1 Transport for Buckinghamshire Conference 2013

2 Asset Management Transport for Buckinghamshire has a duty to maintain the largest community asset Buckinghamshire County Council possesses the asset is a living, deteriorating entity. If we had to replace all of the assets in the County we look after, it would cost around 4.2bn. The team: Provides information and guidance to Members enabling them to choose roads to resurface Prepares programmes of work and reports condition (for carriageways and footways) Oversees the Capital Maintenance Programme Uses its data to target work at the right time for the least overall cost Collects data on the other assets including signs, lines, safety fencing etc. Collects data on all the footways Advises on the condition of the asset and forecasts its future needs Looks for new techniques and materials to provide better value for money The asset includes all aspects of the highway: 3200 km of Carriageways 2200 km of Footways Over 450 Bridges and Structures Nearly 27,000 Streetlights 1 Lift 1 Public Toilet 113 Manual counts in 2013 and 151 automatic counters on many of the main roads We have access to specialist software created by our shareholders, helping us to choose and prioritise schemes from the data we already hold Expand our knowledge of the asset and its condition Create strategic plans to maintain key areas such as drainage TfB has over 4000 illuminated signs

3 Capital Works The Capital Works team provides design, construction and project management services for Transport for Buckinghamshire, other clients within Buckinghamshire County Council (BCC) and external organisations such as District and Parish Councils This is a core service that enables the design and delivery of all highway related schemes including surfacing projects, junction improvements, installation of pedestrian crossings, new roads, feasibility studies, lining and signing schemes Currently deliver approx. 20m of work annually Work both day and night on delivering the Member led Capital works choice schemes plus strategic surfacing sites Facilitate Member led approach for choosing roads to resurface Also project manage and arrange delivery of Local Area Forum (LAF) schemes, Bucks Connectivity Project (Chapel Lane), A40 Rye Crossing, Capital Footway Maintenance Programme and assist BCC in responding to HS2 issues In 2012/13 we treated 178 roads across Buckinghamshire - the equivalent of: The distance from Aylesbury to Central London twice - with some miles left over 93kms to be resurfaced in 2013/14 The team is currently inspecting and investigating treatments for next years We re Working on it programme which will then need to be delivered across Buckinghamshire The area of roads treated in 2012/13 is equivalent to 90 football pitches

4 Highway Structures Inspect and maintain the majority of structures supporting the network, enabling them to perform the key task in linking the network together Anything over a 0.9m span is considered to be a structure Key part of the network asset any problems can have high impact on the network Approve highway structures built for new developments Provide technical liaison and advice with outside parties such as Network Rail, Rivers and Canals Trust, Environment Agency, Crossrail etc. 130 culverts Over 100 highway retaining walls 7 cattle grids 1 slipway submarine Our works range from replacing structures completely to repairing historic structures and removing debris within structures Continue the review of bridge parapets, to identify high risk sites for bridge strikes Review all structures in watercourses, to assess their resilience Review all low headroom bridge signs, to keep likelihood of bridge strikes to a minimum Over 4000 abnormal load movements are checked each year

5 Street Lighting The Street Lighting Team maintains the County s 26,816 lights. The team has: Five, two man crews that respond reactively to 2 and 24 hour emergency call-outs A programme to replace 7500 street lights with LEDs over the next three years which started October of this year In addition to this the teams are responsible for implementing the variable lighting scheme, column replacement programme and undertaking night scouts to identify faults. 26,816 street lights maintained by Transport for Buckinghamshire 1,100 LED replacements by the end of December 7,500 over the three year period 330 Tonnes of CO 2 saving generated by LED replacements last year and 392 Tonnes of CO 2 saved this year 1350 street lights switched off as part of the Street Light Switch Off programme Three year Street Light Switch Off trial was completed in September 2011 saving energy and reducing carbon footprint Maintenance teams have reduced response times to repair street lights from 28 days down to 13 days Other Ringway Jacobs lighting contracts around the country provide excellent support and wealth of expertise Continue to deliver countywide LED installation programme Lamp column replacement programme Did you know? TfB also maintain 5993 illuminated bollards and signs

6 Rights of Way Ensure paths remain open and available by removing excessive natural vegetation growing on them Signpost paths where they leave a metalled road and waymark along them where required Provide and maintain bridges over natural watercourses and ditches Provide, where possible, support for the maintenance of stiles and gates Work with path volunteers and parishes wishing to carry out maintenance Survey 5% of our network per year to monitor our performance using a national methodology Offer a free advice service and materials to encourage land managers and occupiers to make access easier on Public Rights of Way by removing stiles completely where they are no longer needed, replacing stiles with gates wherever possible and making existing gates easier to use Provide information to assist users, landowners and others who are involved with public rights of way Investigate complaints and take appropriate enforcement action as necessary to ensure paths remain open and available Over 3300 kms (2000 miles) of public footpaths, bridleways and byways, which is managed in partnership with land managers, farmers, user groups, volunteers and Parish Councils 2300 Bridges 4500 Sign posts with 6900 arms attached 5900 Gates 3200 Waymark Posts Improve and develop relationships with volunteer groups to allow better resilience in maintaining assets Did you know? TfB maintain 5200 stiles throughout the County

