1 MAIDSTONE BOROUGH COUNCIL LEADER OF THE COUNCIL REPORT OF THE HEAD OF BUSINESS IMPROVEMENT Report prepared by Steve Trigg Date Issued: 16 April MULTIFUNCTION DEVICES AND PRINT MANAGEMENT SOFTWARE FOR MAIDSTONE HOUSE Issue for Decision To consider the provision of multifunctional devices within the new offices 1.2 Recommendation of the Head of Business Improvement To agree to the award of the provision of multifunction devices and associated print management software from Kent County Supplies through Ricoh/Infotec; To give delegated authority to the Chief Finance Officer to agree the outright purchase or annual rental of the print management software following further investigation of purchase cost; To give delegated authority to the Chief Finance Officer to agree the most economic settlement of rental agreements on existing equipment; and To agree that the provision of a bond is not appropriate for this contract 1.3 Reasons for Recommendation The outcome of the review of how the Council conducts its printing and photocopying was the desire to migrate to multifunctional devices (MFD s). This allows for photocopying, desktop printing, low level scanning and faxing to be provided via a number of strategically positioned MFD s and the elimination of the large number of independent devices currently in use The benefits of this approach are cost savings from reduced

2 space requirements as well as lower costs and reduced environmental impact. In addition, investment in print management software allows for savings from better routing and use of the printers and further environmental benefits The budget set for the new equipment was that it should be cost neutral or better compared with present spend on hardware, consumables and maintenance During March 2007, a print audit was conducted to inform the requirements for devices, configuration, quantity and actual deployment. The results indicated a total print and photocopy annual volume estimated at 9,000,000 copies of which approximately 500,000 were colour reproductions Specifications for devices and the numbers required (both mono and colour)were devised based on this audit, the space plans, advice from the print audit supplier, advice from IT on future machine and software integration requirements and discussions with managers on the new way of working and general deployment plans. These discussions also included agreement that desktop printers will not be used within the new offices and that only specialised printing equipment will be transferred (such as the large planning printers). It is important that with the exception of permanent home workers, all printing is conducted within the office. Proposals Based on the above, proposals were sought from the market via a mini competition using the newly created CBC 6 (Central Buying Consortium) framework. This was selected as it was most likely to offer the best value for money. This framework is administered locally by Kent County Supplies and is compliant from both a European directives perspective and the Council s constitutional requirements It was considered that seeking proposals based on the print audit results and future intended way of working, would provide an optimal solution from a financial and service perspective. Financial, quality, environmental, reference and other checks were conducted under the original Central Buying Consortium OJEU tendering exercise.

3 1.3.8 Three proposals were submitted. (An alternative proposal from Canon was not evaluated as it did not deliver the overall solution required) The table in exempt appendix 2 describe in summary the costs of the printing solution proposals received based on: Generally accepted best practice to rent devices rather than purchase outright, and that the 5 year rental period offers best value for money. (Although 3 and 4 yr proposals were received); Annual print and photocopy volumes of approximately 9 million; A requirement for 15 open floor MFD (copy/print/fax/scan) and 3 print room devices; A need for print management software to obtain optimum operational and financial performance from the hardware; Acceptance that a number of existing machines would need to be settled in terms of existing rental agreements and; That the opportunity would be taken to redeploy redundant devices to other Council sites where the opportunity arose and was financially beneficial The assessment of options showed that the Ricoh/Infotec solution offered the most economically advantageous price. To progress this option a decision is needed by 18 April to ensure the solution is in place in time for the office move. Costs and savings The proposed solution shows an annual cost of 84k. This compares to existing spend in excess of 89k The annual cost may be further reduced through: Capitalisation of the expenditure on software. Negotiations are underway to achieve this. Should this prove beneficial then budget adjustments will be made in conjunction with Corporate Finance and the IT steering group; and Reductions in the annual settlement costs depending on the financing arrangements.

4 The figure for existing spend is substantially lower than predicted by industry norms (equating to between 1p and 1.5p per print compared with a normal range of 2-5p). However it does not take account of: spending on printers; any reductions in paper that will result from improved management; and energy reductions Further analysis and review will be undertaken to identify and capture these savings to maximise the benefits achieved The management of the MFDs will come under the new post of Facilities Manager who will also help ensure that the equipment is used efficiently to take advantage of its capability of further cost reductions The Constitution requires a bond where contracts exceed 100,000. However, a bond is not considered appropriate in this instance, as the contract will be placed with Kent County Supplies, which is administered by Kent County Council, who will be responsible for alternative arrangements in the event of supplier failure. 1.4 Alternative actions and why not recommended The alternative would be to move to Maidstone House with the existing equipment, but this would add to the pressure on space, be more expensive and prevent much needed efficiency in print management The existing technology is also more limited and therefore several machines are required to do the job of one multifunctional device. This leads to greater energy use, more noise and slower functionality. 1.5 Impact on corporate objectives Implementation of the recommendation will contribute to the core values of value for money and efficiency and be environmentally beneficial.

5 1.6 Risk Management The proposed service hardware and software solutions have been chosen based on the best information available. The supplier is well respected within the industry and has acquired substantial business in Kent serviced by a well established service support network. The direct input of a facilities resource to manage the print solution will help ensure costs are managed. The scope of the CBC6 agreement enables change as a result of under or over specified hardware and it is therefore considered that any risk has been minimised Reference sites have been visited by both Procurement and IT department representatives. 1.7 Other Implications Financial x 2. Staffing 3. Legal 4. Social Inclusion 5. Environmental/Sustainable Development x 6. Community Safety 7. Human Rights Act 8. Procurement x 9. Asset Management The financial implications are set out in Appendix Environmental benefits are achieved from reduced power and paper consumption The proposal complies with the requirements of the Constitution.

