CHESHIRE EAST COUNCIL
|
|
- Lorena Copeland
- 3 years ago
- Views:
Transcription
1 CHESHIRE EAST COUNCIL Cabinet Date of Meeting: 1 st April 2014 Report of: Chief Operating Officer Subject/Title: Total Facilities Management (Forward Plan Ref: CE 13/14-85) Portfolio Holder: Cllr Peter Raynes, Finance 1.0 Report Summary 1.1 Cheshire East Council has a land and property portfolio worth over 600m; and a net operational property budget of 14,638, Under Major Change Project 7.5 Asset Major Change, the Council will be considering options for the future delivery of all property-related services building on the achievement of the Corporate Landlord model and the formation of the Development Company. 1.3 A number of facilities management contracts, which ensure buildings can continue to operate, are due to expire within the next 12 months. In order to ensure continuity of service it will be necessary to publish a contract notice in the OJEU (Official Journal of the European Union) for such works. 1.4 Linked to the wider project, this report deals with mechanisms that must be put in place to ensure that effective service delivery is maintained during this transformation process, with particular focus on Facilities Management, and to consider all options. Options considered, which can be seen in more detail later in this report, include:- - Continue on an as is basis, with individual contracts in place for each facilities management service - Increase the number of suppliers by putting in place a framework with multiple suppliers on the various lots to give SMEs the opportunity of tendering - Reduce the number of contracts, by tendering integrated/bundled packages of work where there are clear synergies - Enter into one Total Facilities Management contract - Utilise the supply chain of the Stockport Strategic Property Partnership, if possible
2 1.5 The current arrangements for the delivery of facilities management services are through a variety of contracts, the largest being the response and cyclical maintenance contract. This contract expires on the 31 March 2015 and cannot be extended within EU Procurement Rules. 1.6 As a legacy of pre-corporate landlord delivery models, and in order to ensure compliance with the Council s financial and procurement regulations, a number of contracts are in place, many of which coincide, with end dates on or around 31 March The transformation process mentioned in paragraph 1.2 and its implementation could extend beyond the March 2015 expiry date mentioned in paragraphs 1.4 and 1.5 and it is essential that a mechanism is in place to enable the Council to continue to effectively deliver facilities management services. 1.8 The value of the services required means that the following contracts would be subject to EU Procurement Rules, requiring a contract notice to be published in the OJEU (Official Journal of the European Union), such notice would be required early in April 2014 in order to be able to reprocure before the expiry date of the current contracts:- - Response and Cyclical Maintenance - Re-roofing and Refenestration - Security - Waste Management - Asbestos Management - Legionella Management 1.9 All these contracts, together with services currently undertaken internally, could be either procured as lots by merging together various elements, or as a Total Facilities Management Contract. All potential services for inclusion in such a contract can be seen in Appendix Cabinet approval was given in December 2013 to further investigate the Strategic Property Partnership between Stockport Metropolitan Borough Council, Carillion and CBRE ( SSPP ) to identify whether there is potential for Cheshire East Council to utilise this Contract, either at Partnership or Supply-Chain level. The investigation into this is continuing as the Partnership establishes it s Supply Chain. This will continue at the same time as initiating the OJEU procurement process outlined in paragraph 1.7. This will keep the Council s options open whilst also protecting its position by ensuring that a mechanism for facilities management services can be in place when the current arrangement expires. 2.0 Recommendations 2.1 That
3 2.2 Approval be given to publish a contract notice in the OJEU (Official Journal of the European Union). 2.3 Approval be given to the establishment of Facilities Management contracts or a Total Facilities Contract, should this be the most cost effective route following the tender process. 2.4 Delegated authority be awarded to the Chief Operating Officer, in consultation with the Portfolio Holder for Finance and Assets, to award contracts to providers meeting the requirements of the Contract/s. 2.5 Delegated authority be awarded to the Chief Operating Officer, in consultation with the Portfolio Holder for Finance and Assets, to abort the procurement, should the need for the Contract no longer be required. 2.6 Delegated authority be awarded to the Chief Operating Officer, in consultation with the Portfolio Holder for Finance and Assets, to utilise the Stockport Strategic Property Partnership on the basis of recommendations from Assets, Finance, Procurement and Legal Services. 3.0 Reasons for Recommendations 3.1 To ensure that the council examines options for alternative delivery models for asset-related services, whilst maintaining the short-term ability to secure value for money in the procurement and delivery of facilities management services. 3.2 To ensure that the commissioning of facilities management services complies with the Public Contracts Regulations 2006 and the Council s Finance and Contract Procedure Rules. 3.3 To explore all options for securing value for money in the delivery of facilities management services. 4.0 Wards Affected 4.1 All 5.0 Local Ward Members 5.1 All 6.0 Policy Implications 6.1 The recommendations in this report support the delivery of the council s priorities by ensuring that key compliant mechanisms are in place to enable the controlled delivery of facilities management services.