7 Road Space Management The Road Space Management Team is a self-funding team of 12, working hard to co-ordinate activities on or affecting the highway and generates 1m income per annum. Our team of Streetworks Technicians carry out checks of works in progress, and ensure that works are completed within the agreed time frame and the sites have been cleared New permit scheme came in to force in Buckinghamshire on 4th November strategic/commuter routes The team also manages all events on the highways Buckinghamshire more attractive to high budget productions. to dig up the road attention to ensure Buckinghamshire keeps moving Fees for permits range from 58 up to 310 depending on the complexity and/or duration of the works Penalties for not adhering to the agreed permit conditions or for working without a permit range from 120 up to 500 the team within the statutory timescales Since 4 November we have administered 404 permit applications and Regulation Order; including Summer Fetes, Charter Fairs, and parades Increase the focus on the new permit scheme to promote better working practices and reduce congestion on our busiest roads. out a more comprehensive coring programme enactment of the Private Members Bill We recieve over 700 event enquiries annually

8 Deliver a variety of schemes across the network including; Install and manage VAS (vehicle activated signs) Work closely with many Parish Councils across the County to Over 100 km of new road markings refreshed or installed each year 100 s of request for new road signs and lines are considered each year all and used to determine what new signs we do and do not install in Did you know? Over 80 VAS managed countywide

9 Transport Systems Responsibility to manage and enhance the County s Intelligent Transport Systems (ITS) including: Rising Bollards Car Park counters Electronic car park information signs NextBus - our bus Real Time Passenger Information (RTPI) system Includes the Passenger Transport team, who promote and develop public transport in Buckinghamshire, through provision of information and marketing of services, managing contracted services and liaison with commercial bus and rail operators timely accurate information to the public to enable them to make informed decisions 125 On-street electronic Real Time Passenger Information (RTPI) displays 112 Signal controlled crossings 21 Car park information signs key locations Recently signed agreement between BCC and Carousel to improve bus time punctuality, focusing on commercial routes Did you know? We maintain and manage 3190 bus stops

10 Parking Services Parking Services manage two strands of work: The enforcement of waiting restrictions throughout Buckinghamshire, ernn Did you know? NSL issue approx 30,000 PCNs a year

11 Casualty Reduction The Road Safety and Casualty Reduction Team has a Statutory Duty on Buckinghamshire County Council (BCC) roads and take appropriate measures to prevent them. The team: Provides Be a Better Driver courses for young drivers, motorcyclists, business drivers and older drivers Provides Community speedwatch - managed and run by volunteers Takes Community requests for changes to speed limits injury collisions In 2012, 1613 people were injured on all Buckinghamshire s roads In 2011 the Road Safety Foundation announced that the most improved motorcyclist safety scheme which has been rolled out across the Thames Valley and adopted by other County Councils In 2012 Buckinghamshire had two routes in the top ten most improved The Department for Transport set 10 year targets in 2000 for all Local target 2 years early Buckinghamshire in students engaged with road safety at 32 schools and colleges (in partnership with Bucks Fire and Rescue) In the absence of new Government targets, TfB is working to a goal to reduce by Did you know? We maintain 38 camera sites

12 Highway Maintenance Services provided include; Drain clearing - undertaken to ensure that surface water is removed from the carriageway as quickly as possible and not allowed to collect or penetrate the foundation of the road. In addition it is important that water is not allowed to stand on the carriageway and cause a road safety hazard Grass cutting - takes place during the summer months, usually starting around April. Grass is cut according to a programme, up to 10 times per year for urban grass cutting and twice a year for rural grass cutting Road sign maintenance - We have one crew dedicated to maintaining our road signs, carrying out repairs and cleaning where necessary Road lines - We maintain, install and remove various road markings across the County. Road lining can be undertaken by hand, or in the case of larger schemes, by our lining vehicle Road repairs reactive pothole repairs and larger patching work Winter maintenance - Our winter maintenance programme starts in County s road network Area maintenance crews - These crews carry out minor works such as kerb and footway repairs, drain resetting and vegetation clearance Developing the use of innovative materials and practices in all aspects of highway maintenance Did you know? of 25 gritters

13 Local Area Technicians Safeguard and support the promotion of TfB services Manage Member, customer and stakeholder expectations proactively and with integrity Develop and maintain relationships and provide guidance and advise on emerging issues Identify and order highway maintenance works to maintain the highway asset Be aware of all area highway related issues in their respective areas Provide guidance and advise on other TfB schemes Support other TfB teams in times of peak demand Process licence applications 18 LATS 19 LAF areas 49 County Council Members 4 District Councils 159 Parish Councils 8 Town Councils 25,200 customer requests/contacts per year 81% satisfaction score, following survey with Members 1st January 2014 onwards: 9 areas countywide (3 per district area based on Member divisions) Alligned to Member areas LATs deal with over 25,000 customer contacts each year

14 Customer Contact Telephone calls going down Visits to SIC going up Did you know? 40% of calls resolved by call centre staff

