VDOT Small Business Enterprise Program Approved Contractors
|
|
|
- Opal Mills
- 10 years ago
- Views:
Transcription
1 A & P Services, LLC Pisgah Forest (828) [email protected] NC Highway, Street and Bridge Construction All Other Support Activities for Road ALH Construction Elizabethton TN (423) [email protected] Road and Bridge Concrete Construction Bridge and Culvert Construction Concrete Paving and Incidental Concrete American Road Signs LLC Virginia Beach Sign Erection, Highway, Roads Street or Bridge (757) [email protected] ARC CON Solutions, INC. Staunton Additions, Alteration and Renovation, Commercial and Institutional (504) [email protected] Arthur Construction Dulles (703) [email protected] Highway, Street and Bridge Construction A-Team Construction Stanley (540) [email protected] Foundation Digging/Excavation Poured Concrete Foundation and Structures Masonry Contractors Page 1 of 8
2 Atlantic Underground Construction, LLC Deltaville (804) Highway, Street and Bridge Construction Other Heavy and Civil Engineering Construction Water and Sewer Line and Related Structures Construction Carroll Construction Co. Winchester (540) Paving, Residential & Commercial Driveway & Parking Lot Commercial Seeding, Inc. Zuni (757) Asphalt Paving Drainage Construction Sites Grading Construction Sites, Demolition & Excavation Contractor Landscaping Services, Tree Removal Services, Hydroseeding Services Cooper and Claiborne Construction, Inc. Hopewell (804) Erosion Control Excavation Services Drainage Structures Underground Utilities Dickerson Construction, LLC. Midlothian (804) Heavy & Civil Engineering F & B Contractors, LTD. Bedford (540) [email protected] Page 2 of 8
3 Fastbreak General Contracors, LLC Hampton (757) Roofing Contractors Industrial Building Construction Drywall and Installation Contractors Painting and Wall Coverings Contractors Highway, Street and Bridge Construction Poured Concrete Foundation and Structure Graham Concrete, LLC Richmond Poured Concrete Foundation and Structure Contractors (804) Structural Steel and Precast Concrete Contractors IQ Electrical Services LLC Richmond Electrical, Electrical Wiring, low voltage work (804) J. R. Caskey, Inc. Oilville (804) Water Supply Systems Industrial Building Construction New Multi-Family Housing Construction New Single-Family Housing Construction Water & Sewer Line & Related Structures Construction J.C. Joyce Trucking and Paving Co., INC Patrick Springs Road Construction (276) Snow Removal Hauling Crushed Stone Page 3 of 8
4 JAG Construction, LLC Richmond (804) New-Single Family Housing New Multifamily Housing Residential Remodelers Landscaping services Jireh Construction Co, Inc. Richmond (804) General Freight Trucking, Local Water & Sewer Line & Related Structures L. A. Welding Chase City Welding (434) Ladybug Concrete Specialties, Inc. Chesapeake (757) Concrete Sawing and Drilling, concrete polishing, concrete grinding LAS Trucking and Construction, Inc. Shawsville Highway, Street, and Bridge Construction (540) M & F Concrete, Inc. Manassas (571) [email protected] Poured Concrete & Foundation & Structure Contractors Page 4 of 8
5 McDemus & Co., LLC Manassas (703) Accounting Services Other Accounting Services Tax Consulting and Preparation Services General Administrative and Management Consulting Services Administrative Support Services Michie Contracting Group Charlottesville (434) Other Heavy & Civil Engineering Construction Water & Sewer Line Related Structure Construction Milani Construction, LLC. Washington DC (202) New Single-Family Housing Construction Commercial & Institutional Building Construction Water & Sewer Line & Related Structures Construction Power & Communication Line & Related Structures Const. Mitchell Utilities, LLC. Windsor (757) Oak Ridge Construction, INC. Millboro Granulated or pelletized (540) Hydromulch Limestone, Agricultural Grass Seeds Construction General Page 5 of 8
