration based on: [17]. 1 risk analysis conducted by experts 2 brainstorming 3 ready-to-use check lists 4 interviews with main project participants 5 field visits 6 business intelligence 7 public debate In particular, the figure 2 presents the results of the empirical studies carried out among 25 contractors, out of 100 leading construction and assembly companies in Poland, where as many as 68% of the companies point at brainstorming. In the respondents opinions, it brings the best results when identifying potential risk sources directly on construction sites. Moreover, its popularity results from the numerous advantages it offers. The second most frequently used risk identification technique is an interview with key participants of projects (48% of the respondents). In practice, discussions are held between the representatives of the general contractor and their potential sub-contractors as well as other business partners and suppliers of utilities and construction equipment. Further on, the contractors participating in the research indicated the following: 18% of them carry out field visits on construction sites in order to identify risks (in practice, this is done by employees with long work history and a lot of experience, who have participated in similar projects before); 24% of the contractors make use of business intelligence, 7% of the respondents hire third party experts on risks (so far, an independent profession of risk manager has not been established in Poland in the construction industry); only 2 contractors used check lists; also, only 2 contractors used a public debate in their business practice. Consequently, these are the most popular risk identification methods in the construction industry in Poland. As ( ) a risk problem is an indispensable element of a modern company s business activity [13], construction companies in Poland (as well as worldwide) also use, to a lower extent, other risk identification methods and techniques (Tab. 1), for example, holistic methods. Among these methods, there is e.g. a risk picture analysis. The risk picture analysis involves drawing a picture which presents, in a holistic way, a project situation, as seen by its analysts [14]. This picture shows the structure of the project, i.e. its elements and relationships among these elements, processes conducted during the project and so-called soft elements, i.e. elements of the project which concern people, their attitude to the project, feelings, emotions, conflicts etc. [14]. This technique is easy to use and understandable and it doesn t require any highly specialised knowledge but just a fully understanding look at the investment project. Likewise, cause and effect diagrams, e.g.

8 Ishikawa diagram, may prove useful. The cause and effect analysis allows us to precisely identify all the areas, in the construction contractors business activities, where risks are particularly intense [15]. This concerns, first of all, such spheres as investment process organisation, selected technologies and techniques, threats caused by acts of god (force majeure risk etc.) [15]. Moreover, attention should be drawn to the impact of modern IT solutions in this area. Owing to appropriate computer software (e.g. PRINCE 2), applied to project management, the risk identification process can be supported successfully. Expert systems are particularly useful here. However, in practice, many companies (not only construction ones) in Poland use the simplest solutions to identify risks, i.e. entrepreneurs use their knowledge, experience and intuition. An experienced project manager (risk manager) is able to recognise and define a risk, which an investment project may be exposed to, in the most accurate way. Also (...) in many cases, the scope of identification is narrowed and it comprises, most frequently: an analysis of characteristics demonstrated by products and (or) services (marketing analysis), created by an investment project, as well as an analysis of planned technology (technical analysis) such analyses may reveal various sources of market risks or technical risks, an analysis of activities, resources and processes which an investment project involves (for example, an analysis of specific works and cost estimates, an analysis of contracts between participants of an investment process), an analysis of historical data about investment projects which are similar, in type, size and lifecycle, to an analysed project such information may be derived from various sources: documents describing a course of an investment process or a post-audit process, publications devoted to analyses of investment projects, which contain case studies, experiences of various entities (for example, consulting companies) or people involved in execution of the analysed investment project [7]. In business practice, in order to ensure satisfactory effectiveness of risk identification, a number of methods may be used simultaneously. It s also important to make sure that the method applied allows us to identify a cause-effect relation of the risk [16]. Conclusions Despite the fact that many of the risk identification methods mentioned in this paper have some disadvantages, we should try to use them in business practice. Depending on the type of an investment project, project managers (possibly, risk managers) may freely select and modify many of these methods. Effectiveness of risk identification methods used in investment projects means positive effects in this field. In terms of risk identification effects, we can, first of all, identify a source of risk, secondly, identify negative events which could possibly occur and lead to a failure, thirdly, indicate first symptoms of risk, and fourthly, inform about a need to take further, additional actions [14]. Accurate identification of risk effects is particularly important as it ensures more effective protection against risks i.e. by taking out extra insurance, creating reserves or e.g. reasonable risk distribution among investment project participants through contracts. One should remember, however, that even a hedging transaction cannot completely eliminate a risk of suffering a loss, as it can only mitigate a potential size of this loss [18].