15 Complaints team The Customer Complaints and Information Team aims to provide high quality services that deliver good value for money. The team ensures that the people of Buckinghamshire know that if they contact the person or service area who is dealing with it. The telephone number to call is advertised and they let them know that any issues raised will be investigated. If it s not possible to resolve the situation straight away the team aims to respond to the customer within 28 days and will also let them know what to do if they are still unhappy. and this is demonstrated by the reduction in complaints received. 80 TfB Stage 1 Complaints 60 TfB Upheld Complaints Number of Complaints Number of Upheld Complaints June July August September October November December Month/Year 0 June July August September October November December Months *Up to 25 th October 2013 ** Comparison June to December 2012 to June to October 2013 Complaints received since May 2013: 14 road safety ** Trends show that the number of upheld complaints has dropped significantly year on year Customer Complaints subject breakdown 8.3% 23.7% 43.8% CMP Grass Hedges/trees Potholes Other e.g Parking, Buses, Road Safety etc. 21 hedges /trees 11.8% 12.4% 40 grasscutting Upheld customer complaints have REDUCED

16 Operational Hub New team set up to help TfB work smarter as a business, by making use of real-time network intelligence, enabling the team to better plan, prioritise, optimise, and monitor works on the network to achieve: Optimised programmes of work network occupancy Sharing real-time information to enable accurate reporting and timely management intervention Collaborative working with third parties Came into operation from 15 May 2013 Has visibility of all programmes, CCTV footage, location of TfB gangs and vehicles on the network, road space bookings, planned events, rights of way works and assets Can track the status of a job in real time Has close contact with Resilience Team and Contact Centre During recent storm, co-ordinated excellent response times in clearing debris from the network, keeping disruption to a minimumm Co-ordinated the recent installation of a new pedestrian crossing to coincide with major re-surfacing work taking place on the same road Launched a map based programme visible to all Members which shows the grass cutting programme, winter maintenance, plane and patch programme, major carriage repairs, gully cleaning programme me thereby reducing the need to contact the Contact Centre deploying maintenance teams across the county 1853 CAT 1 calls diverted from the LATs since 22nd August saving 40k+ With the development of the hub, TfB will have better control and co-ordination of service delivery. Plans to launch the map based programme to the public Plans to integrate with Development Control and have visibility of all new roads and new developments Management Bring all IT sytems together to provide visibility of programmes 29 Capital & 16 Revenue programmes managed daily

17

18 The Contract Transfer of Delivery, Programme and Quality risks to the Contractor Removal of man marking at all levels of the delivery organisation A focus on in the ground through: Streamlined processes Self-delivery and local supply chain Continuous improvement driven by fee at risk Flexibility in openly accommodating and promoting the County Council s corporate objectives The Think Strategies The MTP process Investment in new Fleet and Plant A reactive and responsive team focused on the County Council s needs The integrated contract ensures Value for Money by and through: Annually agreed task orders for the services to be delivered Target outputs and outcomes agreed by Strategic Board The development of detailed Business Plans for 19 streams of business Monthly challenge against these Business Plans Quarterly challenge by Members through the Strategic Board A minimum of 3% saving year on year. (Contractual requirement) Reviewing the Key Performance Indicators (KPIs) annually Placing the fee to be earned at risk against the agreed KPIs The integrity of the staff employed. The boring bit! The contract is for an initial 8 years with a further 7 years available depending on performance against the KPIs. Four years extension to date There is no minimum budget set for the contract It is an actual cost (open book) contract based on the principles of Target cost There are penalties both for failure to meet the KPIs, and where budgets are exceeded.

19

20 John Lamb Service Director Place Lee Merces Operations Director HUB Buckinghamshire County Council CLIENT Corporate RJ Business Improvement Team Alliance Service Leader Business Management Communications Commercial AVDC AVDC OPS WDC SB&C LATS WDC Network Resilience CAPITAL TEAM inc. CMP SB&C Street Lighting HR IT FINANCE FLEET BMS H&S

21 TfB Team Structure Alliance Service Leader Kim Hills Sean Rooney PLACE SERVICE Bob Cook Network Operation Manager John McLernon Teams Routine Works Inspections Street Lighting Local Area Technicians Network Resilience Manager Anne James Marketing and Communications supports all teams Teams Transport Systems Passenger Transport Contracts Rights of way Casualty Reduction Parking Road Space Management Business Manager Martin Heeley Teams Asset Management Structures Capital Works Operational Hub Quality and Performance Business Support Ringway Jacobs Corporate Resources Health and Safety, Human Resources, BMS, Finance, Commercial Contact Centre Tracey Hamlet

22 TfB Contact Information for Members Your Local Area Technician (LAT) is your 1st point of contact. Find your LAT on the Members pages of the SIC. Local Area Technician Team Leaders: Si Khan (South) Mobile: Ext Tim Fowler Teams Asset Management: Keith Carpenter Mobile: Ext Structures: Nicola Head Mobile Ext Capital Works: Paul Turney Mobile: Ext Sian Thomas Mobile: Ext Operational Hub: Michael Light Mobile: Ext Quality & Performance: Michael Light Mobile: Ext Business Support: Janet Newell Mobile: Ext Teams Transport Systems: Dave Roberts Mobile Ext Passenger Transport Contracts: Andy Clarke Mobile: Ext Rights of way: Joanne Taylor Mobile: Ext Casualty Reduction: Sue Brown Mobile: Ext Parking: Steve Kenton Mobile: Ext Road Space Management: Sarah Widdows Mobile: Ext Teams Routine Works: David McMahon Mobile: Ext Safety Inspections: Simon Dudley Mobile: Ext Street Lighting: Kevin Allen Mobile: Ext Marketing & Communications supports all teams Business Manager Martin Heeley Mobile: Network Resilience Manager Anne James Mobile: Ext Network Operations Manager John McLernon Mobile: Ext Alliance Service leader - Kim Hills Senior Management Team Councillor Janet Blake - Cabinet Member for Planning & Transportation

