Avenida del Valle 601, Oficina 31, Ciudad Empresarial, Huechuraba Santiago Chile Telephone Nº (56 2) ; (56-2) Fax (56-2)
|
|
- Veronica Moore
- 8 years ago
- Views:
Transcription
1 DE RE METALLICA LEADER COMPANY IN TECHNOLOGICAL INNOVATION IN PROCESS ENGINEERING Avenida del Valle 601, Oficina 31, Ciudad Empresarial, Huechuraba Santiago Chile Telephone Nº (56 2) ; (56-2) Fax (56-2) Website
2 MISSION De Re Metallica Ingeniería Limitada, DRM, is a Chilean consulting company for industrial processes, created in August 1995 by outstanding professionals in the copper extractive metallurgy. Our mission is to advise companies in the mining and metallurgical field as well as other industrial activities, in a series of aspects such as: Project Engineering, New Process Development, Diagnosis of Industrial Operations, Metallurgical Auditing, Process Optimization and Control, Computational Code Development, Project Evaluation, Patenting Studies and Professional Training. Differentiating element compared to conventional engineering is the TECHNOLOGICAL INNOVATION component in all our work, evidenced through intensive use of Basic Sciences and Engineering Sciences aimed to solve the industrial problems presented to us. DRM has the response capacity of engineering companies with the deepness of a research centre or university.
3 OUR PERSONS Jorge Menacho Llaña Yadranka Zivkovic Domic : Outstanding Chilean professional in the mining industry. He was awarded as the Professional of the Year in 2005 by the Chilean Institution for Mining Engineers and the Ramón Salas Edwards Award to the Outstanding Contribution to Engineering published within years , distinction given by the Chilean Engineer Institution in His background includes basic sciences (B.Sc. Chemistry, University of Chile, 1972) and engineering sciences (D.Sc. Metallurgical Engineering, University of Concepción, Chile, 1985, and Post Doct at Pennsylvania State University, USA, ). Field of interest are Hydrometallurgy, Mineral Processing and Environment. He has been linked to several universities, the Mining and Metallurgical Research Centre (CIMM) and engineering companies. Since 1995 he holds the Technical Manager position at DRM. : Chemical Civil Engineer from the University of Concepción, Chile. She worked shortly for the University of Concepción, then for CIMM and DRM since She has been involved in a variety of projects mainly in the Hydrometallurgy field. Areas of interest are process math modeling for optimization and environment control and the study of chemical topics in SX, contaminant behavior and patenting studies. She is Senior Consultant and Operation Manager at DRM.
4 Patricio Chávez Espinoza : Metallurgical Civil Engineer from the University of Santiago, Chile. He has been involved in many optimization projects as well as metallurgical auditing. He is skilled in process analysis, dynamic modeling, optimization and code development. He is Process Engineer at DRM. Elvis Peñaloza Ortiz : Metallurgical Engineer from the National University San Agustín de Arequipa Perú, he also holds a technical degree in Informatic Systems from the System and Data Processing Institute IPSIPRODA, Perú. He has been involved in development of design and optimization computing codes as well as metallurgical process studies. He currently holds the Process Engineer position at DRM. Boris Merino Pulgar : Metallurgical Civil Engineer from the University of Concepción, Chile. He has been involved in many optimization projects as well as metallurgical auditing. He is skilled in process analysis, modeling and optimization.he has leaded the commissioning and start up of a new SX plant. He is Process Engineer at DRM
5 Guillermo Ávila Castillo : Metallurgical Civil Engineer from the University of Concepción, Chile. He has been involved in industrial optimization projects as well as metallurgical design. He is skilled in process analysis, modeling and optimization. He is Process Engineer at DRM. Daniel Jordán Paredes : Metallurgical Civil Engineer from the University of Santiago, Chile. He has been involved in industrial optimization projects as well as metallurgical design. He is skilled in process analysis, modeling and optimization. He is Process Engineer at DRM. BASIC ADMINISTRATIVE TEAM Natalia Mujica Neira Juan Garay Zelada Leonardo Garetto : Executive Secretary : General Accountant : Lawyer
6 WORKING FIELD DRM is highly skilled in process development, engineering studies and operational analysis with robust knowledge on basic and engineering sciences, much deeper than conventional engineering companies, for whom DRM use to be Consultant. Our knowledge on fundamentals allows to face any industrial process, but our experience is centered in Hydrometallurgy, Mineral Processing and Environmental Issues. We are expert in solving specific process problems and also in the overall optimization and control of industrial plants, strongly oriented toward immediate improvement of the business result, a highly valued feature in these high price days. How can we do this? By using our rich 35 years experience in process analysis and also by handling a battery of phenomenological models, most of them developed by ourselves, with intense use of transport phenomena, chemical kinetics, thermodynamics, reactor analysis, bioprocessing and other tools to model, simulate and optimize industrial operations. Specific skills supported by experience are listed below:
7 (I) Mineral Processing Blasting - Development of novel phenomenological models for granulometry estimation and further prediction of metal recovery at the concentrator operation. Crushing & Screening - Development of novel phenomenological models for optimization of crushing and classification in screens. - Design of industrial crushing plants assisted by phenomenological models. - Optimization of crushing plants assisted by static phenomenological models. - Control of crushing plants assisted by dynamic phenomenological models. - Training courses at specific companies. Rod and Ball Milling - Development and adoption of phenomenological grinding models (population balances) for optimization of industrial circuits. - Development of novel grinding-body wear model (population balances) for industrial optimization purposes. - Design and dimensioning of industrial grinding and classification circuits. - Optimization of industrial grinding and classification circuits. - Dynamic modeling of conventional mills for control purposes. - Procedure to estimate optimal ball make up at industrial plants. - Study on grinding media corrosion. - Training courses at specific companies.
8 SAG Milling - Development and adoption of phenomenological SAG mill model (population balances) for design and optimization issues. - Dimensioning and optimization of SAG mill circuits. - Evaluation of pre-crushing options to enhance capacity in SAG mill circuits assisted by phenomenological models. - Mass transport characterisation in SAG mills by means of radio tracer experiments. - Development of novel model for mass transport in SAG and ball mills (turbulent flow in porous media). - Development and application of methodologies to estimate SAG milling model parameters. - Development and application of scaling up techniques in SAG mills. - Dynamic modeling of conventional mills for control purposes. - Training courses at specific companies. Dry Milling - Development and adoption of phenomenological models for design and optimization of clinker cement dry grinding (air-swept mill models). - Dry cycloning of clinker cement for design and optimization purposes. Non Conventional Fracture Developments - Design and optimization of vertical mills. - Modelling of vertical mills. - Design and optimization of high pressure grinding rolls. - Mechanical and metallurgical modelling of high pressure grinding rolls. - Study on electro fracture of ores. - Development in centrifugal grinding device and process. - Development in ultrasonic grinding device and process.
9 Flotation - Development and adoption of phenomenological flotation models (kinetics model with distributed rate constants) to optimize industrial circuits. - Design and dimensioning of industrial flotation circuits. - Development and application of novel scale up flotation models. - Development of reagent formula in flotation systems. - Fluid dynamics and mass transport in different size cells (RTD tracer experiments). - Development of methodologies to scale up results from lab to industrial plant and pilot plant to industrial plant. - Dynamic modeling of industrial flotation plants for control purposes. - Flotation of clayish copper ores: bench scale tests and optimization at industrial level. - Effect of salty water (brines) in flotation response at lab and scale up to industrial scale. - Training courses at specific companies. Thickening - Process engineering in thickening operations. - Design and dimensioning of industrial thickeners. - Diagnosis of industrial thickening operations. - Metallurgical auditing. - Optimization and control of industrial thickeners. Filtration - Development of a novel phenomenological filtering dynamic model useful in design, optimization and control of industrial circuits (transport phenomena approach). - Process engineering in filtering operations. - Design and dimensioning of industrial filters. - Diagnosis of industrial filtering operations. - Metallurgical auditing. - Optimization and control of filtering systems. - Training courses at specific companies.
10 Drying - Process engineering in drying operations. - Design and dimensioning of industrial dryers. - Diagnosis of industrial operations. - Metallurgical auditing. - Optimization and control of industrial dryers. - Mass and energy balances in industrial dryers. - Solar drying of sulfide concentrates and anodic muds. - Mass transport studies in rotary dryers, assisted by RTD tracer experiments. (II) Hydrometallurgy Blasting - Development of novel phenomenological models for granulometry estimation and further prediction of metal recovery and acid consumption in ROM leach operations. Crushing & Screening - Development of novel phenomenological models for crushing and classification in screens. - Design of industrial crushing plants assisted by phenomenological models. - Optimization of crushing plants assisted by static phenomenological models. - Control of crushing plants assisted by dynamic phenomenological models. - Training courses at specific companies. Aglomeration - Development of novel phenomenological models to describe aglomeration in rotary drums (population balance models). - Design and optimization of aglomeration circuits by means of phenomenological models. - Optimization of lifters design and liquid addition system (acid and raffinate solutions) in industrial aglomerators.
11 - Determination of mass transport patterns through rotary aglomerators assisted by RTD tracer experiments and flow models. - Training courses at specific companies. Stacking - Development of novel physical models for ore stacking (granulometric classification by zones). - Optimization of industrial stacking operations by using phenomenological models. - Studies on segregation phenomena and further impact in the subsequent leach step. - Training courses at specific companies. Leaching - Development of novel phenomenological models for heap leaching, dump leaching and vat leaching. - Development and application of novel models for liquid flow in porous media and application to solve flow problems in industrial operations. - Design of industrial leach operations assisted by phenomenological models. - Optimization of leach cycles assisted by phenomenological models. - Development of novel procedures to scale up hydrodynamics and metallurgy results from column to industrial heap or dump lech operations. - Diagnosis and metallurgical auditing in heap and dump leach operations with the use of transport phenomena tools. - Set up of design parameters for heap and dump operations in phases of conceptual, basic and detail engineering projects. - Development and adoption of tools from the hydrology field to hydrometallurgy. - Development of leaching process for refractory, clayish and lowgrade ores. - Development of concentrate leaching processes.