9 Bibliography [1] Zarządzanie ryzykiem. Edited by JAJUGA, K., Wydawnictwo Naukowe PWN, Warszawa 2007, p. 15. [2] Construction Risk Management. Volume I. International Risk Management Institute, Inc., Dallas 2007, p. I.A.2. [3] WIDEMAN, M.R.: Project & Risk Management. A Guide to Managing Project Risks & Opportunities. Project Management Institute, Newtown Square 1992, p. E-3. [4] FLANAGAN, R., NORMAN, G.: Risk management in construction. Blackwell Publishing, Oxford, July 1993, p. 46. [5] A Guide to the Project Management Body of Knowledge (PMBOK Guide). Fourth Edition. Management Training & Development Centre, Warszawa 2009, p. 287; pp [6] VAN WELL-STAM, D., LINDENAAR, F., VAN KINDEREN S., VAN DEN BUT, B.: Project risk management. An essential tool for managing and controlling projects. KOGAN PAGE, London-Sterling 2004, p. 3. [7] ROGOWSKI, W., MICHALCZEWSKI, A.: Zarządzanie ryzykiem w przedsięwzięciach inwestycyjnych. Ryzyko walutowe i ryzyko stopy procentowej. Oficyna Ekonomiczna, Kraków 2005, p. 19; p. 22. [8] Ryzyko w działalności przedsiębiorstw. Wybrane aspekty. Edited by FIERLA, A., Szkoła Główna Handlowa w Warszawie, Warszawa 2009, p. 17. [9] ALESHIN, A.: Risk management of international projects in Russia. International Journal of Project Management 2001, Vol. 19, No. 2, p [10] Risk Management Standard. IRM, AIRMIC, ALARM 2002, p. 14. Webpage: [11] Practice Standard for Project Risk Management. Project Management Institute, Inc., Newtown Square 2009, pp [12] MULCAHY, R.: Risk Management. Tricks of the Trade for Project Managers. RMS Publications, Inc., Minneapolis, 2003, p. 80. [13] Strategie finansowe przedsiębiorstw w sytuacjach ryzykownych. Edited by ŁUKASIK, G., Akademia Ekonomiczna im. K. Adamieckiego w Katowicach, Katowice 2004, p. 9. [14] MARCINEK, K.: Ryzyko projektów inwestycyjnych. Akademia Ekonomiczna im. K. Adamieckiego w Katowicach, Katowice 2000, p. 117; pp [15] TWOREK, P.: Ryzyko wykonawców przedsięwzięć inwestycyjnych. Akademia Ekonomiczna im. K. Adamieckiego w Katowice, Katowice 2010, p [16] Rachunkowość w zarządzaniu ryzykiem w przedsiębiorstwie. Edited by NOWAK, E., Polskie Wydawnictwo Ekonomiczne, Warszawa 2010, p. 24. [17] MADYDA, A., ZIMA, K.: Stan zarządzania ryzykiem w polskich przedsiębiorstwach budowlanych. W: Strategie zarządzania ryzykiem w przedsiębiorstwie elementy wiedzy teoretycznej i praktycznej. Edited by J. Bizon-Góreckiej. Wydawnictwo BGJ-Consulting, Bydgoszcz 2000, p. 164.

10 [18] KOLB, W.R: Wszystko o instrumentach pochodnych. WIG-PRESS, Warszawa 1997, pp After: Rynek pienięŝny i kapitałowy. Edited by PYKA, I., Akademia Ekonomiczna im. K. Adamieckiego w Katowicach, Katowice 2001, p Summary The paper deals with the issues of risk identification in investment projects carried out by companies. The author focuses, in particular, on the methods used in risk identification processes in companies, which carry out investment projects. The empirical illustration to this point are the findings of the research carried out by the author in 25, out of 100, leading construction companies in Poland as the basic participants of investment processes.

PMI Risk Management Professional (PMI-RMP ) - Practice Standard and Certification Overview

PMI Risk Management Professional (PMI-RMP ) - Practice Standard and Certification Overview PMI Risk Management Professional (PMI-RMP ) - Practice Standard and Certification Overview Sante Torino PMI-RMP, IPMA Level B Head of Risk Management Major Programmes, Selex ES / Land&Naval Systems Division

More information

PMI Risk Management Professional (PMI-RMP) Exam Content Outline

PMI Risk Management Professional (PMI-RMP) Exam Content Outline PMI Risk Management Professional (PMI-RMP) Exam Content Outline Project Management Institute PMI Risk Management Professional (PMI-RMP) Exam Content Outline Published by: Project Management Institute,

More information

Comparative analysis of risk assessment methods in project IT

Comparative analysis of risk assessment methods in project IT Jacek Winiarski * Comparative analysis of risk assessment methods in project IT Introduction IT projects implementation as described in software development methodologies is usually distributed into several

More information

Partnering for Project Success: Project Manager and Business Analyst Collaboration

Partnering for Project Success: Project Manager and Business Analyst Collaboration Partnering for Project Success: Project Manager and Business Analyst Collaboration By Barbara Carkenord, CBAP, Chris Cartwright, PMP, Robin Grace, CBAP, Larry Goldsmith, PMP, Elizabeth Larson, PMP, CBAP,

More information

A Risk Management Standard

A Risk Management Standard A Risk Management Standard Introduction This Risk Management Standard is the result of work by a team drawn from the major risk management organisations in the UK, including the Institute of Risk management

More information

Project Scope Management in PMBOK made easy

Project Scope Management in PMBOK made easy By Dr. TD Jainendrakumar The main objective of any project is to fulfill the scope of the project on time and within the budget. What is Project Scope? Scope refers to all the work involved in creating

More information

Project Risk Management

Project Risk Management Project Risk Management Study Notes PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. Points to Note Risk Management

More information

http://www.io4pm.org IO4PM - International Organization for Project Management

http://www.io4pm.org IO4PM - International Organization for Project Management THE ONLY BOOK CAN SIMPLY LEARN PROJECT MANAGEMENT! Page 1 Contents ABOUT THE AUTHOR... 3 WHAT IS PROJECT MANAGEMENT?... 5 ORGANIZATIONAL INFLUENCES AND PROJECT LIFECYCLE... 11 PROJECT MANAGEMENT PROCESSES...