6 Potomac Contracting, LLC Winchester (540) Sediment Control, System Construction Landscaping Services Highway, Street, Bridge Construction Ramirez Contracting Abingdon (276) Landscaping Services Specialized Freight Trucking, Local All Other Specialty Trade Contractors Water & Sewer Line Related Structures Construction Rod Busters, Inc. Smithfield (757) Highway, Street, and Bridge Construction Structural Steel and Precast Concrete Contractors Fabricated Structural Metal Manufacturing Sandra's Marking, Inc. Buchanan (540) Flagging Services Signs & Signboards Manufacturing Painting Lines on Highways, Streets & Bridges SDC Contracting, LLC. Chesapeake (757) Crane Rental Foundation Digging Industrial Building Construction Commercial Building Construction, Institutional Building Cons. Shelton Federal Group, LLC. Washington DC (202) Other Heavy & Civil Engineering Construction Commercial & Institutional Building Construction Water & Sewer Line & Related Structures Construction Page 6 of 8
7 Spivey Pavment Markings, Inc. Chesapeake (757) Flagging Highway Line Painting Team Henry Enterprises, LLC. Newport News (757) Remediation Services Hydroseeding Services Site Preparation Contractor Environmental Consultant Services Water & Sewage Line Related Structures Ty's Hauling & Paving Richmond (804) Asphalt Paving Ash Collection Services Trucking, Specialized Freight, Local Vess Excavating, LTD Charlottesville (434) Site Work Construction Utility/ Underground Projects Relocate & Remove Utilities Excavation Services Virginia Concrete Construction Petersburg (804) Construction Heavy Curb and gutter Parking lot and alley Pipe Storm drain and sewer Side walk and drive way Page 7 of 8
8 Wunna Contracting Corporation Chantilly (703) Masonry Contractors Other Heavy & Civil Engineering Construction Poured Concrete Foundation & Structures Contractors Other Foundation, Structure & Building Exterior Contractors 40 Page 8 of 8
C-2 Construction, Inc. - NAICS Codes
C-2 Construction, Inc. - NAICS Codes 212313 - Crushed and Broken Granite Mining and Quarrying This U.S. industry comprises: (1) establishments primarily engaged in developing the mine site, and/or mining
FDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES
NAICS CODE Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway (includes 300, 320, 327, 330, 334, 336, 337, 338) Application of prime and tack coats, leveling surfaces and
How To Build A Road In A Townhouse
FDOT DBE CERTIFICATION SPECIALTY/ SHEET WITH CAP SIZES Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway $ 22.41 Application of prime and tack coats, leveling surfaces and
Herbicide Application. Irrigation System (Only) Sanitary System Testing & Inspections
NAICS Code Work Description Work Item 115310 - Support Activities for Forestry 221310 Water Supply and Irrigation Systems 221320 - Sewage Treatment Facilities 236118 Residential Remodelers 236220 Commercial
NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES
NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES All searches and notifications on Bid4Michigan are based on National Institute of Government Purchasing (NIGP) codes. It
BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS
Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development
DOUGLAS COUNTY, WASHINGTON. APPLICATION FOR SMALL WORKS ROSTER and VENDOR LIST
DOUGLAS COUNTY, WASHINGTON APPLICATION FOR SMALL WORKS ROSTER and VENDOR LIST Douglas County Commissioners P O Box 747 203 Rainier Avenue Waterville WA 98858 The following application must be completed
BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS
Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development
CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT
Volkert Field Office 80 M Street SE, Suite 725 Washington, DC 20003 RIVERSMART WASHINGTON - CONSTRUCTION RIVERSMART MACFARLAND, RIVERSMART LAFAYETTE AND GREEN ALLEYS CHEVY CHASE D.C. Contract No.: DCKA-2013-C-0160
MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS
Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT
State of North Carolina Department of Transportation
State of North Carolina Department of Transportation Send completed form to: Office of Equal Opportunity & Workforce Services ATTN: SBE Program Manager Small Business Enterprise (SBE) Form 1511 Mail Service
Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities
Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)
C I T Y O F P E A R S A L L
The Largest City Between San Antonio and Laredo COMMUNITY DEVELOPMENT C I T Y O F P E A R S A L L A Business-Friendly, Family-Oriented Community Building Department Application Information (Please read
Twenty-four contracting services environmental claim scenarios you may not have thought about.