6 1.8 Background Documents There are none. 1.9 Reason for urgency The decision is urgent as the supplier requires confirmation of the Council s commitment to the rental/purchase of devices and software by 18 th April 2008 NO REPORT WILL BE ACCEPTED WITHOUT THIS BOX BEING COMPLETED Is this a Key Decision? Yes X No If yes, when did it appear in the Forward Plan? Not in Forward Plan Is this an Urgent Key Decision? Yes X No Reason for Urgency See above. How to Comment Should you have any comments on the issue that is being considered please contact either the relevant Officer or the Member of the Executive who will be taking the decision. Councillor Fran Wilson Stephen Trigg Leader of the Council Telephone: franwilson@maidstone.gov.uk Procurement Manager Telephone: stephentrigg@maidstone.gov.uk

7 APPENDIX 1 Savings profile Existing photocopier annual rental costs Existing photocopying annual copy costs Estimated existing annual printing consumables cost Estimated total existing photocopying and print costs per annum Proposed MFD solution Expected saving per annum** 33k 20k 37k 89k 84k* 6k * Costs may be reduced through capitalisation of the software ** Additional savings should be realised through reduced paper use, power and reductions in printer purchases. These are not included at this stage but will be reviewed after 6 months.

MAIDSTONE BOROUGH COUNCIL CABINET MEMBER FOR REGENERATION REPORT OF ASSISTANT DIRECTOR FOR DEVELOPMENT AND COMMUNITY STRATEGY

MAIDSTONE BOROUGH COUNCIL CABINET MEMBER FOR REGENERATION REPORT OF ASSISTANT DIRECTOR FOR DEVELOPMENT AND COMMUNITY STRATEGY MAIDSTONE BOROUGH COUNCIL CABINET MEMBER FOR REGENERATION REPORT OF ASSISTANT DIRECTOR FOR DEVELOPMENT AND COMMUNITY STRATEGY Report prepared by John Foster Date Issued: 2 July 2009 1. Consideration of

More information

Cambridge City Council

Cambridge City Council Cambridge City Council Item To: Report by: Relevant scrutiny committee: Wards affected: Executive Councillor for Customer Services and Resources James Nightingale, Head of ICT Client Services Strategy

More information

4. Specification. Contract No: 1752 Title: Provision of Print Devices and Print Management System 61

4. Specification. Contract No: 1752 Title: Provision of Print Devices and Print Management System 61 4. Specification Management System 61 Introduction Tenders are invited for the provision of print devices and a print management system; inclusive of Supply, Delivery, Installation and Configuration, in

More information

HERTSMERE BOROUGH COUNCIL REPORT TO EXECUTIVE

HERTSMERE BOROUGH COUNCIL REPORT TO EXECUTIVE HERTSMERE BOROUGH COUNCIL REPORT TO EXECUTIVE Item no: 7.2 Document Reference No: EX/11/45 Date of Meeting / Decision: 20 July 2011 This is not a key decision call-in on the grounds of urgency Urgency:

More information

Breckland Council. Printing Strategy

Breckland Council. Printing Strategy Breckland Council Printing Strategy Version: 0.1 November 2009 Document control Version history Version Date Comments 1(Draft)_0.1 1 December 2009 First Draft Publishers Reference: Author Kevin Taylor

More information

Managed Service Contracts for Housing Benefits Data Entry and Revenues Bill Printing Services

Managed Service Contracts for Housing Benefits Data Entry and Revenues Bill Printing Services Ref PHD 043-10 SUBJECT: Responsible Officer: Portfolio Holder: Key Decision: Managed Service Contracts for Housing Benefits Data Entry and Revenues Bill Printing Services Julie Alderson (Interim Director

More information

HERTSMERE BOROUGH COUNCIL REPORT TO EXECUTIVE

HERTSMERE BOROUGH COUNCIL REPORT TO EXECUTIVE HERTSMERE BOROUGH COUNCIL REPORT TO EXECUTIVE Item no: 7.4 Document Reference no: EX/13/73 Date of Meeting / Decision: 15 January 2014 This is not a key decision call-in on the grounds of urgency Urgency:

More information

Delegated Decisions of the Board Member, Finance and Efficiency

Delegated Decisions of the Board Member, Finance and Efficiency To: Delegated Decisions of the Board Member, Finance and Efficiency Date: 4 th November 2011 Item No: Report of: Title of Report: Head of Business Improvement Supply of an Integrated Land and Property

More information

BRENT COUNCIL IT STRATEGY 2010-13

BRENT COUNCIL IT STRATEGY 2010-13 BRENT COUNCIL IT STRATEGY 2010-13 Contents 1 Introduction... 2 2 Empowering our customers... 3 2.1 Client Index... 3 2.2 Customer contact... 3 3 Tools for the Job... 4 3.1 Printing and scanning... 4 3.2

More information

University of Exeter. Print and Copy Guidelines July 2012

University of Exeter. Print and Copy Guidelines July 2012 University of Exeter Print and Copy Guidelines July 2012 Revision History: Date Revision Author Reason 24/7/2012 Original 5/3/2013 1.1 KD Formatting changes; updated references 7/3/2013 1.2 PB Student

More information

Gary Cooke Cabinet Member for Corporate & Democratic Services Amanda Beer Corporate Director Engagement, Organisation Design & Development

Gary Cooke Cabinet Member for Corporate & Democratic Services Amanda Beer Corporate Director Engagement, Organisation Design & Development By: Gary Cooke Cabinet Member for Corporate & Democratic Services Amanda Beer Corporate Director Engagement, Organisation Design & Development To: Personnel Committee Date: 4 November 2015 Subject: Classification:

More information

CABINET. 24 March 2015

CABINET. 24 March 2015 CABINET 24 March 2015 Title: Procurement of Electricity and Gas Supplies Report of the Cabinet Member for Finance Open Report with Exempt Appendix 4 Wards Affected: All Report Author: Andrew Sivess Group

More information

LONDON BOROUGH OF WALTHAM FOREST

LONDON BOROUGH OF WALTHAM FOREST LONDON BOROUGH OF WALTHAM FOREST Meeting / Date Cabinet /December 2015 Report Title Cabinet Portfolio Report Author/ Contact details Wards affected Public Access Appendices ICT Data Centre & Infrastructure

More information

Jenny Obee, Head of Information Management jenny.obee@barnet.gov.uk, Tel: 020 8359 4859. Micailah Fleming, IT Director micailah.fleming@capita.co.