More information

Excerpts from the scientific research on risk conducted among the largest Polish contractors

Excerpts from the scientific research on risk conducted among the largest Polish contractors Piotr Tworek * Excerpts from the scientific research on risk conducted among the largest Polish contractors Introduction Risks occur in business operations of every company, including construction and

More information

PROJECT RISK MANAGEMENT

PROJECT RISK MANAGEMENT PROJECT RISK MANAGEMENT DEFINITION OF A RISK OR RISK EVENT: A discrete occurrence that may affect the project for good or bad. DEFINITION OF A PROBLEM OR UNCERTAINTY: An uncommon state of nature, characterized

More information

Risk Management Plan template <TEMPLATE> RISK MANAGEMENT PLAN FOR THE <PROJECT-NAME> PROJECT

Risk Management Plan template <TEMPLATE> RISK MANAGEMENT PLAN FOR THE <PROJECT-NAME> PROJECT RISK MANAGEMENT PLAN FOR THE PROJECT Prepared by: Approved by: Reference: Version: Date: INTRODUCTION This document is the Risk Management

More information

Use a Risk Breakdown Structure (RBS) to Understand Your Risks

Use a Risk Breakdown Structure (RBS) to Understand Your Risks Use a Risk Breakdown Structure (RBS) to Understand Your Risks David Hillson, PhD, PMP, FAPM, MIRM, MCMI, Director of Consultancy, Management Professional Solutions Limited Introducing the Risk Breakdown

More information

PMP Project Management Professional Study Guide, Third Edition

PMP Project Management Professional Study Guide, Third Edition PMP Project Management Professional Study Guide, Third Edition Joseph Phillips McGraw-Hill is an independent entity from the Project Management Institute, Inc. and is not affiliated with the Project Management

More information

The 10 Knowledge Areas & ITTOs

The 10 Knowledge Areas & ITTOs This document is part of a series that explain the newly released PMBOK 5th edition. These documents provide simple explanation and summary of the book. However they do not replace the necessity of reading

More information

Guideline. Records Management Strategy. Public Record Office Victoria PROS 10/10 Strategic Management. Version Number: 1.0. Issue Date: 19/07/2010

Guideline. Records Management Strategy. Public Record Office Victoria PROS 10/10 Strategic Management. Version Number: 1.0. Issue Date: 19/07/2010 Public Record Office Victoria PROS 10/10 Strategic Management Guideline 5 Records Management Strategy Version Number: 1.0 Issue Date: 19/07/2010 Expiry Date: 19/07/2015 State of Victoria 2010 Version 1.0

More information

A structured approach to Enterprise Risk Management (ERM) and the requirements of ISO 31000

A structured approach to Enterprise Risk Management (ERM) and the requirements of ISO 31000 A structured approach to Enterprise Risk Management (ERM) and the requirements of ISO 31000 Contents Executive summary Introduction Acknowledgements Part 1: Risk, risk management and ISO 31000 1 Nature

More information

ISO, CMMI and PMBOK Risk Management: a Comparative Analysis

ISO, CMMI and PMBOK Risk Management: a Comparative Analysis ISO, CMMI and PMBOK Risk Management: a Comparative Analysis Cristine Martins Gomes de Gusmão Federal University of Pernambuco / Informatics Center Hermano Perrelli de Moura Federal University of Pernambuco

More information

Risk Management Primer

Risk Management Primer Risk Management Primer Purpose: To obtain strong project outcomes by implementing an appropriate risk management process Audience: Project managers, project sponsors, team members and other key stakeholders

More information

Introduction to the ITS Project Management Methodology

Introduction to the ITS Project Management Methodology Introduction to the ITS Project Management Methodology In September 1999 the Joint Legislative Committee on Performance Evaluation and Expenditure Review (PEER) produced a report entitled Major Computer

More information

Interpreting the Management Process in IEEE/EIA 12207 with the Help of PMBOK

Interpreting the Management Process in IEEE/EIA 12207 with the Help of PMBOK Interpreting the Management Process in IEEE/EIA 12207 with the Help of PMBOK Lewis Gray, Ph.D., PMP Abelia Fairfax, Virginia USA www.abelia.com Copyright 2002 by Abelia Corporation. All rights reserved

More information

Project Risk Management Single Subject Certificate Syllabus Levels 1&2 4 th Edition

Project Risk Management Single Subject Certificate Syllabus Levels 1&2 4 th Edition Project Risk Management Single Subject Certificate Syllabus Levels 1&2 4 th Edition The Single Subject Certificates in Project Risk Management (Risk SSC) are designed to build on the knowledge gained in

More information

Managing IT Projects. Chapter 2 The PMI Framework

Managing IT Projects. Chapter 2 The PMI Framework Managing IT Projects Chapter 2 The PMI Framework The PMI Framework The Project Management Institute,USA is an internationally acclaimed organization Devoted to Creation & sharing of knowledge in the area

More information

Develop Project Charter. Develop Project Management Plan

Develop Project Charter. Develop Project Management Plan Develop Charter Develop Charter is the process of developing documentation that formally authorizes a project or a phase. The documentation includes initial requirements that satisfy stakeholder needs

More information

INTERNAL AUDIT FRAMEWORK

INTERNAL AUDIT FRAMEWORK INTERNAL AUDIT FRAMEWORK April 2007 Contents 1. Introduction... 3 2. Internal Audit Definition... 4 3. Structure... 5 3.1. Roles, Responsibilities and Accountabilities... 5 3.2. Authority... 11 3.3. Composition...