4 7.0 Financial Implications 7.1 The recommendations within this report support the delivery of facilities management services and ensure that the Contractor selected for the delivery of such services satisfies the requirements of the Council s Financial Rules and comply with EU requirements. 7.2 The proposed OJEU procurement process will be undertaken by Facilities Management officers supported by Procurement and Legal Services colleagues, therefore there are no external costs for this procurement. Significant officer time will not be required until August - Octoberat which time it should be apparent whether the Stockport option is beneficial. These procurement costs and the costs of accessing any other alternative contracts/frameworks will be taken into account in deciding whether to abandon this procurement in favour of other options, e.g., the Stockport Strategic Property Partnership. 8.0 Legal Implications 8.1 The current contracts for facilities management services are due to expire in March 2015 and cannot be extended further. Once the preferred options is known the service will need to ensure that any new contracts are procured in accordance with the Public Contracts Regulations 2006 ( the Regulations ) and the Council s Finance and Contract Procedure Rules 8.2 The Facilities Management Service will be advised and will need to engage with Legal Services to ensure that the Council s duties under the Public Services Social Value Act, as it applies to contracts, are fulfilled. The Act requires the Council to: consider how what is proposed to be procured might improve the social economic and environmental well-being of the relevant area how in conducting a procurement process it may act with a view to securing that improvement 9.0 Risk Management 9.1 A failure to establish a contact/s for facilities management services through which these services can be provided will mean that each contract for each area of the service will need to be tendered individually. This is prohibitive both in terms of time and cost Background and Options 10.1 As part of the its business planning for 2014/15, the Council will be considering options for the future delivery of all asset-related services, building on the achievement of the Corporate Landlord model and the formation of the Development Company. These options will be outlined
5 in a future report to Cabinet and will take into account the imperatives with public sector reform and the objectives of Cheshire East Council to make better use of our operational and non-operational property portfolio It is envisaged that the full implementation of this piece of work to review strategic and operational asset management will continue throughout 2014/15 and possibly 2015/16 and will therefore require the maintenance of Business as Usual processes and procedures in the short-medium term, whilst ensuring that options for future major change are not compromised The delivery of both hard and soft facilities management has historically been provided through both internal and external resources. Such services include, but are not limited to: Facilities Management In House External Hard & Soft FM planning & contract/framework management Property Helpdesk Maintenance Surveyors / property liaison Property Compliance asbestos and legionella monitoring Property Compliance Fire risk assessments, access audits Energy Management Carbon Management / strategy Planned cyclical and responsive maintenance works Reroofing & refenestration works Cleaning Services Security Services Mailroom Solutions Waste Management Washroom Services Window Cleaning Janatorial Services Room booking/building management Office accommodation strategy Space/utilisation planning Move management delivery 10.4 The largest of the contracts currently in place is the response and cyclical maintenance element, which covers both the operational and nonoperational estate. This is a four year framework, which expires on 31 March 2015, with no option to extend As a result of the Corporate Landlord project, the Asset Management Service inherited a variety of contracts, many of which were non-
6 compliant. In order to rationalise the number of contracts, procurement exercises have taken place to ensure that the Council meets its financial and procurement regulations, whilst making savings through the new procurement route. Where possible, these contracts have been entered into with an end date to match that of the response and cyclical maintenance contract, enabling the Council to move towards a Total Facilities Management approach, should this be the desired route Approximately 3.3m per year is spent externally on facilities management services, which excludes any planned maintenance such as boiler replacement, reroofing and refenestration. Contract end dates and values can be seen in Appendix 3 attached A range of options for procuring facilities management services have been considered including: Option 1 Maintain the status quo and re-procure each contract/framework separately Option 2 - Increase the number of contracts by putting in place a preferred contractors list focussing, as far as is practicable, on local businesses Option 3 Creation and procurement of integrated/bundled work packages (see Appendix 2) Option 4 - Procure a single Total Facilities Management contract Option 5 - Enter into access agreements for existing frameworks, e.g. GPS Frameworks, Stockport Strategic Property Partnership (SSPP), etc Cabinet approval was given in December 2013 to further investigate the Strategic Property Partnership between Stockport Metropolitan Borough Council, Carillion and CBRE to identify whether there is potential for Cheshire East Council to utilise this Contract, either at Partnership or Supply-Chain level Whilst acknowledging the work that is taking place to consider a future operating for the whole of the previous Asset Management Service, and in the event that it is not possible to enter into the SSPP, it has been concluded an EU Procurement process should be undertaken. This will continue at the same time as initiating the OJEU procurement process to ensure business continuity. This will keep the Council s options open whilst also protecting its position by ensuring that a mechanism for facilities management services can be in place when the current arrangement expires Having examined the options in 3, it has been concluded that the preferred option involve a tender process which should identify integrated/bundled lots, with bidders being given the opportunity to offer a Total Facilities Management solution, if this demonstrates added cost and efficiency benefits.