12 - Development and application of a novel bioleaching model, which includes liquid transport, solute transport (copper, acid, ferrous and ferric iron), bacteria growth, air and oxygen transport and heat transport. - Training courses at specific companies. Solvent Extraction - Development of novel SX physical models for the copper exchange. - Design and optimization of industrial SX circuits assisted by phenomenological models. - Experimental and conceptual selection of optimal extractant formulae. - Evaluation and selection of industrial diluents. - Control of organic degradation problems at industrial scale. - Analytical service to determine the organic composition of industrial oxime solutions (aldoxime, ketoxime, aldehyde, ketone, tridecyl alcohol, diester TXIB, nitrated oxime, aldehyde and ketone). - Definition of restoring system for the organic phase by jeans of activated clays. - Fundamental adsorption studies of organic polar constituents on zeolite substrates, assisted by molecular modeling software. - Development and application of novel phenomenological model useful for design, optimization and control of impurities in SX electrolytes. - Diagnosis and control of the oxime nitration at industrial SX plants. - Development of a novel mixing and settling model useful to predict entraiments at the weir exit and also a novel procedure to estimate drop size distribution in mixer and settler and 3D velocity profile in the settler. - Design and optimization of picket fences in industrial SX plants, assisted by our own hydrodynamic code and CFD modeling. - Mixing characterisation by application of RTD tracer experiments. - Training courses at specific companies.
13 Electrowinning - Development of a novel phenomenological model for electrowinning (electrochemical kinetic approach). - Development of a novel phenomenological model for chlorine-gas evolution in industrial EW cells (electrochemical kinetic approach). - Chlorine control at EW tankhouse. - Electrochemical decomposition of oximes in EW circuits (polarisation curves, cyclic voltametry in non-aqueous media). - Control of acid aerosols in EW tankhouse (polypropilene spheres, extractor systems, chemical additives such as FC-1100 and saponines). - Development of a novel phenomenological model to estimate dispersion of acid mist in EW tankhouse (electrochemical model for the aid aerosol evolution and atmospheric dispersion model). - Flow pattern characterization at EW cells by jeans of RTD tracer experiments. - Auditing of engineering EW tankhouse projects. - Training courses at specific companies. (III) Environment Water Contamination - Dynamic modeling of water industrial dams to estimate underground infiltration by means of transport phenomena approach. - Stability of organic flotation reagents and infiltration to the sub soil. - Contamination of dam water with humic acids dissolved from the natural soil and effect in the flotation process. - Dynamic modeling of solute transport in the vadose zone, with/without chemical reaction to estimate contaminant spread out. - Transport of organic/inorganic species to estimate contamination in underground courses. - Scale up and forecast of impurity behavior at industrial mineral processing and leaching plants.
14 - Evaluation of the impact of a reverse osmosis plant in the quality of Molybdenum Plants effluents. - Heavy-metal precipitation with lime and disposal in dams. Air Contamination - Probability model to predict transport of paraffinic.contaminants through air. - Model to estimate chlorine gas evolution at industrial tankhouses. - Studies on air pollution control in crushing plants.
15 SELECTED CLIENTS Minera Lomas Bayas, Xstrata Copper Compañía Minera Doña Inés de Collahuasi, Anglo American Xstrata Copper - Mitsui Minera Escondida Limitada, BHP Billiton Empresa Mantos Blancos, División Manto Verde, Anglo American plc AngloAmerican Chile, Planta Las Tórtolas, Planta Los Bronces, Planta El Soldado, Anglo American plc Sociedad Punta del Cobre S.A. Codelco Norte, Gerencia de Hidrometalurgia Norte (ex Radomiro Tomic) Codelco Norte, Gerencia de Hidrometalurgia Sur (ex Chuquicamata) Codelco El Teniente, Subgerencia de Ingeniería Codelco Andina, Subgerencia de Ingeniería Minera Gaby, Codelco Chile Sociedad Contractual Minera El Abra, Codelco Chile, Freeport - McMoran Compañía Minera Quebrada Blanca, OUR Resources Chile Limitada BHP Billiton, BHP Chile Inc. Compañía Minera Cerro Colorado Ltda., BHP Billiton Minera Michilla, Antofagasta Minerals Minera Cerro Dominador S.A., Compañía Minera El Bronce Sociedad Química y Minera de Chile S.A. Cía. Minera Zaldivar, Barrica Chile Bechtel A.R.A. Arcadis Geotécnica Molycop CHile Cognis Chile Avecia Chile, Shell Chile S.A.I.C. Phillips Petroleum Westfalia Chile Refinería Petróleo de Concón, RPC.
16 PROFESSIONAL EXPERIENCE PROJECT : Diagnosis and Improvement of the Organic Quality at the Radomiro Tomic Solvent Extraction Plant COMPANY/YEAR : Codelco Chile, División Codelco Norte, 2008 PROJECT : Environmental Analysis of the Disposal of the HDS Mud-Plant in the Ovejería Dam. Use of Dynamic Simulation Tools COMPANY/YEAR : Codelco Chile, 2008 PROJECT : Diagnosis and Improvement of the Organic Quality at the Minera Escondida Limitada Solvent Extraction Plant COMPANY/YEAR : Minera Escondida Limitada, 2008 PROJECT : Optimization of the Current and Future Leaching and Cristallization Plant to Produce Copper Sulphate COMPANY/YEAR : Compañía Minera Quimal, 2008 PROJECT : Technical Assistance in the Commisioning and Start Up of the SX Plant at Minera Gaby COMPANY/YEAR : Minera Gaby S.A., 2008 PROJECT : Dynamic Simulation of the Compañía Minera Cerro Colorado Leach Operation with Run-of-Mine Granulometry COMPANY/YEAR : BHP Billiton, 2008 PROJECT : Estimation of Production Vector, Acid and Water Consumption in the Caserone ROM Dump Leach Project. Use of Dynamic Simulation Tools COMPANY/YEAR : Aker Kvaerner Chile, 2008 PROJECT : Estimation of the Water Quality Impact in the Metallurgical Response of the Concentrator and Moly
17 Plants. Part II: Exploration of Process and Operation Variables through Dynamic Simulation COMPANY/YEAR : Compañía Minera Doña Inés de Collahuasi, 2007 PROJECT : Development and Application of an Overall Balance Model for the Novel Ferric Leach Procedure Developed at Codelco Chile RT Plant. Behavior of By- Products is Included. Dynamic Simulation Tools were Applied COMPANY/YEAR : Codelco Chile, División Codelco Norte, 2008 PROJECT : Exploration of Different Options within the Loa Production Plan by means of Dynamic Simulation COMPANY/YEAR : Compañía Minera Cerro Colorado, 2007 PROJECT : Scale Up and Estimation of Metallurgical Recoveries in the Regalito Leach Project COMPANY/YEAR : Lumina Copper Chile (Nippon Mining Co.), 2007 PROJECT : Estimation of the Water Quality Impact in the Metallurgical Response of the Concentrator and Moly Plants. Part I: Dynamic Simulation of Posible Scenary COMPANY/YEAR : Compañía Minera Doña Inés de Collahuasi, 2007
18 PROJECT : Integral Water Balance and Physico Chemical Profile in the Concentrator and Osmosis Plant Effluents COMPANY/YEAR : Compañía Minera Doña Inés de Collahuasi, 2007 PROJECT : Estimation of the Loa FY Production Plan through Dynamic Simulation COMPANY/YEAR : Compañía Minera Cerro Colorado, 2007 PROJECT : Diagnosis and Optimization of the San José Concentrator (crushing, grinding and flotation plants) COMPANY/YEAR : Pucobre, 2007 PROJECT : Diagnosis of the Heap Bioleaching Operation COMPANY/YEAR : Minera Zaldívar, 2007 PROJECT : Water Balance in the Cerro Colorado Industrial Operation COMPANY/YEAR : Compañía Minera Cerro Colorado, 2007 PROJECT : Integral Assistance to Improve Operacional Results at Compañía Minera Cerro Colorado COMPANY/YEAR : Compañía Minera Cerro Colorado, 2007 PROJECT : Hydrodynamic Characterization of the ROM Ore COMPANY/YEAR : Compañía Minera Zaldívar, 2007 PROJECT : Technical Analysis of the Crushing and Leaching Operations COMPANY/YEAR : Compañía Minera Zaldívar, 2007 PROJECT : Modelling and Simulation of Comminution Circuits Using the JK.SimMet Code (Pebbles Handling System Re-Powering, Conceptual Engineering) COMPANY/YEAR : SNC Lavalin, 2007
19 PROJECT : Technical Support to Claim the Insurance covering the Stockpile Accident May 2006 COMPANY/YEAR : Compañía Minera Zaldívar, PROJECT : Technical Assistance to Use the DRM LixRom Computational Code COMPANY/YEAR : Sociedad Contractual Minera El Abra, 2007 PROJECT : Modeling and Simulation of Comminution Circuits Using the DRM Simulating Code COMPANY/YEAR : Compañía Minera Doña Inés de Collahuasi, 2007 PROJECT : Use of Dynamic Model to Estimate Future Budget at CMCC COMPANY/YEAR : Compañía Minera Cerro Colorado, 2007 PROYECT : Integral Assistance to Improve Operacional Results at Compañía Minera Escondida Limitada COMPANY/YEAR : Minera Escondida Limitada, 2007 PROJECT : Technical and Economical Audit to Santa Margarita Plant COMPANY/YEAR : Minera Cerro Dominador, 2007 PROJECT : Training in the Use of FilterSim Software (DRM property) COMPANY/YEAR : Compañía Minera Doña Inés de Collahuasi, 2007 PROJECT : Metallurgical Assistance to Comissioning of the Chalcopyrite Pad Leach Pilot Plant COMPANY/YEAR : Codelco Chile, Andina Division, 2007 PROJECT : Gas Permeability of Ores in the Spence Project COMPANY/YEAR : BHP Billiton, 2007
