Data Center Infrastructure Management - a special report
|
|
- Godwin Dickerson
- 8 years ago
- Views:
Transcription
1 Copyright 2012 S1NED Limited all rights reserved Data Center Infrastructure Management - a special report It s not all about cost June 2012
2 How do I know if my Data Center is about to fail? The simple answer is that you probably don t, which ought to seem quite disturbing, given that you are likely to have spent $2,300 per square foot on the design and construction of your data center facility. Research shows that the major reasons for catastrophic data center failure is rarely critical facility design and build issues and much more likely to be caused by human error, exacerbated by inadequate process and poor metrics i. Your wonderful, expensive and highly resilient data center facility operated ineffectively will eventually fail; it s all just a matter of time and luck. In the USA, between 4% and 5% of data centers fail to some extent every year. ii Data Centers are highly complex combinations of facilities and IT systems that do not naturally integrate or work well together. Global best practice demands proactive and real- time monitoring and management of both domains as an integrated whole. Data Center Infrastructure Management platforms such as wise TM DCiM TM provide this integrated view that enables proactive management of the whole environment. Complex interactions and hidden problems can conspire together and deliver unexpected and sometimes catastrophic failures. Figure 1 The Formula for a Silent Running Data Center Estate How do I know if I am getting 100% utilization from my Data Center investment? Ever walked around a data center and seen all of the empty racks, yet been told that the facility is full to capacity? Ever tried to explain to the CFO that you need another $20M to build a data center, as the current one is full? Ever been faced with squeezing in another rack of equipment into your already full data center? These are all too common experiences for data center operators. Lets ask ourselves what does full actually mean from a data center perspective? Is there physical space in the seected rack? Will the rack support the weight of the new equipment as well as what is already in there? Is there enough power in this rack on both streams to support this equipment as well as what is already installed? Is there enough cold airflow to this rack to support the addi^onal heat load? Is there enough network capacity for the SAN and LAN installed in the rack? Figure 2 Some of the key decision making steps in selecting a location for new IT equipment in our Data Center Copyright 2012 wise Inc. all rights reserved
3 The myth of the full data center Data centers are considered full when they run out of one or more of their constrained resources. In the main, full data centers are hampered by a single constraint, usually either power or cooling. In many cases, this constraint can be released offering us the opportunity to improve our data center ROI significantly. Real life experience shows that it would be disappointing to see less than 10% and surprising to get more than 40% additional capacity ($230- $920 per square foot value). Building Power 910KVA UPS 300KVA UPS 300KVA UPS 300KVA Figure 3 Simplified Power Distribution Scheme (Power Stream Resilience Omitted, 140 s Omitted for clarity) The diagram shows a data center with 150 x s connected to 15 x s connected to 3 x UPS connected to the main building power. At each stage, the data center and rack planners have added safety margin, misstated the real load, introduced rounding errors and have been left with stranded capacity. In a modern data center with heavy virtualization combined with adaptive CPU and cooling systems the actual load will change in real- time as CPUs scale back under low compute load conditions and fan speed vary depending on ambient temperature at the server air inlets. Boilerplate loads are almost always higher than the true load under real data center conditions. Given real- time monitoring and recording of power draw by, and UPS it is possible to simultaneously optimize and protect the data center. The table below is based on Figure 3 and needs some explanation. It shows the scale of the potential prize when applying best practice with properly designed tools such as wise DCiM. By managing the excess capacity down as we bring power loading risk under control we could find capacity for another 21 racks worth of equipment just by re- planning the equipment layout (10 spare capacity in the row). Following up, we could physically install another 15 racks or possibly reconfigure the s to deliver more power per rack gaining an additional 6 or 13 racks worth of IT equipment. (This would involve installing additional electrical wiring and control gear). We might even consider fitting a few additional partially populated s and as many as 15 more racks to deliver an additional 7 from the partially loaded UPS equipment. In summary we could deliver an additional 50 racks worth of equipment (30% more) from our full to capacity data center. Component Boilerplate or calculated load Actual load Stranded & safety margin (design boilerplate) Design capacity Available for expansion per component (design actual) Total available for expansion for all components 4.8KVA 4.3KVA 0.2KVA 5.0KVA 0.7KVA 10 (x150) 48KVA (10 racks) 43KVA 12KVA 180KVA (x15) UPS 27 (5 s) KVA 8 2 (x3) Building 82 (3 UPS) 64 10KVA 910KVA (plus stranded) Copyright 2012 wise Inc. all rights reserved