Environmental DIVISION Twenty-four contracting services environmental claim scenarios you may not have thought about. Contracting Services Environmental Liability Policy Great American Insurance Group
NIF Insurance Services of California Artisan Pak Land Improvement Contractor Qualifier General Liability ( GL )
NIF Insurance Services of California Artisan Pak Land Improvement Contractor Qualifier General Liability ( GL ) a division of NIF Group, Inc. Phone: (916) 566-1000 P.O. Box 13456 [email protected]
Advanced Materials and Diversified Manufacturing
Advanced Materials and Diversified Manufacturing Analysis for, Ohio Advanced Materials and Diversified Manufacturing Cluster 3 Automobile manufacturing Copper wire, except mechanical, drawing Iron and
Crump Insurance Services
Crump Insurance Services Greenwood Village, Colorado COLORADO ASSOC. OF HOME BUILDERS Phone: 303-386-8020 CONTRACTORS SUPPLEMENTAL Fax: 303-386-8025 Complete in addition to the ACORD 125 & 126 applications
SECTION 02221 SELECTIVE DEMOLITION
SECTION 02221 PART 1 -GENERAL 1.01 DESCRIPTION This section includes all material, labor, machinery and supervision required to demolish and remove the following items where applicable and as noted on
BMIC S APPETITE GUIDE EFFECTIVE JUNE 2013
The following guide is a general list of Builders Mutual s appetite for business classes residential and commercial WorkSafe workers compensation and Builders Best general liability (including trade contractors),
PLUMBING, HEATING & AIR CONDITIONING, REFRIGERATION & BOILER INSTALLATION CONTRACTORS QUESTIONNAIRE
PLUMBING, HEATING & AIR CONDITIONING, REFRIGERATION & BOILER INSTALLATION CONTRACTORS QUESTIONNAIRE 1. General Information Name of Applicant: Website Address: Annual Receipts: 2. Indicate the percentage
SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or
Application Form - Contracting Firm
Application Form - Contracting Firm This form is for civil construction and general contracting companies to apply for membership of Civil Contractors New Zealand Company s details CCNZ Branch you want
Seattle Public Schools Building Excellence IV Projects Under Construction
Seattle Public Schools Building Excellence IV Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 13 Genesee
REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS. ATTACHMENTS: 1. Construction Management Update
REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS MEETING DATE: March 16, 2011 SUBJECT: PRESENTER: ATTACHMENTS: Construction Management Update David Berry Yes 1. Construction Management
Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements
Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements Charles County Government Planning and Growth Management P.O. Box 2150, La Plata, MD 20646 (301) 645-0692 Schedule
American Safety Insurance Company
American Safety Insurance Company General Liability Program A- Rated (Non-Admitted) Table of Contents Page 2 Page 3 Page 4 5 Underwriting Guidelines and Coverages Prohibited Classes Underwriting Classification
ADMINISTRATIVE CODE BOARD OF COUNTY COMMISSIONERS
ADMINISTRATIVE CODE BOARD OF COUNTY COMMISSIONERS CATEGORY: Codes and Building Services CODE NUMBER: 12-6 TITLE: Categories of Contractor Certificates of Competency Available Through Application to the
Economic Impacts of the Construction Industry on the State of Colorado
Economic Impacts of the Construction Industry on the State of Colorado Colorado Construction Colorado Employment & Wages Industry Projections Sponsored by grants from the Prepared by Melissa Thevenin,
SECTION 02100 SITE PREPARATION
SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division
PROPERTY EVALUATION AND RESERVE FUND STUDY
PROPERTY EVALUATION AND RESERVE FUND STUDY COMPLEX NORTH & WEST AVENUES LAS VEGAS, NV Prepared for: HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM ENGINEERS 22 Monument Square Portland, ME 04101 CONTENTS
VILLAS OF TRADITIONS AT GREY OAKS
Report of Turnover Survey VILLAS OF TRADITIONS AT GREY OAKS Grey Oaks Development Naples, Collier County, Florida Forge Engineering Project Number 2907-001.01 March 2015 Richard P..Lundberg, P.E cn=richard
TD AMERITRADE Park Omaha
