LAFAYETTE CONSOLIDATED GOVERNMENT PLANNING, ZONING & DEVELOPMENT DEPARTMENT CODES DIVISION
|
|
|
- Joleen Arnold
- 10 years ago
- Views:
Transcription
1 LAFAYETTE CONSOLIDATED GOVERNMENT PLANNING, ZONING & DEVELOPMENT DEPARTMENT CODES DIVISION APPLICATION FOR COMMERCIAL PLAN REVIEW Project Name: Project Address: Applicant Name: Applicant Address: City: State: Zip Code: Phone: Fax: Address: Contact Person: (in the event corrections are needed on plans, if different from applicant) Name: Address: City: State: Zip Code: Phone: Fax: Address: Total Number of Sheets Plan review fee is $10.00 per sheet (charged on the first set of plans), with a minimum fee of $ Submit three (3) sets of plans plus one set on compact disc in.pdf format. Page 1
2 COMMERCIAL PLAN REVIEW CHECKLIST CITY OF LAFAYETTE AND UNINCORPORATED AREAS OF LAFAYETTE PARISH (Exclusive of Broussard, Carencro, Duson, Scott & Youngsville) Three (3) complete sets of plans plus one set on compact disc in pdf format shall be submitted. This office will circulate these plans to the various departments for review. Approximately ten (10) to twenty (20) working days will be required to review the plans. If the project is a tenant improvement or strictly interior renovation, only two (2) sets of plans and one compact disc will be required. 1) Site plan drawn to scale should include (see example on Page 9): Project name and address (street and number) Property lines and lot dimensions All easements (utility, drainage, etc.) and any other encumbrances Existing and proposed overhead utility lines All buildings and structures on the site and their dimensions (main buildings, storage buildings, porches/canopies, signs, fences, etc.) For additions, identify existing building(s) and addition(s) Parking lot and each parking space All driveways and sidewalks, showing width and location Open/green space (unpaved, planted areas) All required landscaping and trees (not to interfere with overhead utility lines) Front setback (distance from front of building to front property line, not street) as well as side and rear setbacks Edge of the road shall be shown in relation to the property line Subsurface drainage, if required A vicinity map either to scale or with a distance to the nearest intersection. 2) Drainage Plan, drawn to scale, should include: North Arrow All items on the site plan, except o Each parking space o Front Setback o Edge of Roof Site Elevations/Grading Plan Adjacent property elevations Existing drainage system inverts Proposed drainage infrastructure including o Elevations o Inverts o Material o Size o Lengths Public Drainage Servitudes (if applicable) Private Drainage Servitudes ( existing and proposed) Drainage Impact Analysis if site is greater than or equal to 0.75 acres Page 2
3 3) 4) Building plans shall include the following: Type of construction Group or building use (Occupancy Classification) Information on sprinkler system in building Information on structural fire protection Size of the building or space (square feet) being remodeled and/or total tenancy area Number of floors in the building (Height) Total square feet per floor of the building (Area) Number of people in the space, tenancy and/or building based on Code Table (Occupancy Load) International Building code, 2012 Edition. When applicable, please include the floor, roof and wind load design Foundation plans Structural plans Elevations Manufacturer s certification of the design loads and/or a 3 rd party inspection certificate is required on all pre-engineered buildings, overhead doors larger than 10 feet in height and 12 feet in width and other components. Electrical plans shall include the following: Site plan include where power is available and where meter is located Service location, type and size Complete riser diagram to include the conduit size, wire size and type, along with the meter base size and the voltage and phase, along with various panels Lighting schedule include the wattages of all fixtures Power panel schedules Location of all panels, transformers, transformer switches, etc. A/C and heating load Equipment Schedule amps on each Load calculations to include lighting, power, equipment, etc. working up to a total connected load Available fault current on transformers (if larger than 300 kva.) 5) Plumbing plans shall include riser diagrams and other details necessary to determine compliance with the plumbing code. 6) 7) 8) Mechanical Plans shall include: Equipment types, sizes and locations Fan shut down controls Ventilation and exhaust systems Ductwork materials, layouts and fire protection of penetrations It is the responsibility of the owner or his representative to obtain written approval from the State Fire Marshall and State Health Department (if applicable). If the subject property falls in the unincorporated part of Lafayette Parish the applicant must go through the Parish Land Use Review. For questions and information please contact Sara Gary at Page 3
4 Commercial Plan Review Internet Status Reporting An application can be accessed via the Internet in order to obtain up-to-date information about the status of a project going through the Commercial Plan Review Process. In order to see the status, log on to: Click on PERMIT SEARCH. Enter the Permit number assigned at the time of submittal. The site address, subdivision name, owner name, or contractor name can also be used as a search query. Double click on the permit you are requesting and select REVIEWS. Click on the + sign. Review comments can be viewed here: Page 4
5 CONTACT LIST 1. Codes Division John Broyles (337) Development Division Tenique B. Nedd (337) Flood Plain Administrator Kerwin Woodard (337) Zoning Division (337) Traffic Engineering Shane Bordelon (337) Drainage Engineering Larry Primeaux (337) Environmental Quality Division Bess Foret (337) Lafayette Parish Health Unit (337) Ext LCG Fire Department Forrest Chaisson (337) State Fire Marshall (225) National Electrical Code Greg Wiltz (337) Louisiana State Plumbing Code David Cloteaux (337) International Mechanical Code Todd Hebert (337) International Building Code Gerald Stroud (337) LUS Electrical Engineering Keith Zerangue (337) LUS Water and Sewer J. B. Cormier (337) LUS Fiber - Yvette Reynolds (337) Entergy SLEMCO (337) BellSouth (toll free) 21. Atmos (337) Cox Communications (Cable TV) (337) State Highway Department (337) Land Use Review Sara Gary (337) Mailing Address and Physical Address: Lafayette Consolidated Government Codes Division 220 West Willow Street, Building B Lafayette LA Page 5