4 The Genesis of a Data Center Failure Let s take a real life example; we have two Power Distribution Units (s) resiliently supporting a row of racks with an A and B power feed. All of the equipment in the racks is plugged into both power feeds with a design objective of being able to survive a either a failure / single power feed circuit breaker trip or provide the capability to take one out of operation to perform routine maintenance. This is good practical critical facilities design and implementation. - A supplies half the load and provides backup to - B B supplies the other half of the load and provides backup to - A Row of s in Data Center being supplied resilliently from both - A and - B - A fails or is taken out of produc^on B now supplies the full load Row of s in Data Center being supplied non- resilliently from - B Figure 4 Before - A Fails Figure 5 After - A Fails This is where process, metrics and attention to detail come into play, the humans in our rack planning and implementation teams were under pressure to deliver fast, as a result they did not pay enough attention in planning and when adding a new server into one of the racks, they miscalculated the additional load. As a result, - A is now running at 56% capacity and - B is running at 54%. Everything goes well for months, (maybe even years) as the s are quite happy running at this level of loading. Then the inevitable happens and we have either an electrical failure in - A that causes an unplanned shutdown or we need to perform maintenance on - A and we shutdown manually as part of the maintenance plan. Our data center is resilient and designed (at great expense) to deal with failure and planned maintenance yet we have a catastrophic and unexpected event. We trigger a cascade failure as the additional load coming across from - A takes the demand on - B beyond it s design capability and it shuts down, tripping it s main breakers. The whole row of racks is now without power and we have a catastrophe. On another day, perhaps we don t get the load calculations wrong but our new guy in the rack implementation team manages to plug both of the new server power cords into the A power stream. It works quite happily like that for months and years, until the inevitable happens, the power from - A is interrupted and our server fails. Resilient processes must support Data Center designs, and these must constantly monitor and report on misconfiguration before misconfigurations can cause critical failures. Real- time monitoring of the power draw would have highlighted the problem before it became a disaster. Copyright 2012 wise Inc. all rights reserved
5 If you don t (or can t) measure it you can t expect to manage or protect it The key to effective Data Center operation is a tightly managed blend of trained people, operating mature and tested processes, supported by real time metrics and delivered on resilient critical facilities technology. Only by combining these together can we prevent catastrophic data center outages. Spending money on the facility and leaving out the people and processes is a recipe for disaster. Getting the people and processes right without accurate underpinning real- time data is simultaneously ineffective and risky. This brings me neatly onto Data Center Infrastructure Management, the coalescence and integration of IT and critical facilities management, reporting and planning. Data Center Infrastructure Management systems are designed to co- ordinate facility configurations with real- time information in order to deliver an essential dashboard of data center health, efficiency, capacity and performance. Data Center Compromises Data center planners are forced to make compromise decisions between maximizing utilization and protecting availability because they lack the accurate data points they need to maintain the most optimal configurations. Availability figures strongly in the compromise and as a result a large number of data centers are significantly underutilized compromising the expected Return on Investment (ROI). Efficiency ROI Availability Data Center Infrastructure Management We have seen that understanding the configuration and dependencies of the power feeds in our data center is critically important. We also know that static and theoretical calculations are prone to human error. What wise DCiM offers is a dynamic, real time environment that delivers a number of business advantages: Enables proactive protection of critical systems Reduces the risk of cascade failures Reduces operating costs Improves Data Center Capital ROI Improve Return on Capital Reduce Risk Reduce Opera^ng Costs Figure 6 The wise DCiM Prizes Improve U^liza^on Copyright 2012 wise Inc. all rights reserved