20 PROJECT : Projection of Pilot Plant Results Using the BioLeach Code (DRM property) COMPANY/YEAR : Codelco Chile, Andina Division, 2007 PROJECT : Bench Marking on Reverse Flow SX Plants COMPANY/YEAR : Minera Gaby, 2006 PROJECT : Diagnosis on Residual Flotation Reagents at Las Tórtolas Plant COMPANY/YEAR : AngloAmerican Chile, 2006 PROJECT : Overall Water Balance and Physico-Chemical Profile of Patache Effluents COMPANY/YEAR : Compañía Minera Doña Inés de Collahuasi, 2006 PROJECT : Preliminar Analysis of the Lipesed Coalescer at Compañía Mantos de la Luna S.A. COMPANY/YEAR : Codelco Chile, División Codelco Norte, 2006 PROJECT : Dynamic Simulation of Daily Results during the Ramp Up at Minera Gaby COMPANY/YEAR : Codelco Chile, Minera Gaby, 2006 PROJECT : Bench Marking on Evaporation Rate in Heap Leach Plants COMPANY/YEAR : Sociedad Minera El Abra, 2006 PROJECT : Workshop on the Use of the FilterSim Code (DRM Property) COMPANY/YEAR : Compañía Minera Doña Inés de Collahuasi, 2006 PROJECT : Scale Up and Projection of Results in the Secondary Ripios Heap Leaching at Minera Gaby COMPANY/YEAR : Minera Gaby, 2006
21 PROJECT : Analysis of the Industrial Cleaner Filip Ser Circuit Sampling September 2006 COMPANY/YEAR : Compañía Minera Doña Inés de Collahuasi, 2006 PROJECT : Fines Control at the CMCC Crushing Plant COMPANY/YEAR : Compañía Minera Cerro Colorado, 2006 PROJECT : Production Vector Dynamic Simulation with the Mine Program /04/09/2006, Stacking in 1, 2 and 3 Phases COMPANY/YEAR : Sociedad Minera El Abra, 2006 PROJECT : Proposal of Protocol to Check the Process Guarantee of the Bateman Gaby SX Plant COMPANY/YEAR : Minera Gaby, 2006 PROJECT : Oxide Leach Plants Bench Marking COMPANY/YEAR : Minera Escondida Limitada, 2006 PROJECT : Dynamic Simulation of the Minera Gaby Secondary Ripio Heap Leach Operation COMPANY/YEAR : Minera Gaby, 2006 PROJECT : Calculation of the Optimum Leach Cycle to Reach a Steady Concentration and the PLS Solution COMPANY/YEAR : Minera Gaby, 2006 PROJECT : Use of Tritium as Radiotracer to Characterize Solution Movement inside the Codelco Norte Leach Pads COMPANY/YEAR : Codelco Chile, Codelco Norte Division, 2006 PROJECT : Ramp Up Production Options in the Ripio Secondary Leaching ENMS/RCHU Project COMPANY/YEAR : Bechtel Chile, 2006
22 PROJECT : Global Assistance to the Pilot Plant Heap Leach Program with Future Ores COMPANY/YEAR : Compañía Minera Cerro Colorado, 2006 PROJECT : Process Options to Control the Statistical Variability in the Mine Grades COMPANY/YEAR : Codelco Chile, División Codelco Norte, 2006 PROJECT : Fines Control at the Crushing and Agglomeration Plants COMPANY/YEAR : Compañía Minera Cerro Colorado, 2006 PROJECT : Estimation of the Production Program for the Fiscal Year 2007 Assisted by Dynamic Simulation COMPANY/YEAR : Compañía Minera Cerro Colorado, 2006 PROJECT : Metallurgical and Hydrodynamic Simulation of Nitrate Caliche Leach Pads COMPANY/YEAR : Soquimich, 2006 PROJECT : Beneficiation of Blend of Mina Sur and Chuqui Ripios (RMS/RCH): Conceptual Engineering Project COMPANY/YEAR : Cade Idepe, 2006 PROJECT : Improvement in the Production Planning System at CMCC COMPANY/YEAR : Compañía Minera Cerro Colorado, 2006 PROJECT : Scale Up in the Recovery and Acid Consumption for Ripios Blends COMPANY/YEAR : Codelco Chile, Codelco Norte Division, 2006 PROJECT : Options to Maximize Throughput at the Crushing Plant COMPANY/YEAR : Codelco Chile, Codelco Norte Division, 2005
23 PROJECT : Development of the Software Pro2. PTMP1.0 COMPANY/YEAR : Codelco Chile, Codelco Norte Division, 2005 PROJECT : Optimization of the Patache Industrial Filter Plant COMPANY/YEAR : Compañía Minera Doña Inés de Collahuasi, 2005 PROJECT : Study on Grinding Media Corrosion and Impact on Floatability of Copper Sulfide Ores COMPANY/YEAR : Molycop, 2005 PROJECT : Bench Marking in Sulfide Concentrate Filter Plants COMPANY/YEAR : Minera Escondida Limitada, 2005 PROJECT : Use of Dynamic Simulation to Estimate Daily Production during the Ramp Up in the Sulfolix Project COMPANY/YEAR : Sociedad Minera El Abra, 2005 PROJECT : Technical and Economical Evaluation of Addition of a New Filter Unit at Puerto Patache COMPANY/YEAR : Compañía Minera Doña Inés de Collahuasi, 2005 PROJECT : Development of a New Calculation System to Estimate Production Programs Assisted by Dynamic Simulation COMPANY/YEAR : Codelco Chile, Codelco Norte Division, 2005 PROJECT : Diagnosis of the Heap Leach Operation COMPANY/YEAR : Compañía Minera Doña Inés de Collahuasi, 2005 PROJECT : Revision of the Drainage System and Heel Permeability at the PTMP Hep Leach Plant COMPANY/YEAR : Codelco Chile, Codelco Norte Division, 2005 PROJECT : Metallurgical Optimization of the Crushing Plant (9,000 t/h capacity) COMPANY/YEAR : Codelco Chile, Codelco Norte Division, 2005.
24 PROJECT : Molybdenite Flotation Depression at Las Tórtolas Concentrator COMPANY/YEAR : Anglo American Chile, PROJECT : Lifter Design in Agglomerator Drums COMPANY/YEAR : Compañía Minera Doña Inés de Collahuasi, 2004 PROJECT : Hydrodynamic Optimization at the HidroSur SX Plant COMPANY/YEAR : Codelco Chile, Codelco Norte Division, 2004 PROJECT : Pre Crushing Step in the SAG Circuit Conceptual Engineering Study COMPANY/YEAR : Compañía Minera Doña Inés de Collahuasi, 2004 PROJECT : Restoring of Physical Properties of the Organic Extractant at the SX HidroSur Plant COMPANY/YEAR : Codelco Chile, Codelco Norte Division, 2004 PROJECT : Diagnosis of Current Situation at the LIX-SX Radomiro Tomic Industrial Plant COMPANY/YEAR : Codelco Chile, Codelco Norte Division, 2004 PROJECT : Estimating Monthly Production Vector in the Secondary Leaching Project at Cerro Colorado COMPANY/YEAR : Compañía Minera Cerro Colorado, 2004 PROJECT : Metallurgical Analysis of Copper Recovery from the Rosario COMPANY/YEAR : Compañía Minera Doña Inés de Collahuasi, 2004 PROJECT : Purge Destine Optimization at SX Plant COMPANY/YEAR : Compañía Minera Doña Inés de Collahuasi, 2004
25 PROJECT : Metallurgical Support and Definition of the Optimal Leaching Sequency in the Secondary Dump Leaching Gaby Project COMPANY/YEAR : Arcadis Geotécnica, 2004 PROJECT : Diagnosis of the Cathode Contamination with Chloride COMPANY/YEAR : Minera Michilla, 2004 PROJECT : Development of a New Decanter Device for SX Plants COMPANY/YEAR : Compañía Minera Lomas Bayas, PROJECT : Recovery Optimization of CMDIC Heap leaching Operation Assisted by Process Simulator COMPANY/YEAR : Compañía Minera Doña Inés de Collahuasi, 2004 PROJECT : Development of a Process Simulator for the ROM Leach Operation COMPANY/YEAR : El Abra, 2004 PROJECT : Revision and Improvement in the Draining System at the Heap Leach Plant COMPANY/YEAR : Compañía Minera Doña Inés de Collahuasi, 2004 PROJECT : Diagnosis of the Current and Future Operation at the Concentrate CMDIC Filtering Plant COMPANY/YEAR : Compañía Minera Doña Inés de Collahuasi, 2004 PROJECT : Evaluation of a New Alternative to Remove Manganese from Tankhouse Electrolytes COMPANY/YEAR : Compañía Minera Doña Inés de Collahuasi, 2004 PROJECT : Metallurgical Consulting at Compañía Minera Cerro Colorado COMPANY/YEAR : Compañía Minera Cerro Colorado, 2004
26 PROJECT : Assistance to the CMCC Leach Operation COMPANY/YEAR : Compañía Minera Cerro Colorado, 2004 PROJECT : Mineralogy Characterization of Current and Future Ores COMPANY/YEAR : Compañía Minera Doña Inés de Collahuasi, 2004 PROJECT : Metallurgical Audit of the Industrial Operation COMPANY/YEAR : Compañía Minera Cerro Colorado, 2004 PROJECT : Optimization of the Flotation Response of Clayish Sulfide Ores COMPANY/YEAR : Compañía Minera Doña Inés de Collahuasi, 2003 PROJECT : Metallurgical Consulting for the Hydrometallurgy Management COMPANY/YEAR : Gerencia de Hidrometalurgia Norte, Codelco Norte Division, 2003 PROJECT : Diagnosis of the Current SX Plant Facing the New ENMS Project COMPANY/YEAR : Codelco Chile, Codelco Norte Division, 2003 PROJECT : Estimation of the Oxide Plant Capacity COMPANY/YEAR : Compañía Minera Doña Inés de Collahuasi, 2003 PROJECT : Estimation of the Concentrator Plant Capacity COMPANY/YEAR : Compañía Minera Doña Inés de Collahuasi, 2003 PROJECT : Optimization of the Leaching Operation COMPANY/YEAR : Compañía Minera Doña Inés de Collahuasi, 2003 PROJECT : Trade Off: Organic Entrainment versus Throughput at the Industrial SX Plant COMPANY/YEAR : Compañía Minera Doña Inés de Collahuasi, 2003
27 PROJECT : Development of a Computing Platform to Optimize Stacking and Irrigation Programs according to Budget COMPANY/YEAR : Compañía Minera Doña Inés de Collahuasi, 2003 PROJECT : In Situ Impurity Precipitation from the Chuquicamata Ripio and Underlying Graves COMPANY/YEAR : Codelco Norte, Gerencia de Hidrometalurgia Sur, 2003 PROJECT : Improvement in Moly Recovery at Las Tórtolas Flotation Plant COMPANY/YEAR : Anglo American Chile, 2003 PROJECT : Alternatives to Control the Extractant Chemical Degradation at the SX Plant COMPANY/YEAR : Codelco Norte, Gerencia de Hidrometalurgia, 2003 PROJECT : Development of a Novel Picket Fence Distributor for SX Plants: Design, Construction and Installation COMPANY/YEAR : Cía. Minera Doña Inés de Collahuasi, 2003 PROJECT : Hydrodynamic Analysis of Solution Run-off through the ENMS Heaps COMPANY/YEAR : Codelco Norte, Gerencia de Hidrometalurgia, 2003 PROJECT : Study of Chemical Stability of Sulfosuccinate Diester COMPANY/YEAR : Codelco Norte, Gerencia de Hidrometalurgia, 2003 PROJECT : Recovery Scale up from Mini Column to Heap and Dump Leaching Operations COMPANY/YEAR : Codelco Norte, Gerencia de Hidrometalurgia, 2003 PROJECT : Dimensioning of a Plate Filter for the SX Plant COMPANY/YEAR : Codelco Chile, División Codelco Norte, Gerencia de Hidrometalurgia Sur, 2002