6 EXAMPLES OF COMMERCIAL PERMIT EXEMPTIONS: (Must comply with Planning/Zoning regulations) One-story detached accessory structures used as storage or a tool shed on a pier or skid foundation that does not exceed 120 square feet. Fences not over 7 feet high Retaining walls, which are not over 4 feet in height, measured from the bottom of the footing to the top of the wall. Sidewalks and driveways not more than 30 inches above grade and which are not part of an accessible route. Painting, papering, tiling, carpeting, cabinets, counter tops, and similar finish work. Page 6
7 PROCESS TO OBTAIN COMMERCIAL BUILDING PERMIT 1. Obtain a municipal address from the Lafayette Consolidated Government Development Division (337) If the subject property falls in the Unincorporated Area of Lafayette Parish the applicant must go through the Parish Land Use Review. For questions and information please call Sara Gary at Verify that the property is platted through the Development Division or is eligible to be grandfathered. 4. Preliminary research for the construction plans of the building and site work, utilities and improvements can be initiated by direct contact with the people identified on the contact list. This gives your design team the needed information on local requirements to start developing building and site plans. If requested, a meeting of many of the contacts involved with plan site development can be arranged. 5. Verify the type of sewage and water systems that are available to the site. Contact LUS for municipal water and sewer, or the Lafayette Parish Health Unit for specific information on private sewage and water systems. See contact list for names and phone numbers. 6. Once the plans are received, they are routed to the various departments for review. The Developer should simultaneously submit one (1) set of plans to the State Fire Marshal s office for review. The application can be obtained at: 7. Once all comments are received, this usually takes ten (10) to twenty (20) working days, they are compiled into a letter that is ed to the developer or his agent outlining all conditions of approval. The corrections required by the review comments must be addressed by either submitting corrected plans, issuing of proper addenda or agreeing to develop the project in compliance with the review comments. The developer should contact the department making the comments to determine which method will be required. State Fire Marshal approval will also be required prior to issuance of the permit. This approval will be sent directly to the developer or his agent. 8. Once the plans have been approved by all pertinent review departments, including the State Fire Marshal s office and the Lafayette Parish Health Unit (if applicable), the building permit may be issued. 9. The building permit fee is $5.00 per $1,000 of Fair Market Value. The minimum building permit fee is $ If the project value is over $50,000.00, the purchaser must be licensed by the State of Louisiana Contractors Licensing Board ( ) as a Building Contractor. Page 7
8 11. Subcontractors must also be licensed by the Louisiana State Contractors Licensing Board if their contract amounts are $50, or more. Subcontractors in the specific fields of Electrical, Plumbing, Gas or Mechanical work must also be licensed or registered with the Codes Division prior to obtaining their permits. This office can provide a complete list of contractors who meet this requirement or assist in obtaining contractors licensed in their field. 12. Inspections are required at certain phases during the construction process. Specifics will be given to each permit purchaser. 13. In compliance with local code (LCG Code of Ordinances, Chapter 74, Section 109), prior to issuance of a building permit or certificate of occupancy an applicant must provide certain solid waste collection documentation. Complete and submit attached Solid Waste Collection Notification Requirement Forms for Building Permit and for Certificate of Occupancy (Attachment II and III). 14. Temporary electrical power is available through the use of a temporary power pole. The electrician should contact Codes for specifics. 15. LUS utility deposits can be made with Customer Service at (337) Temporary electric and water service to the building is also available under certain stringent criteria. The electrician and plumber should contact the Codes Division for specifics. Contact Codes also for a temporary Certificate of Occupancy (C.O.) to obtain temporary power. Prior to occupancy of the building, a permanent C.O. is required. The proposed occupant should contact Codes once all inspections have been made, the local fire department has inspected and all other LCG departments have approved as well as the Lafayette Parish Health Unit, if applicable. 17. Should you encounter any problems during this process, contact the Codes Division at (337) The Lafayette Consolidated Government wants you to know that we appreciate your considering developing in Lafayette and wish to assure you of every courtesy and assistance in doing so. Page 8
9 GENERAL INFORMATION Currently adopted codes in effect: Building Codes International Building Code, 2012 Edition (IBC), not including Chapters 11, 27 & 29 (see Attachment I, II & III) Residential Code International Residential Code, 2012 Edition (IRC), not including Parts V, VII and VIII Plumbing Codes 2013 Edition LA State Plumbing Code Electrical Codes 2011 Edition National Electric Code (NEC) Gas Codes International Fuel/Gas Code, 2012 Edition (IFGC) Mechanical Codes International Mechanical Code, 2012 Edition (IMC) Loads: Ultimate Design Wind Speed is dependent on Risk Category Risk Category I is 120 mph Risk Category II is 130 mph Risk Category III & IV is 140 mph See Wind Speed Map on our website (the above mentioned speeds correlate to the red line on the map) Seismic negligible Snow negligible Note: For State and Local Amendments, as well as related Ordinances see: Code of Ordinances, Chapter 26-Development on the LCG website Page 9