Highway Asset Management Strategy

Highway Asset Management Strategy 1. Introduction 1.1. Cheshire East Council (CEC) recognises the importance of its highway infrastructure and how an effectively maintained and managed network contributes to the achievement of its corporate

More information

Highway Infrastructure Asset Management Strategy

Highway Infrastructure Asset Management Strategy Highway Infrastructure Asset Management Strategy City Development Highways and Transportation Highways Asset Management Page i Asset Management Strategic Documents Contents Page Foreword 4. 1 Introduction)...)))))))))))))))))))))))...

More information

Hampshire s Highway Asset Management Strategy. 1 Implementing Effective Asset Management

Hampshire s Highway Asset Management Strategy. 1 Implementing Effective Asset Management Hampshire s Highway Asset Management Strategy 1 Implementing Effective Asset Management 1.1 Hampshire County Council recognises the importance of the highway infrastructure in the context of the well being

More information

INTERIM ADVICE NOTE 65/05 DESIGN OF VEHICLE RECOVERY OPERATIONS AT ROAD WORKS

INTERIM ADVICE NOTE 65/05 DESIGN OF VEHICLE RECOVERY OPERATIONS AT ROAD WORKS INTERIM ADVICE NOTE 65/05 DESIGN OF VEHICLE RECOVERY OPERATIONS AT ROAD WORKS The Purpose of this document is to provide the Project Sponsor / Designer with comprehensive guidance on the range of issues

More information

A Guide to the Role of Community Flood Wardens

A Guide to the Role of Community Flood Wardens A Guide to the Role of Community Flood Wardens What is a Community Flood Warden Scheme? Community Flood Warden schemes are completely voluntary, and can consist of a single person or several people acting

More information

SD10: HIGHWAY NETWORK MANAGEMENT BEST VALUE REVIEW. (reproduced review document)

SD10: HIGHWAY NETWORK MANAGEMENT BEST VALUE REVIEW. (reproduced review document) SD10: HIGHWAY NETWORK MANAGEMENT BEST VALUE REVIEW (reproduced review document) Highway Network Management Best Value Review Report of the Member Panel Summary of Key Findings Leicestershire County Council

More information

Bedford s Network Management Strategy (2011 2021) November 2010

Bedford s Network Management Strategy (2011 2021) November 2010 Bedford s Network Management Strategy (2011 2021) November 2010 Page 1 of 13 1. Introduction 1.1. The Bedford Borough Council Network Management Strategy has been developed to support local and national

More information

TRAFFIC MANAGEMENT PLAN

TRAFFIC MANAGEMENT PLAN TRAFFIC MANAGEMENT PLAN For: The construction and operation of a Photovoltaic (PV) Facility in Dabenoris, South Africa Prepared for: Alternative Energy Solutions (Pty) Ltd PO Box 4939 Tygervalley, South

More information

Environment Committee 11 January 2016

Environment Committee 11 January 2016 Environment Committee 11 January 2016 Title Whole Life Costing of Footway Maintenance Treatments and Scheme Prioritisation Report of Wards Status Urgent Key Enclosures Commissioning Director, Environment

More information

Climate Local Hampshire County Council Our progress on November 2013

Climate Local Hampshire County Council Our progress on November 2013 Climate Local Hampshire County Council Our progress on November 2013 Since signing up to Climate Local on in July 2013 we have made the following progress towards achieving the commitments and actions

More information

APPENDIX A: ASSET INFORMATION STRATEGY

APPENDIX A: ASSET INFORMATION STRATEGY APPENDIX A: ASSET INFORMATION STRATEGY A1 1 Appendix A: Asset Information Strategy A1.0 Highway Assets For the purpose of this plan the Highway assets within Coventry have been broken down into nine groupings

More information

Highway Asset Management Strategy

Highway Asset Management Strategy Highway Asset Management Strategy April 2015 to March 2021 WiganCouncilOnline wigancouncil @wigancouncil wigan.gov.uk Highway Asset Management Strategy 1. Background This document forms our Highway Asset

More information

11. Managing our Transport Assets

11. Managing our Transport Assets 11. Managing our Transport Assets 11.1 The Need for an Asset Management Plan 11.1.1 A key challenge is to make transport assets work for the city in a way which fully contributes to the delivery of corporate

More information

eastsussex.gov.uk Highway Asset Management Strategy 2015-2022

eastsussex.gov.uk Highway Asset Management Strategy 2015-2022 eastsussex.gov.uk Highway Asset Management Strategy 2015-2022 Contents Foreword... 1 Introduction... 3 Asset Management Framework... 6 Strategy for Main Asset Groups... 8 Data Management... 22 Best Practice

More information

Route Optimisation / Traffic Signals Efficiency

Route Optimisation / Traffic Signals Efficiency Route Optimisation / Traffic Signals Efficiency Glossary Auckland Council Advanced Real-time Traffic Information System Auckland Transport Closed Circuit Television (Traffic cameras) Full Time Equivalent