Jenny Obee, Head of Information Management jenny.obee@barnet.gov.uk, Tel: 020 8359 4859. Micailah Fleming, IT Director micailah.fleming@capita.co. Performance and Contract Management Committee 7 January 2016 Title Report of Wards Status ICT Operations ITIL Methodology Assessment Chief Operating Officer All Public Urgent Key No No Enclosures None

More information

How To Write A Report On A Mobile Phone Solution

How To Write A Report On A Mobile Phone Solution DELEGATED POWERS REPORT NO. SUBJECT: Mobile Phone Solutions Control sheet 1593 All of the following actions MUST be completed at each stage of the process and the signed and dated report MUST be passed

More information

STRATEGY AND RESOURCES COMMITTEE ITEM 14 27 MARCH 2012 FACILITIES MANAGEMENT: FUTURE CONTRACTUAL ARRANGEMENTS

STRATEGY AND RESOURCES COMMITTEE ITEM 14 27 MARCH 2012 FACILITIES MANAGEMENT: FUTURE CONTRACTUAL ARRANGEMENTS FACILITIES MANAGEMENT: FUTURE CONTRACTUAL ARRANGEMENTS Report of the: Contact: Urgent Decision? If yes, reason urgent decision required: Annexes/Appendices: Other available papers: Director of Operations

More information

Agreement for the provision of IT Management Services and IT Services

Agreement for the provision of IT Management Services and IT Services Board Date: 26 March 2015 Item 16: Agreement for the provision of IT Management Services and IT Services This paper will be considered in public 1 Summary 1.1 This paper asks the Board to approve extended

More information

ROYAL AUSTRALASIAN COLLEGE OF SURGEONS Division Resources Ref. No. RES-INT-010 Department Information Technology Asset Management

ROYAL AUSTRALASIAN COLLEGE OF SURGEONS Division Resources Ref. No. RES-INT-010 Department Information Technology Asset Management 1. PURPOSE AND SCOPE The purpose of this policy is to define the management of Iinformation Technology (IT) assets of the IT at the Royal Australasian College of Surgeons (the College). 2. KEYWORDS, Assets,

More information

CABINET 9TH JULY 2015. Report of the Head of Finance and Property Services. Lead Member: Councillor Tom Barkley. Part A

CABINET 9TH JULY 2015. Report of the Head of Finance and Property Services. Lead Member: Councillor Tom Barkley. Part A CABINET 9TH JULY 2015 Report of the Head of Finance and Property Lead Member: Councillor Tom Barkley Part A ITEM 8 ANNUAL PROCUREMENT PLAN 2015/16 UPDATE Purpose of Report This report sets out additions

More information

NOT PROTECTIVELY MARKED

NOT PROTECTIVELY MARKED Approved By: Mark Gilmartin. Chief Officer Classification of Paper: Report to PCC/Deputy PCC (delete as appropriate) Date of Decision Date of Report (delete/insert as appropriate) Report reference number

More information

SUBJECT: REPLACEMENT OF CORPORATE ELECTRONIC DATA STORAGE, BACKUP AND DISASTER RECOVERY SOLUTIONS

SUBJECT: REPLACEMENT OF CORPORATE ELECTRONIC DATA STORAGE, BACKUP AND DISASTER RECOVERY SOLUTIONS REPORT TO CABINET TO BE HELD ON 15 SEPTEMBER 2015 Key Decision No Forward Plan Ref No 23K Corporate Priority The proposals in this report contribute to the delivery of all the Council s priorities Cabinet

More information

University of Glasgow. Strategy/Policy Statement. University of Glasgow Provision of Printing

University of Glasgow. Strategy/Policy Statement. University of Glasgow Provision of Printing Print 1.0 11-Nov-2013 1-Jan-2015 1 P a g e 1. Purpose 2. Scope The document is designed to detail how print solutions should be deployed in line with the University of Glasgow s Print Strategy. By following

More information

FUNDING APPROVAL FOR IMPLEMENTATION OF CLOUD-BASED PRODUCTIVITY AND COLLABORATION TOOLS (OFFICE 365)

FUNDING APPROVAL FOR IMPLEMENTATION OF CLOUD-BASED PRODUCTIVITY AND COLLABORATION TOOLS (OFFICE 365) London Borough of Hammersmith & Fulham CABINET 2 NOVEMBER 2015 FUNDING APPROVAL FOR IMPLEMENTATION OF CLOUD-BASED PRODUCTIVITY AND COLLABORATION TOOLS (OFFICE 365) Report of the Leader - Councillor Stephen

More information

How To Get Value For Money From 2016 To 2020

How To Get Value For Money From 2016 To 2020 Paper 4 Oxfordshire County Council Schools Forum 3 December 2014 Energy Procurement 2016 2020 Settings Sector Academies Foundation Stage Maintained Schools Primary PVI Nurseries Secondary Special Schools

More information

Version Author Revisions Made Date 1.6 David Sharkey Executive Board 27 March 2012 2.0 Robin Hunt

Version Author Revisions Made Date 1.6 David Sharkey Executive Board 27 March 2012 2.0 Robin Hunt Purchasing Policy Originator name: Section / Dept: Implementation date: Date of next review: Related policies: Policy history: Robin Hunt Procurement 1 December 2013 Finance Regulations, Purchase Card

More information

FINANCE AND ASSET MANAGEMENT SUB-COMMITTEE. Meeting held at the Civic Centre, Uxbridge on Tuesday 20 June 2000 at 7.30pm