10 74'-0" 20'-0" GREEN AREA PROPERTY LINE STORAGE 10'-0" 60'-0" BUILDING 30'-0" 129'-0" SHRUBS (1) CLASS "A" OR (2) CLASS "B" TREES EVERY 50' HANDICAP SIGN 5'-0" 8'-0" 1 8'-0" HANDICAP SPACE 6 18'-6" 7 5' LANDSCAPE STRIP 2 9'-0" 8 BUSINESS SIGN 3 26'-0" 9 4 PAVED PARKING AREA 10 10' UTILITY EASEMENT 5 26'-0" MIN. FOR 2 WAY 11 10'-0" 25'R COMMERCIAL SITE PLAN EXAMPLE NOT TO SCALE 9 9 S T R E E T Page 10
11 ATTACHMENT I A design professional is required when the square footage of a space or building exceeds the square footages specified below: NFPA IBC SQ FT Storage 6250 Storage (S-1 & S-2) Utility & Miscellaneous Factory/Industrial 5000 Factory/Industrial Mercantile/Business/Apartments 4000 Mercantile/Business/R-1, R-2, R-4 Concentrated Assembly 2650 Assembly occupancies less than 15 Sq. ft. per occupant Less Concentrated Assembly 4000 Assembly occupancies 15 Sq. ft. per occupant Hazardous Storage or Process 1500 H-1, H-2, H-3, H-4, H-5 Educational & Institutional 2500 Educational & I-1, I-2, I-3, I-4 A design professional is also required for any renovation or alteration project in excess of $125,000. Page 11
12 Louisiana Pollutant Discharge Elimination System (LPDES) General Permit For Storm Water Discharges from Commercial Construction Activities Permit #s LAR100000, LAR Pursuant to the Clean Water Act, as amended (33 U.S.C et seq.), and the Louisiana Environmental Quality Act, as amended (La R. S. 30:2001 et seq.), rules and regulations effective or promulgated under the authority of said Acts, the Louisiana Pollutant Discharge Elimination System (LPDES) General Permits are issued. These permits authorize the discharge of storm water from construction activities to waters of the State, in accordance with the conditions and requirements set forth in the permits. Please note that there are requirements associated with these permits, depending on the size of the project. Listed below are the conditions, grouped by project size. If you have any questions, you can contact Lafayette Consolidated Government Environmental Quality Division, Regulatory Compliance Section or Louisiana Department of Environmental Quality. To review the state permits: deq.state.la.us/permits/lpdes/pdf/lar pdf deq.state.la.us/permits/lpdes/pdf/lar pdf Sites less than one (1) acre: If the disturbed acreage at construction is less than the State regulated limit of one (1) acre, no regulations, but it is suggested that erosion control be implemented during and after construction for storm water pollution control during a storm event. Sites between one (1) and five (5) acres: As per LAR200000, a Storm Water Pollution Prevention Plan (SWPPP) is required for the site. A site specific SWPPP must be created, implemented, and maintained before and during construction. A copy of the SWPPP must be kept on site. For a SWPPP checklist, go to lafayettela.gov. Written notification of intent to be covered under this permit is not required, there is automatic coverage for sites this size. When a project is complete and the site has been properly stabilized in accordance with the permit (Part III.D.2.a.2), the owner/ operator shall submit a Completion Report form to the LDEQ. For an example Completion Report, go to lafayettela.gov. Requirements: 1. SWPPP 2. Completion Report Page 12
13 Sites over five (5) acres: As per LAR Part II, the permittee is required to send a Notice of Intent (NOI) before construction begins. For Notification Report, go to lafayettela.gov. A site specific SWPPP must be created, implemented, and maintained before and during construction. For an example SWPPP, go to lafayettela.gov. A copy of the SWPPP must be kept on site. There is also an annual permit fee to the Louisiana Department of Environmental Quality associated with projects larger than five (5) acres. Also, a Notice of Termination (NOT) must be sent at job completion in accordance with Part VIII of this permit. For Notice of Termination, go to lafayettela.gov. Requirments: 1. SWPPP 2. Notice of Intent (NOI) 3. Notice of Completion (NOT) Questions: Contact Lafayette Consolidated Government To understand all requirements, please review LAR and LAR Louisiana Department of Environmental Quality Permits Division P.O. Box 4313 Baton Rouge, La Page 13
14 ATTACHMENT II Lafayette Consolidated Government Public Works Department Environmental Quality Division Solid Waste Collection Notification Requirement Form Building Permit In compliance with the below referenced local code, please complete this form and return in the packet to PZC or return to Environmental Quality Division located at 1515 East University Ave, Lafayette, Louisiana This form may be faxed back to the Environmental Quality Division at or for more information please contact us at Thank you for your time and assistance in our efforts to keep Lafayette a clean and beautiful place to live. Lafayette Consolidated Government Code of Ordinances Chapter 74 (Solid Waste) Section 109 Collection Requirement for New or Renovated Commercial Construction. Prior to the issuance of a building permit by the department of planning, zoning, and codes for new or renovated commercial construction, the applicant must provide evidence that proper facilities have been provided for the storage and collection of solid waste throughout construction. The applicant must state the use to which the facility will be employed, total disturbed area, estimated solid waste volume and the location size and frequency of the service to the storage collection container. Name of Facility /Applicant: Address and Phone Number of Facility: Page 14
15 Total Disturbed Area: Estimated Solid Waste Volume (per month): Solid Waste Form cont. Location of Container: (ex. Collection container located on southwest corner of parking lot) Size and Type of Container: (ex. 10 cubic yards) Frequency of Service to Container: (ex. Once per week) Once again please contact the Environmental Quality Division at if you have any questions concerning this local code requirement. EQ Comments only: Page 15