7 10.11 It will be necessary to publish a contract notice in the OJEU (Official Journal of the European Union) in early April 2014 to ensure that the new arrangements are in place when the existing contracts expire, and allowing for a period of mobilisation Tender documentation would indicate a requirement that a local workforce should be considered and would include provision for Town and Parish Councils, wholly owned companies of the Council, schools, Academies and other community groups to access the Councils Framework on a direct relationship basis The option analysis process for facilities management identified that there is an opportunity to access existing frameworks, as follows: Fusion 21 facilities Management framework Lot 11 Total FM Fusion 21 is a Liverpool based company who specialise in Social Housing and Local Authority Procurement Services GPS Facilities management framework Lot 2 Total FM Due to be in place Jan/Feb 2015 (high risk if delayed - potentially insufficient mobilisation period The Stockport Partnership is currently in mobilisation stage and did not have supply-chains in place until February Whilst it is too early to be sure, it seems that this Partnership may have potential benefits for Cheshire East Council for a wide range of asset-related services, subject to Legal Services being satisfied that the Council can access this contract Further investigation would be needed to identify whether the Stockport Partnership would be able to be fully accessed by the Cheshire East Council s Alternative Service Delivery Vehicles as they were not specifically named in the procurement process. It is therefore recommended that the Stockport Strategic Property Partnership is further explored by officers with due diligence undertaken and service delivery options explored at the same time as initiating the OJEU procurement process previously outlined. This will protect the Council s interests by ensuring that a mechanism for commissioning total facilities management services can be in place when the current arrangements expire Access to Information The background papers relating to this report can be inspected by contacting the report writer: Name: Denise Griffiths Designation: Facilties Manager Tel No:
CABINET. 24 March 2015
CABINET 24 March 2015 Title: Procurement of Electricity and Gas Supplies Report of the Cabinet Member for Finance Open Report with Exempt Appendix 4 Wards Affected: All Report Author: Andrew Sivess Group
London Borough of Bromley COMMISSIONING - PROPOSED TOTAL FACILITY MANAGEMENT CONTRACT
Report No. DRR14/089 London Borough of Bromley PART 1 - PUBLIC Decision Maker: Executive Date: 15 th October 2014 Decision Type: Non-Urgent Executive Key Title: COMMISSIONING - PROPOSED TOTAL FACILITY
LONDON BOROUGH OF WALTHAM FOREST
LONDON BOROUGH OF WALTHAM FOREST Meeting / Date 22 nd June 2015 Report Title Cabinet Portfolio Report Author/ Contact details Wards affected Public Access Contract for the provision of Total Facilities
CHESHIRE EAST COUNCIL
CHESHIRE EAST COUNCIL Cabinet Date of Meeting: 9 th December 2014 Report of: Director of Economic Growth and Prosperity Subject/Title: Vulnerable and Older Persons Handyperson Service (Ref CE 14/15-34)
Regeneration Development Partner Agreement (081002/CAB020)
15-1 Item No. 15 Regeneration Development Partner Agreement () To: Cabinet 2 October 2008 Main Portfolio Area: Planning & Development Author of report: Classification: Ward: David Candlin Non-Exempt (with
CABINET. 18 December 2013
CABINET 18 December 2013 Title: Procurement of Various Supplies and Service Contracts Report of the Cabinet Member for Finance Open Report Wards Affected: None Report Author: Martin Storrs, Head of Procurement
LONDON BOROUGH OF WALTHAM FOREST
LONDON BOROUGH OF WALTHAM FOREST Meeting / Date Cabinet /December 2015 Report Title Cabinet Portfolio Report Author/ Contact details Wards affected Public Access Appendices ICT Data Centre & Infrastructure
Page 97. Executive Head of Asset Planning, Management and Capital Delivery
Page 97 Agenda Item 7 Report to: Strategy and Resources Committee Date: 16 December 2013 Report of: Executive Head of Asset Planning, Management and Capital Delivery Ward Location: Not applicable Author
MS DENISE LE GAL, CABINET MEMBER FOR BUSINESS SERVICES AND RESIDENT EXPERIENCE JULIE FISHER STRATEGIC DIRECTOR FOR BUSINESS SERVICES
Item SURREY COUNTY COUNCIL CABINET DATE: 22 SEPTEMBER 2015 REPORT OF: LEAD OFFICER: SUBJECT: MS DENISE LE GAL, CABINET MEMBER FOR BUSINESS SERVICES AND RESIDENT EXPERIENCE JULIE FISHER STRATEGIC DIRECTOR
SUBJECT: FRAMEWORK AGREEMENT FOR THE PROVISION OF VIDEO CONFERENCING EQUIPMENT
REPORT TO INDIVIDUAL CABINET MEMBER FOR FINANCE, LEGAL AND ICT 29 FEBRUARY Key Decision YES Forward Plan Ref No Corporate Priority ALL Cabinet Portfolio Holder: Date of Decision/ Referral to O&S Cllr David
Decisions 1. Approve the Council entering into a new lease and a licence for alterations to provide additional parking at North London Business Park.
ACTION TAKEN UNDER DELEGATED POWERS BY OFFICER 16 th September 2015 Title Approval of Additional Temporary Car Parking at NLBP Report of Chief Operating Officer Wards All Status Public Enclosures Agreed
(Cabinet 10 December 2014) The supply of Hard Facilities Management (Hard FM) maintenance services to the County Council estate
Somerset County Council Cabinet 10 th December 2014 (Cabinet 10 December 2014) Paper H Item No. 11 The supply of Hard Facilities Management (Hard FM) maintenance services to the County Council estate Cabinet
Procurement Strategy. Homes for Haringey
Procurement Strategy Homes for Haringey 2010-2015 Achieving value for money should always be a priority for government, and it is never a finished process. Challenging economic circumstances impact directly
Cab.1 7.7.2013/6.2 BARNSLEY METROPOLITAN BOROUGH COUNCIL. This matter is a key decision within the Council s definition and has been
included in the relevant Forward Plan. Report of the Assistant Chief Barnsley LIFT Centres Soft Services Facilities Management This matter is a key decision within the Council s definition and has been
Procurement of Insurance Cover and Claims Handling for Islington
Finance Department 7 Newington Barrow Way London N7 7EP Report of: Executive Member for Finance Meeting of Date Agenda Item Ward(s) Executive 17 March 2011 D7 n/a Delete as appropriate Non-Exempt REASON
Estates and Facilities Management. Director of Estates and Facilities Management. Professional Services Job Level 7. Chief Financial Officer
Post Details Last Updated: 19/05/2015 Faculty/Administrative/Service Department Estates and Facilities Management Job Title Job Family Responsible to Responsible for (Staff) Director of Estates and Facilities
LONDON BOROUGH OF WALTHAM FOREST
LONDON BOROUGH OF WALTHAM FOREST Meeting / Date Cabinet 13 th November 2012 Agenda Item 10 Report Title Cabinet Portfolio Report Author/ Contact details Wards affected Public Access Appendices OneSAP ERP
Yes. Assurance. Yes. Section 1 Summary and Recommendations
REPORT FOR: CABINET Date of Meeting: 13 February 2014 Subject: Key Decision: Buildings Insurance for Residential Leaseholders Yes Responsible Officer: Simon George, Director of Finance and Assurance Portfolio
INIVTATION TO TENDER - DOCUMENT BACK SCANNING SERVICE (REF:CU2410)
Wards Affected: All Wards ITEM 10 CABINET PROCUREMENT COMMITTEE 4 MARCH 2014 INIVTATION TO TENDER - DOCUMENT BACK SCANNING SERVICE (REF:CU2410) Authors: P Wheeler - Head of IT Strategic Development Tel:
(2) That the contract runs from 1 April 2015 for an initial period of seven years. The value of the contract will be in the order of 10m per annum.