FINANCE AND ASSET MANAGEMENT SUB-COMMITTEE. Meeting held at the Civic Centre, Uxbridge on Tuesday 20 June 2000 at 7.30pm FINANCE AND ASSET MANAGEMENT SUB-COMMITTEE Meeting held at the Civic Centre, Uxbridge on Tuesday 20 June 2000 at 7.30pm Councillors: Robert Benson John Morse Jonathan Bianco Norman Nunn-Price Steve Carey

More information

MINUTES of a meeting of CABINET held on 13 October 2015 at County Hall, Matlock. PRESENT. Councillor A Western (in the Chair)

MINUTES of a meeting of CABINET held on 13 October 2015 at County Hall, Matlock. PRESENT. Councillor A Western (in the Chair) MINUTES of a meeting of CABINET held on 13 October 2015 at County Hall, Matlock. PRESENT Councillor A Western (in the Chair) Councillors D Allen, A Botham, D Collins, J A Coyle and P J Smith. Councillor

More information

HAMPSHIRE COUNTY COUNCIL. Decision Report. Customer Relationship Management Software

HAMPSHIRE COUNTY COUNCIL. Decision Report. Customer Relationship Management Software HAMPSHIRE COUNTY COUNCIL Decision Report Decision Maker: Executive Member Economic Development and Rural Affairs Date: 7 November 2012 Title: Customer Relationship Management Software Reference: 4358 Report

More information

Date: 26/01/2004. MEETING NAME Executive Delegation of award of energy supply contracts

Date: 26/01/2004. MEETING NAME Executive Delegation of award of energy supply contracts Item No. Classification: Open Report title: Ward(s) or groups affected: From: Date: 26/01/2004 MEETING NAME Executive Delegation of award of energy supply contracts ALL Assistant Chief Executive Strategy

More information

M O P 4. z ft o / One element of the Total Technology Programme Infrastructure (TFPI) is the replacement of the

M O P 4. z ft o / One element of the Total Technology Programme Infrastructure (TFPI) is the replacement of the Executive Summary: 9UE5flOR DMPC DECISION - DMPCD 201 4-1 05 DMPCD v4 I confirm I have considered whether or not I have any personal or prejudicial interest in this matter and Nov 2012 1 Signature Date

More information

Leasing in the Queensland Public Sector Policy Guidelines. Policy Guidelines for public sector entities considering entering into lease arrangements

Leasing in the Queensland Public Sector Policy Guidelines. Policy Guidelines for public sector entities considering entering into lease arrangements Leasing in the Queensland Public Sector Policy Guidelines Policy Guidelines for public sector entities considering entering into lease arrangements November 2014 Table of Contents 1. INTRODUCTION...3 2.

More information

Contract Tender for Library Management System

Contract Tender for Library Management System Contract Tender for Library Management System AGENDA NO: Cabinet Date 4 th July 2012 Leader of the Council Key Decision Background Documents Location/Contact for inspection of Background Documents Main

More information

Fleet Management. A guide to saving money by rationalising your printing and copying resources. Prepared by. Nathan Taylor, IT Technical Writer

Fleet Management. A guide to saving money by rationalising your printing and copying resources. Prepared by. Nathan Taylor, IT Technical Writer Fleet Management A guide to saving money by rationalising your printing and copying resources Prepared by Nathan Taylor, IT Technical Writer Updated September 2008 Sponsored by White Paper Fleet Management

More information

SUBJECT: FRAMEWORK AGREEMENT FOR THE PROVISION OF VIDEO CONFERENCING EQUIPMENT

SUBJECT: FRAMEWORK AGREEMENT FOR THE PROVISION OF VIDEO CONFERENCING EQUIPMENT REPORT TO INDIVIDUAL CABINET MEMBER FOR FINANCE, LEGAL AND ICT 29 FEBRUARY Key Decision YES Forward Plan Ref No Corporate Priority ALL Cabinet Portfolio Holder: Date of Decision/ Referral to O&S Cllr David

More information

FRAMEWORK BRIEF. Document Management Services

FRAMEWORK BRIEF. Document Management Services FRAMEWORK BRIEF Document Management Services FRAMEWORK OVERVIEW HealthTrust Europe s (HTE) Document Management Services framework agreement offers a simple and compliant route to market for the procurement

More information

Page 97. Executive Head of Asset Planning, Management and Capital Delivery

Page 97. Executive Head of Asset Planning, Management and Capital Delivery Page 97 Agenda Item 7 Report to: Strategy and Resources Committee Date: 16 December 2013 Report of: Executive Head of Asset Planning, Management and Capital Delivery Ward Location: Not applicable Author

More information

Impartiality must be maintained in selecting suppliers to fulfil Council s requirements.

Impartiality must be maintained in selecting suppliers to fulfil Council s requirements. Title: Type: Council Adopted: 17 December 2014 File No: SF/491 TRIM Reference: 14/35410 Attachments: Guidelines (TRIM: 14/38862) 1. Purpose The purpose of this policy is to provide principles, processes

More information

Courtney Davis Head of Information Management. Public with separate exempt report

Courtney Davis Head of Information Management. Public with separate exempt report ACTION TAKEN UNDER DELEGATED POWERS BY OFFICER [19 June 2015] Title Report of Wards Status Enclosures Decision to award Off Site Document Management Services Contract under ESPO framework Courtney Davis

More information

POLICE AND CRIME COMMISSIONER FOR LANCASHIRE ALAN BROWN HEAD OF MANAGEMENT ACCOUNTS AUTOMATIC NUMBER PLATE RECOGNITION (ANPR)

POLICE AND CRIME COMMISSIONER FOR LANCASHIRE ALAN BROWN HEAD OF MANAGEMENT ACCOUNTS AUTOMATIC NUMBER PLATE RECOGNITION (ANPR) Decision No 2014/03 REPORT TO: REPORT BY: POLICE AND CRIME COMMISSIONER FOR LANCASHIRE ALAN BROWN HEAD OF MANAGEMENT ACCOUNTS DATE: 9 APRIL 2014 TITLE: AUTOMATIC NUMBER PLATE RECOGNITION (ANPR) EXECUTIVE

More information

Printing Acceptable Use Policy (ISP06)

Printing Acceptable Use Policy (ISP06) Printing Acceptable Use Policy (ISP06) 1 DOCUMENT CONTROL 3 1 INTRODUCTION 4 2 CORE PRINCIPLES 5 3 USE OF MULTI-FUNCTION DEVICES 5 4 MANAGEMENT OF DEVICES 8 5 PAYING FOR PRINTING AND COPYING 8 6 AUTHORISATION

More information

Decisions 1. Approve the Council entering into a new lease and a licence for alterations to provide additional parking at North London Business Park.