16 ATTACHMENT III Lafayette Consolidated Government Public Works Department Environmental Quality Division Solid Waste Collection Notification Requirement Form Certificate of Occupancy In compliance with the below reference local code, please complete this form and return in the packet or return to the Environmental Quality Division located at 1515 East University Ave, Lafayette, Louisiana This form may be faxed back to the Environmental Quality Division at or for more information please contact us at Thank you for your time and assistance in our efforts to keep Lafayette a clean and beautiful place to live. Lafayette Consolidated Government Code of Ordinances Chapter 74 (Solid Waste) Section 109 Collection Requirement for New or Renovated Commercial Construction. Prior to the issuance of a Certificate of Occupancy by the department of planning, zoning, and codes for new or renovated commercial construction, the applicant must provide evidence that proper facilities have been provided for the storage and collection of solid waste throughout construction. The applicant must state the use to which the facility will be employed, total disturbed area, estimated solid waste volume and the location size and frequency of the service to the storage collection container. Name of Facility /Applicant: Address and Phone Number of Facility: Page 16
17 Total Usable Square Feet: Estimated Solid Waste Volume (per month): Solid Waste Form cont. Location of Container: (ex. Collection container located on southwest corner of parking lot) Size and Type of Container: (ex. 10 cubic yards) Disposal Service Company Name Frequency of Service to Container: (ex. Once per week) Once again please contact the Environmental Quality Division at if you have any questions concerning this local code requirement. EQ comments only Page 17
18 Page 18
Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County
Building Permit Application Packet The purpose of Building Codes is to establish the minimum requirements to safe guard the public health, safety and general welfare through structural strength, means
City of Mandeville. Guidelines for Construction and Development
City of Mandeville Guidelines for Construction and Development 1 Application for Permitting Requirements The following items must accompany any application for a permit for the construction of single family
Residential Plan Routing Information
Residential Plan Routing Information BUILDING INSPECTIONS 800 4th AVENUE EAST WEST FARGO, ND 58078 PHONE: 701-433-5480 The building Inspection s Department receives and issues all applications for building
City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas 78121 Phone: (830)779-4541 Fax: (830) 253-1198 cityoflavernia@lavernia-tx.
[email protected] Commercial New/Remodel Building Requirements This document is not meant to modify any Federal or State laws or City Ordinances. It is intended to be informative and to be
BUILDING PERMIT APPLICATION APPLICABLE TO CITY LIMITS AND ETJ CHAPTER 18, General
BUILDING PERMIT APPLICATION APPLICABLE TO CITY LIMITS AND ETJ CHAPTER 18, General Property Address: Property Owner: Lot: Block: Subdivision: Lot Size: Scope of Work: Note: Please attach copies of all general
SECTION 15 FLOODPLAIN MANAGEMENT
SECTION 15 15.1 Purpose Certain areas of the City of Gardiner, Maine, are subject to periodic flooding, causing serious damages to properties within these areas. Relief is available in the form of flood
City of Douglas Commercial Building Permit Site Application
City of Douglas Commercial Building Permit Site Application *Complete the following information including a complete site plan and floor plan. *Incomplete information may result in delay and/or rejection
RESIDENTIAL BUILDING PERMIT REQUIREMENTS
RESIDENTIAL BUILDING PERMIT REQUIREMENTS The Building Inspection Division has compiled this packet to help our customers obtain a Building Permit. Enclosed we have listed all departments and inspection
Bureau Veritas Contact Information
Bureau Veritas Contact Information Permit Submittal The permit documents and fees will be submitted to the city. Submittal documents should be complete to expedite plan review and permit issuance. Please
Single Family Residential Building Permit Questions & Answers
Single Family Residential Building Permit Questions & Answers Prepared by Dept. of Public Works Revised 07/01/13 200 East Park Street Edwardsville, IL 62025 (618) 692-7535 (618) 692-7505(Fax) Hours: Monday
Electronic Signature and Fee Payment Confirmation
Jeff Levine, AICP, Director Planning & Urban Development Department Electronic Signature and Fee Payment Confirmation Notice: Your electronic signature is considered a legal signature per state law. By
City of Colleyville Community Development Department. Site/Landscape Plan Application Packet
City of Colleyville Community Development Department Site/Landscape Plan Application Packet Development Application Fees City of Colleyville 100 Main Street Colleyville TX 76034 817.503.1050 Zoning Zoning
PERMIT APPLICATION FORM SELECT ALL THAT APPLY: BUILDING DRIVEWAY ELECTRICAL PLUMBING HEATING DEMOLITION SIGN MOBILE HOME
PERMIT # TOWN OF ASHLAND, NEW HAMPSHIRE 20 HIGHLAND STREET PO BOX 517 ASHLAND, NH 03217 603-968-4432 FAX 603-968-3776 www.ashland.nh.gov PERMIT APPLICATION FORM SELECT ALL THAT APPLY: BUILDING DRIVEWAY
Development Services Guidelines
Dear Customer/Developer: Balcones Heights 3300 Hillcrest San Antonio, Texas 78201 210-735-9148 ext 246 Fax: 210-735-9409 Development Services Guidelines Welcome to the City of Balcones Heights, we look
Development Services Guidelines
Dear Customer/Developer: Balcones Heights 3300 Hillcrest San Antonio, Texas 78201 210-735-9148 ext 246 Fax: 210-735-9409 Development Services Guidelines Welcome to the City of Balcones Heights, we look
Commercial Building Permit Application & Submittal Guidelines
Building Inspection Department 1625 13 th Street, Suite 106 Lubbock, Texas 79457 (806) 775-2087 (806) 775-2088 http://buildinsp.ci.lubbock.tx.us/ Commercial Building Permit Application & Submittal Guidelines
#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist
#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist Case #: Date: Project Name: Site Address: Application Submittal Building permit applications and plans can be submitted to the
When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:
When is a Permit Required? The most common types of projects that require permits are: -New Houses or buildings -Room Additions or Expansions -Structural repairs, remodeling and alterations -Accessory