6 About wise DCiM wise, Inc. (OTCBB: RACK.OB) is a leader in software development and marketing within the growing markets for IT infrastructure tracking, monitoring, modeling, and management. The Company s suite of product and service offerings enables clients to effectively manage today s high density computing configurations and virtualized data centers while mitigating the risks associated with cascading faults within the infrastructure. wise solutions integrate device level, real- time monitoring with advanced modeling, reporting, analytics and other critical features and functionalities, providing users with robust, state- of- the- art platforms to responsibly optimize operations and maximize cost efficiencies of their IT infrastructures, and progress toward achieving sustainable green data centers. Its branded wise Products and Services, Solutions, are used by over 150 companies worldwide. For more information, visit or call About Steve O Donnell and The Hot Aisle Steve O Donnell has over 30 years global Data Center experience and is globally recognized as a specialist in Data Centers and Sustainability. He is an Engineer and holds a number of patents in the data center cooling area. He works as a speaker, analyst and commentator publishing on his blog and tweeting He was a member of the advisory board for Fusion- io, he currently chairs both the advisory boards for Violin Memory and wise. He serves on the Advisory Board for DC Professional Development, a division of Data Center Dynamics. He is founder and CEO at Chalet Tech a Database Security business and Chairman at Preventia a UK based Security systems reseller. Steve brings real life experience to his analysis of Data Centers with a career IT budget of $30B. He was CEO at MEEZA, the leading data center and Cloud- services Company based in Doha Qatar and serving the MENA region. He was a Senior Analyst at Enterprise Strategy Group where he specialized in data center power & cooling, data center strategy and best practice. Steve ran IT Infrastructure Internationally for First Data Corp, the largest card- processing company in the world. He was global head of data centers at BT running the largest data center estate and the biggest IT operation in Europe. He has a worldwide reputation as a thought leader in Green IT having won six industry awards for his 21st Century Data Centre vision and design. Working with Harqs Singh, a member of the wise Advisory Board, he developed The Green Grid Data Center Maturity Model (DCMM) for categorizing Data Centre Efficiency. i Source Uptime Institute 70% of data center failures caused by human error ii Source Data Center Dynamics Data Center Survey (2012) Copyright 2012 wise Inc. all rights reserved
T: 0344 875 4555 ENQUIRIES@DATACENTRE-UK.COM
T: 0344 875 4555 ENQUIRIES@DATACENTRE-UK.COM DATACENTRE UK INTRODUCTION Datacentre UK are specialist providers of energy efficient data centre and physical infrastructure solutions across the UK, Europe
More informationRaising Inlet Temperatures in the Data Centre
Raising Inlet Temperatures in the Data Centre White paper of a round table debate by industry experts on this key topic. Hosted by Keysource with participants including the Uptime Institute. Sophistication
More informationData centres that deliver ENQUIRIES@DATACENTRE-MEA.AE
Data centres that deliver ENQUIRIES@DATACENTRE-MEA.AE DATA CENTRE INFRASTRUCTURE MANAGEMENT (DCIM) DCIM solutions are designed to collect and manage information about a data centre s assets, resource use
More informationManaging Power Usage with Energy Efficiency Metrics: The Available Me...
1 of 5 9/1/2011 1:19 PM AUG 2011 Managing Power Usage with Energy Efficiency Metrics: The Available Metrics and How to Use Them Rate this item (1 Vote) font size Data centers consume an enormous amount
More informationMicrosoft Technology Center: Philadelphia
A Customer Success from the Experts in Business-Critical Continuity TM. Background Microsoft Technology Center: Philadelphia Microsoft Technology Centers are collaborative, state-of-the-art facilities
More informationMeasuring Power in your Data Center
RESEARCH UNDERWRITER WHITE PAPER LEAN, CLEAN & GREEN Raritan Measuring Power in your Data Center Herman Chan, Director, Power Solutions Business Unit, and Greg More, Senior Product Marketing Manager There
More informationImproving Economics of Blades with VMware
Improving Economics of Blades with VMware Executive Summary Today IT efficiency is critical for competitive viability. However, IT organizations face many challenges, including, growing capacity while
More informationSmartDesign Intelligent, Integrated Infrastructure For The Data Center. Solutions For Business-Critical Continuity
SmartDesign Intelligent, Integrated Infrastructure For The Data Center Solutions For Business-Critical Continuity Prepare Your Data Center For What s Next Efficiency. Availability. Capacity. Control. One
More informationAEGIS DATA CENTER SERVICES POWER AND COOLING ANALYSIS SERVICE SUMMARY
AEGIS DATA CENTER SERVICES POWER AND COOLING ANALYSIS SERVICE SUMMARY The Aegis Services Power and Assessment Service provides an assessment and analysis of your data center facility and critical physical
More informationHolistic, Energy Efficient Datacentre Design @ Cardiff Going Green Can Save Money
Holistic, Energy Efficient Datacentre Design @ Cardiff Going Green Can Save Money Dr Hugh Beedie CTO ARCCA & INSRV The Context Introduction Drivers to Go Green Where does all the power go? Before the equipment
More informationEnergy Savings in the Data Center Starts with Power Monitoring
Energy Savings in the Data Center Starts with Power Monitoring As global competition intensifies, companies are increasingly turning to technology to help turn mountains of data into a competitive edge.
More informationOverview of Green Energy Strategies and Techniques for Modern Data Centers
Overview of Green Energy Strategies and Techniques for Modern Data Centers Introduction Data centers ensure the operation of critical business IT equipment including servers, networking and storage devices.