Cabinet Member for Corporate Relations Redesign of Facilities Management Services April 2014 Report by Director Service Operations and Principal Manager Facilities Management Ref No: CR02(14/15) Key Decision:
How to do Business with the London. Borough of Sutton
How to do Business with the London Borough of Sutton February 2013 1 About this guide This guide has been developed to assist businesses wishing to sell their goods and services to the Borough. Contents
A guide on how to do business with Stockport NHS Foundation Trust. Procurement Buying In to Buying Locally
A guide on how to do business with Stockport NHS Foundation Trust Procurement Buying In to Buying Locally Contents Page Introduction 3 Aim of the guide 4 Corporate Citizenship more than a hospital 4 The
Health and Wellbeing Board
Health and Wellbeing Board Date of Meeting: 26 January 2016 Report of: Subject/Title: Portfolio Holder: Caroline Simpson. Executive Director of Economic Growth & Prosperity. Key Worker Accommodation: Gathering
AWARD OF CONTRACT MAINTENANCE AND UPGRADE OF THE HIGHWAYS ASSET MANAGEMENT SYSTEM (REF: CU2373)
Wards Affected: All Wards ITEM 9 CABINET PROCUREMENT COMMITTEE 5 AUGUST 2014 AWARD OF CONTRACT MAINTENANCE AND UPGRADE OF THE HIGHWAYS ASSET MANAGEMENT SYSTEM (REF: CU2373) Author: Rachael Kingsley, Head
EXEMPT INFORMATION REPORT NO: 83/2015 Appendix 1 (See Paragraph 11) CABINET. 21 st April 2015. Social Care Case Management System
EXEMPT INFORMATION REPORT NO: 83/2015 Appendix 1 (See Paragraph 11) CABINET 21 st April 2015 Social Care Case Management System Report of the Director for People STRATEGIC AIM: Creating a Safer Community
CABINET. 19 January 2016. Accountable Divisional Director: Martin Rayson, Divisional Director for Human Resources and Organisational Development
CABINET 19 January 2016 Title: Oracle R12 - Proposal to Extend Contract for Hosting and Support Report of the Cabinet Member for Finance and Central Services Open Report Wards Affected: None Report Author:
(1) That the merger of management of the County Council s vehicle fleets is agreed.
Cabinet Member for Finance Fleet Management Restructure and Vehicle Maintenance Framework Procurement January 2016 Report by Executive Director Communities and Public Protection and Director of Operations
Procurement strategy for communal heating maintenance and responsive repairs including out of hours cover
Housing and Adult Social Services 7 Newington Barrow Way, London N7 7EP Report of: Executive Member for Housing and Development Meeting of: Date Ward(s) Executive 21 May 2015 All Delete as appropriate
Date: 26/01/2004. MEETING NAME Executive Delegation of award of energy supply contracts
Item No. Classification: Open Report title: Ward(s) or groups affected: From: Date: 26/01/2004 MEETING NAME Executive Delegation of award of energy supply contracts ALL Assistant Chief Executive Strategy
Agreement for the provision of IT Management Services and IT Services
Board Date: 26 March 2015 Item 16: Agreement for the provision of IT Management Services and IT Services This paper will be considered in public 1 Summary 1.1 This paper asks the Board to approve extended
Housing and Communities Overview & Scrutiny Committee
AGENDA ITEM: 7 SUMMARY Report for: Date of meeting: 14 th September 2011 PART: 1 Housing and Communities Overview & Scrutiny Committee If Part II, reason: Sensitive commercial questions Title of report:
ACTION TAKEN UNDER DELEGATED POWERS BY OFFICER 26 September 2016
ACTION TAKEN UNDER DELEGATED POWERS BY OFFICER 26 September 2016 Title Award of Contract for Strategic Construction Partner contract ref 701462 to John Graham Construction Ltd. Report of Interim Chief
Section 8 - Procurement Procedure Rules (The Council s rules for procuring works, supplies or services)
Section 8 - Procurement Procedure Rules (The Council s rules for procuring works, supplies or services) Section Description Page 1 Introduction and Scope 101 Interpretation and Definitions 101 Exemptions
Sustainable Supply Chain Policy
Sustainable Supply Chain Policy 1. Contents Page 2. Introduction & Purpose 1 3. Definitions 1 4. Benefits of a Sustainable approach to the Supply Chain 2 5. Operational Context 2 6. Elements & Principles
Governance of the Business Transformation Partnership Responsible Officer: Executive Director (Business Development)
Meeting: Cabinet Date: 6 October 2005 Subject: Governance of the Business Transformation Partnership Responsible Officer: Executive Director (Business Development) Contact Officer: Portfolio Holder: Key
Gosport Borough Council. Procurement Strategy. Pursuit of Excellence