BUSINESS USE PERMIT APPLICATION
BUSINESS USE PERMIT APPLICATION Instructions and Information for Business Use Permits and Temporary Certificates of Occupancy are included at the end of this application. Planning and Development Services
BUILDING PERMIT RESIDENTIAL BASEMENT FINISH
BUILDING PERMIT RESIDENTIAL BASEMENT FINISH DOCUMENTS YOU WILL NEED 1. Building Permit Residential Basement Finish Package 2. Contractors copy of state and business license ADDITIONAL FORMS YOU MAY NEED
CITY OF YORBA LINDA P.O. BOX 87014 CALIFORNIA 92885-8714
CITY OF YORBA LINDA P.O. BOX 87014 CALIFORNIA 92885-8714 BUILDING DIVISION (714) 961-7120 Single Family Residential New Construction, Additions & Alterations Submittal Requirements Required agency approvals
MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3
TOWN OF SIDNEY Multi-Family, Commercial, Industrial and Institutional Building Permit Guide The information provided is intended as a guide only and does not replace current bylaws and regulations. Complete
APPLICATION. Internal Use Only 1311 Chestnut Street TDLR# Bastrop, Texas 78602 Intake Date
For all Residential Construction, Commercial Construction, Fences, Accessory Buildings, and any other structural addition, remodel or new construction within the City Limits of Bastrop. No partial submittals
TENT AND STAGE CUSTOMER ASSISTANCE GUIDE
TENT AND STAGE CUSTOMER ASSISTANCE GUIDE Charles County Government Department of Planning & Growth Management P.O. Box 2150 La Plata, MD 20646 (301) 645 0692 / (301) 870 3935 Fax: (301) 645 0575 Web Site:
REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT
REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT ATTACHED ARE THE REQUIREMENTS FOR OBTAINING A BUILDING PERMIT INCOMPLETE SUBMISSIONS WILL BE RETURNED IN THEIR ENTIRETY -- NO EXCEPTIONS!!
BUILDING INSPECTION DEPARTMENT www.ci.garland.tx.us FEE SCHEDULE CHAPTER 30 ARTICLE XV. Effective October 1, 2011
BUILDING INSPECTION DEPARTMENT www.ci.garland.tx.us FEE SCHEDULE CHAPTER 30 ARTICLE XV Effective October 1, 2011 The following fees shall be charged when issuing either combined permits or individual permits
WHEN IS A PERMIT REQUIRED?
WHEN IS A PERMIT REQUIRED? Any owner, builder, contractor, or other authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure,
CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT
Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide
Building Permit Application
Building Permit Application Administrative Use Only PARENT PERMIT NUMBER (Required if part of another project) PERMITTEE: PERMITTEE ADDRESS: E-MAIL ADDRESS: ARCHITECT/ENGINEER: PHONE: PHONE: ARCHITECT/ENGINEER
Data Center Due Diligence List
Data Center Due Diligence List Name and address of site facility Date constructed Building owner/date purchased by current owner Name of previous owner Adjacent Property Descriptions North South East West
EXISTING STRUCTURES 1) FAIR MARKET VALUE OF STRUCTURE(s) BEFORE IMPROVEMENT: 2) COST OF IMPROVEMENTS:
Date Received: Received By: Project/Permit Number: Fee: (To be Completed by MOA) FLOOD HAZARD PERMIT APPLICATION (Please fill out application completely; Indicate NA if necessary. Property information
RESIDENTIAL WINDOW REPLACEMENT
3S258 MANNING AVENUE WARRENVILLE, IL 60555 PH: 630.393.9050 FAX 630.393.1531 RESIDENTIAL WINDOW REPLACEMENT A building permit is required for the installation or replacement of windows in a residence.
FILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request
FILE NO.: Z-6915-C NAME: Gamble Road Short-form PCD and Land Alteration Variance Request LOCATION: Located on the Northwest corner of Chenal Parkway and Gamble Road DEVELOPER: Davis Properties P.O. Box
The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE
The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE BUILDING SERVICES DEPARTMENT 789 Broadway Street, Box 3000 Wyoming, ON N0N 1T0 Telephone: 519 845-0801 Toll-free: 1-866-324-6912 Fax: 519
TOWN OF JUNO BEACH 340 Ocean Drive Juno Beach, FL 33408 Phone: (561) 656-0302 Fax: (561) 775-0812
TOWN OF JUNO BEACH 340 Ocean Drive Phone: (561) 656-0302 Fax: (561) 775-0812 Application for Building Permit & Certificate of Occupancy OFFICE USE ONLY: Date: Permit #: Tracking #: Job Address: Property
PERMIT APPLICATION REQUIREMENTS FOR RESIDENTIAL ROOF MOUNTED PHOTOVOLTAIC SYSTEMS
Butte County Department of Development Services PERMIT CENTER 7 County Center Drive, Oroville, CA 95965 Main Phone (530)538-7601 Permit Center Phone (530)538-6861 Fax (530)538-7785 FORM NO DBP-71 PERMIT
The City of Basehor, Kansas
The City of Basehor, Kansas Residential and Miscellaneous Permits This list provides general information regarding permit requirements for various residential construction and maintenance activities. The
WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24
Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge
COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS
COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS Permit applicants shall submit three (3) COMPLETE SETS of plans and specifications with each application for a permit. Plans and specifications
Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa. 18966 Phone: 215-322-9700 Fax: 215-322-5842
Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa. 18966 Phone: 215-322-9700 Fax: 215-322-5842 APPLICATION for ZONING and BUILDING PERMIT APPLICATION INSTRUCTIONS:
Residential Plan Review Emergency Vehicle Access and Water Supply Permit Information Packet
Residential Plan Review Emergency Vehicle Access and Water Supply Permit Information Packet 1. Definitions a. AHJ Authority Having Jurisdiction. The Fire Chief or Fire Marshal of a given Fire District
Electric Service Conversion Overhead-to-Underground. Minnesota
Electric Service Conversion Overhead-to-Underground Xcel Energy Electric Connections Minnesota Process Please fill out these forms and complete this checklist to begin your application process: 1) Overhead-to-Underground
A HOMEOWNERS GUIDE TO BUILDING IN GREY HIGHLANDS
A HOMEOWNERS GUIDE TO BUILDING IN GREY HIGHLANDS AIM AND APPLICATION OF THE GUIDE This guide is intended to help you better understand the requirements for building as set by applicable law, which could