More information

PERFORMANCE REPORT Quarter 2 2014/15

PERFORMANCE REPORT Quarter 2 2014/15 PERFORMANCE REPORT Quarter 2 2014/15 CONTENTS 1. RELIABILITY... 3 2. NETWORK DISRUPTION... 9 3. TRAFFIC VOLUMES... 15 4. TRAFFIC SPEEDS... 17 5. ROAD SAFETY... 18 6. ASSET AVAILABILITY... 19 7. STATE OF

More information

Slough Borough Council. Highway Asset Management Strategy

Slough Borough Council. Highway Asset Management Strategy Slough Borough Council Highway Asset Management Strategy OUR AMBITION USING RESOURCES WISELY By 2019 the Council s income and the value of its assets will be maximised 1 Key Priorities 1.1 We understand

More information

London Borough of Merton Local Flood Risk Management Strategy

London Borough of Merton Local Flood Risk Management Strategy Local Flood Risk Management Strategy Summary 2014-2020 Introduction In response to the severe flooding across large parts of England and Wales in summer 2007, the Government has recently enacted the Flood

More information

Claims for compensation

Claims for compensation Claims for compensation Relating to an incident on the highway or footway which resulted in personal injury and/or damage to property Introduction This document is about compensation claims for incidents

More information

Newbiggin House Farm,

Newbiggin House Farm, Newbiggin House Farm, Near Waberthwaite Flood Investigation Report 32 Flood Event 30/8/2012 Cumbria County Council Version Undertaken by Reviewed by Approved by Date Preliminary Colin Parkes Anthony Lane

More information

Wiltshire Highways Asset Management Strategy

Wiltshire Highways Asset Management Strategy Wiltshire Highways Asset Management Strategy May 2015 1 Wiltshire Highways Asset Management Strategy Contents 1. Introduction 3 The Importance of Highway Infrastructure to Wiltshire 3 Contribution of Highways

More information

Road Asset Management Plan 2012

Road Asset Management Plan 2012 Road Asset Management Plan 2012 Contents EXECUTIVE SUMMARY... 5 1. INTRODUCTION... 6 1.1 What is asset management... 6 1.2 Drivers for asset management... 6 1.3 Clackmannanshire Council's Road Asset Management

More information

Activity Management Plan Overview

Activity Management Plan Overview Trevor Kerr Timaru District Council Activity Management Plan Overview 2012 2022 Transport Table of Contents 1. What we do now?... 5 1.1. Transport Assets... 5 1.2. Transport Activities... 5 2. Key Network

More information

HIGHWAY ASSET MANAGEMENT STRATEGY 2015

HIGHWAY ASSET MANAGEMENT STRATEGY 2015 HIGHWAY ASSET MANAGEMENT STRATEGY 2015 0 Contents Foreword... 2 Executive Summary... 3 1.0 Highway Asset Management... 4 2.0 What is a Highway Asset... 7 3.0 Why and How we Manage Highway Assets... 8 4.0

More information

Development Layout Design

Development Layout Design Development Layout Design General Design Considerations for Adoptable Highways Version 1 June 2012 Transportation, Waste and Environment Service Issue and Revisions Record Revision Date Originator Purpose

More information

Summer 2007 Floods Joint Scrutiny Task Group. Thursday 22 April 2010, 3.00pm, County Hall NOTES

Summer 2007 Floods Joint Scrutiny Task Group. Thursday 22 April 2010, 3.00pm, County Hall NOTES Summer 2007 Floods Joint Scrutiny Task Group Thursday 22 April 2010, 3.00pm, County Hall NOTES Present: Councillors: Worcestershire County Council Malvern Hills District Council Redditch Borough Council

More information

Traffic Management During Construction

Traffic Management During Construction Traffic Management During Construction The construction of Dublin Port Tunnel couldn t begin until a traffic management plan had been developed and agreed to facilitate construction of the Tunnel and to

More information

Construction Logistics Plan Guidance

Construction Logistics Plan Guidance Construction Logistics Plan Guidance For planners MAYOR OF LONDON Transport for London Section 1 Introduction Contents Section 1 Introduction 3 Section 2 Policy background 6 Section 3 Typical contents

More information

Mapping and geolocation technology for waste collection services West Suffolk and Northamptonshire.

Mapping and geolocation technology for waste collection services West Suffolk and Northamptonshire. Mapping and geolocation technology for waste collection services West Suffolk and Northamptonshire. Summary In the face of budget cuts, increased tax burdens for landfill, and challenging targets to improve

More information

Pavement Asset Management Guidance Section 5.3: Condition Surveying and Rating - Drainage

Pavement Asset Management Guidance Section 5.3: Condition Surveying and Rating - Drainage Pavement Asset Management Guidance Section 5.3: Condition Surveying and Rating - Drainage December 2014 Document Information Title Author Description Pavement Asset Management Guidance, Section 5.3: Condition

More information

Highway Asset Management Strategy Growth & Neighbourhoods Directorate December 2015

Highway Asset Management Strategy Growth & Neighbourhoods Directorate December 2015 Highway Asset Management Strategy Growth & Neighbourhoods Directorate December 2015 V2.0 Table of Contents Record of Amendments... 3 Introduction... 4 1 The Importance of Highway Infrastructure to Manchester...