Gosport Borough Council Procurement Strategy Delivering for Gosport Pursuit of Excellence Contents Page 1 Introduction to Gosport Borough Council s 2 Procurement Strategy 2 Strategic framework 3 3 Procurement
Cabinet Decision (Supplementary Report to the Contracts Forward Plan Q1 Report )
Cabinet Decision (Supplementary Report to the Contracts Forward Plan Q1 Report ) 5 th April 2016 Report of: Zena Cooke, Corporate Director of Resources Classification: [Unrestricted] Procurement Strategy
Sandwell and West Birmingham Hospitals NHS Trust Midland Metropolitan Hospital Project. Outline Business Case. Appendix 10a Soft FM Services Review
Sandwell and West Birmingham Hospitals NHS Trust Midland Metropolitan Hospital Project Outline Business Case Appendix 10a Soft FM Services Review SANDWELL AND WEST BIRMINGHAM HOSPITALS NHS TRUST PFI PROJECT
Property Management Service Level Agreement
Property Management Service Level Agreement 2014 comms:3292 www.lancashire.gov.uk 2 Contents 3 Welcome Mission Statement 4 Customer Charter 5 Introduction 6 Responsibilities and Choices 7 Service Level
Gary Cooke, Cabinet Member for Corporate and Democratic Services. Rebecca Spore, Director of Infrastructure
From: Gary Cooke, Cabinet Member for Corporate and Democratic Services Rebecca Spore, Director of Infrastructure To: Subject: Classification: The Policy and Resources Cabinet Committee Total Facilities
REPORT 4 FOR DECISION. This report will be considered in public
REPORT 4 Subject: Safety Readiness for the Summer 2013 Events Programme Agenda item: Public Item 7 Report No: 4 Meeting date: 28 May 2013 Report to: Board Report of: Mark Camley, Interim Executive Director
Managed Service Contracts for Housing Benefits Data Entry and Revenues Bill Printing Services
Ref PHD 043-10 SUBJECT: Responsible Officer: Portfolio Holder: Key Decision: Managed Service Contracts for Housing Benefits Data Entry and Revenues Bill Printing Services Julie Alderson (Interim Director
JOB DESCRIPTION. TITLE: Corporate Property Manager SALARY RANGE: 55,000-70,000
TITLE: Corporate Property Manager SALARY RANGE: 55,000-70,000 JOB DESCRIPTION DEPARTMENT: Property Management Services REGION: North East / North West / Midlands / London / South ACCOUNTABILITIES: The
Version Author Revisions Made Date 1.6 David Sharkey Executive Board 27 March 2012 2.0 Robin Hunt
Purchasing Policy Originator name: Section / Dept: Implementation date: Date of next review: Related policies: Policy history: Robin Hunt Procurement 1 December 2013 Finance Regulations, Purchase Card
Corporate Procurement Strategy
Corporate Procurement Strategy 2012-2016 Created: October 2012 Version: 04 Page 1 of 13 Contents 1. Introduction... 3 1.1 Definition... 3 1.2 Purpose... 3 1.3 Aims and objectives... 3 2. Procurement at
NUNEATON & BEDWORTH BOROUGH COUNCIL
NUNEATON & BEDWORTH BOROUGH COUNCIL PROCUREMENT STRATEGY 2012 2016 Both the Gershon Efficiency Review (2004) and the Roots Review (2009) highlighted the fundamental role Procurement plays in achieving
SUBJECT: REPLACEMENT OF CORPORATE ELECTRONIC DATA STORAGE, BACKUP AND DISASTER RECOVERY SOLUTIONS
REPORT TO CABINET TO BE HELD ON 15 SEPTEMBER 2015 Key Decision No Forward Plan Ref No 23K Corporate Priority The proposals in this report contribute to the delivery of all the Council s priorities Cabinet
Cabinet Member Finance and Resources. Procurement of Electricity and Gas Supplies
Cabinet Member Finance and Resources Procurement of Electricity and Gas Supplies Report by Executive Director Customers and Change Ref No. FR07(11/12) Key Decision Yes Part I Electoral Division N/A Executive
Supplier & Contract Management System (SCMS)
Meeting of the Executive Member for Corporate Services and Advisory Panel 30 October 2007 Report of the Assistant Director Audit and Risk Management Supplier & Contract Management System (SCMS) Summary
1486 SUBJECT: Acceptance of Quotation from UK Power Networks to upgrade the electrical supply to QE Girls School Control sheet
DELEGATED POWERS REPORT NO. 1486 SUBJECT: Acceptance of Quotation from UK Power Networks to upgrade the electrical supply to QE Girls School Control sheet All of the following actions MUST be completed
Draft guidelines and measures to improve ICT procurement. Survey results
Draft guidelines and measures to improve ICT procurement Survey results Europe Economics Chancery House 53-64 Chancery Lane London WC2A 1QU Tel: (+44) (0) 20 7831 4717 Fax: (+44) (0) 20 7831 4515 www.europe-economics.com
MANAGEMENT AND OPERATION OF HARLOW ENTERPRISE HUB JANE GREER, HEAD OF COMMUNITY WELLBEING (01279)
REPORT TO: CABINET DATE: 21 JULY 2016 TITLE: PORTFOLIO HOLDER: LEAD OFFICER: CONTRIBUTING OFFICERS: MANAGEMENT AND OPERATION OF HARLOW ENTERPRISE HUB COUNCILLOR TONY DURCAN JANE GREER, HEAD OF COMMUNITY