More informationDATA CENTER ASSESSMENT SERVICES
DATA CENTER ASSESSMENT SERVICES ig2 Group Inc. is a Data Center Science Company which provides solutions that can help organizations automatically optimize their Data Center performance, from assets to
More informationProtect Your Business with Automated Business Continuity Solutions
SOLUTION brief Protect Your Business with Automated Overview VMware makes business continuity simple and affordable, so no company operating a single-site or multiple-site environment has to do without
More informationIncreasing Data Center Resilience While Lowering PUE
Increasing Data Center Resilience While Lowering PUE Nandini Mouli, Ph.D. President/Founder esai LLC mouli.nandini@gmail.com www.esai.technology Introduction esai LLC esai LLC: Is a Disadvantaged woman-owned
More informationIT Cost Savings Audit. Information Technology Report. Prepared for XYZ Inc. November 2009
IT Cost Savings Audit Information Technology Report Prepared for XYZ Inc. November 2009 Executive Summary This information technology report presents the technology audit resulting from the activities
More informationColocation Selection Guide. Workspace Technology Ltd
Colocation Selection Guide Workspace Technology Ltd Technology House 5 Emmanuel Court Reddicroft Sutton Coldfield West Midlands B72 1TJ Tel 0121 354 4894 Fax 0121 354 6447 www.workspace-technology.com
More informationBackup is Good, Recovery is KING
Backup is Good, Recovery is KING Who is Blue Net? Onsite Managed Services, Hybrid Cloud and Fully Hosted Cloud Solutions Provider Proudly serving our clients and fueling success since 2007. Backup is Good,
More informationCase study: End-to-end data centre infrastructure management
Case study: End-to-end data centre infrastructure management Situation: A leading public sector organisation suspected that their air conditioning units were not cooling the data centre efficiently. Consequently,
More informationPower and Cooling for Ultra-High Density Racks and Blade Servers
Power and Cooling for Ultra-High Density Racks and Blade Servers White Paper #46 Introduction The Problem Average rack in a typical data center is under 2 kw Dense deployment of blade servers (10-20 kw
More informationConsiderations for a Highly Available Intelligent Rack Power Distribution Unit. A White Paper on Availability
Considerations for a Highly Available Intelligent Rack Power Distribution Unit A White Paper on Availability Introduction Data centers are currently undergoing a period of great change. Data center managers
More informationIntroducing AUDIT- BUDDY
Introducing AUDIT- BUDDY Monitoring Temperature and Humidity for Greater Data Center Efficiency 202 Worcester Street, Unit 5, North Grafton, MA 01536 www.purkaylabs.com info@purkaylabs.com 1.774.261.4444
More informationData center upgrade proposal. (phase one)
Data center upgrade proposal (phase one) Executive Summary Great Lakes began a recent dialogue with a customer regarding current operations and the potential for performance improvement within the The
More informationData Center Energy Consumption
Data Center Energy Consumption The digital revolution is here, and data is taking over. Human existence is being condensed, chronicled, and calculated, one bit at a time, in our servers and tapes. From
More informationModel Manage Monitor Maximize your Data Center
NetZoomDC is the most feature rich, fully-scalable, enterprise Data Center Infrastructure Management (DCIM) software application. It enables data center professionals to Model, Manage, Monitor and Maximize
More informationReducing Data Center Energy Consumption
Reducing Data Center Energy Consumption By John Judge, Member ASHRAE; Jack Pouchet, Anand Ekbote, and Sachin Dixit Rising data center energy consumption and increasing energy costs have combined to elevate
More informationTIA-942 Data Centre Standards Overview WHITE PAPER
TIA-942 Data Centre Standards Overview WHITE PAPER TIA-942 Data Centre Standards Overview For the past 20 years, cabling standards have been the cornerstone of ensuring proper design, installation, and
More informationEnergy Management Services
February, 2012 Energy Management Services Data centers & IT environments are often critical to today s businesses, directly affecting operations and profitability. General & Mechanical Services has the
More informationData Center Infrastructure Management: ERP for the Data Center Manager
Data Center Infrastructure Management: ERP for the Data Center Manager 1 2 Topics What s DCIM & the ERP Analogy Why DCIM How DCIM Works How DCIM Helps 3 DCIM by Definition DCIM is a system that collects
More informationUsing CFD for optimal thermal management and cooling design in data centers
www.siemens.com/datacenters Using CFD for optimal thermal management and cooling design in data centers Introduction As the power density of IT equipment within a rack increases and energy costs rise,
More informationEnergy Efficient Data Centre at Imperial College. M. Okan Kibaroglu IT Production Services Manager Imperial College London.