TD AMERITRADE Park Omaha November 19, 2009 Report No. 6 MONTHLY CONSTRUCTION PROGRESS REPORT METROPOLITAN ENTERTAINMENT & CONVENTION AUTHORITY MONTHLY CONSTRUCTION PROGRESS REPORT Metropolitan Entertainment
CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03
CITY OF SAN ANTONIO Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 (010) FORMAL INVITATION FOR BIDS (IFB) to CONTRACT 2016-2017 TASK ORDER CONTRACT
FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation
644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING
Unit Price Averages Reports
Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation
A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES
A Residential Owner s Guide to PERMITS CITY OF Elgin PLANNING & NEIGHBORHOOD SERVICES CITY OF Elgin A Residential Owner s Guide Welcome! This booklet has been prepared to provide residential property owners
Estimating Database Checklist
Estimating Database Checklist If you are creating a new estimating database for projects, the following list offers a thorough listing of Main and Sub Categories. You can also use it as a checklist to
FY08 SEWER POINT REPAIRS BID TABULATION
6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "
Construction Contractors License Application Step-by-Step
Construction Contractors License Application Step-by-Step For Limited Liability Companies 9/29/11 Select a business entity: Limited Liability Company (LLC) Unincorporated association having one or more
SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM
Shepherd University Board of Governors June 9, 2005 Agenda Item No. 9 SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM In 1994 construction began on the Byrd Science and
Sewer Backup Protection Grant Program. Guidelines, materials and frequently asked questions
Sewer Backup Protection Grant Program Guidelines, materials and frequently asked questions SEWER BACKUP PROTECTION GRANT PROGRAM GUIDELINES I. WHAT IS IT? The Village of Oak Park Sewer Backup Protection
Information for Construction Contractors. Terry O Neill Taxpayer Service Specialist
Information for Construction Contractors Terry O Neill Taxpayer Service Specialist Today s Webinar Definitions and details 4 types of contractors Sales tax for each type of contractor Materials, Equipment,
City of Valdosta Land Development Regulations. Table of Contents
TITLE 1 ADMINISTRATION Chapter 102 General Provisions 102-1 Title 102-2 Purpose 102-3 Authority 102-4 Jurisdiction 102-5 Application of Ordinance 102-6 Relationship to Existing Ordinances 102-7 Powers
City of Mandeville. Guidelines for Construction and Development
City of Mandeville Guidelines for Construction and Development 1 Application for Permitting Requirements The following items must accompany any application for a permit for the construction of single family
Construction Contractors License Application Step-by-Step
Construction Contractors License Application Step-by-Step For Sole Proprietorships 9/29/11 Select a business entity: Sole proprietorship A sole proprietorship exists when a single individual owns and operates
Tennessee 07/01/14. Contracting Class Codes with Descriptions 50-6-901(8)
Contracting s with s * NCCI Basic Manual: "The Governing ification" at a specific job or location is the classification, other 0042 LANDSCAPE GARDENING & DRIVERS 0050 FARM MACHINERY OPERATION-BY CONTRACTOR-&
FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR
FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR ESTABLISHING CONSTRUCTION CONTRACT DURATION July 2010 DISCLAIMER: The following documentation as a whole was derived from Federal Highway Administration
Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts
SECTION 00300 BID FORM S For additions and deletions to the Contract, the following unit prices shall be applicable for the specific items listed. Unit Prices shall be complete, in place including required
Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components
Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development
Home Improvement Contractors New Application. State of Arkansas CONTRACTORS LICENSING BOARD
Home Improvement Contractors New Application State of Arkansas CONTRACTORS LICENSING BOARD $100.00 Filing Fee - NON-REFUNDABLE MAIL TO: CONTRACTORS LICENSING BOARD 4100 RICHARDS ROAD NORTH LITTLE ROCK,