Ian Parry, Deputy Leader and Cabinet Member for Strategy, Finance and Corporate Issues said,
Cabinet Meeting on Wednesday 16 December 2015 Support Services Service and System Replacement Ian Parry, Deputy Leader and Cabinet Member for Strategy, Finance and Corporate Issues said, As a well-run
Date: 28 August Gateway 2 - Contract Award Approval Piling and associated Works at Wilkinson House Camberwell and Peckham
Item No. Classification: Open Date: 28 August Meeting Name: Strategic Director of Children s and Adults Services Report title: Ward(s) or groups affected: From: Gateway 2 - Contract Award Approval Piling
Procurement Strategy for Cleaning Janitorial Supplies
Finance and Resources 7 Newington Barrow Way London N7 7EP Report of: Executive Member for Finance and Performance Meeting of: Date Ward(s) Executive 21 May 2015 All Delete as appropriate Non-exempt SUBJECT:
DERWENTSIDE HOMES JOB DESCRIPTION AND PERSONAL SPECIFICATION MAINTENANCE SURVEYOR. Operational Teams within the Repairs and Maintenance section.
DERWENTSIDE HOMES JOB DESCRIPTION AND PERSONAL SPECIFICATION MAINTENANCE SURVEYOR Responsible to: Responsible for: Overall Purpose: Building Surveyor Operational Teams within the Repairs and Maintenance
Cabinet Member for Business, Skills and Housing. Title: Purchase of Communal Electricity and Gas 2014/15
Decision Maker: Cabinet Member for Business, Skills and Housing Date: 13 January 2014 Classification: General Release Title: Purchase of Communal Electricity and Gas 2014/15 Wards Affected: Better City,
JOINT PROCUREMENT STRATEGY
JOINT PROCUREMENT STRATEGY 2012-2016 Contents Foreword... 3 Introduction... 4 Strategic Procurement... 4 Key Principles for Effective Procurement... 7 Priorities for Improving Procurement...11 Procurement
AUDIT & PERFORMANCE REVIEW COMMITTEE ON 26 TH SEPTEMBER 2007
PAGE: 1 REPORT TO: SUBJECT: BY: AUDIT & PERFORMANCE REVIEW COMMITTEE ON 26 TH SEPTEMBER 2007 ASSET MANAGEMENT CHIEF FINANCIAL OFFICER 1. REASON FOR REPORT 1.1 To provide the Audit and Performance Review
LIST OF BACKGROUND PAPERS AS REQUIRED BY LAW (papers relied on to write the report but which are not published and do not contain exempt information)
9 COMMITTEE: EXECUTIVE REF NO: E/14/43 DATE: 7 OCTOBER 2014 SUBJECT: CUSTOMER ACCESS STRATEGY 2013-16: CUSTOMER RELATIONSHIP MANAGEMENT SYSTEM (CRM) REPLACEMENT PORTFOLIO HOLDER: COUNCILLOR NEIL MACDONALD
Governing Body meeting (held in public)
ENCLOSURE: H Agenda Item: 114/15 Governing Body meeting (held in public) DATE: 30 July 2015 Title Procurement of Non Emergency Patient Transport Services (to Dartford & Gravesham Hospital Trust Non-emergency
EAST AYRSHIRE HEALTH AND SOCIAL CARE PARTNERSHIP SHADOW INTEGRATION BOARD 24 APRIL 2014
EAST AYRSHIRE HEALTH AND SOCIAL CARE PARTNERSHIP SHADOW INTEGRATION BOARD 24 APRIL 2014 PROPOSALS FOR PARTNERSHIP MANAGEMENT AND GOVERNANCE ARRANGEMENTS PURPOSE Report by Director of Health and Social
Group Procurement Policy. Policy Owner: Executive Director Finance and Resources
Group Procurement Policy Policy Owner: Executive Director Finance and Resources 0 Control Date Policy level Regulatory / Strategic Policy Reference FR/001/2012 Link to Strategy Procurement Strategy Version
DUBLIN CITY COUNCIL CORPORATE PROCUREMENT PLAN
DUBLIN CITY COUNCIL CORPORATE PROCUREMENT PLAN 2015 2017 1 CORPORATE PROCUREMENT PLAN 2015-2017 CONTENTS 1. Introduction 3 2. Objectives 4-5 3. The Procurement Plan 6 4. Implementation 7-8 5. Procurement
Procurement Strategy. Spelthorne Borough Council Environment Services
Procurement Strategy Spelthorne Borough Council Environment Services 01784 451499 Procurement Strategy The aim of this strategy is to set out a clear corporate framework to achieve the most effective method
JOB DESCRIPTION Facilities Manager Soft Services. RESPONSIBLE FOR: Team Leaders and Contract Support staff
JOB DESCRIPTION Facilities Manager Soft Services DIRECTORATE: Merlin Works DEPARTMENT: Facilities Management SALARY: 44,880 RESPONSIBLE TO: Head of Facilities Management RESPONSIBLE FOR: Team Leaders and
Asset Management Strategy (2013-2017) Doing things Differently A New Approach for a sustainable future
Asset Management Strategy (2013-2017) A New Approach for a sustainable future Contents Introduction... 2 The Asset Management Vision, Policy Statement & Strategic Themes... 5 Part B The Asset Management
Procurement Strategy for Business Critical software contract
Key Decision Report of the Corporate Director of Finance and Resources Finance and Resources Digital Services Town Hall Islington N1 2UD Officer Key Decision Date:12/01/2016 Ward(s): All Delete as appropriate
- The removal of employment and immigration from the scope of Council funded advice services.