Decisions 1. Approve the Council entering into a new lease and a licence for alterations to provide additional parking at North London Business Park. ACTION TAKEN UNDER DELEGATED POWERS BY OFFICER 16 th September 2015 Title Approval of Additional Temporary Car Parking at NLBP Report of Chief Operating Officer Wards All Status Public Enclosures Agreed

More information

Councillor K Chambers Personnel & Business Support

Councillor K Chambers Personnel & Business Support Agenda item 18 Cabinet 4 February 2015 Tendering for replacement mobile phone contract Portfolio: Councillor K Chambers Personnel & Business Support Related portfolios: All Service: Wards: Key decision:

More information

Gravesham Borough Council. Report to Cabinet. Digital Performance Manager. Single Customer Contact Platform

Gravesham Borough Council. Report to Cabinet. Digital Performance Manager. Single Customer Contact Platform Classification: N/A Key Decision: No Gravesham Borough Council Report to: Report to Cabinet Date: 6 July 2015 Reporting officer: Subject: Digital Performance Manager Single Customer Contact Platform Purpose

More information

Guidance on Framework Agreements

Guidance on Framework Agreements 1. Introduction Guidance on Framework Agreements The purpose of this document is to provide guidance to public purchasers on the operation of framework agreements as provided for under current public procurement

More information

EXECUTIVE BURNLEY TOWN HALL

EXECUTIVE BURNLEY TOWN HALL EXECUTIVE BURNLEY TOWN HALL Tuesday, 20 th September 2011 PRESENT MEMBERS Councillors Charlie Briggs (in the Chair), Roger Frost, Peter McCann, Neil Mottershead, Jeff Sumner and Linda White. OFFICERS Steve

More information

REQUEST FOR MAYORAL DECISION MD405. Title: Disaster Recovery Services

REQUEST FOR MAYORAL DECISION MD405. Title: Disaster Recovery Services REQUEST FOR MAYORAL DECISION MD405 Title: Disaster Recovery Services Executive Summary: In May 2006, the GLA entered into an agreement with a recovery partner to offer immediate replacement IT equipment

More information

PRINT SERVICES BEST VALUE REVIEW

PRINT SERVICES BEST VALUE REVIEW Action Plan PRINT SERVICES BEST VALUE REVIEW Action Timetable Resource 1 Identify all expenditure by the Council on design and printing of publications, both internally and externally 2 Expand pre-press

More information

Community Academies Trust Leasing Policy

Community Academies Trust Leasing Policy Community Academies Trust Leasing Policy Page 1 of 6 1. Introduction Community Academies Trust (CAT) is committed to ensuring that its systems of financial governance conform to the requirements of both

More information

CONVENIENCE COPYING, PRINT MANAGEMENT AND DOCUMENT MANAGEMENT SERVICES

CONVENIENCE COPYING, PRINT MANAGEMENT AND DOCUMENT MANAGEMENT SERVICES 0 Metro Los Angeies County One Gateway Plaza 213.gz2.z000 Tel Metropolitan Transportation Authority Los Angeles, CA gooi2-zg~2 metro.net OPERATIONS COMMITTEE SEPTEMBER 16,2010 SUBJECT: ACTION: CONVENIENCE

More information

Decisions 1. Permission to tender for a recruitment partner to supply 15 permanent social work practitioners with a contract value of 159,000.

Decisions 1. Permission to tender for a recruitment partner to supply 15 permanent social work practitioners with a contract value of 159,000. ACTION TAKEN UNDER DELEGATED POWERS BY OFFICER 28 th October 2015 Title Report of Wards Status Recruitment of Children s Social Work Practitioners Nicola Francis, Family Services Director All Public Enclosures

More information

Standard Information Communications Technology. Multifunction Device. January 2013 Version 2.2. Department of Corporate and Information Services

Standard Information Communications Technology. Multifunction Device. January 2013 Version 2.2. Department of Corporate and Information Services Standard Information Communications Technology January 2013 Version 2.2 Corporate and Information Services Document details Document Title Contact details File name Version 2.2 Date issued January 2013

More information

The leasing company might retain responsibility for maintenance

The leasing company might retain responsibility for maintenance Understanding leasing When it comes to determining the most appropriate equipment leasing strategy for your school, understanding the main differences between a finance and an is essential. In both cases,

More information

NUCLEAR NEW BUILD IN WEST CUMBRIA NOMINATION CASE REQUEST TO SUPPORT PROJECT FINANCIAL MANAGEMENT

NUCLEAR NEW BUILD IN WEST CUMBRIA NOMINATION CASE REQUEST TO SUPPORT PROJECT FINANCIAL MANAGEMENT NUCLEAR NEW BUILD IN WEST CUMBRIA NOMINATION CASE REQUEST TO SUPPORT PROJECT FINANCIAL MANAGEMENT EXECUTIVE MEMBER: Leader, Councillor Elaine Woodburn LEAD OFFICER: Julie Crellin, Head of Finance and Information

More information

Procurement of Goods, Services and Works Policy

Procurement of Goods, Services and Works Policy Procurement of Goods, Services and Works Policy Policy CP083 Prepared Reviewed Approved Date Council Minute No. Procurement Unit SMT Council April 2016 2016/0074 Trim File: 18/02/01 To be reviewed: March

More information

How to Register to use the Staff Printer Network at any device on the network Monitor Embedded : Login & First Use