28 PROJECT : Infrared Analysis of Organic Solution at the SX Plant COMPANY/YEAR : Codelco Chile, Codelco Norte Division, 2002 PROJECT : Dimensioning of a Plate Filter at the SX Plant COMPANY/YEAR : Codelco Chile, Codelco Norte Division, 2002 PROJECT : A New Procedure to Remove Chloride in the Reducting Tower of Chuquicamata SX Plant COMPANY/YEAR : Codelco Chile, Codelco Norte Division, 2002 PROJECT : Effect of Intermittent Irrigation in the Copper Recovery, Acid Consumption and Heat Balance in Heap Bioleaching COMPANY/YEAR : Compañía Minera Cerro Colorado, 2002 PROJECT : Metallurgical and Geotechnical Analysis in Heap Remining Operations: Pads 15 and 16 COMPANY/YEAR : Compañía Minera Doña Inés de Collahuasi, 2002 PROJECT : Design and Projection of Heap Leach Testing in the ROM Gaby Project COMPANY/YEAR : Codelco Chile, Radomiro Tomic Division, 2002 PROJECT : Metallurgical Audit: Upgrading of the SX-1 and SX-2 Solvent Extraction Plants COMPANY/YEAR : Minera Michilla, 2002 PROJECT : Integral Restoring of Properties of the SX Organic Phase COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 2002 PROJECT : Hydrodynamic Characterization of Picket Fences at the SX Plant COMPANY/YEAR : Compañía Minera Doña Inés de Collahuasi, 2002
29 PROJECT : Analysis of the New Organic Washing System at the SX Plant COMPANY/YEAR : Codelco Chile, Radomiro Tomic Division, 2002 PROJECT : Integral Assistance to the Heap Leach Operation COMPANY/YEAR : Compañía Minera Doña Inés de Collahuasi, 2002 PROJECT : Historical Analysis of Codelco s Contribution to Development of the Modern Hydrometallurgy COMPANY/YEAR : Codelco Chile, Radomiro Tomic Division, 2001 PROJECT : Integral Procedure to Improve Efficiency in the SX Plant COMPANY/YEAR : Codelco Chile, Radomiro Tomic Division, 2001 PROJECT : Analysis of the Ripio Heap Leach Operation COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 2001 PROJECT : Metallurgical Optimization of the Radomiro Tomic Crushing Plant COMPANY/YEAR : Codelco Chile, Radomiro Tomic Division, 2001 PROJECT : Metallurgical Model to Estimate Production COMPANY/YEAR : Codelco Chile, Radomiro Tomic Division, 2001 PROJECT : Diagnosis of the Operation in the Dry and Wet Areas COMPANY/YEAR : Compañía Minera Doña Inés de Collahuasi, 2001 PROJECT : Conceptual Engineering RT Plant Enlargement to 330 kt Cut/year Project (Process Discipline) COMPANY/YEAR : Outokumpu - Indepro, 2001 PROJECT : Experimental Study to Leach Ripios Mixes COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 2001
30 PROJECT : Experimental Study in the Dump Leach Operation COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 2001 PROJECT : Revision of the Profile Engineering Chuqui North Project COMPANY/YEAR : Codelco Chile, Radomiro Tomic Division, 2001 PROJECT : Effect of the Inclined Base in the Solution Movement through Flotation Tailing Heap Leach Pilot Operation COMPANY/YEAR : Codelco Chile, El Teniente Division, 2001 PROJECT : Restoring Properties of the Organic Phase in the SX Plant COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 2001 PROJECT : Material Handling in the Industrial Test to Leach Old Tails Stocked in the Barahona Dam COMPANY/YEAR : Codelco Chile, El Teniente Division, 2001 PROJECT : Control of the Process Guarantee at the Industrial SX VSF Outokumpu Train D SX Plant COMPANY/YEAR : Codelco -Chile, Radomiro Tomic Division, 2001 PROJECT : Metallurgical Report ARI C99XL44 Checking the Stacking and Leach Design Parameters COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 2001 PROJECT : Detail Engineering for the Radomiro Tomic Dump Leach Operation (Process Aspects) COMPANY/YEAR : Codelco -Chile, Radomiro Tomic Division, 2001 PROJECT : Diagnosis of the Industrial Hydrometallurgical Operation COMPANY/YEAR : Compañía Minera Doña Inés de Collahuasi, 2001
31 PROJECT : Heap Leach Optimization at Minera Michilla Plant COMPANY/YEAR : Minera Michilla S.A., 2001 PROJECT : Assistance in the Selection of an Optimum Extractant Formula at the SX Plant COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 2001 PROJECT : Technical and Economical Feasibility to Recover Valuable By-Products from the RT Leach Solutions COMPANY/YEAR : Codelco Chile, Radomiro Tomic Division, 2001 PROJECT : Column Testing to Leach Flotation Tailings COMPANY/YEAR : Codelco Chile, El Teniente Division, 2001 PROJECT : Optimization of the Crushing Plant COMPANY/YEAR : Minera Michilla S.A., 2001 PROJECT : Aglomeration of Flotation Tailing in Rotary Drums COMPANY/YEAR : Codelco Chile, El Teniente Division, 2001 PROJECT : Diagnosis of the Ripio Dump Leach Operation COMPANY/YEAR : Compañía Minera Disputada de Las Condes, 2001 PROJECT : RTD Analysis at the Grinding and Flotation Circuits COMPANY/YEAR : Compañía Minera Doña Inés de Collahuasi, 2001 PROJECT : RTD Analysis in Mini-Box Heap Leaching Tests COMPANY/YEAR : Codelco Chile, División Chuquicamata, 2000 PROJECT : State-of-the-Art in the Technology to Agglomerate Ores with Flocculant Additives COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 2000 PROJECT : Arsenic Handling in the RMSA Project COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 2000
32 PROJECT : Analysis and Projection of the Ripio Mina Sur Column Leach Testing COMPANY/YEAR : Codelco -Chile, Chuquicamata Division, 2000 PROJECT : Bench Scale Flotation Study of RT Ores COMPANY/YEAR : Codelco Chile, División Radomiro Tomic, 2000 PROJECT : Chacterization of the Organic Solution Recovered from the Raffinate Pond COMPANY/YEAR : Compañía Minera Doña Inés de Collahuasi, 2000 PROJECT : Optional SX Circuits to Minimize Entrainments at the SX Plant COMPANY/YEAR : Compañía Minera Lomas Bayas, 2000 PROJECT : Improving the Leach Conditions at the Ripio Dump Leach Operation COMPANY/YEAR : Cía. Minera Disputada de Las Condes, 2000 PROJECT : Hydrodynamic Characterization of Fines in the RMSA Material COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 2000 PROJECT : Heap Leach Scale Up Results from Column Tests COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 2000 PROJECT : Effect of Flocculant Additives in the RMSA Ripio Heap Leach Operation COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 2000 PROJECT : Extractant Formula Selection for the Fourth Train at RT SX Plant COMPANY/YEAR : Codelco Chile, División Radomiro Tomic, 2000
33 PROJECT : Comparative Evaluation of Shell and Market SX Diluents COMPANY/YEAR : Shell Chile S.A.I.C., 2000 PROJECT : Hydrodynamic Analysis of the RMSA Heap Leach Industrial Operation Up to May 2000 COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 2000 PROJECT : Planning of Checking Testwork to Leach Old Tails from the Barahona Dam COMPANY/YEAR : Codelco Chile, El Teniente Division, 2000 PROJECT : Diagnosis of Measuring System and Procedure to Compute the Metallurgical Balance COMPANY/YEAR : Codelco -Chile, Radomiro Tomic Division, 2000 PROJECT : Analysis of Results from the Experimental Ripios Mina Sur Heap Leaching COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 1999 PROJECT : Optimization and Control of the Agglomeration of Ripios Mina Sur at Industrial Scale COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 1999 PROJECT : Improvement in the Heap Leach Operation COMPANY/YEAR : Codelco -Chile, Chuquicamata Division, 1999 PROJECT : Study to Maximize Throughput at the Industrial Crushing Plant COMPANY/YEAR : Cía. Minera Lomas Bayas, 1999 PROJECT : Control of Solid Contaminants at the Quebrada Blanca SX Plant COMPANY/YEAR : Cía. Minera Quebrada Blanca, 1999
34 PROJECT : Study to Reduce Degradation of the Organic Phase at the Quebrada Blanca SX Plant COMPANY/YEAR : Cía. Minera Quebrada Blanca, 1999 PROJECT : Calcium Removal from Molybdenum Concentrates at Las Tórtolas Concentrator COMPANY/YEAR : Cía. Minera Disputada de Las Condes PROJECT : Optimization of the Belt Transport and Stacking of Agglomerated Ores COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 1999 PROJECT : Diagnosis of the Current Operation at the Quebrada Blanca SX Plant COMPANY/YEAR : Cía. Minera Quebrada Blanca, 2000 PROJECT : Diagnosis of the Current Operation at the Quebrada Blanca SX Plant COMPANY/YEAR : Cía. Minera Quebrada Blanca, 1999 PROJECT : Development of Procedures and Protocols to Control the Experimental Ripio RMSA Heap Leach Test COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 1999 PROJECT : Control of Process Guarantee at Trains A-B-C SX VSF Outokumpu Plant COMPANY/YEAR : Codelco Chile, Radomiro Tomic Division, 1999 PROJECT : Comments to the SRK audit. Report on the Geometallurgical Plan COMPANY/YEAR : Codelco Chile, Chuquicamata Division, PROJECT : Evaluation of New Additives to Improve Solution Flow through the CMCC Pads COMPANY/YEAR : Cía. Minera Cerro Colorado, 1999
35 PROJECT : Effect of Magnafloc 333 Flocculant in the Hydrodynamic Response of Different Geometallurgical Unit Ores COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 1999 PROJECT : Development of an Improved System to Estimate Metallurgical Balances at Radomiro Tomic Plant COMPANY/YEAR : Codelco -Chile, Radomiro Tomic Division, 1999 PROJECT : Patent Review on Procedures to Clean Organics with Decanter Devices COMPANY/YEAR : Westfalia Chile, 1999 PROJECT : Kinetic of Decomposition of Aldoxime and Ketoxime Extractants at Lomas Bayas COMPANY/YEAR : Cía. Minera Lomas Bayas, 1999 PROJECT : Development of a Computational System to Estimate Long-Term Production at CMCC COMPANY/YEAR : Cía. Minera Cerro Colorado, 1999 PROJECT : Diagnosis of the Metallurgical Balance System at the CMDIC Concentrator Plant COMPANY/YEAR : Cía. Minera Doña Inés de Collahuasi, 1999 PROJECT : Simulation of Alternative SX Circuits to Maximize Production at Loma Bayas COMPANY/YEAR : Cía. Minera Lomas Bayas, 1999 PROJECT : Impact and Control of Nitrate in Leach Solutions at Radomiro Tomic COMPANY/YEAR : Codelco -Chile, Radomiro Tomic Division, 1999 PROJECT : Revision of the Irrigation System at the RMSA Heap Leach Operation COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 1999