ITEM NO. CC113 Subject: Review of Advice Services Cabinet Member: Councillor Peter Williams Portfolio Holder for Customer Services and Economic Affairs 1. RECOMMENDATIONS / DECISION REQUESTED 1.1. Members
Aura s capabilities. Schools and Academy Services
Introduction Aura is a business with a reputation for listening and delivering client requirements, we provide building consultancy, contract management, construction and facilities management. We strive
CABINET. 24 April 2012. Title: Term Contract for Maintenance, Repair and Minor Works on Security and Protection Systems
CABINET 24 April 2012 Title: Term Contract for Maintenance, Repair and Minor Works on Security and Protection Systems Report of the Cabinet Member for Finance and Education Open Report Wards Affected:
Cabinet Member for Finance and Treasury. AGENDA ITEM: Background document to item 14 Cabinet 15.12.14
Part A Report REPORT TO: Cabinet Member for Finance and Treasury AGENDA ITEM: Background document to item 14 Cabinet 15.12.14 SUBJECT: Payroll Administration and Management Services for Corporate Staff,
DECISION BOOK. The decision book is open to public inspection at the Civic Offices between 9.00 am and 5.00 pm, Mondays to Fridays.
DECISION BOOK Issue: 246 Date: 4 January 2008 Decisions set out in the book have been made under delegated powers by the Chief Executive, Corporate Directors or the Chief Finance Officer and Monitoring
AGENDA ITEM: 8 SUMMARY
AGENDA ITEM: 8 SUMMARY Report for: Housing and Community Overview and Scrutiny Committee Date of meeting: 28th January 2015 PART: 1 If Part II, reason: Title of report: Contact: Purpose of report: Recommendations
DELEGATED POWERS REPORT NO. SUBJECT: Mobile Phone Solutions Control sheet
DELEGATED POWERS REPORT NO. SUBJECT: Mobile Phone Solutions Control sheet 1593 All of the following actions MUST be completed at each stage of the process and the signed and dated report MUST be passed
CABINET. 21 October 2014. Accountable Divisional Director: Glynis Rogers, Divisional Director of Commissioning and Partnerships
CABINET 21 October 2014 Title: Re-tender of Translating and Interpreting Services Report of the Leader of the Council Open Report Wards Affected: All Report Author: Mark Tyson, Group Manager, Integration
HIGH PEAK BOROUGH COUNCIL/ STAFFORDSHIRE MOORLANDS DISTRICT COUNCIL. Report to the Joint Alliance Scrutiny Panel. 4th March 2010
AGENDA ITEM 10 HIGH PEAK BOROUGH COUNCIL/ STAFFORDSHIRE MOORLANDS DISTRICT COUNCIL Report to the Joint Alliance Scrutiny Panel 4th March 2010 TITLE: Efficiency Savings from Business Travel 2010-11 EXECUTIVE
Tunbridge Wells Borough Council Decisions taken by the Cabinet on Thursday, 25 June 2015. That the report be noted. REASON(S) FOR DECISION:
Tunbridge Wells Borough Council s taken by the Cabinet on Thursday, 25 June 2015 Part A Items considered in public 10 Annual Report on the Use of RIPA by Tunbridge Wells That the report be noted. 11 Quarter
Assets & Street Services. Business Plan 2014/15
Assets & Street Services Business Plan /15 Business Plan -15 Directorate: - Assets and Street Services Table 1: Service Activities from Corporate Plan Delivery Plan CPDP 1. Aim 2 Priority 12 By March We
Assistant Director for Human Resources
Assistant Director for Human Resources Indicative Salary Range: 90,000 to 105,000 p/a Reports to Chief Operating Officer Job Purpose The purpose of the role is to lead, manage and be accountable for the
DECISION BOOK. The decision book is open to public inspection at the Civic Offices between 9.00 am and 5.00 pm, Mondays to Fridays.