Energy Efficient Data Centre at Imperial College M. Okan Kibaroglu IT Production Services Manager Imperial College London 3 March 2009 Contents Recognising the Wider Issue Role of IT / Actions at Imperial
More informationCheat Sheets to Data Center Infrastructure Management
^ Business-wise, Future-drivenTM Cheat Sheets to Data Center Infrastructure Management The Brands You Trust. Table of Contents Introduction...3 How DCIM helps operations...4 How DCIM helps planning...5
More informationGreening Commercial Data Centres
Greening Commercial Data Centres Fresh air cooling giving a PUE of 1.2 in a colocation environment Greater efficiency and greater resilience Adjustable Overhead Supply allows variation in rack cooling
More informationThe Use of Fresh Air in the Data Centre
The Use of Fresh Air in the Data Centre White paper of a round table debate by industry experts on this key topic. Hosted by Keysource with participants including the Uptime Institute. Sophistication Through
More informationTen Steps to Increasing Data Center Efficiency and Availability through Infrastructure Monitoring
Ten Steps to Increasing Data Center Efficiency and Availability through Infrastructure Monitoring A White Paper from the Experts in Business-Critical Continuity Summary The first decade of the 21st century
More informationData Center 2020: Delivering high density in the Data Center; efficiently and reliably
Data Center 2020: Delivering high density in the Data Center; efficiently and reliably March 2011 Powered by Data Center 2020: Delivering high density in the Data Center; efficiently and reliably Review:
More informationAirflow Simulation Solves Data Centre Cooling Problem
Airflow Simulation Solves Data Centre Cooling Problem The owner s initial design for a data centre in China utilized 40 equipment racks filled with blade servers spread out in three rows along the length
More informationAvailability and Disaster Recovery: Basic Principles
Availability and Disaster Recovery: Basic Principles by Chuck Petch, WVS Senior Technical Writer At first glance availability and recovery may seem like opposites. Availability involves designing computer
More informationStrategies for Deploying Blade Servers in Existing Data Centers
Strategies for Deploying Blade Servers in Existing Data Centers By Neil Rasmussen White Paper #125 Revision 1 Executive Summary When blade servers are densely packed, they can exceed the power and cooling
More informationApplying Data Center Infrastructure Management in Collocation Data Centers
Applying Data Center Infrastructure Management in Collocation Data Centers Infrastructure Management & Monitoring for Business-Critical Continuity TM Applying Data Center Infrastructure Management (DCIM)
More informationTen Steps to Increasing Data Center Efficiency and Availability through Infrastructure Monitoring
Ten Steps to Increasing Data Center Efficiency and Availability through Infrastructure Monitoring A White Paper from the Experts in Business-Critical Continuity Summary The first decade of the 21st century
More informationHow To Build A High Performance Datacenter With Vmware Vsphere
Building a High-Performance Datacenter with VMware The global leader in virtualization solutions from the desktop to the datacenter Building a High Performance Datacenter with VMware Four Measures of a
More informationScalable. Affordable. Flexible. Fast.
Modular Data Center Solutions Scalable. Affordable. Flexible. Fast. Build the data center you need today with the flexibility to meet tomorrow s challenges The only constant in business is change. Fluctuations
More informationInformation Technology White Paper
Information Technology White Paper Virtualization Building an Adaptive, Cost Effective Infrastructure at SSCT October 5, 2009 As the College grows the College needs to be poised to respond faster to market
More informationin other campus buildings and at remote campus locations. This outage would include Internet access at the main campus.
DATA CENTER The current Campus Data Center is located within historic Founders Hall which is in a less-than ideal location for a variety of reasons, but is typical of an existing campus IT infrastructure
More informationOptimizing Power Distribution for High-Density Computing
Optimizing Power Distribution for High-Density Computing Choosing the right power distribution units for today and preparing for the future By Michael Camesano Product Manager Eaton Corporation Executive
More informationPlanning for and Surviving a Data Disaster
Planning for and Surviving a Data Disaster Solutions to successfully meet the requirements of business continuity. An Altegrity Company 2 2 5 7 Introduction Managing Host Storage for Virtual Environments
More informationMaking Existing Server Rooms More Efficient Steve Bowes-Phipps, Data Centre Manager University of Hertfordshire. http://rare-idc.herts.ac.