KIEWIT CM/GC Enabling/Utilities
South Terminal Redevelopment Program KIEWIT CM/GC Enabling/Utilities Contract Value $50 million M/WBE Goal 20 percent Contact John Todd, LEED AP Project Manager 303.930.9046 [email protected] General
The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11
Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;
CHAPTER 5. Storm Sewer
CHAPTER 5 Storm Sewer A. Introduction All proposed developments shall have a properly designed and constructed storm water conveyance system. This chapter deals only with the conveyance system. Storm water
NAHB 1-00-0000 PRODUCT DEFINITION
NAHB Standard Homebuilder Cost Codes Cost Code Description 1-00-0000 PRODUCT DEFINITION 1-01-0000 PREAQUISITION COSTS 1-01-0110 Feasibility Study 1-01-0120 Environmental Impact Study 1-01-0130 Option Fees
BEFORE YOU BUILD GUIDE
- 1 - BEFORE YOU BUILD GUIDE A GUIDE FOR HOMEBUILDERS Permit Process Steps The following shows the steps in the permit process. A description of each step is included in the following pages. Gather information
Listing of Minority Owned Businesses and Woman Owned Businesses
Listing of Minority Owned Businesses and Woman Owned Businesses Minority Owned Business Enterprises (MBEs) Listing by County (Source: State of Wisconsin Dept of Commerce MBE/WBE website) Kenosha County
Artisan Contractors General Liability Contractors Equipment Program
Artisan Contractors General Liability Contractors Program Available in AR, AZ, CA, CO, ID, IL, KS, MA, MI, MN, NC, NM, NV, OH, OK, OR, PA, SC, TX, UT, WA, WI Navigators Artisan Contractors General Liability
CONSTRUCTION LAW. Mechanical Roofing Contractor. Electrical Class A Air Conditioning. Contractor Class B Air Conditioning
CONSTRUCTION LAW I. Contractor Licensing 1. The Basic Rule: No person who is not certified or registered shall engage in the business of contracting in this state. FS 489.113. Pinellas County Code 22-14
When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:
When is a Permit Required? The most common types of projects that require permits are: -New Houses or buildings -Room Additions or Expansions -Structural repairs, remodeling and alterations -Accessory
OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY
Cost Code # Description Cost Code # Description 01 00 00.001 General Requirements 02 00 00.001 Existing Conditions 01 31 19.13.001 Preconstruction Meetings 02 21 00.001 Surveys 01 32 33.001 Photographic
NEW YORK CONTRACTORS SUPPLEMENTAL APPLICATION (Excluding Residential Contractors)
NEW YORK CONTRACTORS SUPPLEMENTAL APPLICATION (Excluding Residential Contractors) tes: Where the words you, your or yours appear in this application, they mean the individual signing as applicant and the
UNIT PRICE LIST January 2009
UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only
Guidelines for. Permeable Pavement
What is permeable pavement? Guidelines for Permeable Pavement When rainwater falls on conventional pavement, such as concrete, it accumulates and then flows across and off of this impervious surface as
PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions
PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY Introduction and Assumptions 1. The existing section 27 Mineral Extraction of the Zoning Ordinance would remain and continue
Complete Application & Fax to (845) 279-7768 APPLICANT INFORMATION OPERATIONS
Complete Application & Fax to (845) 279-7768 Attn: Full Name of Applicant: Address: Website Address: Separately list and describe all operations: APPLICANT INFORMATION List states in which the applicant
VDOT 2001 Road and Bridge Standards Section 100 - Drainage Items
VDOT 2001 Road and Bridge s Page Title EW-1 EW-1A 101.01 Endwall for Pipe Culverts 12" - 36" Circular and 23" X 14" - 53" X 34" Elliptical Pipes EW-1PC EW-1APC 101.02 Precast Endwall for Pipe Culverts
FINANCIAL STATEMENTS AND RATIO ANALYSIS
In following we will be demonstrating the use of ratios to help examine the health of a firm. Ratios allow managers evaluate to a firm's financial statements in order to point out the strengths and weaknesses
SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT
SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer
Chapter 22. Lump Sum Project Guidelines
Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11
7. Do you perform any out of state work?... If yes, in what states and provide details of work performed
Applicant s Name* (*If more than one entity, attach separate sheet with description of each entity s operations, relationship to each other and ownership.) Contractors Application Agent Applicant Mailing
CONTRACTORS SUPPLEMENTAL INSURANCE APPLICATION
CONTRACTORS SUPPLEMENTAL INSURANCE APPLICATION IMPORTANT: SUBMITTING AN APPLICATION DOES NOT BIND COVERAGE NOTE: Do not leave any questions blank. If it does not apply, mark it "N/A." HOW TO COMPLETE THIS
NAD SB NAICS with $$
113310 Logging 22 $ 3,090,552 115112 Soil Preparation, Planting, and Cultivating 94 $ 84,311 115310 Support Activities for Forestry 98 $ 69,242 211111 Crude Petroleum and Natural Gas Extraction 177 $ 7,398
MARKET SCOUT CONTRACTORS QUESTIONNAIRE (complete in addition to an Acord application) 1. Applicant:
1. Applicant: 2. Type of all work performed by or for applicant (check You if performed by applicant and Subs if performed by subcontractors and both if done by both): Air Condition Systems Installation,
CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT
Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide
Scope of Work Class I Contractor s Licenses. Putnam County Ordinance 2004-13. Section 17. Types of Authorized Contractor Licenses.
Scope of Work Class I Contractor s Licenses Putnam County Ordinance 2004-13 Section 17. Types of Authorized Contractor Licenses. A. Class I Contractors: The Class I Contractors are listed in this subsection
MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #5
Rendering Provided by McKissick Associates MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #5 Additions and Alterations to Williamsport Area Middle School Williamsport Area School District 17 July 2012 Geo-Thermal
NOTICE TO CONTRACTORS
NOTICE TO CONTRACTORS Notice is hereby given that San Luis Obispo County Community College District, ( District ) is accepting sealed Informal Bidding Prequalification Applications and Formal Bidding Prequalification
Downspout Disconnection Program FAQs
Why is the Village making downspout disconnection mandatory? A mandatory downspout disconnection has been the law for several years in La Grange Park. All gutter downspouts must be disconnected from the
GENERAL LIABILITY PROGRAM FOR ARTISAN CONTRACTORS
GENERAL LIABILITY PROGRAM FOR ARTISAN CONTRACTORS Approved Territory AL, DE, GA, IL, IN, KY, MD, MS, NC, NJ, OH, SC, TN, WV. Eligible Risks The Artisan Contractor Program provides general liability coverage
2012 Program Report. Agricultural Group Drainage Program
2012 Program Report Agricultural Group Drainage Program Accomplishments: It was a successful year for the drainage program. We were able to complete two new projects and seven maintenance projects throughout
City of Shelbyville Site Inspection Checklist
City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather
Twenty Mile Insurance Contractor Application (5/2009)
Twenty Mile Insurance Contractor Application (5/2009) Please include with this application: Five (5) years currently valued, legible loss runs; Resume of owner (required if start up or less than two years
BUILDING PERMIT APPLICATION APPLICABLE TO CITY LIMITS AND ETJ CHAPTER 18, General
BUILDING PERMIT APPLICATION APPLICABLE TO CITY LIMITS AND ETJ CHAPTER 18, General Property Address: Property Owner: Lot: Block: Subdivision: Lot Size: Scope of Work: Note: Please attach copies of all general
The WOSB Federal Contract Program includes 197 six-digit EDWOSB NAICS codes. EDWOSB NAICS codes are eligible for EDWOSB contracts.
A code 221310 EDWOSB Water Supply and Irrigation Systems 221320 EDWOSB Sewage Treatment Facilities 221330 EDWOSB Steam and Air-Conditioning Supply 236115 EDWOSB New Single-Family Housing Construction (except
UNIVERSITY OF MISSISSIPPI FIXED ASSET CAPITALIZATION POLICY
UNIVERSITY OF MISSISSIPPI FIXED ASSET CAPITALIZATION POLICY The term capitalized fixed assets includes land, improvements to land, easements, buildings, building improvements, vehicles, machinery, furniture,
APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT
APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of