How to Register to use the Staff Printer Network at any device on the network Monitor Embedded : Login & First Use How to Register to use the Staff Printer Network at any device on the network Monitor Embedded : Login & First Use Touch your Swinburne Staff ID card on the card reader on the Fuji Xerox Device The card

More information

HERTSMERE BOROUGH COUNCIL EXECUTIVE. Urgency: The proposals are not exempt from call-in on PLANNING IMPROVEMENT PROGRAMME REPLACEMENT SOFTWARE

HERTSMERE BOROUGH COUNCIL EXECUTIVE. Urgency: The proposals are not exempt from call-in on PLANNING IMPROVEMENT PROGRAMME REPLACEMENT SOFTWARE HERTSMERE BOROUGH COUNCIL EXECUTIVE PART 1 Agenda Item No 8.1 Document Reference No EX/12/45 Date of Meeting / Decision: 7 November 2012 This is a key decision. the grounds of urgency. Urgency: The proposals

More information

ICT Digital Transformation Programme

ICT Digital Transformation Programme Officer and Date Item Cabinet 11 th May 2016 Public ICT Digital Transformation Programme Responsible Officer: Clive Wright, Chief Executive Email: Clive.wright@shropshire.gov.uk Tel: 01743 252007 1.0 Summary

More information

How To Manage A National Council Of Education And Care Service (Acecqa)

How To Manage A National Council Of Education And Care Service (Acecqa) Procurement Policy and Procedure Version 0.5 Document Version History Version No. Author Date Comment Draft V0.1 ACECQA 16 August 2011 Initial draft for Board V0.2 ACECQA 19 December 2011 Edited Draft

More information

TREASURER S DIRECTIONS ACCOUNTING LIABILITIES Section A3.6 : Leases

TREASURER S DIRECTIONS ACCOUNTING LIABILITIES Section A3.6 : Leases TREASURER S DIRECTIONS ACCOUNTING LIABILITIES Section A3.6 : Leases STATEMENT OF INTENT Assets required by Agencies to deliver outputs can be obtained by purchase or by lease. This Section provides the

More information

Software Licence Compliance. A guide to Software Asset Management in the Enterprise

Software Licence Compliance. A guide to Software Asset Management in the Enterprise Software Licence Compliance A guide to Software Asset Management in the Enterprise Prepared by the xassets Software Development Team Paul Lambert, 22 nd March 2004 Overview Software Asset Management (SAM)

More information

(2) That the contract runs from 1 April 2015 for an initial period of seven years. The value of the contract will be in the order of 10m per annum.

(2) That the contract runs from 1 April 2015 for an initial period of seven years. The value of the contract will be in the order of 10m per annum. Cabinet Member for Corporate Relations Redesign of Facilities Management Services April 2014 Report by Director Service Operations and Principal Manager Facilities Management Ref No: CR02(14/15) Key Decision:

More information

LSB Procurement Framework

LSB Procurement Framework LSB Procurement Framework Introduction Procurement covers the typical purchase of services, supplies and works required to enable project delivery and to manage the infrastructure. The Services Board (LSB)

More information

LONDON BOROUGH OF WALTHAM FOREST

LONDON BOROUGH OF WALTHAM FOREST LONDON BOROUGH OF WALTHAM FOREST Meeting / Date 22 nd June 2015 Report Title Cabinet Portfolio Report Author/ Contact details Wards affected Public Access Contract for the provision of Total Facilities

More information

Procurement of Insurance Cover and Claims Handling for Islington

Procurement of Insurance Cover and Claims Handling for Islington Finance Department 7 Newington Barrow Way London N7 7EP Report of: Executive Member for Finance Meeting of Date Agenda Item Ward(s) Executive 17 March 2011 D7 n/a Delete as appropriate Non-Exempt REASON

More information

Essex County Council. Architecture Excellence

Essex County Council. Architecture Excellence Essex County Council Architecture Excellence the customer overview Customer Essex County Council Website www.essex.gov.uk Number of employees Approx 9000 Country or region Essex, United Kingdom Industry

More information

WATFORD BOROUGH COUNCIL PROCUREMENT RECOMMENDATION SUBMITTED BY: TRICIA TAYLOR - CORPORATE DIRECTOR

WATFORD BOROUGH COUNCIL PROCUREMENT RECOMMENDATION SUBMITTED BY: TRICIA TAYLOR - CORPORATE DIRECTOR WATFORD BOROUGH COUNCIL PROCUREMENT RECOMMENDATION TO: CORPORATE MANAGEMENT BOARD SUBMITTED BY: TRICIA TAYLOR - CORPORATE DIRECTOR REQUIREMENT: INTEGRATED HR SYSTEMS WITH PAYROLL DATE: 11 November 2008

More information

Yes. Assurance. Yes. Section 1 Summary and Recommendations

Yes. Assurance. Yes. Section 1 Summary and Recommendations REPORT FOR: CABINET Date of Meeting: 13 February 2014 Subject: Key Decision: Buildings Insurance for Residential Leaseholders Yes Responsible Officer: Simon George, Director of Finance and Assurance Portfolio

More information

Council Tax Resolution 2015/16

Council Tax Resolution 2015/16 Civic Centre, Castle Street, CF47 8AN Main Tel: 01685 725000 www.merthyr.gov.uk FULL COUNCIL REPORT Date Written 4 th February 2015 Report Author Steve Jones Service Finance Exempt/Non Exempt Non Exempt

More information

Procurement Strategy for Business Critical software contract

Procurement Strategy for Business Critical software contract Key Decision Report of the Corporate Director of Finance and Resources Finance and Resources Digital Services Town Hall Islington N1 2UD Officer Key Decision Date:12/01/2016 Ward(s): All Delete as appropriate

More information

Technology Workstream. Overview for Managed Document Services Framework

Technology Workstream. Overview for Managed Document Services Framework Technology Workstream September 2013 Version Control Contributor(s) Date Version Comments Bal Kang 09/13 V1 Bal Kang 11/13 V2 Updated address and removed Kainos Contact Details Bal Kang Senior Category