More information

Information Technology Project Oversight Framework

Information Technology Project Oversight Framework i This Page Intentionally Left Blank i Table of Contents SECTION 1: INTRODUCTION AND OVERVIEW...1 SECTION 2: PROJECT CLASSIFICATION FOR OVERSIGHT...7 SECTION 3: DEPARTMENT PROJECT MANAGEMENT REQUIREMENTS...11

More information

PROJECT MANAGEMENT METHODOLOGY SECTION 3 -- PLANNING PHASE

PROJECT MANAGEMENT METHODOLOGY SECTION 3 -- PLANNING PHASE PROJECT MANAGEMENT METHODOLOGY SECTION 3 -- PLANNING PHASE Table of Contents Introduction...3-1 Overview...3-1 The Process and the Project Plan...3-1 Project Objectives and Scope...3-1 Work Breakdown Structure...3-1

More information

Monitoring and Evaluation of. Interventions

Monitoring and Evaluation of. Interventions Monitoring and Evaluation of Sports in Development (SiD) Interventions presented by: Pamela K. Mbabazi, Ph.D. Faculty of Development Studies, Department of Development Studies Mbarara University of Science

More information

Operational Risk Management - The Next Frontier The Risk Management Association (RMA)

Operational Risk Management - The Next Frontier The Risk Management Association (RMA) Operational Risk Management - The Next Frontier The Risk Management Association (RMA) Operational risk is not new. In fact, it is the first risk that banks must manage, even before they make their first

More information

ENTERPRISE RISK MANAGEMENT FRAMEWORK

ENTERPRISE RISK MANAGEMENT FRAMEWORK ROCKHAMPTON REGIONAL COUNCIL ENTERPRISE RISK MANAGEMENT FRAMEWORK 2013 Adopted 25 June 2013 Reviewed: October 2015 TABLE OF CONTENTS 1. Introduction... 3 1.1 Council s Mission... 3 1.2 Council s Values...

More information

Integration Mgmt / Initiating Process Group 4.1 Develop Project Charter

Integration Mgmt / Initiating Process Group 4.1 Develop Project Charter 1 Mgmt / Initiating Process Group 4.1 Develop Project Charter Project statement of work Business case Agreements Facilitation techniques Project charter 26/02/2013 18:23:36 1 2 Mgmt / Planning Process

More information

Exemplars. Research Report

Exemplars. Research Report Exemplars Research Report Every effort has been made to trace and contact the authors of these works, but this has not been possible in every case. If notified, we will undertake to rectify any errors

More information

FUNBIO PROJECT RISK MANAGEMENT GUIDELINES

FUNBIO PROJECT RISK MANAGEMENT GUIDELINES FUNBIO PROJECT RISK MANAGEMENT GUIDELINES OP-09/2013 Responsible Unit: PMO Focal Point OBJECTIVE: This Operational Procedures presents the guidelines for the risk assessment and allocation process in projects.

More information

Best Practices Statement Project Management. Best Practices for Managing State Information Technology Projects

Best Practices Statement Project Management. Best Practices for Managing State Information Technology Projects State of Arkansas Office of Information Technology 124 W. Capitol Ave. Suite 990 Little Rock, AR 72201 501.682.4300 Voice 501.682.4020 Fax http://www.cio.arkansas.gov/techarch Best Practices Statement

More information

Quick Reference Guide Interactive PDF Project Management Processes for a Project

Quick Reference Guide Interactive PDF Project Management Processes for a Project Project Processes for a Project Click the Knowledge Area title (below and left in blue underline) to view the details of each Process Group. Project Process Groups and Knowledge Areas Mapping Project Process

More information

Crosswalk Between Current and New PMP Task Classifications

Crosswalk Between Current and New PMP Task Classifications Crosswalk Between Current and New PMP Task Classifications Domain 01 Initiating the Project Conduct project selection methods (e.g., cost benefit analysis, selection criteria) through meetings with the

More information

The purpose of Capacity and Availability Management (CAM) is to plan and monitor the effective provision of resources to support service requirements.

The purpose of Capacity and Availability Management (CAM) is to plan and monitor the effective provision of resources to support service requirements. CAPACITY AND AVAILABILITY MANAGEMENT A Project Management Process Area at Maturity Level 3 Purpose The purpose of Capacity and Availability Management (CAM) is to plan and monitor the effective provision

More information

A COMPARISON OF PRINCE2 AGAINST PMBOK

A COMPARISON OF PRINCE2 AGAINST PMBOK Introduction This comparison takes each part of the PMBOK and gives an opinion on what match there is with elements of the PRINCE2 method. It can be used in any discussion of the respective merits of the

More information

CPM -100: Principles of Project Management

CPM -100: Principles of Project Management CPM -100: Principles of Project Management Lesson E: Risk and Procurement Management Presented by Sam Lane samlane@aol.com Ph: 703-883-7149 Presented at the IPM 2002 Fall Conference Prepared by the Washington,

More information

Project risk management selected aspects Zarz dzanie ryzykiem projektu wybrane aspekty