36 PROJECT : Behavior of Nitrate at the SX Lomas Bayas Plant COMPANY/YEAR : Cía. Minera Lomas Bayas, 1999 PROJECT : Use of Lagrange Multipliers to Estimate Material Balance at Leach Operations COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 1999 PROJECT : Nuclear Magnetic Resonance Analysis of Organic SX Solutions COMPANY/YEAR : Codelco -Chile, Radomiro Tomic Division, 1998 PROJECT : Study to Optimize Industrial Agglomerate Drums at the RMSA Plant COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 1998 PROJECT : Analysis of the Organic Phase at Minera Michilla SX Plant COMPANY/YEAR : Minera Michilla S. A., 1998 PROJECT : Control of the Chloride Transfer to the Electrolyte at the Radomiro Tomic SX-EW Plant COMPANY/YEAR : Zeneca, 1998 PROJECT : Organic Analysis of Extractant Solutions at Different SX Plants in Chile COMPANY/YEAR : Zeneca, 1998 PROJECT : Upgrading the Metallurgical Lab Facilities COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 1999 PROJECT : Technical Analysis on Current Situation in the RMSA Experimental Pad COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 1998
37 PROJECT : Ripio Characterization from the Cerro Colorado Hydrometallurgical Operation COMPANY/YEAR : Compañía Minera Cerro Colorado, 1998 PROJECT : Filtering of Organic and Kieselghur Mix in a Larox Unit COMPANY/YEAR : Codelco Chile, Radomiro Tomic Division, 1998 PROJECT : Control of Fine Particles and its Effect in the Heap Leach Operation at CMCC COMPANY/YEAR : Compañía Minera Cerro Colorado, 1998 PROJECT : Metallurgical Classification of the Mina Sur Ores COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 1998 PROJECT : Chemical Transfer of Chloride via Oximes in the Copper Solvent Extraction COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 1998 PROJECT : Basis to Develop an Integrated Information System COMPANY/YEAR : Codelco Chile, Radomiro Tomic Division, 1998 PROJECT : Development of a New Extractant Formula at the Chuquicamata SX Plant COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 1998 PROJECT : Study of the Composition of the Organic Phase at the RT SX Plant COMPANY/YEAR : Codelco Chile, Radomiro Tomic Division, 1998 PROJECT : Simulation of the Crushing Plant Period for Different Mixes of Oxide and Sulfide Ores COMPANY/YEAR : Compañía Minera Cerro Colorado, 1998
38 PROJECT : Metallurgical Consulting in the RAMS/RFMS Heap Leach Operation COMPANY/YEAR : Codelco -Chile, Chuquicamata Division, 1998 PROJECT : Evaluation of Westfalia Decanter as Alternative to Recover Organic Solution from Cruds in Copper SX Plants COMPANY/YEAR : Westfalia Separator, 1998 PROJECT : Simulation of the CMCC Crushing Plant with P 80 1/2 and 5/8 COMPANY/YEAR : Compañía Minera Cerro Colorado, 1998 PROJECT : Crushing Options for the SNSA Ore COMPANY/YEAR : Compañía Minera Cerro Colorado, 1998 PROJECT : Statistical Method to Estimate Copper Recovery in Vat Leaching Starting from the Forecast Laboratory Test COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 1998 PROJECT : Procedure for Sampling the Feed Ore to Leaching Using the Ramsey System COMPANY/YEAR : Codelco Chile, Radomiro Tomic Division, 1998 PROJECT : Scale Up Flow Considerations in Heterogeneous Particle Beds COMPANY/YEAR : Codelco Chile, Radomiro Tomic Division, 1998 PROJECT : Bench Marking of the Grinding Media Market COMPANY/YEAR : Molycop, 1998 PROJECT : Exploring Flocculants Alternatives to Magnafloc 333 in Vat Leach Industrial Operation COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 1998
39 PROJECT : Peripherical Feed to Vat Leach Tanks COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 1997 PROJECT : Study to Reduce Fines at the Crushing CMCC Plant COMPANY/YEAR : Compañía Minera Cerro Colorado, 1997 PROJECT : Particle Size Segregation Model in Ore Stacking Operations COMPANY/YEAR : Codelco Chile, Radomiro Tomic Division, 1997 PROJECT : Development of an Analytical Technique to Determine Polyacrylamide Residuals in Acid Solutions COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 1997 PROJECT : Study to Optimize the Magnafloc 333 Preparation and Addition System in the Vat Leach Operation COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 1997 PROJECT : Technical and Economical Analysis of Using Magnafloc 333 at the Whole Hydrometallurgical Operation COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 1997 PROJECT : Analytical Service to Evaluate Solvent for SX Plants COMPANY/YEAR : Concón Oil Refinery, 1997 PROJECT : Technical Inspection to the Radomiro Tomic Pilot Plant COMPANY/YEAR : Codelco Chile, Radomiro Tomic Division, 1997 PROJECT : Study on Iodine Analytical Determination COMPANY/YEAR : Codelco Chile, Radomiro Tomic Division, 1997 PROJECT : NMR Analysis of Organics from the Low Grade Sulfide Plant COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 1997
40 PROJECT : Development of a New Extractant Formula at the Chuquicamata SX Plant COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 1997 PROJECT : Study to Reduce Crud Formation at the Mantos Blancos SX Plant COMPANY/YEAR : Empresa Minera Mantos Blancos S.A., 1997 PROJECT : Market Study for Solvent in the Mining Industry COMPANY/YEAR : Paréz y Alvarez Ingenieros Asociados Ltda., 1997 PROJECT : Evaluation of the ORFOM-SX12 Solvent COMPANY/YEAR : Interquímica, 1997 PROJECT : New Solvents for the Mining Industry COMPANY/YEAR : Concón Oil Refinery, 1996 PROJECT : Analysis of Critical Success Factors in the New CSM Process COMPANY/YEAR : Metaproject, División Andina 1996 PROJECT : Characterization of MOC 55TD Extractant Samples COMPANY/YEAR : Andean Mining & Chemicals Ltd., 1996 PROJECT : Comments on the Copper-Zinc Ore Processing at Minera Antamina, Perú COMPANY/YEAR : Cía. Minera Cerro Colorado, 1996 PROJECT : Final Simulations for the New Crushing Plant at Cerro Colorado COMPANY/YEAR : Cía. Minera Cerro Colorado, 1996 PROJECT : Environmental Analysis of the New "LR" Process in Codelco Chile, Andina Division COMPANY/YEAR : Codelco Chile, Andina Division, 1996
41 PROJECT : Study to Reduce Solution Impregnation in Drained Vat Leach Ripios COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 1996 PROJECT : Exploring Study on Crushing Options in the Cerro Colorado Expansion COMPANY/YEAR : Compañía Minera Cerro Colorado, 1996 PROJECT : Study to Control the Solvent Evaporation at the SX Plant, "Processing of CMD Mine Waters", Conceptual Engng. Project COMPANY/YEAR : Compañía Minera Disputada de Las Condes, 1996 PROJECT : Study to Reduce the Agglomeration in the Copper Filtered Concentrate at Las Tórtolas Plant COMPANY/YEAR : Compañía Minera Disputada de Las Condes, Las Tórtolas Area, 1996 PROJECT : Study to Control the Acid Mist at the SX Plant, "Processing of CMD Mine Waters", Conceptual Engng. Project COMPANY/YEAR : Compañía Minera Disputada de Las Condes, 1995 PROJECT : Conceptual Study to Increase the Crushing Plant Capacity by Introducing a New Screening Station COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 1995 PROJECT : RTD Study at the Flotation Tailing Barahona Dump Leaching COMPANY/YEAR : Codelco Chile, El Teniente Division, 1995 PROJECT : Diluents Evaluation for the Chuquicamata SX Plant COMPANY/YEAR : Codelco Chile, Chuquicamata Division,
42 PROJECT : Options to Implement the New Extractant Formula at the Chuquicamata SX Plant COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 1995 PROJECT : Side Effect in the SX Plant due to Use of Wetting Agents in the Leach Operation COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 1995 PROJECT : Development of a Grinding-Flotation Flowsheet for the Minera La Patagua Plant COMPANY/YEAR : Compañía Minera La Patagua, 1995 PROJECT : Optimization of the Industrial Grinding Circuit at Minera Tocopilla COMPANY/YEAR : Compañía Minera Tocopilla, 1995 PROJECT : Revision of Design and Operational Conditions at Las Tórtolas Black Acid Neutralization Plant COMPANY/YEAR : Compañía Minera Disputada de Las Condes, 1995 PROJECT : Flocculant Identification at the Chuquicamata SX Plant COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 1995 PROJECT : Study to Control the Iron Precipitation in the Heap Leach Operation COMPANY/YEAR : Compañía Minera Cerro Colorado, 1995 PROJECT : Hydraulic and Metallurgical Characterization in Box Leach Experiments COMPANY/YEAR : Codelco Chile, Chuquicamata Division through CIMM, 1995 PROJECT : Conceptual Evaluation of Sprinkler Evaporation to Concentrate PLS Solutions COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 1994
43 PROJECT : Defense of Application Patents Nº , and Codelco Chile Property COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 1994 PROJECT : Development of an Isobaric Percolator to Simulate Leaching under Load COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 1994 PROJECT : RTD Measurements in Leach Boxes and Scale Up to the Industrial Dump Operation COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 1994 PROJECT : Extractant Evaluation at the SX Plant COMPANY/YEAR : Codelco Chile, Chuquicamata Division, 1994 PROJECT : Development of a New Hydro Method to Enrich and Purify Copper Concentrates COMPANY/YEAR : Codelco Chile, Chuquicamata Division, PROJECT : Evaluation of the New Chuquicamata Mesh Filter to Clean Aqueous SX Solutions COMPANY/YEAR : Codelco Chile, Chuquicamata Division, PROJECT : Marketing and Technology Sale of the Mechanical Crud Rupture to Recover Organic Solution at SX Plants COMPANY/YEAR : Codelco Chile, División Chuquicamata, PROJECT : Study to Increase Molibdenite Recovery at the Concentrator Plant COMPANY/YEAR : FONDEF and Codelco Chile, Andina Division, PROJECT : Development of an Ultrasonic Comminuting Device for the Ore grinding COMPANY/YEAR : FONDEF,
ENGINEERING AND INNOVATION FOR THE INDUSTRY AND MINING. years. www.metaproject.cl 1992-2 0 1 2-2 0 3 2
Metaproject in its 20 year history totals more than 1.000 successful projects to his credit,with an average of 50 projects per year, about 80,000 man / hours, demonstrating creativity, expertise and innovation.