9. Does the County of San Diego keep home plans on file for existing homes?
County of San Diego, Planning & Development Services FIRESTORM POLICY DOCUMENT BUILDING DIVISION FIRE REBUILD Answers to Commonly Asked Questions The County of San Diego understands the confusion and frustration
City of North Chicago Department of Building and Community Development 1850 Lewis Avenue North Chicago, IL 60064 (847) 596-8650 (847) 596-8669 Fax
To whom it may concern: CONTRACTOR REGISTRATION INFORMATION PACKET (Revised December 2014) To register a contracting company to work in the City of North Chicago, the company s principle owner must apply
SITE DEVELOPMENT PLAN CHECKLIST. Project Name: Site Plan No.:
SITE DEVELOPMENT PLAN CHECKLIST 5/12/05 Rev.3/14/06 Project Name: Site Plan No.: REVIEW CRITERIA Plans: A site development plan (signed and sealed) shall be on a 24 x 36 sheet at a scale that is no smaller
A Guide for the Homeowner/Builder
A Guide for the Homeowner/Builder To repair, alter, add to or construct a new home, carport, garage, sundeck or other work Plus other related information Table of Contents 1. Introduction... 1 2. Building
NATIONAL FLOOD INSURANCE PROGRAM (NFIP) SUBSTANTIAL DAMAGE/ SUBSTANTIAL IMPROVEMENT (50% RULE)
NATIONAL FLOOD INSURANCE PROGRAM (NFIP) SUBSTANTIAL DAMAGE/ SUBSTANTIAL IMPROVEMENT (50% RULE) If your home or business is located within a 100-year floodplain and it was constructed through a County Building
CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST
CITY OF BERKELEY DETAILED CHECKLIST This checklist will assist you in preparing plans for submittal with a building permit application. Alterations, additions and remodeling projects may not require all
The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08
The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08 Fairfax County requires developers to post a performance bond if they are
D Sample Notices to Property Owners, Sample Affidavits, and Other Material
D Sample Notices to Property Owners, Sample Affidavits, and Other Material These samples are offered to illustrate specific points in the Desk Reference. States and communities should examine them carefully
Residential Building Permits Information
City of Bonham Building Department 514 Chestnut St. Bonham, Texas 75418 OFFICE: (903) 583-7555 FAX: (903)583-5761 Residential Building Permits Information Application for Permits: To apply for a permit,
Residential Building Permits
LANE COUNTY PUBLIC WORKS Residential Building Permits LAND MANAGEMENT DIVISION 3050 N. DELTA HWY, EUGENE OR 97408 i CONTACT PHONE NUMBERS: Building Program: (541) 682-4651 Inspection Requests: (888) 299-2821