Project risk management selected aspects Zarz dzanie ryzykiem projektu wybrane aspekty Zeszyty Naukowe UNIWERSYTETU PRZYRODNICZO-HUMANISTYCZNEGO w SIEDLCACH Nr 92 Seria: Administracja i Zarz dzanie 2012 dr Marek Szajczyk Uniwersytet Przyrodniczo-Humanistyczny w Siedlcach Project risk management

More information

RISK MANAGEMENT OVERVIEW - APM Project Pathway (Draft) RISK MANAGEMENT JUST A PART OF PROJECT MANAGEMENT

RISK MANAGEMENT OVERVIEW - APM Project Pathway (Draft) RISK MANAGEMENT JUST A PART OF PROJECT MANAGEMENT RISK MANAGEMENT OVERVIEW - APM Project Pathway (Draft) Risk should be defined as An uncertain event that, should it occur, would have an effect (positive or negative) on the project or business objectives.

More information

Criticism of Implementation of ITSM & ISO20000 in IT Banking Industry. Presented by: Agus Sutiawan, MIT, CISA, CISM, ITIL, BSMR3

Criticism of Implementation of ITSM & ISO20000 in IT Banking Industry. Presented by: Agus Sutiawan, MIT, CISA, CISM, ITIL, BSMR3 Criticism of Implementation of ITSM & ISO20000 in IT Banking Industry Presented by: Agus Sutiawan, MIT, CISA, CISM, ITIL, BSMR3 Outline What is IT Service Management What is ISO 20000 Step by step implementation

More information

Project Management. [Student s Name] [Name of Institution]

Project Management. [Student s Name] [Name of Institution] 1 Paper: Assignment Style: Harvard Pages: 10 Sources: 7 Level: Master Project Management [Student s Name] [Name of Institution] 2 Project Management Introduction The project management also known as management

More information

DESCRIPTION OF COURSES

DESCRIPTION OF COURSES DESCRIPTION OF COURSES MGT600 Management, Organizational Policy and Practices The purpose of the course is to enable the students to understand and analyze the management and organizational processes and

More information

ENGINEERING COUNCIL. Guidance on Risk for the Engineering Profession. www.engc.org.uk/risk

ENGINEERING COUNCIL. Guidance on Risk for the Engineering Profession. www.engc.org.uk/risk ENGINEERING COUNCIL Guidance on Risk for the Engineering Profession www.engc.org.uk/risk This guidance describes the role of professional engineers and technicians in dealing with risk, and their responsibilities

More information

HOW TO USE THE DGI DATA GOVERNANCE FRAMEWORK TO CONFIGURE YOUR PROGRAM

HOW TO USE THE DGI DATA GOVERNANCE FRAMEWORK TO CONFIGURE YOUR PROGRAM HOW TO USE THE DGI DATA GOVERNANCE FRAMEWORK TO CONFIGURE YOUR PROGRAM Prepared by Gwen Thomas of the Data Governance Institute Contents Why Data Governance?... 3 Why the DGI Data Governance Framework

More information

the indicator development process

the indicator development process Part Two Part Two: the indicator development process the indicator development process Part Two: the indicator development process Key elements of the indicator development process Define strategic directions

More information

Key performance indicators

Key performance indicators Key performance indicators Winning tips and common challenges Having an effective key performance indicator (KPI) selection and monitoring process is becoming increasingly critical in today s competitive

More information

BENEFITS REALIZATION ENSURES CHANGE DELIVERS GREATER BUSINESS VALUE

BENEFITS REALIZATION ENSURES CHANGE DELIVERS GREATER BUSINESS VALUE BENEFITS REALIZATION ENSURES CHANGE DELIVERS GREATER BUSINESS VALUE Focusing on the delivery of value-adding benefits is an excellent way to achieve greater ROI from change. Benefits & Value Management

More information

Certificate In Project Management (CIPM)

Certificate In Project Management (CIPM) Conceptualize Plan Plan & Deliver Organize Implement Control Change if Required Integrate Deliver & Closeout Knowledge Leverage Certificate In Project Management (CIPM) Course Overview The Certificate

More information

IMEO International Mass Event Organization based on Recent Experience of Euro 2012

IMEO International Mass Event Organization based on Recent Experience of Euro 2012 IMEO International Mass Event Organization based on Recent Experience of Euro 2012 1. Name of the project: Project Management 2. Leader of the workshop (materials' author): Szymon Włochowicz 1 Objectives

More information

pm4dev, 2007 management for development series The Project Management Processes PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS

pm4dev, 2007 management for development series The Project Management Processes PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS pm4dev, 2007 management for development series The Project Management Processes PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS A methodology to manage

More information

Seven steps to effective board and director evaluations

Seven steps to effective board and director evaluations COMPANY SECRETARY Seven steps to effective board and director evaluations By Geoffrey Kiel, Professor, University of Queensland; Founder and Chairman, Competitive Dynamics Pty Ltd; and James Beck, Managing

More information

Project Management Body of Knowledge (PMBOK) (An Overview of the Knowledge Areas)

Project Management Body of Knowledge (PMBOK) (An Overview of the Knowledge Areas) Project Management Body of Knowledge (PMBOK) (An Overview of the Knowledge Areas) Nutek, Inc. 3829 Quarton Road, Suite 102 Bloomfield Hills, Michigan 48302, USA. Phone: 248-540-4827, Email: Support@Nutek-us.com