More informationInvestment && projects
Investment & projects We assigned US$ 3.34 billion to our investment portfolio in. We are the company that invests the most in Chile. Between and 2019 we will transfer over US$ 20.0 billion into our investment
More informationOutotec Gold Processing Solutions
Finland, September 2013. Outotec provides leading technologies and services for the sustainable use of Earth s natural resources. As the global leader in minerals and metals processing technology, Outotec
More informationENGINEERING AND INNOVATION FOR THE INDUSTRY AND MINING. años. www.metaproject.cl 1992-2 0 1 2-2 0 3 2
S.A. ENGINEERING AND INNOVATION FOR THE INDUSTRY AND MINING. Metaproject in its 20 years history totals more than 1000 successful projects to its credit, with an average of 50 projects per year, about
More informationCODELCO UPDATE April 2015. Copyrights 2014 CODELCO-CHILE. Todos los Derechos Reservados. Copyrights 2014 by CODELCO-CHILE. All Rights Reserved.
CODELCO UPDATE April 2015 Codelco Highlights Industry Overview Operating and Financial Review Development Plan and Outlook Codelco s Highlights 2014 Copper Mine Production: increased by 2.7% in 2014 to
More informationChile s Outlook in Copper
LatAm MINING Congress 2010 April 30 Coral Gables Chile s Outlook in Copper Ana Isabel Zuñiga Research and Policy Planning Director CONTENTS Chile s Leadership in the Copper Industry Legal Framework and
More informationDaniel González Roubillard
Daniel González Roubillard E- Mail: daniel.gonzalez@a2b-eng.com Web Site: www.a2b-eng.com Civil Constructor Claims & Contract Consultant 30 years of professional experience in the engineering and construction
More informationEngineering and Innovation for the Industry and Mining. years. Setting your Dreams and Ours in Motion. www.metaproject.cl 1992-2 0 1 2-2 0 3 2
Engineering and Innovation for the Industry and Mining. ENVIRONMENTAL AND SOCIAL Metaproject in its 20 year history totals more than 1000 successful projects to his credit, with an average of 50 projects
More informationCHILEAN COPPER MINING AND CODELCO CHALLENGES
CHILE JAPAN BUSINESSCOMMITTEE CHILEAN COPPER MINING AND CODELCO CHALLENGES NelsonPizarro C. CEO December 2 nd, 2014 Copyrights 2014 CODELCO CHILE. Todos los Derechos Reservados. Copyrights 2014 by CODELCO
More informationCan Chilean Copper Maintain Its World Market Share?
Can Chilean Copper Maintain Its World Market Share? Diego Hernández President Base Metals-BHP Billiton CRU 4th. World Copper Conference Chilean and World Mine Copper Production 1985 Others 84% Chile 16%
More informationTHE ROLE OF METALLURGY IN ENHANCING BENEFICIATION IN THE SOUTH AFRICAN MINING INDUSTRY
THE ROLE OF METALLURGY IN ENHANCING BENEFICIATION IN THE SOUTH AFRICAN MINING INDUSTRY Marek Dworzanowski, Presidential Address, SAIMM AGM, 22 August 2013 CONTENTS Introduction Definitions Phases of metallurgical
More informationMINERA ESCONDIDA ANALYSTS VISIT. April 24th, 2004
MINERA ESCONDIDA ANALYSTS VISIT April 24th, 2004 Presentation Content Escondida Overview Operations Financial Overview Business Strategy Growth Opportunities Marketing Current Activities Slide 2 World
More informationEnvironmental risk managements of mine wastes (from planning to aftercare) Marja Liisa Räisänen ELY-centre for Kainuu
Environmental risk managements of mine wastes (from planning to aftercare) Marja Liisa Räisänen ELY-centre for Kainuu Mine wastes, what they are? Environmental characteristics, characterization How to
More informationDoctor's degree in Sciences mention Chemistry, Pontificia Universidad Católica de Valparaíso 2000 2004.
C L A U D I O S U Á R E Z - A U T H I È V R E 2 5 1 5 B A T H U R S T S T R E E T S U I T E 1 0 0 9, T O R O N T O, ON, M 6 B 2 Z 1, C A N A D A. T E L : ( 4 1 6 ) 8 5 4 2 9 4 5, c l a u d i o. s u a r
More informationCodelco Investor Presentation. April 2014
Codelco Investor Presentation April 2014 Codelco s Highlights Industry Overview Operating & Financial Review Development Plan Update & Outlook 2 Codelco At a Glance December 2013 World Largest Copper Producer:
More informationREVIEW ON HEAP LEACHING OF COPPER ORES
REVIEW ON HEAP LEACHING OF COPPER ORES Carlos Avendaño V. Sociedad Terral S.A. * The common approach observes the ore behavior, which has been detected through test work and experience, with minimum manipulation.
More informationTotal technology solutions across the mining value chain
Processing Copper Ore Total technology solutions across the mining value chain TENOVA is a worldwide supplier of advanced technologies, products and engineering services for the iron & steel and mining
More informationAPPLICATION OF HIGH FREQUENCY SCREENS IN CLOSING GRINDING CIRCUITS
APPLICATION OF HIGH FREQUENCY SCREENS IN CLOSING GRINDING CIRCUITS Laércio Albuquerque, Jobe Wheeler, Steven Valine And Brenno Ganahl Derrick Corporation, USA Godofredo Barrios Goldex S.A., Peru ABSTRACT
More informationNew Discoveries in the Relationship Between Macro and Micro Grindability
Paper for the CIM AGM, Toronto, ON May 13, 29 11:2AM Page 1 of Authors: John Starkey, Starkey & Associates Inc. and Mike Samuels, Fortune Minerals Limited ABSTRACT New Discoveries in the Relationship Between
More informationRECYCLING AND UPCYCLING SPENT LITHIUM-ION BATTERIES
RECYCLING AND UPCYCLING SPENT LITHIUMION BATTERIES The Growing Lithium ion Battery Market Creates Parallel Disposal Problem Advances in the commercial development of lithium ion batteries have spawned
More informationAdvances in high-temperature heap leaching of refractory copper sulphide ores
Advances in high-temperature heap leaching of refractory copper sulphide ores by S.W. Robertson*, P.J. van Staden*, and A. Seyedbagheri* Synopsis Acid heap leaching has been extensively applied to the
More informationECONOMIC RANKING OF COPPER MINING PROJECTS AT EXPLORATION AND EARLY ENGINEERING STAGES
ECONOMIC RANKING OF COPPER MINING PROJECTS AT EXPLORATION AND EARLY ENGINEERING STAGES Rodrigo Riquelme GeoInnova Consultores, Chile Roberto Fréraut División Codelco Norte, Chile ABSTRACT Mining companies
More informationProject Vice-Presidency
Codelco Investment Plan 2012 Project Vice-Presidency Enero 2012 March 2012 CODELCO INVESTMENTS 2011 Investment e t Projects (*) US$ 1.835 Bn Mine development expenses costs US$ 670 M Project contribute
More informationMauricio H. Arias Rivas Ingeniero Civil Eléctrico
CURRÍCULUM VITAE Mauricio H. Arias Rivas Ingeniero Civil Eléctrico HISTORY Participate, as client representative, design engineer, discipline lead or PEM, in iron ore, steel plants, cellulose, and cooper
More informationPaladin Energy. Development & Expansion of the Langer Heinrich Operation in Namibia. June 2009
Paladin Energy Development & Expansion of the Langer Heinrich Operation in Namibia June 2009 1 Disclaimer This presentation includes certain statements that may be deemed forward-looking statements. All
More informationChilean Mining Investments Project Portfolio 2015-2024
Chilean Mining Investments Project Portfolio 2015-2024 DEPP 13/2015 Intellectual Property Registry #256,643 Chilean Mining Investments Project Portfolio 2015-2024 1 Brief The objective of this Assessment
More informationCURRICULUM VITAE. 1953 1956 Instituto Chacabuco, Hermanos Maristas, Los Andes. 1957 1961 Instituto Rafael Ariztía, Hermanos Maristas, Quillota.
CURRICULUM VITAE JAIME ALFREDO ARIAS FARIAS EDUCATION 1952 Escuela Primaria N 2; Los Andes 1953 1956 Instituto Chacabuco, Hermanos Maristas, Los Andes. 1957 1961 Instituto Rafael Ariztía, Hermanos Maristas,
More informationThe Helmholtz Institute Freiberg for Resource Technology
I I www.hzdr.de/hif The Helmholtz Institute Freiberg for Resource Technology Raimon Tolosana-Delgado Santiago de Chile, 29.June-3.July German Federal Ministry of Economic Affairs and Energy Business Development
More informationLecture 28. Potash Fertilizers - Potassium Sulphate
Lecture 28 Potash Fertilizers - Potassium Sulphate Potassium Sulfate Potassium sulfate is the second largest tonnage potassium compound and it is also used primarily as a fertilizer. The sulfate or other
More informationFOURTH QUARTER 2011 RESULTS
FOURTH QUARTER 2011 RESULTS Mexico City, February 27, 2012, Minera Frisco, S.A.B. de C.V. ( Frisco, BMV: FRISCO OTC: MSNFY) announced today its results for the fourth quarter and full year 2011. Highlights
More informationRemediation of Water-Based Drilling Fluids and Cleaning of Cuttings
OVERVIEW Water-Based Drilling Fluids are environmentally friendly compared with oil-based drilling fluids; however their safe disposal can still be a challenge. There are normally no hydrocarbons present,
More informationKathleen L. Quirk. Executive Vice President & CFO. New York City PROVEN PERFORMANCE SHINING FUTURE MACQUARIE CONNECTIONS MACQUARIE CAPITAL (USA) INC.