More information

Birmingham Highways Maintenance and Management Service CIHT Northern Ireland

Birmingham Highways Maintenance and Management Service CIHT Northern Ireland Birmingham Highways Maintenance and Management Service CIHT Northern Ireland 21 st November 2011 Birmingham Highways Maintenance and Management Service (PFI) Mike Notman AMEY PROJECT DIRECTOR Amey Today

More information

SCC LOCAL COMMITTEE IN SPELTHORNE. Local Transportation Revenue Expenditure 2004/05 6 DECEMBER 2004

SCC LOCAL COMMITTEE IN SPELTHORNE. Local Transportation Revenue Expenditure 2004/05 6 DECEMBER 2004 s SCC LOCAL COMMITTEE IN SPELTHORNE Local Transportation Revenue Expenditure 2004/05 KEY ISSUE: 6 DECEMBER 2004 To review the current revenue budgets relating to Transportation activities within Spelthorne

More information

MINUTES of a Public Meeting to consider Flooding issues in Shaw & Whitley held on Monday 6 th October 2014 at Shaw School Hall, Shaw at 7.

MINUTES of a Public Meeting to consider Flooding issues in Shaw & Whitley held on Monday 6 th October 2014 at Shaw School Hall, Shaw at 7. MINUTES of a Public Meeting to consider Flooding issues in Shaw & Whitley held on Monday 6 th October 2014 at Shaw School Hall, Shaw at 7.00pm Present: Melksham Without Parish Council (MWPC) Cllr Richard

More information

Why build the Silvertown Tunnel?

Why build the Silvertown Tunnel? Why build the Silvertown Tunnel? Over the last 30 years east London has changed with the redevelopment of former industrial areas into major commercial and residential districts. The development of Canary

More information

Principles of Traffic Management on sites / road network

Principles of Traffic Management on sites / road network IOSH Ireland, Construction Specialist Section Springfield Hotel, Leixlip, County Kildare. 25 March 2015 Principles of Traffic Management on sites / road network Padraig Watters, Chartered Engineer This

More information

POSITION DESCRIPTION

POSITION DESCRIPTION POSITION DESCRIPTION TITLE DIRECTORATE UNIT AWARD CLASSIFICATION Infrastructure Maintenance Team Member Sustainable Development Works Unit Band 2 of the Victorian Local Government Award 2001, as amended

More information

SUFFOLK COASTAL DISTRICT COUNCIL DOMESTIC FLOOD PROTECTION POLICY

SUFFOLK COASTAL DISTRICT COUNCIL DOMESTIC FLOOD PROTECTION POLICY SUFFOLK COASTAL DISTRICT COUNCIL DOMESTIC FLOOD PROTECTION POLICY 1. Introduction 1.1 The Council recognises the threat to local communities from flooding following severe weather events and as a result

More information

4 Adoption of Asset Management Policy and Strategy

4 Adoption of Asset Management Policy and Strategy 4 Adoption of Asset Management Policy and Strategy Abstract The report recommends the adoption of an updated Asset Management Policy 2014 and an Asset Management Strategy 2014-2019. Both documents are

More information

FEES AND CHARGES 2015/16: Highways, Planning, Transport Services and Engineering Design Group. Service

FEES AND CHARGES 2015/16: Highways, Planning, Transport Services and Engineering Design Group. Service FEES AND CHARGES 2015/16: Highways, Planning, Transport Services and Engineering Design Group Service Charge 2015-16 1 Traffic and Road Safety Data 1.1 Accident/Traffic Statistics Members of the Public

More information

Report of the Head of Service of Highways, Capital Development and Waste

Report of the Head of Service of Highways, Capital Development and Waste HCW/14/48 Public Rights of Way Committee 19 June 2014 Public Rights of Way Storm Damage Update Report of the Head of Service of Highways, Capital Development and Waste Please note that the following recommendation

More information

CONSTRUCTION TRAFFIC MANAGEMENT PLAN Issue 2, V5, 11/11/13

CONSTRUCTION TRAFFIC MANAGEMENT PLAN Issue 2, V5, 11/11/13 Note: Please refer to the end of this document for guidance notes about completing this form Q1. What is the full postal address of the site? Your response Q2. Planning reference and revision number (if

More information

Better Bus Area Monitoring and Evaluation Framework

Better Bus Area Monitoring and Evaluation Framework Do Better Bus Area Monitoring and Evaluation Framework March 2014 The Department for Transport has actively considered the needs of blind and partially sighted people in accessing this document. The text

More information

Bolton s Flood Risk Management Strategy

Bolton s Flood Risk Management Strategy Bolton s Flood Risk Management Strategy www.bolton.gov.uk Public Summary Bolton s Flood Risk Management Strategy Public Summary Introduction Over 5.5 million properties in England and Wales are at risk

More information

Shropshire Highways Draft Asset Management and Communications Strategy and Implications of Department for Transport Incentivised funding

Shropshire Highways Draft Asset Management and Communications Strategy and Implications of Department for Transport Incentivised funding Committee and Date Cabinet 14 th October 2015 Shropshire Highways Draft Asset Management and Communications Strategy and Implications of Department for Transport Incentivised funding Responsible Officer

More information

To invite the Planning and Environment Committee to decide on an approach to dealing with pavement obstructions in the centre of town.