More information

The Key to a Successful KM Project

The Key to a Successful KM Project Introduction An integrated PKM methodology enables organizations to maximize their investments by ensuring initiatives are on time and within budget, while sharing project challenges and successes that

More information

STANDARD. Risk Assessment. Supply Chain Risk Management: A Compilation of Best Practices

STANDARD. Risk Assessment. Supply Chain Risk Management: A Compilation of Best Practices A S I S I N T E R N A T I O N A L Supply Chain Risk Management: Risk Assessment A Compilation of Best Practices ANSI/ASIS/RIMS SCRM.1-2014 RA.1-2015 STANDARD The worldwide leader in security standards

More information

Project Management. Synopsis. 1. Introduction. Learning Objectives. Sections. Learning Summary

Project Management. Synopsis. 1. Introduction. Learning Objectives. Sections. Learning Summary Synopsis Project Management 1. Introduction By the time you have completed Module 1 you should understand: what is meant by a project; the concept of project management; how project management can be structured

More information

Procuring Penetration Testing Services

Procuring Penetration Testing Services Procuring Penetration Testing Services Introduction Organisations like yours have the evolving task of securing complex IT environments whilst delivering their business and brand objectives. The threat

More information

Job Description. Industry business analyst. Salary Band: Purpose of Job

Job Description. Industry business analyst. Salary Band: Purpose of Job Job Description Job Title: Industry business analyst Division/Company: Industry Policy/Payments UK Reporting To: Director of Industry Policy Salary and: C Purpose of Job To provide thought leadership and

More information

Problem Management: A CA Service Management Process Map

Problem Management: A CA Service Management Process Map TECHNOLOGY BRIEF: PROBLEM MANAGEMENT Problem : A CA Service Process Map MARCH 2009 Randal Locke DIRECTOR, TECHNICAL SALES ITIL SERVICE MANAGER Table of Contents Executive Summary 1 SECTION 1: CHALLENGE

More information

Redesigned Framework and Approach for IT Project Management

Redesigned Framework and Approach for IT Project Management Vol. 5 No. 3, July, 2011 Redesigned Framework and Approach for IT Project Management Champa Hewagamage 1, K. P. Hewagamage 2 1 Department of Information Technology, Faculty of Management Studies and Commerce,

More information

Program Management Professional (PgMP) Examination Content Outline

Program Management Professional (PgMP) Examination Content Outline Program Management Professional (PgMP) Examination Content Outline Project Management Institute Program Management Professional (PgMP ) Examination Content Outline April 2011 Published by: Project Management

More information

Evaluation and Integration of Risk Management in CMMI and ISO/IEC 15504

Evaluation and Integration of Risk Management in CMMI and ISO/IEC 15504 Evaluation and Integration of Risk Management in CMMI and ISO/IEC 15504 Dipak Surie, Email : ens03dse@cs.umu.se Computing Science Department Umea University, Umea, Sweden Abstract. During software development,

More information

PMP SAMPLE QUESTIONS BASED ON PMBOK 5TH EDITION

PMP SAMPLE QUESTIONS BASED ON PMBOK 5TH EDITION PMP SAMPLE QUESTIONS http://www.tutorialspoint.com/pmp-exams/pmp_sample_questions_set2.htm Copyright tutorialspoint.com BASED ON PMBOK 5TH EDITION Here are 200 more objective type sample questions and

More information

Principles of Execution. Tips and Techniques for Effective Project Portfolio Management

Principles of Execution. Tips and Techniques for Effective Project Portfolio Management Principles of Execution Tips and Techniques for Effective Project Management Roadmap Develop A Shared Vision for Management Understanding the Difference between Project Management Reviews and Management

More information

PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE:

PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE: PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE: Project Name Project Management Plan Document Information Document Title Version Author Owner Project Management Plan Amendment History

More information

Underwriting put to the test: Process risks for life insurers in the context of qualitative Solvency II requirements

Underwriting put to the test: Process risks for life insurers in the context of qualitative Solvency II requirements Underwriting put to the test: Process risks for life insurers in the context of qualitative Solvency II requirements Authors Lars Moormann Dr. Thomas Schaffrath-Chanson Contact solvency-solutions@munichre.com

More information

Project Risk Management in Automotive Industry. A Case Study

Project Risk Management in Automotive Industry. A Case Study 6th International Conference on Industrial Engineering and Industrial Management. XVI Congreso de Ingeniería de Organización. Vigo, July 18-20, 2012 Project Risk Management in Automotive Industry. A Case

More information

Making project management indispensable for business results. Project Management 101

Making project management indispensable for business results. Project Management 101 Making project management indispensable for business results. Project Management 101 Donald E. Moore, MBA, PMP, President of PMI NB Kelly Barter, Chapter Manager of PMI NB AGM April 28, 2011 Topics of

More information

Project Management Topics

Project Management Topics S E C T I O N II T W O Project Management Topics SECTION II: PROJECT MANAGEMENT TOPICS TABLE OF CONTENTS Introduction 3 1. PROJECT TRIAGE 5 1.1 Gather the Data 7 1.2 Review and Analyze the Data 10 1.3

More information

Chartered Engineer. Go back to www.iop.org to choose an alternative status. Write your professional review report

Chartered Engineer. Go back to www.iop.org to choose an alternative status. Write your professional review report Chartered Engineer Start your journey Chartered Engineers are characterised by their ability to develop appropriate solutions to engineering problems, using new or existing technologies, through innovation,