MACQUARIE CONNECTIONS MACQUARIE CAPITAL (USA) INC. Global Metals & Mining Conference Kathleen L. Quirk Executive Vice President & CFO New York City PROVEN PERFORMANCE SHINING FUTURE www.fcx.com November
More informationBIOHEAPLEACHING Marja Riekkola-Vanhanen Senior Biotechnology Adviser
BIOHEAPLEACHING Marja Riekkola-Vanhanen Senior Biotechnology Adviser 2 Short history of bioleaching Copper recovery from mine waters in the Mediterranean area 3000 years ago Heapleaching in Spain in big
More informationTHE MINERAL INDUSTRY OF CHILE. By Pablo Velasco
THE MINERAL INDUSTRY OF CHILE By Pablo Velasco In 1995, Chile continued to be the world's top producer became a model for policymakers in other Latin American and exporter of copper (in terms of volume
More informationGUIDELINES FOR LEACHATE CONTROL
GUIDELINES FOR LEACHATE CONTROL The term leachate refers to liquids that migrate from the waste carrying dissolved or suspended contaminants. Leachate results from precipitation entering the landfill and
More informationSPE Distinguished Lecturer Program
SPE Distinguished Lecturer Program The SPE Distinguished Lecturer Program is funded principally through a grant from the SPE Foundation. The society gratefully acknowledges the companies that support this
More informationFINANCIAL RESULTS 2014
FINANCIAL RESULTS 2014 Nelson Pizarro C. President & CEP Press Conference, 27 March 2015 1 PRODUCTION & COSTS 2 ktr Copper Production January - December: 2014-2013 Copper production at Codelco divisions
More informationCodelco s Mining Resources: History and Strategy
Codelco s Mining Resources: History and Strategy José Pesce Rosenthal Mineral Resources and Development Vice-President J-SUMMIT2 May 2015 DISCLAIMER This presentation does not constitute an offer to any
More informationUpdate on Heap Leach potential of the Murchison gold project
3 July 2012 Australian-based Kentor Gold Limited (ASX: KGL) is entering the ranks of operating gold mining companies in 2012. The Company is progressing a pipeline of advanced projects in Australia and
More informationSun and Wind, new motors of desalination and its possibilities for mining
Sun and Wind, new motors of desalination and its possibilities for mining Santiago de Chile, May 4 th. 2015 INDEX 1.- Scarcity water on mining sector 2.- Renewable energy sources for desalination 3.- Idom:
More informationThe Bevill Exemption from Hazardous Waste Regulation
The Bevill Exemption from Hazardous Waste Regulation Dean Miller Davis Graham & Stubbs LLP Roadmap What s at Stake RCRA 101 Hazardous Waste Identification, Management, and Exemptions Solid Waste Identification,
More informationMETAPROJECT S.A. Setting your Dreams and Ours in Motion. ENGINEERING AND INNOVATION FOR THE INDUSTRY AND MINING. YEARS
S.A. ENGINEERING AND INNOVATION FOR THE INDUSTRY AND MINING. Mt Metaproject t in its 20 years history totals more than 1000 successful projects to its credit, with an average of 50 projects per year, about
More informationChemistry at Work. How Chemistry is used in the Water Service
Chemistry at Work How Chemistry is used in the Water Service WATER TREATMENT Everyday, more than 100 water treatment works in Northern Ireland put approximately 680 million litres of water into the supply
More informationExpansion in South America:
Expansion in South America: Progress and Sustainable Development Jose Marún Executive General Manager S h America South A i Operations O i Di i i Division 4 October 2012 South America Operations Division
More informationAPPENDIX A.4M: Processing Flow Sheets
Project introduction & overview BioPhysicAl VAlued components socio-economic VAlued components Ad yes req A.1 Introduction APPENDIX A.4M: Processing Flow Sheets A.1A Concordance Table to the Executive
More informationThe next generation of permanent cathode and lead anode technology
MARSDEN, T. and JICKLING, J The next generation of permanent cathode and lead anode technology. Hydrometallurgy Conference 2009, The Southern African Institute of Mining and Metallurgy, 2009. The next
More informationEnvironmental Engineering Professors Cal (Chair of Department), Richardson Associate Professor Huang Adjunct Faculty Brady, Hendrickx
Environmental Engineering Professors Cal (Chair of Department), Richardson Associate Professor Huang Adjunct Faculty Brady, Hendrickx Degrees Offered: B.S. in Environmental Engineering; M.S. in Environmental
More informationMine Water Treatment Solutions for Discharge and Re-Use
Mine Water Treatment Solutions for Discharge and Re-Use Bernhard Doll Pall Corporation Summary This paper focusses on the description of reliable, safe and economical treatment of mine water from different
More informationCandelaria and Ojos del Salado Chile
TSX : LUN OMX : LUMI 2016 Candelaria Key Facts Open Pit and Underground Mine Copper, gold, and silver 2016 estimate 124,000-128,000 tonnes copper Cash costs of $1.45 per lb copper after by-product credits
More informationRECOFLO ION EXCHANGE TECHNOLOGY
RECOFLO ION EXCHANGE TECHNOLOGY Michael Sheedy Prosep Technologies Inc. a subsidiary of Eco-Tec Ltd, 1145 Squires Beach Road, Pickering, Ontario, Canada, L1W 3T9. Abstract Recoflo ion exchange technology
More informationNews release. No. 7/2015 KATANGA MINING ANNOUNCES 2015 SECOND QUARTER RESULTS
No. 7/2015 News release KATANGA MINING ANNOUNCES 2015 SECOND QUARTER RESULTS BAAR, SWITZERLAND, August 12, 2015 Katanga Mining Limited (TSX: KAT) ("Katanga" or the "Company") today announces its financial
More informationMining. info@saxuming.net www.saxuming.net
Mining SAXUM ENGINEERED SOLUTIONS SAXUM is a mul disciplinary engineering company with extensive experience in assistance services to the Mining Industry. Our capabili es include full Engineering services
More information1.3 Properties of Coal
1.3 Properties of Classification is classified into three major types namely anthracite, bituminous, and lignite. However there is no clear demarcation between them and coal is also further classified
More informationLEAD CRYSTAL. User Manual. Valve-regulated lead-crystal batteries Energy storage Cells
Engineering Production Sales LEAD CRYSTAL Valve-regulated lead-crystal batteries Energy storage Cells User Manual www.axcom-battery-technology.de info@.axcom-battery-technology.de Chapter 1: 1. Introduction
More informationCNSolution TM 9310 On-line Cyanide Analyzer. Product Release Synopsis. I Product Description/Function. 1 3 Cyanide Recycle
CNSolution TM 9310 Product Release Synopsis I Product Description/Function The CNSolution 9310 is designed to measure and control cyanide used in hydrometallurgical leaching of gold and silver from ores.
More informationHector Espinosa Senior Engineer Consultant of Project Nexus
CURRICULUM VITAE Hector Espinosa Senior Engineer Consultant of Project Nexus HISTORY Twenty five years of experience in structural and civil engineering, port and harbors, project development and construction,
More informationTHE RECOVERY OF MANGANESE FROM LOW GRADE RESOURCES: BENCH SCALE METALLURGICAL TEST PROGRAM COMPLETED
THE RECOVERY OF MANGANESE FROM LOW GRADE RESOURCES: BENCH SCALE METALLURGICAL TEST PROGRAM COMPLETED Prepared for: American Manganese Inc. 2A 15782 Marine Drive White Rock, BC V4B 1E6 CANADA Prepared by:
More informationRECENT DEVELOPMENTS IN FLOTATION REAGENTS TO IMPROVE BASE METAL RECOVERY. W.A. Grobler, S Sondashi and F.J. Chidley. Betachem (Pty) Ltd
RECENT DEVELOPMENTS IN FLOTATION REAGENTS TO IMPROVE BASE METAL RECOVERY W.A. Grobler, S Sondashi and F.J. Chidley Betachem (Pty) Ltd ABSTRACT Some of the challenges facing the flotation of base metal
More informationWASTE WATER TREATMENT for surface treatment applications
WASTE WATER TREATMENT for surface treatment applications Effluent an important cost factor Effluent cannot be avoided Water and compound are essential for vibratory mass finishing. During the finishing
More informationWater resources management at the mining industry in Chile
Water resources management at the mining industry in Chile Alejandra P. Acuña *, Reinaldo Peñailillo Environmental Group, Golder Associates S.A., Santiago, Chile, Project Engineer, 56-2 26162347, aacuna@golder.cl
More informationDepartment of Environmental Engineering
Department of Environmental Engineering Master of Engineering Program in Environmental Engineering (International Program) M.Eng. (Environmental Engineering) Plan A Option 1: (1) Major courses: minimum
More informationM2M-TECHNOLOGY: THE NEW STANDARD TO MINIMIZE BAUXITE RESIDUE
Proceedings of the International Conference on Aluminium, INCAL 2007; 21-23 November 2007; Hyderabad Vol.1 (2007) 257-263; Eds. S. Subramanian and D. H. Sastry The Aluminium Association of India M2M-TECHNOLOGY:
More informationEXPERIMENT 12: Empirical Formula of a Compound
EXPERIMENT 12: Empirical Formula of a Compound INTRODUCTION Chemical formulas indicate the composition of compounds. A formula that gives only the simplest ratio of the relative number of atoms in a compound
More informationAlgae Harvesting, Dewatering and Extraction
Algae Harvesting, Dewatering and Extraction Safe Harbor Statement Matters discussed in this presentation contain forward-looking statements within the meaning of the Private Securities Litigation Reform
More informationChile: World Leadership in Mining
Chile: World Leadership in Mining Jerónimo Carcelén Carcelén & Cia. Abogados Balochistan Mining Sector Technical Assistant Project Workshop on International Norms in Large-Scale Mining September 27 28,
More informationEmPREsAs ANNUAL copec REPORT 2014 79 OThER InvEsTmEnTs
79 Other copec REPORT 214 8 inmobiliaria LAS SALINAS Inmobiliaria Las Salinas was established in 212 to concentrate in one single company the lands of the former Las Salinas plant, which for decades played
More informationGrowth Opportunities and Challenges for the Chilean Copper Mining Industry
Growth Opportunities and Challenges for the Chilean Copper Mining Industry COCHILCO Seminar Mining in the Bicentennial: The Road Ahead Bicentennial Mining Week, Antofagasta 29th September 2010 David Coombs
More informationA NOVEL ION-EXCHANGE/ELECTROCHEMICAL TECHNOLOGY FOR THE TREATMENT OF AMMONIA IN WASTEWATER
A NOVEL ION-EXCHANGE/ELECTROCHEMICAL TECHNOLOGY FOR THE TREATMENT OF AMMONIA IN WASTEWATER ABSTRACT Leonard P. Seed, M.Sc., P.Eng., Enpar Technologies Inc. * Daren D. Yetman, A.Sc.T., Enpar Technologies
More informationOutotec HIGmills; A Fine Grinding Technology
23 rd International Mining Congress & Exhibition of Turkey 16-19 April 2013 ANTALYA Outotec HIGmills; A Fine Grinding Technology H. Lehto Outotec Finland Oy A. Paz Outotec Pty Ltd, Perth, Australia I.