1161.01 CONFORMITY WITH PLANS; DRAINAGE.
CHAPTER 1161 Subdivision Requirements 1161.01 Conformity with plans; drainage 1161.07 Easements 1161.02 Trees 1161.08 Streets 1161.03 Subdivision name 1161.09 Blocks 1161.04 Street names 1161.10 Lots 1161.05
SITE IMPROVEMENT PLANS CHECKLIST
REVIEW SERVICES TEAM SITE IMPROVEMENT PLANS CHECKLIST (Also for SITE DEVELOPMENT PERMIT applications) GENERAL REQUIREMENTS This checklist applies to commercial building site work involving engineering,
Single Family Residential Basement Finish
How to Use This Guide Building Guide Pottawattamie County Planning & Development Department Building & Safety Division Single Family Residential Basement Finish Provide two (2) sets of plans and complete
PRELIMINARY PROJECT REVIEW PROCESS
CITY OF CYPRESS 5275 Orange Avenue Cypress, California 90630 (714) 229-6720 PRELIMINARY PROJECT REVIEW PROCESS 1. Discuss project with Planning staff to determine zoning regulations, unusual characteristics
Floodplain Development Land Use Review
COMMUNITY DEVELOPMENT DEPARTMENT Planning Division P.O. Box 490 333 Broadalbin Street SW Albany, OR 97321 Phone 541-917-7550 Fax 541-791-0150 www.cityofalbany.net Floodplain Development Land Use Review
Frequently-Asked Questions about Floodplains and Flood Insurance FLOOD INSURANCE
Frequently-Asked Questions about Floodplains and Flood Insurance What is a floodplain? The floodplain is any area covered by water during normal water flows, and which could be inundated as a result of
HATFIELD TOWNSHIP DEMOLITION PERMIT APPLICATION PROCEDURES
HATFIELD TOWNSHIP DEMOLITION PERMIT APPLICATION PROCEDURES A demolition permit is required for complete demolition of residential or non-residential structures. PART I Location of Property Complete address
KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS
St. Louis County Department of Public Works Division of Code Enforcement KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS This guideline is intended to provide the homeowner/contractor with the
2. What building projects are exempted? (permit not required)
BUILDING AND SAFETY DEPARTMENT 1. What building projects require a permit? Following is a list of projects that require building permits based on Appendix chapter 1 of the California Building Code and
PLUMBING PERMIT REQUIREMENTS AND CHECKLIST
Town of North Hempstead Department of Building Safety Inspection and Enforcement 210 Plandome Road, Manhasset, NY 11030-2327 Tel. (516) 869-6311 Fax. (516) 869-7662 PLUMBING PERMIT REQUIREMENTS AND CHECKLIST
REQUEST FOR ELECTRIC SERVICE Commercial
This form should be completed if you are applying to have new electric facilities installed on your property for the purpose of providing electric service to a commercial entity. PROJECT CHECKLIST Below
RESIDENTIAL UTILITY PERMITS APPLICATION PACKET
Community and Economic Development Development Services Division 16000 N. Civic Center Plaza Surprise, AZ 85374 Ph 623-222-3000 Fax 623-222-3002 TTY 623-222-1002 RESIDENTIAL UTILITY PERMITS APPLICATION
Development Services Department City of San Antonio. Permits & Licenses. Development Services Manager. Deputy Historic Preservation Officer
Development Services Department City of San Antonio Development Process 101 Permits & Licenses Michael Dice Development Services Manager Kathy Rodriguez Deputy Historic Preservation Officer 1 Permit &
Botetourt County, Virginia. Frequently Asked Questions
Botetourt County, Virginia Development Services Construction Compliance Frequently Asked Questions Permits... 2 When is a permit required?... 2 When is a permit NOT required?... 2 Who may apply for a permit?...
ARTICLE 12 FLOOD DAMAGE PREVENTION
ARTICLE 12 FLOOD DAMAGE PREVENTION SECTION 12.1 AUTHORIZATION 12.1.1 General The Legislature of the State of North Carolina has in Part 6, Article 21 of Chapter 143; Parts 3 and 4 of Article 18 of Chapter
BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL 60458 Phone: (708) 458-2130 Fax: (708) 458-3207
BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL 60458 Phone: (708) 458-2130 Fax: (708) 458-3207 SELF EVALUATION CHECKLIST FOR RESIDENTIAL AND MULTI-FAMILY DWELLING INSPECTIONS The attached checklist
SOLAR PV SYSTEMS PERMITTING PROCESS
Department of Consumer and Regulatory Affairs SOLAR PV SYSTEMS PERMITTING PROCESS How to Reach Us 1100 4 th Street, SW Washington, DC 20024 [email protected] Permit Center Hours Monday, Tuesday, Wednesday &
ARTICLE 22: FEE SCHEDULE
for annexation. The following fees shall be submitted to the City of Grand Prairie, upon the passage of a resolution by the City Council calling public hearings for annexation of such area, said fee to
City of Morro Bay Building Division 955 Shasta Ave., Morro Bay, CA 93442-1900, 805-772-6261
City of Morro Bay Building Division 955 Shasta Ave., Morro Bay, CA 93442-1900, 805-772-6261 BUILDING PERMIT APPLICATION Permit No. Type Date Project Address Parcel No. Lot Block Tract Project Description:
SOLD. Lot 1. 1 Mile: Population: 10,200 Median HH Income: $33,100. 3 Mile: Population: 80,200 Median HH Income: $34,900
Walmart Outparcels For Sale College Station, TX Store # 1150 1815 Brothers Blvd FM 2818 W SOLD Texas Ave S/ Hwy 6 Longmire Dr Brothers Blvd Lot 1 For more information about this site, contact: Lot 1: ±2.41
Planning & Development Department MANUFACTURED HOME / MOBILE HOME / MOVE ON RESIDENCE SUBMITTAL FORMS INDEX
Planning & Development Department MANUFACTURED HOME / MOBILE HOME / MOVE ON RESIDENCE SUBMITTAL FORMS INDEX APPLICANT S GUIDE 301 TYPICAL SITE PLAN 3012 APPLICATION WITH: LICENSING TIMEFRAME/FEE/PRE- APPLICATION
New Electric Connection Application Packet Commercial and Industrial. City of Plummer P.O. Box B, Plummer, ID 83851 (208) 686-1641