Making Existing Server Rooms More Efficient Steve Bowes-Phipps, Data Centre Manager University of Hertfordshire http://rare-idc.herts.ac.uk Making Existing Server Rooms More Efficient Reduction and Re-use
More informationTitle: Design of a Shared Tier III+ Data Center: A Case Study with Design Alternatives and Selection Criteria
Tier 3+ 1 Title: Design of a Shared Tier III+ Data Center: A Case Study with Design Alternatives and Selection Criteria Abstract: Schoolcraft College is constructing a High Availability (HA) Data Center
More informationManagement and Wireless in the Data Center
SOLUTIONS BRIEF Management and Wireless in the Data Center High Performance Wireless Networks Management and Wireless in the Data Center Worldwide demand for new and more powerful IT-based applications,
More informationData Center Consolidation Trends & Solutions. Bob Miller Vice President, Global Solutions Sales Emerson Network Power / Liebert
Data Center Consolidation Trends & Solutions Bob Miller Vice President, Global Solutions Sales Emerson Network Power / Liebert Agenda Traditional Data Centers Drivers of a Changing Environment Alternate
More informationCommon mistakes in datacentre planning
Common mistakes in datacentre planning White Paper Last edited: March 2013 Document Control Document Information Title Author Common mistakes in datacentre planning Nick Ewing This document is based upon
More informationSite24x7: Key Mistakes in Data Center Operations
Site24x7: Key Mistakes in Data Center Operations Introduction In today s connected society, the demands placed on data center professionals is at an all-time high due to the need for modern devices to
More informationEnergy management White paper. Greening the data center with IBM Tivoli software: an integrated approach to managing energy.
Energy management White paper Greening the data center with IBM Tivoli software: an integrated approach to managing energy. May 2008 2 Contents 3 Key considerations for the green data center 3 Managing
More informationData Centers: Definitions, Concepts and Concerns
Data Centers: Definitions, Concepts and Concerns Arash Mousavi DCC September 2013 Agenda 1. Introduction 2. Issues in Modern Data Centers: Siemens Integrated Data Center Solutions 3. Issues in Modern Data
More informationIT@Intel. Thermal Storage System Provides Emergency Data Center Cooling
White Paper Intel Information Technology Computer Manufacturing Thermal Management Thermal Storage System Provides Emergency Data Center Cooling Intel IT implemented a low-cost thermal storage system that
More informationRed Hat Enterprise linux 5 Continuous Availability
Red Hat Enterprise linux 5 Continuous Availability Businesses continuity needs to be at the heart of any enterprise IT deployment. Even a modest disruption in service is costly in terms of lost revenue
More informationDynamic Power Variations in Data Centers and Network Rooms
Dynamic Power Variations in Data Centers and Network Rooms By Jim Spitaels White Paper #43 Revision 2 Executive Summary The power requirement required by data centers and network rooms varies on a minute
More informationDatacentre Studley. Dedicated managed environment for mission critical services. Six Degrees Group www.6dg.co.uk
Dedicated managed environment for mission critical services www.6dg.co.uk Our datacentres are the core of our business. At we own and manage 30,000 square feet of highly available, geographically diverse
More informationData Operations Center Renovation
Data Operations Center Renovation Frederick County s main Data Center is located at Winchester Hall and was originally designed to house five HP3000 computer systems and the support hardware needed for
More informationAPC APPLICATION NOTE #112
#112 Best Practices for Deploying the InfraStruXure InRow SC By David Roden Abstract The InfraStruXure InRow SC (ACSC100 and ACSC101) is a self-contained air conditioner for server rooms and wiring closets.
More informationAn Introduction to Cold Aisle Containment Systems in the Data Centre
An Introduction to Cold Aisle Containment Systems in the Data Centre White Paper October 2010 By Zac Potts MEng Mechanical Engineer Sudlows October 2010 An Introduction to Cold Aisle Containment Systems
More informationCommon Power Problems & Power Protection Solutions
W H I T E P A P E R Common Power Problems & Power Protection Solutions Executive Summary All systems, from home theaters and office desktops to enterprise IT equipment in data centers, are prone to downtime,
More informationTHE KEY TO DATA CENTRE INFRASTRUCTURE
ENCLOSURES, RACKS & CABINETS THE KEY TO DATA CENTRE INFRASTRUCTURE PAGE 52 www.insidenetworksme.com JULY 15 Jonathan Duncan, Data Centre and Integrated Solutions Director, Schneider Electric, outlines
More informationCan Your Data Center Infrastructure Handle the Heat of High Density? 5 Ways to Test Your Data Center Infrastructure before Installing Blades
Can Your Data Center Infrastructure Handle the Heat of High Density? 5 Ways to Test Your Data Center Infrastructure before Installing Blades Can Your Data Center Infrastructure Handle the Heat of High
More informationPrediction Is Better Than Cure CFD Simulation For Data Center Operation.
Prediction Is Better Than Cure CFD Simulation For Data Center Operation. This paper was written to support/reflect a seminar presented at ASHRAE Winter meeting 2014, January 21 st, by, Future Facilities.