More informationDESIGN OF THE KUBAKA GRINDING CIRCUIT USING SPI AND BOND
DESIGN OF THE KUBAKA GRINDING CIRCUIT USING SPI AND BOND By John Starkey, President, Starkey & Associates Grinding Design and Process Engineering, and Graham Holmes, Manager of Mineral Processing, Kvaerner
More informationCREATING A GREEN FUTURE THROUGH WATER REMEDIATION
CREATING A GREEN FUTURE THROUGH WATER REMEDIATION Cornerstone Principles for Conducting Business Active Treatment Systems, Inc. goes to great lengths to instill in every employee the importance of ethical
More informationOutotec and Environment
Outotec and Environment Kalle Härkki President, Pori Research Center CMD Seville May 15, 2008 2 Content General Ferroalloy technologies Flash Smelting and Converting technologies Acid plant technologies
More informationON-LINE ANALYSIS - WHAT HAS BEEN DONE? Mr P de Waal Blue Cube Systems (Pty) Ltd
Pieter de Waa! ON-LINE ANALYSIS - WHAT HAS BEEN DONE? Mr P de Waal Blue Cube Systems (Pty) Ltd Synopsis: The beneficiation equipment under the control of plant metallurgists exploits the differences in
More informationWater remediation: Passive Treatment Technologies
Presenter: Jacques Meyer Project design: Adrian Haagner, Piet Smit & Jacques Meyer Water remediation: Passive Treatment Technologies Using a sub-surface flow wetland on a rehabilitated decommissioned coal
More informationCopper recovery using leach/solvent extraction/electrowinning technology: Forty years of innovation, 2.2 million tonnes of copper annually
Copper recovery using leach/solvent extraction/electrowinning technology: Forty years of innovation, 2.2 million tonnes of copper annually by G.A. Kordosky* Synopsis The concept of selectively extracting
More informationPOLYCOM high-pressure grinding roll for the minerals industry.
POLYCOM high-pressure grinding roll for the minerals industry. A company of ThyssenKrupp Technologies Polysius tk POLYCOM high-pressure grinding roll. The economic and gentle processing solution. The high-pressure
More informationNEWS RELEASE Nippon Mining & Metals Co., Ltd. Mitsui Mining & Smelting Co., Ltd. Pan Pacific Copper Co., Ltd.
NEWS RELEASE Nippon Mining & Metals Co., Ltd. Mitsui Mining & Smelting Co., Ltd. Pan Pacific Copper Co., Ltd. Re: Pan Pacific Copper Co., Ltd. Announces Friendly Takeover Bid for Regalito Copper Corp.
More informationBMO Capital Markets 2016 Global Metals and Mining Conference. Diego Hernández Chief Executive Officer
BMO Capital Markets 2016 Global Metals and Mining Conference Diego Hernández Chief Executive Officer 29 February 2016 Cautionary statement This presentation has been prepared by Antofagasta plc. By reviewing
More informationChapter 3: Separating Mixtures (pg. 54 81)
Chapter 3: Separating Mixtures (pg. 54 81) 3.2: Separating Mechanical Mixtures (PB Pg. 40 5 & TB Pg. 58 61): Name: Date: Check Your Understanding & Learning (PB pg. 40 & TB pg. 61): 1. What are four methods
More informationHow To Understand And Understand The History Of Mining In Chile
Mining in Chile Interregional IAEA-CYTED-UNECE Workshop on UNFC 2009 Applications in Uranium and Thorium Alberto Salas President & CEO Chilean Mining Association Santiago, July 10 th 2013 SUBJECTS The
More informationBioremediation of contaminated soil. Dr. Piyapawn Somsamak Department of Environmental Science Kasetsart University
Bioremediation of contaminated soil Dr. Piyapawn Somsamak Department of Environmental Science Kasetsart University Outline Process description In situ vs ex situ bioremediation Intrinsic biodegradation
More informationFACT SHEET (pursuant to NAC 445A.401) Noble Technologies Corporation
FACT SHEET (pursuant to NAC 445A.401) Permittee Name: Project Name: oration Noble Project Permit Number: A. Location and General Description The facility is located in Storey County, Section 5, Township
More informationRemoving Thallium from Industrial FGD Scrubber Water with Sorbster Adsorbent Media
Case History MAR Systems Inc. Removing Thallium from Industrial FGD Scrubber Water with Sorbster Adsorbent Media Trace thallium levels in process and wastewater streams pose a human toxicity threat. Tidwell
More informationCharacterization of Contaminated Soil and Surface Water/ Ground Water Surrounding Waste Dump Sites in Bangalore
International Journal of Environmental Research and Development. ISSN 2249-3131 Volume 4, Number 2 (2014), pp. 99-104 Research India Publications http://www.ripublication.com/ijerd.htm Characterization
More informationWastewater Nutrient Removal
Wastewater Nutrient Removal An overview of phosphorus and nitrogen removal strategies Presented by: William E. Brown, P.E. Peter C. Atherton, P.E. Why are nutrients an issue in the environment? Stimulates
More informationIs the Python Right for Me? Python Amenability Test Work
Is the Python Right for Me? Python Amenability Test Work T Hughes 1, K Donaldson 2 and B Murphy 3 ABSTRACT Gekko Systems Pty Ltd have developed the Python Underground Processing Plant for the concentration
More informationChristopher Harto Argonne National Laboratory
Managing Water from CCS Programs Christopher Harto Argonne National Laboratory John A. Veil - Argonne National Laboratory Andrea McNemar - DOE/NETL GWPC Energy and Water Sustainability Symposium Pittsburgh,
More informationPrinted Circuit Board Recycling Methods
Printed Circuit Board Recycling Methods 1. Introduction to Printed Circuit Boards The Printed Circuit Board (PCB 1 ) manufacturing process is very complicated, involving many special chemicals and valuable
More informationCHAPTER 7: REMEDIATION TECHNOLOGIES FOR CONTAMINATED GROUNDWATER
CHAPTER 7: REMEDIATION TECHNOLOGIES FOR CONTAMINATED GROUNDWATER There are a number of technologies that are being use to remediate contaminated groundwater. The choice of a certain remediation technology
More informationA Comparison Between a Flotation Mini Pilot Plant and a Copper Concentrator Mill
A Comparison Between a Flotation Mini Pilot Plant and a Copper Concentrator Mill L M Loyola 1 and K L C Gonçalves 2 ABSTRACT In 1999, the Mineral Development Centre of CVRD (CDM) acquired a flotation device
More informationFURNACEPHOSPHORUS AND PHOSPHORICACID PROCESS ECONOMICS PROGRAM. Report No. 52. July 1969. A private report by. the
Report No. 52 FURNACEPHOSPHORUS AND PHOSPHORICACID by GEORGE E. HADDELAND July 1969 A private report by. the PROCESS ECONOMICS PROGRAM STANFORD RESEARCH INSTITUTE MENLO PARK, CALIFORNIA CONTENTS 1 INTRODUCTION........................
More informationProject Development South America Region. Bob Drabik - EGM PDSA
Project Development South America Region Bob Drabik - EGM PDSA 4 October 2012 Agenda Project Development Division overview, team and resources Project development challenges Xstrata - Bechtel Strategic
More informationQ4 2015 PRODUCTION REPORT STRONGEST QUARTER OF 2015
Antofagasta plc CEO, Diego Hernández said: Q4 2015 PRODUCTION REPORT STRONGEST QUARTER OF 2015 NEWS RELEASE, 27 JANUARY 2016 We have finished the year strongly with our best quarter of the year. Copper
More informationChemical Engineering - CHEN
Auburn University 1 Chemical Engineering - CHEN Courses CHEN 2100 PRINCIPLES OF CHEMICAL ENGINEERING (4) LEC. 3. LAB. 3. Pr. (CHEM 1110 or CHEM 1117 or CHEM 1030) and (MATH 1610 or MATH 1613 or MATH 1617
More informationECOAZUR BLUEWATER WATER PURIFICATION PLANTS
ECOAZUR BLUEWATER WATER PURIFICATION PLANTS CONTACT EcoAzur Calle 11a #492 x 60 y 62 Tel: +52-999-920-1972 Col. Residencial Pensiones Email: info@eco-azur.com C.P. 97217 Merida, Yucatan, Mexico Website:
More informationUNIVERSITA DEGLI STUDI DI ROMA LA SAPIENZA DIPARTIMENTO INGEGNERIA CHIMICA MATERIALI AMBIENTE
UNIVERSITA DEGLI STUDI DI ROMA LA SAPIENZA DIPARTIMENTO INGEGNERIA CHIMICA MATERIALI AMBIENTE REPORT ON A TEST EXECUTED ON A KDV DEPOLYMERIZATION PLANT ON JAN 19TH 2012 IN THE ORION ECOSOLUTIONS DEMONSTRATION
More informationWASTEWATER TREATMENT OBJECTIVES
WASTEWATER TREATMENT OBJECTIVES The student will do the following: 1. Define wastewater and list components of wastewater. 2. Describe the function of a wastewater treatment plant. 3. Create a wastewater
More informationIB Chemistry. DP Chemistry Review
DP Chemistry Review Topic 1: Quantitative chemistry 1.1 The mole concept and Avogadro s constant Assessment statement Apply the mole concept to substances. Determine the number of particles and the amount
More information