To invite the Planning and Environment Committee to decide on an approach to dealing with pavement obstructions in the centre of town. Report to P&E Committee 12-Aug-14 Report No. 1 Pavement Obstructions 1. Purpose of Report To invite the Planning and Environment Committee to decide on an approach to dealing with pavement obstructions

More information

Asset Management Policy March 2014

Asset Management Policy March 2014 Asset Management Policy March 2014 In February 2011, we published our current Asset Management Policy. This is the first update incorporating further developments in our thinking on capacity planning and

More information

Level 2 Award in Safe Driving at Work

Level 2 Award in Safe Driving at Work Level 2 Award in Safe Driving at Work Student notes (sample) www.britsafe.org Membership Training Qualifications Audit and Consultancy Audit and Policy Consultancy and Opinion Policy Awards and Opinion

More information

Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan

Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan Triton Knoll Offshore Wind Farm Limited Electrical System Outline Traffic Management Plan October 2014 RWE Innogy UK Triton Knoll TMP Copyright 2014 RWE Innogy UK Ltd All pre-existing rights reserved.

More information

HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT STRATEGY

HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT STRATEGY HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT STRATEGY 16 November 2015 Highway Infrastructure Asset Management Strategy Contents Introduction 1.0 The Need for Asset Management 1.1. Background 1.2. Aims and

More information

Goals & Objectives. Chapter 9. Transportation

Goals & Objectives. Chapter 9. Transportation Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system

More information

Highway Asset Management Strategy 2014-15

Highway Asset Management Strategy 2014-15 Highway Asset Management Strategy 2014-15 - 0 - P a g e Record of Amendments Issue No.: 6.0/2015 Status: Final Date: January 2015 Author: Reviewed by: Mark Evans (Asset Management Engineer) David Kinsey

More information

HAMIS. Highways Asset Management Integrated Service. Delivering Highway Maintenance Efficiency Savings

HAMIS. Highways Asset Management Integrated Service. Delivering Highway Maintenance Efficiency Savings HAMIS Highways Asset Management Integrated Service Delivering Highway Maintenance Efficiency Savings The additional efficiency savings of almost 300k in the first year of HAMIS is impressive and welcomed,

More information

Rural Road Safety Policy in Korea: Lesson Learned

Rural Road Safety Policy in Korea: Lesson Learned Regional Seminar on Safe, Climate Adaptive and Disaster Resilient Transport for Sustainable Development Nov. 17 th, Seoul Rural Road Safety Policy in Korea: Lesson Learned Sangjin HAN Korea Transport Institute

More information

Your responsibilities...

Your responsibilities... Your responsibilities... Identify if you are living in a flood risk area: visit www.environment-agency.gov.uk/floodline or call Floodline on 0845 9881188. Protect your home or property. Provide your own

More information

A Code of Practice for Highway Structures An Asset Management Approach

A Code of Practice for Highway Structures An Asset Management Approach A Code of Practice for Highway Structures An Asset Management Approach Dick Feast Principal Consultant Whole Life Asset Management Amey Infrastructure Services The Code of Practice Code of Practice for

More information

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) EHS Regulatory Instrument Code of Practice EHS RI CoP 44.0 Traffic Management and Logistics Version 2.0 February 2012 ACKNOWLEDGEMENTS With gratitude

More information

DEPARTMENT OF TRANSPORT CYCLING STRATEGY 29 February 2008

DEPARTMENT OF TRANSPORT CYCLING STRATEGY 29 February 2008 DEPARTMENT OF TRANSPORT CYCLING STRATEGY 29 February 2008 INTRODUCTION The Department of Transport s Business Plan for the 2007/08 financial year stated the following: Government Aim: Quality Environment

More information

OAKPARK SECURITY SYSTEMS LIMITED. Health & Safety Policy. Requests or suggestions for amendment to this procedure

OAKPARK SECURITY SYSTEMS LIMITED. Health & Safety Policy. Requests or suggestions for amendment to this procedure OAKPARK SECURITY SYSTEMS LIMITED Requests or suggestions for amendment to this procedure should be submitted to the owner of the process PROCESS OWNER: MANAGEMENT TEAM Current version: PREVIOUS VERSION

More information

Our journey to a low carbon economy. Sustainable travel in Greater Manchester

Our journey to a low carbon economy. Sustainable travel in Greater Manchester Our journey to a low carbon economy Sustainable travel in Greater Manchester 2 Transport for Greater Manchester Greater Manchester has a vision of placing sustainable commuting and business travel at the

More information

Technical Journal. Paper 142

Technical Journal. Paper 142 Technical Journal 09 Paper 142 142 Kevin Balaam Programme Manager Highways & Transportation Atkins The Area 6 MAC approach to planning and programme management Introduction Steve Dickinson Schemes Manager

More information

Cllrs T G Cutmore, B T Hazlewood, K H Hudson, Mrs J R Lumley, Mrs J E McPherson, Mrs C E Roe, Cllrs C G Seagers, D J Sperring and I H Ward.