More information

Creating excellence in professional standards and practices to enable Healthcare market researchers to become highly valued business partners

Creating excellence in professional standards and practices to enable Healthcare market researchers to become highly valued business partners Creating excellence in professional standards and practices to enable Healthcare market researchers to become highly valued business partners EphMRA Vision EMA Workshop on Patient Support Programmes and

More information

Project Management Professional (PMP) Examination Content Outline

Project Management Professional (PMP) Examination Content Outline Project Management Professional (PMP) Examination Content Outline Project Management Institute Project Management Professional (PMP ) Examination Content Outline Revised August 2011 Published by: Project

More information

ENHANCEMENT OF FINANCIAL RISK MANAGEMENT WITH THE AID OF ANALYTIC HIERARCHY PROCESS

ENHANCEMENT OF FINANCIAL RISK MANAGEMENT WITH THE AID OF ANALYTIC HIERARCHY PROCESS ISAHP 2005, Honolulu, Hawaii, July 8-10, 2003 ENHANCEMENT OF FINANCIAL RISK MANAGEMENT WITH THE AID OF ANALYTIC HIERARCHY PROCESS Jerzy Michnik a,b, 1, Mei-Chen Lo c a Kainan University, No.1, Kainan Rd.,

More information

Project Management Certificate (IT Professionals)

Project Management Certificate (IT Professionals) Project Management Certificate (IT Professionals) Whether your field is architecture or information technology, successful planning involves a carefully crafted set of steps to planned and measurable goals.

More information

Project Management Standards: A Review of Certifications/Certificates

Project Management Standards: A Review of Certifications/Certificates Project Standards: A Review of Certifications/Certificates Standards for Project Supporting Certification and Certificates Certificate Certification The Project Body of Knowledge PMBOK Guide Projects in

More information

THE INFORMATION AUDIT AS A FIRST STEP TOWARDS EFFECTIVE KNOWLEDGE MANAGEMENT: AN OPPORTUNITY FOR THE SPECIAL LIBRARIAN * By Susan Henczel

THE INFORMATION AUDIT AS A FIRST STEP TOWARDS EFFECTIVE KNOWLEDGE MANAGEMENT: AN OPPORTUNITY FOR THE SPECIAL LIBRARIAN * By Susan Henczel INSPEL 34(2000)3/4, pp. 210-226 THE INFORMATION AUDIT AS A FIRST STEP TOWARDS EFFECTIVE KNOWLEDGE MANAGEMENT: AN OPPORTUNITY FOR THE SPECIAL LIBRARIAN * By Susan Henczel Introduction Knowledge is universally

More information

TAPISTRY: A Software Process Improvement Approach Tailored for Small Enterprises

TAPISTRY: A Software Process Improvement Approach Tailored for Small Enterprises TAPISTRY: A Software Process Improvement Approach Tailored for Small Enterprises Joey van Angeren (3227162) Group 2 Department of Information and Computing Sciences, Utrecht University Princetonplein 5,

More information

An Approach to Proactive Risk Classification

An Approach to Proactive Risk Classification An Approach to Proactive Risk Classification M.S. Rojabanu 1, Dr. K. Alagarsamy 2 1 Research Scholar, Madurai Kamaraj Universtiy, Madurai,India. 2 Associate Professor, Computer Centre, Madurai Kamaraj

More information

www.aryanengineering.com Email: info@aryanengineering.com

www.aryanengineering.com Email: info@aryanengineering.com What is PMP Certification exam? www.aryanengineering.com PMP stands for Project Management Professional certification exam. PMP, is one of the most respected and globally recognized certification is offered

More information

Project Management Institute PRACTICE STANDARD FOR PROJECT RISK MANAGEMENT

Project Management Institute PRACTICE STANDARD FOR PROJECT RISK MANAGEMENT Project Management Institute PRACTICE STANDARD FOR PROJECT RISK MANAGEMENT ISBN: 978-1-933890-38-8 Published by: Project Management Institute, Inc. 14 Campus Boulevard Newtown Square, Pennsylvania 19073-3299

More information

Project Zeus. Risk Management Plan

Project Zeus. Risk Management Plan Project Zeus Risk Management Plan 1 Baselined: 5/7/1998 Last Modified: N/A Owner: David Jones/Zeus Project Manager Page Section 1. Introduction 3 1.1 Assumptions, Constraints, and Policies 3 1.2 Related

More information

Business Analysis Standardization & Maturity

Business Analysis Standardization & Maturity Business Analysis Standardization & Maturity Contact Us: 210.399.4240 info@enfocussolutions.com Copyright 2014 Enfocus Solutions Inc. Enfocus Requirements Suite is a trademark of Enfocus Solutions Inc.