DECISION BOOK Issue: 451 Date: 2 May 2014 Decisions set out in the book have been made under delegated powers by the Managing Director, Corporate Directors or the Chief Finance Officer and Monitoring Officer,
REPORT TO: POLICY AND RESOURCES COMMITTEE ON 28TH MARCH 2007
ITEM:13 PAGE: 1 REPORT TO: POLICY AND RESOURCES COMMITTEE ON 28TH MARCH 2007 SUBJECT: BY: ASSET MANAGEMENT CHIEF FINANCIAL OFFICER 1. REASON FOR REPORT 1.1 This report provides details of progress over
Guidance on Framework Agreements
1. Introduction Guidance on Framework Agreements The purpose of this document is to provide guidance to public purchasers on the operation of framework agreements as provided for under current public procurement
ITEM 4 CABINET PROCUREMENT COMMITTEE 1 OCTOBER 2013
Wards Affected: All Wards ITEM 4 CABINET PROCUREMENT COMMITTEE 1 OCTOBER 2013 INVITATION TO TENDER PROVISION OF EXECUTIVE SEARCH AND SELECTION SERVICES (REF: CU2380) Author: Morag Shaw, Assistant Director,
Based upon the results of the council s procurement processes and officers recommendations, this report recommends to Cabinet to appoint:
b Cabinet 9 July 2012 Total Facilities Management - Procurement All Wards Cabinet Portfolio: Cabinet Member for Finance and Resources: Councillor Paul McGlone Report authorised by: Executive Director Finance
Gary Cooke, Cabinet Member for Corporate and Democratic Services
From: To: Decision No: Subject: Classification: Gary Cooke, Cabinet Member for Corporate and Democratic Services The Property Sub Committee N/A Total Facilities Management 2 nd Biannual Review Unrestricted
LOW COST HOME OWNERSHIP: PHASE 2 OF THE HRA PIPELINE PROGRAMME
LOW COST HOME OWNERSHIP: PHASE 2 OF THE HRA PIPELINE PROGRAMME Cabinet Member Cabinet Portfolio Officer Contact Papers with report Councillor Philip Corthorne Social Services, Health and Housing Paul Feven,
CHESHIRE EAST COUNCIL. Cabinet
CHESHIRE EAST COUNCIL Cabinet Date of Meeting: 8 th December 2015 Report of: Director of Adult Social Care and Independent Living Brenda Smith Subject/Title: The Quality Assurance of Care Services in Adult
Portfolio Holder Decision Making Session FUTURE MANAGEMENT OF BISHOP S CASTLE LIBRARY
Portfolio Holder Decision Making Session Portfolio Holder for Business, ip&e, Culture and Commissioning (North) Monday 21 st September, 2pm, Item 1 Public/Private FUTURE MANAGEMENT OF BISHOP S CASTLE LIBRARY
CABINET 12 JANUARY 2016 PROPOSAL FOR SOCIAL IMPACT BOND
CABINET 12 JANUARY 2016 PROPOSAL FOR SOCIAL IMPACT BOND Portfolio Holder: Report from: Author: Councillor Mike O Brien Children s Services Barbara Peacock Director of Children and Adult Services Helen
MAIDSTONE BOROUGH COUNCIL LEADER OF THE COUNCIL REPORT OF THE HEAD OF BUSINESS IMPROVEMENT
MAIDSTONE BOROUGH COUNCIL LEADER OF THE COUNCIL REPORT OF THE HEAD OF BUSINESS IMPROVEMENT Report prepared by Steve Trigg Date Issued: 16 April 2008 1. MULTIFUNCTION DEVICES AND PRINT MANAGEMENT SOFTWARE
NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013
APPENDIX 1 NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013 Page 1 of 10 1. INTRODUCTION It is widely recognised that asset management is a core component of effective
Procurement and contract management strategy
Procurement and contract management strategy Approved 2015 by Contents 1 Introduction...3 1.1 Purpose of procurement and contract management strategy 1.2 What is procurement? 1.3 What is contract management?
Property Directorate
Property Directorate POLICY INSTRUCTION MOD BUILDING REGULATIONS COMPLIANCE SYSTEM Number: PI 02/10 Property Directorate Sponsor: Ray Dickinson Date of issue: 01 Jan 14 Contact if different from Property
MS DENISE LE GAL, CABINET MEMBER FOR CHANGE AND EFFICIENCY
Item Item REVISED SURREY COUNTY COUNCIL CABINET DATE: 23 APRIL 2013 REPORT OF: LEAD OFFICER: SUBJECT: MS DENISE LE GAL, CABINET MEMBER FOR CHANGE AND EFFICIENCY LAURA LANGSTAFF, ACTING HEAD OF PROCUREMENT
7. BUSINESS CASE FOR A JOINT PROPERTY VEHICLE
Cabinet 6 March 2014 7. BUSINESS CASE FOR A JOINT PROPERTY VEHICLE Relevant Cabinet Member Relevant Officer Recommendation Mr J P Campion Director of Resources 1. The Cabinet Member with Responsibility
Asset Management. Enabling effective estates strategies >
Asset Management Enabling effective estates strategies Enabling effective estates strategies In these challenging times, we help our clients deliver strategies that contribute to the overall performance
JOB DESCRIPTION. Grade: Responsible for: Sustainable Procurement Manager Supply Chain Manager Procurement Officer
JOB DESCRIPTION Job Title: Grade: Responsible to: Head of Procurement T Financial Controller Responsible for: Sustainable Procurement Manager Supply Chain Manager Procurement Officer Penryn Campus is Cornwall's
DECISION BOOK. The decision book is open to public inspection at the Civic Offices between 9.00 am and 5.00 pm, Mondays to Fridays.
DECISION BOOK Issue: 320 Date: 18 June 2010 Decisions set out in the book have been made under delegated powers by the Chief Executive, Corporate Directors or the Chief Finance Officer and Monitoring Officer,
Update on Programme Management Controls & Risks
Committee and Date Audit Committee 26/06/14 Update on Programme Management Controls & Risks Responsible Officer George Candler Director of Commissioning e-mail: George.Candler@shropshire.gov.uk Tel: 01743