Cllrs T G Cutmore, B T Hazlewood, K H Hudson, Mrs J R Lumley, Mrs J E McPherson, Mrs C E Roe, Cllrs C G Seagers, D J Sperring and I H Ward. Rochford District Councillors: Other Agencies: Officers: Cllrs T G Cutmore, B T Hazlewood, K H Hudson, Mrs J R Lumley, Mrs J E McPherson, Mrs C E Roe, Cllrs C G Seagers, D J Sperring and I H Ward. R Baranowski

More information

Service Level Agreement (SLA)

Service Level Agreement (SLA) Hertford College, Oxford Service Level Agreement (SLA) For Maintenance, Risk Management, and Domestic Accommodation Services At Hertford College, its residential annexes and non- residential properties

More information

2014/15 Performance Measures and Targets

2014/15 Performance Measures and Targets Surface Transport Panel Date: 9 April 2014 Item 6: formance Measures and Targets This report will be considered in public 1 Summary 1.1 The purpose of this paper is to provide the Panel with an overview

More information

Guidance Notes: GARDEN FLOODING

Guidance Notes: GARDEN FLOODING Page 1 of 7 Guidance Notes: GARDEN FLOODING If you are unsure about anything within these notes then please contact the Flood Risk Management (FRM) team using the details at the end of this document. Water

More information

TREE RISK MANAGEMENT DOCUMENT

TREE RISK MANAGEMENT DOCUMENT TREE RISK MANAGEMENT DOCUMENT INTRODUCTION The Council has a statutory duty of care under the Health and Safety at Work Act 1974 and the Occupiers Liability Act 1999 to ensure that members of the public

More information

Public Transport Vehicle Management System. Request for Information

Public Transport Vehicle Management System. Request for Information Public Transport Vehicle Management System Request for Information Public Transport Authority Western Australia Page 2 of 11 Table of Contents 1 INTRODUCTION... 3 1.1 Information for Respondents... 3 1.2

More information

Transport Asset Management Plan. Worcestershire Local Transport Plan 3. Worcestershire Local Transport Plan 3

Transport Asset Management Plan. Worcestershire Local Transport Plan 3. Worcestershire Local Transport Plan 3 Worcestershire Local Transport Plan 3 Worcestershire Local Transport Plan 3 Transport Asset Management Plan Find out more online: www.worcestershire.gov.uk/ltp3 Definition of Transport Asset Management...

More information

Galloper Wind Farm Project. Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513. Galloper Wind Farm Limited

Galloper Wind Farm Project. Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513. Galloper Wind Farm Limited Galloper Wind Farm Project Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513 Galloper Wind Farm Limited Document title Galloper Wind Farm Project Traffic Management Plan Status

More information

Erection of replacement warehouse building and erection of two buildings in connection with builder s merchants

Erection of replacement warehouse building and erection of two buildings in connection with builder s merchants Plan: O 02/00708/FUL Thames Ward (A) Address: Development: Applicant: London Works, Ripple Road, Barking Erection of replacement warehouse building and erection of two buildings in connection with builder

More information

Oxfordshire Local Transport Plan 2011-2030 Revised April 2012. Objective 3 Reduce casualties and the dangers associated with travel

Oxfordshire Local Transport Plan 2011-2030 Revised April 2012. Objective 3 Reduce casualties and the dangers associated with travel 6. Road Safety Objective 3 Reduce casualties and the dangers associated with travel Road safety continues to be a core priority both nationally and locally reflecting the very high human and other costs

More information

18 November 2015 At a meeting of the Select Committee held at 10.30 a.m. at County Hall, Chichester.

18 November 2015 At a meeting of the Select Committee held at 10.30 a.m. at County Hall, Chichester. Environmental & Community Services Select Committee 18 November 2015 At a meeting of the Select Committee held at 10.30 a.m. at County Hall, Chichester. Present: Mr Tyler (Chairman) Mr Barrett-Miles Mr

More information

WEST YORKSHIRE BUS STRATEGY

WEST YORKSHIRE BUS STRATEGY WEST YORKSHIRE BUS STRATEGY Phase 1 Consultation on Vision and Principles Introduction and Purpose There is a statutory requirement for the West Yorkshire Combined Authority (WYCA) to produce a Local Transport

More information

Vehicle Replacement & Fleet Utilisation Policy To be considered as part of the overarching Fleet Strategy. Submitted: 29 September 2013

Vehicle Replacement & Fleet Utilisation Policy To be considered as part of the overarching Fleet Strategy. Submitted: 29 September 2013 Vehicle Replacement & Fleet Utilisation Policy To be considered as part of the overarching Fleet Strategy Submitted: 29 September 2013 To be Reviewed: September 2015 VERSION: AUTHOR: OWNER: v2.3 Barry

More information

HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT

HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT GUIDANCE DOCUMENT MAY 2013 Although this report was commissioned by the Department for Transport (DfT), the findings and recommendations are those of the authors

More information

DRAFT PLANNING THE OPENING OF A ROAD PROJECT GUIDELINE 1

DRAFT PLANNING THE OPENING OF A ROAD PROJECT GUIDELINE 1 DRAFT PLANNING THE OPENING OF A ROAD PROJECT GUIDELINE 1 Guideline: DRAFT Planning the opening of a road project guideline Version: 1.1 Issue: September 2009 Approved By: Phil Margison General Manager,

More information