More information

Corporate Procurement of the Council s Electricity and Gas Supplies

Corporate Procurement of the Council s Electricity and Gas Supplies POLICY & RESOURCES COMMITTEE Agenda Item 146 Brighton & Hove City Council Subject: Date of Meeting: 12 February 2015 Report of: Corporate Procurement of the Council s Electricity and Gas Supplies Interim

More information

CHESHIRE EAST COUNCIL

CHESHIRE EAST COUNCIL CHESHIRE EAST COUNCIL Cabinet Date of Meeting: 1 st April 2014 Report of: Chief Operating Officer Subject/Title: Total Facilities Management (Forward Plan Ref: CE 13/14-85) Portfolio Holder: Cllr Peter

More information

Business Improvement Programme Framework

Business Improvement Programme Framework Finance and Policy Committee Date: 11 March 2015 Item 19: Business Improvement Programme Framework This paper will be considered in public 1 Summary 1.1 The Transport for London Business Improvement Programme

More information

MAIDSTONE BOROUGH COUNCIL CABINET MEMBER FOR COMMUNITY SERVICES REPORT OF DIRECTOR OF RESOURCES AND PARTNERSHIPS

MAIDSTONE BOROUGH COUNCIL CABINET MEMBER FOR COMMUNITY SERVICES REPORT OF DIRECTOR OF RESOURCES AND PARTNERSHIPS MAIDSTONE BOROUGH COUNCIL CABINET MEMBER FOR COMMUNITY SERVICES REPORT OF DIRECTOR OF RESOURCES AND PARTNERSHIPS Report prepared by: Zena Cooke Date Issued: 8 October 2009 1. EQUITY RELEASE 1.1 Issue for

More information

Caerphilly County Borough Council. Workforce Planning Guidance. and Template

Caerphilly County Borough Council. Workforce Planning Guidance. and Template APPENDIX 1 Caerphilly County Borough Council Workforce Planning Guidance and Template May 2013 1 Content Description Page Number Part 1 Introduction 1.1 Introduction 1.2 What is Workforce Planning? 1.3

More information

County Councillor Stephens (Chairperson); County Councillors Berman, Derbyshire, Jones, Salway, Walker and Walsh. County Councillor Sheppard

County Councillor Stephens (Chairperson); County Councillors Berman, Derbyshire, Jones, Salway, Walker and Walsh. County Councillor Sheppard 1. EMPLOYMENT CONDITIONS COMMITTEE 19 JUNE 2007 Present: Apology: County Councillor Stephens (Chairperson); County Councillors Berman, Derbyshire, Jones, Salway, Walker and Walsh County Councillor Sheppard

More information

HERTSMERE BOROUGH COUNCIL REPORT TO EXECUTIVE

HERTSMERE BOROUGH COUNCIL REPORT TO EXECUTIVE HERTSMERE BOROUGH COUNCIL REPORT TO EXECUTIVE Item no: 8.4 Document Reference no: EX/12/20 Date of Meeting / Decision: This is not a key decision Urgency: The proposals are not exempt from call-in on the

More information

Options for the Council s Debit & Credit Card (Merchant Acquirer) Contract Not a Key Decision

Options for the Council s Debit & Credit Card (Merchant Acquirer) Contract Not a Key Decision Cambridge City Council Item To: Report by: Relevant scrutiny committee: Wards affected: Executive Councillor for Strategy: Councillor Julie Smith Julia Minns Strategy & Resources Scrutiny Committee All

More information

How to Procure a Payment Service Contract in Cambridge City

How to Procure a Payment Service Contract in Cambridge City Cambridge City Council Item To: Report by: Relevant scrutiny committee: Wards affected: Executive Councillor for Planning Policy and Transport: Councillor Kevin Blencowe Sean Cleary, Commercial Operations

More information

Printing Lease and Management software Advice for Schools

Printing Lease and Management software Advice for Schools Printing Lease and Management software Advice for Schools Printing Advice for Schools Due to issues that have arisen over the years with some schools leasing printers - One IT Services and Solutions thought

More information

MEMBERS CONSIDER THE RISK STRATEGY AND RECOMMEND APPROVAL TO COUNCIL.

MEMBERS CONSIDER THE RISK STRATEGY AND RECOMMEND APPROVAL TO COUNCIL. Agenda item: 8 Committee: Audit & Standards Committee Date of meeting: 19 th September 2011 Subject: Risk Management Strategy Lead Officer: Head of Finance Portfolio Holder: Resources - Councillor T Oliver

More information

Report Authorised by: Sue Foster, Strategic Director, Neighbourhoods and Growth

Report Authorised by: Sue Foster, Strategic Director, Neighbourhoods and Growth Officer delegated decision Decision Due: 25 November 2015 Extension to Existing Waiver for Hays Specialist Recruitment Wards: All Report Authorised by: Sue Foster, Strategic Director, Neighbourhoods and

More information

TEWKESBURY BOROUGH COUNCIL

TEWKESBURY BOROUGH COUNCIL TEWKESBURY BOROUGH COUNCIL Report to: Executive Committee Date of Meeting: 4 July 2012 Subject: Report of: Director: Lead Member: Number of Appendices: Replacement of the Council s Telephone System Tina

More information

DERBYSHIRE COUNTY COUNCIL. Cabinet. 28th November 2006. Report of the Deputy Chief Executive and Strategic Director Corporate Resources

DERBYSHIRE COUNTY COUNCIL. Cabinet. 28th November 2006. Report of the Deputy Chief Executive and Strategic Director Corporate Resources DERBYSHIRE COUNTY COUNCIL Cabinet 28th November 2006 Report of the Deputy Chief Executive and Strategic Director Corporate Resources County-wide PC Commissioning Unit (Strategic Policy and Budget) 1. PURPOSE

More information

Officer Delegated Decision Report - Procurement

Officer Delegated Decision Report - Procurement G atew a y T h r ee Officer Delegated Decision Report - Procurement Decision report for contract awards valued at 100,000 and greater and all waivers valued at 25,000 and greater ICT Virtual Desktop (Citrix)