More informationStatement Of Work. Data Center Power and Cooling Assessment. Service. Professional Services. Table of Contents. 1.0 Executive Summary
Statement Of Work Professional Services Data Center Power and Cooling Assessment Data Center Power and Cooling Assessment Service 1.0 Executive Summary Table of Contents 1.0 Executive Summary 2.0 Features
More informationLiebert : The Right Cooling For IT Environments. Precision Cooling For Business-Critical Continuity
Liebert : The Right Cooling For IT Environments Precision Cooling For Business-Critical Continuity New Challenges To IT System Uptime Many IT professionals are finding that dedicated precision cooling
More informationFive Essential Components for Highly Reliable Data Centers
GE Intelligent Platforms Five Essential Components for Highly Reliable Data Centers Ensuring continuous operations with an integrated, holistic technology strategy that provides high availability, increased
More informationACE Performance Assessment - Empowering the Data Center Operator
ACE Performance Assessment - Empowering the Data Center Operator Future Facilites White Paper DAVE KING senior data center engineer, EMEA STEVE DAVIES product marketing manager Executive Summary In this
More informationOPTIMIZING SERVER VIRTUALIZATION
OPTIMIZING SERVER VIRTUALIZATION HP MULTI-PORT SERVER ADAPTERS BASED ON INTEL ETHERNET TECHNOLOGY As enterprise-class server infrastructures adopt virtualization to improve total cost of ownership (TCO)
More informationRevolutionizing Data Center Infrastructure Management
Infrastructure Management & Monitoring for Business-Critical Continuity TM Revolutionizing Data Center Infrastructure Management The Trellis Platform A Real-Time Solution to Continuous Performance Improvement
More informationBEYOND DIAGRAMS AND SPREADSHEETS DATA CENTER INFRASTRUCTURE MANAGEMENT (DCIM)
BEYOND DIAGRAMS AND SPREADSHEETS DATA CENTER INFRASTRUCTURE MANAGEMENT (DCIM) THE CHALLENGE. Solve complexity The trend for consolidation and construction of ever- larger data centers has been basically
More informationNIGERIA S PREMIUM DATA CENTRE
NIGERIA S PREMIUM DATA CENTRE TIER III DESIGN CERTIFIED SECURE RELIABLE SCALABLE 1 WHY WOULD YOU WANT TO BUILD A DATA CENTRE? IT TAKES MILLIONS OF US DOLLARS TO BUILD AN EFFICIENT DATA CENTRE. A KEY ASSET,
More informationPower and Cooling Guidelines for Deploying IT in Colocation Data Centers
Power and Cooling Guidelines for Deploying IT in Colocation Data Centers White Paper 173 Revision 0 by Paul Lin and Victor Avelar Executive summary Some prospective colocation data center tenants view
More information(Examples of various colocation sites)
Overview The largest factor involved in maintaining business servers today are the fixed costs associated with data centers. The Colocation Environment is an outsourcing model whereby a colocation company
More informationDynamic Power Variations in Data Centers and Network Rooms
Dynamic Power Variations in Data Centers and Network Rooms White Paper 43 Revision 3 by James Spitaels > Executive summary The power requirement required by data centers and network rooms varies on a minute
More informationCreating an IT Infrastructure that Adapts to Your Business PLAYBOOK
Creating an IT Infrastructure that Adapts to Your Business PLAYBOOK F O R C H A N G E For decades, data centers have been over-provisioned two or even three times over in an attempt to plan for growth.
More informationWhite Paper. The Top 20 Tools Needed for Hybrid IT
White Paper The Top 20 Tools Needed for Hybrid IT 1 IT today is more complex than ever. Public cloud, networks, storage systems, servers, and applications all combine to deliver today s IT services. But
More informationHow Eight California Data Centers Reduced Energy by 20%
How Eight California Data Centers Reduced Energy by 20% Sponsored by the California Energy Commission Public Interest Energy Research David Weightman, Energy Commission Specialist California Energy Commission
More informationManaging Cooling Capacity & Redundancy In Data Centers Today
Managing Cooling Capacity & Redundancy In Data Centers Today About AdaptivCOOL 15+ Years Thermal & Airflow Expertise Global Presence U.S., India, Japan, China Standards & Compliances: ISO 9001:2008 RoHS
More informationHow High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions
Intel Intelligent Power Management Intel How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions Power savings through the use of Intel s intelligent
More informationIMPROVING DATA CENTER EFFICIENCY AND CAPACITY WITH AISLE CONTAINMENT
DATA CENTER RESOURCES WHITE PAPER IMPROVING DATA CENTER EFFICIENCY AND CAPACITY WITH AISLE CONTAINMENT BY: STEVE HAMBRUCH EXECUTIVE SUMMARY Data centers have experienced explosive growth in the last decade.