More information

A Human Resource Capacity Tool for First Nations // planning for treaty

A Human Resource Capacity Tool for First Nations // planning for treaty A Human Resource Capacity Tool for First Nations // planning for treaty table of contents Introduction //...3 Tools //... 9 HR Planning Timeline... 9 Stage 1 Where are we now?...11 Stage 2 Where do we

More information

In the first three installments of our series on Information Security

In the first three installments of our series on Information Security Information Security Management Programs: Assessment Analysis Lessons Learned and Best Practices Revealed JUSTIN SOMAINI AND ALAN HAZLETON This article, the fourth in a series, expands on the overlooked

More information

Minnesota Health Insurance Exchange (MNHIX)

Minnesota Health Insurance Exchange (MNHIX) Minnesota Health Insurance Exchange (MNHIX) 1.2 Plan September 21st, 2012 Version: FINAL v.1.0 11/9/2012 2:58 PM Page 1 of 87 T A B L E O F C O N T E N T S 1 Introduction to the Plan... 12 2 Integration

More information

PASTA Abstract. Process for Attack S imulation & Threat Assessment Abstract. VerSprite, LLC Copyright 2013

PASTA Abstract. Process for Attack S imulation & Threat Assessment Abstract. VerSprite, LLC Copyright 2013 2013 PASTA Abstract Process for Attack S imulation & Threat Assessment Abstract VerSprite, LLC Copyright 2013 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

More information

Appendix V Risk Management Plan Template

Appendix V Risk Management Plan Template Appendix V Risk Management Plan Template Version 2 March 7, 2005 This page is intentionally left blank. Version 2 March 7, 2005 Title Page Document Control Panel Table of Contents List of Acronyms Definitions

More information

PROJECT RISK MANAGEMENT

PROJECT RISK MANAGEMENT 11 PROJECT RISK MANAGEMENT Project Risk Management includes the processes concerned with identifying, analyzing, and responding to project risk. It includes maximizing the results of positive events and

More information

Your Software Quality is Our Business. INDEPENDENT VERIFICATION AND VALIDATION (IV&V) WHITE PAPER Prepared by Adnet, Inc.

Your Software Quality is Our Business. INDEPENDENT VERIFICATION AND VALIDATION (IV&V) WHITE PAPER Prepared by Adnet, Inc. INDEPENDENT VERIFICATION AND VALIDATION (IV&V) WHITE PAPER Prepared by Adnet, Inc. February 2013 1 Executive Summary Adnet is pleased to provide this white paper, describing our approach to performing

More information

Training Objectives and Course Modules

Training Objectives and Course Modules 1. MARKET DEVELOPMENT Penetrating new markets allows your producers to generate business growth and a more sustainable business practice. In this series of workshops, participants will learn how to successfully

More information

Department of Administration Portfolio Management System 1.3 June 30, 2010

Department of Administration Portfolio Management System 1.3 June 30, 2010 E 06/ 30/ 2010 EX AM PL 1. 3 06/ 28/ 2010 06/ 24/ 2010 06/ 23/ 2010 06/ 15/ 2010 06/ 18/ 2010 Portfolio System 1.3 June 30, 2010 Contents Section 1. Project Overview... 1 1.1 Project Description... 1 1.2

More information

-Blue Print- The Quality Approach towards IT Service Management

-Blue Print- The Quality Approach towards IT Service Management -Blue Print- The Quality Approach towards IT Service Management The Qualification and Certification Program in IT Service Management according to ISO/IEC 20000 TÜV SÜD Akademie GmbH Certification Body

More information

Project Services. How do we do it?

Project Services. How do we do it? Project Services Many organisations struggle with inconsistent or poor project management performance across their business. Sometimes the failure to deliver on time and on budget (or at all!) is simply

More information

Enhancing Outsourcing Relationship Management Capabilities: Driving Greater Value from AllianceBernstein s Global Operations

Enhancing Outsourcing Relationship Management Capabilities: Driving Greater Value from AllianceBernstein s Global Operations Enhancing Outsourcing Relationship Management Capabilities: Driving Greater Value from AllianceBernstein s Global Operations A Vantage Partners Case Study 2011 Vantage Partners, LLC. All rights reserved.

More information

4 Testing General and Automated Controls

4 Testing General and Automated Controls 4 Testing General and Automated Controls Learning Objectives To understand the reasons for testing; To have an idea about Audit Planning and Testing; To discuss testing critical control points; To learn

More information

Enterprise Risk Management

Enterprise Risk Management Enterprise Management ERM provides a framework for risk management, which typically involves identifying particular events or circumstances relevant to the organization's objectives (risks and opportunities),

More information

1. What is PRINCE2? Projects In a Controlled Environment. Structured project management method. Generic based on proven principles

1. What is PRINCE2? Projects In a Controlled Environment. Structured project management method. Generic based on proven principles 1. What is PRINCE2? Projects In a Controlled Environment Structured project management method Generic based on proven principles Isolates the management from the specialist 2 1.1. What is a Project? Change

More information

Financial Planner of the Year 2015. Financial Plan Guide

Financial Planner of the Year 2015. Financial Plan Guide Financial Planner of the Year 2015 Financial Plan Guide TABLE OF CONTENTS INTRODUCTION 3 PROFESSIONAL SKILLS 3 PROFESSIONAL RESPONSIBILITY 4 PRACTICE 4 COMMUNICATION 4 COGNITIVE 4 PROFESSIONAL AND LEGAL

More information

ITIL Service Lifecycles and the Project Manager

ITIL Service Lifecycles and the Project Manager 1 ITIL Service Lifecycles and the Project Manager The intersection of IT Service and Project Delivery Presented to: Kansas City Mid-America PMI Chapter Mark Thomas January 17, 2011 1 Agenda 2 Introduction

More information

The Association of Change Management Professionals

The Association of Change Management Professionals The Association of Change Management Professionals Statement of Change Management Scope, Knowledge Areas, and Process Groups March 31, 2012 Introduction The Association of Change Management Professionals

More information