More information

1.1 Approve the proposals for the roll-out of the new telephone system as set out in this report.

1.1 Approve the proposals for the roll-out of the new telephone system as set out in this report. APPENDIX L Agenda Item No. 13 REPLACEMENT OF TELEPHONE SYSTEM Councillor Cartwright Leader of the Council 1.0 Purpose The purpose of this paper is to recommend the progressive roll-out of new telephone

More information

2.0 RECOMMENDATIONS Members of the Committee are asked to note the information contained within this report.

2.0 RECOMMENDATIONS Members of the Committee are asked to note the information contained within this report. REPORT TO: SCRUTINY COMMITTEE 25 JUNE 2013 REPORT ON: REPORT BY: INTERNAL AUDIT REPORTS CHIEF INTERNAL AUDITOR REPORT NO: 280-2013 1.0 PURPOSE OF REPORT To submit to Members of the Scrutiny Committee a

More information

Councillors Nick Emmerson, Neil Garratt, Nighat Piracha, Marian Radford, Tony Shields

Councillors Nick Emmerson, Neil Garratt, Nighat Piracha, Marian Radford, Tony Shields LONDON BOROUGH OF SUTTON STRATEGY AND RESOURCES COMMITTEE MONDAY, 15TH DECEMBER, 2014 Second Dispatch efg 7.30 pm at the Civic Offices, St Nicholas Way, Sutton SM1 1EA To all members of the Strategy and

More information

Debt Management Strategy Cabinet Member for Resources and Performance

Debt Management Strategy Cabinet Member for Resources and Performance AGENDA ITEM: 10 Pages nos. 197-213 Meeting Cabinet Resources Committee Date 16 January 2012 Subject Report of Summary Officer Contributors Status (public or exempt) Wards affected Enclosures For decision

More information

Implementing the Scottish Government s einvoicing Solution at West Lothian Council - Case Study

Implementing the Scottish Government s einvoicing Solution at West Lothian Council - Case Study Implementing the Scottish Government s einvoicing Solution at West Lothian Council - Case Study Background Whilst einvoicing has been implemented by some public sector bodies across Scotland, it has been

More information

Purchasing and Managing Software Licences

Purchasing and Managing Software Licences Purchasing and Managing Software Licences REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 579 Session 2002-2003: 1 May 2003 LONDON: The Stationery Office 8.25 Ordered by the House of Commons to be printed

More information

Procurement and Contract Management Strategy 2013-2017

Procurement and Contract Management Strategy 2013-2017 Procurement and Contract Management Strategy 2013-2017 Title Owner Version 1 Distribution Procurement and Contract Management Strategy 2013 2017 Procurement and Performance Manager Corporate Issue date

More information

Section 1 Summary and Recommendations

Section 1 Summary and Recommendations REPORT FOR: CABINET Date of Meeting: 10 December 2015 Subject: Key Decision: Responsible Officer: Portfolio Holder: Exempt: Decision subject to Call-in: Wards affected: Homes for Harrow: Building homes

More information

Page 69. Sutton Living Business Plan and Loan Agreement. Mary Morrissey, Strategic Director of Environment, Housing and Regeneration

Page 69. Sutton Living Business Plan and Loan Agreement. Mary Morrissey, Strategic Director of Environment, Housing and Regeneration Page 69 Agenda Item 5b Report to: Opportunity Sutton Limited Sub- Committee Date: 4 August 2015 Report title: Report from: Ward/Areas affected: Chair of Committee/Lead Member: Author(s)/Contact Number(s):

More information

CABINET. 24 April 2012. Title: Term Contract for Maintenance, Repair and Minor Works on Security and Protection Systems

CABINET. 24 April 2012. Title: Term Contract for Maintenance, Repair and Minor Works on Security and Protection Systems CABINET 24 April 2012 Title: Term Contract for Maintenance, Repair and Minor Works on Security and Protection Systems Report of the Cabinet Member for Finance and Education Open Report Wards Affected:

More information

Service excellence and Managed Print Services

Service excellence and Managed Print Services Ensuring service quality through strong governance May 2012 With so many printer companies having jumped on the managed print services bandwagon, 2012 will see this buzz continue as more organisations

More information

CORPORATE PROCUREMENT POLICY

CORPORATE PROCUREMENT POLICY DOCUMENT OF THE EUROPEAN BANK FOR RECONSTRUCTION AND DEVELOPMENT CORPORATE PROCUREMENT POLICY As approved by the Board of Directors at its meeting of 29 January 2014 CORPORATE PROCUREMENT POLICY TABLE

More information

CABINET. 21 October 2014. Accountable Divisional Director: Glynis Rogers, Divisional Director of Commissioning and Partnerships

CABINET. 21 October 2014. Accountable Divisional Director: Glynis Rogers, Divisional Director of Commissioning and Partnerships CABINET 21 October 2014 Title: Re-tender of Translating and Interpreting Services Report of the Leader of the Council Open Report Wards Affected: All Report Author: Mark Tyson, Group Manager, Integration

More information

DECISION BOOK. The decision book is open to public inspection at the Civic Offices between 9.00 am and 5.00 pm, Mondays to Fridays.

DECISION BOOK. The decision book is open to public inspection at the Civic Offices between 9.00 am and 5.00 pm, Mondays to Fridays. DECISION BOOK Issue: 451 Date: 2 May 2014 Decisions set out in the book have been made under delegated powers by the Managing Director, Corporate Directors or the Chief Finance Officer and Monitoring Officer,

More information

PROCUREMENT & LOGISTICS DEPARTMENT

PROCUREMENT & LOGISTICS DEPARTMENT PROCUREMENT & LOGISTICS DEPARTMENT Tender/OJEU Procedure Overview This procedure applies to all purchases over 50,000 not covered by existing contracts and should be followed in conjunction with the Tender/OJEU

More information