More informationData Center Infrastructure Management Managing the Physical Infrastructure for Greater Efficiency
Data Center Infrastructure Management Managing the Physical Infrastructure for Greater Efficiency Infrastructure Management & Monitoring for Business-Critical Continuity TM DATA CENTER INFRASTRUCTURE MANAGEMENT
More informationOvercoming the Causes of Data Center Outages
Overcoming the Causes of Data Center Outages Executive Summary A data center s main function should be to provide constant uptime for the mission-critical applications it houses. However, unplanned outages
More informationopdc Cut your data center OPEX upto 70%
opdc Cut your data center OPEX upto 70% Advantages Configuration Introducing the plug & play On Premises Data Center Introducing - The plug & play on premises data center The is a self-contained data center
More informationHow To Improve Energy Efficiency Through Raising Inlet Temperatures
Data Center Operating Cost Savings Realized by Air Flow Management and Increased Rack Inlet Temperatures William Seeber Stephen Seeber Mid Atlantic Infrared Services, Inc. 5309 Mohican Road Bethesda, MD
More informationEnabling an agile Data Centre in a (Fr)agile market
Enabling an agile Data Centre in a (Fr)agile market Phil Dodsworth Director, Data Centre Solutions 2008 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without
More informationIncreasing safety, reliability and efficiency for today s data centers
Increasing safety, reliability and efficiency for today s data centers Products and expertise for data center success Drawing upon vast experience in complex industries where uptime is critical, ABB provides
More informationPower Distribution Units (PDUs): Power monitoring and environmental monitoring to improve uptime and capacity planning
Power Distribution Units (PDUs): Power monitoring and environmental monitoring to improve uptime and capacity planning 2009, Raritan Inc. Overview Corporate America is more dependent than ever on computing
More informationInsourcing vs. Outsourcing. Bart Leung Senior Associate, Ehvert Mission Critical
Insourcing vs. Outsourcing Bart Leung Senior Associate, Ehvert Mission Critical 1 Agenda Ehvert Mission Critical Data Centres Then and Now Power & Cooling Considerations Costs Making the Choice 2 History
More informationThe Real Cost of Manual Asset Management
The Real Cost of Manual Asset Management No Limits Software White Paper #3 By David Cole 2011 No Limits Software. All rights reserved. No part of this publication may be used, reproduced, photocopied,
More informationAnalysis of data centre cooling energy efficiency
Analysis of data centre cooling energy efficiency An analysis of the distribution of energy overheads in the data centre and the relationship between economiser hours and chiller efficiency Liam Newcombe
More informationExpert Reference Series of White Papers. Visions of My Datacenter Virtualized
Expert Reference Series of White Papers Visions of My Datacenter Virtualized 1-800-COURSES www.globalknowledge.com Visions of My Datacenter Virtualized John A. Davis, VMware Certified Instructor (VCI),
More informationCapgemini UK Infrastructure Outsourcing
Together. Free your energies Capgemini UK Infrastructure Outsourcing Project Arthur Improved Data Centre Efficiency Paul Feeney Capgemini Tony Mills Spie Matthew Hall Project Arthur The Toltec data centre,
More informationDoes Tape Still Make Sense? An investigation of tape s place in a modern backup system. My 20
An investigation of tape s place in a modern backup system My 20 May 2009 Contents Abstract... 3 Disk makes tape better... 3 Throwing the baby out with the bathwater?... 3 What do you lose when you lose
More informationGlobal Green Data Center Best Practices In Action
Global Green Data Center Best Practices In Action DOUG WASHBURN VICE PRESIDENT & RESEARCH DIRECTOR September 25, 2013 Four questions I will answer 1 Why is green important to your business? 2 Why is green
More informationSensor Monitoring and Remote Technologies 9 Voyager St, Linbro Park, Johannesburg Tel: +27 11 608 4270 ; www.batessecuredata.co.
Sensor Monitoring and Remote Technologies 9 Voyager St, Linbro Park, Johannesburg Tel: +27 11 608 4270 ; www.batessecuredata.co.za 1 Environment Monitoring in computer rooms, data centres and other facilities
More informationThe Efficient Enterprise. Juan Carlos Londoño Data Center Projects Engineer APC by Schneider Electric
Ee The Efficient Enterprise Juan Carlos Londoño Data Center Projects Engineer APC by Schneider Electric Keystrokes Kilowatts Heat OUT Electricity IN Need for bandwidth exploding Going hyperbolic! 30,000
More informationAN APPLICATION-CENTRIC APPROACH TO DATA CENTER MIGRATION
AN APPLICATION-CENTRIC APPROACH TO DATA CENTER MIGRATION Five key success factors IT organizations today are under constant business pressure to transform their infrastructure to reduce costs, increase