New Electric Connection Application Packet Commercial and Industrial General Information: Maps: City of Plummer P.O. Box B, Plummer, ID 83851 (208) 686-1641 Please type or print plainly in ink. Applications
BOROUGH OF OAKLAND COUNTY OF BERGEN STATE OF NEW JERSEY ORDINANCE 13-CODE-685
BOROUGH OF OAKLAND COUNTY OF BERGEN STATE OF NEW JERSEY ORDINANCE 13-CODE-685 AN ORDINANCE TO AMEND, SUPPLEMENT AND REVISE THE CODE OF THE BOROUGH OF OAKLAND, LAND USE, CHAPTER 59 ENTITLED LAND USE AND
4. REQUEST FOR ELECTRIC SERVICE. 4.1 General Service Information
4. REQUEST FOR ELECTRIC SERVICE To establish an electric service, temporary or permanent, contact UI s Customer Care Center by calling: 1-800-722-5584 (7:00 a.m. 7:00 p.m., Monday Friday and 7:00 AM to
CONSTRUCTION PERMIT APPLICATION AND INSTRUCTIONS (Permit Application follows instructions)
CONSTRUCTION PERMIT APPLICATION AND INSTRUCTIONS (Permit Application follows instructions) When is a permit required? Section 403.42 and Section 403.62 of the Uniform Construction Code states: Any owner
BUILDING PERMIT SPECIFICATIONS
BUILDING PERMIT SPECIFICATIONS The below noted requirements are based upon La Plata County Building Code. These specifications are not intended as a complete set of requirements, but are intended to provide
CHAPTER 150: BUILDING REGULATIONS. Adoption of Regulatory Codes by Reference
CHAPTER 150: BUILDING REGULATIONS Section Adoption of Regulatory Codes by Reference 150.01 Scope 150.02 Commercial Construction Code 150.03 Commercial Plumbing Code 150.04 Heating, Air Conditioning, Refrigeration
Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements
Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements Charles County Government Planning and Growth Management P.O. Box 2150, La Plata, MD 20646 (301) 645-0692 Schedule
Notice to Property Owners
Modification or Repair of your Flood Prone Property Notice to Property Owners Rebuilding or Remodeling Your Home If your home or business sustained damage, or if you are making improvements to the structure
VILLAGE OF PLEASANT PRAIRIE COMMERCIAL COMMUNICATION PERMIT
VILLAGE OF PLEASANT PRAIRIE COMMERCIAL COMMUNICATION PERMIT CLASS 1 COLLOCATION New Commercial Communication Structure Substantial Modification Please check one of the following: CLASS 2 COLLOCATION OTHER
Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
Bond Release Process for New Subdivision Developments in Fairfax County
Bond Release Process for New Subdivision Developments in Fairfax County An Overview for Homeowners Associations A Fairfax County, Va., publication April 2009 For more information or to request this document
dpd Seattle Permits Tip www.seattle.gov/dpd Small Business: Getting Your Use and Building Permit from DPD RESEARCH RESOURCES
dpd Department of Planning and Development Tip 102 Seattle Permits part of a multi-departmental City of Seattle series on getting a permit Small Business: Getting Your Use and Building Permit from DPD
PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013
PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580
City of Stephenville New Commercial Building Information Packet
New Commercial Building Information Packet Building permitting is the process through which the ensures compliance with all codes and ordinances, relative to the construction of buildings and building
PRE APPLICATION CONFERENCE - INTRODUCTION
CITY OF AUBURN Planning & Development Department Auburn City Hall Annex, 2 nd Floor 1 East Main Street Auburn, WA 98001 Tel: 253.931.3090 Fax: 253.804.3114 [email protected] www.auburnwa.gov PRE-APPLICATION
VILLAGE OF BETHALTO COMMERCIAL BUILDING PERMIT APPLICATION
VILLAGE OF BETHALTO COMMERCIAL BUILDING PERMIT APPLICATION VILLAGE OF BETHALTO COMMERICAL BUILDING PERMIT INFORMATION / REQUIRMENTS I. APPLICATION REQUIREMENTS 1. GENERAL APPLICATION REQUIREMENTS A building
d. Building permits may only be approved if consistent with the approved development plan and land division for all units with common walls.
Section 20.920.060 Tier 2 Infill Standards. In addition to the Tier 1 standards and incentives, Tier 2 infill parcels and land divisions and the subsequent development on those Tier 2 infill parcels shall
TOWN OF HILLSBOROUGH BUILDING & PLANNING DEPARTMENT DESIGN, CONSTRUCTION AND LANDSCAPE PROFESSIONAL NEWSLETTER Fall Greetings 2013
TOWN OF HILLSBOROUGH BUILDING & PLANNING DEPARTMENT DESIGN, CONSTRUCTION AND LANDSCAPE PROFESSIONAL NEWSLETTER Fall Greetings 2013 TIS THE SEASON - GRADING MORATORIUM! Once again our Grading Moratorium
Commercial Construction Permit Application
THIS IS NOT A CONSTRUCTION PERMIT DO NOT START CONSTRUCTION UNTIL PERMIT IS ISSUED City of Lincoln Commercial Construction Permit Application Rev. 4-14 Page 1 Commercial Permit Application THIS IS NOT
BGE Service Application Guidelines Commercial & Industrial Projects
BGE Service Application Guidelines Commercial & Industrial Projects To the Customer Following is important information to assist you in applying for BGE gas and/or electric service and in completing the
SEEKING COMPLETENESS WAIVERS AND PRELIMINARY & FINAL SITE PLAN APPROVAL
APPLICATION & REPORTS FOR PB2009-05 INTERNATIONAL DEVELOPMENT CORPORATION SEEKING COMPLETENESS WAIVERS AND PRELIMINARY & FINAL SITE PLAN APPROVAL MEMORANDUM TO: FROM: RE: Borough of Tinton Falls
Planning & Development Department SINGLE FAMILY RESIDENCE SUBMITTAL FORMS INDEX
Planning & Development Department SINGLE FAMILY RESIDENCE SUBMITTAL FORMS INDEX APPLICANT S GUIDE 301 TYPICAL SITE PLAN 3012 APPLICATION WITH: LICENSING TIMEFRAME/FEE/PRE- APPLICATION INFORMATION, FINANCIAL
All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.
2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other
